Fluid Heating System
The fluid heating system integrates a heat pump and combustion device with demand response controls to manage power consumption and emissions, addressing cost and environmental impact by optimizing device operation based on external power generation data.
Patent Information
- Application Number
- JP2020194598
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-11-24
- Publication Date
- 2025-01-20
- Estimated Expiration
- 2040-11-24
AI Technical Summary
Existing fluid heating systems face challenges in reducing running costs and carbon dioxide emissions, as control methods based solely on running costs may not be optimal and do not effectively address global carbon footprint considerations.
A fluid heating system incorporating a heat pump device and a combustion device, with a control mechanism that adjusts operations to comply with power consumption limits, prioritizes carbon dioxide emission reduction, and optimizes running costs through strategic use of both devices based on external power generation information and demand response controls.
The system effectively balances power demand and supply, reduces carbon dioxide emissions, and minimizes running costs by optimizing the operation of the heat pump and combustion devices, ensuring comfort and efficiency during peak demand periods.
Smart Images

Figure 0007617375000001 
Figure 0007617375000002 
Figure 0007617375000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a fluid heating system, and more particularly to a fluid heating system including a heat pump device and a combustion device. [Background technology]
[0002] Patent Document 1 (Patent No. 5597767) shows a cost-effective heating system equipped with an electrically driven heat pump and a fuel-fired boiler. This heating system focuses on electricity and fuel prices and uses the break-even coefficient of performance (BECOP) to control the system to reduce running costs. Summary of the Invention [Problem to be solved by the invention]
[0003] 2. Description of the Related Art In a fluid heating system that heats a fluid, such as a heating device, reducing the running costs is important from the user's point of view.
[0004] However, in a fluid heating system, control that uses running costs as an indicator alone may not be considered suitable control when viewed from another perspective. [Means for solving the problem]
[0005] A fluid heating system according to a first aspect includes a heat pump device, a flow path, a combustion device, and a control unit. The heat pump device has a refrigerant circuit through which a refrigerant circulates. The heat pump device is operated by electric power. A fluid to be heated by the refrigerant flows through the flow path. The combustion device has a combustion unit. The combustion device operates to heat the fluid separately from the heat pump device. The control unit has an upper limit value acquisition unit and an operation control unit. The upper limit value acquisition unit acquires an upper limit value of power consumption. The operation control unit controls the operation of the heat pump device so that the power consumption of the heat pump device does not exceed the upper limit value during a first time period in which the upper limit value needs to be maintained. The operation control unit operates the combustion device when the amount of heating of the fluid by the heat pump device alone is insufficient during the first time period.
[0006] In this case, during a first time period in which the upper limit of power consumption needs to be maintained, the operation of the heat pump device is controlled so as not to exceed the upper limit. This makes it possible to balance the power supply and demand in the area by suppressing the power consumption of the heat pump device during peak power supply times in the area in which the fluid heating system is installed, for example.
[0007] In addition, in the first time period, if the amount of heat required to heat the fluid by the heat pump device alone is insufficient, the combustion device is operated as an auxiliary device, which allows users of the fluid heating system to enjoy heating and hot water without significantly reducing comfort.
[0008] A fluid heating system according to a second aspect is the fluid heating system according to the first aspect, wherein the upper limit acquisition unit receives information on the upper limit determined according to a state of an external power generation facility from an external device.
[0009] Here, for example, the upper limit acquisition unit acquires information on the upper limit provided by a power supply company that supplies power to the heat pump device or an aggregator that provides an energy management service to balance power supply and power demand. This allows the user or manager of the fluid heating system to directly or indirectly cooperate with the power supplier.
[0010] A fluid heating system according to a third aspect is the fluid heating system according to the first aspect, further comprising a first calculation unit and a second calculation unit. The first calculation unit calculates a total carbon dioxide emission based on information on the amount of carbon dioxide emission during power generation per unit of power supply. The total carbon dioxide emission is the sum of the amount of carbon dioxide emission due to operation of the heat pump device and the amount of carbon dioxide emission due to operation of the combustion device. The second calculation unit calculates an upper limit value of power consumption so as to reduce the total carbon dioxide emission. The upper limit value acquisition unit acquires the upper limit value of power consumption from the second calculation unit.
[0011] Not only combustion devices, which are generally recognized as having large carbon dioxide emissions, but also heat pump devices emit carbon dioxide when the electricity they consume is generated (when electricity is produced). Oil is burned in thermal power generation, and power generation devices that use natural energy also emit carbon dioxide during the manufacturing process of the device. In consideration of these facts, the upper limit acquisition unit calculates the upper limit of power consumption so that the total carbon dioxide emissions are reduced. This allows the fluid heating system to effectively contribute to reducing carbon dioxide emissions on a global scale.
[0012] A fluid heating system of a fourth aspect is a fluid heating system of any of the first aspect to the third aspect, wherein, when the amount of heating of the fluid is insufficient by heating the fluid only by the heat pump device during a first time period, the operation control unit operates the combustion device to heat the fluid by the amount of heating that is insufficient by suppressing the power consumption of the heat pump device to below an upper limit value.
[0013] Generally, the amount of carbon dioxide emitted by the operation of a heat pump device is less than the amount of carbon dioxide emitted by the operation of a combustion device. In view of this, in this embodiment, while the heat pump device is operated with priority, during the first time period in which the upper limit of power consumption needs to be met, the power consumption of the heat pump device is suppressed to below the upper limit, and the combustion device is operated to provide only the heating amount that is insufficient. This allows the fluid heating system to effectively contribute to reducing carbon dioxide emissions on a global scale.
