Early UE panel switching report

By enabling early panel switch detection and signaling in UE, the UE estimates potential panel changes and informs the gNB, optimizing beam alignment and reducing overhead, addressing throughput degradation in 5G networks.

JP7569931B2Active Publication Date: 2024-10-18NOKIA TECHNOLOGIES OY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
JP2023519807
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2020-09-30
Filing Date
2021-09-23
Publication Date
2024-10-18
Estimated Expiration
2041-09-23

AI Technical Summary

Technical Problem

In 5G wireless communication networks, the overhead of channel state information reference symbols (CSI-RS) and throughput degradation due to panel switching in user equipment (UE) are significant issues, particularly in mmWave frequencies, as there is no mechanism for the UE to signal upcoming panel switches to the gNB, leading to random and inefficient beam alignment.

Method used

The UE is equipped with multiple antenna panels and a processor to estimate potential panel switches based on L1 RSRP measurements, providing early panel switch detection messages to the gNB, allowing for optimized CSI-RS transmission and reducing overhead and throughput degradation.

Benefits of technology

This approach enables timely and efficient panel switching, minimizing overhead and maintaining optimal throughput by aligning beams proactively, thus enhancing network performance in 5G networks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007569931000001
    Figure 0007569931000001
  • Figure 0007569931000002
    Figure 0007569931000002
  • Figure 0007569931000003
    Figure 0007569931000003
Patent Text Reader

Abstract

The user equipment includes a plurality of antenna panels, at least one processor, and at least one memory containing computer program code configured to cause the user equipment, with the at least one processor, to: identify a potential change in an active antenna panel at the user equipment from a first antenna panel of the plurality of antenna panels to a second antenna panel of the plurality of antenna panels, and transmit at least one early panel switch detection message indicating the potential change in the active antenna panel to a base station serving the user equipment.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] One or more exemplary embodiments relate to wireless communications networks. [Background technology]

[0002] Fifth generation (5G) wireless communication networks are the next generation of mobile communication networks. Standards for 5G communication networks are currently being developed by the 3rd Generation Partnership Project (3GPP). These standards are known as 3GPP New Radio (NR) standards. Summary of the Invention

[0003] The scope of protection sought for various exemplary embodiments is indicated by the independent claims. Exemplary embodiments and / or features described herein that do not fall within the scope of the independent claims should, if any, be interpreted as examples useful for understanding the various embodiments.

[0004] One or more exemplary embodiments are based on the 3rd Generation Partnership Project New Radio (3GPP NR) standard, e.g., millimeter (mm) wave bands or higher range frequencies such as FR2.

[0005] According to an example embodiment, a user equipment (UE) can provide feedback to a gNB to enable the gNB to determine when to transmit aperiodic channel state information reference symbols (CSI-RS) on a repetitive basis for narrow beam refinement at the UE, thereby reducing CSI-RS overhead and / or reducing and / or preventing throughput degradation due to panel switching at the UE.

[0006] According to an example embodiment, the UE can estimate the likelihood of the active panel switching as well as the approximate timing of the switching based on L1 RSRP measurements in the scanning state (during the scanning period), and thus the decision to switch active panels at the UE is not random from the perspective of the UE and / or the network / gNB.

[0007] At least one example embodiment provides a user equipment comprising a plurality of antenna panels, at least one processor, and at least one memory including computer program code that causes the user equipment, with the at least one processor, to identify a potential (or alternatively, an upcoming or future) change of an active antenna panel in the user equipment from a first antenna panel of the plurality of antenna panels to a second antenna panel of the plurality of antenna panels, and transmit at least one early panel switch detection message indicating the potential change of the active antenna panel to a base station serving the user equipment.

[0008] At least one example embodiment provides a user equipment including a plurality of antenna panels, means for identifying a potential change in an active antenna panel at the user equipment from a first antenna panel of the plurality of antenna panels to a second antenna panel of the plurality of antenna panels, and means for transmitting at least one early panel switch detection message indicating the potential change in the active antenna panel to a base station serving the user equipment.

[0009] At least one example embodiment provides a method that includes identifying a potential change in an active antenna panel at a user equipment from a first antenna panel of a plurality of antenna panels to a second antenna panel of the plurality of antenna panels, and transmitting at least one early panel switch detection message indicating the potential change in the active antenna panel to a base station serving the user equipment.

[0010] At least one other example embodiment is a non-transitory computer-readable medium including computer-executable instructions that, when executed by at least one processor in the user equipment, cause a user equipment to perform a method including identifying a potential change in an active antenna panel in the user equipment from a first antenna panel of a plurality of antenna panels to a second antenna panel of the plurality of antenna panels; and transmitting at least one early panel switch detection message indicating the potential change in the active antenna panel to a base station serving the user equipment.

[0011] According to an example embodiment, the at least one memory and computer program code may be configured to, with the at least one processor, cause the user equipment to switch an active antenna panel from a first antenna panel of the plurality of antenna panels to a second antenna panel of the plurality of antenna panels.

[0012] The at least one early panel switch detection message includes at least one of: (i) a difference between a first received signal power for a first antenna panel of the multiple antenna panels and a second received signal power for a second antenna panel of the multiple antenna panels; (ii) an estimated time until the active antenna panel switches from the first antenna panel of the multiple antenna panels to the second antenna panel of the multiple antenna panels; (iii) an indication of a selected downlink reference signal for the second antenna panel of the multiple antenna panels; or (iv) an indication of a number of transmit beams for the second antenna panel of the multiple antenna panels.

[0013] The at least one memory and computer program code cause, with the at least one processor, the user equipment to perform the steps of estimating a difference between a first received signal power for a first antenna panel of the plurality of antenna panels and a second received signal power for a second antenna panel of the plurality of antenna panels based on the received signal block, and identifying a potential change in active antenna panels at the user equipment based on the estimated difference.

[0014] The at least one memory and computer program code, with the at least one processor, cause the user equipment to identify a potential change in an active antenna panel in the user equipment in response to the estimated difference being less than a panel switch threshold.

[0015] The at least one memory and computer program code, with the at least one processor, cause the user equipment to perform the steps of determining that the estimated difference is less than a panel switch threshold and, in response to determining that the estimated difference is less than the panel switch threshold, calculating a panel switch delay. The at least one early panel switch detection message may include a panel switch delay.

[0016] The at least one early panel switch detection message may be transmitted via L1 signaling or L2 signaling.

[0017] The at least one early panel switch detection message may be at least one physical uplink shared channel message.

[0018] The at least one physical uplink shared channel message may be an Uplink Control Information (UCI) message transmitted via L1 signaling or a MAC control element transmitted via L2 signaling.

[0019] The at least one early panel switch detection message may include an uplink control information (UCI) message transmitted on a physical uplink control channel via L1 signaling.

[0020] The at least one memory and computer program code cause, with the at least one processor, to perform the steps of transmitting, to the user equipment, a scheduling request for transmitting at least one early panel switch detection message, and transmitting, in response to a scheduling grant transmitted in response to the scheduling request, the at least one early panel switch detection message.

[0021] The at least one memory and computer program code may be configured, with the at least one processor, to cause the user equipment to periodically transmit at least one early panel switch detection message, each early panel switch detection message may include either (i) a difference between a first received signal power for a first antenna panel of the multiple antenna panels and a second received signal power for a second antenna panel of the multiple antenna panels, or (ii) an estimated time until an active antenna panel changes from the first antenna panel of the multiple antenna panels to a second antenna panel of the multiple antenna panels.

[0022] At least one example embodiment provides a radio access network element comprising at least one processor and at least one memory including computer program code that, with the at least one processor, causes the radio access network element to perform the steps of receiving at least one early panel switch detection message indicating a potential upcoming change of an active antenna panel at a user equipment from a first antenna panel to a second antenna panel, and repeatedly transmitting a reference signal to the user equipment based on the received at least one early panel switch detection message.

[0023] At least one example embodiment may include a radio access network element including means for receiving at least one early panel switch detection message indicating a potential upcoming change of an active antenna panel at a user equipment from a first antenna panel to a second antenna panel, and means for repeatedly transmitting a reference signal to the user equipment based on the received at least one early panel switch detection message.

