Power system, server, and method for adjusting power supply and demand
By allocating parking spaces for power-supplying vehicles in power grids, the system stabilizes power supply and demand, addressing the challenge of excessive demand and enabling simultaneous charging of multiple vehicles.
Patent Information
- Application Number
- JP2020212351
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-12-22
- Publication Date
- 2024-11-13
- Estimated Expiration
- 2040-12-22
AI Technical Summary
In power grids such as microgrids, maintaining a balance between power supply and demand is crucial to stabilize power, but situations arise where excessive demand, particularly from simultaneous charging of multiple vehicles, disrupts this balance, leading to a situation where charging cannot be immediately performed.
A power system with management devices that allocate parking spaces for vehicles equipped to supply power back to the grid when demand exceeds supply, incentivizing users to consent to power supply, and a server that manages these resources to optimize power distribution.
This approach maintains power supply and demand balance by allowing vehicles to supply power back to the grid, thereby stabilizing the system and enabling more vehicles to be charged.
Smart Images

Figure 0007581842000001 
Figure 0007581842000002 
Figure 0007581842000003
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a power system, a server, and a method for adjusting power supply and demand. [Background technology]
[0002] Japanese Patent Application Laid-Open No. 2020-28198 (Patent Document 1) discloses a control system for a microgrid. Patent Document 1 describes that voltage fluctuations in the microgrid may occur due to the on / off of a large power load in the microgrid. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2020-28198 A Summary of the Invention [Problem to be solved by the invention]
[0004] In a power grid such as a microgrid, it is necessary to maintain a balance between power supply and demand in order to stabilize power. A plurality of power adjustment resources may be electrically connected to the power grid. Specifically, vehicles such as electric vehicles and plug-in hybrid vehicles may be connected to the power grid. When many vehicles attempt to charge at the same time, the power supply and demand balance becomes excessive, and a situation may arise in which charging cannot be performed immediately. It is necessary to maintain a balance between power supply and demand in order to enable charging of many vehicles.
[0005] The present disclosure has been made to solve the above-mentioned problems, and an object of the present disclosure is to maintain a balance between power supply and demand in a power grid. [Means for solving the problem]
[0006] (1) A power system according to a first aspect of the present disclosure includes a plurality of power adjustment resources electrically connected to a power grid, and a management device that manages the plurality of power adjustment resources. The plurality of power adjustment resources each have a parking space, and include a plurality of power facilities configured to enable power supply from a vehicle among a plurality of power supply vehicles to the power grid when the vehicle is parked in the parking space. The management device is configured to manage the parking spaces, and when the power supply and demand balance of the power grid is in excess of demand, the management device allocates the parking space for supplying power to the power grid to a vehicle among the plurality of power supply vehicles that has responded to a power supply request to the power grid.
[0007] (2) Each of the plurality of power facilities is configured to be able to charge a vehicle from the power grid when the vehicle among the plurality of charging vehicles is parked in a parking space. When the power supply and demand balance of the power grid is in excess of demand and at least some of the plurality of charging vehicles are waiting to be charged, the management device allocates a parking space to a vehicle that responds to a power supply request.
[0008] In the above configurations (1) and (2), when the power supply and demand balance of the power grid is in excess of demand, particularly when there is a vehicle waiting to be charged from the power grid, a parking space for supplying power to the power grid is allocated to a vehicle that is not supplying power to the power grid. It is considered that the user of the vehicle agrees to supply power from the vehicle to the power grid as an incentive to receive the parking space. Supplying power from the vehicle to the power grid improves the power supply and demand balance of the power grid. Thus, according to the above configurations (1) and (2), the power supply and demand balance of the power grid can be maintained.
[0009] (3) When the power supply and demand balance is predicted to be in excess of demand during a certain time period, the management device assigns a parking space to a vehicle that has responded to a power supply request for supplying power to the power grid during the above time period.
[0010] According to the above configuration (3), the power supply and demand balance in the power grid can be maintained similarly even during time periods when the power supply and demand balance is predicted to become excessive in the future.
[0011] (4) When the degree of excess demand in the electricity supply and demand balance is greater than a predetermined amount, the management device extends the time for allocating a parking space to a vehicle that responds to a power supply request, compared to when the degree of excess demand in the electricity supply and demand balance is less than a predetermined amount.
[0012] According to the above configuration (4), when the degree of excess demand in the power supply and demand balance is greater than a predetermined amount, i.e., when there is a great need to improve the power supply and demand balance, the incentive for providing the parking space is increased by lengthening the time for allocating the parking space. This increases the possibility that the user will agree to supply power from the vehicle to the power grid, so that the power supply and demand balance of the power grid can be maintained more reliably.