[0014] A fluid heating system according to a fifth aspect is the fluid heating system according to the second aspect, further comprising a first calculation unit. The first calculation unit calculates a total carbon dioxide emission, which is the amount of carbon dioxide emission caused by the operation of the heat pump device and the combustion device. The operation control unit determines a ratio between heating of the fluid by the heat pump device and heating of the fluid by the combustion device and controls the operation of the heat pump device and the combustion device so that the total carbon dioxide emission is small during a second time period in which it is not necessary to maintain the upper limit value of power consumption.
[0015] Here, during the second time period when it is not necessary to maintain the upper limit of power consumption, control different from that during the first time period is performed. By controlling the operation of the heat pump device and the combustion device during this second time period so as to reduce the total carbon dioxide emissions, the fluid heating system can effectively contribute to reducing carbon dioxide emissions on a global scale.
[0016] A fluid heating system according to a sixth aspect is the fluid heating system according to the second or fifth aspect, further comprising a third calculation unit. The third calculation unit calculates a first running cost required for operation of the heat pump device and a second running cost required for operation of the combustion device. The operation control unit determines a ratio between heating of the fluid by the heat pump device and heating of the fluid by the combustion device and controls the operation of the heat pump device and the combustion device so that the sum of the first running cost and the second running cost is small during a third time slot in which it is not necessary to maintain the upper limit value.
[0017] Here, during the third time slot, when it is not necessary to maintain the upper limit of power consumption, a control different from that of the first time slot is performed. During this third time slot, the operation of the heat pump device and the combustion device is controlled so that the sum of the first running cost and the second running cost is reduced, allowing the user to enjoy the benefit of reduced costs. Meanwhile, during the first time slot, as described above, for example, it becomes possible to balance the local power supply and power demand, allowing the user to receive heating, hot water, and the like without significantly reducing comfort.
[0018] A seventh aspect of the present invention relates to a fluid heating system according to any one of the first to sixth aspects, in which the fluid heated by the refrigerant is water. The water heated in the flow path is used for space heating and / or hot water supply.
[0019] The fluid heating system of an eighth aspect is the fluid heating system of any one of the first aspect to the sixth aspect, in which the fluid heated by the refrigerant is air, and the air heated in the flow path is used for heating. [Brief description of the drawings]
[0020] [Figure 1] FIG. 1 is a schematic diagram for explaining a power consumption management system. [Diagram 2] 1 is a schematic diagram showing a configuration of a power management device 10 of a power company. [Diagram 3] 2 is a schematic diagram showing a configuration of a storage unit 14 of the power management device 10. FIG. [Figure 4] FIG. 2 is a schematic diagram showing the configuration of a control device 30 installed in each building. [Diagram 5] FIG. 2 is a schematic diagram showing the configuration of a heating system 203 installed in each building. [Figure 6] 13 is a schematic diagram showing the configuration of a heating control unit 280. FIG. [Figure 7] FIG. 11 is a diagram comparing control in a second time period with control in a third time period. [Figure 8] This is a diagram in which the axis for power consumption has been added to Fig. 7. [Figure 9] FIG. 11 is a diagram showing the relationship between the outside air temperature, the HP operation ratio, and the power consumption in a first time slot and a second time slot. [Figure 10] FIG. 13 is a diagram showing the relationship between the outside air temperature and the HP operation ratio in a first time slot, a second time slot, and a third time slot. [Figure 11] FIG. 11 is a diagram showing the relationship between each control and CO2 emissions. [Figure 12] FIG. 2 is a schematic diagram showing the configuration of an air conditioning system according to a modified example A. [Figure 13] FIG. 13 is a schematic diagram showing an example in which the air conditioning system of modification A is installed in a house. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0021] 1 and 5, a heating system 203 serving as a fluid heating system is a system that heats water (fluid) using one or both of an electrically powered heat pump unit and a boiler unit that burns fuel, and provides heating by flowing the heated water to a heat emitter. This heating system 203 is one of the facility devices 20 owned by a user who is an electricity consumer in the electricity consumption management system shown in Fig. 1. Below, first, the electricity consumption management system will be explained, and then the heating system 203 will be described in detail.
[0022] (1) Overall configuration of the electricity consumption management system FIG. 1 is a schematic diagram for explaining the power consumption management system. The power consumption management system is a mechanism for providing an incentive to a user of facility equipment 20 when the power consumption of the facility equipment 20 is adjusted for a predetermined period (hereinafter referred to as the adjustment period) in response to a control request from power company 1a. This power consumption management system provides incentives individually to users of multiple facility equipment 20. The power company 1a and the users have concluded a contract that prescribes an arrangement regarding the use of power, and the form of the incentive is also determined in advance based on the contract. Such a power consumption management system is realized by power company 1a, the power supplier, and devices installed in buildings A and B of consumers.
[0023] The electric power company 1a has a power management device 10. The power management device 10 transmits a "control request" to each facility device 20 to prompt the adjustment of power. The power management device 10 also calculates the amount of incentive to be given to the user based on a record of the facility device 20 responding to the control request.
[0024] The facilities 3a and 3b in the buildings A and B are, for example, office buildings, tenant buildings, factories, and general homes. In each of the buildings A and B, equipment 20, a power source 6 that supplies power to the equipment 20, a power meter 7 that measures the amount of power supplied from the power source 6 to the equipment 20, and a control device 30 that controls the equipment 20 are installed. The facilities 3a and 3b in the buildings A and B are supplied with power from the power company 1a through a power line 102a. The equipment 20 in the same building is supplied with power from the power source 6 through an indoor power line 102b. The power management device 10 and the control device 30 are connected, for example, by the Internet 101a. The control device 30 and the equipment 20 in the same building are connected by a dedicated control line 101b or the like.
[0025] In FIG. 1, the numbers of buildings A and B and devices are shown in a limited manner, but the numbers are not limited to these.
