Probabilistic bidding strategies for a virtual power plant with mobile energy storage

The stochastic optimization model for virtual power plants with mobile energy storage optimizes bidding strategies across multiple buses, addressing the suboptimal profit issue in traditional systems by leveraging uncertain market conditions and conditional value-at-risk, thereby enhancing economic benefits and reducing risk.

JP7580311B2Active Publication Date: 2024-11-11MITSUBISHI ELECTRIC CORP

Patent Information

Application Number
JP2021041670
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2020-03-18
Filing Date
2021-03-15
Publication Date
2024-11-11
Estimated Expiration
2041-03-15

AI Technical Summary

Technical Problem

Traditional bidding strategies for virtual power plants using fixed-location energy storage fail to maximize total expected profit due to the variability of energy and reserve markets across different buses, leading to suboptimal utilization of storage resources.

Method used

A stochastic optimization model for virtual power plants that incorporates mobile energy storage, considering uncertain market prices, renewable energy production, and load demand through scenarios and conditional value-at-risk (CVaR) to optimize energy and reserve bidding strategies across multiple buses.

Benefits of technology

The proposed model enhances the total expected profit of virtual power plants by effectively utilizing mobile energy storage at critical locations and times, reducing risk and increasing economic benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007580311000018
    Figure 0007580311000018
  • Figure 0007580311000019
    Figure 0007580311000019
  • Figure 0007580311000020
    Figure 0007580311000020
Patent Text Reader

Abstract

To provide systems and methods for allocating energy including distributing and receiving energy using a mobile energy storage (MEES) system at locations of a power supplier in an energy market system by a user.SOLUTION: A method includes: determining allocating amounts of energy for a MEES system for each time interval for all time interval for an upcoming operating time period based on a set of uncertain parameters using an optimization model; at the same time, optimizing an objective function for a value hierarchy associated with energy and reserve bidding scenarios for the user and delivery scheduling for the MEES system based upon stored user risk preferences; and controlling scheduling of the MEES system between locations of a power supplier, according to allocating of an amount of electrical energy for the MEES system at the locations of the power supplier.SELECTED DRAWING: Figure 1A
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] Field The present disclosure relates generally to power systems, and more specifically to bidding strategies for virtual power plants with mobile energy storage. [Background technology]

[0002] background The deregulated North American electricity market is operated by an Independent System Operator (ISO) or a Regional Transmission Organization (RTO) to ensure the reliable delivery of electricity to consumers and to maximize the overall social welfare of all market participants. On the one hand, the short-term energy market consists of the day-ahead (DA) and real-time (RA) markets, which are trading floors used by different participants to strategically trade electricity to maximize economic profits. On the other hand, the reliability of the power system operation is guaranteed by using reserve markets, which mainly include the operating reserve market, the non-operating reserve market, and the frequency regulation reserve market, all of which have different settlement prices. In this context, it is a complex portfolio optimization problem for market participants to maximize their total expected profits in multiple energy and reserve markets, taking into account both uncertain market prices and their own physical assets. Moreover, over the past two decades, large intermittent renewable energy sources have been integrated into the power grid, and these renewable electricity producers not only have to face volatile electricity and reserve prices, but also deal with their own uncertain renewable electricity production.

[0003] In order to increase the economic benefits of multiple renewable energy sources (RES), a virtual power plant (VPP) framework has been proposed that aggregates the output of many renewable energy sources and demand sources and manages them as a single market participant in the electricity market.

[0004] Energy storage has been widely used by virtual power plants to deal with uncertain renewable energy production and market prices. On the one hand, renewable electricity can be stored by storage during periods when market prices are low and sold by virtual power plants during other periods when prices are high, so energy storage can help in real-time arbitrage of price differences in different periods. On the other hand, the response time of energy storage is usually fast, so virtual power plants can also participate in multiple reserve markets to pursue higher profits.

[0005] In the traditional bidding strategy of a virtual power plant, the energy storage is located at a fixed location. However, since the virtual power plant may consist of multiple renewable energy sources (RES) and demands at different buses, whose power production, demand, and market prices may be different, the energy storage located at a fixed bus may not fully maximize the total expected profit of the virtual power plant in the energy and reserve markets. In recent years, large-scale mobile energy storage has been used to operate distribution systems and microgrids using RES. However, large-scale mobile energy storage has not yet been utilized in the optimal bidding strategy of a virtual power plant in the electricity market.

[0006] US 2014 / 0316973 A1 discloses an approach for facilitating generation of energy-related revenue for an energy customer of an electricity supplier. The approach includes generating an operating schedule for a controller of an energy asset. Implementing the generated operating schedule facilitates derivation of an energy-related revenue over a time period T associated with operation of the energy asset according to the generated operating schedule. The energy-related revenue available to the energy customer over the time period T is based at least in part on a wholesale electricity market. [Prior art documents] [Patent documents]

[0007] [Patent Document 1] US 2014 / 0316973 A1 Summary of the Invention [Problem to be solved by the invention]

[0008] However, all these traditional approaches address the bidding challenge by treating storage as a combination of generating and consuming devices at a fixed location. Unfortunately, these traditional approaches fail to note that if storage were transportable, it could be used more effectively to reduce network congestion, increase reserve response capability, and smooth out load and renewable fluctuations. With mobile energy storage, VPPs can achieve greater economic benefits through more effective use of storage at critical times in critical locations at more favorable prices.

[0009] Therefore, a more advanced energy and reserve bidding strategy for virtual power plants is needed that fully utilizes large-scale mobile energy storage to optimize bidding in multiple electricity markets. That is, a joint optimization model is needed to determine an optimal energy and reserve bidding strategy for a virtual power plant and simultaneously generate an optimal delivery schedule for its mobile energy storage. [Means for solving the problem]

[0010] overview The present disclosure relates to power systems, and more particularly to bidding strategies for virtual power plants with mobile energy storage.

[0011] The present disclosure proposes a stochastic optimization-based energy and reserve bidding strategy for a virtual power plant (VPP) with renewable energy sources, power demand, and mobile energy storage in multiple buses. In the proposed bidding strategy, the energy market includes a day-ahead (DA) energy market and a real-time (RA) energy market, and the reserve market includes an operating reserve market, a regulation up reserve market, and a regulation down reserve market. Since the energy and reserve prices, renewable power production, and power demand in multiple buses may be different on the next day, each mobile energy storage can be delivered to a different bus to maximize the total expected profit of the virtual power plant in the market by considering the risk preference of the virtual power plant.

[0012] In the proposed stochastic optimization model, uncertain market prices, renewable electricity production, and electricity demand are represented through scenarios, and conditional value at risk (CVaR) is used as a risk measure to manage the risk of the virtual power plant in the worst-case scenario, whose value depends on the confidence level specified by the virtual power plant. Furthermore, since the virtual power plant may have to manage the risks associated with multiple confidence levels, the proposed bidding strategy considers multiple conditional values ​​at risk with different confidence levels that are simultaneously optimized in the objective function.

[0013] A system according to an embodiment of the present disclosure is a system for allocating electric energy, including distribution and reception of electric energy at a power supplier's location in a market-based resource allocation system by market participants using a mobile electrical energy storage (MEES) system. A transceiver receives data including historical data and other data, and a memory has executable programs and stored data. The system includes a processor connected to the transceiver and the memory. The processor is configured to determine an allocation amount of the electric energy for the MEES system and a scheduling of the amount of electric energy for the MEES system for each time interval of all time intervals of a future operating period based on a set of uncertain parameters using an optimization model. The determination is made by calculating an objective function of the optimization model based on a subset of the uncertain parameters including energy and reserve market prices, renewable energy production, and electric energy demand. The processor identifies periodic and aggregate constraints and updates the objective function using the identified subset of periodic and aggregate constraints. The processor simultaneously optimizes the objective function for a value hierarchy associated with energy and reserve bidding scenarios for the market participants and delivery scheduling for the MEES system based on the stored risk preferences of the market participants. The processor controls the scheduling of the MEES system between the locations of the energy storage device of the power supplier according to (a) the distribution of the amount of electric energy to the location of the energy storage device of the power supplier for discharging, and (b) the reception of the amount of electric energy for the MEES system at the location of the energy storage device of the power supplier for charging the MEES system, according to the determined schedule of the MEES system and the allocation of the amount of electric energy distribution and reception from the updated objective function.The MEES system is charged or discharged according to the determined MEES system schedule and the allocation of the amount of electrical energy distribution and reception for a future time interval.

[0014] A method according to another embodiment of the present disclosure is a method for allocating electric energy, comprising dispatching and receiving electric energy using a mobile electric energy storage (MEES) system at a power supplier location in a market-based resource allocation system by a market participant. Data including historical data and other data is received, and an executable program and stored data are stored in a memory. The method includes using a processor connected to the transceiver and the memory. The processor is configured to determine an allocation amount of the electric energy for the MEES system and a scheduling of the amount of electric energy for the MEES system for each time interval of all time intervals of a future operating period based on a set of uncertain parameters using an optimization model. The determination is made by calculating an objective function of the optimization model based on a subset of the uncertain parameters including energy and reserve market prices, renewable energy production, and electric energy demand. The processor identifies periodic and aggregate constraints, and updates the objective function using the identified subset of periodic and aggregate constraints. The processor simultaneously optimizes the objective function for a value hierarchy associated with energy and reserve bidding scenarios for the market participants and delivery scheduling for the MEES system based on the stored risk preferences of the market participants. The processor controls the scheduling of the MEES system between the locations of the energy storage device of the power supplier according to (a) the distribution of the amount of electric energy to the location of the energy storage device of the power supplier for discharging, and (b) the reception of the amount of electric energy for the MEES system at the location of the energy storage device of the power supplier for charging the MEES system, according to the determined schedule of the MEES system and the allocation of the amount of electric energy distribution and reception from the updated objective function.The MEES system is charged or discharged according to the determined MEES system schedule and the allocation of the amount of electrical energy distribution and reception for a future time interval.

