Management system and method
The management system efficiently allocates grid computing power to clients by predicting device availability and matching job data with suitable devices, addressing the lack of resource allocation in existing systems and ensuring timely job completion.
Patent Information
- Application Number
- JP2021077881
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2021-04-30
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2041-04-30
AI Technical Summary
Existing systems do not provide grid computing power to clients, and there is a need to efficiently allocate computing resources among multiple devices based on job requirements and device availability.
A management system that includes a storage unit to store computing capacity and operating status information of multiple devices, a control unit to predict computing capacity changes, and a process to match job data with suitable devices based on calculation type, execution conditions, and delivery dates.
Enables effective allocation of computing resources to job data, ensuring timely completion and appropriate resource utilization in grid computing processes.
Smart Images

Figure 0007593220000001 
Figure 0007593220000002 
Figure 0007593220000003
Abstract
Description
[Technical field]
[0001] The technology disclosed herein relates to managing grid computing. [Background technology]
[0002] Patent Document 1 discloses a system including a plurality of communication devices and a management server that manages grid computing. The management server includes a signal receiving unit, a state determining unit, and a response transmitting unit. The signal receiving unit receives a signal from a communication device indicating that the communication device is capable of participating in grid computing. The state determining unit determines a state of insufficient processing capacity of each of the plurality of processing devices based on the usage status of the computational resources of each of the plurality of processing devices. When the processing capacity of at least one of the plurality of processing devices is insufficient, the response transmitting unit transmits an instruction to the communication device to participate in grid computing based on the signal. With this configuration, the computational resources of the plurality of communication devices are effectively utilized. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2020-160661 A Summary of the Invention [Problem to be solved by the invention]
[0004] Patent Document 1 does not disclose anything about how the computational power of grid computing is provided to clients.
[0005] The technology disclosed herein has been made in consideration of the above points, and its purpose is to provide clients with the computational power of grid computing. [Means for solving the problem]
[0006] The technology disclosed herein relates to a management system that manages a grid computing process in which job data is processed by an available computing device among a plurality of computing devices, and this management system includes a memory unit and a control unit, and the memory unit stores computing capacity information indicating the computing capacity of each of the plurality of computing devices and operating status information indicating the operating status of each of the plurality of computing devices, and the control unit performs a job reception process that accepts job data requested to be calculated by a client, a prediction process that predicts changes over time in the computing capacity available in the grid computing process of each of the plurality of computing devices based on the computing capacity information and the operating status information, and a matching process that assigns a computing device among the plurality of computing devices that is available in the grid computing process to the job data accepted by the job reception process based on the result of the prediction process.
[0007] In the above configuration, the computational power of grid computing can be provided to clients.
[0008] In the management system, the control unit may be configured to, in the matching process, assign to the job data a computing device among the plurality of computing devices that is available for use in the grid computing process and has performance corresponding to a calculation type of the job data.
[0009] In the above-described configuration, it is possible to appropriately allocate a computing device to job data according to the calculation type of the job data.
[0010] In the management system, the control unit may be configured to, in the matching process, assign to the job data a computing device among the plurality of computing devices that is available for use in the grid computing process and has performance corresponding to the execution conditions of the job data.
[0011] In the above-described configuration, it is possible to appropriately allocate a computing device to job data in accordance with the execution conditions of the job data.
[0012] In the management system, the control unit may be configured to, in the matching process, assign to the job data a computing device among the plurality of computing devices that is available for the grid computing process, so that the grid computing process for the job data is completed by a delivery date set in the job data.
[0013] In the above-described configuration, it is possible to appropriately allocate the arithmetic unit to the job data in accordance with the deadline for the job data.
[0014] The technology disclosed herein also relates to a management method for managing, by a computer, a grid computing process in which job data is processed by an available computing device among a plurality of computing devices, the management method including: a job receiving step in which the computer receives job data requested to be calculated by a client; a prediction step in which the computer predicts, by the computer, a change over time in the computing capacity available in the grid computing process of each of the plurality of computing devices based on computing capacity information indicating the computing capacity of each of the plurality of computing devices and operating status information indicating the operating status of each of the plurality of computing devices; and a matching step in which the computer assigns, by the computer, a computing device available in the grid computing process among the plurality of computing devices to the job data received in the job receiving step based on a result of the prediction step.
[0015] In the above method, the computational power of grid computing can be provided to clients. Effect of the Invention
[0016] According to the technology disclosed herein, the computational power of grid computing can be provided to clients. [Brief description of the drawings]
[0017] [Figure 1] FIG. 1 is a schematic diagram illustrating a configuration of a system according to an embodiment. [Diagram 2] FIG. 1 is a conceptual diagram for explaining grid computing. [Diagram 3] FIG. 1 is a block diagram illustrating a configuration of a vehicle. [Figure 4] FIG. 2 is a block diagram illustrating a configuration of a user terminal. [Diagram 5] FIG. 2 is a block diagram illustrating a configuration of a client server. [Figure 6] FIG. 2 is a block diagram illustrating a configuration of a facility server. [Figure 7] FIG. 2 is a block diagram illustrating a configuration of a management server. [Figure 8] 10 is a flowchart illustrating a job reception process. [Figure 9] FIG. 11 is a schematic diagram illustrating an example of an image of a job reception screen. [Figure 10] 11 is a flowchart illustrating a prediction process. [Figure 11] 11 is a flowchart illustrating a matching process. [Figure 12] 1 is a flow chart illustrating a grid computing process. [Figure 13] FIG. 13 is a schematic diagram illustrating an example of an image of a confirmation screen. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0018] Hereinafter, the embodiments will be described in detail with reference to the drawings. In the drawings, the same or corresponding parts are designated by the same reference characters and their description will not be repeated.
[0019] (system) 1 illustrates an example of the configuration of a system 1 according to an embodiment. The system 1 includes a plurality of vehicles 10, a plurality of user terminals 20, a client server 30, a facility server 40, and a management server 50. These components are capable of communicating with each other via a communication network 5. Each of the plurality of vehicles 10 is equipped with a computing device 105. Note that the system 1 may be provided with a plurality of client servers 30. Similarly, the system 1 may be provided with a plurality of facility servers 40.
[0020] [Grid Computing] As shown in FIG. 2, in the system 1 of the embodiment, grid computing is configured by a plurality of computing devices 105, and grid computing processing is performed in which an available computing device 105 among the plurality of computing devices 105 processes job data.
[0021] When the computing power of the arithmetic device 105 is required in the vehicle 10, the arithmetic device 105 enters an operating state and uses the computing power of the arithmetic device 105. For example, when the vehicle 10 is traveling, the computing power of the arithmetic device 105 is required for the traveling control of the vehicle 10, and the arithmetic device 105 enters an operating state.
