Earthmoving machine and method for creating foundations in soil
Patent Information
- Application Number
- JP2023159971
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2023-08-01
- Filing Date
- 2023-09-25
- Publication Date
- 2025-03-14
- Estimated Expiration
- 2043-09-25
AI Technical Summary
【0032】 本発明は、地盤内の基礎を特に効率的に且つ計画に従い造成できる土木機械及び方法を提供することができる。
Smart Images

Figure 0007645954000001 
Figure 0007645954000002
Abstract
Description
[Technical field]
[0001] The present invention relates to a civil engineering machine for creating foundations in the ground, configured to create holes in the ground to a specified target depth for forming at least one foundation element in the ground or to directly introduce at least one foundation element into the ground up to the specified target depth, comprising in particular a control unit in which the target depth can be entered and a display device, in particular a screen, with which the control unit can display data about the operation of the civil engineering machine, according to the preamble of claim 1.
[0002] The invention further relates to a method for creating a foundation in the ground, comprising creating holes in the ground to a specified target depth for forming at least one foundation element in the ground or directly introducing at least one foundation element into the ground to a specified target depth, in particular inputting the target depth into a control unit of the earthmoving machine and causing the control unit to display data for operating the earthmoving machine on a display device, in particular a screen, of the earthmoving machine, according to the preamble of claim 15. [Background technology]
[0003] Civil engineering machines and methods for creating foundations in the ground have been known for some time. A foundation element can be created, for example, by creating a hole in the ground, such as a drill hole or a kerf, then filling it with a hardening medium, in particular cement, and creating a foundation pile or a diaphragm wall segment thereon, possibly in combination with additional reinforcement. A foundation element can also be created, for example, by driving or vibrating a foundation pile or screed. The foundation element according to the invention is not limited to a load-bearing or load-bearing capacity function, but can alternatively or additionally also assume a sealing function and / or other tasks, as is known, for example, in the case of construction pit enclosures with diaphragm walls from special civil engineering.
[0004] Today, known earth moving machines are equipped with an electronic control unit that facilitates the operation of the earth moving machine by the machine operator and can even take over part or all of the operation automatically. Various operating data are recorded via sensors and fed to the control unit. Control commands can be issued via corresponding data lines to corresponding actuators, in particular drives and working cylinders.
[0005] Such construction machines are known, for example, from US Pat. No. 5,399,633 and US Pat. No. 5,499,623.
[0006] Timely completion of foundation works is crucial for efficient workflow on the construction site. Time delays in foundation works can lead to time delays for subsequent subsections. [Prior art documents] [Patent documents]
[0007] [Patent Document 1] European Patent Application Publication No. 3299523 (A1) [Patent Document 2] European Patent Application Publication No. 3296467 (A1) Summary of the Invention [Problem to be solved by the invention]
[0008] The object underlying the invention is to provide an earth-moving machine and a method with which foundations in the ground can be constructed particularly efficiently and in a planned manner. [Means for solving the problem]
[0009] This object is achieved on the one hand by a construction machine having the features of claim 1 and on the other hand by a method having the features of claim 15. Preferred embodiments of the invention are set out in the dependent claims.
[0010] A feature of the civil engineering machine according to the invention is that the calculation device is provided, in particular as part of the control unit, and is adapted to calculate an estimated time to reach the input target depth on the basis of the input target depth and as a function of input parameters for the foundation construction, and to display said estimated time to reach the target depth on the display device, preferably such parameters being input or capable of being input into the control unit.
[0011] The basic idea of the invention is to display on a display device, preferably by a control unit, a predicted time to reach the target based on an input target depth of the foundation element to be created for the machine operator and / or for one or several other persons, for example the foreman or site manager. The time to reach the target can be calculated by a calculation device, preferably by a control unit, depending on stored parameters. In the simplest case, the average advance speed of the used civil engineering machine and / or the used tool is stored as a parameter. The calculated time to reach the target can be calculated once at the beginning of the work or several times during the work and can be updated and specified if necessary. This time to reach the target includes the time to reach the target depth and, if necessary, can include information on additional time to complete the measurement of the foundation.
[0012] For example, specifying a target time makes it easier for machine operators to operate the earthmoving machine and for others to plan the construction site. It allows a better estimation of whether and, if so, how many foundation elements can be completed by the end of a shift. The determination of the target time also allows the coordination of further operational actions, such as the supply of reinforcing cages, the supply of hardening media, in particular mortar or cement slurry, and / or the distribution of further construction materials and / or foundation elements for later works.
[0013] According to a further development of the invention, a particularly accurate calculation of the expected target time is achieved by including in the parameters values for one or more of the following: soil type, soil profile, construction method, construction tool, machine type, drive force, rotational speed and / or torque of the drive, rotational speed of the construction tool, feed force and / or feed rate. The corresponding values of these parameters can be entered or queried beforehand by the machine operator and / or the main office, or can be recorded and stored by the machine itself before or during operation.