[0015] A method according to another embodiment of the present disclosure is a computer-implemented method for allocating electric energy, comprising: distribution and receipt of electric energy by a market participant at power supplier locations in a market-based resource allocation system using a mobile electric energy storage (MEES) system. Each power supplier location includes one or a combination of an energy storage device, a renewable source, or an electric load. Executable programs and data are stored in a memory. The computer-implemented method includes receiving data, including historical data and other data, via a transceiver. The historical data includes: (1) historical energy market and reserve market settlement price and volume data from an independent system operator (ISO), (2) historical renewable generation and consumption demand data from a virtual power plant (VPP), and (3) historical weather data. The other data includes: (a) market participant data associated with the market participant's confidence level associated with a conditional value-at-risk, (b) market participant's electric energy production data, and (c) energy-related data. The method uses a processor coupled to the transceiver and the memory. The processor is configured to determine the electric energy allocation amount for the MEES system and the scheduling of the electric energy amount for the MEES system for each time interval of all time intervals of a future operating period based on a set of uncertain parameters using an optimization model. The determination is made by calculating an objective function of the optimization model based on a subset of the uncertain parameters including energy and reserve market prices, renewable energy production, and electric energy demand. The processor identifies periodic and aggregate constraints and updates the objective function with the identified subset of periodic and aggregate constraints. The processor simultaneously optimizes the objective function for a value hierarchy associated with energy and reserve bidding scenarios for the market participants and delivery scheduling for the MEES system based on the stored risk preferences of the market participants.The processor controls the scheduling of the MEES system between the locations of the energy storage device of the power supplier according to (a) the distribution of the amount of electric energy to the location of the energy storage device of the power supplier for discharging, and (b) the reception of the amount of electric energy for the MEES system at the location of the energy storage device of the power supplier for charging the MEES system, according to the determined schedule of the MEES system and the allocation of the amount of electric energy distribution and reception from the updated objective function. The MEES system is charged or discharged according to the determined schedule of the MEES system and the allocation of the amount of electric energy distribution and reception for a future time interval.

[0016] A storage medium according to another embodiment of the present disclosure is a non-transitory computer-readable storage medium having a computer executable program implemented therein for performing a method. The method includes distributing and receiving electric energy by a market participant at power supplier locations in a market-based resource allocation system using a mobile electric energy storage (MEES) system. Each power supplier location includes one or a combination of an energy storage device, a renewable source, or an electric load. The executable program and data are stored in a memory. The non-transitory computer-readable storage medium includes receiving data, including historical data and other data, via a transceiver. The historical data includes: (1) historical energy market and reserve market settlement price and volume data from an independent system operator (ISO), (2) historical renewable generation and consumption demand data from a virtual power plant (VPP), and (3) historical weather data. The other data includes: (a) market participant data associated with the market participant's confidence level associated with a conditional value-at-risk, (b) market participant's electric energy production data, and (c) energy-related data. The method uses a processor connected to the transceiver and the memory. The processor is configured to determine the electric energy allocation amount for the MEES system and the scheduling of the electric energy amount for the MEES system for each time interval of all time intervals of a future operating period based on a set of uncertain parameters using an optimization model. The determination is performed by calculating an objective function of the optimization model based on a subset of the uncertain parameters including energy and reserve market prices, renewable energy production, and electric energy demand. The processor identifies periodic and aggregate constraints and updates the objective function with the identified subset of periodic and aggregate constraints.The processor simultaneously optimizes the objective function for a value hierarchy associated with energy and reserve bidding scenarios for the market participants and delivery scheduling for the MEES system based on the stored risk preferences of the market participants. The processor controls the scheduling of the MEES system between the locations of the energy storage device of the power supplier according to (a) the distribution of the amount of electric energy to the location of the energy storage device of the power supplier for discharging, and (b) the reception of the amount of electric energy for the MEES system at the location of the energy storage device of the power supplier for charging the MEES system, according to the determined schedule of the MEES system and the allocation of the amount of electric energy distribution and reception from the updated objective function. The MEES system is charged or discharged according to the determined schedule of the MEES system and the allocation of the amount of electric energy distribution and reception for a future time interval.

[0017] A system according to another embodiment of the present disclosure is a system for allocating electric energy, comprising distribution and receipt of electric energy by market participants at power supplier locations in a market-based resource allocation system using a mobile electric energy storage (MEES) system. Each power supplier location includes one or a combination of an energy storage device, a renewable source, or an electric load. The market participants include power production sources including renewable energy production facilities. The system includes a transceiver for receiving data including historical data and other data. The historical data includes: (1) historical energy market and reserve market settlement price and quantity data from an independent system operator (ISO), (2) historical renewable generation and consumption demand data from a virtual power plant (VPP), and (3) historical weather data. The other data includes: (a) market participant data associated with a confidence level of the market participant used in association with a conditional value-at-risk calculation, (b) electric energy production data of the market participant, and (c) energy-related data. A memory has an executable program and stored data. A processor is coupled to the transceiver and the memory. The processor is configured to determine the electric energy allocation amount for the MEES system and the scheduling of the electric energy amount for the MEES system for each time interval of all time intervals of a future operating period based on a set of uncertain parameters using an optimization model by calculating an objective function of the optimization model based on a subset of the uncertain parameters including energy and reserve market prices, renewable energy production, and electric energy demand. The processor identifies periodic and aggregate constraints and updates the objective function with the identified subset of periodic and aggregate constraints.The processor simultaneously optimizes the objective function for a value hierarchy associated with energy and reserve bidding scenarios for the market participants and delivery scheduling for the MEES system based on the stored risk preferences of the market participants. The processor controls the scheduling of the MEES system between the locations of the energy storage device of the power supplier according to (a) the distribution of the amount of electric energy to the location of the energy storage device of the power supplier for discharging, and (b) the reception of the amount of electric energy for the MEES system at the location of the energy storage device of the power supplier for charging the MEES system, according to the determined schedule of the MEES system and the allocation of the amount of electric energy distribution and reception from the updated objective function. The MEES system is charged or discharged according to the determined schedule of the MEES system and the allocation of the amount of electric energy distribution and reception for a future time interval.

[0018] The presently disclosed embodiments are further described with reference to the accompanying drawings, which are not necessarily to scale, emphasis instead being placed upon illustrating the principles of the presently disclosed embodiments. [Brief description of the drawings]

[0019] [Figure 1A] FIG. 1 is a block diagram illustrating a method for controlling operation and bidding of a virtual power plant using a mobile electric energy storage (MEES) system, according to an embodiment of the present disclosure. [Figure 1B] FIG. 1 is a schematic diagram illustrating components and steps for controlling operation and bidding of a virtual power plant using a mobile electric energy storage (MEES) system, according to some embodiments of the present disclosure. [Figure 1C] FIG. 1 is a schematic diagram illustrating a virtual power plant connected to a power grid and in communication with an ISO according to some embodiments of the present disclosure. [Figure 2A] FIG. 2 is a block diagram illustrating tradable products and participants in the energy and reserve markets according to some embodiments of the present disclosure. [Figure 2B] FIG. 2 is a schematic diagram illustrating a trading floor where a virtual power plant is available, according to some embodiments of the present disclosure. [Figure 2C] FIG. 2 is a schematic diagram illustrating a time frame for energy and reserve markets according to some embodiments of the present disclosure. [Figure 2D] FIG. 1 is a block diagram for determining a storage delivery and VPP bidding schedule according to some embodiments of the present disclosure. [Figure 2E] FIG. 1 is a schematic diagram illustrating contingent value-at-risk for virtual power plant bidding according to some embodiments of the present disclosure. [Diagram 3] FIG. 2 is a schematic diagram illustrating a virtual power plant using resources on three buses according to some embodiments of the present disclosure. [Figure 4] 1 is a table showing a list of parameters of mobile energy storage k, according to some embodiments of the present disclosure. [Figure 5A] 1 is a graph illustrating a list of expected renewable electricity production and demand for one bus, according to some embodiments of the present disclosure. [Figure 5B] 1 is a graph illustrating a list of expected renewable electricity production and demand for one bus, according to some embodiments of the present disclosure. [Figure 5C] 1 is a graph illustrating a list of expected renewable electricity production and demand for one bus, according to some embodiments of the present disclosure. [Figure 6A] 1 is a graph illustrating a list of expected energy and reserve prices for one bus according to some embodiments of the present disclosure. [Figure 6B] 1 is a graph illustrating a list of expected energy and reserve prices for one bus according to some embodiments of the present disclosure. [Figure 6C]1 is a graph illustrating a list of expected energy and reserve prices for one bus according to some embodiments of the present disclosure. [Figure 7A] 1 is a graph illustrating a list of expected values ​​of energy and reserve bid capacities for a virtual power plant according to some embodiments of the present disclosure. [Figure 7B] 1 is a graph illustrating a list of expected values ​​of energy and reserve bid capacities for a virtual power plant according to some embodiments of the present disclosure. [Figure 7C] 1 is a graph illustrating a list of expected values ​​of energy and reserve bid capacities for a virtual power plant according to some embodiments of the present disclosure. [Figure 8] 1 is a graph showing a list of expected energy levels for energy storage in three buses according to some embodiments of the present disclosure. [Figure 9] 1 is a table illustrating the total expected profit and conditional value-at-risk of a virtual power plant obtained in Cases 1 to 3 according to some embodiments of the present disclosure. [Figure 10] 1 is a table illustrating the total expected profit and conditional value-at-risk of a virtual power plant obtained in cases 2, 4, and 5 according to some embodiments of the present disclosure. [Figure 11A] FIG. 1 is a schematic diagram illustrating a computing device that can be used to implement some techniques of the methods and systems according to embodiments of the present disclosure. [Figure 11B] FIG. 1 is a block diagram illustrating some components that may be used to implement systems and methods according to embodiments of the present disclosure. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0020] While the above drawings depict embodiments disclosed herein, other embodiments are contemplated as described herein. The present disclosure presents illustrative embodiments by way of representation and not by way of limitation. Those skilled in the art can envision numerous other modifications and embodiments that fall within the scope and spirit of the principles of the embodiments disclosed herein.

