Maintenance necessity determination device and maintenance necessity determination method
The maintenance necessity determination device simplifies the setting of threshold values by calculating average equipment performance metrics, addressing the complexity of conventional methods and ensuring timely maintenance decisions.
Patent Information
- Application Number
- JP2020189739
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-11-13
- Publication Date
- 2024-10-25
- Estimated Expiration
- 2040-11-13
AI Technical Summary
Conventional methods for determining maintenance necessity for equipment are complex and require user-adjusted threshold values, which are time-consuming and difficult to set appropriately.
A maintenance necessity determination device that calculates an average value of equipment performance metrics and adjusts a threshold value by subtracting a constant to simplify the setting process, using a CPU or system LSI to determine maintenance needs based on operating time or input counts.
Enables easy and efficient setting of threshold values for determining maintenance needs, reducing labor and ensuring appropriate maintenance timing without complex calculations.
Smart Images

Figure 0007573419000001 
Figure 0007573419000002 
Figure 0007573419000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a maintenance necessity determining device and a maintenance necessity determining method for determining whether or not maintenance is required for a device. [Background technology]
[0002] In the management of facilities such as buildings, the equipment installed in the facilities is monitored for abnormalities, and if an abnormality is found, maintenance (repair or replacement, etc.) is performed. In this case, in order to detect abnormalities in the equipment in advance, it is sometimes necessary to determine whether maintenance is required for the equipment based on the operating time or number of times the equipment is turned on.
[0003] Conventionally, for example, a threshold is set for the operating time or number of inputs of the device, and when the operating time or number of inputs of the device exceeds the threshold, it is determined that maintenance of the device is necessary, and a user such as a facility manager is prompted to take action such as repairing or replacing the device. For example, when the device is a light, it is possible to determine whether or not maintenance of the light is necessary based on the total lighting time since the light was first used.
[0004] Here, the threshold value may be a limit value recommended by the device manufacturer, but since the lifespan varies depending on the operating conditions of the facility (such as the installation environment or usage method of the device), it is difficult to set an appropriate value in advance, and adjustment by the user is required. Furthermore, such adjustment requires the user to calculate an appropriate value when the device breaks down or reaches the end of its lifespan, which is time-consuming.
[0005] On the other hand, there are methods for performing complex calculations based on various information for preventive maintenance, such as the technology disclosed in Patent Document 1. However, since the technology disclosed in Patent Document 1 targets plants, preventive maintenance using complex calculations such as those described above is necessary, but in building management, there are many devices such as electric lights that, even if they do break down, have little impact on operations if the number of such breakdowns is small, and so complex calculations such as those described above are not essential. [Prior art documents] [Patent documents]
[0006] [Patent Document 1] JP 2004-145496 A Summary of the Invention [Problem to be solved by the invention]
[0007] As described above, in the conventional technology, the adjustment and setting of the threshold value for determining whether or not equipment maintenance is required is complicated.
