Scaffolding device for replacing counterweight and method for replacing counterweight

The counterweight replacement scaffolding device with a fixed and variable scaffold system enhances efficiency by allowing easy access to adjustment weight pieces, reducing the need for scaffold disassembly and assembly during the replacement process.

JP7595481B2Active Publication Date: 2024-12-06MITSUBISHI ELECTRIC BUILDING SOLUTIONS CORP
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
JP2021025305
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-02-19
Publication Date
2024-12-06
Estimated Expiration
2041-02-19

Smart Images

  • Figure 0007595481000001
    Figure 0007595481000001
  • Figure 0007595481000002
    Figure 0007595481000002
  • Figure 0007595481000003
    Figure 0007595481000003
Patent Text Reader

Abstract

To obtain a scaffold device for replacement of a counterweight capable of improving the efficiency of replacement work of the counterweight.SOLUTION: A scaffold device 7 for replacement of a counterweight comprises a fixed scaffold 701 installed in a hoistway 5 and a variable scaffold 702 provided above the fixed scaffold 701 and attached to a pair of counterweight guide rails 4. The fixed scaffold 701 is arranged in the hoistway 5 so as to be adjacent to a landing 6. The variable scaffold 702 includes a first rotating shaft 709, a supporting part 710, and a scaffold board 711 rotatably provided on the first rotating shaft 709. The scaffold board 711 moves between an installation position provided across the first rotating shaft 709 and the supporting part 710 and facing the fixed scaffold 701 in the height direction and a storage position which is shifted from the installation position by rotating about the first rotating axis 709.SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a scaffolding device for replacing a counterweight and a method for replacing a counterweight. [Background technology]

[0002] Conventionally, a counterweight replacement method is known in which an existing counterweight is removed from a hoistway and a new counterweight is brought into the hoistway to replace the existing counterweight with the new counterweight (see, for example, Patent Document 1). [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Japanese Patent Application Publication No. 11-349255 Summary of the Invention [Problem to be solved by the invention]

[0004] When an existing counterweight is to be removed from a hoistway to a landing, a fixed scaffold is first installed in the hoistway adjacent to the landing. Then, a worker stands on the installed fixed scaffold and removes the multiple adjustment weight pieces placed on the counterweight frame from the hoistway, and then removes the counterweight frame from the hoistway. When a new counterweight is to be delivered from a landing to the hoistway, a worker stands on the fixed scaffold and carries the counterweight frame into the hoistway, and then carries the multiple adjustment weight pieces into the hoistway and places them on the counterweight frame.

[0005] When the height dimension of the counterweight is large, the worker standing on the fixed scaffold cannot reach the upper adjusting weight piece among the multiple adjusting weight pieces placed on the existing counterweight frame. This makes it impossible for the worker standing on the fixed scaffold to remove the adjusting weight piece from the existing counterweight frame. Similarly, the worker standing on the fixed scaffold cannot attach the adjusting weight piece to the new counterweight frame. Therefore, the worker sets up the scaffold support leg on the fixed scaffold and places the additional scaffold board on the scaffold support leg. After that, the worker standing on the additional scaffold board removes the adjusting weight piece from the existing counterweight frame and attaches the adjusting weight piece to the new counterweight frame.

[0006] However, after removing the adjustment weight piece from the existing counterweight frame, the worker must remove the scaffolding support leg and the additional scaffolding board from the fixed scaffold in order to carry the existing counterweight frame from the hoistway to the landing. Also, after removing the scaffolding support leg and the additional scaffolding board from the fixed scaffold, the worker must set up the scaffolding support leg on the fixed scaffold again and place the additional scaffolding board on the scaffolding support leg in order to attach the adjustment weight piece to the new counterweight frame. This caused a problem of poor efficiency in the work of replacing the counterweight.

[0007] The present disclosure has been made to solve the problems described above, and its purpose is to provide a scaffolding device for counterweight replacement and a counterweight replacement method that can improve the efficiency of counterweight replacement work. [Means for solving the problem]

[0008] The scaffolding device for replacing a counterweight disclosed herein comprises a fixed scaffolding installed in a hoistway, and an adjustable scaffolding arranged above the fixed scaffolding and attached to a pair of counterweight guide rails, wherein the fixed scaffolding is arranged in the hoistway adjacent to the landing, and the adjustable scaffolding has a first rotating shaft attached to one of the pair of counterweight guide rails, a support part attached to the other of the pair of counterweight guide rails, and a scaffolding board rotatably mounted on the first rotating shaft, and the scaffolding board moves between an installation position that is arranged between the first rotating shaft and the support part and faces the fixed scaffolding in the height direction, and a storage position that is offset from the installation position, by rotating around the first rotating shaft. The counterweight replacement method according to the present disclosure includes a scaffolding device installation process for installing a fixed scaffolding in a hoistway, attaching an adjustable scaffolding to a pair of counterweight guide rails, and setting the position of the scaffolding board to an installation position; a counterweight moving process for moving the existing counterweight to a position corresponding to the landing; an adjustment weight piece carrying out process for removing a plurality of adjustment weight pieces placed on the counterweight frame of the existing counterweight from the counterweight frame after the scaffolding device installation process and the counterweight moving process; a scaffolding board storage process for moving the position of the scaffolding board from the installation position to a storage position after the adjustment weight piece carrying out process; The method includes a counterweight frame replacement process in which, after the counterweight frame replacement process, the counterweight frame of the existing counterweight is removed from the hoistway and a counterweight frame of the new counterweight is brought into the hoistway; a scaffold board installation process in which, after the counterweight frame replacement process, the position of the scaffold board is moved from a stored position to an installation position; an adjustment weight piece delivery process in which, after the scaffold board installation process, a plurality of adjustment weight pieces are attached to the counterweight frame of the new counterweight; and a scaffold device removal process in which, after the adjustment weight piece delivery process, the adjustable scaffold is detached from the pair of counterweight guide rails and the fixed scaffold is removed from the hoistway. Effect of the Invention