[0021] Detailed Description The present disclosure relates generally to power systems, and more specifically to bidding strategies for virtual power plants with mobile energy storage.

[0022] The present disclosure provides a stochastic optimization based energy and reserve bidding strategy for a Virtual Power Plant (VPP) with mobile energy storage, renewable energy sources (RES), and power demand in multiple buses. In the proposed bidding strategy, the energy market includes a day-ahead energy market and a real-time energy market, and the reserve market includes a driving reserve market, a frequency upregulation reserve market, and a frequency downregulation reserve market. Considering that the energy and reserve prices, renewable generation, and load demands vary among buses on the next day, the total expected profit of the VPP can be maximized by delivering mobile energy storage to different buses while considering the risk preferences of the VPP. In this stochastic optimization model for generating the bidding strategy, the uncertain market prices, renewable generation, and load demand are represented through scenarios, and the conditional value-at-risk (CVaR) is used as a risk measure to manage the risk of the VPP in the worst-case scenario associated with a confidence level. Since the VPP may have to manage the risks associated with multiple confidence levels, the disclosed model maximizes multiple CVaRs with different confidence levels.

[0023] FIG. 1A is a block diagram illustrating a method for controlling operation and bidding of a virtual power plant using mobile energy storage according to an embodiment of the present disclosure.

[0024] Step 116 of FIG. 1A involves receiving, via receiver 153, historical energy market and reserve market settlement prices and volumes from the ISO and historical renewable generation and consumption demand from the VPP.

[0025] Step 126 of FIG. 1A includes a processor 155 configured to communicate with the receiver 153 and generate a set of possible scenarios for energy and reserve prices, renewable generation, and load demand for a future time interval based on historical data and future weather and other information.

[0026] Step 136 of FIG. 1A is processed using processor 155 to select a subset of scenarios that are of particular interest and have corresponding confidence levels for risk management.

[0027] Step 146 of FIG. 1A is processed using processor 155 to determine a joint optimal storage delivery schedule for a future time interval and bid amounts for each of the energy and reserve markets by maximizing a weighted sum of expected profits and a number of conditional value-at-risks.

[0028] Step 156 of FIG. 1A includes a controller 157 that can be used to control the delivery and operation of the mobile energy storage according to the determined delivery schedule and the settled bid results from the ISO.

[0029] A settled bid outcome refers to the decision of approval or disapproval made by ISO regarding a bid submitted by a VPP. Once its bid is approved by ISO, the VPP may execute its determined delivery and production schedule.

[0030] FIG. 1B is a schematic diagram illustrating components and steps for controlling operation and bidding of a virtual power plant using mobile energy storage according to an embodiment of the present disclosure.

[0031] The VPP 130 includes mobile storage 131, renewable sources 132, and load demand 133. The VPP 130 communicates with an ISO 140, which controls the operation of the power grid 115. The control system 100 of the VPP 130 may include a computer 151 or similar device, or multiple computers. It is contemplated that the computer(s) may be located at different locations and in communication with each other. Additionally, other components of the computer may be located at other locations, but connected via a network or similar configuration.

[0032] Continuing to refer to FIG. 1B, a receiver 153 in the VPP control system receives historical energy market and reserve market settlement prices and quantities from the ISO and historical renewable generation and consumption demand from the VPP (step 116).

[0033] The processor 155 then communicates with the receiver 153 to generate a set of possible scenarios for energy and reserve prices, renewable generation, and load demand for future time intervals based on historical data and upcoming weather and other information (step 126), and selects a subset of scenarios of particular interest and with corresponding confidence levels for risk management (step 136).

[0034] After obtaining market prices and possible scenarios for VPP generation and demand, processor 155 determines a joint optimal storage delivery schedule for the future time interval and bid amounts for each of the energy and reserve markets by maximizing a weighted sum of expected profits and multiple conditional value-at-risks (step 146).

[0035] Continuing to refer to FIG. 1B , the control system 100 of the VPP 130 sends the determined bids for the future time interval to the ISO 140, and the controller 157 controls the delivery and operation of the mobile storage according to the determined delivery schedule and the settled bid results from the ISO.

[0036] Optionally, the control system 100 of the VPP 130 can store system energy and pricing data in a computer readable memory 144, which is in communication with the processor 155 and the controller 157. It is further possible that the input interface 145 can be in communication with the memory 144 and the processor 155 and the controller 157. For example, a user may input projected load demand and renewable generation via a user interface of the input interface 145. It is contemplated that the receiver, processor, and controller may be a single computer system or multiple computer systems located at different locations depending on the particular application(s).

[0037] FIG. 1C is a schematic diagram illustrating a virtual power plant connected to a grid and communicating with an ISO, according to some embodiments of the present disclosure. In this diagram, different line types are used to show the energy flow, information flow, and energy transfer between the VPP and its components. The VPP 130 can be considered as a group of aggregated renewable generation, load demand, and storage connected to the grid at one or more points, i.e., buses. The renewable energy can include wind 10, solar energy 5, and other types of renewable sources. The load demand can include residential consumers 15, commercial consumers 20, and industrial consumers 25. The storage 131 can be a mobile object that can be transferred between the buses that connect the VPP to the grid 115. The VPP can inject power, such as renewable generation, into the grid 115 and can also take power, such as load demand, out of the grid 115. The VPP can also provide bidirectional energy flow through charging and discharging the storage. Furthermore, the storage can be transferred between the available buses that connect the VPP to the grid. This provides additional flexibility to the grid, easing network congestion, reducing system peaks, and improving power quality. The VPP communicates with ISO 140 to trade its generation and services, and dispatches its storage based on the ISO settlement results. In FIG. 1C, there are three mobile storages 131A, 131B, and 131C. The storages can be transported to different locations once or multiple times daily based on the operational needs determined by the VPP. For example, in FIG. 1C, the three storages are initially located on bus III, but are then moved to storage 131A (131A 1 131B (illustrated as 131B) is connected to bus I. 1 131C (shown as 131C) is connected to bus IV. 1 and ) are transferred to bus II, respectively. VPP 130 has two-way communication with storage 131 to control its distribution and charging / discharging. VPP 130 also has two-way communication with ISO 140 to transmit bidding scenarios and received settled bidding results.

[0038] Market Framework for Virtual Power Plants Energy and reserve market products and participants FIG. 2A is a block diagram illustrating tradable products and participants in the energy and reserve markets according to some embodiments of the present disclosure. For example, FIG. 2A shows that there are three types of reserve products, including operating reserve, non-operating reserve, and regulating reserve. Both operating reserve and regulating reserve sources should be online and able to increase or decrease power output within the required time frame, while regulating reserve must respond to generation or demand imbalances within a very short period of time, which may be just a few seconds. In contrast, non-operating reserves may be offline, and their response time is much longer than that of the operating reserve and regulating reserve markets.

[0039] There are multiple types of participants in the energy market and the reserve market. Power producers and consumers need to sell and buy power in the energy market, respectively. If the consumers do not have knowledge of power trading or the consumers' demand level does not meet the minimum bidding capacity requirement, retailers can act as intermediaries between the consumers and the market. Since a virtual power plant has both a generation source and a demand source, it may buy and sell power in the energy market according to its real-time generation and demand level. In addition, market participants can provide ancillary services in the reserve market as long as their bidding capacity and response speed meet the reserve market requirements.

[0040] In this disclosure, we assume that a virtual power plant with mobile energy storage participates in multiple energy and reserve markets. The non-operating reserve market is not the target of the virtual power plant in the proposed bidding strategy because its prices are usually lower than those of the operating reserve and frequency regulation reserve markets. Therefore, we assume that the energy market, operating reserve market, and frequency regulation reserve market are the trading floors of the virtual power plant, and the virtual power plant is a price taker due to its small generation and demand capacity, which indicates that the energy price and reserve price are not affected by the bidding strategy of the virtual power plant.

[0041] Energy and reserve market timeframes 2B is a schematic diagram showing trading floors where the Virtual Power Plant is available. FIG. 2B shows that there are two trading floors where the Virtual Power Plant is available, including a day-ahead market and a real-time market.

