Transport system, control method, and control program

The control system addresses collision issues in conveyance systems by using a control unit to manage multiple transport devices, ensuring efficient and collision-free transport of workpieces through temporary storage or evacuation strategies.

JP7579994B2Active Publication Date: 2024-11-08DMG MORI CO LTD

Patent Information

Application Number
JP2023573516
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2022-01-11
Publication Date
2024-11-08
Estimated Expiration
2042-01-11

AI Technical Summary

Technical Problem

Existing conveyance systems with multiple transport devices face inefficiencies due to potential collisions along shared paths, necessitating improved methods to enhance workpiece transport efficiency while avoiding such collisions.

Method used

A control system that includes a first and second conveyance device, a control unit to determine potential collisions, and a method to control their drives to prevent collisions, utilizing temporary storage areas or evacuation routes to safely transport workpieces to machine tools.

Benefits of technology

Enhances workpiece transport efficiency by preventing collisions between conveyance devices, optimizing the use of multiple devices on shared paths.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007579994000001
    Figure 0007579994000001
  • Figure 0007579994000002
    Figure 0007579994000002
  • Figure 0007579994000003
    Figure 0007579994000003
Patent Text Reader

Abstract

Provided is a conveyance system (10) for a workpiece, comprising: a conveyance path (330); a first conveyance device (340A) configured to be able to travel on the conveyance path (330) for conveying the workpiece; a second conveyance device (340B) configured to be able to travel on the conveyance path (330) for conveying the workpiece; a machine tool (400) for processing the workpiece conveyed by the first conveyance device (340A) or the second conveyance device (340B); and a control unit for controlling the conveyance system (10). The control unit executes: processing to determine if a collision between the first conveyance device (340A) and the second conveyance device (340B) will occur when the first conveyance device (340A) conveys the workpiece to be processed to the machine tool (400); and, if it is determined that the collision will occur, processing to convey the workpiece to be processed to the machine tool (400) while controlling the driving of the first conveyance device (340A) and the second conveyance device (340B) so that the collision will not occur.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a transport system, a control method, and a control program. [Background technology]

[0002] Patent Document 1 (Japanese Patent No. 6918259) discloses a transport system capable of automatically transporting workpieces. The transport system is composed of a workpiece storage unit, a workpiece transport device, a machine tool, a work station, and the like.

[0003] An operator sets a workpiece to be machined at a work station. The transport device then stores the workpiece in a storage section. When the time comes to process the workpiece, the transport device transports the workpiece from the storage section to a machine tool. When the processing of the workpiece is completed, the transport device transports the workpiece to the storage section or the work station. [Prior art documents] [Patent documents]

[0004] [Patent Document 1] Patent No. 6918259 Summary of the Invention [Problem to be solved by the invention]

[0005] The conveying system disclosed in Patent Document 1 includes one conveying device. In order to efficiently convey the workpieces, multiple conveying devices are required. When multiple conveying devices share a conveying path, there is a possibility that the conveying devices may collide with each other. Therefore, it is desirable to efficiently convey the workpieces while avoiding collisions between the conveying devices. [Means for solving the problem]

[0006] In one example of the present disclosure, a workpiece transport system includes a transport path, a first transport device configured to be able to travel on the transport path and for transporting a workpiece, a second transport device configured to be able to travel on the transport path and for transporting a workpiece, a machine tool for machining the workpiece transported by the first transport device or the second transport device, and a control unit for controlling the transport system. The control unit executes a process of determining whether or not a collision will occur between the first transport device and the second transport device when the first transport device transports a workpiece to be machined to the machine tool, and a process of controlling the drive of the first transport device and the second transport device so as not to cause the collision and transporting the workpiece to be machined to the machine tool when it is determined that the collision will occur.

[0007] In one example of the present disclosure, the transporting process includes a process of transferring the workpiece to be processed from the first transport device to the second transport device, and a process of controlling the drive of the second transport device so as to transport the workpiece to be processed transferred to the second transport device to the machine tool.

[0008] In one example of the present disclosure, the conveying system further includes a storage unit capable of storing a plurality of workpieces, and the transferring process includes a process of driving the first conveying device to store the workpiece to be machined in a temporary storage area in the storage unit, and a process of transferring the workpiece to be machined stored in the temporary storage area from the temporary storage area to the second conveying device.

[0009] In one example of the present disclosure, the control unit further executes a process of determining, as the temporary storage area, an empty space within the storage unit that is closer to the machine tool than the second conveying device and that is closer to the first conveying device.

[0010] In one example of the present disclosure, the control unit further executes a process of controlling driving of the second conveying device so as to move the second conveying device away from the first conveying device before executing the process of determining.

[0011] In one example of the present disclosure, the determination process determines that the collision will occur if the second conveying device is present on the travel path when the first conveying device transports the workpiece to be processed to the machine tool.

[0012] In another example of the present disclosure, a control method for a workpiece transport system is provided. The transport system includes a transport path, a first transport device configured to be able to travel on the transport path and for transporting a workpiece, a second transport device configured to be able to travel on the transport path and for transporting a workpiece, and a machine tool for machining the workpiece transported by the first transport device or the second transport device. The control method includes a step of determining whether or not a collision occurs between the first transport device and the second transport device when the first transport device transports a workpiece to be machined to the machine tool, and a step of controlling the drive of the first transport device and the second transport device so as not to cause the collision when it is determined that the collision will occur, and transporting the workpiece to be machined to the machine tool.

[0013] In another example of the present disclosure, a control program for a workpiece transport system is provided. The transport system includes a transport path, a first transport device configured to be able to travel on the transport path and for transporting a workpiece, a second transport device configured to be able to travel on the transport path and for transporting a workpiece, and a machine tool for machining the workpiece transported by the first transport device or the second transport device. The control program causes the transport system to execute a step of determining whether or not a collision occurs between the first transport device and the second transport device when the first transport device transports a workpiece to be machined to the machine tool, and a step of controlling the driving of the first transport device and the second transport device so as not to cause the collision when it is determined that the collision will occur, and transporting the workpiece to be machined to the machine tool.

[0014] The above and other objects, features, aspects and advantages of the present invention will become apparent from the following detailed description of the invention taken in conjunction with the accompanying drawings. [Brief description of the drawings]

[0015] [Figure 1] FIG. 1 is a conceptual diagram illustrating a configuration of a transport system. [Diagram 2] FIG. 2 is a diagram illustrating an example of a device configuration of a transport system. [Diagram 3] 1A to 1C are diagrams illustrating an example of a process of transporting a workpiece. [Figure 4] FIG. 2 is a diagram illustrating an example of a functional configuration of a transport system. [Diagram 5] FIG. 13 is a diagram illustrating an example of a data structure of processing settings. [Figure 6] FIG. 4 is a diagram illustrating an example of a data structure of work information. [Figure 7] FIG. 4 is a diagram illustrating an example of a data structure of a transport schedule. [Figure 8] 11A to 11C are diagrams illustrating an example of a driving process of a conveying device. [Figure 9] 9 is a diagram showing the driving process of the conveying device subsequent to FIG. 8. [Figure 10] 10 is a diagram showing the driving process of the transport device subsequent to FIG. 9. [Figure 11] 11 is a diagram showing the driving process of the conveying device subsequent to FIG. 10. [Figure 12] 11A to 11C are diagrams illustrating an example of a driving process of a conveying device. [Figure 13] 13 is a diagram showing the driving process of the conveying device subsequent to FIG. 12. [Figure 14] FIG. 2 is a schematic diagram illustrating an example of a hardware configuration of a control system. [Figure 15] FIG. 1 is a block diagram showing a main hardware configuration of a PLC (Programmable Logic Controller). [Figure 16] FIG. 2 is a block diagram showing a main hardware configuration of a machine tool. [Figure 17] FIG. 2 is a schematic diagram illustrating an example of a hardware configuration of an operation terminal. [Figure 18] 11 is a flowchart showing a flow of a transport control process performed by the transport system. [Figure 19]This is a diagram showing an example of the driving process of the conveying device. [Figure 20] This is a diagram showing the driving process of the conveying device following FIG. 19. [Figure 21] This is a diagram showing the driving process of the conveying device following FIG. 20. [Figure 22] This is a diagram showing the driving process of the conveying device following FIG. 21.