[0024] At least one other example embodiment may provide a method that includes receiving at least one early panel switch detection message indicating a potential upcoming change of an active antenna panel at a user equipment from a first antenna panel to a second antenna panel, and repeatedly transmitting a reference signal to the user equipment based on the received at least one early panel switch detection message.

[0025] At least one other example embodiment is a non-transitory computer-readable storage medium storing computer-executable instructions that, when executed by at least one processor in a radio access network element, cause the radio access network element to perform a method of receiving at least one early panel switch detection message indicating a potential upcoming change of an active antenna panel at a user equipment from a first antenna panel to a second antenna panel, and repeatedly transmitting a reference signal to the user equipment based on the received at least one early panel switch detection message.

[0026] According to an example embodiment, the at least one early panel switch detection message includes: (i) a difference between a first received signal power for the first antenna panel and a second received signal power for the second antenna panel; (ii) an estimated time until the active antenna panel changes from the first antenna panel to the second antenna panel; (iii) an indication of a selected downlink reference signal for the second antenna panel at the radio access network element; or (iv) an indication of a number of transmit beams for the second antenna panel. It may include any of the following.

[0027] The at least one early panel switch detection message may be received via L1 signaling or L2 signaling.

[0028] The at least one early panel switch detection message may be at least one uplink control information (UCI) message transmitted via L1 signaling on the physical uplink shared channel or the physical uplink control channel, or at least one MAC control element transmitted on the physical uplink shared channel via L2 signaling.

[0029] The at least one memory and computer program code may be configured, with the at least one processor, to cause the radio access network element to transmit a scheduling grant in response to a scheduling request for transmitting at least one early panel switch detection message.

[0030] The at least one memory and computer program code, using the at least one processor, cause the radio access network element to perform the steps of determining an estimated time when an active antenna panel is scheduled to be changed from a first antenna panel to a second antenna panel based on the at least one early panel switch detection message, and repeatedly transmitting a reference signal based on the estimated time.

[0031] The at least one early panel switch detection message includes a plurality of early panel switch detection messages. The at least one memory and computer program code can be configured, with the at least one processor, to cause the radio access network element to determine an estimated time for an active antenna panel to change from a first antenna panel to a second antenna panel based on the plurality of early panel switch detection messages. [Brief description of the drawings]

[0032] Example embodiments will become more fully understood from the following detailed description and the accompanying drawings, in which like elements are represented by like reference numerals, which are given for purposes of illustration only and therefore are not intended to limit the disclosure.

[0033] [Figure 1] 1 illustrates an example radiation pattern for a hypothetical multi-panel user equipment (MPU). [Diagram 2] 4 shows example radiation patterns for other MPUE assumptions where multiple panels are simultaneously active. [Diagram 3] 1 illustrates an exemplary beam alignment procedure. [Figure 4] FIG. 13 illustrates an example timing diagram for panel switch control in the UE. [Diagram 5] 13 shows an example of beam alignment delay at the UE. [Figure 6] 1 shows an example of multiple UEs performing successive narrow beam sweeps in succession. [Figure 7] FIG. 1 is a schematic diagram of early panel switch detection and subsequent panel switch in a UE in accordance with an example embodiment. [Figure 8A] 1 is a flowchart illustrating a method according to an example embodiment. [Figure 8B] 10 is a flowchart illustrating another method according to an example embodiment. [Figure 9] 10 is a flowchart illustrating yet another method according to an example embodiment. [Figure 10] 13 illustrates an exemplary message structure for a next panel switch notification message, according to an exemplary embodiment. [Figure 11] 1 illustrates an example message structure including a vector of values ​​in a Media Access Control (MAC) Control Element (MAC CE) container, according to an example embodiment. [Figure 12] To illustrate an example embodiment, a simplified diagram of a portion of a 3rd Generation Partnership Project (3GPP) New Radio (NR) access deployment is shown. [Figure 13] 1 shows a block diagram illustrating an example embodiment of a UE. [Figure 14] FIG. 1 is a signal flow diagram illustrating a four-step RACH approach according to an exemplary embodiment. [Figure 15] FIG. 1 is a signal flow diagram illustrating a two-step RACH approach according to an exemplary embodiment.

[0034] It should be noted that these figures are intended to illustrate the general features of methods, structures, and / or materials utilized in some exemplary embodiments, as well as to supplement the descriptions provided below. However, these figures are not to scale, may not precisely reflect the exact structure or performance characteristics of any given embodiment, and should not be construed as defining or limiting the range of values ​​or properties encompassed by the exemplary embodiments. The use of similar or identical reference numbers in the various figures is intended to indicate the presence of similar or identical elements or features. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0035] Various exemplary embodiments will now be described more fully with reference to the accompanying drawings, in which several exemplary embodiments are shown.

[0036] Detailed exemplary embodiments are disclosed herein. However, the specific structural and functional details disclosed herein are merely representative for purposes of describing the exemplary embodiments. However, the exemplary embodiments may be embodied in many alternative forms and should not be construed as being limited to only the embodiments described herein.

[0037] It is to be understood that there is no intention to limit the example embodiments to the particular forms disclosed. On the contrary, the example embodiments are intended to encompass all modifications, equivalents, and alternatives falling within the scope of this disclosure. Like numbers refer to like elements throughout the description of the figures.

[0038] Although one or more exemplary embodiments may be described in terms of a wireless network element (e.g., a gNB), a user equipment (UE), etc., it should be understood that one or more exemplary embodiments described herein may be performed by one or more processors (or processing circuitry) in an applicable device. For example, according to one or more exemplary embodiments, at least one memory may include or store computer program code, and the at least one memory and the computer program code may be configured, with the at least one processor, to cause the wireless network element (or user equipment) to perform operations described herein.

[0039] As discussed herein, the terms "one or more" and "at least one" may be used interchangeably.

[0040] As described herein, a gNB may also be referred to as a base station, an access point, an enhanced Node B (eNodeB), or more generally, a radio access network element or network node. A UE may also be referred to herein as a mobile station and may include a mobile phone, a cell phone, a smartphone, a handset, a personal digital assistant (PDA), a tablet, a laptop computer, a phablet, etc.

[0041] It will be understood that several exemplary embodiments may be used in combination.

[0042] The frequency bands may include millimeter wave (mmWave) (e.g., FR2) or higher range frequencies, and the UE may be equipped with a panel of directional antenna arrays supporting beam steering.

[0043] Many different types of multi-panel arrangements, positions, and orientations have been proposed and studied in the 3rd Generation Partnership Project (3GPP). One exemplary edge design includes three to four panels placed on each edge of a UE, such as a smartphone.

[0044] For multi-panel deployments, 3GPP proposes different types of multi-panel UE (MPU) assumptions to support one active panel at a time and all panels active simultaneously. Specifically, 3GPP proposes three types of MPUE assumptions: MPUE-Assumption 1 (MPUE1): Multiple panels are implemented on the UE and only one panel is activated at a time. MPUE-Assumption 2 (MPUE2): Multiple panels are implemented on the UE, multiple panels may be activated simultaneously, and one or more panels may be used for transmission simultaneously. MPUE-Assumption 3 (MPUE3): Multiple panels are implemented on the UE and multiple panels may be activated at one time, but only one panel may be used for transmission at a time.

[0045] Figure 1 shows an example radiation pattern for MPUE-Assumption MPUE1, where only one panel is active at a time, and Figure 2 shows example radiation patterns for MPUE assumptions MPUE2 and MPUE3, where multiple panels are simultaneously active at a given time.

[0046] The discussion herein focuses on UEs supporting MPUE assumptions MPUE1 and MPUE3, with one panel being used for transmission at a time, however, example embodiments should not be limited to only the example embodiments discussed herein.

[0047] 3GPP standard 3GPP TS38.300 describes the input selection for two states of active panel selection in a UE: scanning state and active state. The panel scanning state occurs during SSB burst reception (scanning period) in the UE. The active state occurs during all other reception of control and data channels.