[0008] The present invention has been made to solve the above-mentioned problems, and aims to provide a maintenance necessity determination device that, as opposed to the conventional technology, can easily set a threshold value for determining whether or not equipment maintenance is necessary. [Means for solving the problem]
[0009] The maintenance necessity determination device according to the present invention includes an acquisition unit that acquires the operating time or the number of inputs until a breakdown or maintenance of an equipment, and a threshold setting unit that sets a threshold for determining the necessity of maintenance for the equipment based on the acquisition result by the acquisition unit. The threshold setting unit calculates an average value of the results obtained multiple times by the first acquisition unit, and sets the average value obtained by subtracting a constant as the threshold value. It is characterized by: Effect of the Invention
[0010] According to the present invention, as configured as above, it becomes possible to easily set a threshold value for determining whether or not equipment maintenance is required, in contrast to the prior art. [Brief description of the drawings]
[0011] [Figure 1] 1 is a diagram illustrating an example of the configuration of a maintenance necessity determination device according to a first embodiment. [Diagram 2] 5 is a flowchart showing an example of a threshold setting operation performed by the maintenance necessity determination device according to the first embodiment. [Diagram 3]5 is a diagram showing an example of a threshold setting operation performed by the maintenance necessity determination device according to the first embodiment; FIG. [Figure 4] 7 is a diagram showing another example of a threshold setting operation performed by the maintenance necessity determination device according to the first embodiment. FIG. [Diagram 5] 4 is a flowchart showing an example of a maintenance necessity determination operation performed by the maintenance necessity determination device according to the first embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0012] Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings. Embodiment 1 Fig. 1 is a diagram showing an example of the configuration of a maintenance necessity determination device 1 according to embodiment 1. In Fig. 1, in addition to the maintenance necessity determination device 1, a device 2 that is to be subjected to determination by the maintenance necessity determination device 1 is shown. The maintenance necessity determination device 1 determines whether or not maintenance (repair, replacement, etc.) is required for a device 2 installed in a facility such as a building. One or more devices 2 are installed in the facility. In FIG. 1, two devices 2 are shown as devices 2 to be determined by the maintenance necessity determination device 1. Examples of the devices 2 include electric lights, air conditioners, and fans. As shown in FIG. 1, the maintenance necessity determination device 1 includes a memory unit 11, an acquisition unit (first acquisition unit) 12, a threshold setting unit 13, an acquisition unit (second acquisition unit) 14, a determination unit 15, and an alarm unit 16.
[0013] The maintenance necessity determination device 1 is realized by a processing circuit such as a system LSI (Large Scale Integration), or a CPU (Central Processing Unit) that executes a program stored in a memory or the like.
[0014] The storage unit 11 stores data indicating various information used in the maintenance necessity determination device 1. For example, the storage unit 11 stores data indicating the measurement results for each device 2 by the acquisition unit 12 and data indicating the measurement results for each device 2 by the acquisition unit 14. In addition, for example, the storage unit 11 stores data indicating the threshold value for each device 2 set by the threshold value setting unit 13. The storage unit 11 is configured by a hard disk drive (HDD), a digital versatile disk (DVD), a memory, or the like.
[0015] 1 shows a case where the storage unit 11 is provided inside the maintenance necessity determination device 1. However, the present invention is not limited to this, and the storage unit 11 may be provided outside the maintenance necessity determination device 1, and the maintenance necessity determination device 1 may be configured to appropriately acquire data from the storage unit 11 provided outside.
[0016] The acquisition unit 12 acquires the operation time or the number of inputs until the device 2 breaks down or undergoes maintenance. Here, for example, the maintenance necessity determination device 1 has a function of counting the operation time or the number of inputs of the device 2 and resetting the counted value after the device 2 breaks down or undergoes maintenance. In this case, the acquisition unit 12 acquires the value immediately before being reset by the maintenance necessity determination device 1, thereby acquiring the operation time or the number of inputs until the device 2 breaks down or undergoes maintenance. The operation time is the time during which the device 2 is in operation, and in the case of an electric light, it is the total lighting time. Also, the number of inputs is the number of times the device 2 is switched on and off (operating and stopped). The acquisition unit 12 operates when setting a threshold value used when the maintenance necessity determination device 1 determines the necessity of maintenance for the device 2 (when performing a threshold value setting operation).
[0017] The threshold setting unit 13 sets a threshold for determining whether or not maintenance is required for the equipment 2, based on the results acquired by the acquisition unit 12. At this time, for example, the threshold setting unit 13 calculates an average value for the results acquired multiple times by the acquisition unit 12, and sets the threshold value to a value obtained by subtracting a constant from the calculated average value. The constant is set in advance. The threshold setting unit 13 operates when the maintenance necessity determination device 1 performs a threshold setting operation.
[0018] The acquisition unit 14 acquires the current operating time or number of inputs of the device 2. Here, in the case where the maintenance necessity determination device 1 has a function of counting the operating time or number of inputs of the device 2 as described above, the acquisition unit 14 acquires the current operating time or number of inputs of the device 2 by acquiring the value counted by the maintenance necessity determination device 1. The acquisition unit 14 operates when the maintenance necessity determination device 1 determines whether or not maintenance is required for the device 2 using the threshold value set in the threshold value setting operation (when performing the maintenance necessity determination operation).