[0009] According to the scaffolding device for replacing a counterweight and the counterweight replacement method disclosed herein, the efficiency of the counterweight replacement work can be improved. [Brief description of the drawings]

[0010] [Figure 1] 1 is a plan view showing an elevator apparatus to which a counterweight replacement scaffolding apparatus according to a first embodiment is attached. FIG. [Diagram 2] FIG. 2 is a side view showing a state in which the counterweight replacement scaffolding device according to the first embodiment is attached to the elevator device of FIG. [Diagram 3] FIG. 3 is a front view showing the counterweight replacement scaffolding device and elevator device of FIG. 2. [Figure 4] 4 is a diagram showing the scaffolding board of FIG. 3 and the state in which the scaffolding board is in a bent shape. FIG. [Diagram 5] FIG. 4 shows the scaffold board and scaffold board of FIG. 3 in a stored position. [Figure 6] 4 is a flowchart showing a counterweight replacing method according to the first embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] Embodiment 1 1 is a plan view showing an elevator apparatus to which a counterweight replacement scaffolding device according to embodiment 1 is attached. The elevator apparatus includes a car 1, a pair of car guide rails 2, a counterweight 3, and a pair of counterweight guide rails 4. Each of the car 1, the car guide rails 2, the counterweight 3, and the counterweight guide rails 4 is provided in a hoistway 5.

[0012] Each car guide rail 2 is disposed extending in the vertical direction. Moreover, each car guide rail 2 is disposed facing each other in the frontage direction A of the entrance of the landing 6. The car 1 is disposed between the pair of car guide rails 2. The car 1 moves up and down the elevator shaft 5 while being guided by the pair of car guide rails 2.

[0013] Each counterweight guide rail 4 is disposed extending in the vertical direction. Moreover, each counterweight guide rail 4 is disposed facing each other in the frontage direction A of the entrance of the landing 6. The counterweight 3 is disposed between the pair of counterweight guide rails 4. The counterweight 3 is guided by the pair of counterweight guide rails 4 to ascend and descend in the hoistway 5.

[0014] The counterweight 3 and the pair of counterweight guide rails 4 are disposed farther from the landing 6 than the car 1 and the pair of car guide rails 2. In other words, the car 1 and the pair of car guide rails 2 are disposed between the counterweight 3 and the pair of counterweight guide rails 4 and the landing 6.

[0015] The counterweight 3 has a counterweight frame 301 and a plurality of adjustment weight pieces 302 placed on the counterweight frame 301. The weight of the counterweight 3 is adjusted by adjusting the number of adjustment weight pieces 302 placed on the counterweight frame 301.

[0016] When renovation work is carried out on the elevator system, the car 1 and the counterweight 3 are each replaced.

[0017] Fig. 2 is a side view showing a state in which the scaffolding device for replacing a counterweight according to the first embodiment is attached to the elevator device of Fig. 1. Fig. 3 is a front view showing the scaffolding device for replacing a counterweight and the elevator device of Fig. 2. The scaffolding device 7 for replacing a counterweight according to the first embodiment is installed in the hoistway 5 when the counterweight 3 is replaced.

[0018] The counterweight replacing scaffolding device 7 according to the first embodiment includes a fixed scaffolding 701, a plurality of adjustable scaffoldings 702, and a worker safety device 703.

[0019] The fixed scaffold 701 has a pair of fixing parts 704, one attached to each of the pair of counterweight guide rails 4, and a fixed scaffold board 705 fixed to each of the pair of fixing parts 704. The fixed scaffold board 705 is disposed across the pair of fixing parts 704 and the floor surface of the landing 6. The fixed scaffold 701 is disposed in the hoistway 5 so as to be adjacent to the landing 6 from which the counterweight frame 301 of the existing counterweight 3 is carried out from the hoistway 5.

[0020] In the first embodiment, the number of adjustable scaffolds 702 is two. The two adjustable scaffolds 702 are arranged side by side in the vertical direction. The lower one of the two adjustable scaffolds 702 is a first adjustable scaffold 706, and the upper one of the two adjustable scaffolds 702 is a second adjustable scaffold 707.