[0048] During the scanning state (while receiving SSB bursts), the UE measures the L1 reference signal received power (RSRP) for each panel relative to the best beam from the gNB, compares the measured L1 RSRP for the best beam in each panel, and identifies the panel with the highest L1 RSRP as the panel in the active state (active panel).

[0049] On the gNB / network side, a beam alignment procedure is utilized to obtain the perfect beam gain between the gNB and the designated active panel in the UE. This procedure relies on a three-step approach including steps P1, P2 and P3.

[0050] Step P1 is based on periodic SSB burst transmissions of coarse gNB beams with a recommended periodicity of approximately 20 ms.

[0051] Step P2 is based on CSI-RS for narrow beam refinement in the gNB.

[0052] Step P3 is based on iterative CSI-RS for narrow beam refinement in the UE (CSI-RS with repetition).

[0053] 3 shows each of steps P1, P2, and P3 with the associated antenna beam alignment gain for beams b1, b2, b3, b4 at the UE. A prerequisite for narrow beam sweeping at the UE (UE receive (RX) beam refinement / training to panel) (step P3) is that the UE maintains the same active panel.

[0054] In the example shown in FIG. 3, the downlink (DL) L1 RSRP at the UE may experience a step of gain of approximately 6 dB with respect to completed steps P2 and P3, resulting in a total gain of approximately 12 dB.

[0055] As also noted above, during an SSB burst transmission, the UE monitors its panels and activates the panel with the highest L1 RSRP (also above the active panel switch threshold) during data transmission for reception of an (e.g., DL) transmission such as a physical downlink shared channel (PDSCH). If the UE detects that the L1 RSRP of the inactive (target) panel is greater than the L1 RSRP of the current active panel (and is greater than the active panel switch threshold), the UE makes the target panel the active panel for the next data transmission period.

[0056] An example of this panel switch control timing is shown in Figure 4, which shows both the scan state and the active state during an SSB burst. During the scan state (SSB burst), the UE scans for the best panel to designate as the active panel for the active state during the SSB-Burst. In Figure 4, the UE determines that the best panel has changed based on the third (right-most) SSB burst, and therefore a different best panel is subsequently designated as the active panel.

[0057] Conventionally, there is no mechanism for the UE to signal the next (potential) switch in the active panel at the UE to the gNB so that the panel switch does not appear random (e.g., at the gNB). Rather, the UE may either apply a wide low gain beam in the new best active panel or utilize a narrow beam sweep with periodic non-zero power channel state information reference symbols (NZP-CSI-RS) with a periodicity of about 10 ms.

[0058] With respect to applying wide low gain beams to the new best panels, this can result in the known 6 dB worse performance for a 4 patch array and 9 dB worse performance for an 8 patch array, both in the uplink (UL) and DL.

[0059] For narrow beam sweeping with periodic NZP-CSI-RS, beam alignment may be relatively slow and may result in additional overhead. In addition, even if the UE is configured to decode periodic tracking reference symbols (TRS), each TRS resource has two symbols, and the UE is not expected to perform RX beam refinement from the TRS since it needs to use the TRS to update the channel estimation filter (e.g., to estimate the average delay, delay spread, Doppler spread, etc.). A numerical example is a UE with a set of eight narrow beams, and a 3-tap L1 FIR filter requires 8×3=24 samples with a separation of about 10 ms, giving a total of about 240 ms, to perform a complete narrow beam sweep after panel switching, even without RX beam refinement.

[0060] Furthermore, during UE narrow beam sweeping, transmitted and received data and control messages risk being further degraded by more than about 6dB-9dB for a misaligned narrow UE beam. In this case, the UE may report on a different channel (as the beam is changing) and the gNB may incorrectly adapt, for example, power control commands and / or modulation schemes.

[0061] FIG. 5 illustrates an example case in which delays in beam alignment at a UE using NZP-CSI-RS may result in poor link performance at the UE.

[0062] As shown in Figure 5, if the gNB is notified of the panel switch at the UE after the panel switch is enabled, there will be a long period of time when the narrow beam is not aligned at the UE. From the time the panel switch occurs at the UE until the establishment of the P3 aligned beam, a relatively poor suboptimal UL beam pattern is used at the UE (e.g., at least 6 dB worse than that of the aligned P3 UL beam). This delay may therefore degrade throughput and / or performance.

[0063] For example, the problem with UE narrow beam alignment may further increase when more active UEs are switching panels in the same serving cell, since each UE needs NZP-CSI-RS to perform narrow beam sweep after panel switching. In the case of mmWave implementation, the gNB panel may only utilize one active beam at a time (e.g., analog beamforming architecture), and thus the CSI-RS resources are time-division multiplexed, which may generate overhead proportional to the number of independent gNB beams serving an increasing number of UEs. The gNB may decide to transmit additional aperiodic NZP-CSI-RS with "repeat on" to assist the UEs in narrow beam alignment, but has no clear way to give higher priority to UEs that need narrow beam alignment more, which may further increase the delay for each UE to perform accurate narrow beam scanning, thereby degrading throughput.

[0064] FIG. 6 shows the successive narrow beam sweeping (steps P2 and P3) for multiple UEs MT1, MT2 and MT3 in more detail.

[0065] As shown in Figure 6, the narrow beam sweeps (steps P2 and P3) for UEs MT1, MT2, and MT3 are performed sequentially. As a result, the time delay Δt for completing the narrow beam sweeps for each of UEs MT2 and MT3 is delayed, which in turn may delay these UEs from completing P3 beam alignment, thereby degrading the throughput for each of UEs MT2 and MT3.

[0066] Exemplary embodiments provide a mechanism for early detection (pre-detection) of a potential switch in an active panel at a UE (sometimes referred to as early panel switch detection). Once detected, the UE can signal this early panel switch detection to the gNB. In response to the early panel detection, the gNB can trigger a CSI-RS with iterations for narrow beam sweeping at the appropriate time, for example, to mitigate throughput degradation at the UE.

[0067] FIG. 7 illustrates an example of early panel switch detection and subsequent panel switch in a UE, in accordance with an example embodiment.

[0068] Referring to FIG. 7, in this example, the current active panel may be UE panel 3 and the target panel may be UE panel 0. As shown, at time tEPS, the UE detects a potential panel switch from UE panel 3 to UE panel 0 and reports the potential panel switch to the gNB. Then, at time tS, the UE switches the active panel from UE panel 3 to UE panel 0 when the L1-RSRP of UE panel 0 exceeds the L1-RSRP of UE panel 3 with a relative gap larger than a panel switch threshold (e.g., about 3 dB). In this case, the time from tEPS (early panel detection) to tS (panel switch) is about 2.5 seconds.

[0069] FIG. 12 is a simplified diagram of a portion of a 3rd Generation Partnership Project (3GPP) New Radio (NR) access deployment to explain an example embodiment in more detail.

[0070] Referring to FIG. 12, a 3GPP NR radio access deployment includes a gNB 102 having transmit and receive points (TRPs) 102A, 102B, 102C. Each TRP 102A, 102B, 102C may be, for example, a remote radio head (RRH) or a remote radio unit (RRU) including at least, for example, a radio frequency (RF) antenna (or antennas) or antenna panel and a radio transceiver for transmitting and receiving data within a geographic area. In this regard, the TRPs 102A, 102B, 102C provide cellular resources for user equipment (UE) (e.g., UE 106) within the geographic coverage area. In some cases, baseband processing may be split between the TRPs 102A, 102B, 102C and the gNB 102 in a fifth generation (5G) cell. Alternatively, the baseband processing may be performed in the gNB 102. In the example shown in Figure 12, the TRPs 102A, 102B, 102C are configured to communicate with the UE 106 via one or more transmit (TX) / receive (RX) beam pairs. The gNB 102 communicates with a core network, referred to as the New Core in 3GPP NR.

[0071] The TRPs 102A, 102B, 102C may have independent schedulers, or the gNB 102 may perform joint scheduling between the TRPs 102A, 102B, 102C.