Embodiments for Carrying out the Invention

[0016] Hereinafter, each embodiment according to the present invention will be described with reference to the drawings. In the following description, the same parts and components are denoted by the same reference numerals. Their names and functions are also the same. Therefore, detailed descriptions thereof will not be repeated. Note that each embodiment and each modification described below may be selectively combined as appropriate.

[0017] <A. Appearance of the Conveying System 10> Referring to FIG. 1, the conveying system 10 will be described. FIG. 1 is a conceptual diagram schematically showing the configuration of the conveying system 10.

[0018] As shown in FIG. 1, the conveying system 10 includes a storage unit 200, a conveying unit 300, a machine tool 400, and a work station 500.

[0019] The storage unit 200 is one of the destinations for the workpiece conveyed by the conveying unit 300. The storage unit 200 is configured to be able to store a plurality of pallets PL. In the example of FIG. 1, the storage unit 200 has storage areas AR1 to AR6. The pallet PL is configured to be able to attach the workpiece W. The storage unit 200 can store an empty pallet PL without the workpiece W attached, a pallet PL with the workpiece W before processing attached, a pallet PL with the workpiece W being processed attached, a pallet PL with the processed workpiece W attached, and the like. Note that the storage areas AR1 to AR6 of the storage unit 200 may be configured in one stage or multiple stages.

[0020] The transport section 300 includes a transport path 330 and a plurality of transport devices 340. In the example of Fig. 1, the transport section 300 is composed of two transport devices 340A and 340B. In the following, when the transport devices 340A and 340B are not particularly distinguished from each other, the transport devices 340A and 340B are also referred to as the transport devices 340. The transport section 300 may be composed of three or more transport devices 340.

[0021] The transport device 340 is configured to be capable of traveling on the transport path 330, and transports a designated pallet PL to a designated location. The transport device 340 is driven along the transport path 330 by, for example, a servo motor 335 (see FIG. 2) described below.

[0022] As an example, the conveying path 330 is a straight rail, and the conveying device 340 is a cart that travels on the rail. The cart has a fork unit that is configured to be drivable in a direction perpendicular to the conveying path 330 (i.e., a direction perpendicular to the traveling direction of the cart). The cart moves along the conveying path 330 to the position of the pallet PL to be conveyed, and uses the fork unit to place the pallet PL to be conveyed on the cart. Thereafter, the cart moves along the conveying path 330 to a designated destination, and uses the fork unit to carry the pallet PL to be conveyed to the destination. Note that the conveying device 340 may be provided with an arm robot instead of the fork unit.

[0023] The machine tool 400 is one of the destinations to which the pallet PL is transported by the transport unit 300. In the example of FIG. 1, the transport system 10 is composed of two machine tools 400A, 400B. Hereinafter, when the machine tools 400A, 400B are not particularly distinguished from each other, the machine tools 400A, 400B are also referred to as the machine tool 400. The transport system 10 may be composed of one machine tool 400, or may be composed of two or more machine tools 400. In addition, the machine tool 400 may be a machining center, a lathe, an additional processing machine, or another processing machine such as a cutting machine or a grinding machine.

[0024] The machine tool 400 processes the workpiece W attached to the loaded pallet PL according to a pre-designed machining program. When the machining of the workpiece W is completed, the pallet PL in the machine tool 400 is conveyed by the conveying device 340 to the storage unit 200 or the work station 500.

[0025] The work station 500 is one of the conveyance destinations of the pallet PL by the conveying unit 300. In the example of FIG. 1, an example in which the conveying system 10 is composed of one work station 500 is shown, but the conveying system 10 may be composed of two or more work stations 500.

[0026] At the work station 500, the operator performs various operations on the loaded pallet PL. As an example, at the work station 500, the operator performs operations such as attaching the workpiece W to be machined to the loaded pallet PL and removing the machined workpiece W from the pallet PL. When the operation on the pallet PL is completed, the operator performs an operation for instructing the completion of the operation. Based on this, the pallet PL in the work station 500 is conveyed by the conveying device 340 to the storage unit 200 or the machine tool 400.

[0027] <B. Device Configuration of Conveying System 10> FIG. 2 is a diagram showing an example of the device configuration of the conveying system 10. With reference to FIG. 2, an example of the device configuration of the conveying system 10 will be described.

[0028] As shown in FIG. 2, the conveying system 10 includes a control unit 50, remote I / O (Input / Output) units 61 to 63, a conveying device 340, a machine tool 400, and a work station 500.

[0029] The "control unit 50" in this specification means a device that controls the conveyance system 10. The device configuration of the control unit 50 is arbitrary. The control unit 50 may be configured with a single control unit or multiple control units. In the example of FIG. 2, the control unit 50 is configured with a control system 100 and a control panel 150. The control unit 50 may include a CNC 401 that controls the machine tool 400, or an operation terminal 550 in the work station 500.

[0030] The control system 100 is a main computer that controls the transport system 10. The control panel 150 controls various industrial devices for automating the processing steps. The control panel 150 includes a PLC 151.

[0031] The control system 100 and the PLC 151 are connected to a network NW1. The control system 100 and the PLC 151 may be connected for communication by wire or wirelessly. EtherNET (registered trademark) or the like is adopted for the network NW1. The control system 100 sends a control command to the PLC 151 via the network NW1. The control command specifies the pallet PL to be transported, the destination of the pallet PL, start / stop of transport of the pallet PL, etc.

[0032] The remote I / O units 61 to 63 and the PLC 151 are connected to a network NW2. It is preferable to use a field network that performs periodic communication and guarantees the arrival time of data for the network NW2. As a field network that performs such periodic communication, EtherCAT (registered trademark), EtherNet / IP (registered trademark), CC-Link (registered trademark), CompoNet (registered trademark), or the like is used.

[0033] The conveying device 340 includes one or more servo drivers 334 and one or more servo motors 335. A remote I / O unit 61 is installed in the conveying section 300 or in the vicinity of the conveying section 300. The remote I / O unit 61 mediates data exchange between the servo driver 334 and the PLC 151. The servo driver 334 receives a control command from the PLC 151 via the remote I / O unit 61 at regular intervals, and drives and controls the servo motor 335 according to the control command. As an example, one servo motor 335 controls the travel of the carriage of the conveying device 340 (see FIG. 1), and the other servo motor 335 controls the drive of the fork part of the conveying device 340 (see FIG. 1).

[0034] The servo driver 334 sequentially receives the input of the target rotation speed (or the target position) from the PLC 151, and controls the servo motor 335 so that the servo motor 335 rotates at the target rotation speed. More specifically, the servo driver 334 calculates the actual rotation speed (or the actual position) of the servo motor 335 from a feedback signal of an encoder (not shown) for the servo motor 335. The servo driver 334 increases the rotation speed of the servo motor 335 when the actual rotation speed is smaller than the target rotation speed, and decreases the rotation speed of the servo motor 335 when the actual rotation speed is larger than the target rotation speed. In this way, the servo driver 334 makes the rotation speed of the servo motor 335 approach the target rotation speed while sequentially receiving the feedback of the rotation speed of the servo motor 335. This allows the transport device 340 to move the pallet PL to any transport destination.