[0013] (5) When there are multiple vehicles that have responded to the power supply request, the management device assigns a parking space to a vehicle that can supply more power to the power grid among the multiple vehicles.
[0014] When there is a shortage of parking spaces, the question arises of which vehicle to allocate the parking space to. According to the configuration of (5) above, the parking space is allocated to a vehicle that can supply more power to the power grid, so that the power supply and demand balance of the power grid can be more reliably maintained.
[0015] (6) A server according to a second aspect of the present disclosure manages a plurality of power adjustment resources electrically connected to a power grid. The plurality of power adjustment resources each have a parking space and include a plurality of power facilities configured to enable power supply from a vehicle among a plurality of power supply vehicles to the power grid when the vehicle is parked in the parking space. The server includes a processor and a memory that stores a program executable by the processor, and when the power supply and demand balance of the power grid is in excess of demand, the processor allocates the parking space for supplying power to the power grid to a vehicle among the plurality of power supply vehicles that has responded to a power supply request to the power grid.
[0016] According to the method of (6) above, like the configuration of (1) above, it is possible to maintain the balance between power supply and demand in the power grid.
[0017] (7) A method for adjusting power supply and demand according to a third aspect of the present disclosure manages a plurality of power adjustment resources electrically connected to a power grid. The plurality of power adjustment resources each have a parking space, and include a plurality of power facilities configured to enable power supply from a vehicle among a plurality of power supply vehicles to the power grid when the vehicle is parked in the parking space. The method for adjusting power supply and demand includes first and second steps. The first step is a step of allocating a parking space for supplying power to the power grid to a vehicle among the plurality of power supply vehicles that has responded to a request to supply power to the power grid when the power supply and demand balance of the power grid is in excess of demand. The second step is a step of the vehicle that has been allocated the parking space supplying power to the power grid.
[0018] According to the method (7) above, like the configurations (1) and (6) above, it is possible to maintain the balance between power supply and demand in the power grid. Effect of the Invention
[0019] According to the present disclosure, it is possible to maintain the balance between power supply and demand in the power grid. [Brief description of the drawings]
[0020] [Figure 1]1 is a diagram illustrating a schematic configuration of a power system according to a first embodiment of the present disclosure. [Diagram 2] FIG. 1 is a diagram for explaining a situation in which the power supply and demand balance of a microgrid is in an excess demand state. [Diagram 3] FIG. 13 is a conceptual diagram for explaining an example of a reservation frame for a parking space. [Figure 4] 4 is a flowchart showing processing related to allocation of parking spaces in the first embodiment. [Diagram 5] FIG. 11 is a sequence diagram showing a process related to allocation of a parking space in the second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0021] Hereinafter, embodiments of the present disclosure will be described in detail with reference to the drawings. In the drawings, the same or corresponding parts are denoted by the same reference characters, and the description thereof will not be repeated.
[0022] [Embodiment 1] <Overall configuration of the power system> 1 is a diagram showing a schematic configuration of a power system according to a first embodiment of the present disclosure. The power system 100 includes a CEMS 1, a CEMS server 2, a power receiving and transforming facility 3, a power system 4, and a power transmission and distribution company server 5. CEMS stands for Community Energy Management System or City Energy Management System.
[0023] The CEMS 1 includes a Factory Energy Management System (FEMS) 11, a Building Energy Management System (BEMS) 12, a Home Energy Management System (HEMS) 13, a generator 14, a naturally variable power source 15, an Energy Storage System (ESS) 16, a plurality of charging stations (Electric Vehicle Supply Equipment (EVSE)) 17, and a plurality of vehicles 7 and 8. In the CEMS 1, a microgrid MG is constructed by these components. The microgrid MG corresponds to an example of the "power grid" according to the present disclosure.
[0024] The FEMS 11 is a system that manages the supply and demand of electricity used in a factory. The FEMS 11 includes a factory building (including lighting fixtures, air conditioning equipment, etc.) and industrial equipment (production lines, etc.) that operate with electricity supplied from the microgrid MG. Although not shown, the FEMS 11 may also include power generation equipment (generators, solar panels, etc.) installed in the factory. Electricity generated by these power generation equipment may be supplied to the microgrid MG. The FEMS 11 further includes a FEMS server 110 that is capable of bidirectional communication with the CEMS server 2.