[0042] FIG. 2C is a schematic diagram illustrating the time frame of the energy and reserve markets according to some embodiments of the present disclosure. For example, FIG. 2C illustrates the time frame of the energy and reserve markets. In the day-ahead market, energy and reserve bids are submitted by virtual power plants the day before the operation date, and the bids are settled at the energy and reserve prices of the day before. In the real-time market, the real-time power slip, the deployed operating reserve, and the deployed frequency regulation reserve are all settled at the real-time power price of the operation date.

[0043] To maximize the virtual power plant's total profit, the mobile energy storage can be delivered to other buses during the first few hours of the driving day, where the bids for operating and frequency regulation reserves are limited by both the energy level and the delivery schedule of the virtual power plant's mobile energy storage.

[0044] A stochastic optimization model for a virtual power plant Uncertainty characterization and multiple CVaR-based risk management There are many uncertainties that a virtual power plant faces when generating a bidding strategy in the electricity market, and stochastic optimization is used to maximize the expected profit of the virtual power plant. The uncertain parameters are represented via scenarios.

[0045] In the disclosed model, there are seven uncertain parameters, namely, day-ahead energy price, real-time energy price, operating reserve price, frequency up regulation reserve price, frequency down regulation reserve price, renewable energy production, and electricity demand.

[0046] All these uncertainties can be represented using a set of representative scenarios. The scenarios can be generated based on forecasts of market prices, renewable generation, and load demand using mathematical models such as regression analysis and machine learning. The scenarios can also be set directly as historical data for these parameters for the most recent representative days.

[0047] 2D is a block diagram for determining storage delivery and VPP bidding schedules according to some embodiments of the present disclosure. First, a set of uncertain parameter scenarios 215 is determined based on historical or forecasted market prices 205 and renewable and demand 210. Then, a subset of scenarios of special interest is identified and assigned a desired confidence level for risk management. Then, a joint optimization of storage delivery and VPP market bidding 275 can be performed, and the solution provides the required storage delivery and bidding schedule 280 to the VPP.

[0048] To manage the risks posed by those uncertainties, the VPP may determine its probabilistic bidding strategy by adopting either a risk-neutral strategy, a risk-averse strategy, or a risk-seeking strategy. A risk-neutral strategy seeks to maximize expected profits across all scenarios. In contrast, a risk-averse strategy may voluntarily reduce expected profits in some less profitable scenarios but avoid potential losses or low profits, and a risk-seeking strategy may voluntarily reduce expected profits for some more profitable scenarios but avoid potential losses of high profits. This disclosure is directed only to risk-averse strategies, but is easily applicable to risk-seeking strategies as well.

[0049] To quantify the bidding risk faced by a VPP, CVaR can be used to measure the risk in a worst-case scenario. Figure 2E is a schematic diagram showing the conditional value-at-risk for a hypothetical power plant bidding.

[0050]

number

[0051] In this situation, the objective function of the stochastic optimization model for a risk-averse participant is the sum of the weighted expected profit and the conditional value-at-risk, where the sum of the weights is equal to 1. The weight assigned to the conditional value-at-risk is also referred to as the participant's risk aversion.

[0052] In traditional risk-averse bidding strategies in electricity markets, only one conditional value-at-risk is used by market participants, i.e., only the risk associated with one confidence level is considered. However, in practice, an optimal bidding strategy for a virtual power plant with uncertainty may have to consider the risks associated with multiple confidence levels. On the one hand, the owner of the virtual power plant may be interested in controlling the risks associated with multiple confidence levels. On the other hand, the virtual power plant may be owned or managed by multiple decision makers, who may be interested in the risks associated with different confidence levels.

[0053]

number

[0054] Mathematical formulation of the disclosed model The objective of generating a bidding strategy for a virtual power plant is to determine a storage allocation schedule and a renewable generation and demand consumption schedule for a future operating period, which includes a set of equal-length time intervals. A typical length of an operating period may be a day, a portion of a day, or several days. A typical length of a time interval may be 60 minutes, 30 minutes, 15 minutes, or 5 minutes.

[0055] The generation of bidding strategies for the virtual power plant is formulated as a stochastic optimization model.

[0056]

number

[0057]

number

[0058]

number

[0059]

number

[0060]

number

[0061] The stochastic optimization model is further subjected to a set of constraints (12)–(30). Constraint (12) ensures real-time power balancing of the virtual power plants at each bus, in which the total power sold to the energy market and reserve market should be equal to the real-time renewable power production and energy storage discharge power minus the power demand consumption and energy storage charge power.

[0062]

number

[0063] Constraints (13)-(18) guarantee upper and lower bounds on bidding capacity in the day-ahead energy market, the real-time energy market, the driving reserve market, the frequency upregulation reserve market, and the frequency downregulation reserve market.

[0064]

number

[0065] In constraint (13), the upper and lower bounds of the day-ahead bidding capacity are limited by the credit of the virtual power plant and the total generation and demand capacity. Constraint (14) ensures the non-negativity of the bidding capacity in the real-time energy market, the operating reserve market, the frequency upregulation reserve market, and the frequency downregulation reserve market. Constraints (15) and (16) ensure that the positive or negative real-time power deviation of the virtual power plant is zero. Since it is assumed that only energy storage can meet the requirement of providing reserve service, constraints (17) and (18) limit the reserve bidding capacity based on the charging and discharging power capacity of the energy storage.

[0066] Constraint (19) ensures that each energy storage can be located on only one of the buses of the virtual power plant.

[0067]

number

[0068] Constraints (20)-(22) limit the energy level of the energy storage in each period t, taking into account the initial location of the energy storage.

[0069]

number

[0070] Constraints (23)-(28) limit the charge / discharge power capacity taking into account the energy storage delivery situation in the first few hours of the next day.

[0071]

number

[0072] Note that for simplicity, we assume that the storage can only change location once per day to formulate the above constraints. However, the storage can easily be adapted to change location multiple times per day.

[0073]

number

[0074] Constraints (30) address the binary variables used in the proposed optimization model.

[0075]

number

[0076]

number

[0077] After solving the optimization models (1)-(30), optimal energy and reserve bidding strategies for the virtual power plant and delivery schedules for the mobile energy storage can be simultaneously generated taking into account the risk preferences of the virtual power plant.

[0078] Simulation results Figure 3 is a schematic diagram illustrating a virtual power plant using resources in three buses according to some embodiments of the present disclosure. A case study is conducted on the virtual power plant as shown in Figure 3 to prove the effectiveness of the disclosed energy and reserve bidding strategy. The VPP includes two mobile energy storages and three power demands and renewable energy sources located in the three buses. The distance between the two buses is 30 km.

[0079] It is contemplated that the MEES system may include one or a combination of a vehicle 310, an airplane 320, a train 330, or a ship 340 configured to transport stored electrical energy to a power supplier's location by charging one or more storage devices of the MEES system, and to receive electrical energy from one or a combination of the power supplier's energy storage device(s), the power supplier's renewable sources, or the power grid, and the MEES system configured to transport the received electrical energy to another location.

[0080] FIG. 4 is a table showing a list of parameters of a mobile energy storage k according to some embodiments of the present disclosure. For example, FIG. 4 shows that the virtual power plant has two mobile energy storages with the same parameters, and the speed of the energy storage carrier is initially set to 20 km / h. The historical energy and reserve prices of the actual system, as well as the historical wind and demand data, are used. The percentages of reserves deployed in the real-time market are all set to 0.9.

[0081] Consider a constrained bidding strategy with disclosed conditional value-at-risk, where the energy storage is initially located at bus 3 and two conditional values-at-risk with confidence levels of 0.8 and 0.95 are considered by the hypothetical power plant. First, the total expected profit, CVaR 0.8 and CVaR 0.9 The weights assigned to are 0.9, 0.05 and 0.05, respectively. In the considered case, 40 scenarios of uncertain parameters are generated by directly using the latest historical data of 40 days.

[0082] 5A, 5B, and 5C are graphs illustrating a list of expected renewable electricity production and demand for three buses (Bus 1 (FIG. 5A), Bus 2 (FIG. 5B), and Bus 3 (FIG. 5C)), according to some embodiments of the present disclosure. For example, FIGS. 5A-5C show expected renewable electricity production and demand.

[0083] 6A, 6B, and 6C are graphs illustrating a list of expected energy and reserve prices for three buses (Bus 1 (FIG. 6A), Bus 2 (FIG. 6B), and Bus 3 (FIG. 6C)), according to some embodiments of the present disclosure. For example, FIGS. 6A-6C show expected energy and reserve prices.

[0084] 5A-5C and 6A-6C, as shown in FIG. 5A, the renewable electricity production of bus 1 the next day is higher than that of the other two buses in FIG. 5B-5C, and the renewable electricity production of these three buses is more probabilistic than the electricity demand. FIG. 6A-6C show that the real-time energy price is more volatile than the day-ahead energy price because price spikes are more likely to occur in the real-time market due to unexpected events in the power system, such as power outages caused by extreme weather events.

[0085] By solving models (1)–(30) for the considered cases, the results of the stochastic bidding strategies for one day are obtained.

[0086] 7A, 7B, and 7C are graphs illustrating a list of expected values ​​of energy and reserve bid capacities for a virtual power plant, according to some embodiments of the present disclosure.

[0087] FIG. 8 is a graph illustrating a list of expected energy levels for energy storage in three buses, according to some embodiments of the present disclosure.