[0026] One aspect of the above-mentioned power consumption management system is “demand response,” and power adjustment control for realizing the demand response is called “demand response control.” The control of the heating system 203 in the first time slot, which will be described later, is one example of “demand response control.”
[0027] (2) Devices used in electricity consumption management systems (2-1) Power management device 10 2 is a schematic diagram showing the configuration of the power management device 10. The power management device 10 includes a communication unit 11, an input unit 12, an output unit 13, a storage unit 14, and a calculation unit 15.
[0028] The communication unit 11 communicates with the control device 30, and is composed of a network interface that enables connection to the Internet 101a.
[0029] The input unit 12 is used to input information to the power management device 10, and is composed of operation buttons, a keyboard, a mouse, and the like.
[0030] The output unit 13 outputs information stored in the power management device 10, and is configured with a display or the like.
[0031] The storage unit 14 stores information input to the power management device 10, and is configured with a hard disk, etc. As shown in Fig. 3, the storage unit 14 stores combinations of adjustable power amounts and adjustable time periods in each of the buildings A and B. The storage unit 14 also stores programs to be executed by the calculation unit 15, etc.
[0032] The calculation unit 15 executes various calculations based on information stored in the power management device 10 and is realized by a computer. The calculation unit 15 includes a control calculation device and a storage device. A processor such as a CPU or a GPU can be used for the control calculation device. The control calculation device reads out a program stored in the storage unit 14 and performs predetermined image processing and calculation processing according to the program. Furthermore, the control calculation device can write the calculation result to the storage device and read out information stored in the storage device according to the program. Each part in the calculation unit 15 shown in FIG. 2 indicates various functional blocks realized by the control calculation device. Specifically, by reading out and executing the program, the calculation unit 15 functions as a power consumption prediction unit 15a, a power adjustment determination unit 15b, an equipment selection unit 15c, a control request transmission unit 15d, and an incentive information determination unit 15e shown in FIG. 2.
[0033] The power consumption prediction unit 15a predicts the amount of power supply and demand, and predicts the amount of power consumption after a predetermined time. The power consumption prediction unit 15a also determines whether or not there is a possibility that the amount of power demand after a predetermined time will exceed a predetermined amount of power supply. The amount of power supply is determined according to the status of the power generation facilities operated by the power company 1a. The power generation facilities are, for example, facilities that perform thermal power generation, wind power generation, solar power generation, etc.
[0034] The power adjustment determination unit 15b determines the amount of adjustment, the adjustment time, and the adjustment period required to reduce power consumption when the power consumption prediction unit 15a determines that the demand for power after a specified time period is likely to exceed a specified supply amount.
[0035] The facility equipment selection unit 15c selects the facility equipment 20 for which demand-response control is to be performed, based on the information about the facility equipment 20 stored in the memory unit 14 and the information necessary for reducing power consumption determined by the power adjustment determination unit 15b.
[0036] The control request sending unit 15d sends a "control request" to the control device 30 selected by the facility device selecting unit 15c to prompt the control device 30 to adjust the amount of power usage. The control request includes information such as the amount of power to be adjusted and the time period. Depending on the contents of the contract between the power supplier and the power consumer, the amount of power to be adjusted may be determined in advance, in which case the sending of information regarding the amount of power to be adjusted is omitted.
[0037] The incentive information determination unit 15e determines information regarding the amount of incentive to be given to a user. The amount of incentive is given by multiplying the power adjustment amount by the incentive unit price, for example. The incentive information determination unit 15e changes the incentive unit price, etc. according to the situation.
[0038] (2-2) Equipment 20 The facility devices 20 are devices that operate under control conditions set by the control device 30. When the facility devices 20 operate under control conditions that satisfy a control request from the power management device 10, the power consumption is adjusted in the power consumption management system.
[0039] The types of facility equipment 20 include a ventilation fan 201, lighting equipment 202, and a heating system 203. The ventilation fan 201 is only operated to be turned on / off and consumes a fixed amount of power when in operation. Some of the lighting equipment 202 is only operated to be turned on / off and consumes a fixed amount of power when in operation, while others have multiple levels of illuminance switching and consume different amounts of power for each operation. As described above, the heating system 203 as a fluid heating system is a system that includes a boiler unit 210 that consumes almost no power and a heat pump unit 220 that consumes a lot of power, and will be described in detail later.
[0040] (2-3) Control device 30 4 is a schematic diagram showing the configuration of the control device 30. The control device 30 is used in a power consumption management system and controls the facility equipment 20. The control device 30 includes a communication unit 31, an input unit 32, an output unit 33, a storage unit 34, a setting unit 35, a calculation unit 36, and a control unit 37.
[0041] The communication unit 31 communicates with the power management apparatus 10, and is configured with a network interface that enables connection to the Internet 101a.
[0042] The input unit 32 is used to input information to the control device 30, and is composed of operation buttons, a touch screen covering the display of the output unit 33, and the like. Through this input unit 32, a user can input various commands, such as changing the settings of the facility device 20 and changing the operation mode.
[0043] The output unit 33 outputs information stored in the control device 30 and is configured with a display etc. For example, the output unit 33 outputs a screen showing the operation state of the facility equipment 20 to the display, and presents to the user the ON / OFF state, operation mode, set temperature, illuminance, ventilation volume, operating time, operating rate, other information on the operating capabilities during operation of the facility equipment 20, current power consumption, etc.
[0044] The storage unit 34 stores information input to the control device 30, and is configured with a hard disk or the like. The storage unit 34 also stores a program that can be read and executed by the calculation unit 36 described below. Furthermore, the storage unit 34 stores information on control conditions and power consumption according to the type of facility device 20.
[0045] The setting unit 35 sets the control conditions of the facility device 20 based on the information inputted from the input unit 32 and the like.