[0035] The machine tool 400 includes a CNC (Computer Numerical Control) 401, a servo driver 411, and a servo motor 412. A remote I / O unit 62 is installed inside or around the machine tool 400. The remote I / O unit 62 mediates data exchange between various drive units (e.g., the CNC 401) inside the machine tool 400 and the PLC 151. Similar to the servo driver 334, the servo driver 411 receives control commands from the PLC 151 via the remote I / O unit 62 at regular intervals and drives and controls the servo motor 412 according to the control commands. The servo motor 412 drives the main spindle 415 (see FIG. 16) and the like, which will be described later.

[0036] The work station 500 includes an operation terminal 550 that receives operations by an operator. A remote I / O unit 63 is installed inside or around the work station 500. The remote I / O unit 63 mediates data exchange between the operation terminal 550 and the PLC 151. The operation content of the operator on the operation terminal 550 is sent to the PLC 151 via the remote I / O unit 63 at regular intervals.

[0037] <C. Overview> Next, with reference to FIG. 3, the workpiece transfer control by the transfer system 10 will be described. FIG. 3 is a diagram showing an example of the workpiece transfer process.

[0038] In the transfer system 10 according to the present embodiment, a plurality of transfer devices 340A and 340B share one transfer path 330. When the control unit 50 of the transfer system 10 drives the transfer devices 340A and 340B so as to transfer the workpiece to be processed to the machine tool 400 along the shortest route, there is a possibility that the transfer devices 340A and 340B may collide.

[0039] As an example, assume that the work of attaching workpiece W1 to pallet PL1 is completed at work station 500. If machine tool 400A is machining another workpiece or machine tool 400A is not compatible with machining workpiece W1, workpiece W1 is transported to machine tool 400B instead of machine tool 400A. In this case, if conveyance device 340A conveys workpiece W1 from work station 500 to machine tool 400B, the conveyance route will be the shortest. However, there is another conveyance device 340B on the conveyance route of conveyance device 340A.

[0040] Therefore, the control unit 50 judges whether or not a collision will occur between the transport device 340A and the transport device 340B when the transport device 340A transports the workpiece W1 to be machined to the machine tool 400B. The timing of this judgment may be the timing when the transport device 340A starts transporting the workpiece W1, or may be before the transport device 340A starts transporting the workpiece W1.

[0041] When the control unit 50 determines that a collision will occur between the conveying devices 340A and 340B, it controls the driving of the conveying devices 340A and 340B so as to prevent the collision, and conveys the workpiece W1 to be processed to the machine tool 400B.

[0042] Collision between the transport device 340A and the transport device 340B can be avoided by various methods. In the example of Fig. 3, the control unit 50 first transfers the workpiece W1 to be processed from the transport device 340A to the transport device 340B. The workpiece W1 may be directly transferred from the transport device 340A to the transport device 340B, or may be indirectly transferred from the transport device 340A to the transport device 340B via a temporary storage area such as the storage unit 200. Thereafter, the control unit 50 controls the drive of the transport device 340B so as to transport the workpiece W1 to the machine tool 400B.

[0043] As a result, the control unit 50 can transfer the workpiece W1 to the machine tool 400B while avoiding a collision between the transfer device 340A and the transfer device 340B. Further, since the transfer system 10 includes a plurality of transfer devices 340A and 340B, the transfer efficiency of the workpiece is higher than that when the workpiece is transferred by a single transfer device 340.

[0044] <D. Functional Configuration of Control Unit 50> With reference to FIGS. 4 to 11, the functional configuration of the control unit 50 (see FIG. 2) of the transfer system 10 will be described. FIG. 4 is a diagram showing an example of the functional configuration of the control unit 50.

[0045] As shown in FIG. 4, the control unit 50 includes, as functional components, a schedule generation unit 152, a collision determination unit 154, and a transfer control unit 156. These functional components are implemented in the control system 100 (see FIG. 2) or the PLC 151 (see FIG. 2). Alternatively, these functional components may be implemented in the operation terminal 550 (see FIG. 2).

[0046] In a certain aspect, some of the functional configurations of the schedule generation unit 152, the collision determination unit 154, and the transfer control unit 156 are implemented in the control system 100, and the remaining functional configurations are implemented in the PLC 151. In another aspect, all of the schedule generation unit 152, the collision determination unit 154, and the transfer control unit 156 are implemented in the control system 100. In another aspect, all of the schedule generation unit 152, the collision determination unit 154, and the transfer control unit 156 are implemented in the PLC 151.

[0047] (D1. Schedule Generation Unit 152) First, with reference to FIGS. 5 to 7, the function of the schedule generation unit 152 shown in FIG. 4 will be described.

[0048] The schedule generation unit 152 generates a transfer schedule 125 shown in FIG. 7 based on the processing setting 123 shown in FIG. 5 and the workpiece information 124 shown in FIG. 6.

[0049] 5 is a diagram showing an example of the data structure of the processing settings 123. An operator registers the workpieces to be processed in advance by registering the processing settings 123. The processing settings 123 are registered by the operator, for example, in the above-mentioned control system 100 or the above-mentioned operation terminal 550. The contents registered by the operator include, for example, identification information (such as the workpiece name and workpiece ID) of the workpieces to be processed, the number of workpieces to be processed, and the processing order of the workpieces.

[0050] In the example of FIG. 5, the machining setting 123 includes a machining task for two workpieces W1, a machining task for two workpieces W2, a machining task for four workpieces W3, and a machining task for six workpieces W4.

[0051] 6 is a diagram showing an example of the data structure of the work information 124. As an example, in the work information 124, a machining program for realizing machining of the work, the weight of the work, the machining time required for machining the work, and other information related to the machining of the work are specified for each identification information of the work.

[0052] The machining program defined in the workpiece information 124 is registered by an operator, for example, in the above-mentioned control system 100, the above-mentioned machine tool 400, or the above-mentioned operation terminal 550. The machining program may be generated in any manner. As an example, some machine tools 400 have a function for automatically generating a machining program by having an operator answer questions in an interactive format. The machining program is generated, for example, by this function. Alternatively, the machining program may be designed by an operator writing a program code.

[0053] The weight defined in the workpiece information 124 may be preset by a user, or may be registered when a machining program is designed. As an example, the weight is inputted at the operation terminal 550. The weight indicates the weight of the workpiece before machining starts.

[0054] The machining time defined in the workpiece information 124 is, for example, input in advance by an operator. Alternatively, the machining time may be calculated from the past machining results of each workpiece.

[0055] The schedule generating unit 152 refers to the workpiece information 124 and specifies a processing time for each workpiece defined in the processing setting 123. Next, the schedule generating unit 152 generates a transfer schedule 125 shown in FIG. 7 based on the specified processing time, the number of each workpiece defined in the processing setting 123, and the processing sequence of each workpiece defined in the processing setting 123.

[0056] 7 is a diagram showing an example of a data structure of the transfer schedule 125. The transfer schedule 125 specifies a workpiece transport task by the transport device 340. The transfer schedule 125 generated by the schedule generating unit 152 is stored in, for example, a storage device in the transport system 10.

[0057] As an example, in the transfer schedule 125, the transfer date and time, the transfer subject, the transfer origin, the transfer destination, and the transfer target are associated in chronological order.

[0058] The date and time indicated in the transfer schedule 125 is information that specifies the timing for starting the transfer of a workpiece or a pallet. The date and time is specified, for example, by a date and a time. Note that the transfer schedule 125 may further specify the timing for ending the transfer of a workpiece or a pallet.