[0088] With reference to Figures 7A-7C and 8, the expected values ​​of the bid capacity and energy level of the storage are given, respectively. The energy storage is initially located at bus 3, but reserve bids are submitted at both bus 1 and bus 3, and the energy level of the storage at bus 1 is shown to be positive. These results indicate that one of the energy storages of the virtual power plant is moved from bus 3 to bus 1, and the renewable electricity production at bus 1 is higher than that at buses 2 and 3.

[0089] To further analyze the benefits of using mobile energy storage for the virtual power plant, we calculate the results of a bidding strategy with storage fixedly located on the original bus by solving models (1)–(30) and setting the delivery speed v to zero.

[0090] 9 is a table showing the total expected profit and conditional value-at-risk of a virtual power plant obtained in cases 1 to 3, according to some embodiments of the present disclosure. For example, FIG. 9 compares the total expected profit and conditional value-at-risk of a virtual power plant obtained using different bidding strategies, where v=0 means that the energy storage is located at the original bus and cannot be moved to the next day.

[0091] Figure 9 also shows the total expected profit, CVaR, in Case 2. 0.8 and CVaR 0.95 are $10, $500 and $849 higher than the total expected profit in case 1, respectively, which indicates that mobile energy storage can not only increase the expected profit, but also reduce the risk in the worst-case scenario of the virtual power plant. Furthermore, to explore the impact of the risk preference of the virtual power plant on the bidding strategy, case 3 is designed by setting β0, β1 and β2 to 0.95, 0.025 and 0.025, respectively. Compared with case 1, the total expected profit, CVaR in case 3 is $10, $500 and $849 higher than the total expected profit in case 1 ... 0.8 and CVaR 0.95improve by $18, $430 and $732 respectively, indicating that the less risk-averse the virtual power plant becomes, the less improvement in conditional value-at-risk is gained by using mobile energy storage.

[0092] FIG. 10 is a table showing the total expected profit and conditional value-at-risk of a virtual power plant obtained in cases 2, 4, and 5 according to some embodiments of the present disclosure. For example, FIG. 10 shows that to prove the effectiveness of using multiple conditional value-at-risk in the disclosed bidding strategy, cases 4 and 5 are designed by setting β1 and β2 to zero, respectively, and FIG. 10 compares the simulation results of cases 2, 4, and 5. In case 4, β2 is set to zero, and CVaR 0.95 is not optimized in the stochastic optimization model, so CVaR 0.95 is $162 lower than in Case 2. In Case 5, β1 is set to zero and CVaR 0.8 is not optimized in the stochastic optimization model, so CVaR 0.8 is $101 lower than that of case 2. Therefore, the simulation results in Fig. 10 show that the proposed bidding strategy can simultaneously optimize multiple risks associated with different confidence levels. Moreover, the expected profit in case 4 is higher than that in case 5, which is due to the CVaR 0.8 is CVaR 0.95 is closer to the expected profits for all scenarios than CVaR. 0.8 Even if we maximize 0.95 This shows that the total expected profit does not decrease as much as maximizing

[0093] In summary, we use the disclosed stochastic optimization model to generate a set of energy and reserve bidding strategies for a virtual power plant with mobile energy storage, renewable energy sources, and electricity demand on multiple buses. We represent the uncertainties faced by the virtual power plant through scenarios, and simultaneously maximize multiple conditional value-at-risk with different confidence levels, taking into account the risk preferences of the virtual power plant.

[0094] The above simulation results show that the total expected profits for the virtual power plant increased and the risks decreased by substituting mobile energy storage for stationary energy storage. Furthermore, by using the proposed bidding strategy, multiple conditional values-at-risk can be maximized simultaneously in the model, taking into account the risk preferences of the virtual power plant in the energy and reserve markets.

[0095] 11A is a schematic diagram illustrating, by way of non-limiting example, a computing device 1100A that can be used to implement some techniques of the methods and systems according to embodiments of the present disclosure. The computing device 1129 represents various forms of digital computers, such as laptops, desktops, workstations, personal digital assistants, servers, blade servers, mainframes, and other suitable computers.

[0096] The computing device 1129 includes a power supply 1108, a processor 1109, a memory 1110, and a storage device 1111, all of which are connected to a bus 1135. Additionally, a high-speed interface 1112, a low-speed interface 1113, a high-speed expansion port 1114, and a low-speed connection port 1115 may be connected to the bus 1135. Also, a low-speed expansion port 1116 connects to the bus 1135. Depending on the particular application, various component configurations are contemplated that may be mounted on a common motherboard 1130 as a non-limiting example. Additionally, an input interface 1117 may be connected to the external transceiver 1106 and an output interface 1118 via the bus 1135. A receiver 1119 may be connected to the external transceiver 1106 and a transmitter 1120 via the bus 1135. An external memory 1104, an external sensor 1103, a machine(s) 1102, and an environment 1101 may also be connected to the bus 1135. Additionally, one or more external input / output devices 1005 may be connected to the bus 1135. A network interface controller (NIC) 1121 may be adapted to connect to a network 1122 through the bus 1135 to, among other things, render data or other data on a third party display device, a third party imaging device, and / or a third party printing device external to the computing device 1129.

[0097] It is intended that the memory 1110 can store instructions executable by the computing device 1129, historical data, and any data that can be utilized by the methods and systems of the present disclosure. The memory 1110 can include random access memory (RAM), read only memory (ROM), flash memory, or other suitable memory systems. The memory 1110 can be one or more volatile memory units and / or one or more non-volatile memory units. The memory 1110 can also be another form of computer readable medium, such as a magnetic or optical disk.

[0098] 11A, the storage device 1111 may be adapted to store supplemental data and / or software modules used by the computing device 1129. For example, the storage device 1111 may store historical data and other related data as described above with respect to this disclosure. Additionally or alternatively, the storage device 1111 may store historical data similar to that described above with respect to this disclosure. The storage device 1111 may include a hard drive, an optical drive, a thumb-drive, an array of drives, or any combination thereof. Additionally, the storage device 1111 may include a computer-readable medium such as a floppy disk device, a hard disk device, an optical disk device, or an array of devices including a tape device, a flash memory or other similar solid-state memory device, or a storage area network or other configuration of devices. Instructions may be stored on the information carrier. The instructions, when executed by one or more processing units (e.g., the processor 1109), perform one or more methods, such as those described above.

[0099] The system may optionally be linked through a bus 1135 to a display interface or user interface (HMI) 1123 adapted to connect the system to a display device 1125 and a keyboard 1124, which may include, among others, a computer monitor, a camera, a television, a projector, or a mobile device.

[0100] 11A, the computing device 1129 can include a user input interface 1117 adapted to a printer interface (not shown) that can also be connected over a bus 1135 and adapted to connect to a printing device (not shown), which can include a liquid inkjet printer, a solid ink printer, a large scale commercial printer, a thermal printer, a UV printer, or a dye sublimation printer, among others. Also, an external controller or controllers 1107 can be connected to an external device 1130.

[0101] The high-speed interface 1112 manages the bandwidth-intensive operations of the computing device 1000A, while the low-speed interface 1113 manages the less bandwidth-intensive operations. Such allocation of functions is merely an example. In some implementations, the high-speed interface 1112 can be coupled to the memory 1110 (e.g., through a graphics processor or accelerator), to a user interface (HMI) 1123, and to a keyboard 1124 and a display 1125, and can also be coupled to a high-speed expansion port 1114 via a bus 1135 that can accept various expansion cards (not shown). In this implementation, the low-speed interface 1113 is coupled to the storage device 1111 and the low-speed expansion port 1115 via the bus 1135. Low speed expansion ports 1115, which may include various communication ports (e.g., USB, Bluetooth, Ethernet, wireless Ethernet), may be coupled, for example through a network adapter, to one or more input / output devices 1105 and other devices such as a keyboard 1124, a pointing device (not shown), a scanner (not shown), or a networking device such as a switch or router.

[0102] 11A, the computing device 1129 may be implemented in many different forms, as shown. For example, it may be implemented as a standard server 1126, or multiple times in a group of such servers. It may also be implemented in a personal computer, such as a laptop computer 1127. It may also be implemented as part of a rack server system 1128. Alternatively, components from the computing device 1129 may be combined with other components in a mobile device, such as a mobile computing device. Each such device may include one or more of the computing device 1129 and a mobile computing device, and the entire system may be made up of multiple computing devices that communicate with each other.

[0103] FIG. 11B is a block diagram illustrating some computing devices that can be used to implement the system and method, including a network overview, according to an embodiment of the present disclosure. An example of a network for implementing the VPP control system 1051 can include a central computer 1142, i.e., a central computer, which may be more than one, and a network 1149 connected to communicate with the networked computers 1144, 1146, 1148, 1150, and 1152. The central computer 1142 can manage and operate the VPP 1051, and can correspond, as a non-limiting example, to an operator managing a virtual power plant that produces or consumes the power associated with the networked computers 1144, 1146, 1148, 1150, and 1152. The central computer 1142 can correspond to one or more power generation, one or more power demands, and one or more energy storage devices in the VPP. The network 1149 can also include, as a non-limiting example, computing hardware connected to an electric device, a generator, or a storage device, etc., and the computing hardware can include an integrated circuit configured to execute the system and method of the present disclosure. The central computer 1142 can receive requests from those computing devices associated with electricity demand or consumption, which may be computing devices 1146, 1148, and can receive requests from those computing devices associated with electricity generation, which may be computing devices 1144, 1150, and 1152. The operator or the central computer 1142 can then calculate the value at which the electricity should be transmitted and transmit this transmission value to the computing devices 1144, 1146, 1148, 1150, and 1152. The transmission value refers to the actual electricity price, i.e., the "settlement price," for the current or next time interval. Note that the time intervals can vary, for example, from 10 minutes to 5 minutes, 60 minutes, 30 minutes, 15 minutes, etc.The central computer 1142 can be used by computing devices 1144, 1146, 1148, 1150, and 1152 to calculate bids for power production. The central computer 1142 can also have other data, such as future market data, that can be transmitted to the networked computers. Additionally, the central computer 1142 can be accessed over a network 1149, which can be a local area network ("LAN") using wired networking (e.g., Ethernet IEEE Standard 802.3 or other suitable standard) or wireless networking.