[0022] On the other hand, when the computing power of the arithmetic device 105 becomes unnecessary in the vehicle 10, the arithmetic device 105 is stopped and the computing power of the arithmetic device 105 is not used. For example, when the vehicle 10 is stopped and the power supply of the vehicle 10 is turned off, the computing power of the arithmetic device 105 becomes unnecessary and the arithmetic device 105 is stopped.
[0023] Here, when the computing power of the arithmetic device 105 is not required in the vehicle 10, the computing power of the arithmetic device 105 can be provided for grid computing processing, thereby making it possible to effectively utilize the computing power of the arithmetic device 105.
[0024] 〔vehicle〕 The vehicle 10 is owned by a user. The user drives the vehicle 10. In this example, the vehicle 10 is a four-wheeled automobile. The vehicle 10 is also equipped with a battery (not shown). Power from the battery is supplied to on-board devices such as the computing device 105. Examples of such a vehicle 10 include an electric vehicle and a plug-in hybrid vehicle.
[0025] As shown in FIG. 3, the vehicle 10 includes an actuator 11, a sensor 12, an input unit 101, an output unit 102, a communication unit 103, a storage unit 104, and a computing device 105.
[0026] The actuator 11 includes a drive system actuator, a steering system actuator, a braking system actuator, etc. Examples of the drive system actuator include an engine, a transmission, and a motor. Examples of the braking system actuator include a brake. Examples of the steering system actuator include a steering wheel.
[0027] The sensor 12 acquires various types of information used for controlling the vehicle 10. Examples of the sensor 12 include an exterior camera that captures images outside the vehicle, an interior camera that captures images inside the vehicle, a radar that detects objects outside the vehicle, a vehicle speed sensor, an acceleration sensor, a yaw rate sensor, an accelerator opening sensor, a steering sensor, and a brake oil pressure sensor.
[0028] The input unit 101 inputs information and data. Examples of the input unit 101 include an operation unit that is operated to input information corresponding to the operation, a camera that inputs an image showing information, and a microphone that inputs a sound showing information. Examples of the operation unit include an operation button or a touch sensor of a car navigation device. The information and data input to the input unit 101 are sent to the calculation device 105.
[0029] The output unit 102 outputs information and data. Examples of the output unit 102 include a display unit that outputs an image showing information, and a speaker that outputs sound showing information. An example of the display unit is a display of a car navigation device. An example of the speaker is a speaker of a car navigation device.
[0030] The communication unit 103 transmits and receives information and data. The information and data received by the communication unit 103 are sent to the calculation device 105.
[0031] The storage unit 104 stores information and data.
[0032] The arithmetic device 105 controls each part of the vehicle 10. In this example, the arithmetic device 105 controls the actuator 11 in response to various information obtained by the sensor 12.
[0033] The arithmetic device 105 includes a processor, a memory, etc. Examples of the processor include a CPU (Central Processing Unit), a GPU (Graphics Processing Unit), etc. The memory stores a program for operating the processor, information and data indicating the processing results of the processor, etc.
[0034] The number of processors mounted on the arithmetic device 105 may be one or more. The processor mounted on the arithmetic device 105 may be only one of a CPU and a GPU, or may be both a CPU and a GPU. In this example, the arithmetic device 105 has both a CPU and a GPU. For example, the arithmetic device 105 is configured by one or more ECUs (Electronic Control Units).
[0035] In this example, the storage unit 104 stores vehicle information D11, vehicle state information D12, driving history information D13, computing device information D14, and operation history information D15.
[0036] <Vehicle Information> The vehicle information D11 is information related to the vehicle 10. For example, the vehicle information D11 includes a vehicle ID set in the vehicle 10, vehicle performance information indicating the performance of the vehicle, etc. The vehicle ID is an example of vehicle identification information that identifies the vehicle 10. The user ID is an example of user identification information that identifies a user.
[0037] <Vehicle status information> Vehicle status information D12 indicates the status of vehicle 10. For example, vehicle status information D12 includes vehicle position information, vehicle communication information, vehicle power information, vehicle battery remaining information, vehicle charging information, etc. Vehicle position information indicates the position (latitude and longitude) of vehicle 10. For example, vehicle position information can be acquired by GPS (Global Positioning System). Vehicle communication information indicates the communication status of vehicle 10. Vehicle power information indicates the state of the power supply of vehicle 10. For example, vehicle power information indicates whether the ignition power is on or off, whether the accessory power is on or off, etc. Vehicle battery remaining information indicates the remaining charge of a battery (not shown) installed in vehicle 10. Vehicle charging information indicates whether vehicle 10 is being charged in charging equipment (not shown).
[0038] <Driving history information> The driving history information D13 is information that indicates the driving history of the vehicle 10. For example, the driving history information D13 indicates the position of the vehicle 10 in association with time.
[0039] <Calculation device information> The arithmetic device information D14 is information related to the arithmetic device 105. For example, the arithmetic device information D14 includes an arithmetic device ID set in the arithmetic device 105, a vehicle ID set in the vehicle 10 in which the arithmetic device 105 is mounted, arithmetic device performance information indicating the performance of the arithmetic device 105, and the like. The arithmetic device ID is an example of arithmetic device identification information for identifying the arithmetic device 105. The performance of the arithmetic device 105 indicated in the arithmetic device performance information includes a calculation capacity indicating the calculation capacity (specifically, the maximum calculation capacity) of the arithmetic device 105, a ratio of the CPU and the GPU in the arithmetic device 105, and the like. The calculation capacity of the arithmetic device 105 is the amount of data that the arithmetic device 105 can calculate per unit time.
[0040] <Operation history information> The operation history information D15 is information indicating the operation history of the arithmetic device 105. For example, the operation history information D15 indicates the utilization rate of the computational capacity of the arithmetic device 105 in association with time.
[0041] [User terminal] The user terminal 20 is owned by a user. The user operates the user terminal 20 to use various functions. The user can also carry the user terminal 20. Examples of such a user terminal 20 include a smartphone, a tablet, and a notebook personal computer.
[0042] As shown in FIG. 4, the user terminal 20 includes an input unit 201, an output unit 202, a communication unit 203, a storage unit 204, and a control unit 205.
[0043] The input unit 201 inputs information and data. Examples of the input unit 201 include an operation unit that is operated to input information corresponding to the operation, a camera that inputs an image showing information, and a microphone that inputs a sound showing information. Examples of the operation unit include an operation button and a touch sensor. The information input to the input unit 101 is sent to the calculation device 105.