[0072] Although only a single UE 106 is shown in FIG. 12, the gNB 102 and the TRPs 102A, 102B, 102C may provide communication services to a relatively large number of UEs within the coverage areas of the TRPs 102A, 102B, 102C. For clarity of the exemplary embodiment, communication services (including transmission and reception of wireless signals) are described as between the gNB 102 and the UE 106. However, it should be understood that signals may be transmitted between the UE 106 and one or more of the TRPs 102A, 102B, 102C.

[0073] The UE 106 includes multiple panels 1062, 1064, 1066, 1068 for transmitting and receiving data to and from the gNB 102 on the UL and DL. Although only four antenna panels are shown in FIG. 12, exemplary embodiments should not be limited to this example. Exemplary functionality and operation of the UE 106 are described in more detail below.

[0074] In the following description, it is assumed that only one of the multiple panels 1062, 1064, 1066, 1068 is active at a time for reception of DL transmissions (e.g., Physical Downlink Shared Channel (PDSCH)) at the UE 106. The active panel is also considered to be the currently best panel (the panel having the beam with the highest L1 RSRP measured during the most recent SSB burst). However, the exemplary embodiments should not be limited to this example. Furthermore, although the exemplary embodiments may be discussed with respect to DL transmissions, the exemplary embodiments should not be limited to this example. Rather, the exemplary embodiments may be equally applicable to UL transmissions from the UE 106 to the gNB 102.

[0075] In the scan state (while receiving SSB bursts), the UE 106 measures the L1 RSRP for the best beam from the gNB 102 for each panel. The UE 106 then performs early panel switch detection based on the highest measured L1 RSRP for each panel (e.g., based on a comparison between them). When the UE 106 determines that the measured L1 RSRP of the target panel exceeds the measured L1 RSRP of the current active panel (e.g., based on a comparison of the measured L1 RSRP for each panel obtained in a subsequent scan state), the UE 106 switches the active panel (e.g., makes the target panel the active panel) and communicates with the gNB 102.

[0076] The UE 106 may perform early panel switch detection by detecting when the difference between the highest L1 RSRP (for an active panel) and the next highest L1 RSRP (for a non-active or target panel) falls below a threshold for early panel switch detection at the UE. As described herein, the difference between the highest L1 RSRP (for an active panel) and the next highest L1 RSRP may be referred to as a panel switch gap (PSG). The threshold for early panel switch detection at the UE 106 may be referred to herein as a PSG threshold and may be implementation specific or configurable by the network or network operator (e.g., based on empirical evidence and / or data).

[0077] Upon detecting a potential next panel switch at the UE 106, the UE 106 may send (or signal) one or more next panel switch notification messages to the gNB 102.

[0078] In one example, the next panel switch notification message may include, among other things, a PSG (sometimes referred to herein as a PSG technique). In another example, the next panel switch notification message may include, among other things, a time to switch (TTSP) (sometimes referred to herein as a TTSP technique) indicating an estimated time that the UE may switch the active panel. This estimate may be in the form of an indication of the number of subframes before a panel switch occurs. An example format of the next panel switch notification message is described below.

[0079] In one example, the next panel switch notification message (signaling) may be sent periodically (e.g., only) after the PSG falls below the PSG threshold. In this case, the UE may provide multiple / repeated (e.g., periodic) next panel switch notification messages, each including an updated PSG and / or TTSP, starting after the PSG falls below the PSG threshold. The gNB 102 may then determine when to expect a panel switch to occur (panel switch timing) based on the information included in the next panel switch notification message from the UE 106.

[0080] The gNB 102 may estimate the panel switch timing in any suitable manner, which may be implementation specific. For example, the size of the PSG included in the next panel switch notification message may indicate that a switch between active panels is imminent, and the gNB 102 may utilize linear interpolation with extrapolation to intelligence built into the gNB 102 using some predictive filter (Kalman), artificial intelligence (AI), or other known methods to estimate the panel switch timing.

[0081] The gNB 102 may then send CSI-RS along with an iteration for narrow beam alignment of the new active panel at the UE 106 based on the time that the panel switch is expected to occur.

[0082] In another example, the UE 106 may transmit a single next panel switch notification message including the PSG and / or TTSP. In this example, the gNB 102 may determine when to expect a panel switch at the UE 106 based on the next panel switch notification message. In this case, the gNB 102 may also transmit CSI-RS along with an iteration for narrow beam alignment of the new active panel at the UE 106 based on the time the panel switch is expected to occur.

[0083] The next panel switch notification message may further include the preferred TX beam from the gNB 102, the number of received RX beams for the newly active panel, and / or the number of iterations required to perform alignment (depending on which panel the UE is switching to), if the preferred TX beam is different from the current serving beam for the UE 106. The gNB 102 may take this additional information into account in subsequent actions, such as aperiodic UE narrow beam refinement (step P3 discussed above). In providing the preferred TX beam from the gNB 102, the UE 106 may determine whether to include the preferred TX beam based on a network configured threshold or based on a specification. In one example, the configured threshold may be approximately 1, 2, or 3 dB.

[0084] The dynamic indication of the number of RX beams for a new active panel from the UE 106 may enable the gNB 102 to improve and / or optimize the number of CSI-RS iterations for the UE 106. Note that the panels at a UE do not all need to be the same size and have the same number of supported beams. Rather, a UE may be equipped with different panel sizes and correspondingly different numbers of supported beams.

[0085] On the network side, as also described above, the gNB 102 estimates when a potential panel switch may occur at the UE 106 based on one or more subsequent panel switch notification messages, and then transmits CSI-RS with repetitions for narrow beam refinement at the UE 106 at an appropriate time based on the estimated time when the potential panel switch may occur. The gNB 102 may transmit the CSI-RS repetitions after a panel switch is made at the UE 106. In one example, the gNB 102 may have built-in intelligence that utilizes feedback from the UE 106 to estimate the appropriate timing of the CSI-RS repetitions. In this regard, the gNB 102 may estimate the appropriate timing of the CSI-RS repetitions in any suitable manner.

[0086] Methods for early panel switch detection and narrow beam refinement will now be discussed in more detail with respect to FIGS.

[0087] 8A is a flow chart illustrating a method for early panel switch detection in a UE, according to an example embodiment. For illustrative purposes, the example embodiment shown in FIG. 8A is discussed with respect to a 3GPP NR deployment as shown in FIG. 12. However, the example embodiment should not be limited to this example.

[0088] 8A, at S802, the UE 106 receives configuration information regarding early panel switch detection and reporting from the gNB 102. According to an example embodiment, the configuration information may include a report type (e.g., aperiodic, periodic, etc.), as well as threshold and value types, and types of data to be reported (e.g., dB, subframe offset, both, etc.). In one example, the configuration information may be transmitted from the gNB 102 to the UE 106 via radio resource control (RRC) signaling.

[0089] With respect to RRC signaling, the configuration information may be transmitted using a structure similar to the CSI report. In one example, the gNB 102 may configure the report type (e.g., aperiodic, periodic, etc.) as well as the threshold and value type and type of data to be reported (e.g., dB, subframe offset, both, etc.).

[0090] An example structure for an RRC message containing configuration information is shown below: In this example, the type of data reported includes both dB and subframe offset information. EPS-ReportConfig::=SEQUENCE{} ReportConfigId EPS-ReportConfigId Carrier ServCellIndex OPTIONAL ResourceForChannelMeasurement EPS-ResourceConfigId ReportConfigType CHOICE periodic array { reportSlotConfig EPS-ReportPeriodicityAndOffset, }, semiPersistentOnPUCCH SEQUENCE{ reportSlotConfig EPS-ReportPeriodicityAndOffset, }, semiPersistentOnPUSCH SEQUENCE{ reportSlotConfig ENUMERATED{sl5,sl10,sl20,sl40,sl80,sl160,sl320} reportSlotOffsetList SEQUENCE(SIZE(1..maxNrofUL-Allocations))OF INTEGER(0.32) }, Non-periodic arrays reportSlotOffsetList SEQUENCE(SIZE(1..maxNrofUL-Allocations)) OF INTEGER(0.32) } }, reportQuantity CHOICE No NULLs, DB value NULL, Slotoffset value NULL }, }

[0091] The exemplary embodiments should not be limited to the exemplary RRC messages described above.