[0046] The calculation unit 36 executes various calculations based on information stored in the control device 30, and is composed of, for example, a CPU, a ROM, and a RAM. The functions of the calculation unit 36 are realized by reading and executing the programs stored in the storage unit 34. The calculation unit 36 has a function of calculating the amount of incentive to be acquired based on the control conditions set by the setting unit 35.
[0047] The control unit 37 controls the facility equipment 20 based on the control conditions and the like set by the setting unit 35 .
[0048] (3) Heating System 203 As shown in FIGS. 5 and 6, a heating system 203 serving as a fluid heating system includes a boiler unit 210, a heat pump unit 220, a heat dissipation unit 230, and a heating control unit 280.
[0049] (3-1) Boiler unit 210, heat pump unit 220 and heat release unit 230 The heat release unit 230 includes heat emitters arranged in a plurality of rooms as the space to be heated, for example if the heating system 203 is used for heating a house. The plurality of heat emitters are heat exchangers, such as radiators, floor heating, convection heaters. In FIG. 5, the heat emitters are indicated diagrammatically by reference numeral 231. Furthermore, one or more thermostats 232 having room temperature sensors 233 are provided in the space to be heated. The room temperature sensors 233 measure the temperature of the rooms in which the room temperature sensors 233 are arranged. In the case where the heat release unit 230 heats a plurality of rooms constituting the space to be heated, a thermostat 232 is arranged in each room or in many rooms. Each thermostat 232 has a room temperature sensor 233. A user of the heating system 203 sets a desired room temperature via the thermostat 232. The desired room temperature may be different for each room. The desired room temperature of the space to be heated may be set centrally. The room temperature sensors 233 measure the current room temperature of the corresponding rooms.
[0050] The heat pump unit 220 is a heat pump device operated by electricity. In the present application, the heat pump unit 220 is described as "HP" in the drawings. The heat pump unit 220 has a known heat pump circuit 221. The heat pump circuit 221 is a ring-shaped refrigerant circuit in which a compressor, a condenser, an expansion mechanism, and an evaporator are connected by refrigerant piping. In the heating mode, the condenser is formed by a first heat exchanger 222. The evaporator is arranged in the outdoor unit 223, although not shown. The compressor and the expansion mechanism are also arranged in the outdoor unit 223, although not shown. Here, an air heat pump is used as the heat pump circuit 221. The evaporator arranged in the outdoor unit 223 extracts heat from the outdoor air, which causes the refrigerant flowing in the heat pump circuit 221 to evaporate and flow to the heat exchanger 222 for condensation. In the condensation process, the heat of the refrigerant is transferred to a working fluid (described later). The compressor of the heat pump circuit 221 is preferably operated at variable frequency to allow operation at partial load. The outdoor temperature sensor may be provided in the outdoor unit 223 or may be located at a different location that provides a reliable measurement of the outdoor temperature.
[0051] The boiler unit 210, which is a combustion device, is a known gas-fired condensing boiler and has a burner 211 for heating a working fluid (described later). The burner 211 as a combustion unit heats the working fluid separately from the heat pump unit 220. Furthermore, the burner 211 operates to generate domestic hot water 240. The domestic hot water 240 is directly heated by the burner 211 through a pipe 251 when used. The boiler unit 210 has an inlet pipe 214 connected to an inlet of a second heat exchanger 211a heated by the burner 211. Furthermore, the boiler unit 210 has an outlet pipe 215 connected to an outlet of the second heat exchanger 211a.
[0052] The heat pump unit 220 has a first inlet pipe 225 and a first outlet pipe 228. The first inlet pipe 225 is connected to an inlet of the first heat exchanger 222 and a bypass pipe 226 that bypasses the first heat exchanger 222 via a three-way valve 227. The first outlet pipe 228 is connected to an outlet of the first heat exchanger 222 and the bypass pipe 226. The heat pump unit 220 further has a second inlet pipe 229. The second inlet pipe 229 is connected to the second outlet pipe 234 via a pump 235 and a flow rate sensor 236.
[0053] A three-way valve 216 and a bypass pipe 256 are disposed between the boiler unit 210 and the heat pump unit 220. The bypass pipe 256 is a pipe for bypassing the boiler unit 210. By bypassing the boiler unit 210, it is possible to heat a working fluid (described later) only by the heat pump unit 220.
[0054] The second outlet pipe 234 of the heat pump unit 220 is connected to the inlet pipe 238 of the heat release section 230. The outlet pipe 239 of the heat release section 230 is connected to the first inlet pipe 225 of the heat pump unit 220.
[0055] The first temperature sensor 241 is disposed in the inlet pipe 238 of the heat release section 230, or in the second outlet pipe 234 of the heat pump unit 220 located upstream thereof. The second temperature sensor 242 is disposed in the outlet pipe 239 of the heat release section 230, or in the first inlet pipe 225 of the heat pump unit 220 located downstream thereof. The third temperature sensor 243 is disposed in the first outlet pipe 228 of the heat pump unit 220.
[0056] The pipes 239, 225, 228, 214, 215, 229, 234 and 238 form a flow circuit 203a and direct a working fluid, such as water, to the heat discharge section 230. Here, water is used as the working fluid. A first temperature sensor 241 measures the temperature of the working fluid flowing into the heat discharge section 230 via the pipe 238. A second temperature sensor 242 measures the temperature of the working fluid flowing out of the heat discharge section 230. A third temperature sensor 243 measures the temperature of the working fluid downstream of the first heat exchanger 222 of the heat pump unit 220. A pump 235 circulates the working fluid in the flow circuit 203a. A flow rate sensor 236 measures the flow rate of the working fluid.