[0044] The output unit 202 outputs information and data. Examples of the output unit 202 include a display unit that outputs an image representing information, and a speaker that outputs sound representing information.
[0045] The communication unit 203 transmits and receives information and data. The information and data received by the communication unit 303 are sent to the control unit 205.
[0046] The storage unit 204 stores information and data.
[0047] The control unit 205 controls each unit of the user terminal 20. The control unit 205 has a processor, a memory, etc. The memory stores a program for operating the processor, information and data indicating the processing results of the processor, and the like.
[0048] In this example, the storage unit 204 stores terminal information D21, terminal state information D22, and schedule information D23.
[0049] <Device Information> The terminal information D21 is information related to the user terminal 20. For example, the terminal information D21 includes a user terminal ID set in the user terminal 20, user terminal performance information indicating the performance of the user terminal 20, etc. The user terminal ID is an example of user terminal identification information that identifies the user terminal 20.
[0050] <Device status information> The terminal status information D22 is information indicating the status of the user terminal 20. The terminal status information D22 includes user terminal position information indicating the position of the user terminal 20, user terminal communication status information indicating the communication status of the user terminal 20, and the like.
[0051] <Schedule Information> The schedule information D23 indicates the behavior history and behavior schedule of the user who owns the user terminal 20. For example, the schedule information D23 indicates the user's location and the stay period (or planned stay period) in association with each other. The schedule information D23 can be acquired by a schedule function installed in the user terminal 20. Specifically, the user inputs his / her own behavior history and behavior schedule into the user terminal 20 using the schedule function, and the schedule information D23 indicating the user's behavior history and behavior schedule is obtained.
[0052] [Client Server] The client server 30 is owned by a client. The client requests the calculation of job data. Examples of such clients include companies, research institutes, and educational institutions.
[0053] As shown in FIG. 5, the client server 30 includes an input unit 301, an output unit 302, a communication unit 303, a storage unit 304, and a control unit 305.
[0054] The input unit 301 inputs information and data. Examples of the input unit 301 include an operation unit that is operated to input information corresponding to the operation, a camera that inputs an image indicating information, and a microphone that inputs a sound indicating information. Examples of the operation unit include an operation button, a touch sensor, a keyboard, and a mouse. The information and data input to the input unit 301 are sent to the control unit 305.
[0055] The output unit 302 outputs information and data. Examples of the output unit 302 include a display unit that outputs an image representing information, and a speaker that outputs sound representing information.
[0056] The communication unit 303 transmits and receives information and data. The information and data received by the communication unit 303 are sent to the control unit 305.
[0057] The storage unit 304 stores information and data.
[0058] The control unit 305 controls each unit of the client server 30. The control unit 305 has a processor, a memory, etc. The memory stores a program for operating the processor, information and data indicating the processing results of the processor, etc.
[0059] In this example, the storage unit 304 stores client information D31 and job data D1.
[0060] Client Information The client information D31 is information about a client. The client information D31 includes a client ID set in the client, a client server ID set in the client server 30 owned by the client, a person in charge name, an address, a telephone number, and the like. The client ID is an example of client identification information that identifies the client. The client server ID is an example of client server identification information that identifies the client server 30.
[0061] <Job Data> The job data D1 is data corresponding to a job, and is data to be processed for the execution of the job.
[0062] The job data D1 can be classified by calculation type. Examples of calculation types include a CPU-based calculation type and a GPU-based calculation type. Job data D1 of the CPU-based calculation type tends to require complex calculations with many conditional branches, such as simulation calculations. Job data D1 of the GPU-based calculation type tends to require a huge amount of simple calculations, such as image processing and machine learning.
[0063] Furthermore, the job data D1 can be classified according to the processing conditions. Examples of the processing conditions include a processing condition that requires constant communication, a processing condition that does not require constant communication, and the like. Job data D1 with a processing condition that requires constant communication requires that the arithmetic device 105 is always able to communicate in the grid computing process. Job data D1 with a processing condition that does not require constant communication does not require that the arithmetic device 105 is always able to communicate in the grid computing process.
[0064] <Job Information> Note that job information related to a job may be stored in the storage unit 304. The job information includes job name information indicating the name of the job, job content information explaining the content of the job, job data information related to the job data corresponding to the job, job delivery date information indicating the delivery date of the job, etc. The job data information indicates the calculation type, processing conditions, necessary calculation capacity, etc. of the job data.
[0065] [Facility Server] The facility server 40 is owned by a facility. A user visits the facility. A user can make a reservation to visit the facility. Examples of such facilities include stadiums, theaters, supermarkets, restaurants, accommodation facilities, and stores.
[0066] 6, facility server 40 includes an input unit 401, an output unit 402, a communication unit 403, a storage unit 404, and a control unit 405. The configurations of the input unit 401, the output unit 402, the communication unit 403, the storage unit 404, and the control unit 405 of facility server 40 are similar to the configurations of the input unit 301, the output unit 302, the communication unit 303, the storage unit 304, and the control unit 305 of client server 30.
[0067] In this example, the storage unit 404 stores facility information D41 and facility usage information D42.
[0068] Facility Information Facility information D41 is information related to a facility. Facility information D41 includes a facility ID set for the facility, a facility server ID set for the facility server 40 owned by the facility, facility location information indicating the location (latitude and longitude) of the facility, the name of a person in charge, an address, a telephone number, etc. The facility ID is an example of facility identification information that identifies a facility. The facility server ID is an example of facility server identification information that identifies the facility server 40.
[0069] <Facility Usage Information> The facility usage information D42 indicates the usage status (usage history and planned usage) of the facility. Specifically, the facility usage information D42 indicates users who visit the facility and their stay period (or planned stay period) in association with each other.
[0070] [Management Server] The management server 50 manages the operation of the system 1 in which grid computing is implemented. The management server 50 is owned by the operator who operates the system 1.
[0071] 7, the management server 50 includes an input unit 501, an output unit 502, a communication unit 503, a storage unit 504, and a control unit 505. The configurations of the input unit 501, the output unit 502, the communication unit 503, the storage unit 504, and the control unit 505 of the management server 50 are similar to the configurations of the input unit 301, the output unit 302, the communication unit 303, the storage unit 304, and the control unit 305 of the client server 30. The storage unit 504 and the control unit 505 are examples of components of a management system that manages grid computing processing.
[0072] In this example, the storage unit 504 stores a user table D51, a processing unit table D52, a client table D53, a job table D54, a resource table D55, a matching table D56, job data D1, and calculation result data D2.