[0014] The information on the type of ground can include, inter alia, information on the ground strength and thus the expected advance speed. If a ground profile is entered, it can be taken into account that the ground can be multi-layered with layers of different strengths. With regard to the construction method, basic construction procedures can be stored, for example whether continuous drilling with an endless auger or discontinuous drilling with a drilling bucket is planned. Data on the dimensioning and / or conditions, in particular data on the actual or expected wear state of the construction tools, can also have an influence on the advance speed. The same applies for various machine performance data relating to the rotation speed and / or torque of the drive, the rotation speed of the construction tool, the feed force and / or the feed rate or feed rate. When determining the target arrival time, other parameters can also be taken into account that can affect the construction speed when constructing the foundation element. The parameters can be related to the measured or calculated tool wear. For example, it can be taken into account whether the tool or the tool set needs to be changed and this can be incorporated into the calculation of the target arrival time.
[0015] According to an advantageous embodiment of the invention, a computing device is advantageously arranged integrated in or separate from the control unit of the construction machine, with the computing device communicating with the control unit via a data transmission device. The computing device may be integral with the control unit of the construction machine. However, the computing device can also be formed partly or entirely separate from the construction machine, for example on a mobile computer such as a laptop or tablet computer, or at a remote location, such as the site manager's office or a central office, preferably with a wireless data connection or connection via the Internet.
[0016] According to a further development of the invention, it is expedient if the control unit or the calculation unit is arranged to automatically detect the parameters by means of one or more sensor devices and / or to retrieve the parameters from a database on-machine and / or off-machine. In particular, the control unit can detect and determine the construction speed until a first depth, which is shallower than the target depth, is reached. Based on the first construction step until the first distance is reached, the control unit can perform an estimation until the target depth is reached.
[0017] At the construction site, the working speed of the construction of previous foundation elements can also be used to calculate the future target time. The corresponding data can also be obtained from the main office, especially if the construction site is large and several identical or similar earthmoving machines are used there. Data and information on the soil geology can be recorded by the machine itself or can be obtained from an external database, for example a database that is usually prepared for construction sites and in which data from soil expertise are stored. The more complete the recorded or stored data on the parameters, the more accurately the target time can be predicted.
[0018] In principle, the target time needs to be determined only once at the beginning of the process. In one embodiment of the present invention, it is advantageous for a particularly precise determination of the target time to be made if the control unit is configured to adapt the parameters to changing conditions during foundation construction and to calculate the expected target time on the basis of an updated database and display it on the display device. The target time can be recalculated continuously. It is preferable for the recalculation to be carried out at predetermined time intervals, for example within the range of a few seconds or minutes.
[0019] According to a further development of the invention, it is particularly useful for an operator, for example, to be able to indicate the expected time to reach the target by displaying the amount of time to reach the target and / or the date and time when the target is reached. Such an indication of the expected time to reach the target makes it possible, in particular, to coordinate further actions to be started or prepared during the construction of the foundation element or when the target depth is reached, or to schedule necessary breaks in the work. In addition to the time indication, it is also useful to display the "current work depth" and / or the "remaining depth until the target depth is reached".
[0020] A further preferred embodiment of the invention is that a data transmission device is arranged which can transmit parameters "from the external machine database or main office to the control unit" and / or "from the control unit to the external machine database or main office". In principle, the machine operator can also manually input the target depth and / or the parameters via an input device, e.g. a keyboard. However, data input can also be performed in any other suitable way, e.g. input from a data carrier or by data transmission from a data storage device inside or outside the machine by cable or wirelessly. The data transmission device can be operated appropriately for wired and / or wireless data transmission.
[0021] According to a further embodiment variant of the invention, it is advantageous if the control unit or the calculation unit is adapted to display additional time indications for actions to be performed or recommended actions on the display device as a function of the expected target arrival time. In this way, the control unit can indicate the time or moment at which a further material order is indicated, for example for a mortar or cement suspension, for a reinforcing cage and / or for further foundation piles or planks. In particular, it is preferred that the control unit triggers the corresponding action "automatically" and / or "after release by the machine operator, in particular after release with the intervention of the main office". In this way, the workflow on the construction site can be made even more efficient.
[0022] The target time to delivery can be sent to a remote master office, particularly a site management master office or master site office, to manage and control the construction process.
[0023] According to a further development of the invention, a further improvement of the construction process can be achieved in that the control unit is configured in such a way that the actions displayed on the display device can be directly seen and initiated by the machine operator. In this context, the display device can in particular be configured as a "touch screen" or a "cursor or mouse-operated screen", the actions displayed on the display device being configured as active control fields. These actions can be initiated or triggered by a simple touch in the case of a touch screen or by a click in the case of a cursor.