[0021] The number of adjustable scaffolds 702 is not limited to two, but may be three or more, or may be one.

[0022] Each of the multiple adjustable scaffolds 702 is disposed above the fixed scaffold 701. Therefore, the fixed scaffold 701, the first adjustable scaffold 706, and the second adjustable scaffold 707 are disposed in this order from below: the fixed scaffold 701, the first adjustable scaffold 706, and the second adjustable scaffold 707.

[0023] The first adjustable scaffolding 706 has a pair of fixed parts 708, a first rotating shaft 709, a support part 710, and a plurality of scaffolding boards 711.

[0024] One of the pair of counterweight guide rails 4 is a first counterweight guide rail 401, and the other of the pair of counterweight guide rails 4 is a second counterweight guide rail 402.

[0025] One of the pair of fixed portions 708 is a first fixed portion 712, and the other of the pair of fixed portions 708 is a second fixed portion 713. The first fixed portion 712 is attached to the first counterweight guide rail 401, and the second fixed portion 713 is attached to the second counterweight guide rail 402.

[0026] The first fixed portion 712 is fixed to the first counterweight guide rail 401 using a rail clip (not shown). Therefore, when the rail clip is removed from the first counterweight guide rail 401, the first fixed portion 712 is removed from the first counterweight guide rail 401.

[0027] The second fixed portion 713 is fixed to the second counterweight guide rail 402 using a rail clip (not shown). Therefore, when the rail clip is removed from the second counterweight guide rail 402, the second fixed portion 713 is removed from the second counterweight guide rail 402.

[0028] The first rotating shaft 709 is fixed to a first fixed portion 712. Therefore, the first rotating shaft 709 is attached to the first counterweight guide rail 401 via the first fixed portion 712. The first rotating shaft 709 is formed in a cylindrical shape. When the first fixed portion 712 is attached to the first counterweight guide rail 401, the first rotating shaft 709 is disposed so as to extend in the depth direction B of the landing 6.

[0029] The support part 710 is fixed to the second fixed part 713. Therefore, the support part 710 is attached to the second counterweight guide rail 402 via the second fixed part 713. The support part 710 is formed in a cylindrical shape. When the second fixed part 713 is attached to the second counterweight guide rail 402, the support part 710 is disposed so as to extend in the depth direction B of the landing 6.

[0030] The first fixed portion 712 is attached to the first counterweight guide rail 401, and the second fixed portion 713 is attached to the second counterweight guide rail 402. In this case, the first rotating shaft 709 and the support portion 710 are disposed so as to face each other in the frontage direction A of the entrance of the landing 6.

[0031] Each scaffold board 711 is rotatably provided on a first rotation shaft 709. In the first embodiment, the number of scaffold boards 711 is three. The three scaffold boards 711 are arranged side by side in the depth direction B of the landing 6.

[0032] Each scaffolding board 711 has a first scaffolding piece 714 , a second rotation axis 715 , and a second scaffolding piece 716 .

[0033] The first scaffold piece 714 is rotatably provided on the first rotating shaft 709. The second rotating shaft 715 is provided on the first scaffold piece 714. The first scaffold piece 714 is formed in a long board shape. The first rotating shaft 709 is provided on one end of the first scaffold piece 714 in the longitudinal direction, and the second rotating shaft 715 is provided on the other end of the first scaffold piece 714 in the longitudinal direction. The first rotating shaft 709 and the second rotating shaft 715 are disposed opposite to each other. In addition, the first rotating shaft 709 and the second rotating shaft 715 are disposed parallel to each other.

[0034] The second scaffold piece 716 is rotatably provided on a second rotating shaft 715. The second scaffold piece 716 is formed in a long board shape. The second rotating shaft 715 is provided at one end in the longitudinal direction of the second scaffold piece 716. The other end in the longitudinal direction of the second scaffold piece 716 is placed on the support part 710. The other end in the longitudinal direction of the second scaffold piece 716 is shaped like a hook that can be hung from above on the support part 710.

[0035] The shape of the scaffolding board 711 changes between a flat shape and a curved shape as the second scaffolding piece 716 rotates around the second rotation axis 715. When the scaffolding board 711 is flat, the first scaffolding piece 714 and the second scaffolding piece 716 are arranged along the same plane. On the other hand, when the scaffolding board 711 is curved, the first scaffolding piece 714 and the second scaffolding piece 716 are arranged along different planes.

[0036] When the scaffold board 711 has a flat shape, the radial dimension of the first rotating shaft 709 of the scaffold board 711 is larger than the dimension between the first rotating shaft 709 and the support part 710. On the other hand, when the scaffold board 711 has a curved shape, the radial dimension of the first rotating shaft 709 of the scaffold board 711 is smaller than the dimension between the first rotating shaft 709 and the support part 710.

[0037] The second adjustable scaffolding 707 has a pair of fixed portions 717, a first rotating shaft 718, a support portion 719, and a plurality of scaffolding plates 720.