[0073] <User table> The user table D51 is a table for managing users. For each user, the user table D51 registers a user ID set for that user, a vehicle ID set for the vehicle 10 owned by that user, a calculation device ID set for the calculation device 105 owned by that user, a user terminal ID set for the user terminal 20 owned by that user, and the like.
[0074] <Calculation Unit Table> The arithmetic device table D52 is a table for managing the arithmetic devices 105. In the arithmetic device table D52, for each arithmetic device 105, a arithmetic device ID set in the arithmetic device 105, a user ID set for the user who owns the arithmetic device 105, a vehicle ID set in the vehicle 10 in which the arithmetic device 105 is mounted, and the like are registered.
[0075] Furthermore, in the arithmetic device table D52, the performance of the arithmetic device 105 (computational capacity, ratio of CPU to GPU, etc.), the operation status of the arithmetic device 105 (operation history and operation schedule), etc. are registered for each arithmetic device 105. In other words, the arithmetic device table D52 includes operation status information D5 indicating the operation status of each of the multiple arithmetic devices 105, and performance information D6 indicating the performance of each of the multiple arithmetic devices 105. The performance information D6 includes computational capacity information D7 indicating the computational capacity of each of the multiple arithmetic devices 105.
[0076] Client Table The client table D53 is a table for managing clients. For each client, the client ID set for that client, the client server ID set for the client server 30 owned by the client, the name, address, and telephone number of the person in charge of that client are registered in the client table D53.
[0077] <Job Table> The job table D54 is a table for managing jobs requested by clients. For each job, the reception number set for that job, the client ID set for the client who requested the job, the name and content of the job, etc. are registered in the job table D54. In addition, for each job, the job table D54 registers the calculation type and processing conditions of the job data corresponding to that job, the required calculation capacity which is the calculation capacity required for the calculation of the job data, the delivery date set for that job, etc.
[0078] Resource Table The resource table D55 is a table for managing the computational capacity in grid computing processing. Specifically, the resource table D55 is a table for managing the results of a prediction process, which will be described later. In the resource table D55, for each computation device 105, a computation device ID set in the computation device 105, a prediction result of a temporal change in computational capacity available in grid computing processing of the computation device 105, and the like are registered.
[0079] Matching Table The matching table D56 is a table for managing the results of a matching process described later. For each job, the matching table D56 registers the reception number set for that job, the job data corresponding to that job, the arithmetic device ID set in the arithmetic device 105 assigned to that job data by the matching process, and the like.
[0080] <Job Data> The job data D1 stored in the storage unit 504 is job data D1 accepted by a job acceptance process, which will be described later.
[0081] <Calculation result data> The calculation result data D2 stored in the storage unit 504 is job data calculated by grid computing processing, which will be described later, and indicates the results of the calculation.
[0082] [Update user table] Next, the update of the user table D51 will be described. The user table D51 is updated by the control unit 505 of the management server 50.
[0083] For example, when a new user joins the system 1, the control unit 505 updates the user table D51 by registering information related to the new user in the user table D51.
[0084] Specifically, the control unit 505 sets a new user ID for the new user, associates the "user ID" set for the new user with the "vehicle ID" set for the vehicle 10 owned by the user, the "computing device ID" set for the computing device 105 mounted on the vehicle 10, and the "user terminal ID" set for the user terminal 20 owned by the new user, and registers them in the user table D51.
[0085] It is possible to obtain a "vehicle ID" and a "computing device ID" related to the new user through communication between the vehicle 10 owned by the new user and the management server 50. It is also possible to obtain a "user terminal ID" related to the new user through communication between the user terminal 20 owned by the new user and the management server 50.
[0086] [Updating the arithmetic unit table] Next, the update of the arithmetic unit table D52 will be described. The arithmetic unit table D52 is updated by the control unit 505 of the management server 50.
[0087] For example, when a new arithmetic device 105 joins the system 1, the control unit 505 updates the arithmetic device table D52 by registering information related to the new arithmetic device 105 in the arithmetic device table D52.
[0088] Specifically, the control unit 505 associates the "calculation device ID" set in the new calculation device 105, the "user ID" set for the user who owns the calculation device 105, the "vehicle ID" set for the vehicle 10 in which the calculation device 105 is installed, and the "performance" and "operational status" of the calculation device 105, and registers them in the calculation device table D52.
[0089] It is possible to obtain the "calculation device ID", "vehicle ID", "performance", and "operation status" related to the new arithmetic device 105 by communication between the vehicle 10 equipped with the new arithmetic device 105 and the management server 50. It is also possible to obtain the "user ID" related to the new arithmetic device 105 by referring to the user table D51.
[0090] [Periodic update of the calculation unit table] In addition, the “operation status” of the arithmetic device 105 registered in the arithmetic device table D52 is periodically updated. In other words, the operation status information D5 included in the arithmetic device table D52 is periodically updated. This periodic update is performed by the control unit 505 of the management server 50.
[0091] <First update process> For example, the "operation status" of the arithmetic device 105 in the arithmetic device table D52 (in other words, the operation status information D5) may be periodically updated based on the "operation history information D15" of the vehicle 10. Specifically, the control unit 505 may execute the following first update process for each arithmetic device 105 registered in the arithmetic device table D52.
[0092] In the first update process, the control unit 505 requests the vehicle 10 equipped with the arithmetic device 105 to access the "operation history information D15". In response to the request, the arithmetic device 105 of the vehicle 10 permits access to the "operation history information D15". The control unit 505 updates the "operation history", which is the past operation status, of the "operation status" of the arithmetic device 105 registered in the arithmetic device table D52, based on the operation history of the arithmetic device 105 indicated in the operation history information D15.
[0093] <Second update process> Furthermore, the "operation status" of the arithmetic device 105 in the arithmetic device table D52 (in other words, the operation status information D5) may be periodically updated based on the "travel history information D13" of the vehicle 10. Specifically, the control unit 505 may execute the following second update process for each arithmetic device 105 registered in the arithmetic device table D52.
[0094] In the second update process, the control unit 505 requests the vehicle 10 equipped with the arithmetic device 105 to access the "driving history information D13". In response to the request, the arithmetic device 105 of the vehicle 10 permits access to the "driving history information D13". The control unit 505 estimates the operation history of the arithmetic device 105 based on the driving history of the vehicle 10 indicated in the driving history information D13. Next, the control unit 505 updates the "operation history", which is the past operation status, of the "operation status" of the arithmetic device 105 registered in the arithmetic device table D52 based on the estimated operation history of the arithmetic device 105.