[0092] Referring further to FIG. 8A, in response to receiving an SSB burst in the scan state in step S804, UE 106 calculates (or estimates) the PSG between the current active panel (the panel having the highest L1 RSRP of the beams) and the panel having the next highest L1-RSRP in step S806. As described above, the PSG (also referred to as the delta panel RSRP gap) is the difference between the L1 RSRP of the best (active) panel and the L1 RSRP of the second strongest panel at UE 106.

[0093] In step S808, UE 106 determines whether the PSG is less than the PSG threshold by comparing the PSG with the PSG threshold. In one example, the PSG threshold can be about 5 dB and can be configured by the network or network operator based on empirical evidence.

[0094] If UE 106 determines that the PSG is not less than the PSG threshold (PSG ≧ PSG threshold), the process returns to step S804 and UE 106 waits for the next SSB burst.

[0095] Returning to step S808, if the PSG is less than the PSG threshold (PSG < PSG threshold), in step S810, UE 106 transmits one or more next panel switch notification messages (also referred to as early panel switch detection messages or indications) to gNB 102. Thereafter, the process returns to step S804 and waits for the next SSB burst from gNB 102.

[0096] As also described above, in step S810, the UE 106 may periodically transmit one or more next panel switch notification messages after the PSG falls below the PSG threshold. In this case, the UE 106 may provide multiple / repeated (e.g., periodic) next panel switch notification messages, each including an updated PSG, starting after the PSG falls below the PSG threshold. In another example, the UE 106 may transmit a one-off panel switch notification message to the gNB 102 after detecting that the PSG falls below the PSG threshold.

[0097] 8B is a flow chart illustrating another method for early panel switch detection in a UE, according to an example embodiment. For illustrative purposes, similar to FIG. 8A, the example embodiment shown in FIG. 8B is discussed with respect to the 3GPP NR deployment shown in FIG. 12. However, the example embodiment should not be limited to this example.

[0098] Referring to Figure 8B, each of steps S802, S804, S806, and S808 is the same as that described above with respect to Figure 8A, and therefore will not be described in detail here.

[0099] According to at least the exemplary embodiment shown in FIG. 8B, upon determining that the PSG is less than the PSG threshold, in step S910, the UE 106 calculates a switch estimated time (TTSP) for a potential next panel switch at the UE 106 (also referred to herein as a panel switch delay).

[0100] In one example, and referring again to Figure 7, for example, the UE 106 includes a panel switch threshold that can calculate the TTSP by predicting when the slope of the L1-RSRP of the new best panel (e.g., panel 0 in Figure 7) will cross the L1-RSRP of the current best panel (e.g., panel 3 in Figure 7). This prediction by the UE 106 may be based on signal processing for slope crossing prediction.

[0101] In one example, the TTSP may be in the form of a number of subframes until a potential panel switch is to occur at the UE 106.

[0102] In step S911, the UE 106 transmits one or more next panel switch notification messages to the gNB 102. The UE 106 may send the one or more next panel switch notification messages to the gNB 102 in the same or substantially the same manner as discussed above with respect to step S810 of FIG. 8A, except that the next panel notification messages include a TTSP (e.g., in addition to a PSG).

[0103] The process then returns to step S804 and continues as discussed above.

[0104] Although not shown in FIG. 8B, the UE 106 may include tracking the TTSP and decrementing the countdown of the panel switch delay in one or more panel switch notification messages sent periodically to the gNB 102.

[0105] According to one or more exemplary embodiments, the UE 106 may send one or more upcoming panel switch notification messages (e.g., including a PSG and / or a TTSP) to the gNB 102 via L1 or L2 signaling. In one example, the early panel switch notification message may be communicated using a dedicated / shared periodic (or semi-persistent) physical uplink control channel (PUCCH) resource. In another exemplary embodiment, the early panel switch notification message may be communicated using a conditional grant (CG) resource in the form of uplink control information (UCI) on the PUSCH resource, or a periodic PUSCH resource, such as a UL MAC Control Element (CE) transmitted over the PUSCH resource.

[0106] The above information elements or structures may be signaled using L1 signaling on a portion of the UCI multiplexed on the dedicated / shared (or semi-persistent) PUCCH resources or PUSCH. If the UE 106 does not have PUCCH or PUSCH resources for the information element signaling, the UE 106 may initiate a procedure to request PUSCH resources using either a Scheduling Request (SR) or a RACH procedure as discussed in more detail below. According to at least one example embodiment, the UE 106 may configure specific SR resources for the next panel switch notification message, if necessary.

[0107] Regarding L2 signaling, the payload of the next panel switch notification message may be a two-field container designed to include PSG (e.g., up to 3 bits to indicate values ​​between 0 dB and 3 dB with 0.5 dB granularity) and slot_offset / subframe_offset (e.g., up to 3 bits to indicate values ​​between sl5 and sl40). The device ID (e.g., C-RNTI (Cell-Radio Network Temporary Identifier) ​​to uniquely identify the device) may be implicit (by having dedicated uplink resources to carry signaling / indications) or may be included in the payload.

[0108] As mentioned above, the next panel switch notification message may be a MAC CE. In this example, a reserved bit may indicate that the payload includes a PSG or slot_offset / subframe_offset values ​​or both. A timestamp may be given with a frame number offset, subframe number offset, or slot offset. The next panel switch notification message may also include a power value for reference (e.g., L1-SINR or RSRP). Although discussed separately, any combination of the above is also possible depending on the reporting configuration, and the C-RNTI may also be part of the payload.

[0109] FIG. 10 illustrates an exemplary message structure for a next panel switch notification message, according to an exemplary embodiment.

[0110] More specifically, FIG. 10 shows an example MAC CE message structure including PSG (dB_value), slot offset (slot_offset), DL RSRP, and C-RNTI.

[0111] In a more predictable scenario, the UE 106 may also send a vector of values ​​as the next panel switch notification message. In this case, the UE 106 may send the vector within a MAC CE container.

[0112] FIG. 11 illustrates an example message structure including a vector of values ​​in a MAC CE container.

[0113] 11, the payload of the MAC CE container may include a vector of PSG values ​​(dB_value1, dB_value2, ..., dB_value3), a vector of slot offsets (slot_offset1, slot_offset2, ..., slot_offset3), a vector of RSRP values ​​(DL RSRP1, DL RSRP2, ..., DL RSRP3), and a device ID (C-RNTI). For the next panel switch notification message including the TTSP, the value may be associated with a time index (e.g., slot offset). Although described with respect to the device ID, example embodiments may also incorporate a panel ID (e.g., instead of the device ID).

[0114] Further referring to the L2 signaling example, if no scheduling grant is provided to send the next panel switch notification message to the gNB 102, the UE 106 may send an SR indicating that the UE 106 has data (e.g., PSG and / or TTSP) to transmit and send via L2 signaling. The gNB 102 may output a scheduling grant to the UE 106 to transmit the next panel switch notification message. The UE 106 may then transmit the next panel switch notification message on the scheduled resource. The SR is transmitted at PHY rate, which may be beneficial, for example, when the UE 106 is rotating or the channel is changing (e.g., very rapidly). Alternatively, the UE 106 may transmit the next panel switch notification message on the PUCCH in formats 2, 3, and 4 so as not to be bit limited.

[0115] In yet another example, the UE 106 may send the next panel switch notification message as the payload of a RACH message. In one example, the UE 106 may send the next panel switch notification message as the payload of Msg3 in a four-step RACH approach, or on the PUSCH of MsgA in a two-step RACH approach. Since the four-step and two-step RACH approaches are commonly known, only a brief discussion is provided.

[0116] Figure 14 is a signal flow diagram illustrating a four-step RACH approach according to an exemplary embodiment.Figure 15 is a signal flow diagram illustrating a two-step RACH approach according to an exemplary embodiment.

[0117] Referring to FIG. 14, as shown, Msg3 containing the next panel switch notification message is sent during contention resolution in the four-step RACH approach.