[0104] 11B, 1100B includes a computing device 1152 (which may be a controller, such as a transactional or active controller) including a hardware processor 1154 in communication with a transceiver 1156. The transceiver 1156 may communicate with a sensor 1102 or sensors that collect data from an environment 1101 associated with an area in which the electrical device operates. The sensor 1102 converts inputs into signals that may be stored in a memory 1158. The hardware processor 1154 is in communication with a computer storage memory, i.e., memory 1158, which includes stored data including algorithms, instructions, and other data that the hardware processor 1154 can implement. The computing device 1152 may further include a controller 1160, an external memory device 1162, a network-enabled server 1164, and a client device 1168.

[0105] It is contemplated that the hardware processor 1154 may include two or more hardware processors, which may be internal or external, as needed for a particular application. Of course, other components may be incorporated into the method 1100B, including output interfaces and transceivers, among others.

[0106] The network 1149 may include, as non-limiting examples, one or more local area networks (LANs) and / or wide area networks (WANs). The networking environment may be an enterprise-wide computer network, an intranet, and the Internet, as well as the like. It is contemplated that there may be any number of client devices, storage components, and data sources used within the system 1100B for all of the mentioned components. Each may include a single device or multiple devices working together in a distributed environment. Additionally, the system 1100B may include one or more data sources (not shown). The data source(s) may include a data source for determining a bidding strategy. Data provided by the data source(s) may include historical bid and settlement prices and amounts, as well as historical aggregate renewable generation and aggregate energy consumption.

[0107] Features A system according to an aspect of the disclosure is a system for allocating electric energy, including distribution and reception of electric energy using a mobile electric energy storage (MEES) system at a power supplier location in a market-based resource allocation system by market participants. A transceiver receives data including historical data and other data, and a memory has executable programs and stored data. The system includes a processor coupled to the transceiver and the memory. The processor is configured to determine an allocation amount of the electric energy for the MEES system and a scheduling of the amount of electric energy for the MEES system for each time interval of all time intervals of a future operating period based on a set of uncertain parameters using an optimization model. The determination is made by calculating an objective function of the optimization model based on a subset of the uncertain parameters including energy and reserve market prices, renewable energy production, and electric energy demand. The processor identifies periodic and aggregate constraints and updates the objective function using the identified subset of periodic and aggregate constraints. The processor simultaneously optimizes the objective function for a value hierarchy associated with energy and reserve bidding scenarios for the market participants and delivery scheduling for the MEES system based on the stored risk preferences of the market participants. The processor controls the scheduling of the MEES system between the locations of the energy storage device of the power supplier according to (a) the distribution of the amount of electric energy to the location of the energy storage device of the power supplier for discharging, and (b) the reception of the amount of electric energy for the MEES system at the location of the energy storage device of the power supplier for charging the MEES system, according to the determined schedule of the MEES system and the allocation of the amount of electric energy distribution and reception from the updated objective function.The MEES system is charged or discharged according to the determined MEES system schedule and the allocation of the amount of electrical energy distribution and reception for a future time interval. It is contemplated that the following aspects can be combined individually or together to create different embodiments of the present disclosure. For example, one aspect can create an embodiment, or two or more aspects can create an embodiment, and many embodiments are contemplated based on the multiple aspects presented below.

[0108] In an aspect of the disclosure, the MEES system includes one or a combination of vehicles, trains, planes, or ships that transport the electric energy for allocation at the power supplier's location.

[0109] Another aspect of the disclosure may include that the optimization model is a stochastic optimization model formulated as a mixed integer linear programming problem.

[0110] Another aspect of the present disclosure may include that the value tiers associated with energy and reserve bidding scenarios are based on expected profits derived by the market participants from the energy and reserve markets, determined as expected revenue minus associated MEES system costs, where the revenue is selected from the group including day-ahead market revenue, real-time market revenue, operating reserve market revenue, frequency up regulation reserve revenue, and frequency down regulation reserve revenue, and the MEES system costs associated with market revenue are selected from the group including energy storage operating costs, energy storage delivery costs, and energy storage installation costs.

[0111] In one aspect, the subset of the uncertain parameters may include day-ahead energy prices, real-time energy prices, operating reserve prices, frequency up regulation reserve prices, frequency down regulation reserve prices, renewable energy production, and electricity demand, and a distribution of the uncertain parameters may be represented using a set of possible scenarios that have associated occurrence frequencies.

[0112] Another aspect may include that for each time interval of the future operating period, a scenario is determined for the subset of uncertain parameters using regression or machine learning of historical data for the subset of uncertain parameters, or directly using corresponding values ​​of the subset of uncertain parameters for the same time interval for the most recent past few days obtained from the stored historical data.

[0113] Yet another aspect may include that the power supplier is one or a combination of an aggregated electric load, an aggregated renewable source, and a mobile storage that connects to the power grid at one or more locations within the power grid.

[0114] One aspect may include the power supplier participating in generation bidding in multiple energy and reserve markets, including a day-ahead energy market, a real-time energy market, a driving reserve market, an up-regulation reserve market, and a down-regulation reserve market.

[0115] Another aspect may include the conditional value-at-risk being associated with confidence levels of one or more market participants, each market participant's confidence level being provided by the market participant, and where there are more than one market participant, the conditional value-at-risk may be associated with different confidence levels.

[0116] In yet another aspect, the subset of periodic constraints and aggregate constraints include: (a) power to balance at each location for each time interval of the future time period, where total power sold to the energy market and reserve market in the time interval is equal to real-time renewable electricity production and storage discharge power minus electricity demand consumption and storage charge power in the time interval; (b) maximum and minimum day-ahead bidding capacity limited by total electricity supplier generation and demand capacity; and (c) reserve bidding capacity limited by charge and discharge power capacity of the MEES system; and (d) the MEES system includes mobile energy storage vehicles, where each mobile electric energy storage vehicle is limited to be located at only one location during a time interval. (e) an energy level of each mobile electric energy storage vehicle is determined based on the energy level of the mobile electric energy storage vehicle at a last location and charging / discharging actions occurring after the mobile electric energy storage vehicle moves to a next location; (f) a storage charging / discharging power capacity of the mobile electric energy storage vehicle is constrained by a delivery status of an energy storage device of the power supplier at the next location; and (g) during a delivery process of the mobile electric energy storage vehicle moving to the next location, the mobile electric energy storage vehicle cannot charge or discharge electric energy, and a time length of the delivery process is determined by the distance between two successive locations and a delivery speed of a carrier.

[0117]

number

[0118]

number

[0119] Embodiment The following description provides only exemplary embodiments and is not intended to limit the scope, applicability, or configuration of the present disclosure. Rather, the following description of exemplary embodiments will provide those skilled in the art with an enabling description for implementing one or more exemplary embodiments. It is contemplated that various changes may be made in the function and arrangement of elements without departing from the spirit and scope of the disclosed subject matter, as set forth in the appended claims.

[0120] Specific details are provided in the following description to provide a thorough understanding of the embodiments. However, those skilled in the art will appreciate that the embodiments may be practiced without these specific details. For example, systems, processes, and other elements in the disclosed subject matter may be shown as components in block diagram form in order to avoid obscuring the embodiments in unnecessary detail. In other instances, well-known processes, structures, and techniques may be shown without unnecessary detail in order to avoid obscuring the embodiments. Additionally, like reference numbers and names in the various drawings refer to like elements.

[0121] Also, the individual embodiments may be described as a process that is depicted as a flowchart, a flow diagram, a data flow diagram, a structure diagram, or a block diagram. Although a flowchart may describe operations as a sequential process, many of the operations may be performed in parallel or simultaneously. In addition, the order of operations may be rearranged. A process may terminate when its operations are completed, or may have additional steps not discussed or included in the diagram. Moreover, not all operations in any process specifically described may occur in all embodiments. A process may correspond to a method, a function, a procedure, a subroutine, a subprogram, or the like. When a process corresponds to a function, the end of the function may correspond to the function returning to the calling function or to the main function.

[0122] Furthermore, embodiments of the disclosed subject matter may be implemented, at least in part, either manually or automatically. The manual or automatic implementation may be performed or at least assisted through the use of a machine, hardware, software, firmware, middleware, microcode, hardware description language, or any combination thereof. When implemented in software, firmware, middleware, or microcode, the program code or code segments for performing the necessary tasks may be stored in a machine-readable medium. A processor(s) may perform the necessary tasks. The processor may be, as a non-limiting example, computer hardware, i.e., logic circuitry that responds to and processes basic instructions that drive a computer to implement the algorithms described in this disclosure.