[0095] <Third update process> Furthermore, the "operation status" of the arithmetic device 105 in the arithmetic device table D52 (in other words, the operation status information D5) may be periodically updated based on the "schedule information D23" of the user terminal 20. Specifically, the control unit 505 may execute the following third update process for each arithmetic device 105 registered in the arithmetic device table D52.
[0096] In the third update process, the control unit 505 requests the user terminal 20 owned by the user who owns the arithmetic device 105 to access "schedule information D23". In response to the request, the control unit 205 of the user terminal 20 permits access to "schedule information D23". The control unit 505 detects a behavioral situation related to the vehicle 10 equipped with the arithmetic device 105 from the behavioral situation of the user (behavior history and behavior plan) shown in the schedule information D23.
[0097] For example, from among the user's behavioral status, which is the past behavioral status, behavioral history in which the user has boarded the vehicle 10 is detected, and from among the user's behavioral status, which is the future behavioral status, behavioral plans in which the user plans to board the vehicle 10 are detected.
[0098] Next, the control unit 505 estimates the driving status (driving history and driving schedule) of the vehicle 10 based on the detected behavioral status of the user. Next, the control unit 505 estimates the operation status (operation history and operation schedule) of the arithmetic device 105 based on the estimated driving status of the vehicle 10. Then, the control unit 505 updates the "operation status" of the arithmetic device 105 registered in the arithmetic device table D52 based on the estimated operation status of the arithmetic device 105.
[0099] <Fourth update process> Furthermore, the "operation status" of the arithmetic device 105 in the arithmetic device table D52 (in other words, operation status information D5) may be periodically updated based on the "facility usage information D42" of the facility server 40. Specifically, the control unit 505 may execute the following fourth update process for each arithmetic device 105 registered in the arithmetic device table D52.
[0100] In the fourth update process, the control unit 505 requests the facility server 40 to access the "facility usage information D42". In response to the request, the facility server 40 permits access to the "facility usage information D42". The control unit 505 detects the usage status related to the vehicle 10 equipped with the calculation device 105 from the usage status (usage history and usage schedule) of the facility indicated in the facility usage information D42.
[0101] For example, from among the facility usage history, which is past usage, usage history in which the user has boarded vehicle 10 is detected, and from among the facility usage plans, which are future usage, usage plans in which the user plans to board vehicle 10 are detected.
[0102] Next, the control unit 505 estimates the driving status (driving history and driving schedule) of the vehicle 10 based on the detected usage status of the facility. Next, the control unit 505 estimates the operation status (operation history and operation schedule) of the arithmetic device 105 based on the estimated driving status of the vehicle 10. Next, the control unit 505 updates the "operation status" of the arithmetic device 105 registered in the arithmetic device table D52 based on the estimated operation status of the arithmetic device 105.
[0103] [Update client table] Next, the update of the client table D53 will be explained. The client table D53 is updated by the control unit 505 of the management server 50.
[0104] For example, when a new client joins the system 1, the control unit 505 updates the client table D53 by registering information related to the new client in the client table D53.
[0105] Specifically, the control unit 505 sets a new client ID for the new client, associates the "client ID" set for the new client, the "client server ID" set for the client server 30 owned by the new client, and the "person in charge," "address," and "telephone number" of the new client, and registers them in the client table D53.
[0106] By communication between the client server 30 and the management server 50, it is possible to obtain the "client server ID", "person in charge", "address" and "telephone number" of the new client.
[0107] [Processing by the control unit (management method)] The control unit 505 performs job reception processing, prediction processing, matching processing, and grid computing processing.
[0108] [Job acceptance process (job acceptance step)] Next, the job acceptance process will be described with reference to Fig. 8. In the job acceptance process, job data D1 for which a calculation is requested by a client is accepted. For example, the control unit 505 performs the following process every time a calculation of the job data D1 is requested by the client.
[0109] <Step S11> First, the management server 50 accepts a job request from a client. Specifically, in response to an operation by a person in charge of the client, the client server 30 transmits a job request application to the management server 50. In response to the application, the control unit 505 of the management server 50 performs the following processes.
[0110] The control unit 505 requests the client server 30 to transmit information required for accepting a job (specifically, client information related to the client requesting the job and job information related to the job). In this example, the control unit 505 transmits image data of a job acceptance screen to the client server 30. The control unit 305 of the client server 30 reproduces an image of the job acceptance screen from the image data, and causes the output unit 302 (display unit) to output (display) the image.
[0111] 9, the job reception screen is a screen for inputting information required for receiving a job. The job reception screen includes a client name input field R101 for inputting the client name, a person in charge name input field R102 for inputting the client's person in charge name, an address input field R104 for inputting the client's address, a job name input field R111 for inputting the name of the job, a job content input field R112 for inputting an explanation of the job content, a calculation type input field R113 for inputting the calculation type of job data corresponding to the job, a processing condition input field R114 for inputting the processing conditions of the job data, a required calculation capacity input field R115 for inputting the required calculation capacity of the job data, a delivery date input field R116 for inputting the delivery date of the job, and a registration button B100.
[0112] The person in charge of the client operates the input unit 301 (operation unit) of the client server 30 to input necessary information into the job reception screen. This inputs client information about the client requesting the job and job information about the job. Then, after completing input of this information, the person in charge of the client operates the input unit 301 (operation unit) of the client server 30 to press the registration button B100 on the job reception screen. When the registration button B100 is pressed, the control unit 305 of the client server 30 transmits the information (client information and job information) input into the job reception screen to the management server 50. The control unit 505 of the management server 50 receives the client information and job information.
[0113] Next, the control unit 505 requests the client server 30 to transmit job data D1 corresponding to the job. In response to the request, the control unit 305 of the client server 30 transmits the job data D1 corresponding to the job to the management server 50. The control unit 505 of the management server 50 receives the job data D1.
[0114] <Step S12> Next, the control unit 505 of the management server 50 analyzes the job data D1 received in step S11. Specifically, the control unit 505 analyzes the calculation type, processing conditions, required calculation capacity, etc. of the job data D1. Then, the control unit 505 modifies the job information received in step S11 based on the result of the analysis of the job data D1.
[0115] If the job information received in step S11 is sufficiently reliable, the process in step S12 may be omitted.
[0116] <Step S13> Next, the control unit 505 of the management server 50 associates the client information received in step S11 with the job information corrected as necessary in step S12 (or the job information received in step S11), and registers them in the job table D54. The control unit 505 also stores the job data D1 received in step S11 in the storage unit 504.