[0059] The transport subject indicated in the transport schedule 125 is information for uniquely identifying the transport device 340. The transport subject is defined, for example, by the identification information of the transport device 340. Examples of the transport subject include transport devices 340A and 340B.

[0060] The transfer origin indicated in the transfer schedule 125 is information for uniquely identifying the storage location of the pallet or workpiece. Examples of the storage location include the storage areas AR1 to AR6 in the storage unit 200, the machine tools 400A and 400B, and the work station 500.

[0061] The transfer destination indicated in the transfer schedule 125 is information for uniquely identifying the transfer destination of the pallet or workpiece. Examples of the transfer destination include the storage areas AR1 to AR6 in the storage unit 200, the machine tools 400A and 400B, and the work station 500.

[0062] The transfer target indicated in the transfer schedule 125 is information for uniquely identifying an object to be transferred. The transfer target is defined, for example, by at least one of the identification information of the workpiece and the identification information of the pallet.

[0063] (D2. Collision judgment unit 154) Next, still with reference to FIG. 7, the function of the collision determination unit 154 shown in FIG. 4 will be described.

[0064] The collision determination unit 154 determines, based on the transfer schedule 125, whether or not a collision will occur between the transfer devices 340A and 340B.

[0065] As a more specific process, the collision determination unit 154 monitors the date and time specified in the transport schedule 125 and determines whether or not the timing to execute the work transport task has arrived. When it is determined that the timing to execute the work transport task has arrived, the collision determination unit 154 acquires the transport task to be executed from the transport schedule 125. The transport task includes at least the entity transporting the work, the source of the work, and the destination of the work.

[0066] Next, the collision determination unit 154 determines whether or not another transport device other than the transport subject exists on the transport route between the transport source and the transport destination. The position of the other transport device may be specified from the transport schedule 125, for example, or may be calculated from the feedback signal of the servo motor 335 (see FIG. 2).

[0067] When the collision determination unit 154 determines that another transport device exists on the transport path, it determines that a collision will occur between the transport devices 340. On the other hand, when the collision determination unit 154 determines that another transport device does not exist on the transport path, it determines that a collision will not occur between the transport devices 340. The determination result by the collision determination unit 154 is output to the transport control unit 156.

[0068] The method for determining whether or not a collision will occur between the transport devices 340 is not limited to the above-mentioned method, and various other methods may be adopted.

[0069] As an example, a sensor capable of detecting an obstacle (hereinafter also referred to as an "obstacle sensor") may be provided in the transport device 340, and the collision determination unit 154 may determine whether or not a collision will occur between the transport devices 340 based on an output value of the obstacle sensor. As the obstacle sensor, for example, a distance sensor such as an ultrasonic sensor or a laser sensor is adopted.

[0070] The distance sensor is provided on at least one of the transport devices 340A and 340B so as to detect the distance between the transport devices 340A and 340B. The collision determination unit 154 determines that a collision between the transport devices 340A and 340B will occur when the distance detected by the distance sensor becomes less than a predetermined value. On the other hand, the collision determination unit 154 determines that a collision between the transport devices 340A and 340B will not occur while the distance detected by the distance sensor is equal to or greater than the predetermined value.

[0071] (D3. Transport control unit 156) Next, still with reference to FIG. 7, the function of the transport control unit 156 shown in FIG. 4 will be described.

[0072] The transfer control unit 156 controls the transfer of the transfer device 340 in accordance with the transfer task defined in the transfer schedule 125. As an example, when the current date and time becomes "T1", the transfer control unit 156 controls the drive of the transfer subject "transfer device 340A" to transfer the transfer target "pallet PL1" located in the transfer source "storage area AR1" to the transfer destination "machine tool 400B". When the current date and time becomes "T2", the transfer control unit 156 controls the drive of the transfer subject "transfer device 340B" to transfer the transfer target "pallet PL6" located in the transfer source "storage area AR6" to the transfer destination "work station 500".

[0073] On the other hand, when the collision determination unit 154 determines that a collision of the transport device 340 will occur, the transport control unit 156 executes a collision avoidance process for the transport device 340. An example of the collision avoidance process for the transport device 340 will be described below with reference to Figs. 8 to 11.

[0074] 8 is a diagram showing an example of the driving process of the transport devices 340A and 340B. As described above, when the date and time "T1" arrives, the transport device 340A starts the process of transporting the workpiece W1 to the machine tool 400B. At this time, the transport device 340B is present on the travel path when the transport device 340A transports the workpiece W1 to be processed to the machine tool 400B, so the collision determination unit 154 described above determines that a collision will occur between the transport devices 340A and 340B.

[0075] Based on this, the transfer control unit 156 determines a temporary placement area for the workpiece W1 from among the storage areas AR1 to AR6 of the storage unit 200. Preferably, the transfer control unit 156 determines, as the temporary placement area, an empty area that is closer to the destination machine tool 400B among empty areas in the storage unit 200 that are closer to the transfer device 340A side than the transfer device 340B.

[0076] 8, the transfer control unit 156 determines the temporary placement area from among the storage areas AR1-AR5 that are closer to the transfer device 340A than the transfer device 340B. As an example, the transfer control unit 156 determines the storage area AR5 that is closest to the machine tool 400B among the storage areas AR1-AR5 that are empty areas as the temporary placement area.

[0077] Next, the transport control unit 156 controls the driving of the transport device 340A so as to store the workpiece W1 stored in the storage area AR1 in the storage area AR5 determined as the temporary placement area.

[0078] Fig. 9 is a diagram showing the driving process of the transport devices 340A and 340B following Fig. 8. Referring to Fig. 9, based on the fact that the workpiece W1 has been stored in the storage area AR5 as a temporary placement area, the transport control unit 156 controls the driving of the transport device 340A so as to move it away from the transport device 340B. As a result, the transport device 340A is retracted, and the travel path of the transport device 340B is secured.

[0079] Fig. 10 is a diagram showing the driving process of the transport devices 340A and 340B following Fig. 9. Referring to Fig. 10, based on the fact that the transport device 340A has been evacuated, the transport control unit 156 moves the transport device 340B to the front of the storage area AR5, which is a temporary placement area.

[0080] Fig. 11 is a diagram showing the driving process of the transport devices 340A and 340B following Fig. 10. Referring to Fig. 11, when the transport device 340B moves to the front of the storage area AR5, which is a temporary placement area, the transport control unit 156 places the workpiece W1 stored in the storage area AR5 on the transport device 340B. Thereafter, the transport control unit 156 controls the driving of the transport device 340B so as to transport the workpiece W1 to the machine tool 400B.

[0081] As described above, the conveyance control unit 156 drives the conveyance device 340A to store the workpiece W1 to be processed in the temporary storage area within the storage unit 200, and drives the conveyance device 340B to convey the workpiece W1 stored in the temporary storage area to the machine tool 400B. Thereby, collisions between the conveyance devices 340A and 340B are avoided.

[0082] Note that in the above description, an example in which the temporary storage area is used when transferring the workpiece W1 from the conveyance device 340A to the conveyance device 340B has been described. However, the workpiece W1 may be transferred from the conveyance device 340A to the conveyance device 340B.

[0083] <E. Collision Avoidance Processing Using a Retraction Area> Next, with reference to FIGS. 12 and 13, collision avoidance processing using a retraction area will be described.

[0084] In the above example, the conveyance control unit 156 conveyed the workpiece to be processed to the machine tool 400 using the temporary storage area within the storage unit 200. That is, the conveyance device 340A conveyed the workpiece to the temporary storage area, and another conveyance device 340B conveyed the workpiece from the temporary storage area to the machine tool 400. In contrast, in this example, the conveyance control unit 156 retracts the conveyance device 340B to the retraction area, and conveys the workpiece to be processed to the machine tool 400 without using the temporary storage area.