[0118] Referring to FIG. 15, as shown, Msg A on PUSCH containing the next panel switch notification message is transmitted during the RAR window and contention resolution in the two-step RACH approach.

[0119] An example operation of gNB102 according to an example embodiment will now be described with respect to FIG.

[0120] 9 illustrates a method for narrow beam alignment in response to early panel switch detection in a UE, according to an example embodiment. For illustrative purposes, the example embodiment shown in FIG. 9 is discussed with respect to a 3GPP NR deployment shown in FIG. 12. However, the example embodiment should not be limited to this example.

[0121] 9, in step S1002, the gNB 102 transmits configuration information to the UE 106. The configuration information is the same as that described above with respect to step S802 of Figures 8A and 8B.

[0122] In step S1004, the gNB102 transmits an SSB burst to the UE106.

[0123] In step S1006, the gNB 102 determines whether at least one next panel switch notification message has been received from the UE 106 in response to the SSB burst transmitted in step S1004.

[0124] If at least one next panel switch notification message has not been received from the UE 106, the process returns to step S1004 and the gNB 102 waits for the next scan state to output the next SSB burst.

[0125] Returning to step S1006, if the gNB102 receives at least one next panel switch notification message, in step S1008, the gNB102 estimates the time when a potential panel switch should occur in the UE106 based on the PSG and / or TTSP included in the next panel switch notification message.

[0126] If the at least one next panel switch notification message includes a TTSP, the gNB 102 can determine a time when a potential panel switch may occur based on the TTSP included therein, which may be in the form of a number of subframes (e.g., 8, 5, 2, etc.). In another example, if the at least one next panel switch notification message includes a PSG (without a TTSP), the gNB 102 can determine when a potential panel switch may occur based on the PSG included in the at least one next panel switch notification message from the UE 106. In one example, the gNB 102 can determine when a potential panel switch may occur based on the PSG values ​​and associated timestamps included in the three most recent next panel switch notification messages from the UE 106. As mentioned above, the gNB 102 can estimate the panel switch timing in any suitable manner, which may be implementation specific. For example, the size of the PSG included in the next panel switch notification message may indicate that a switch between active panels is imminent, and the gNB102 may utilize linear interpolation with extrapolation to intelligence built into the gNB102 using some predictive filter (Kalman), artificial intelligence (AI), or other known methods to estimate the panel switch timing.

[0127] In step S1010, the gNB 102 transmits the CSI-RS repeatedly at the appropriate time based on the estimated time when the panel switch should occur. As described above, the gNB 102 may output the CSI-RS repeatedly after a panel switch occurs at the gNB 102. In one example, the gNB 102 may have built-in intelligence that utilizes feedback from the UE 106 to estimate the appropriate timing of the CSI-RS repetition. In this regard, the gNB 102 may estimate the appropriate timing of the CSI-RS repetition in any suitable manner.

[0128] FIG. 13 illustrates an example embodiment of the UE 106 shown in FIG.

[0129] As shown, the UE 106 may include a memory 740, a processor 720 connected to the memory 740, various interfaces 760 connected to the processor 720, and one or more (e.g., multiple) antennas or antenna panels 765 connected to the various interfaces 760. The various interfaces 760 and antennas 765 may configure a transceiver for transmitting / receiving data to / from the gNB 102 via one or more wireless beams, or to / from multiple TRPs 102A, 102B, 102C, etc. As will be appreciated, depending on the implementation of the UE 106, the UE 106 may include more components than those shown in FIG. 13. However, it is not necessary to show all of these generally conventional components to disclose the exemplary embodiments.

[0130] The memory 740 may be a computer-readable storage medium that generally includes a random access memory (RAM), a read-only memory (ROM), and / or a permanent mass storage device such as a disk drive. The memory 740 also stores an operating system and any other routines / modules / applications for providing functionality of the UE 106 (e.g., functionality of the UE, methods according to an exemplary embodiment, etc.) executed by the processor 720. These software components may also be loaded into the memory 740 from a separate computer-readable storage medium using a drive mechanism (not shown). Such separate computer-readable storage medium may include a disk, tape, DVD / CD-ROM drive, memory card, or other similar computer-readable storage medium (not shown). In some exemplary embodiments, the software components may be loaded into the memory 740 through one of the various interfaces 760 rather than through a computer-readable storage medium.

[0131] The processor 720 may be configured to execute instructions of a computer program by performing system arithmetic, logical, and input / output operations. Instructions may be provided to the processor 720 by the memory 740.

[0132] The various interfaces 760 may include components that interface the processor 720 with an antenna 765 or other input / output components. As will be appreciated, the various interfaces 760 and the programs stored in the memory 740 to describe the dedicated functions of the UE 106 will vary depending on the implementation of the UE 106.

[0133] The interface 760 may also include one or more user input devices (eg, a keyboard, keypad, mouse, etc.) and user output devices (eg, a display, speakers, etc.).

[0134] 13 may be utilized to implement, among other things, the TRP 102A, 102B, 102C, gNB 102, other radio access and backhaul network elements and / or devices. In this regard, for example, the memory 740 may store an operating system and any other routines / modules / applications for providing functionality of the TRP, gNB, etc. (e.g., functionality of these elements, methods according to example embodiments, etc.) to be executed by the processor 720.

[0135] Terms such as first, second, etc. may be used herein to describe various elements, but these elements should not be limited by these terms. These terms are used only to distinguish one element from another. For example, a first element can be called a second element, and similarly, a second element can be called a first element, without departing from the scope of the present disclosure. As used herein, the term "and / or" includes any and all combinations of one or more of the associated listed items.

[0136] When an element is referred to as being "connected" or "coupled" to another element, it can be directly connected or coupled to the other element, or there may be intervening elements. In contrast, when an element is referred to as being "directly connected" or "directly coupled" to another element, there are no intervening elements. Other words used to describe relationships between elements should be construed in a similar manner (e.g., "between," "directly between," "adjacent," "directly adjacent," etc.).

[0137] The terms used herein are for the purpose of describing particular embodiments only and are not intended to be limiting. As used herein, the singular forms "a," "an," and "the" are intended to include the plural unless the context clearly dictates otherwise. Furthermore, the terms "comprises," "comprising," "includes," and / or "including," as used herein, specify the presence of stated features, integers, steps, operations, elements, and / or components, but are understood not to preclude the presence or addition of one or more other features, integers, steps, operations, elements, components, and / or groups thereof.

[0138] Also, in some alternative implementations, the functions / acts described may occur out of the order noted in the figures. For example, two figures shown in succession may in fact be executed substantially concurrently or in the reverse order, depending on the functions / acts involved.

[0139] In the following description, specific details are provided to provide a thorough understanding of the exemplary embodiments. However, it will be understood by those skilled in the art that the exemplary embodiments may be practiced without these specific details. For example, systems may be shown in block diagrams to avoid obscuring the exemplary embodiments in unnecessary detail. In other instances, well-known processes, structures, and techniques may be shown without unnecessary detail to avoid obscuring the exemplary embodiments.

[0140] As described herein, exemplary embodiments are described with reference to acts and symbolic representations of operations (e.g., in the form of flowcharts, flow diagrams, data flow diagrams, structure diagrams, block diagrams, etc.) that perform particular tasks or implement particular abstract data types and may be implemented using existing hardware in, for example, existing user equipment, base stations, eNBs, RRHs, gNBs, femto base stations, network controllers, computers, etc. Such existing hardware may be processing or control circuitry such as, but not limited to, one or more processors, one or more central processing units (CPUs), one or more controllers, one or more arithmetic logic units (ALUs), one or more digital signal processors (DSPs), one or more microcomputers, one or more field programmable gate arrays (FPGAs), one or more systems on chips (SoCs), one or more programmable logic units (PLUs), one or more microprocessors, one or more application specific integrated circuits (ASICs), or any other device or devices capable of responding to and executing instructions in a defined manner.