[0117] [Prediction process (prediction step)] Next, the prediction process will be described with reference to Fig. 10. In the prediction process, the computational capacity of the computation device 105 available for grid computing processing among the multiple computation devices 105 is predicted based on the computation device table D52 (specifically, the computational capacity information D7 and the operation status information D5) stored in the storage unit 504. For example, when the computation device table D52 (specifically, at least one of the computational capacity information D7 and the operation status information D5) stored in the storage unit 504 is updated, the control unit 505 performs the following process.
[0118] <Step S21> First, the control unit 505 acquires the “computing capacity” and the “operating status” of the arithmetic unit 105 registered in the arithmetic unit table D52. In other words, the control unit 505 acquires the computing capacity information D7 and the operating status information D5 included in the arithmetic unit table D52.
[0119] <Step S22> Next, for each computing device 105, the control unit 505 predicts changes over time in the computing capacity available for grid computing processing of the computing device 105 based on the computing capacity of the computing device 105 indicated in the computing capacity information D7 and the operating status of the computing device 105 indicated in the operating status information D5.
[0120] Specifically, the control unit 505 predicts a trend (pattern) of change in the utilization rate of the computing capacity of the computing device 105 from the operating status of the computing device 105 shown in the operating status information D5. This prediction of the trend of change in the utilization rate of the computing capacity of the computing device 105 may be realized by machine learning. Then, the control unit 505 predicts a period in which the computing capacity of the computing device 105 has spare capacity (a period in which the utilization rate of the computing capacity is not 100%) based on the trend of change in the utilization rate of the computing capacity of the computing device 105, and sets the period as a "period in which the computing capacity of the computing device 105 can be used for grid computing processing." For example, the control unit 505 sets a period in which the utilization rate of the computing capacity of the computing device 105 is "30%" as a period in which "70%" of the computing capacity of the computing device 105 can be used for grid computing processing.
[0121] <Step S23> Next, the control unit 505 registers in the resource table D55, for each arithmetic device 105, the change over time in the computational capacity available for grid computing processing of the arithmetic device 105 predicted in step S22. This updates the resource table D55.
[0122] [Matching process (matching step)] Next, the matching process will be described with reference to Fig. 11. The matching process is a process of allocating a computing device 105 available for grid computing processing among the multiple computing devices 105 to the job data D1 accepted in the acceptance process based on the prediction result of the prediction process. For example, the control unit 505 performs the following process after the job acceptance process is completed.
[0123] <Step S31> First, the control unit 505 selects a job to be a target of the matching process from among the jobs registered in the job table D54. Then, the control unit 505 selects job data D1 corresponding to the job to be a target of the matching process from among the job data D1 stored in the storage unit 504.
[0124] <Step S32> Next, the control unit 505 selects, from among the multiple computing devices 105, a computing device 105 that can be used in grid computing processing for the job data D1 selected in step S31, based on the predicted result of the change over time in the computing capacity available for grid computing processing of each of the multiple computing devices 105 registered in the resource table D55.
[0125] Specifically, the control unit 505 determines a planned calculation period during which grid computing processing for the job data D1 is to be executed, and detects a calculation device 105 capable of providing calculation capacity during the planned calculation period from among the multiple calculation devices 105. Then, the control unit 505 selects a calculation device 105 to be assigned to the job data D1 from among the calculation devices 105 capable of providing calculation capacity during the planned calculation period, so that the "total calculation capacity provided to the grid computing processing" is equal to or greater than the "computation capacity required for the calculation of the job data D1 in the grid computing processing."
[0126] <Step S33> Next, the control unit 505 assigns the arithmetic device 105 selected in step S32 to the job data D1 selected in step S31. Then, the control unit 505 registers matching result information indicating which arithmetic device 105 is assigned to which job data D1 in the matching table D56.
[0127] [Grid Computing Processing] Next, the grid computing process will be described with reference to Fig. 12. In the grid computing process, the job data D1 is processed by an available arithmetic device 105 among the multiple arithmetic devices 105. For example, after the matching process is completed, the control unit 505 performs the following process.
[0128] <Step S41> First, the control unit 505 refers to the matching table D56 and distributes the job data D1 to be subjected to the grid computing process to the arithmetic devices 105 assigned to the job data D1 in the matching process. Specifically, the control unit 505 transmits a part of the job data D1 to each of the arithmetic devices 105 assigned to the job data D1. As a result, the job data D1 is processed in parallel by the arithmetic devices 105 assigned to the job data D1.
[0129] <Step S42> Next, when each of the arithmetic devices 105 completes the calculation of the data (part of the job data D1) transmitted to that arithmetic device 105, it transmits the partial calculation result data obtained by the calculation to the management server 50. The control unit 505 of the management server 50 receives the partial calculation result data transmitted from the arithmetic devices 105 and stores the partial calculation result data in the memory unit 504.
[0130] <Step S43> The control unit 505 determines whether or not all of the arithmetic devices 105 to which the job data D1 was distributed in step S41 have completed the calculations. If all of the arithmetic devices 105 have completed the calculations, the process of step S44 is performed, and if not, the process of step S42 is performed.
[0131] <Step S44> When all of the arithmetic devices 105 have completed the calculations, the control unit 505 generates calculation result data D2 (calculation result data D2 indicating the result of the calculation of the job data D1) corresponding to the job data D1 to be subjected to the grid computing process by combining the partial calculation result data stored in the storage unit 504. Then, the control unit 505 transmits the calculation result data D2 corresponding to the job data D1 to be subjected to the grid computing process to the client server 30 of the client that requested the calculation of the job data D1.
[0132] <Step S45> Next, a reward is given to the user who provided the computing power of the computing device 105 to the grid computing process by the operator of the system 1. Examples of the reward given to the user include points, virtual currency, and product discount benefits that can be used in the system 1. For example, the control unit 505 of the management server 50 performs a process for giving a reward to the user who provided the computing power of the computing device 105 to the grid computing process. Examples of the process for giving a reward include a process for registering in the user table D51 a "user ID" set for the user and "points" (or virtual currency) that can be used in the system 1 in association with each other, and a process for transmitting information indicating a product discount benefit to the user terminal 20 owned by the user. The information indicating the reward may be registered for each job in the job table D54.
[0133] Furthermore, a reward may be given by the client to a user who has provided the computing power of the computing device 105 to the grid computing process. For example, the control unit 305 of the client server 30 may execute a process for giving a reward to a user who has provided the computing power of the computing device 105 to the grid computing process.
[0134] [Check job progress] In this example, when the control unit 505 of the management server 50 receives a request from the client server 30 of the client that has requested the job to confirm the progress of the job processing, the control unit 505 responds to the request by transmitting image data of a confirmation screen for confirming the progress of the job processing to the client server 30. The client server 30 reproduces an image of the confirmation screen from the image data, and causes the output unit 302 (display unit) to output (display) the image.