[0057] (3-2) Heating control unit 280 The heating control unit 280 controls the compressor and expansion mechanism of the heat pump unit 220, the pump 235, the three-way valve 227, the burner 211 of the boiler unit 210, the three-way valve 216, and the like, in accordance with instructions and requests from the thermostat 232. The heating control unit 280 is realized by a computer. The heating control unit 280 includes a control arithmetic device and a storage unit 294. A processor such as a CPU or a GPU can be used for the control arithmetic device. The control arithmetic device reads out a program stored in the storage unit 294, and performs predetermined image processing and arithmetic processing according to the program. Furthermore, the control arithmetic device can write the calculation result to a storage device and read out information stored in the storage unit 294 according to the program. Each unit 281, 282, 291, and 293 of the heating control unit 280 in FIG. 6 indicates various functional blocks realized by the control arithmetic device. The storage unit 294 can be used as a database.
[0058] As shown in FIG. 6, the heating control unit 280 has an upper limit value acquisition unit 281, an operation control unit 282, a first calculation unit 291, a third calculation unit 293, and a storage unit 294.
[0059] (3-2-1) Upper limit acquisition unit 281 The upper limit value acquisition unit 281 acquires the upper limit value of power consumption for each time period imposed on the heating system 203, which has been determined by the power management apparatus 10. Specifically, a "control request" is sent from the control request sending unit 15d of the power management apparatus 10 to the control device 30 to make the power consumption of the heating system 203 of each building less than a predetermined upper limit value, for example, between 1 pm and 2 pm. The control device 30 then sends the upper limit value of power consumption set for the heating system 203 to the upper limit value acquisition unit 281. This is acquired by the upper limit value acquisition unit 281.
[0060] As described above, the power management device 10 determines the upper limit of power consumption for each facility device 20, including the heating system 203, by time period, based on the power supply amount determined according to the status of the operating power generation facility and the predicted power demand. Specifically, the power adjustment determination unit 15b determines the adjustment amount, adjustment time, and adjustment period required to reduce power consumption, and the control request sending unit 15d sends a "control request" to the control device 30, urging the adjustment of the power consumption amount.
[0061] (3-2-2) First Calculation Unit 291 The first calculation unit 291 calculates the total carbon dioxide emission amount based on information on the amount of carbon dioxide emission during power generation per unit of power supply. In the drawings of this application, carbon dioxide is described as "CO2" and carbon dioxide emission amount is described as "CO2 emission amount." The total carbon dioxide emission amount is the sum of the amount of carbon dioxide emission associated with power consumption due to the operation of the heat pump unit 220 and the amount of carbon dioxide emission caused by fuel combustion during the operation of the boiler unit 210. Information on the amount of carbon dioxide emission during power generation per unit of power supply is periodically obtained by the heating control unit 280 from the power management device 10 via the control device 30.
[0062] The amount of carbon dioxide emissions during power generation per unit of power supply varies depending on which of the power generation facilities of the power company 1a are in operation and the operating rate of each power generation facility. For example, when the proportion of solar power generation and wind power generation is high and the proportion of thermal power generation is low, the amount of carbon dioxide emissions per unit of power supply is small. Conversely, when thermal power generation is the main source of power generation, the amount of carbon dioxide emissions per unit of power supply is large. Furthermore, the amount of carbon dioxide emissions caused by power consumption due to the operation of the heat pump unit 220 is small when the heat pump unit 220 can be operated under ambient conditions with a good COP (Coefficient Of Performance), but is large when the COP of the heat pump unit 220 is poor, such as when the outdoor air temperature is low.
[0063] (3-2-3) Third Calculation Unit 293 The third calculation unit 293 calculates a first running cost required for operating the heat pump unit 220 and a second running cost required for operating the boiler unit 210. Specifically, the first running cost is the cost of electricity required for operating the heat pump unit 220. The second running cost is the cost of fuel (gas, etc.) required for operating the boiler unit 210. The third calculation unit 293 calculates the first running cost and the second running cost, for example, as shown in International Publication No. WO2012 / 077333 (Publication date: June 14, 2012).
[0064] (3-2-4) Operation control unit 282 The operation control unit 282 controls the operation of the heat pump unit 220 so that the power consumption of the heat pump unit 220 does not exceed the upper limit during the first time period in which the heating system 203 needs to maintain the upper limit of power consumption. For example, the operation control unit 282 reduces the capacity of the compressor of the heat pump unit 220 to suppress the power consumption of the heat pump unit 220.
[0065] The first time period is determined based on the adjustment time and adjustment period of the above-mentioned "control request." The upper limit of power consumption is determined based on the amount of adjustment required to reduce power consumption in the above-mentioned "control request."
[0066] During the first time period, when the amount of heating of the working fluid by the heat pump unit 220 alone is insufficient, the operation control unit 282 operates the boiler unit 210 to provide the insufficient amount of heating by suppressing the power consumption of the heat pump unit 220 so as not to exceed an upper limit value, and activates the burner 211.
[0067] During a second time period when it is not necessary to maintain the upper limit value of power consumption, the operation control unit 282 determines the ratio between heating of the working fluid by the heat pump unit 220 and heating of the working fluid by the boiler unit 210, and controls the operation of the heat pump unit 220 and the boiler unit 210 so as to reduce the total amount of carbon dioxide emissions.
[0068] The operation control unit 282 determines the ratio between heating of the working fluid by the heat pump unit 220 and heating of the working fluid by the boiler unit 210 so that the sum of the first running cost and the second running cost is small during a third time slot in which it is not necessary to maintain the upper limit value, and controls the operation of the heat pump unit 220 and the boiler unit 210. The operation control unit 282 performs an operation that reduces the running cost (operating cost), for example, as shown in International Publication No. WO2012 / 077333 (publication date: June 14, 2012).