[0141] Although a flowchart may describe operations as a sequential process, many of the operations may be performed in parallel, simultaneously, or concurrently. Additionally, the order of operations may be rearranged. A process may be terminated when its operations are completed, but may have additional steps not included in the figures. A process may correspond to a method, a function, a procedure, a subroutine, a subprogram, etc. When a process corresponds to a function, its termination may correspond to a return of the function to the calling function or a main function.

[0142] As disclosed herein, the terms "storage medium," "computer-readable storage medium," or "non-transitory computer-readable storage medium" may refer to one or more devices for storing data, including read-only memory (ROM), random access memory (RAM), magnetic RAM, core memory, magnetic disk storage media, optical storage media, flash memory devices, and / or other tangible machine-readable media for storing information. The term "computer-readable medium" may include, but is not limited to, portable or fixed storage devices, optical storage devices, and various other media capable of storing, containing, or carrying instructions and / or data.

[0143] Furthermore, the exemplary embodiments may be implemented by hardware, software, firmware, middleware, microcode, hardware description languages, or any combination thereof. When implemented in software, firmware, middleware, or microcode, the program code or code segments for performing the necessary tasks may be stored in a machine-readable medium or computer-readable medium, such as a computer-readable storage medium. When implemented in software, one or more processors perform the necessary tasks. For example, as described above, according to one or more exemplary embodiments, at least one memory may include or store computer program code, and the at least one memory and computer program code may be configured to cause the at least one processor to perform the necessary tasks of the network element or network device. Furthermore, the processor, memory, and exemplary algorithms may be encoded as computer program code and act as a means for providing or causing the execution of the operations discussed herein.

[0144] A code segment of the computer program code may represent a procedure, a function, a subprogram, a program, a routine, a subroutine, a module, a software package, a class, or any combination of instructions, data structures, or program statements. A code segment may be coupled to another code segment or a hardware circuit by passing and / or receiving information, data, arguments, parameters, or memory contents. Information, arguments, parameters, data, etc. may be passed, forwarded, or transmitted via any suitable technique including memory sharing, message passing, token passing, network transmission, etc.

[0145] The terms "including" and / or "having" as used herein are defined as comprising (i.e., open language). The term "coupled" as used herein is defined as connected, although not necessarily directly and not necessarily mechanically. Terms derived from the term "indicate" (e.g., "indicate" and "indicate") are intended to encompass all the various techniques available for communicating or referencing the object / information being indicated. Some, but not all, examples of techniques available for communicating or referencing the object / information shown include conveying the object / information shown, conveying an identifier for the object / information shown, conveying information used to generate the object / information shown, conveying some part or portion of the object / information shown. Conveyance of some derivation of the object / information is shown, and conveyance of some symbol representing the object / information is shown.

[0146] According to an exemplary embodiment, the user equipment, base station, eNB, RRH, gNB, femto base station, network controller, computer, etc. may be (or may include) hardware, firmware, hardware executing software, or any combination thereof. Such hardware may include processing or control circuitry, such as, but not limited to, one or more processors, one or more CPUs, one or more controllers, one or more ALUs, one or more DSPs, one or more microcomputers, one or more FPGAs, one or more SoCs, one or more PLUs, one or more microprocessors, one or more ASICs, etc., or any other device(s) capable of responding to and executing instructions in a defined manner. Benefits, other advantages, and solutions to problems have been discussed above with respect to specific embodiments of the invention. However, the benefits, advantages, solutions to problems, and any elements that may cause or bring about such benefits, advantages, or solutions, or that may make such benefits, advantages, or solutions more significant, should not be construed as critical, necessary, or essential features or elements of any or all claims.

[0147] 1. A plurality of antenna panels; At least one processor; at least one memory containing computer program code; The at least one memory and the computer program code are transmitted by the at least one processor to the user equipment, identifying a potential change in an active antenna panel at the user equipment from a first antenna panel of the plurality of antenna panels to a second antenna panel of the plurality of antenna panels; transmitting at least one early panel switch detection message indicating the potential change in an active antenna panel to a base station serving the user equipment; A user equipment characterized by executing the above. 2. The user equipment, wherein the at least one memory and the computer program code, using the at least one processor, cause the user equipment to switch the active antenna panel from the first antenna panel of the plurality of antenna panels to the second antenna panel of the plurality of antenna panels. 3. The at least one early panel switch detection message comprises: (i) a difference between a first received signal power for the first antenna panel of the plurality of antenna panels and a second received signal power for the second antenna panel of the plurality of antenna panels; (ii) an estimated time until the active antenna panel switches from the first antenna panel of the plurality of antenna panels to the second antenna panel of the plurality of antenna panels; (iii) an indication of a selected downlink reference signal for the second antenna panel of the plurality of antenna panels; or (iv) an indication of a number of transmit beams for a second antenna panel of the plurality of antenna panels; 3. The user equipment according to claim 1, characterized in that it is at least one of the above. 4. The at least one memory and the computer program code, using the at least one processor, on the user equipment: estimating a difference between a first received signal power for the first antenna panel of the plurality of antenna panels and a second received signal power for the second antenna panel of the plurality of antenna panels based on the received signal block; identifying a potential change in the active antenna panel at the user equipment based on the estimated difference; 4. A user equipment according to claim 1, further comprising: 5. The user equipment of claim 4, wherein the at least one memory and the computer program code cause the at least one processor to perform the step of causing the user equipment to identify a potential change in an active antenna panel in the user equipment in response to the estimated difference being less than a panel switch threshold. 6. The at least one memory and the computer program code, using the at least one processor, on the user equipment: determining that the estimated difference is less than a panel switch threshold; in response to determining that the estimated difference is less than a panel switch threshold, calculating a panel switch delay; 5. The user equipment of claim 4, wherein the at least one early panel switch detection message includes the panel switch delay. 7. A user equipment according to any one of claims 1 to 6, characterized in that the at least one early panel switch detection message is transmitted via L1 signalling or L2 signalling. 8. The user equipment of claim 7, wherein the at least one early panel switch detection message is at least one physical uplink shared channel message. 9. The at least one physical uplink shared channel message comprises: an Uplink Control Information (UCI) message sent via L1 signaling, or A MAC control element transmitted via L2 signaling; 9. The user equipment according to claim 8, characterized in that it is at least one of the above. 10. The user equipment of claim 7, wherein the at least one early panel switch detection message comprises an uplink control information (UCI) message transmitted on a physical uplink control channel via L1 signaling. 11. The at least one memory and the computer program code, using the at least one processor, on the user equipment: transmitting a scheduling request for transmitting the at least one early panel switch detection message; transmitting the at least one early panel switch detection message in response to a scheduling grant transmitted in response to the scheduling request; 11. A user equipment according to any one of claims 1 to 10, characterized in that the user equipment is adapted to execute the following: 12. The at least one memory and the computer program code, using the at least one processor, in the user equipment: 12. The user equipment of claim 1, further comprising: a first antenna panel detection message configured to detect an active panel switch of a first antenna panel of the plurality of antenna panels and a second antenna panel of the plurality of antenna panels, the first antenna panel detection message configured to detect an active panel switch of a second antenna panel of the plurality of antenna panels, the second antenna panel of the plurality of antenna panels being ... 13. identifying, by a user equipment, a potential change in an active antenna panel at the user equipment from a first antenna panel of the plurality of antenna panels to a second antenna panel of the plurality of antenna panels; transmitting at least one early panel switch detection message indicating a potential change in an active antenna panel to a base station serving the user equipment; The method according to claim 1, further comprising: 14. At least one processor; and at least one memory containing computer program code, The at least one memory and the computer program code are configured to, using the at least one processor, cause the radio access network element to: receiving at least one early panel switch detection message indicating an upcoming potential change of an active antenna panel at the user equipment from a first antenna panel to a second antenna panel; transmitting a reference signal repeatedly to the user equipment based on the received at least one early panel switch detection message; 23. A radio access network element comprising: 15. The at least one early panel switch detection message comprises: (i) a difference between a first received signal power for the first antenna panel and a second received signal power for the second antenna panel; (ii) an estimated time for the active antenna panel to change from the first antenna panel to the second antenna panel; (iii) an indication of a selected downlink reference signal for the second antenna panel at the radio access network element; (iv) an indication of a number of transmit beams for the second antenna panel; 16. A radio access network element according to claim 15, characterized in that it is at least one of: 16. A radio access network element according to claim 15 or 16, characterized in that the at least one early panel switch detection message is received via L1 signaling or L2 signaling. 17. The at least one early panel switch detection message comprises: at least one Uplink Control Information (UCI) message transmitted on a physical uplink shared channel or a physical uplink control channel via L1 signaling; or 18. A radio access network element according to claim 17, characterized in that at least one MAC control element is transmitted on the physical uplink shared channel via L2 signalling. 18. A radio access network element according to any one of claims 15 to 18, characterized in that the at least one memory and the computer program code are configured, using the at least one processor, to cause the radio access network element to transmit a scheduling grant in response to a scheduling request for transmitting the at least one early panel switch detection message. 19. The at least one memory and the computer program code, using the at least one processor, to the radio access network element: determining an estimated time that the active antenna panel will be changed from the first antenna panel to the second antenna panel based on the at least one early panel switch detection message; transmitting the reference signal repeatedly based on the estimated time; 20. A radio access network element according to any one of claims 15 to 19, characterized in that the element is adapted to execute the following: 20. The at least one early panel switch detection message includes a plurality of early panel switch detection messages; and wherein the at least one memory and the computer program code, using the at least one processor, cause the radio access network element to determine the estimated time for the active antenna panel to change from the first antenna panel to the second antenna panel based on the plurality of early panel switch detection messages. A radio access network element according to claim 20.