[0019] The determination unit 15 determines whether or not maintenance is required for the device 2 by determining whether the result acquired by the acquisition unit 14 exceeds the threshold set by the threshold setting unit 13. That is, when the determination unit 15 determines that the result acquired by the acquisition unit 14 exceeds the threshold set by the threshold setting unit 13, it determines that maintenance is required for the device 2. On the other hand, when the determination unit 15 determines that the result acquired by the acquisition unit 14 is equal to or less than the threshold set by the threshold setting unit 13, it determines that maintenance is not required for the device 2. The threshold used by the determination unit 15 is a threshold corresponding to the device 2 to be determined. The determination unit 15 operates when the maintenance necessity determination device 1 performs a maintenance necessity determination operation.
[0020] When the determination unit 15 determines that maintenance is required for the device 2, the warning unit 16 issues a warning to notify a user that maintenance is required for the device 2. At this time, the warning unit 16 issues the warning, for example, by displaying a screen on a display device (not shown), outputting a sound via a sound output device (not shown), or turning on a warning lamp (not shown). The warning unit 16 operates when the maintenance necessity determination device 1 performs a maintenance necessity determination operation.
[0021] 1 shows a case where the maintenance necessity determination device 1 includes both a configuration that operates when performing a threshold setting operation (acquisition unit 12 and threshold setting unit 13) and a configuration that operates when performing a maintenance necessity determination operation (acquisition unit 14, determination unit 15, and alarm unit 16). However, this is not limiting, and the configuration that operates when performing a threshold setting operation and the configuration that operates when performing a maintenance necessity determination operation may be provided in separate devices.
[0022] Next, an example of a threshold setting operation by the maintenance necessity determination device 1 according to the first embodiment shown in Fig. 1 will be described with reference to Fig. 2. The threshold setting operation by the maintenance necessity determination device 1 is performed, for example, during operation of the facility, continuously or until the threshold converges within a certain range. Furthermore, the threshold setting unit 13 sets the initial value of the threshold to, for example, a value based on a limit value recommended by the manufacturer of the device 2. The maintenance necessity determination device 1 according to the first embodiment acquires the operating time or the number of inputs until a breakdown or maintenance of the device 2, and sets a threshold value for determining whether or not maintenance is necessary for the device 2 based on the acquired results.
[0023] In an example of a threshold setting operation by the maintenance necessity determination device 1 according to embodiment 1 shown in FIG. 1, first, as shown in FIG. 2, the acquisition unit 12 acquires the operating time or the number of inputs until a breakdown or maintenance of the device 2 (step ST201).
[0024] Next, the threshold setting unit 13 sets a threshold for determining whether or not maintenance is required for the device 2, based on the results acquired by the acquisition unit 12 (step ST202). At this time, the threshold setting unit 13 calculates an average value for the results acquired multiple times by the acquisition unit 12, as shown in Fig. 3, for example, and sets the threshold value to a value obtained by subtracting a constant from the calculated average value. Fig. 3 shows five operating times until failure or maintenance of a certain device 2. Also in Fig. 3, reference numeral 301 indicates the average operating time of the device 2, and reference numeral 302 indicates a threshold value obtained by subtracting a constant from the average value shown in reference numeral 301.
[0025] In the above description, the threshold setting unit 13 calculates an average value for a plurality of acquisition results by the acquisition unit 12 and subtracts a constant from the calculated average value as a method of setting the threshold value. However, the threshold setting unit 13 is not limited to this method. The threshold setting unit 13 may set the average value as the threshold value. The threshold setting unit 13 may also calculate the average value of the average value and a currently set threshold value, and set the calculated average value or a value obtained by subtracting a constant from the calculated average value as the threshold value. In this case, the average value and the currently set threshold value may be weighted by different coefficients (for example, 1 for the average value and 9 for the currently set threshold value) before calculating the average value. For example, as shown in FIG. 4, the threshold setting unit 13 may calculate a normal distribution for a plurality of acquisition results by the acquisition unit 12 and set a value with a high probability from the calculated normal distribution as the threshold value. In FIG. 4, reference numeral 401 indicates a value with a high probability based on the normal distribution.