[0135] As shown in FIG. 13, the confirmation screen is provided with a job name display field R201 that displays the name of the job, a processing progress display field R202 that displays the processing progress of the job, a calculation start date and time display field R203 that indicates the date and time when job processing starts, a calculation end date and time display field R204 that indicates the date and time when job processing ends, and a participating user display field R205 that indicates users who will provide the computing power of the computing device 105 for the grid computing processing for the job.
[0136] [Effects of the embodiment] As described above, in the system 1 of the embodiment, the computational power of grid computing can be provided to clients.
[0137] Furthermore, by providing a reward to a user who provides the computing power of the computing device 105 to grid computing, it is possible to encourage the provision of the computing power of the computing device 105 to grid computing. This makes it easier to secure computing power for grid computing.
[0138] (First Modification of the Embodiment) The matching process may be performed taking into consideration the calculation type of the job data D1.
[0139] In the first variation of the embodiment, in the matching process, the control unit 505 assigns to the job data D1 a computing device 105 among the multiple computing devices 105 that is available for grid computing processing and has performance corresponding to the calculation type of the job data D1.
[0140] With the above configuration, it is possible to appropriately allocate the arithmetic device 105 to the job data D1 according to the calculation type of the job data D1. For example, it is possible to allocate the arithmetic device 105 in which the ratio of CPU is higher than the ratio of GPU to the job data D1 of a CPU-based calculation type. Also, it is possible to allocate the arithmetic device 105 in which the ratio of GPU is higher than the ratio of CPU to the job data D1 of a GPU-based calculation type.
[0141] (Modification 2 of the embodiment) Furthermore, the matching process may be performed taking into consideration the execution conditions of the job data D1.
[0142] In the second variation of the embodiment, in the matching process, the control unit 505 assigns, to the job data D1, one of the multiple arithmetic devices 105 that can be used in grid computing processing and has performance corresponding to the execution conditions of the job data D1.
[0143] With the above configuration, it is possible to appropriately allocate the arithmetic device 105 to the job data D1 according to the execution conditions of the job data D1. For example, it is possible to allocate the arithmetic device 105 capable of constant communication to the job data D1 with processing conditions that require constant communication. Also, it is possible to allocate the arithmetic device 105 not capable of constant communication to the job data D1 with processing conditions that do not require constant communication.
[0144] (Modification 3 of the embodiment) Furthermore, the matching process may be performed taking into consideration the delivery date of the job data D1.
[0145] In the third variation of the embodiment, in the matching process, the control unit 505 assigns, to the job data D1, one of the multiple computing devices 105 that can be used in the grid computing process, so that the grid computing process for the job data D1 is completed by the delivery date set in the job data D1.
[0146] With the above-described configuration, it is possible to appropriately allocate the arithmetic device 105 to the job data D1 in accordance with the deadline of the job data D1.
[0147] (Fourth Modification of the Embodiment) Furthermore, the matching process may be performed taking into consideration the communication state of the arithmetic device 105 (more specifically, the communication state of the vehicle 10 in which the arithmetic device 105 is mounted).
[0148] In the fourth modification of the embodiment, the control unit 505 monitors the quality of the communication state of each arithmetic device 105, and predicts (learns) a temporal change in the quality of the communication state of the arithmetic device 105 from the history of the communication state of the arithmetic device 105. Then, in the matching process, the control unit 505 assigns, to the job data D1, a arithmetic device 105 that is available for grid computing processing and has a communication state quality that exceeds a predetermined quality, among the multiple arithmetic devices 105.
[0149] With the above-described configuration, it is possible to appropriately allocate the arithmetic devices 105 to the job data D1 in accordance with the quality of the communication state of the arithmetic devices 105.
[0150] (Fifth Modification of the Embodiment) Furthermore, the matching process may be performed taking into consideration the remaining battery charge of the vehicle 10 in which the arithmetic device 105 is mounted.
[0151] In the fifth modified example of the embodiment, the control unit 505 monitors the remaining battery charge of each vehicle 10, and predicts (learns) a temporal change in the remaining battery charge of the vehicle 10 from the history of the remaining battery charge of the vehicle 10. Then, in the matching process, the control unit 505 assigns, to the job data D1, a calculation device 105 among the multiple calculation devices 105 that is available for grid computing processing and is installed in a vehicle 10 whose remaining battery charge exceeds a predetermined amount.
[0152] With the above-described configuration, it is possible to appropriately allocate the arithmetic device 105 to the job data D1 in accordance with the remaining battery power of the vehicle 10 in which the arithmetic device 105 is mounted.
[0153] (Sixth Modification of the Embodiment) Furthermore, the matching process may be performed taking into consideration whether the vehicle 10 in which the arithmetic device 105 is mounted is parked.
[0154] In the sixth modified example of the embodiment, the control unit 505 monitors the position of each vehicle 10, and predicts (learns) the parking period of the vehicle 10 from the position history of the vehicle 10. Then, in the matching process, the control unit 505 assigns, to the job data D1, a calculation device 105 among the multiple calculation devices 105 that is available for grid computing processing and is installed in the parked vehicle 10.
[0155] With the above-described configuration, it is possible to appropriately allocate the arithmetic device 105 to the job data D1 depending on whether the vehicle 10 in which the arithmetic device 105 is mounted is parked or not.
[0156] (Seventh Modification of the Embodiment) Furthermore, the matching process may be performed taking into consideration whether the vehicle 10 equipped with the arithmetic device 105 is being charged at a charging facility.
[0157] In the seventh modification of the embodiment, the control unit 505 monitors, for each vehicle 10, whether the vehicle 10 is being charged (charged at a charging facility) and predicts (learns) the charging period of the vehicle 10 from the history of whether the vehicle 10 is being charged. Then, in the matching process, the control unit 505 assigns, to the job data D1, a calculation device 105 among the multiple calculation devices 105 that is available for grid computing processing and is installed in the vehicle 10 that is being charged at a charging facility.
[0158] With the above-described configuration, it is possible to appropriately allocate the arithmetic device 105 to the job data D1 depending on whether the vehicle 10 equipped with the arithmetic device 105 is being charged at a charging facility.
[0159] (Other embodiments) In the above description, the storage unit 504 and the control unit 505 of the management system are integrated into a single management server 50. However, the present invention is not limited to this. For example, the storage unit 504 and the control unit 505 may be distributed among a plurality of management servers 50 (not shown) that communicate with each other via the communication network 5.