[0025] The BEMS 12 is a system that manages the supply and demand of electricity used in buildings such as offices or commercial facilities. The BEMS 12 includes lighting fixtures and air conditioning equipment installed in the building. The BEMS 12 may include power generation equipment (such as solar panels) or a cold heat source system (such as a waste heat recovery system or a heat storage system). The BEMS 12 further includes a BEMS server 120 that is capable of bidirectional communication with the CEMS server 2.
[0026] The HEMS 13 is a system that manages the supply and demand of electricity used in the home. The HEMS 13 includes household appliances (lighting appliances, air conditioners, other electrical appliances, etc.) that operate with power supplied from the microgrid MG. The HEMS 13 may also include solar panels, a household heat pump system, a household cogeneration system, a household storage battery, etc. The HEMS 11 further includes a HEMS server 130 that is capable of bidirectional communication with the CEMS server 2.
[0027] The generator 14 is a power generation facility that is not dependent on weather conditions, and outputs the generated power to the microgrid MG. The generator 14 may include a steam turbine generator, a gas turbine generator, a diesel engine generator, a gas engine generator, a biomass generator, a stationary fuel cell, etc. The generator 14 may include a cogeneration system that utilizes heat generated during power generation.
[0028] The naturally variable power source 15 is a power generation facility whose power output varies depending on weather conditions, and outputs the generated power to the microgrid MG. Although a solar power generation facility (solar panel) is illustrated in Fig. 1, the naturally variable power source 15 may include a wind power generation facility instead of or in addition to the solar power generation facility.
[0029] The power storage system 16 is a stationary power source that stores power generated by the naturally variable power source 15 or the like. The power storage system 16 is a secondary battery, for example a lithium-ion battery or a nickel-metal hydride battery that is a battery (recycled product) used in a vehicle. However, the power storage system 16 is not limited to a secondary battery, and may be a power-to-gas device that produces gaseous fuel (hydrogen, methane, etc.) using surplus power.
[0030] Each of the multiple charging / discharging facilities 17 is electrically connected to the microgrid MG and configured to be capable of charging and discharging (power supply) between the microgrid MG. The charging / discharging facilities 17 correspond to the "electrical facilities" according to the present disclosure.
[0031] The multiple vehicles 7, 8 may specifically include plug-in hybrid vehicles (PHVs), electric vehicles (EVs), plug-in fuel cell vehicles, etc. Each vehicle 8 includes a human machine interface (HMI) 80 for exchanging various information between the vehicle and a user. The HMI 80 is, for example, a touch panel display (not shown) of a navigation system. Although not shown, the vehicle 7 also includes an HMI.
[0032] At least some of the multiple vehicles 7, 8 are configured to be able to supply power from the microgrid MG to the vehicles by connecting a charging cable to an inlet (not shown) of the vehicle. This mode of power supply is also referred to as "external charging." At least some of the multiple vehicles 7, 8 are configured to be able to supply power from the vehicles to the microgrid MG by connecting a charging cable to an outlet (not shown) of the vehicle. This mode of power supply is also referred to as "external power supply." The multiple vehicles 7, 8 may include vehicles that are configured to be able to both externally charge and externally supply power.
[0033] Hereinafter, among the multiple vehicles 7 and 8, a vehicle that is being externally charged or is about to be externally charged will be referred to as a "charging vehicle 7." Meanwhile, among the multiple vehicles 7 and 8, a vehicle that is being externally fed power or is about to be externally fed power will be referred to as a "power feeding vehicle 8."
[0034] 1, the CEMS 1 includes one each of FEMS 11, BEMS 12, HEMS 13, generator 14, naturally variable power source 15, and power storage system 16, but the number of these systems or facilities included is arbitrary. CEMS 1 may include multiple of these systems or facilities, or there may be systems or facilities not included in CEMS 1. FEMS 11, BEMS 12, and / or HEMS 13 may include facilities such as generators, and may include charging / discharging facilities 17, charging vehicles 7, and / or power supply vehicles 8.
[0035] Each of the FEMS 11 (factory buildings, industrial facilities, etc.), BEMS 12 (lighting fixtures, air conditioning equipment, etc.), HEM 13 (household appliances, etc.), generator 14, naturally variable power source 15, and power storage system 16 included in CEMS 1 corresponds to an example of the "multiple power adjustment resources" according to the present disclosure.