[0069] Note that time periods other than the first time period are set as the second time period by default. The user can change the setting of part or all of the second time period to the third time period using the thermostat 232 or another setting device. When reducing running costs takes priority over reducing carbon dioxide emissions, the user can change part or all of the second time period to the third time period.
[0070] (3-2-4-1) Comparison between the second and third time slots A comparison between the control performed by the operation control unit 282 in the second time slot and the control performed by the operation control unit 282 in the third time slot is shown in Fig. 7 in the form of an HP operation ratio relative to the outdoor air temperature. The HP operation ratio is the ratio of the heating amount of the heat pump unit 220 to the total of the heating amount of the heat pump unit 220 and the heating amount of the boiler unit 210. As shown in Fig. 7, when the outdoor air temperature is low, the COP of the heat pump unit 220 is small, so the HP operation ratio is 0%, and the working fluid is heated only by the boiler unit 210. Conversely, when the outdoor air temperature is high, the COP of the heat pump unit 220 is large, so the HP operation ratio is 100%, and the working fluid is heated only by the heat pump unit 220.
[0071] The control performed by the operation control unit 282 in the second time slot is control that prioritizes suppression of carbon dioxide emissions. The control performed by the operation control unit 282 in the third time slot is control that prioritizes suppression of running costs. As shown in FIG. 7, even at the same outside air temperature, the HP operation ratio tends to be high in control that prioritizes suppression of carbon dioxide emissions, and the HP operation ratio tends to be low in control that prioritizes suppression of running costs. However, the graph shown in FIG. 7 is not always constant, but changes according to changes in the prices of electricity and fuel, the COP of the heat pump unit 220, the amount of carbon dioxide emissions during power generation per unit of power supply, etc.
[0072] (3-2-4-2) Control of the first time period Figure 8 is an example of the relationship between outdoor temperature and power consumption added below Figure 7. Up to a certain outdoor temperature, the power consumption increases as the proportion of HP operation increases. However, once the outdoor temperature rises above a certain point, the amount of heat required for heating decreases, so power consumption starts to decline.
[0073] The graph in Fig. 8 also shows the power consumption upper limit (the upper limit of power consumption set for the heating system 203) acquired by the upper limit acquisition unit 281. In a first time slot, which is an adjustment period of the "control request" sent from the control request sending unit 15d to the control device 30, the operation control unit 282 controls the operation of the heat pump unit 220 so that the power consumption of the heat pump unit 220 does not exceed the power consumption upper limit in Fig. 8. Then, as described above, in the first time slot, when the amount of heating of the working fluid is insufficient only by heating the working fluid by the heat pump unit 220, the operation control unit 282 operates the boiler unit 210 by the insufficient amount of heating by suppressing the power consumption of the heat pump unit 220 so as not to exceed the upper limit, and heats the working fluid by the burner 211.
[0074] In this way, in the second time slot, the HP operation ratio is determined so as to suppress carbon dioxide emissions from the heating system 203, and in the third time slot, the HP operation ratio is determined so as to suppress the running costs of the heating system 203, but based on this control, in the first time slot, the operation of the heat pump unit 220 is controlled so that the power consumption of the heat pump unit 220 does not exceed the power consumption upper limit. Then, in the first time slot, when the capacity of the heat pump unit 220 is reduced and the amount of heat required for heating cannot be secured, the operation control unit 282 starts the boiler unit 210 or increases the operation of the boiler unit 210 to make up for the lack of heat.
[0075] 9 shows a diagram (graph) comparing the HP operation ratio when "CO2 emission amount priority" control is being performed in the second time slot, which prioritizes suppression of carbon dioxide emissions, and the HP operation ratio when "power restriction" control is being performed in the first time slot upon receipt of a "control request." The HP operation ratio during "power restriction," indicated by the dashed line, is smaller than the HP operation ratio during "CO2 emission amount priority" control. The amount of heating by the heat pump unit 220 is reduced due to the power restriction, and the operation control unit 282 performs control to compensate for this amount by operating the boiler unit 210, so the HP operation ratio during "power restriction" is smaller.
[0076] Like Fig. 9, Fig. 10 shows a comparison between the HP operation ratio when "CO2 emission priority" control is performed in the second time slot and the HP operation ratio when "power limit" control is performed in the first time slot. Fig. 10 also shows a comparison between the HP operation ratio when "running cost priority" control is performed in the third time slot and the HP operation ratio when "power limit" control is performed in the first time slot. In both cases, during "power limit", the amount of heating by the heat pump unit 220 is reduced, and the operation control unit 282 performs control to compensate by operating the boiler unit 210, so the HP operation ratio is smaller.
[0077] (3-2-4-3) Relationship between each control by the operation control unit 282 and CO2 emission amount FIG. 11 is a diagram showing the relationship between each control by the operation control unit 282 and the amount of CO2 emissions. FIG. 11 shows the amount of CO2 emissions in six types of control: control of heating only by the boiler unit 210, control of heating only by the heat pump unit 220, control of "prioritizing running costs" in the third time slot, control of "power restriction" in the first time slot based on the control of "prioritizing running costs" in the third time slot, control of "prioritizing CO2 emissions" in the second time slot, and control of "power restriction" in the first time slot based on the control of "prioritizing CO2 emissions" in the second time slot. As shown in FIG. 11, when the amount of CO2 emissions in the control of heating only by the boiler unit 210 is set to 100, the amounts of CO2 emissions in the remaining five control cases are 95, 89, 89.5, 85, and 86, respectively. The graph in FIG. 11 shows the average values at several typical outside air temperatures.