[0085] FIG. 12 is a diagram showing an example of the driving process of the conveyance devices 340A and 340B. As shown in FIG. 12, in this example, a retraction area EVB is provided. The retraction area EVB is provided, for example, at a location farther from the conveyance device 340A (for example, the end of the conveyance path 330), and is an area not used by the conveyance device 340A. Typically, the distance on the conveyance path 330 from the conveyance device 340A to the retraction area EVB is longer than the distance on the conveyance path 330 from the conveyance device 340A to the machine tool 400B.

[0086] When a collision between the transfer devices 340A and 340B occurs and is determined by the above-described collision determination unit 154, the transfer control unit 156 controls the drive of the transfer device 340B so as to move away from the transfer device 340A. As a result, the transfer device 340B moves to the evacuation area EVB. As a result, the travel path of the transfer device 340A is secured.

[0087] FIG. 13 is a diagram showing the driving process of the transfer devices 340A and 340B following FIG. 12. Referring to FIG. 13, based on the fact that the transfer device 340B has moved to the evacuation area EVB, the transfer control unit 156 moves the transfer device 340A in front of the storage area AR1 that stores the workpiece W1 to be transferred. Thereafter, the transfer control unit 156 controls the drive of the transfer device 340A so as to transfer the workpiece W1 stored in the storage area AR1 to the machine tool 400B.

[0088] As described above, in this example, the transfer control unit 156 avoids a collision between the transfer device 340A and the transfer device 340B by evacuating the transfer device 340B to the evacuation area EVB.

[0089] In the above description, an example in which the evacuation area EVB for the transfer device 340B is provided in the transfer unit 300 has been described. However, an evacuation area for the transfer device 340A (hereinafter, also referred to as "evacuation area EVA") may be provided in the transfer unit 300. The evacuation area EVA is provided, for example, at a location farther from the transfer device 340B (for example, the end of the transfer path 330). Typically, the distance on the transfer path 330 from the transfer device 340B to the evacuation area EVA is longer than the distance on the transfer path 330 from the transfer device 340B to the machine tool 400A. As an example, the evacuation area EVA for the transfer device 340A is located at the antipole of the evacuation area EVB for the transfer device 340B.

[0090] When the transfer device 340A moves to the evacuation area EVA, the travel path of the transfer device 340B is secured. As a result, a collision between the transfer device 340A and the transfer device 340B can be avoided.

[0091] <F. Hardware Configuration of the Control System 100> The hardware configuration of the control system 100 will be described with reference to Fig. 14. Fig. 14 is a schematic diagram showing an example of the hardware configuration of the control system 100.

[0092] The control system 100 includes a processor 101, a ROM (Read Only Memory) 102, a RAM (Random Access Memory) 103, a communication interface 104, a display interface 105, an input interface 107, and an auxiliary storage device 120. These components are connected to a bus 110.

[0093] The processor 101 is, for example, configured by at least one integrated circuit. The integrated circuit may be, for example, configured by at least one central processing unit (CPU), at least one graphics processing unit (GPU), at least one application specific integrated circuit (ASIC), at least one field programmable gate array (FPGA), or a combination thereof.

[0094] The processor 101 controls the operation of the control system 100 by executing various programs such as a control program 122 and an operating system. The control program 122 is a program related to the transport control of a workpiece. Upon receiving an execution command for the control program 122, the processor 101 reads the control program 122 from the auxiliary storage device 120 or the ROM 102 to the RAM 103. The RAM 103 functions as a working memory and temporarily stores various data required for the execution of the control program 122.

[0095] A LAN (Local Area Network), an antenna, and the like are connected to the communication interface 104. The control system 100 is connected to a network NW1 via the communication interface 104. This allows the control system 100 to exchange data with external devices connected to the network NW1. The external devices include, for example, a control panel 150 and a server (not shown). The control system 100 may be configured to be able to download the control program 122 from the external devices.

[0096] A display 106 is connected to the display interface 105. The display interface 105 sends an image signal for displaying an image to the display 106 in accordance with a command from the processor 101 or the like. The display 106 is, for example, a liquid crystal display, an organic EL (Electro Luminescence) display, or other display device. The display 106 may be configured integrally with the control system 100, or may be configured separately from the control system 100.

[0097] An input device 108 is connected to the input interface 107. The input device 108 is, for example, a mouse, a keyboard, a touch panel, or other device capable of receiving a user's operation. The input device 108 may be configured integrally with the control system 100, or may be configured separately from the control system 100.

[0098] The auxiliary storage device 120 is a storage medium such as a hard disk or a flash memory, for example. The auxiliary storage device 120 stores a control program 122, the above-described processing settings 123, the above-described workpiece information 124, and the above-described conveyance schedule 125, etc. The storage location of various data stored in the auxiliary storage device 120 is not limited to the auxiliary storage device 120. The various data may be stored in a storage area (such as a cache memory) of the processor 101, the ROM 102, the RAM 103, an external device (such as a PLC 151 or an external server), etc.

[0099] Note that the control program 122 may be provided incorporated as part of an arbitrary program, rather than as a single program. In this case, the conveyance control process by the control program 122 is realized in cooperation with an arbitrary program. Even a program that does not include such a part of a module does not deviate from the gist of the control program 122 according to the present embodiment. Furthermore, part or all of the functions provided by the control program 122 may be realized by dedicated hardware. Furthermore, the control system 100 may be configured in a form such as a so-called cloud service in which at least one server executes part of the processing of the control program 122.

[0100] <Hardware Configuration of G.PLC151> With reference to FIG. 15, an example of the hardware configuration of the PLC 151 will be described. FIG. 15 is a block diagram showing the main hardware configuration of the PLC 151.

[0101] The PLC 151 includes a processor 161, a ROM (Read Only Memory) 162, a RAM (Random Access Memory) 163, communication interfaces 164, 165, and an auxiliary storage device 170.

[0102] The processor 161 is configured by at least one integrated circuit. The integrated circuit is configured by, for example, at least one CPU, at least one MPU (Micro Processing Unit), at least one ASIC, at least one FPGA, or a combination thereof.

[0103] The processor 161 controls the operations of the transport device 340 and the machine tool 400 by executing various programs such as a control program 172. Upon receiving an execution command for the control program 172, the processor 161 reads the control program 172 from the auxiliary storage device 170 to the ROM 162. The RAM 163 functions as a working memory and temporarily stores various data required for the execution of the control program 172.

[0104] A LAN, an antenna, and the like are connected to the communication interface 164. The PLC 151 is connected to the network NW1 via the communication interface 164. As a result, the PLC 151 exchanges data with external devices connected to the network NW1. The external devices include, for example, the control system 100 and a server (not shown).

[0105] The communication interface 165 is an interface for connecting to the network NW2, which is a field network. The PLC 151 exchanges data with external devices connected to the network NW2 via the communication interface 165. The external devices include, for example, the remote I / O units 61 to 63.

[0106] The auxiliary storage device 170 is a storage medium such as a hard disk or a flash memory, for example. The auxiliary storage device 170 stores a control program 172, work information 174, a transfer schedule 175, and the like. The work information 174 corresponds to the work information 124 received from the control system 100 described above. The transfer schedule 175 corresponds to the transfer schedule 125 received from the control system 100 described above. The storage location of various data stored in the auxiliary storage device 170 is not limited to the auxiliary storage device 170, and may be stored in a storage area (such as a cache area) of the processor 161, the ROM 162, the RAM 163, an external device (such as a server), or the like.