[0036] The CEMS server 2 is a computer that manages power adjustment resources within the CEMS 1. The CEMS server 2 includes a control device 21, a storage device 22, and a communication device 23. The control device 21 includes a processor, and is configured to execute predetermined arithmetic processing. The storage device 22 includes a memory that stores programs executed by the control device 21, and stores various information used by the programs (maps, relational expressions, parameters, etc.). The communication device 23 includes a communication interface, and is configured to communicate with the outside (other servers, etc.).
[0037] The CEMS server 2 may be an aggregator server. An aggregator is an electric utility that provides an energy management service by bundling multiple power adjustment resources. The CEMS server 2 corresponds to an example of a "management device" or a "server" according to the present disclosure. In addition, the servers (110, 120, 130) included in each of the FEMS 11, BEMS 12, and HEMS 13 systems can also be the "management device" or the "server" according to the present disclosure.
[0038] The power receiving and transforming equipment 3 is provided at an interconnection point (power receiving point) of the microgrid MG, and is configured to be able to switch between parallel (connection) and parallel-off (disconnection) between the microgrid MG and the power system 4. The power receiving and transforming equipment 3 includes a high-voltage side (primary side) switchgear, a transformer, a protective relay, measuring instruments, and a control device, all of which are not shown. When the microgrid MG is interconnected with the power system 4, the power receiving and transforming equipment 3 receives, for example, extra-high voltage AC power (a voltage exceeding 7000 V) from the power system 4, and steps down the received power to supply it to the microgrid MG.
[0039] The power system 4 is a power network constructed by power plants and power transmission and distribution facilities. In this embodiment, an electric power company serves as both a power generation business operator and a power transmission and distribution business operator. The electric power company corresponds to a general power transmission and distribution business operator, and also corresponds to a manager of the power system 4, and maintains and manages the power system 4.
[0040] The electricity transmission and distribution company server 5 is a computer that belongs to an electric power company and manages the supply and demand of electricity in the electric power system 4. The electricity transmission and distribution company server 5 is also configured to be capable of bidirectional communication with the CEMS server 2.
[0041] <Electricity supply and demand balance> In the microgrid MG, it is necessary to maintain a balance between power supply and demand in order to stabilize the power. A plurality of charging vehicles 7 and power supply vehicles 8 can be electrically connected to the microgrid MG. When external charging is attempted for many charging vehicles 7 at the same time, the power supply and demand balance of the microgrid MG is disrupted due to excess demand, and a situation may arise in which external charging is not possible immediately. As a result, some charging vehicles 7 may be waiting for external charging.
[0042] 2 is a diagram for explaining a situation in which the power supply and demand balance of the microgrid MG is in an excess demand state. Each of the multiple charging and discharging facilities 17 has a parking space 18. Each parking space 18 is provided adjacent to the charging and discharging facility 17.
[0043] When many charging vehicles 7 wish to charge externally, it is possible that external power supply from the power supply vehicle 8 to the microgrid MG is also performed in order to maintain the power demand balance of the microgrid MG. The fact that many charging vehicles 7 wish to charge externally means that the charging / discharging equipment 17 is already being used or is about to be used accordingly. In the example shown in FIG. 2, most of the charging / discharging equipment 17 is being used by many charging vehicles 7. With the use of the charging / discharging equipment 17, all of the parking spaces 18 are also occupied.
[0044] In the CEMS 1, the parking space 18 for using the charging / discharging equipment 17 is limited. The user of the power supply vehicle 8 is willing to cooperate with external power supply to the microgrid MG in order to maintain the power demand balance of the microgrid MG. However, since there is no surplus parking space 18 for the power supply vehicle 8, external power supply from the power supply vehicle 8 to the microgrid MG cannot be performed. As a result, the state in which the power demand balance of the microgrid MG is in excess of demand is not resolved, and the situation in which the charging vehicle 7 cannot be externally charged immediately may continue. Therefore, in this embodiment, a configuration is adopted in which the parking space 18 for the power supply vehicle 8 is secured when the power supply and demand balance of the microgrid MG is in excess of demand.
[0045] <Parking space reservation quota> In this embodiment, when the power supply and demand balance of the microgrid MG is in excess of demand (which may include a case where excess demand is expected in the near future), the CEMS server 2 extracts a power supply vehicle 8 that is not using the charging / discharging equipment 17 (in other words, is not parked in the parking space 18) from among the multiple power supply vehicles. Then, the CEMS server 2 secures a reservation slot for the parking space 18 for the extracted power supply vehicle 8.