[0078] (4) Features of Heating System 203 (4-1) In the heating system 203, during a first time period in which an upper limit value of power consumption (such as the power consumption upper limit shown in FIG. 8) needs to be observed, the operation of the heat pump unit 220 is controlled so as not to exceed the upper limit value. This suppresses the power consumption of the heat pump unit 220 during the peak time of power supply by the electric power company 1a in the area where the heating system 203 is installed, thereby maintaining a balance between the power supply and power demand in the area.
[0079] In addition, in this case, during a first time period (power adjustment period) when a "control request" is issued from the power management device 10 of the power company 1a, if the amount of heating of the working fluid by the heat pump unit 220 alone is insufficient, the boiler unit 210 is operated as an auxiliary. This allows users of the heating system 203 to receive heating and hot water without significantly reducing comfort.
[0080] (4-2) In the heating system 203, the upper limit acquisition unit 281 acquires information on the upper limit of power consumption provided by the power management device 10 of the power company 1a that supplies power to the heat pump unit 220. This enables the user or manager of the heating system 203 to cooperate with the power company 1a, which is the power supplier, in balancing the power supply and power demand in the area.
[0081] (4-3) Generally, the amount of carbon dioxide emissions caused by the operation of the heat pump unit 220 is less than the amount of carbon dioxide emissions caused by the operation of the boiler unit 210. In view of this, in the heating system 203, the heat pump unit 220 is operated preferentially in the "CO2 emission priority" control in the second time period, while the boiler unit 210 is operated to make up for the shortage of heating by suppressing the power consumption of the heat pump unit 220 to below the upper limit in the first time period in which the upper limit of power consumption is observed. In this way, the heating system 203 can effectively contribute to the reduction of carbon dioxide emissions on a global scale.
[0082] (4-4) In the heating system 203, during the second time period when it is not necessary to maintain the upper limit value of power consumption, the operation of the heat pump unit 220 and the boiler unit 210 is controlled so as to reduce the total carbon dioxide emission amount described above. As a result, even during the second time period, the heating system 203 effectively contributes to the reduction of carbon dioxide emission amount on a global scale.
[0083] (4-5) In the heating system 203, basically, a time period other than the first time period is set as the second time period. However, the user can change a part or all of the second time period to the third time period. In this third time period, the heat pump unit 220 and the boiler unit 210 are operated so that the sum of the first running cost, which is the electricity charge of the heat pump unit 220, and the second running cost, which is the fuel charge of the boiler unit 210, is reduced. In this way, in the heating system 203, if the user wishes, a part or all of the second time period in which the control of "prioritizing CO2 emissions" is performed can be changed to the third time period to perform operation of "prioritizing running costs". This allows the user to enjoy the benefit of cost reduction. In addition, in the first time period, as described above, it is possible to balance the power supply and power demand in the area.
[0084] (5) Modifications to heating systems (5-1) Variation A In the above embodiment, a heating system 203 is used in which a working fluid such as water flows through a flow circuit 203a and the room is heated via the circulating working fluid. Alternatively, as shown in Fig. 12, an air conditioning system 301 may be used in which heating is performed by heating air using a heat pump 302 and a combustion device 303.
[0085] The air conditioning system 301 shown in Figures 12 and 13 mainly comprises a heat pump 302 including a refrigerant circuit in which a refrigerant is sealed, a combustion device 303 that generates heat by flame, and a blower 304 that sends air heated by the heat pump 302 and the combustion device 303 to room R1.
[0086] The air conditioning system 301 includes a first unit 1A that houses the heat pump 302 user-side equipment, the combustion device 303, and the blower 304, and a second unit 1B that houses the heat pump 302 heat source-side equipment. The first unit 1A includes, for example, a user-side heat exchanger 342 of the heat pump 302, a furnace heat exchanger 356 of the combustion device 303, and the blower 304. The first unit 1A has an opening (air outlet H1) for sending out air. The air outlet H1 is connected to one end of the duct D1. The first unit 1A has an opening (air inlet H2) for taking in air to be sucked into the blower 304. The second unit 1B includes a heat source-side heat exchanger 323 of the heat pump 302. A microcomputer and various electric components for controlling the operation of each part of the air conditioning system 301 are arranged in one or both of the first unit 1A and the second unit 1B.
[0087] In the air conditioning system 301, the first unit 1A, the second unit 1B, and the refrigerant connection pipes 306 and 307 constitute a refrigerant circuit of a heat pump 302. During operation, the heat pump 302 performs a vapor compression refrigeration cycle in the refrigerant circuit, and heats or cools the air sent to the duct D1. The combustion device 303 heats the air sent to the duct D1 by a heat source (specifically, heat from the combustion of fuel) different from the heat pump 302.
[0088] The air conditioning system 301 can be installed in a building such as a house in various configurations, such as a ducted split type or a rooftop type. For example, when the air conditioning system 301 is installed in a house 400 in the configuration shown in Fig. 13, the first unit 1A and the second unit 1B are arranged separately. In Fig. 13, the first unit 1A is installed in a basement B1, the second unit 1B is installed outdoors, and the first unit 1A and the second unit 1B are connected by refrigerant connection pipes 306 and 307. The dashed arrow in Fig. 13 indicates the flow direction of air sent from the air conditioning system 301 to a room R1 through a duct D1.
[0089] 12 and 13, the power consumption of the heat pump 302 is suppressed during peak power supply times, maintaining a balance between the local power supply and power demand, as in the heating system 203. When the amount of heating of the working fluid by the heat pump 302 alone is insufficient, the combustion device 303 is operated as an auxiliary, allowing the user to enjoy heating without significantly reducing comfort.
[0090] (5-2) Variation B In the above embodiment, a power meter 7 is installed in each of the buildings A and B, and the control device 30 controls the facility equipment 20 in response to a "control request" sent from the control request sending unit 15d of the power management device 10. This maintains a balance between the power supply and power demand in the area. The heating system 203 does not have its own power measuring device, and estimates the power consumption of the heat pump unit 220 from the compressor capacity, etc., when controlling the power consumption of the heating system 203 to be less than a predetermined upper limit.