[0038] One of the pair of fixed portions 717 is a first fixed portion 721, and the other of the pair of fixed portions 717 is a second fixed portion 722. The first fixed portion 721 is attached to the first counterweight guide rail 401, and the second fixed portion 722 is attached to the second counterweight guide rail 402.

[0039] The first fixed portion 721 is fixed to the first counterweight guide rail 401 using a rail clip (not shown). Therefore, when the rail clip is removed from the first counterweight guide rail 401, the first fixed portion 721 is removed from the first counterweight guide rail 401.

[0040] The second fixed portion 722 is fixed to the second counterweight guide rail 402 using a rail clip (not shown). Therefore, when the rail clip is removed from the second counterweight guide rail 402, the second fixed portion 722 is removed from the second counterweight guide rail 402.

[0041] The first rotating shaft 718 is fixed to a first fixed portion 721. Therefore, the first rotating shaft 718 is attached to the first counterweight guide rail 401 via the first fixed portion 721. The first rotating shaft 718 is formed in a cylindrical shape. When the first fixed portion 721 is attached to the first counterweight guide rail 401, the first rotating shaft 718 is disposed so as to extend in the depth direction B of the landing 6.

[0042] The support portion 719 is fixed to the second fixed portion 722. Therefore, the support portion 719 is attached to the second counterweight guide rail 402 via the second fixed portion 722. The support portion 719 is formed in a cylindrical shape. When the second fixed portion 722 is attached to the second counterweight guide rail 402, the support portion 719 is disposed so as to extend in the depth direction B of the landing 6.

[0043] The first fixed portion 721 is attached to the first counterweight guide rail 401, and the second fixed portion 722 is attached to the second counterweight guide rail 402. In this case, the first rotating shaft 718 and the support portion 719 are disposed so as to face each other in the frontage direction A of the entrance of the landing 6.

[0044] Each scaffold board 720 is rotatably provided on a first rotation shaft 718. In the first embodiment, the number of scaffold boards 720 is two. The two scaffold boards 720 are arranged side by side in the depth direction B of the landing 6.

[0045] Each scaffolding board 720 has a first scaffolding piece 723 , a second rotation axis 724 , and a second scaffolding piece 725 .

[0046] The first scaffold piece 723 is rotatably provided on the first rotating shaft 718. The second rotating shaft 724 is provided on the first scaffold piece 723. The first scaffold piece 723 is formed in a long board shape. The first rotating shaft 718 is provided on one end of the first scaffold piece 723 in the longitudinal direction, and the second rotating shaft 724 is provided on the other end of the first scaffold piece 723 in the longitudinal direction. The first rotating shaft 718 and the second rotating shaft 724 are disposed opposite to each other. In addition, the first rotating shaft 718 and the second rotating shaft 724 are disposed parallel to each other.

[0047] The second scaffold piece 725 is rotatably provided on the second rotating shaft 724. The second scaffold piece 725 is formed in a long board shape. The second rotating shaft 724 is provided at one end in the longitudinal direction of the second scaffold piece 725. The other end in the longitudinal direction of the second scaffold piece 725 is placed on the support part 719. The other end in the longitudinal direction of the second scaffold piece 725 is shaped like a hook that can be hung from above on the support part 719.

[0048] The shape of the scaffolding board 720 changes between a flat shape and a curved shape as the second scaffolding piece 725 rotates about the second rotation axis 724. When the scaffolding board 720 is flat, the first scaffolding piece 723 and the second scaffolding piece 725 are arranged along the same plane. On the other hand, when the scaffolding board 720 is curved, the first scaffolding piece 723 and the second scaffolding piece 725 are arranged along different planes.

[0049] When the scaffold board 720 has a flat shape, the radial dimension of the first rotating shaft 718 in the scaffold board 720 is larger than the dimension between the first rotating shaft 718 and the support part 719. On the other hand, when the scaffold board 720 has a curved shape, the radial dimension of the first rotating shaft 718 in the scaffold board 720 is smaller than the dimension between the first rotating shaft 718 and the support part 719.

[0050] The first adjustable scaffold 706 and the second adjustable scaffold 707 have the same structure except that the numbers of scaffold planks 711 and scaffold planks 720 are different from each other.

[0051] The worker safety device 703 has a fixed part 726 , a support rod 727 , and a rope 728 .

[0052] The fixed portion 726 is fixed to the first counterweight guide rail 401 using a rail clip (not shown). Therefore, by removing the rail clip from the first counterweight guide rail 401, the fixed portion 726 is removed from the first counterweight guide rail 401. Note that the fixed portion 726 may be attached to the second counterweight guide rail 402 instead of the first counterweight guide rail 401.

[0053] The support rod 727 is fixed to the fixed portion 726. Therefore, the support rod 727 is attached to the first counterweight guide rail 401 via the fixed portion 726. The support rod 727 is formed in a cylindrical shape. When the fixed portion 726 is attached to the first counterweight guide rail 401, the support rod 727 is disposed so as to extend in the depth direction B of the landing 6.