[0046] FIG. 3 is a conceptual diagram for explaining an example of a reservation slot for a parking space 18. The reservation slot for the charging / discharging equipment 17 is determined, for example, by a location and a time period. In the example shown in FIG. 3, due to space limitations, only reservation slots for three locations (parking spaces A to C) are shown, but in reality, there may be many more reservation slots. In addition, in the example shown in FIG. 3, the time period is divided into one-hour intervals, but the manner in which the time period is divided can be set arbitrarily, and may be longer than one hour (for example, two hours) or shorter than one hour (for example, 30 minutes). Information regarding such reservation slots is stored in the storage device 22 of the CEMS server 2.
[0047] "Reserved" indicates a reservation slot that has already been assigned to one of the vehicles (charging vehicle 7 or power supply vehicle 8). On the other hand, "Available" indicates an available reservation slot that is not assigned to any vehicle. The CEMS server 2 assigns to the power supply vehicle 8 that has responded to the power supply request a reservation slot for a parking space that is close to the destination of the power supply vehicle 8 and is in a time period when the power supply vehicle 8 is expected to arrive at the destination. In this example, a two-hour reservation slot for parking space C from 12:00 to 14:00 is assigned. This time period is a time period when the power supply and demand balance of the microgrid MG is expected to be in an excess demand state.
[0048] 3 may be displayed on an HMI 80 such as a touch panel display of a navigation system mounted on the power supply vehicle 8. The user of the power supply vehicle 8 can select which reservation slot he / she desires by operating the HMI 80. This allows the reservation slot desired by the user to be allocated to the power supply vehicle 8. Instead of the HMI 80, a mobile terminal (smartphone, etc.) owned by the user may be used.
[0049] <Processing flow> Fig. 4 is a flowchart showing a process related to the allocation of the parking space 18 in the first embodiment. This flowchart is called from a main routine (not shown) and executed repeatedly every time a predetermined condition is satisfied or at predetermined intervals. In Fig. 4, a series of processes executed by the CEMS server 2 is shown on the left side, and a series of processes executed by the power supply vehicle 8 is shown on the right side. Each step is realized by software processing by the CEMS server 2 or the power supply vehicle 8, but may also be realized by hardware (electrical circuits) created in the CEMS server 2 or the power supply vehicle 8. Hereinafter, step is abbreviated as S.
[0050] In S11, the CEMS server 2 determines whether the power supply and demand balance of the microgrid MG is predicted to be in an excess demand state (as will be described later, it may also determine whether the power supply and demand balance is in an excess demand state). For example, the CEMS server 2 can determine that the power supply and demand balance is in an excess demand state when the ratio of the total power consumption of each facility in the microgrid MG to the power supplied from the power system 4 to the microgrid MG is likely to be higher than a predetermined value. The power supplied by the microgrid MG may include the power generated by each facility (the generator 14, the naturally variable power source 15, etc.) in the microgrid MG, the power supplied from the power storage system 16 to the microgrid MG, etc.
[0051] Furthermore, the CEMS server 2 may determine whether the power supply and demand balance of the microgrid MG is in a state of excess demand based on the number (or the ratio of waiting vehicles) of charging vehicles 7 that wish to supply external power but are waiting without obtaining permission to do so from the CEMS server 2. Whether an excess demand state is predicted to occur may be determined based on a history of excess demand states occurring in the past under similar conditions (conditions related to season, weather, temperature, day of the week, time of day, etc.).
[0052] If the power supply and demand balance of the microgrid MG is not in excess of demand (NO in S11), the process returns to the main routine without executing the subsequent processes. If the power supply and demand balance is in excess of demand (YES in S11), the CEMS server 2 requests the power supply vehicle 8 that is not in external power supply and not parked in the parking space 18 to supply external power to the microgrid MG (S12).
[0053] The power supply request may be output to multiple power supply vehicles 8. The CEMS server 2 periodically acquires location information of the current locations of power supply vehicles 8 located within the CEMS1 (and around the CEMS1). The CEMS server 2 may output a power supply request to all power supply vehicles 8 that are parked or traveling in a specific area within the CEMS1, for example. Furthermore, the power supply vehicles 8 to which the power supply request is output are not limited to those located within the CEMS1 at that time. The power supply vehicles 8 to which the inquiry is output may also include vehicles located outside the CEMS1 (for example, around the CEMS1).