[0123] Furthermore, the embodiments of the present disclosure and the functional operations described herein can be realized in digital electronic circuitry, tangibly embodied computer software or firmware, computer hardware including the structures disclosed herein and their structural equivalents, or one or more combinations thereof. Furthermore, some embodiments of the present disclosure can be realized as one or more computer programs, i.e., as one or more modules of computer program instructions encoded on a tangible, non-transitory program carrier for execution by or to control the operation of a data processing apparatus. Furthermore, the program instructions can be encoded on an artificially generated propagated signal, e.g., a machine-generated electrical, optical, or electromagnetic signal, generated to encode information to be transmitted to a suitable receiving device for execution by the data processing apparatus. The computer storage medium may be a machine-readable storage device, a machine-readable storage substrate, a random or serial access memory device, or one or more combinations thereof.

[0124] According to an embodiment of the present disclosure, the term "data processing apparatus" may encompass all kinds of apparatus, devices, and machines for processing data, including, by way of example, a programmable processor, a computer, or multiple processors or computers.

[0125] A computer program (which may also be referred to or described as a program, software, software application, module, software module, script, or code) can be written in any form of programming language, including compiled or interpreted languages, or declarative or procedural languages, and can be deployed in any form, including stand-alone programs or modules, components, subroutines, or other units suitable for use in a computing environment. A computer program may correspond to a file in a file system, but need not. A program can be stored in part of a file that holds other programs or data, e.g. one or more scripts stored in a markup language document, or in a single file dedicated to the program in question, or in several associated files, e.g. files that store one or more modules, subprograms, or parts of code. A computer program can be deployed to be executed on one computer, or on several computers located at one site or distributed across several sites and interconnected by a communications network. A computer suitable for the execution of a computer program may include or be based on a general-purpose or special-purpose microprocessor, or both, or any other type of central processing unit. In general, the central processing unit receives instructions and data from a read-only memory or a random access memory, or both. The essential elements of a computer are a central processing unit for carrying out or executing instructions, and one or more memory devices for storing instructions and data. Typically, a computer also includes one or more mass storage devices, such as magnetic, magneto-optical, or optical disks, for storing data, or is operatively coupled to receive data from or transfer data to, or both. However, a computer need not have such devices.Additionally, a computer may be incorporated into another device, such as a mobile phone, a personal digital assistant (PDA), a mobile audio or video player, a game console, a Global Positioning System (GPS) receiver, or a portable storage device, such as a Universal Serial Bus (USB) flash drive, to name a few.

[0126] Although the present disclosure has been described with reference to certain preferred embodiments, it should be understood that various other modifications and improvements are possible within the spirit and scope of the disclosure. It is therefore the object of the following claims to cover all such variations and improvements that fall within the true spirit and scope of the disclosure.

Claims

1. 1. A system for allocating electric energy, the system including distribution and reception of electric energy using a Mobile Electric Energy Storage (MEES) system at a location of an electric power supplier in a market-based resource allocation system by market participants, a transceiver receiving data including historical data and other data, a memory having executable programs and stored data, the system including: a processor coupled to the transceiver and the memory, the processor comprising: determining, for each time interval of all time intervals of a future operating period based on a set of uncertain parameters using an optimization model, an amount of electric energy for the MEES system and a scheduling of the amount of electric energy for the MEES system, the determining comprising: Calculating an objective function of the optimization model based on a subset of the uncertain parameters, including energy and reserve market prices, renewable energy production, and electrical energy demand; identifying periodic and aggregate constraints and updating the objective function with a subset of the identified periodic and aggregate constraints while optimizing the objective function for a value hierarchy associated with energy and reserve bidding scenarios for the market participants and delivery scheduling for the MEES system based on stored risk preferences of the market participants; and controlling the scheduling of the MEES system between the locations of the energy storage device of the power supplier in accordance with: (a) the distribution of the amount of electric energy to the locations of the energy storage device of the power supplier for discharging; and (b) the reception of the amount of electric energy for the MEES system at the locations of the energy storage device of the power supplier for charging the MEES system, in accordance with the determined schedule of the MEES system and an allocation of the amount of distribution and reception of electric energy from the updated objective function; The MEES system is charged or discharged according to the determined MEES system schedule and the allocation of the amount of distribution and reception of electrical energy for a future time interval.

2. each electricity supplier location among the locations includes one or a combination of the energy storage device, the renewable source, or the electric load; The stored historical data includes: (1) historical energy market and reserve market settlement price and quantity data from independent system operators (ISOs); (2) historical renewable generation and consumption demand data from virtual power plants (VPPs); and (3) historical weather data; 2. The system of claim 1 , wherein the other stored data comprises: (a) market participant data associated with the market participant's confidence level for use in association with calculating a conditional value-at-risk; (b) market participant electric energy production data; and (c) energy-related data.

3. the MEES system includes one or a combination of a vehicle, a train, an airplane, or a ship for transporting one or more storage devices; the one or combination of the vehicle, train, plane, or ship is configured to transport stored electrical energy through the MEES system to the location of the power supplier by charging the one or more storage devices of the MEES system, and to receive electrical energy from one or combination of the energy storage devices of the power supplier, the power supplier's renewable sources, or a power grid; The system of claim 1 , wherein the MEES system transports the received electrical energy to another location.

4. The system of claim 1 , wherein the optimization model is a stochastic optimization model formulated as a mixed integer linear programming problem stored in the memory.

5. the value tiers associated with the energy and reserve bidding scenarios are based on expected benefits derived by the market participants from the energy and reserve markets, determined as expected revenue minus associated MEES system costs; The revenue is selected from the group including: day-ahead market revenue, real-time market revenue, operating reserve market revenue, frequency up regulation reserve revenue, and frequency down regulation reserve revenue; The system of claim 1 , wherein the MEES system costs related to market revenue are selected from the group including: energy storage operating costs, energy storage delivery costs, and energy storage installation costs.

6. the subset of uncertain parameters includes day-ahead energy prices, real-time energy prices, operating reserve prices, frequency up regulation reserve prices, frequency down regulation reserve prices, renewable energy production, and electricity demand; The system of claim 1 , wherein the distribution of the uncertain parameters is represented using a set of possible scenarios with associated frequencies of occurrence.

7. 7. The system of claim 6, wherein for each time interval of the future operating period, a scenario is determined for the subset of uncertain parameters using regression or machine learning of historical data for the subset of uncertain parameters, or directly using corresponding values ​​of the subset of uncertain parameters for the same time interval during the most recent past few days obtained from the stored historical data.

8. 2. The system of claim 1, wherein the power supplier includes one or a combination of aggregated electric loads, aggregated renewable sources, and electric energy storage that connects to the power grid at one or more locations within the power grid.

9. The market participants and electricity suppliers participate in generation bidding in a plurality of energy markets and reserve markets; 2. The system of claim 1, wherein the plurality of energy and reserve markets include a day-ahead energy market, a real-time energy market, a running reserve market, a frequency up regulation reserve market, and a frequency down regulation reserve market.

10. the conditional value at risk is associated with one or more market participant confidence levels, each market participant confidence level being provided by the market participant; 3. The system of claim 2, wherein if there are two or more market participants, the conditional value-at-risk may be associated with different confidence levels.

11. The periodic constraints and the subset of the aggregate constraints are (a) a total power sold to the energy market and reserve market during each time interval of the future operating period, including power to be balanced at each location, is equal to real-time renewable electricity production and storage discharge power minus electricity demand consumption and storage charge power during the time interval; The subset is (b) maximum and minimum day-ahead bidding capacities limited by the electricity supplier's total generation and demand capacity; and (c) a reserve power bidding capacity limited by the charging and discharging power capacity of the MEES system; (d) the MEES system includes mobile electric energy storage vehicles, each mobile electric energy storage vehicle capable of being located at only one location during a time interval; (e) determining an energy level of each mobile electric energy storage vehicle based on the energy level of the mobile electric energy storage vehicle at a last location and charging and discharging activities occurring after the mobile electric energy storage vehicle travels to a next location; (f) the storage charge and discharge power capacity of the mobile electric energy storage vehicle is constrained by the delivery status of the energy storage device of the electricity supplier at the next location; 2. The system of claim 1, wherein (g) during a delivery process of the mobile electric energy storage vehicle traveling to the next location, the mobile electric energy storage vehicle cannot charge or discharge electric energy, and a length of time of the delivery process is determined by a distance between two successive locations and a delivery speed of a carrier.

12. 1. A method for allocating electric energy, the method comprising: distribution and receipt of electric energy using a Mobile Electric Energy Storage (MEES) system at a power supplier's location in a market-based resource allocation system by market participants, the market participants including power production sources including renewable energy production facilities, the method receiving data including historical data and other data, the method having an executable program and stored data in a memory, the method comprising: using a processor coupled to a transceiver and to the memory, the processor comprising: determining, for each time interval of all time intervals of a future operating period based on a set of uncertain parameters using an optimization model, an amount of electric energy for the MEES system and a scheduling of the amount of electric energy for the MEES system, the determining comprising: Calculating an objective function of the optimization model based on a subset of the uncertain parameters, including energy and reserve market prices, renewable energy production, and electrical energy demand; identifying periodic and aggregate constraints and updating the objective function with a subset of the identified periodic and aggregate constraints while optimizing the objective function for a value hierarchy associated with energy and reserve bidding scenarios for the market participants and delivery scheduling for the MEES system based on stored risk preferences of the market participants; and controlling the scheduling of the MEES system between the locations of the energy storage device of the power supplier in accordance with: (a) the distribution of the amount of electric energy to the locations of the energy storage device of the power supplier for discharging; and (b) the reception of the amount of electric energy for the MEES system at the locations of the energy storage device of the power supplier for charging the MEES system, in accordance with the determined schedule of the MEES system and an allocation of the amount of distribution and reception of electric energy from the updated objective function; The MEES system is charged or discharged according to the determined MEES system schedule and the allocation of the amount of electrical energy delivery and reception for a future time interval.