[0054] Rope 728 is suspended from support rod 727. The portion of rope 728 attached to support rod 727 is movable in the longitudinal direction of support rod 727. In other words, the portion of rope 728 attached to support rod 727 is movable in the depth direction B of the landing 6. The lower end of rope 728 is connectable to the clothing of the worker. By connecting the lower end of rope 728 to the clothing of the worker, the worker is prevented from falling from the counterweight replacement scaffolding device 7.

[0055] The first variable scaffold 706 further includes a rotating shaft support member 729. The rotating shaft support member 729 is fixed to the end of the first rotating shaft 709 on the landing 6 side. The rotating shaft support member 729 is abutted against a portion of the first counterweight guide rail 401 below the portion to which the first fixed portion 712 is attached. The first rotating shaft 709 is supported by the rotating shaft support member 729 by abutting the first counterweight guide rail 401. This prevents the first rotating shaft 709 from tilting with respect to the horizontal plane. The rotating shaft support member 729 may be fixed to the first counterweight guide rail 401. An example of a member for fixing the rotating shaft support member 729 to the first counterweight guide rail 401 is a rail clip.

[0056] The first variable scaffold 706 further includes a support section support member 730. The support section support member 730 is fixed to the end of the support section 710 on the landing 6 side. The support section support member 730 is abutted against a portion of the second counterweight guide rail 402 below the portion to which the second fixing portion 713 is attached. The support section support member 730 abuts against the second counterweight guide rail 402, whereby the support section 710 is supported by the support section support member 730. This prevents the support section 710 from tilting relative to the horizontal plane. The support section support member 730 may be fixed to the second counterweight guide rail 402. An example of a member for fixing the support section support member 730 to the second counterweight guide rail 402 is a rail clip.

[0057] The second variable scaffold 707 further includes a rotating shaft support member 731. The rotating shaft support member 731 is fixed to the end of the first rotating shaft 718 on the landing 6 side. The rotating shaft support member 731 is abutted against a portion of the first counterweight guide rail 401 below the portion to which the first fixed portion 721 is attached. The first rotating shaft 718 is supported by the rotating shaft support member 731 by abutting the first counterweight guide rail 401. This prevents the first rotating shaft 718 from tilting with respect to the horizontal plane. The rotating shaft support member 731 may be fixed to the first counterweight guide rail 401. An example of a member for fixing the rotating shaft support member 731 to the first counterweight guide rail 401 is a rail clip.

[0058] The second variable scaffold 707 further includes a support section support member 732. The support section support member 732 is fixed to the end of the support section 719 on the landing 6 side. The support section support member 732 is abutted against a portion of the second counterweight guide rail 402 below the portion to which the second fixed section 722 is attached. The support section support member 732 abuts against the second counterweight guide rail 402, whereby the support section 719 is supported by the support section support member 732. This prevents the support section 719 from tilting relative to the horizontal plane. The support section support member 732 may be fixed to the second counterweight guide rail 402. An example of a member for fixing the support section support member 732 to the second counterweight guide rail 402 is a rail clip.

[0059] FIG. 4 is a diagram showing a state in which the scaffold board 711 and the scaffold board 720 in FIG. 3 are bent. FIG. 5 is a diagram showing a state in which the scaffold board 711 and the scaffold board 720 in FIG. 3 are in a storage position. The scaffold board 711 moves between an installation position and a storage position by rotating about a first rotation axis 709. When the position of the scaffold board 711 is the installation position, the scaffold board 711 is provided across the first rotation axis 709 and the support part 710, and faces the fixed scaffold 701 in the height direction. On the other hand, when the position of the scaffold board 711 is the storage position, the position of the scaffold board 711 is a position shifted from the installation position. Specifically, when the position of the scaffold board 711 is the storage position, the position of the scaffold board 711 is a position shifted from the movement path of the counterweight frame 301 when the counterweight frame 301 is carried out.

[0060] Moreover, the scaffold board 720 moves between the installation position and the storage position by rotating about the first rotation shaft 718. When the position of the scaffold board 720 is the installation position, the scaffold board 720 is provided across the first rotation shaft 718 and the support part 719, and faces the fixed scaffold 701 in the height direction. On the other hand, when the position of the scaffold board 720 is the storage position, the position of the scaffold board 720 is a position shifted from the installation position. Specifically, when the position of the scaffold board 720 is the storage position, the position of the scaffold board 720 is a position shifted from the movement path of the counterweight frame 301 when the counterweight frame 301 is carried out.

[0061] When the position of each scaffold plank 711 is the installation position, the scaffold planks 711 are arranged side by side from the counterweight guide rail 4 toward the landing 6. When the position of each scaffold plank 711 is the installation position, the scaffold plank 711 is not arranged above the end of the fixed scaffold plank 705 on the landing 6 side. This allows a worker standing on the fixed scaffold plank 705 to easily climb up to the scaffold plank 711, and a worker standing on the scaffold plank 711 to easily descend to the fixed scaffold plank 705.