[0026] The result of the acquisition by the acquisition unit 12 is the operating time or the number of inputs until the device 2 breaks down or undergoes maintenance. Here, when the operating time or the number of inputs until the device 2 breaks down is used in setting the threshold, the operating time or the number of inputs is a value that exceeds the use limit of the device 2, so it is preferable to adjust the threshold to a value smaller than the operating time or the number of inputs. On the other hand, when the operating time or the number of inputs until the device 2 is maintained is used in setting the threshold, the operating time or the number of inputs is a value that has a margin for the use limit of the device 2, so it is preferable to adjust the threshold to a value larger than the operating time or the number of inputs. Therefore, when the result of the acquisition by the acquisition unit 12 is the operating time or the number of inputs until the device 2 breaks down, the threshold setting unit 13 may set the threshold by adding a negative correction value, and when the result of the acquisition by the acquisition unit 12 is the operating time or the number of inputs until maintenance, the threshold setting unit 13 may set the threshold by adding a positive correction value. This enables the threshold setting unit 13 to set the threshold to a more appropriate value.
[0027] In this way, the maintenance necessity determination device 1 according to the first embodiment acquires past records (the operating time or number of inputs until a breakdown or maintenance of the device 2) and sets a threshold value for determining the necessity of maintenance for the device 2 based on the acquired results. As a result, the maintenance necessity determination device 1 can set the threshold value to an appropriate value by simple calculation using only the record of the device 2, making it possible to reduce the labor required for adjusting and setting the threshold value.
[0028] Next, an example of a maintenance necessity determination operation performed by the maintenance necessity determination device 1 according to the first embodiment shown in FIG. 1 will be described with reference to FIG.
[0029] In an example of a maintenance necessity determination operation by the maintenance necessity determination device 1 according to the first embodiment shown in FIG. 1, first, as shown in FIG. 5, the acquisition unit 14 acquires the current operating time or the number of inputs of the device 2 (step ST501).
[0030] Next, the determination unit 15 determines whether or not maintenance is required for the device 2 by determining whether the result acquired by the acquisition unit 14 exceeds the threshold set by the threshold setting unit 13 (step ST502). That is, when the determination unit 15 determines that the result acquired by the acquisition unit 14 exceeds the threshold set by the threshold setting unit 13, the determination unit 15 determines that maintenance is required for the device 2. On the other hand, when the determination unit 15 determines that the result acquired by the acquisition unit 14 is equal to or less than the threshold set by the threshold setting unit 13, the determination unit 15 determines that maintenance is not required for the device 2. Note that the threshold used by the determination unit 15 is updated every time the threshold is updated by the threshold setting unit 13.
[0031] Next, when the determination unit 15 determines that maintenance is required for the device 2, the alarm unit 16 issues an alarm to notify that maintenance is required for the device 2 (step ST503). At this time, the alarm unit 16 issues an alarm, for example, by displaying a screen on a display device, outputting a sound via a sound output device, or turning on an alarm lamp. Note that, when the determination unit 15 determines that maintenance is not required for the device 2, the alarm unit 16 does not issue an alarm.
[0032] As described above, according to the first embodiment, the maintenance necessity determination device 1 includes an acquisition unit 12 that acquires the operating time or the number of inputs until a breakdown or maintenance of the device 2, and a threshold setting unit 13 that sets a threshold for determining whether or not maintenance is required for the device 2, based on the results acquired by the acquisition unit 12. As a result, the maintenance necessity determination device 1 according to the first embodiment can easily set a threshold for determining whether or not maintenance is required for the device 2, compared to the conventional technology.