[0107] The control program 172 may be provided by being incorporated into a part of an arbitrary program, rather than as a single program. In this case, the control process according to the present embodiment is realized in cooperation with an arbitrary program. Even a program that does not include such a part of the module does not deviate from the spirit of the control program 172 according to the present embodiment. Further, some or all of the functions provided by the control program 172 may be realized by dedicated hardware. Further, the PLC 151 may be configured in a form such as a so-called cloud service in which at least one server executes a part of the processing of the control program 172.

[0108] <H. Hardware Configuration of Machine Tool 400> With reference to FIG. 16, an example of the hardware configuration of the machine tool 400 will be described. FIG. 16 is a block diagram showing the main hardware configuration of the machine tool 400.

[0109] Machine tool 400 includes a CNC 401, a ROM 402, a RAM 403, a field bus controller 404, a display interface 405, an input interface 409, servo drivers 411A-411D, servo motors 412A-412D, encoders 413A-413D, ball screws 414A and 414B, and a spindle 415 for mounting a tool. These devices are connected via a bus (not shown).

[0110] The CNC 401 is configured by at least one integrated circuit. The integrated circuit is configured by, for example, at least one CPU, at least one MPU, at least one ASIC, at least one FPGA, or a combination thereof.

[0111] The CNC 401 controls the operation of the CNC 400 by executing various programs such as a machining program 422. Upon receiving an execution command for the machining program 422, the CNC 401 reads the machining program 422 from the auxiliary storage device 420 to the ROM 402. The RAM 403 functions as a working memory and temporarily stores various data required for the execution of the machining program 422.

[0112] The field bus controller 404 is an interface for realizing communication with the PLC 151 via the remote I / O unit 62. The CNC 400 exchanges data with the PLC 151 via the field bus controller 404.

[0113] The display interface 405 is connected to a display device such as a display 430, and sends an image signal for displaying an image on the display 430 in accordance with a command from the CNC 401 or the like. The display 430 is, for example, a liquid crystal display, an organic EL display, or other display device.

[0114] The input interface 409 may be connected to an input device 431. The input device 431 is, for example, a mouse, a keyboard, a touch panel, or any other input device capable of accepting a user operation.

[0115] The CNC 400 controls the servo driver 411A according to the machining program 422. The servo driver 411A sequentially receives the input of the target rotation speed (or the target position) from the CNC 401, controls the servo motor 412A so that the servo motor 412A rotates at the target rotation speed, and drives the workpiece placement table (not shown) in the X-axis direction. More specifically, the servo driver 411A calculates the actual rotation speed (or the actual position) of the servo motor 412A from the feedback signal of the encoder 413A. When the actual rotation speed is smaller than the target rotation speed, the servo driver 411A increases the rotation speed of the servo motor 412A, and when the actual rotation speed is larger than the target rotation speed, the servo driver 411A decreases the rotation speed of the servo motor 412A. In this way, the servo driver 411A brings the rotation speed of the servo motor 412A closer to the target rotation speed while sequentially receiving the feedback of the rotation speed of the servo motor 412A. The servo driver 411A moves the workpiece placement stage, which is connected to the ball screw 414A, in the X-axis direction, and moves the workpiece placement stage to an arbitrary position in the X-axis direction.

[0116] By similar motor control, servo driver 411B moves a workpiece placement table connected to ball screw 414B in the Y-axis direction in accordance with a control command from CNC 400, and moves the workpiece placement table to an arbitrary position in the Y-axis direction. By similar motor control, servo driver 411C moves spindle 415 in the Z-axis direction in accordance with a control command from CNC 400, and moves spindle 415 to an arbitrary position in the Z-axis direction. By similar motor control, servo driver 411D controls the rotation speed of spindle 415, whose center of rotation is the axial direction of spindle 415, in accordance with a control command from CNC 400.

[0117] The auxiliary storage device 420 is a storage medium such as a hard disk or a flash memory, for example. The auxiliary storage device 420 stores a processing program 422 and the like. The storage location of the processing program 422 is not limited to the auxiliary storage device 420 and may be stored in the storage area of the CNC 401 (such as a cache area), the ROM 402, the RAM 403, an external device (such as a server), or the like.

[0118] <I. Hardware Configuration of the Operation Terminal 550> Referring to FIG. 17, the hardware configuration of the operation terminal 550 installed in the work station 500 will be described. FIG. 17 is a schematic diagram showing an example of the hardware configuration of the operation terminal 550.

[0119] The operation terminal 550 includes a processor 501, a ROM 502, a RAM 503, a communication interface 504, a display interface 505, an input interface 507, and an auxiliary storage device 520. These components are connected to a bus 510.

[0120] The processor 501 is constituted by, for example, at least one integrated circuit. The integrated circuit can be constituted by, for example, at least one CPU, at least one GPU, at least one ASIC, at least one FPGA, or a combination thereof.

[0121] The processor 501 controls the operation of the operation terminal 550 by executing various programs such as a control program 522 and an operating system. Based on receiving an execution instruction of the control program 522, the processor 501 reads the control program 522 from the auxiliary storage device 520 or the ROM 502 into the RAM 503. The RAM 503 functions as a working memory and temporarily stores various data necessary for the execution of the control program 522.

[0122] A LAN, an antenna, and the like are connected to the communication interface 504. The operation terminal 550 is connected to the networks NW1, NW2 via the communication interface 504. As a result, the operation terminal 550 exchanges data with external devices connected to the networks NW1, NW2. The external devices include, for example, the control panel 150 and a server (not shown). The operation terminal 550 may be configured to be able to download the control program 522 from the external devices.

[0123] A display 506 is connected to the display interface 505. The display interface 505 sends an image signal for displaying an image to the display 506 in accordance with a command from the processor 501 or the like. A selection screen for accepting permission or refusal of the forced transport of a pallet currently being worked on at the work station 500 is displayed on the display 506. The display 506 is, for example, a liquid crystal display, an organic electroluminescence display, or other display device. The display 506 may be configured integrally with the operation terminal 550, or may be configured separately from the operation terminal 550.

[0124] An input device 508 is connected to the input interface 507. The input device 508 is, for example, a mouse, a keyboard, a touch panel, or other device capable of accepting user operations. The input device 508 may be configured integrally with the operation terminal 550, or may be configured separately from the operation terminal 550.

[0125] The auxiliary storage device 520 is, for example, a storage medium such as a hard disk or a flash memory. The auxiliary storage device 520 stores the control program 522 and the like. The storage location of the control program 522 and the like is not limited to the auxiliary storage device 520, and may be stored in a storage area of ​​the processor 501 (for example, a cache memory), the ROM 502, the RAM 503, an external device (for example, a server), or the like.

[0126] The control program 522 may be provided not as a standalone program but as part of an arbitrary program. In this case, the control process by the control program 522 is realized in cooperation with the arbitrary program. Even a program that does not include some of the modules does not deviate from the spirit of the control program 522 according to this embodiment. Furthermore, some or all of the functions provided by the control program 522 may be realized by dedicated hardware. Furthermore, the operation terminal 550 may be configured in a form similar to a so-called cloud service in which at least one server executes part of the process of the control program 522.

[0127] <J.フローチャート> Next, a control structure of the transport system 10 will be described with reference to Fig. 18. Fig. 18 is a flowchart showing the flow of a transport control process performed by the transport system 10.

[0128] 18 is realized by the control unit 50 executing the above-described control program 122 or the above-described control program 172. In another aspect, a part or all of the processing may be executed by circuit elements or other hardware.