Claims

1. A plurality of antenna panels; At least one processor; at least one memory containing computer program code; The at least one memory and the computer program code are configured to cause a user equipment, using the at least one processor, to: identifying a potential change in an active antenna panel at the user equipment from a first antenna panel of the plurality of antenna panels to a second antenna panel of the plurality of antenna panels; transmitting at least one early panel switch detection message to a base station serving the user equipment, the early panel switch detection message indicating the potential change in an active antenna panel; estimating a difference between a first received signal power for the first antenna panel of the plurality of antenna panels and a second received signal power for the second antenna panel of the plurality of antenna panels based on the received signal blocks; identifying the potential change in the active antenna panel at the user equipment based on the estimated difference; A user equipment characterized by executing the above.

2. 2. The user equipment of claim 1, wherein the at least one memory and the computer program code, using the at least one processor, cause the user equipment to switch the active antenna panel from the first antenna panel of the plurality of antenna panels to the second antenna panel of the plurality of antenna panels.

3. The at least one early panel switch detection message comprises: (i) a difference between a first received signal power for the first antenna panel of the plurality of antenna panels and a second received signal power for the second antenna panel of the plurality of antenna panels; (ii) an estimated time until the active antenna panel switches from the first antenna panel of the plurality of antenna panels to the second antenna panel of the plurality of antenna panels; (iii) an indication of a selected downlink reference signal for the second antenna panel of the plurality of antenna panels; or (iv) an indication of a number of transmit beams for the second antenna panel of the plurality of antenna panels; 3. The user equipment according to claim 1, characterized in that it is at least one of the above.

4. 2. The user equipment of claim 1, wherein the at least one memory and the computer program code, with the at least one processor, cause the user equipment to perform the step of identifying the potential change in an active antenna panel in the user equipment in response to the estimated difference being less than a panel switch threshold.

5. The at least one memory and the computer program code are configured to cause the at least one processor to: determining that the estimated difference is less than a panel switch threshold; in response to determining that the estimated difference is less than a panel switch threshold, calculating a panel switch delay; The user equipment of claim 1 , wherein the at least one early panel switch detection message includes the panel switch delay.

6. 6. The user equipment of claim 1, wherein the at least one early panel switch detection message is transmitted via L1 signaling or L2 signaling.

7. 7. The user equipment of claim 6, wherein the at least one early panel switch detection message is at least one physical uplink shared channel message.

8. The at least one physical uplink shared channel message comprises: an Uplink Control Information (UCI) message sent via L1 signaling, or MAC control elements transmitted via L2 signaling; 8. The user equipment according to claim 7, characterized in that it is at least one of the above.

9. 7. The user equipment of claim 6, wherein the at least one early panel switch detection message comprises an uplink control information (UCI) message transmitted on a physical uplink control channel via L1 signaling.

10. The at least one memory and the computer program code are configured to cause the at least one processor to: transmitting a scheduling request for transmitting the at least one early panel switch detection message; transmitting the at least one early panel switch detection message in response to a scheduling grant transmitted in response to the scheduling request; 10. A user equipment according to any one of claims 1 to 9, characterized in that the user equipment is adapted to execute the following:

11. The at least one memory and the computer program code are configured to cause the at least one processor to:

11. The user equipment of claim 1, wherein the at least one early panel switch detection message is periodically transmitted, each early panel switch detection message being at least one of: (i) a difference between a first received signal power for the first antenna panel of the plurality of antenna panels and a second received signal power for the second antenna panel of the plurality of antenna panels; or (ii) an estimated time until the active antenna panel changes from the first antenna panel of the plurality of antenna panels to the second antenna panel of the plurality of antenna panels.

12. 12. A user equipment according to any preceding claim, wherein at least two of the plurality of antenna panels are active simultaneously.

13. identifying, by a user equipment, a potential change in an active antenna panel at the user equipment from a first antenna panel of a plurality of antenna panels to a second antenna panel of the plurality of antenna panels; transmitting at least one early panel switch detection message indicating the potential change in an active antenna panel to a base station serving the user equipment; estimating a difference between a first received signal power for the first antenna panel of the plurality of antenna panels and a second received signal power for the second antenna panel of the plurality of antenna panels based on the received signal block; identifying the potential change in the active antenna panel at the user equipment based on the estimated difference; The method according to claim 1, further comprising:

14. At least one processor; and at least one memory containing computer program code, The at least one memory and the computer program code are configured to, using the at least one processor, cause the radio access network element to: receiving at least one early panel switch detection message indicating an upcoming potential change of an active antenna panel at the user equipment from a first antenna panel to a second antenna panel; transmitting a reference signal repeatedly to the user equipment based on the received at least one early panel switch detection message; 23. A radio access network element comprising:

15. The at least one early panel switch detection message comprises: (i) a difference between a first received signal power for the first antenna panel and a second received signal power for the second antenna panel; (ii) an estimated time for the active antenna panel to change from the first antenna panel to the second antenna panel; (iii) an indication of a selected downlink reference signal for the second antenna panel at the radio access network element; (iv) an indication of a number of transmit beams for the second antenna panel; 15. The radio access network element according to claim 14, characterized in that it is at least one of:

16. 16. A radio access network element according to claim 14 or 15, characterized in that the at least one early panel switch detection message is received via L1 signalling or L2 signalling.

17. The at least one early panel switch detection message comprises: At least one Uplink Control Information (UCI) message transmitted on a physical uplink shared channel or a physical uplink control channel via L1 signaling; or 17. The radio access network element of claim 16, characterized in that at least one MAC control element is transmitted on the physical uplink shared channel via L2 signaling.

18. 18. The radio access network element of claim 14, wherein the at least one memory and the computer program code are configured, using the at least one processor, to cause the radio access network element to transmit a scheduling grant in response to a scheduling request for transmitting the at least one early panel switch detection message.

19. The at least one memory and the computer program code are configured to, using the at least one processor, cause the radio access network element to: determining an estimated time that the active antenna panel will be changed from the first antenna panel to the second antenna panel based on the at least one early panel switch detection message; transmitting the reference signal repeatedly based on the estimated time; 19. A radio access network element according to any one of claims 14 to 18, characterized in that the element is adapted to execute the following:

20. the at least one early panel switch detection message includes a plurality of early panel switch detection messages; and wherein the at least one memory and the computer program code, using the at least one processor, cause the radio access network element to determine the estimated time for the active antenna panel to change from the first antenna panel to the second antenna panel based on the plurality of early panel switch detection messages.

20. A radio access network element according to claim 19.