[0062] When the position of each scaffold plank 720 is the installation position, the scaffold planks 720 are arranged side by side from the counterweight guide rail 4 toward the landing 6. When the position of each scaffold plank 711 is the installation position and the position of each scaffold plank 720 is the installation position, no scaffold plank 720 is arranged above one of the multiple scaffold planks 711 that is arranged on the landing 6 side. This allows a worker standing on the scaffold plank 711 to easily climb onto the scaffold plank 720, and a worker standing on the scaffold plank 720 to easily descend onto the scaffold plank 711.

[0063] When the position of each scaffold board 711 is in the installation position and the position of each scaffold board 720 is in the installation position, the fixed scaffold 701, the first adjustable scaffold 706 and the second adjustable scaffold 707 are arranged as a whole in a so-called stepped shape.

[0064] The scaffold plank 711 is suspended from the first rotation axis 709 when the position of the scaffold plank 711 is the stored position. The scaffold plank 720 is suspended from the first rotation axis 718 when the position of the scaffold plank 720 is the stored position.

[0065] Next, a description will be given of a counterweight replacing method for replacing a counterweight using the counterweight replacing scaffolding device 7 according to embodiment 1. Fig. 6 is a flowchart showing the counterweight replacing method according to embodiment 1.

[0066] First, in step S101, a worker performs a scaffolding installation process. In the scaffolding installation process, the worker installs the fixed scaffolding 701 in the elevator 5, attaches the first variable scaffolding 706 and the second variable scaffolding 707 to a pair of counterweight guide rails 4, and sets the positions of the scaffolding boards 711 and 720 to their installation positions.

[0067] After that, in step S102, the worker performs a counterweight moving process. In the counterweight moving process, the worker moves the existing counterweight 3 to a position corresponding to the landing 6.

[0068] Thereafter, in step S103, the worker performs an adjustment weight piece carrying out process. In the adjustment weight piece carrying out process, the worker removes the multiple adjustment weight pieces 302 placed on the counterweight frame 301 of the existing counterweight 3 from the counterweight frame 301. When an upper adjustment weight piece 302 among the multiple adjustment weight pieces 302 is carried out, the worker stands on the scaffolding board 720. When an intermediate adjustment weight piece 302 in the height direction among the multiple adjustment weight pieces 302 is carried out, the worker stands on the scaffolding board 711. When a lower adjustment weight piece 302 among the multiple adjustment weight pieces 302 is carried out, the worker stands on the fixed scaffolding board 705.

[0069] After that, in step S104, the worker performs a scaffolding board storage step. In the scaffolding board storage step, the worker moves each of the scaffolding boards 711 and 720 from the installation position to the storage position.

[0070] After that, in step S105, the worker performs a counterweight frame replacement process. In the counterweight frame replacement process, the worker carries the counterweight frame 301 of the existing counterweight 3 out of the hoistway 5 and carries the counterweight frame 301 of the new counterweight 3 into the hoistway 5.

[0071] After that, in step S106, the worker performs a scaffolding board installation process. In the scaffolding board installation process, the worker moves each of the scaffolding boards 711 and 720 from the storage position to the installation position.

[0072] Thereafter, in step S107, the worker performs an adjustment weight piece delivery process. In the adjustment weight piece delivery process, the worker attaches a plurality of adjustment weight pieces 302 to the counterweight frame 301 of the newly installed counterweight 3. When an adjustment weight piece 302 arranged at the lower part of the plurality of adjustment weight pieces 302 is delivered, the worker stands on the fixed scaffold board 705. When an adjustment weight piece 302 arranged at the middle part in the height direction of the plurality of adjustment weight pieces 302 is delivered, the worker stands on the scaffold board 711. When an adjustment weight piece 302 arranged at the upper part of the plurality of adjustment weight pieces 302 is delivered, the worker stands on the scaffold board 720.

[0073] Thereafter, in step S108, the worker performs a scaffolding device removal process. In the scaffolding device removal process, the worker removes the first adjustable scaffolding 706 and the second adjustable scaffolding 707 from the pair of counterweight guide rails 4, and removes the fixed scaffolding 701 from the hoistway 5. This completes the work of replacing the counterweight.

[0074] As described above, the scaffolding device 7 for replacing a counterweight according to the first embodiment includes the fixed scaffolding 701 and the adjustable scaffolding 702. The fixed scaffolding 701 is installed in the hoistway 5. The adjustable scaffolding 702 is installed above the fixed scaffolding 701 and attached to a pair of counterweight guide rails 4. The fixed scaffolding 701 is disposed in the hoistway 5 so as to be adjacent to the landing 6. The adjustable scaffolding 702 has a first rotating shaft 709 attached to the first counterweight guide rail 401, a support part 710 attached to the second counterweight guide rail 402, and a scaffolding board 711 rotatably provided on the first rotating shaft 709. The scaffolding board 711 rotates around the first rotating shaft 709, so that the scaffolding board 711 moves between an installation position and a storage position. When the position of the scaffolding board 711 is the installation position, the scaffolding board 711 is provided across the first rotation shaft 709 and the support part 710, and faces the fixed scaffolding 701 in the height direction. When the position of the scaffolding board 711 is the storage position, the scaffolding board 711 is disposed shifted from the installation position. As a result, when the existing counterweight frame 301 is carried out from the hoistway 5 to the landing 6 after removing the adjustment weight piece 302 from the existing counterweight frame 301, it is not necessary to remove the variable scaffolding 702 from the hoistway 5. Therefore, the adjustment weight piece 302 can be easily attached to the new counterweight frame 301. As a result, the efficiency of the replacement work of the counterweight 3 can be improved.