13. the value tiers associated with the energy and reserve bidding scenarios are based on expected benefits derived by the market participants from the energy and reserve markets, determined as expected revenue minus associated MEES system costs; The revenue is selected from the group including: day-ahead market revenue, real-time market revenue, operating reserve market revenue, frequency up regulation reserve revenue, and frequency down regulation reserve revenue; The method of claim 12 , wherein the MEES system costs related to market revenue are selected from the group including: energy storage operating costs, energy storage delivery costs, and energy storage installation costs.

14. The subset of uncertain parameters includes a day-ahead energy price, a real-time energy price, a driving reserve price, a frequency up regulation reserve price, a frequency down regulation reserve price, a renewable energy production volume, and an electricity demand, and a distribution of the uncertain parameters is represented using a set of possible scenarios with associated occurrence frequencies; 13. The method of claim 12, wherein for each time interval of the future operating period, a scenario is determined for the subset of uncertain parameters using regression or machine learning of historical data for the subset of uncertain parameters, or directly using corresponding values ​​of the subset of uncertain parameters for the same time interval during the most recent past few days obtained from the stored historical data.

15. The method of claim 1, wherein the other data includes market participant data associated with confidence levels of the market participants used in association with a conditional value-at-risk calculation; the conditional value at risk is associated with one or more market participant confidence levels, each market participant confidence level being provided by the market participant; 13. The method of claim 12, wherein if there are two or more market participants, the conditional value-at-risk may be associated with different confidence levels.

16. A computer-implemented method for allocating electric energy, the method including distribution and reception of electric energy using a mobile electric energy storage (MEES) system at electricity supplier locations in a market-based resource allocation system by market participants, each electricity supplier location including one or a combination of an energy storage device, a renewable source, or an electric load, executable programs and data stored in a memory, the method including: receiving, via a transceiver, data including historical data and other data, the historical data including: (1) historical energy market and reserve market settlement price and volume data from an independent system operator (ISO); (2) historical renewable generation and consumption demand data from a virtual power plant (VPP); and (3) historical weather data, the other data including: (a) market participant data associated with a confidence level of the market participant associated with a conditional value-at-risk; (b) electric energy production data of a market participant; and (c) energy-related data, the method further comprising: using a processor coupled to the transceiver and the memory, the processor comprising: determining, for each time interval of all time intervals of a future operating period based on a set of uncertain parameters using an optimization model, an amount of electric energy for the MEES system and a scheduling of the amount of electric energy for the MEES system, the determining comprising: Calculating an objective function of the optimization model based on a subset of the uncertain parameters, including energy and reserve market prices, renewable energy production, and electrical energy demand; identifying periodic and aggregate constraints and updating the objective function with a subset of the identified periodic and aggregate constraints while optimizing the objective function for a value hierarchy associated with energy and reserve bidding scenarios for the market participants and delivery scheduling for the MEES system based on stored risk preferences of the market participants; and controlling the scheduling of the MEES system between the locations of the energy storage device of the power supplier in accordance with: (a) the distribution of the amount of electric energy to the locations of the energy storage device of the power supplier for discharging; and (b) the reception of the amount of electric energy for the MEES system at the locations of the energy storage device of the power supplier for charging the MEES system, in accordance with the determined schedule of the MEES system and an allocation of the amount of distribution and reception of electric energy from the updated objective function; A computer-implemented method, wherein the MEES system is charged or discharged according to the determined MEES system schedule and the allocation of the amount of electrical energy delivery and reception for a future time interval.

17. the value tiers associated with the energy and reserve bidding scenarios are based on expected profits derived by the market participants from the energy and reserve markets, determined as expected revenues minus associated MEES system costs; The revenue is selected from the group including: day-ahead market revenue, real-time market revenue, operating reserve market revenue, frequency up regulation reserve revenue, and frequency down regulation reserve revenue; 17. The computer-implemented method of claim 16, wherein the MEES system costs related to market revenue are selected from the group including: energy storage operating costs, energy storage delivery costs, and energy storage installation costs.

18. the subset of uncertain parameters includes day-ahead energy prices, real-time energy prices, operating reserve prices, frequency up regulation reserve prices, frequency down regulation reserve prices, renewable energy production, and electricity demand; 17. The computer-implemented method of claim 16, wherein a distribution of the uncertain parameters is represented using a set of possible scenarios with associated frequencies of occurrence.

19. 1. A non-transitory computer readable storage medium having a computer executable program embodied thereon for performing a method for allocating electric energy, the method including distribution and reception of electric energy using a mobile electric energy storage (MEES) system at electricity supplier locations in a market-based resource allocation system by market participants, each electricity supplier location including one or a combination of an energy storage device, a renewable source, or an electric load, the storage medium having an executable program and stored data in a memory, the storage medium comprising: receiving, via a transceiver, data including historical data and other data, the historical data including: (1) historical energy market and reserve market settlement price and volume data from an independent system operator (ISO); (2) historical renewable generation and consumption demand data from a virtual power plant (VPP); and (3) historical weather data, the other data including: (a) market participant data associated with a confidence level of the market participant associated with a conditional value-at-risk; (b) electric energy production data of a market participant; and (c) energy-related data, the storage medium further comprising: using a processor coupled to the transceiver and the memory, the processor comprising: determining, for each time interval of all time intervals of a future operating period based on a set of uncertain parameters using an optimization model, an amount of electric energy for the MEES system and a scheduling of the amount of electric energy for the MEES system, the determining comprising: Calculating an objective function of the optimization model based on a subset of the uncertain parameters, including energy and reserve market prices, renewable energy production, and electrical energy demand; identifying periodic and aggregate constraints and updating the objective function with a subset of the identified periodic and aggregate constraints while optimizing the objective function for a value hierarchy associated with energy and reserve bidding scenarios for the market participants and delivery scheduling for the MEES system based on stored risk preferences of the market participants; and controlling the scheduling of the MEES system between the locations of the energy storage device of the power supplier in accordance with: (a) the distribution of the amount of electric energy to the locations of the energy storage device of the power supplier for discharging; and (b) the reception of the amount of electric energy for the MEES system at the locations of the energy storage device of the power supplier for charging the MEES system, in accordance with the determined schedule of the MEES system and an allocation of the amount of distribution and reception of electric energy from the updated objective function; The MEES system is charged or discharged according to the determined MEES system schedule and the allocation of the amount of distribution and reception of electrical energy for a future time interval.

20. 1. A system for allocating electric energy, the system including distribution and reception of electric energy using a mobile electric energy storage (MEES) system at electricity supplier locations in a market-based resource allocation system by market participants, each electricity supplier location including one or a combination of an energy storage device, a renewable source, or an electric load, the market participants including electricity production sources including renewable energy production facilities, the system including: a transceiver for receiving data including historical data and other data, the historical data including: (1) historical energy market and reserve market settlement price and volume data from independent system operators (ISOs), (2) historical renewable generation and consumption demand data from virtual power plants (VPPs), and (3) historical weather data, the other data including: (a) market participant data associated with confidence levels of the market participants for use in association with calculating a conditional value-at-risk; (b) market participant electric energy production data; and (c) energy-related data, the system further comprising: a memory having executable programs and stored data; a processor coupled to the transceiver and the memory, the processor comprising: determining, for each time interval of all time intervals of a future operating period based on a set of uncertain parameters using an optimization model, an amount of electric energy for the MEES system and a scheduling of the amount of electric energy for the MEES system, the determining comprising: Calculating an objective function of the optimization model based on a subset of the uncertain parameters, including energy and reserve market prices, renewable energy production, and electrical energy demand; identifying periodic and aggregate constraints and updating the objective function with a subset of the identified periodic and aggregate constraints while optimizing the objective function for a value hierarchy associated with energy and reserve bidding scenarios for the market participants and delivery scheduling for the MEES system based on stored risk preferences of the market participants; and controlling the scheduling of the MEES system between the locations of the energy storage device of the power supplier in accordance with: (a) the distribution of the amount of electric energy to the locations of the energy storage device of the power supplier for discharging; and (b) the reception of the amount of electric energy for the MEES system at the locations of the energy storage device of the power supplier for charging the MEES system, in accordance with the determined schedule of the MEES system and an allocation of the amount of distribution and reception of electric energy from the updated objective function; The MEES system is charged or discharged according to the determined MEES system schedule and the allocation of the amount of distribution and reception of electrical energy for a future time interval.

Citation Information

Patent Citations

  • Aggregation control system, aggregation control method, and controller

    JP2018148679A

  • Information processing system

    JP2019146436A

  • Energy system optimization device

    JP2020028137A

  • Facilitating revenue generation from wholesale electricity markets

    US20140316973A1

Cited By

  • Information processing device

    US20230128848A1