[0129] In step S110, the control unit 50 functions as the above-mentioned transport control unit 156, and acquires a transport task whose execution timing has arrived by referring to the transport schedule 125 (see FIG. 7). The transport task specifies the transport date and time of the workpiece, the entity that transports the workpiece, the origin of the workpiece, and the destination of the workpiece. Hereinafter, the transport device 340 that is the entity that transports the workpiece is also referred to as the main transport device, and the transport device 340 that is not the entity that transports the workpiece is also referred to as the sub-transport device.

[0130] In step S120, the control unit 50 judges whether or not a transport task exists. As an example, the control unit 50 judges that a transport task exists when the control unit 50 acquires a transport task in step S110, and judges that a transport task does not exist when the control unit 50 cannot acquire a transport task in step S110. When the control unit 50 judges that a transport task exists (YES in step S120), the control unit 50 switches control to step S130. When the control unit 50 does not judge that a transport task exists (NO in step S120), the control unit 50 ends the process shown in FIG. 18.

[0131] In step S130, the control unit 50 functions as the collision determination unit 154 described above and determines whether or not a collision will occur between the main conveyance device and the sub-conveyance device. The method of determination is as described above, and therefore the description will not be repeated. If the control unit 50 determines that a collision will occur between the main conveyance device and the sub-conveyance device (YES in step S130), it switches control to step S134. If not (NO in step S130), the control unit 50 switches control to step S132.

[0132] In step S132, the control unit 50 functions as the above-mentioned transport control unit 156 and controls the driving of the main transport device according to the transport task acquired in step S110. Based on the completion of the process of step S132, the control unit 50 rewrites the transport schedule 125 so that the transport task acquired in step S110 is completed.

[0133] In step S134, the control unit 50 functions as the above-mentioned transport control unit 156, and obtains a temporary placement area for the workpiece from the free space in the storage unit 200. At this time, the control unit 50 determines, as the temporary placement area, a free space that is closer to the destination machine tool 400 among the free spaces in the storage unit 200 that is closer to the main transport unit than the sub-transport unit.

[0134] The storage status of the pallets in the storage unit 200 is managed, for example, by storage location information (not shown). The storage location information specifies, for each storage area in the storage unit 200, whether a pallet (or work) is stored, the identification number of the stored pallet (or work), etc. The control unit 50 updates the storage location information every time a pallet or work is transported.

[0135] In step S140, the control unit 50 determines whether or not there is a temporary storage area in the storage unit 200. If the control unit 50 determines that there is a temporary storage area in the storage unit 200 (YES in step S140), the control unit 50 switches control to step S142. If not (NO in step S140), the control unit 50 switches control to step S152.

[0136] In step S142, the control unit 50 calculates the transport cost for the multiple transport patterns. The transport cost is calculated based on, for example, the moving distance of the main transport device and the moving distance of the sub-transport device. As an example, the larger the sum of the moving distance of the main transport device and the moving distance of the sub-transport device, the higher the transport cost, and the smaller the sum, the lower the transport cost. As an example, the control unit 50 calculates the transport cost of the first transport pattern and the transport cost of the second transport pattern.

[0137] 8 to 11, and is a pattern in which the temporary placement area is used to transport the workpiece to be machined to the machine tool 400. That is, in the first transport pattern, the main transport device transports the workpiece to the temporary placement area, and the sub-transport device transports the workpiece from the temporary placement area to the machine tool 400.

[0138] The second transfer pattern corresponds to the transfer patterns shown in FIGS. 12 and 13 described above, and is a pattern for transferring the workpiece to be processed to the machine tool 400 without using the temporary storage area. That is, in the second transfer pattern, the sub-transfer device moves to the above-described retracted area EVB, and the main transfer device directly transfers the workpiece to be processed to the machine tool 400.

[0139] In step S150, the control unit 50 determines whether the transfer cost of the first transfer pattern is lower than the transfer cost of the second transfer pattern. When the control unit 50 determines that the transfer cost of the first transfer pattern is lower than the transfer cost of the second transfer pattern (YES in step S150), the control is switched to step S154. Otherwise (NO in step S150), the control unit 50 switches the control to step S152.

[0140] In step S152, the control unit 50 moves the sub-transfer device to the above-described retracted area EVB. Thereafter, when the control returns to step S130 and it is determined that no collision occurs between the main transfer device and the sub-transfer device (YES in step S130), the main transfer device directly transfers the workpiece to be processed to the machine tool 400 (step S132).

[0141] In step S154, the control unit 50 controls the drive of the main transfer device and stores the workpiece to be processed in the temporary storage area acquired in step S134.

[0142] In step S156, the control unit 50 rewrites the transfer task acquired in step S110 and updates the transfer schedule 125. More specifically, the control unit 50 rewrites the information of the transfer source to the temporary storage area and rewrites the information of the transfer entity from the main transfer device to the sub-transfer device. As a result, when the updated transfer task is executed, the workpiece stored in the temporary storage area is transferred to the machine tool 400 at the transfer destination by the sub-transfer device.

[0143] <K. Another Example of Collision Avoidance Processing> Next, another example of the collision avoidance process will be described with reference to FIGS.

[0144] 8 to 11 described above, a method for avoiding collisions that may occur when the transport device 340A transports a workpiece to the machine tool 400B has been described. In contrast, in this example, a method for avoiding collisions that may occur when the transport device 340A transports a workpiece to the machine tool 400B and the transport device 340B transports a workpiece to the machine tool 400A will be described.

[0145] Fig. 19 is a diagram showing an example of a driving process of the transport devices 340A and 340B. With reference to Fig. 19, at a certain timing, the transport control unit 156 receives a transport task of causing the transport device 340A to transport the workpiece W1 to the machine tool 400B and a transport task of causing the transport device 340B to transport the workpiece W6 to the machine tool 400A simultaneously or approximately simultaneously. In this case, the transport devices 340A and 340B cross each other on the transport path 330, so that the transport devices 340A and 340B collide with each other.

[0146] In order to avoid such a collision, first, the transfer control unit 156 moves the transfer device 340A to the front of the storage area AR1 that stores the workpiece W1 to be transferred. Then, the transfer control unit 156 places the workpiece W1 stored in the storage area AR1 on the transfer device 340A.

[0147] Next, the transport control unit 156 determines a temporary placement area for the workpiece W1 from among the empty areas in the storage unit 200 located closer to the transport device 340A than the transport device 340B. In the example of Fig. 19, the transport control unit 156 determines a temporary placement area from among the storage areas AR1 to AR5 located closer to the transport device 340A than the transport device 340B. As an example, the transport control unit 156 determines the storage area AR3 as the temporary placement area.

[0148] Next, the transport control unit 156 moves the transport device 340A to the front of the storage area AR3 determined as the temporary placement area, and stores the workpiece W1 in the storage area AR3. After that, based on the fact that the workpiece W1 has been stored in the storage area AR3, the transport control unit 156 drives the transport device 340A so as to move it away from the transport device 340B. This causes the transport device 340A to retreat, and the travel path of the transport device 340B is secured.

[0149] Fig. 20 is a diagram showing the driving process of the transport devices 340A and 340B following Fig. 19. Referring to Fig. 20, based on the fact that the transport device 340A has been evacuated, the transport control unit 156 moves the transport device 340B to the front of the storage area AR6 storing the workpiece W6 to be transported. After that, the transport control unit 156 places the workpiece W6 stored in the storage area AR6 on the transport device 340B.