[0054] The power supply vehicle 8 that has received the power supply request responds as to whether or not it will comply with the power supply request (whether or not it can accept the power supply request) (S21). For example, if the user performs an operation on the HMI 80 indicating that it can accept the power supply request, the power supply vehicle 8 can respond that it can accept the power supply request. If it will not comply with the power supply request (NO in S21), the power supply vehicle 8 returns the process to the main routine. If it will comply with the power supply request (YES in S21), the power supply vehicle 8 transmits information regarding the destination of the power supply vehicle 8 and information regarding the estimated time of arrival at the destination to the CEMS server 2 (S22).
[0055] When the CEMS server 2 receives the information regarding the destination and expected arrival time of the power supply vehicle 8, it takes the information into consideration and selects a reservation slot for the parking space 18 for the power supply vehicle 8, and proposes it to the power supply vehicle 8 (S13). For a power supply vehicle 8 whose expected arrival time at the destination is included in a time period when the power supply and demand balance of the microgrid MG is predicted to be in excess of demand, the CEMS server 2 can propose a reservation slot that is close to the destination of the power supply vehicle 8 and has a relatively long parking time.
[0056] Furthermore, when the degree of excess demand in the power supply and demand balance of the microgrid MG is greater than a predetermined amount, the CEMS server 2 may extend the time for allocating a parking space to the power supply vehicle 8, compared to when the degree of excess demand in the power supply and demand balance of the microgrid MG is less than a predetermined amount. In other words, the CEMS server 2 may increase the compensation for external power supply provided to the power supply vehicle 8. This can further increase the incentive for the power supply vehicle 8 to cooperate with external power supply. The CEMS server 2 proposes the selected reservation slot to the power supply vehicle 8.
[0057] The power supply vehicle 8 responds to the CEMS server 2 as to whether or not to accept the reservation slot proposed by the CEMS server 2. This response can also be based on a user operation on the HMI 80 (S23).
[0058] If the power supply vehicle 8 accepts the proposed reservation slot (YES in S14), the CEMS server 2 confirms the reservation slot (S15). That is, the CEMS server 2 allocates the charging / discharging equipment 17 and the parking space 18 for the power supply vehicle 8. On the other hand, if the power supply vehicle 8 does not accept the reservation slot (NO in S14), the CEMS server 2 returns the process to S13 and proposes another reservation slot. For example, the CEMS server 2 may propose a reservation slot whose location is closer to the destination of the power supply vehicle 8 but whose parking time is shorter. Alternatively, the CEMS server 2 may propose a reservation slot whose location is somewhat farther from the destination of the power supply vehicle 8 but whose parking time is longer.
[0059] Thereafter, the power supply vehicle 8 travels until the power supply vehicle 8 arrives at the destination (NO in S24). When the power supply vehicle 8 arrives at the destination (YES in S24), the power supply vehicle 8 executes external power supply to the microgrid MG (S25).
[0060] As described above, in the first embodiment, when a situation in which the power supply and demand balance is predicted to be in excess of demand is predicted, the parking space 18 (and the charging / discharging equipment 17) is secured for the power supply vehicle 8. For the user of the power supply vehicle 8, the parking space 18 is provided near the destination in a time period before and after the expected arrival time at the destination, so that an incentive to cooperate in external power supply to the microgrid MG is generated. On the other hand, for the CEMS 1, by having the power supply vehicle 8 use the charging / discharging equipment 17, it is possible to prevent a situation in which even more charging vehicles 7 are waiting for external charging despite the fact that a situation of excess demand has already occurred. Then, as the power supply vehicle 8 starts supplying power to the microgrid MG, the power supply and demand balance of the microgrid MG is improved, so that it is possible to perform external charging for more charging vehicles 7. Thus, according to the first embodiment, the power supply and demand balance of the microgrid MG can be maintained, and as many charging vehicles 7 as possible (for example, charging vehicles 7 on standby) can be charged.
[0061] In this example, it has been described that the parking space 18 for external power supply is allocated to the power supply vehicle 8 when the power supply and demand balance of the microgrid MG is predicted to be in excess of demand. However, the parking space 18 can be allocated in the same manner when the power supply and demand balance is already in excess of demand. In this case, however, when the CEMS server 2 outputs a power supply request to the power supply vehicle 8 (S12), it is desirable to extract a power supply vehicle 8 that is expected to arrive at the destination as early as possible. In other words, the CEMS server 2 may preferentially request power supply to a power supply vehicle 8 traveling toward a nearby destination rather than a power supply vehicle 8 traveling toward a distant destination. This is because by prioritizing a power supply vehicle 8 that will arrive at the destination in a short time, external power supply can be started promptly, and the power supply and demand balance of the microgrid MG can be improved promptly.