[0091] Alternatively, the heating system 203 may be provided with its own power meter 7, and the heat pump unit 220 may be operated so that the reading of the power meter 7 does not exceed the upper limit of the power consumption of the heat pump unit 220.
[0092] (5-3) Variation C In the above embodiment, the power management device 10 of the power company 1a sends a "control request" to the control device 30 of each of the buildings A and B to encourage adjustment of power usage. However, the main entity of the service for balancing power supply and power demand is not limited to the power company 1a. For example, a so-called aggregator may be the main entity of the energy management service. The aggregator is a service provider that receives instructions such as power saving and output control from the power company and sends a "control request" to power consumers such as each of the buildings A and B to encourage adjustment of power usage. In this case, the upper limit acquisition unit 281 of the heating system 203 indirectly acquires the "control request" to encourage adjustment of power usage from the aggregator.
[0093] In the above embodiment, the control device 30 and heating system 203 of each of the buildings A and B are connected to the power management device 10 of the power company 1a via the Internet 101a, but they do not have to be connected. If they are not connected, for example, a "control request" for adjusting the amount of power usage for the next day will be manually input in the control device 30 or the heating system 203.
[0094] (5-4) Variation D In the above embodiment, the upper limit acquisition unit 281 indirectly acquires the upper limit of power consumption of the heating system 203 from the power management device 10 of the power company 1a.
[0095] Alternatively, a second calculation unit 292 (see the dashed line in FIG. 6) that calculates the upper limit of power consumption of the heating system 203 so as to reduce the total carbon dioxide emission may be provided in the heating control unit 280. The second calculation unit 292 can be provided as a functional block realized by a control and arithmetic device of the heating control unit 280. Information required for calculating the upper limit of power consumption of the heating system 203 is preferably stored in advance in the storage unit 294, but may be manually input by the user.
[0096] Not only the boiler unit 210, which is generally recognized as having a large amount of carbon dioxide emissions, but also the heat pump unit 220 emits carbon dioxide when the electricity it consumes is generated (when generating electricity). Oil is burned in thermal power generation, and power generation devices that use natural energy also emit carbon dioxide during the manufacturing process of the device. In view of these facts, in modification D, the second calculation unit 292 calculates the upper limit of power consumption so that the total carbon dioxide emissions are reduced. The heating system of modification D having the second calculation unit 292 can effectively contribute to reducing carbon dioxide emissions on a global scale even when it is not connected to the power management device 10 of the power company 1a.
[0097] (5-5) Variation E In the above embodiment, water is used as the fluid to be heated, but antifreeze may be used instead of water.
[0098] (5-6) Although the embodiments of the fluid heating system have been described above, it will be understood that various changes in form and details can be made without departing from the spirit and scope of the fluid heating system described in the claims. [Explanation of symbols]
[0099] 10 Power management device (external device) 203 Heating systems (fluid heating systems) 203a Flow circuit (flow path) 210 Boiler unit (combustion equipment) 211 Burner (combustion section) 220 Heat pump unit (heat pump device) 221 Heat pump circuit (refrigerant circuit) 280 Heating control unit (control unit) 281 Upper limit acquisition unit 282 Operation control unit 291 First Calculation Section 292 Second Calculation Section 293 Third Calculation Section 301 Air Conditioning System 302 Heat Pump 303 Combustion Equipment [Prior art documents] [Patent documents]
[0100] [Patent Document 1] Patent No. 5597767
Claims
1. A heat pump device (220) having a refrigerant circuit (221) through which a refrigerant circulates and operated by electric power; A flow path (203a) through which a fluid to be heated by the refrigerant flows; A combustion device (210) having a combustion section (211) and operating to heat the fluid separately from the heat pump device; A control unit (280); A fluid heating system comprising: The control unit is a first calculation unit that calculates a total amount of carbon dioxide emissions, which is the amount of carbon dioxide emissions due to operation of the heat pump device and the combustion device, based on information on which power generation facilities of a power company are in operation and on the amount of carbon dioxide emissions during power generation per unit of supplied power, which varies depending on which power generation facilities are in operation and the operation rate of each of the power generation facilities; A second calculation unit that calculates an upper limit of power consumption so as to reduce the total amount of carbon dioxide emission; an upper limit value acquisition unit (281) that acquires the upper limit value of power consumption from the second calculation unit; an operation control unit (282) that controls an operation of the heat pump device so that the power consumption of the heat pump device does not exceed the upper limit during a first time period in which the upper limit value needs to be maintained, and operates the combustion device when the amount of heat of the fluid is insufficient only by heating the fluid by the heat pump device; having The control unit periodically obtains information on the amount of carbon dioxide emission during power generation per unit of power supply from a power management device. A fluid heating system (203).
2. When the amount of heat of the fluid is insufficient only by heating the fluid by the heat pump device during the first time period, the operation control unit (282) operates the combustion device to heat the fluid by the insufficient amount of heat by suppressing the power consumption of the heat pump device to be equal to or less than the upper limit value. The fluid heating system of claim 1 .
3. the fluid is water; The water heated in the flow path is used for heating and / or hot water supply. The fluid heating system according to claim 1 or 2.
4. the fluid is air; The air heated in the flow path is used for heating. A fluid heating system according to any one of claims 1 to 3.
Citation Information
Patent Citations
Mixing adderrsubtracter circuit
JP1980097767A
Hot water supply space heating system
JP2012092997A
Air conditioning system
JP2015132411A
Control unit, hot water supply and heating system, control method, and program
JP2017048991A
Control system, hybrid system, control method and control program
JP2019143913A