[0150] Next, the transport control unit 156 determines a temporary placement area for the workpiece W6 from among the empty areas in the storage unit 200 that are closer to the transport device 340B than the temporary placement area for the workpiece W1 (i.e., the storage area AR3). In the example of Fig. 20, the transport control unit 156 determines a temporary placement area from among the storage areas AR4 and AR5 that are closer to the transport device 340B than the storage area AR3. As an example, the transport control unit 156 determines the storage area AR4, which is the closest to the storage area AR3 among the empty storage areas AR4 and AR5, as the temporary placement area.

[0151] Next, the transport control unit 156 moves the transport device 340B to the front of the storage area AR4 determined as the temporary placement area, and stores the workpiece W6 in the temporary placement area.

[0152] FIG. 21 is a diagram showing the driving process of the transport devices 340A and 340B following FIG. 20. Referring to FIG. 21, based on the fact that the workpiece W6 has been stored in the storage area AR4 as a temporary storage area, the transport control unit 156 moves the transport device 340B in front of the storage area AR3. Thereafter, the transport control unit 156 places the workpiece W1 stored in the storage area AR3 on the transport device 340B and transports the workpiece W1 to the machine tool 400B. Thereby, the transport of the workpiece W1 to the machine tool 400B is completed.

[0153] FIG. 22 is a diagram showing the driving process of the transport devices 340A and 340B following FIG. 21. Referring to FIG. 22, based on the fact that the transport of the workpiece W1 to the machine tool 400B has been completed, the transport control unit 156 moves the transport device 340A in front of the storage area AR4. Thereafter, the transport control unit 156 places the workpiece W6 stored in the storage area AR4 on the transport device 340A and transports the workpiece W6 to the machine tool 400A. Thereby, the transport of the workpiece W6 to the machine tool 400A is completed.

[0154] <L. Modification Example> In the above description, the transport control of the transport device 340 has been described on the premise of the linear transport path 330 having both ends, but the shape of the transport path 330 is not particularly limited.

[0155] As an example, the shape of the transport path 330 may be endless. Examples of the endless transport path 330 include, for example, a circular transport path 330. The various transport processes described above can also be applied to such an endless transport path 330.

[0156] It should be considered that the embodiments disclosed this time are illustrative in all respects and not restrictive. The scope of the present invention is shown not by the above description but by the claims, and it is intended that all modifications within the meaning and scope equivalent to the claims are included.

Explanation of Reference Numerals

[0157] 10 Transport system, 50 Control unit, 61 Remote I / O unit, 62 Remote I / O unit, 63 Remote I / O unit, 100 Control system, 101 Processor, 102 ROM, 103 RAM, 104 Communication interface, 105 Display interface, 106 Display, 107 Input interface, 108 Input device, 110 Bus, 120 Auxiliary storage device, 122 Control program, 123 Processing setting, 124 Work information, 125 Transport schedule, 150 Control panel, 152 Schedule generation unit, 154 Collision judgment unit, 156 Transport control unit, 161 Processor, 162 ROM, 163 RAM, 164 Communication interface, 165 Communication interface, 170 Auxiliary storage device, 172 Control program, 174 Work information, 175 Transport schedule, 200 Storage unit, 300 Transport unit, 330 Conveyor path, 334 servo driver, 335 servo motor, 340 conveyor device, 340A conveyor device, 340B conveyor device, 400 machine tool, 400A machine tool, 400B machine tool, 402 ROM, 403 RAM, 404 field bus controller, 405 display interface, 409 input interface, 411 servo driver, 411A servo driver, 411B servo driver, 411C servo driver, 411D servo driver, 412 servo motor, 412A servo motor, 412B servo motor, 412C servo motor, 412D servo motor, 413A encoder, 413B encoder, 413C encoder, 413D encoder, 414A ball screw, 414B ball screw, 415 spindle, 420 auxiliary storage device, 422 machining program, 430 Display, 431 input device, 500 work station, 501 processor, 502 ROM, 503 RAM, 504 communication interface, 505 display interface, 506 display, 507 input interface, 508 input device, 510 bus, 520 auxiliary storage device, 522 control program, 550 operation terminal.

Claims

1. A workpiece conveying system, comprising: A conveying path; A first conveying device configured to be capable of traveling on the conveying path and for conveying a workpiece; A second conveying device configured to be able to travel on the conveying path and for conveying a workpiece; a machine tool for machining a workpiece transported by the first transport device or the second transport device; A storage section capable of storing multiple workpieces; A control unit for controlling the transport system, The control unit is A process of determining whether or not a collision will occur between the first transport device and the second transport device when the first transport device transports a workpiece to be machined to the machine tool; When it is determined that the collision will occur, a process of controlling the driving of the first transport device and the second transport device so that the collision will not occur and transporting the workpiece to be machined to the machine tool is executed. The transporting process includes: determining, as a temporary placement area, an empty area closer to the machine tool among empty areas in the storage unit that are closer to the first transfer device than the second transfer device; A process of driving the first transport device so as to store the workpiece to be processed in the temporary placement area; and transferring the workpiece to be processed stored in the temporary storage area from the temporary storage area to the second transport device.

2. The control unit further The transport system according to claim 1 , further comprising a step of controlling a drive of the second transport device so as to move the second transport device away from the first transport device before the step of determining the target object is performed.

3. The conveying system according to claim 1 or 2, wherein in the determination process, it is determined that the collision will occur when the second conveying device is present on a travel path when the first conveying device conveys the workpiece to be machined to the machine tool.

4. A control method for a workpiece transport system, comprising: The transport system includes: A conveying path; A first conveying device configured to be capable of traveling on the conveying path and for conveying a workpiece; A second conveying device configured to be able to travel on the conveying path and for conveying a workpiece; a machine tool for machining a workpiece transported by the first transport device or the second transport device; A storage unit capable of storing a plurality of workpieces, The control method includes: A step of determining whether or not a collision will occur between the first transport device and the second transport device when the first transport device transports a workpiece to be machined to the machine tool; When it is determined that the collision will occur, driving of the first transport device and the second transport device is controlled so that the collision will not occur, and the workpiece to be machined is transported to the machine tool. The conveying step includes: determining, as a temporary placement area, an empty area closer to the machine tool among empty areas in the storage unit that are closer to the first transfer device than the second transfer device; Driving the first transport device so as to store the workpiece to be processed in the temporary placement area; and transferring the workpiece to be processed stored in the temporary placement area from the temporary placement area to the second conveying device.

5. A control program for a workpiece transport system, The transport system includes: A conveying path; A first conveying device configured to be capable of traveling on the conveying path and for conveying a workpiece; A second conveying device configured to be able to travel on the conveying path and for conveying a workpiece; a machine tool for machining a workpiece transported by the first transport device or the second transport device; A storage unit capable of storing a plurality of workpieces, The control program includes: A step of determining whether or not a collision will occur between the first transport device and the second transport device when the first transport device transports a workpiece to be machined to the machine tool; when it is determined that the collision will occur, the driving of the first transport device and the second transport device is controlled so that the collision will not occur, and the workpiece to be machined is transported to the machine tool; The conveying step includes: determining, as a temporary placement area, an empty area closer to the machine tool among empty areas in the storage unit that are closer to the first transfer device than the second transfer device; Driving the first transport device so as to store the workpiece to be processed in the temporary placement area; and transferring the workpiece to be processed stored in the temporary placement area from the temporary placement area to the second conveying device.

Citation Information

Patent Citations

  • Pallet carrying line

    JP1994079593A

  • Method and device for allocating warehousing shelves of automated warehouse

    JP2006256815A

  • Workpiece holding device and workpiece transfer device using the same, and workpiece transfer traverser

    JP2012213815A

  • Transport system, control method, and control program

    JP6918259B1

  • Methods for Simultaneously Producing Different Products on a Single Production Line

    US20180074477A1

Cited By

  • Pallet handling system

    JP7879983B1