[0075] The scaffolding board 711 has a first scaffolding piece 714 provided on the first rotating shaft 709, a second rotating shaft 715 provided on the first scaffolding piece 714, and a second scaffolding piece 716 that rotates around the second rotating shaft 715. The second scaffolding piece 716 rotates around the second rotating shaft 715, causing the shape of the scaffolding board 711 to change between a flat shape and a curved shape. When the scaffolding board 711 has a flat shape, the first scaffolding piece 714 and the second scaffolding piece 716 are arranged along the same plane. When the scaffolding board 711 has a curved shape, the first scaffolding piece 714 and the second scaffolding piece 716 are arranged along different planes. When the scaffold board 711 has a flat shape, the radial dimension of the first rotating shaft 709 of the scaffold board 711 is larger than the dimension between the first rotating shaft 709 and the support part 710. When the scaffold board 711 has a curved shape, the radial dimension of the first rotating shaft 709 of the scaffold board 711 is smaller than the dimension between the first rotating shaft 709 and the support part 710. This makes it possible to move the scaffold board 711 between the installation position and the storage position with a simple configuration.

[0076] The scaffolding board 720 has a first scaffolding piece 723 provided on the first rotating shaft 718, a second rotating shaft 724 provided on the first scaffolding piece 723, and a second scaffolding piece 725 that rotates around the second rotating shaft 724. The second scaffolding piece 725 rotates around the second rotating shaft 724, causing the shape of the scaffolding board 720 to change between a flat shape and a curved shape. When the scaffolding board 720 has a flat shape, the first scaffolding piece 723 and the second scaffolding piece 725 are arranged along the same plane. When the scaffolding board 720 has a curved shape, the first scaffolding piece 723 and the second scaffolding piece 725 are arranged along different planes. When the shape of the scaffold board 720 is a flat plate shape, the radial dimension of the first rotating shaft 718 of the scaffold board 720 is larger than the dimension between the first rotating shaft 718 and the support part 719. When the shape of the scaffold board 720 is a curved shape, the radial dimension of the first rotating shaft 718 of the scaffold board 720 is smaller than the dimension between the first rotating shaft 718 and the support part 719. This makes it possible to move the scaffold board 720 between the installation position and the storage position with a simple configuration.

[0077] Furthermore, when the position of the scaffolding board 711 is the storage position, the scaffolding board 711 is suspended from the first rotation shaft 709. This eliminates the need to fix the scaffolding board 711 in the storage position to the counterweight guide rail 4. Therefore, the position of the scaffolding board 711 can be easily maintained in the storage position.

[0078] Furthermore, when the position of the scaffold board 720 is the storage position, the scaffold board 720 is suspended from the first rotating shaft 718. This eliminates the need to fix the scaffold board 720 in the storage position to the counterweight guide rail 4. Therefore, the position of the scaffold board 720 can be easily maintained in the storage position.

[0079] The counterweight replacement method according to the first embodiment includes a scaffolding device installation step, a counterweight moving step, an adjustment weight piece carrying out step, a scaffolding board storage step, and a counterweight frame replacement step. The counterweight replacement method also includes a scaffolding board installation step, an adjustment weight piece carrying in step, and a scaffolding device removal step. In the scaffolding device installation step, the fixed scaffolding 701 is installed in the elevator 5, the adjustable scaffolding 702 is attached to a pair of counterweight guide rails 4, and the positions of the scaffolding board 711 and the scaffolding board 720 are set to the installation positions. In the counterweight moving step, the existing counterweight 3 is moved to a position corresponding to the landing 6. In the adjustment weight piece carrying-out process, after the scaffolding device installation process and the counterweight moving process, the multiple adjustment weight pieces 302 placed on the counterweight frame 301 of the existing counterweight 3 are removed from the counterweight frame 301. In the scaffolding board storage process, after the adjustment weight piece carrying-out process, the scaffolding board 711 and the scaffolding board 720 are moved from the installation position to the storage position. In the counterweight frame replacement process, after the scaffolding board storage process, the counterweight frame 301 of the existing counterweight 3 is carried out from the hoistway 5, and the counterweight frame 301 of the new counterweight 3 is carried into the hoistway 5. In the scaffolding board installation process, after the counterweight frame replacement process, the scaffolding board 711 and the scaffolding board 720 are moved from the storage position to the installation position. In the adjustment weight piece delivery process, after the scaffold board installation process, a plurality of adjustment weight pieces 302 are attached to the counterweight frame 301 of the newly installed counterweight 3. In the scaffold device removal process, after the adjustment weight piece delivery process, the adjustable scaffold 702 is removed from the pair of counterweight guide rails 4, and the fixed scaffold 701 is removed from the hoistway. This can improve the efficiency of the counterweight 3 replacement work. [Explanation of symbols]