[0062] [Embodiment 2] When there are many vehicles 7 wishing to be charged externally, the remaining number of charging / discharging facilities 17 and parking spaces 18 may become very small. When charging / discharging facilities 17 and parking spaces 18 are scarce in this way, it is required to improve the power supply and demand balance of the microgrid MG by utilizing the charging / discharging facilities 17 and parking spaces 18 as effectively as possible. In the second embodiment, a configuration is described in which a reservation slot is assigned to a vehicle capable of supplying larger power. In other words, in the second embodiment, an auction of reservation slots is performed.
[0063] Any number of power supply vehicles 8 may participate in the auction, but for ease of understanding, an example in which two power supply vehicles 8 participate in the auction will be described below. These two power supply vehicles 8 will be referred to as vehicles 8A and 8B to be distinguished from each other. Vehicles 8A and 8B are vehicles that responded to the power supply request.
[0064] 5 is a sequence diagram showing the processing related to the allocation of the parking space 18 in the embodiment 2. In this sequence diagram, sequence processing executed by the vehicle 8A, the vehicle 8B, and the CEMS server 2 is described in order from left to right in the figure.
[0065] In SQ311, the vehicle 8A accepts the power supply request from the CEMS server 2, and in exchange for the external power supply, requests allocation of a reservation frame for the parking space 18. Then, the vehicle 8A transmits information regarding the destination and expected arrival time of the vehicle 8A to the CEMS server 2 (SQ312).
[0066] Vehicle 8B also accepts the power supply request from the CEMS server 2 and requests allocation of a reserved slot for the parking space 18 (SQ321). At the same time, vehicle 8B transmits information regarding the destination and expected arrival time of vehicle 8B to the CEMS server 2 (SQ322). Here, it is assumed that the destination and expected arrival time are the same between vehicle 8A and vehicle 8B.
[0067] In SQ301, the CEMS server 2 extracts candidates to participate in the auction based on information regarding the destination and expected arrival time transmitted from the vehicles 8A and 8B (and other vehicles that have responded to the power supply request, not shown). In this example, it is assumed that the vehicles 8A and 8B are extracted as candidates. The CEMS server 2 proposes a reservation frame for a parking space for external power supply to the vehicles 8A and 8B.
[0068] In SQ313, the user of vehicle 8A operates the HMI 80 or the mobile terminal to input the amount of power that can be externally supplied from vehicle 8A as a price for securing the reservation slot proposed by the CEMS server 2. In other words, vehicle 8A makes a bid for the reservation slot. A signal from vehicle 8A indicating the amount of power supply (a bid amount, so to speak) is transmitted to the CEMS server 2.
[0069] Vehicle 8B also similarly makes a bid for the reservation slot (SQ323). A signal from vehicle 8B indicating the amount of power supply (bid amount) is also transmitted to the CEMS server 2.
[0070] In SQ302, the server 2 determines that the reservation slot has been won by one of the vehicles 8A and 8B that has a larger amount of power supply (i.e., the vehicle with the higher bid). In the example shown in FIG. 5, the reservation slot has been won by the vehicle 8B. The CEMS server 2 allocates the reservation slot to the vehicle 8B (SQ303). After that, when the vehicle 8B arrives at the destination, the vehicle 8B performs external power supply to the microgrid MG (SQ324).
[0071] As described above, in the second embodiment, when a plurality of vehicles 8A, 8B indicate their intention to externally supply power, an auction of reservation slots is held, and the reservation slots are allocated to vehicles capable of externally supplying a large amount of power. This makes it possible to allocate the limited reservation slots to vehicles capable of making a greater contribution to improving the power supply and demand balance of the microgrid MG.
[0072] The embodiments disclosed herein should be considered to be illustrative and not restrictive in all respects. The scope of the present disclosure is defined by the claims, not by the description of the embodiments described above, and is intended to include all modifications within the meaning and scope of the claims. [Explanation of symbols]
[0073] 1 CEMS, 2 CEMS server, 11 FEMS, 110 FEMS server, 12 BEMS, 120 BEMS server, 13 HEMS, 130 HEMS server, 14 generator, 15 naturally fluctuating power source, 16 power storage system, 17 charging / discharging equipment, 18 parking space, 3 substation equipment, 4 power grid, 5 power transmission and distribution company server, 7 charging vehicle, 8 power supply vehicle, MG microgrid, 100 power system.