[0033] It should be noted that, within the scope of the present invention, any of the components of the embodiments may be modified or omitted. [Explanation of symbols]
[0034] 1. Maintenance necessity determination device 2 equipment 11 Storage section 12 Acquisition Department (1st Acquisition Department) 13 Threshold setting section 14 Acquisition Department (Second Acquisition Department) 15 Judgment section 16 Alarm section
Claims
1. A first acquisition unit that acquires an operating time or an input count until a device fails or undergoes maintenance; a threshold setting unit that sets a threshold for determining whether or not maintenance is required for the device based on a result acquired by the first acquisition unit, The threshold setting unit calculates an average value of a plurality of acquisition results obtained by the first acquisition unit, and sets a value obtained by subtracting a constant from the calculated average value as a threshold value. A maintenance necessity determination device characterized by:
2. A first acquisition unit that acquires an operating time or an input count until a device fails or undergoes maintenance; a threshold setting unit that sets a threshold for determining whether or not maintenance is required for the device based on a result acquired by the first acquisition unit, The threshold setting unit calculates a normal distribution for a plurality of acquisition results by the first acquisition unit, and sets a value with a high probability from the calculated normal distribution as a threshold. A maintenance necessity determination device characterized by:
3. A first acquisition unit that acquires an operating time or an input count until a device fails or undergoes maintenance; a threshold setting unit that sets a threshold for determining whether or not maintenance is required for the device based on a result acquired by the first acquisition unit, The threshold setting unit sets a threshold by adding a negative correction value when the result acquired by the first acquisition unit is an operating time until a failure or an input count, and sets a threshold by adding a positive correction value when the result acquired by the first acquisition unit is an operating time until maintenance or an input count. A maintenance necessity determination device characterized by:
4. The threshold setting unit sets a threshold by adding a negative correction value when the result obtained by the first obtaining unit is the operating time until a failure or the number of inputs, and sets a threshold by adding a positive correction value when the result obtained by the first obtaining unit is the operating time until maintenance or the number of inputs.
3. The maintenance necessity determining device according to claim 1 or 2.
5. A second acquisition unit that acquires a current operating time or an input count of the device; a determination unit that determines whether or not maintenance is required for the device by determining whether or not the result of acquisition by the second acquisition unit exceeds the threshold value set by the threshold value setting unit; and an alarm unit that issues an alarm when the determination unit determines that maintenance is required for the device.
5. The maintenance necessity determining device according to claim 1, wherein the maintenance necessity determining device is a maintenance necessity determining device.
6. A step in which a first acquisition unit acquires an operating time or an input count until a device fails or undergoes maintenance; a threshold setting unit setting a threshold for determining whether or not maintenance is required for the device based on the result of acquisition by the first acquisition unit; The threshold setting unit calculates an average value of a plurality of acquisition results obtained by the first acquisition unit, and sets a value obtained by subtracting a constant from the calculated average value as a threshold value. A method for determining whether or not maintenance is required.
7. A step in which a first acquisition unit acquires an operating time or an input count until a device fails or undergoes maintenance; a threshold setting unit setting a threshold for determining whether or not maintenance is required for the device based on the result of acquisition by the first acquisition unit; The threshold setting unit calculates a normal distribution for a plurality of acquisition results by the first acquisition unit, and sets a value with a high probability from the calculated normal distribution as a threshold. A method for determining whether or not maintenance is required.
8. A step in which a first acquisition unit acquires an operating time or an input count until a device fails or undergoes maintenance; a threshold setting unit setting a threshold for determining whether or not maintenance is required for the device based on the result of acquisition by the first acquisition unit; The threshold setting unit sets a threshold by adding a negative correction value when the result acquired by the first acquisition unit is an operating time until a failure or an input count, and sets a threshold by adding a positive correction value when the result acquired by the first acquisition unit is an operating time until maintenance or an input count. A method for determining whether or not maintenance is required.
Citation Information
Patent Citations
Maintenance supporting method for equipment and facility
JP2004145496A
Programmable display, display control program, recording medium for recording this program, screen forming device, screen forming program, and recording medium with the program recorded thereon
JP2006039870A
Productivity evaluation system and method for evaluating productivity
JP2019129255A