[0160] In the above description, the storage unit 504 of the management system may be configured with a single storage device or may be configured with multiple storage devices. The multiple storage devices may be consolidated into a single management server 50, or may be distributed among multiple management servers 50 (not shown) that communicate with each other via the communication network 5.
[0161] In the above description, the control unit 505 of the management system may be configured by a single control unit or may be configured by multiple control units. The multiple control units may be consolidated into a single management server 50, or may be distributed among multiple management servers 50 (not shown) that communicate with each other via the communication network 5.
[0162] In the above description, the arithmetic device 105 may be configured with a single arithmetic unit or may be configured with multiple arithmetic units. The multiple arithmetic units may be consolidated into a single management server 50 or may be distributed among multiple management servers 50 (not shown) that communicate with each other via a communication network 5.
[0163] In the above description, the arithmetic device 105 is mounted on the vehicle 10 (specifically, a four-wheeled motor vehicle), but the present invention is not limited to this. For example, the arithmetic device 105 may be mounted on a moving body other than the vehicle 10. Examples of such moving bodies include transportation machinery and mobile information terminals. Examples of transportation machinery include motorcycles, railroad cars, ships, aircraft, drones, etc. A vehicle is an example of transportation machinery. Examples of mobile information terminals include notebook personal computers, tablets, smartphones, etc.
[0164] In the above description, the grid computing process may be provided with the computing power of not only the computing device 105 mounted on the vehicle 10, but also the computing power of another computing device (not shown). Such another computing device may be a stationary computing device (e.g., a desktop personal computer).
[0165] In addition, the above-described embodiments may be appropriately combined and implemented. The above-described embodiments are essentially preferred examples, and are not intended to limit the scope of the technology disclosed herein, its applications, or its uses. [Industrial Applicability]
[0166] As described above, the technology disclosed herein is useful as a technology for managing grid computing. [Explanation of symbols]
[0167] 1 System 10 Vehicles 105 Arithmetic equipment 20 User terminal 30 Client Server 40 Facility Server 50 Management Server 501 Input section 502 Output section 503 Communications Department 504 Storage section 505 Control Unit D1 Job data D2 Calculation result data
Claims
1. A management system for managing a grid computing process in which job data is processed by an available computing device among a plurality of computing devices, the management system comprising: A storage unit; A control unit. the storage unit stores computational capacity information indicating a computational capacity of each of the plurality of computing devices and operational status information indicating an operational status of each of the plurality of computing devices; The control unit is A job reception process for receiving job data for which a calculation is requested by a client; a prediction process for predicting a temporal change in a computing capacity available for the grid computing process of each of the plurality of computing devices based on the computing capacity information and the operation status information; performing a matching process of allocating a computing device available for the grid computing process among the plurality of computing devices to the job data accepted by the job acceptance process based on a result of the prediction process; the plurality of arithmetic units are mounted on a plurality of vehicles and used for driving control, The control unit updates, for each of the plurality of arithmetic devices, an operation status of the arithmetic device indicated in the operation status information based on a driving status indicating at least one of a driving history and a driving schedule of the vehicle equipped with the arithmetic device; In the prediction process, the control unit predicts, for each of the plurality of arithmetic devices, a trend of change in a utilization rate of the computing capacity of the arithmetic device from the operation status of the arithmetic device indicated in the operation status information, predicts a period during which the computing capacity of the arithmetic device has spare capacity based on the trend of change in the utilization rate of the computing capacity of the arithmetic device, and sets the period as a period during which the computing capacity of the arithmetic device can be used for the grid computing process.
1. A management system comprising:
2. In the management system of claim 1, The control unit estimates, for each of the plurality of arithmetic devices, the driving status of the vehicle equipped with the arithmetic device, based on the behavior status related to boarding the vehicle, among behavior statuses indicating at least one of the user's behavior history and behavior schedule shown in schedule information stored in a user terminal owned by the user who owns the vehicle equipped with the arithmetic device.
1. A management system comprising:
3. In the management system of claim 1, The control unit, in the matching process, assigns, to the job data, a computing device among the plurality of computing devices that is available for the grid computing process and has performance corresponding to a calculation type of the job data.
1. A management system comprising:
4. In the management system of claim 1, The control unit, in the matching process, assigns, to the job data, a computing device among the plurality of computing devices that is available for the grid computing process and has performance corresponding to an execution condition of the job data.
1. A management system comprising:
5. In the management system according to any one of claims 1 to 4, The control unit, in the matching process, assigns a computing device available for the grid computing process among the plurality of computing devices to the job data so that the grid computing process for the job data is completed by a delivery date set in the job data.
1. A management system comprising:
6. In any one of the management systems of claims 1 to 4, The control unit monitors, for each of the plurality of arithmetic devices, a quality of a communication state of the vehicle in which the arithmetic device is mounted, and In the matching process, the control unit assigns, to the job data, a computing device among the plurality of computing devices that is available for the grid computing process and has a communication state quality of the vehicle that exceeds a predetermined quality.
1. A management system comprising:
7. A management method for managing, by a computer, a grid computing process in which job data is processed by an available computing device among a plurality of computing devices, the method comprising: a job receiving step of receiving job data requested by a client to be calculated by the computer; a prediction step of predicting, by the computer, a temporal change in the computing capacity available in the grid computing process of each of the plurality of computing devices based on computing capacity information indicating the computing capacity of each of the plurality of computing devices and operation status information indicating the operation status of each of the plurality of computing devices; a matching step of allocating, by the computer, a computing device available for the grid computing process among the plurality of computing devices to the job data accepted by the job accepting step based on a result of the prediction step; the plurality of arithmetic units are mounted on a plurality of vehicles and used for driving control, For each of the plurality of arithmetic devices, the operation status of the arithmetic device indicated in the operation status information is updated based on a driving status indicating at least one of a driving history and a driving schedule of a vehicle equipped with the arithmetic device; In the prediction step, for each of the plurality of computing devices, a trend of change in a utilization rate of the computing capacity of the computing device indicated in the computing capacity information is predicted from the operating status of the computing device indicated in the operating status information, and a period in which the computing capacity of the computing device has a margin is predicted based on the trend of change in the utilization rate of the computing capacity of the computing device, and the period is set as a period in which the computing capacity of the computing device can be used for the grid computing process. A management method comprising:
Citation Information
Patent Citations
Grid computing mediation device and method
JP2004362149A
Distribution processing service mediation system and its method
JP2005135209A
Method for calculating settlement information about grid system, grid mediation device, and grid mediation program
JP2005208923A
Management server and program
JP2020160661A
Method for processing a predetermined computing task using a distributed vehicle-based computing system, and a computing system, a server device, and a vehicle
JP2021533494A