[0080] 1 cage, 2 cage guide rail, 3 counterweight, 4 counterweight guide rail, 5 elevator, 6 landing, 7 scaffolding device for replacing counterweight, 301 counterweight frame, 302 adjustment weight piece, 401 first counterweight guide rail, 402 second counterweight guide rail, 701 fixed scaffolding, 702 adjustable scaffolding, 703 worker safety device, 704 fixed part, 705 fixed scaffolding board, 706 first adjustable scaffolding, 707 second adjustable scaffolding, 708 fixed part, 709 first rotating shaft, 710 support part, 711 scaffolding board, 712 first fixed part, 713 second fixed part, 714 first scaffolding piece, 715 second rotating shaft, 716 Second scaffold piece, 717 fixed part, 718 first rotating shaft, 719 support part, 720 scaffold board, 721 first fixed part, 722 second fixed part, 723 first scaffold piece, 724 second rotating shaft, 725 second scaffold piece, 726 fixed part, 727 support rod, 728 rope, 729 rotating shaft support member, 730 support part support member, 731 rotating shaft support member, 732 support part support member.

Claims

1. A fixed scaffold installed in the elevator; A variable scaffold provided above the fixed scaffold and attached to a pair of counterweight guide rails; Equipped with The fixed scaffold is disposed in the hoistway adjacent to the landing, The variable scaffolding includes: a first rotating shaft attached to one of the pair of counterweight guide rails; a support portion attached to the other of the pair of counterweight guide rails; A scaffolding board rotatably provided on the first rotation axis; having The scaffolding board rotates around the first rotation axis, and moves between an installation position that is disposed across the first rotation axis and the support portion and faces the fixed scaffolding in the height direction, and a storage position that is shifted from the installation position. This scaffolding device for replacing counterweights.

2. The scaffolding board has a first scaffolding piece provided on the first rotation axis, a second rotation axis provided on the first scaffolding piece, and a second scaffolding piece rotating around the second rotation axis, The shape of the scaffold board is deformed between a flat shape in which the first scaffold piece and the second scaffold piece are arranged along the same plane and a bent shape in which the first scaffold piece and the second scaffold piece are arranged along different planes by rotating the second scaffold piece around the second rotation axis, When the shape of the scaffold board is the flat plate shape, a radial dimension of the first rotation axis of the scaffold board is larger than a dimension between the first rotation axis and the support part, The scaffolding device for replacing counterweights as described in claim 1, wherein when the shape of the scaffolding board is the bent shape, the radial dimension of the first rotation axis of the scaffolding board is smaller than the dimension between the first rotation axis and the support portion.

3. The scaffolding device for replacing a counterweight according to claim 1 or 2, wherein the scaffolding board is suspended from the first rotation axis when the position of the scaffolding board is the stored position.

4. A counterweight replacement method for replacing a counterweight using the counterweight replacement scaffolding device according to any one of claims 1 to 3, comprising: A scaffolding device installation process of installing the fixed scaffolding in the elevator, attaching the adjustable scaffolding to a pair of the counterweight guide rails, and setting the position of the scaffolding board to the installation position; a counterweight moving step of moving the existing counterweight to a position corresponding to the landing; an adjustment weight piece carrying-out process of removing a plurality of adjustment weight pieces placed on the counterweight frame of the existing counterweight from the counterweight frame after the scaffolding device installation process and the counterweight moving process; After the adjustment weight piece carrying-out process, a scaffolding board storage process of moving the position of the scaffolding board from the installation position to the storage position; After the scaffold board storage step, a counterweight frame replacement step of carrying out the counterweight frame of the existing counterweight from the hoistway and carrying the counterweight frame of the newly installed counterweight into the hoistway; After the counterweight frame replacement step, a scaffold board installation step of moving the position of the scaffold board from the storage position to the installation position; After the scaffolding board installation process, an adjustment weight piece delivery process is performed to attach a plurality of adjustment weight pieces to the counterweight frame of the newly installed counterweight; After the adjustment weight piece delivery step, a scaffolding device removal step of removing the adjustable scaffolding from the pair of counterweight guide rails and removing the fixed scaffolding from the elevator; A method for replacing a counterweight comprising the steps of:

Citation Information

Patent Citations

  • JP1975008913U

  • Working table for replacement of main rope on counter side

    JP1997194164A

  • Partial work scaffold and erecting method for joint scaffold using it

    JP1998018578A

  • Counter weight of elevator and method for changing counter rail

    JP1999349255A

  • Suspended scaffold and method for installing the same

    JP2013160011A