Claims
1. A plurality of power conditioning resources electrically connected to a power grid; A management device for managing the plurality of power adjustment resources, The plurality of power adjustment resources include: a plurality of power facilities each having a parking space and configured to be able to supply power from a plurality of power supply vehicles to the power grid when the vehicle is parked in the parking space; The management device is configured to manage the parking spaces; When the power supply and demand balance of the power grid is in excess of demand, The management device outputs a power supply request to the power grid to a vehicle among the plurality of power supply vehicles that is not receiving external power supply and is not parked in the parking space; When the vehicle accepts the power supply request, the vehicle transmits to the management device location information indicating a destination of the vehicle and time information indicating an expected arrival time of the vehicle at the destination when the vehicle travels to the destination, Upon receiving the location information and the time information, the management device proposes to the vehicle a reservation frame for a parking space in which the distance to the destination is shorter than a predetermined distance and the parking available time is longer than a predetermined time, based on the location information and the time information; When the vehicle accepts the reservation slot, the management device confirms the reservation slot.
2. each of the plurality of power facilities is configured to be able to charge a vehicle from the power network when any one of the plurality of charging vehicles is parked in the parking space; The power system according to claim 1 , wherein the management device allocates the parking space to a vehicle that responds to the power supply request when the power supply and demand balance is in excess of demand and at least some of the plurality of charging vehicles are waiting to be charged.
3. 2. The power system according to claim 1, wherein, when there is a time period in which the power supply and demand balance is predicted to be in excess of demand, the management device reserves the parking space for a vehicle that has responded to the power supply request to supply power to the power grid during the time period.
4. The power system according to any one of claims 1 to 3, wherein when the degree of excess demand in the power supply and demand balance is greater than a predetermined amount, the management device extends the time for allocating the parking space to the vehicle that has responded to the power supply request, compared to when the degree of excess demand in the power supply and demand balance is less than the predetermined amount.
5. The power system according to any one of claims 1 to 3, wherein when there are multiple vehicles that have responded to the power supply request, the management device allocates the parking space to a vehicle that can supply greater power to the power grid among the multiple vehicles.
6. A server that manages a plurality of power regulating resources electrically connected to a power grid, The plurality of power adjustment resources include: a plurality of power facilities each having a parking space and configured to be able to supply power from a plurality of power supply vehicles to the power grid when the vehicle is parked in the parking space; The server, A processor; a memory for storing a program executable by the processor; When the power supply and demand balance of the power grid is in excess of demand, The processor outputs a power supply request to the power grid to a vehicle among the plurality of power supply vehicles that is not receiving external power supply and is not parked in the parking space; When the vehicle accepts the power supply request, the vehicle transmits to the processor location information indicating a destination of the vehicle and time information indicating an expected arrival time of the vehicle at the destination when the vehicle travels to the destination; Upon receiving the location information and the time information, the processor proposes to the vehicle a reservation frame for a parking space whose distance to the destination is shorter than a predetermined distance and whose parking available time is longer than a predetermined time, based on the location information and the time information; When the vehicle accepts the reservation slot, the processor confirms the reservation slot. Server.
7. A method for regulating power supply and demand, which manages a plurality of power regulating resources electrically connected to a power grid, comprising: The plurality of power adjustment resources include: a plurality of power facilities each having a parking space and configured to be able to supply power from a plurality of power supply vehicles to the power grid when the vehicle is parked in the parking space; The method for adjusting power supply and demand comprises: When the power supply and demand balance of the power grid is in excess of demand, a management device allocates the parking space for supplying power to the power grid to a vehicle that has responded to a power supply request to the power grid among the plurality of power supply vehicles; and a vehicle that has been assigned a parking space feeding power into the power grid; The allocating step includes: outputting a power supply request to the power grid from the management device to a vehicle among the plurality of power supply vehicles that is not receiving external power supply and is not parked in the parking space; transmitting, when the vehicle accepts the power supply request, location information indicating a destination of the vehicle and time information indicating an expected arrival time of the vehicle at the destination when the vehicle travels to the destination, from the vehicle to the management device; when the location information and the time information are received, the management device proposes to the vehicle a reservation frame for a parking space in which the distance to the destination is shorter than a predetermined distance and the parking available time is longer than a predetermined time based on the location information and the time information; and when the vehicle accepts the reservation slot, the management device confirms the reservation slot.
Citation Information
Patent Citations
Automobile invitation device, on-vehicle terminal device, automobile invitation method, and program therefor
JP2013041324A
Microgrid control system
JP2020028198A
Server device
WO2017009976A1
System and program
WO2020148856A1