[0024] In a further preferred embodiment of the invention, the control unit or the calculation device is arranged to determine the actual construction time when the target depth is reached, to compare it with the calculated predicted target time and to take the result of the comparison into account when calculating the predicted target time for the construction of the subsequent foundation. By comparing the actually achieved arrival time with the previously calculated target time, a further improvement in the accuracy of the determination of the target time can be achieved. It is further preferred if an analysis of the causes of the deviation between the actual time and the target time can be determined by a corresponding artificial intelligence computer program and can then be taken into account in the determination of the subsequent target time.
[0025] In principle, the earthmoving machine can be configured in any known manner that can be used to create a foundation in the ground. According to one embodiment of the present invention, the earthmoving machine comprises a mobile transport device, a mast or boom arm arranged on the transport device, and an earthmoving tool adjustably arranged on the mast or boom arm for carrying out the earthmoving work to create the foundation and in particular to reach a target depth.
[0026] The mobile transport device can have, inter alia, a crawler chassis or a wheeled chassis. The mast, in particular a mast that can be positioned approximately vertically during construction, can be a simple mast, a leader mast or a telescopic leader. The boom arm can, in particular, be arranged on the transport device so that it can be swiveled about a horizontal pivot axis. The transport device can, in particular, comprise an upper carriage mounted on a lower carriage so that it can be swiveled about a vertical pivot axis. In particular, drilling tools, mixing tools, diaphragm wall grabs or cutting wheels can be provided as earthwork tools. In principle, screeds or piles can also be provided as earthwork tools, provided that they can be directly introduced into the ground while displacing the soil material. The piles can, in particular, be configured as driving piles or vibrating piles with corresponding pile tips. The foundation elements to be introduced can also be configured as piles or support tubes.
[0027] The earth-moving machine according to the invention can preferably be configured as a drilling rig, a trench cutter, a grab excavator, a pile driver or a vibrator. Firstly, the drilling rig and the trench cutter can be used to create a hole in the ground and then to place or form a foundation element in the hole. In particular, the hole in the ground, preferably created by drilling, gripping or cutting, i.e. removing, can be filled with a hardening suspension, optionally with one or several reinforcing elements, and the suspension can be hardened to form the foundation element. The hardening suspension can be prepared outside the hole and then placed in the hole, or it can be prepared in situ in the hole as a so-called base mortar, together with the removed soil material remaining in the hole, in other words decomposed soil material. A pile driver or a vibrator can directly drive an existing foundation element, in particular a pile or a screed, into the ground, in particular displacing the soil, to form the foundation element.
[0028] A feature of the method according to the present invention is that based on the input target depth, the control unit calculates an expected target arrival time depending on parameters that can be or are input to the control unit for the construction of the foundation, and displays the expected target arrival time on the display device.
[0029] In principle any suitable display device can be used, particularly preferably according to an embodiment of the invention the display device comprises at least one screen, data glasses, VR or AR glasses, a tablet, a smartphone, a head-up display and / or a glasses-type display.
[0030] Advantageously, according to a further development of the invention, the control unit or the calculation unit is arranged to dispatch or transmit the calculated target time to a main office or to a remote device, so that the information can be sent to any place where it is useful.
[0031] The method according to the invention can be carried out, inter alia, by means of the above-mentioned earth-moving machine according to the invention, and the above-mentioned advantages can be achieved. Effect of the Invention
[0032] The invention makes it possible to provide an earth-moving machine and method that allows for particularly efficient and planned construction of foundations in the ground. [Brief description of the drawings]
[0033] The invention will be further described below in connection with preferred embodiments which are illustrated diagrammatically in the drawings, in which: [Figure 1] 1 is a schematic side view of a construction machine according to the present invention; [Diagram 2] FIG. 2 is a schematic diagram of a control unit having a display device. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0034] The earthmoving machine 10 according to the invention, exemplarily configured in Fig. 1 as a drilling rig, has a lower carriage 12, preferably configured as a crawler chassis, and an upper carriage 14 rotatably mounted on the lower carriage. The lower carriage 12 and the upper carriage 14 form a transport device 15. A drive unit and a control station for a machine operator of the earthmoving machine 10 can be arranged on the upper carriage 14 in a known manner. A control unit and a display device, in particular a screen, can be arranged in the driver's cab.
[0035] A substantially vertical mast 18 having an upper masthead 19 can be adjustably mounted to the front of the upper carriage 14 via an articulation system 16 having a neck cylinder. A slide 20 can be slidably guided along the front of the mast 18. The slide 20 can be provided with a first auger drive 22 including a hydraulic motor 24. Furthermore, a second drive 26 with a cylindrical pivot connection 27 may be provided on the slide 20 in order to establish a torque-proof connection with the support tube 4. The second drive 26 may, for example, essentially consist of a transmission connection to the first auger drive 22 with a hydraulic motor 24 so as to apply a torque to the pivot connection 27 and thus to the support tube 4.
[0036] The substantially cylindrical first auger drive 22 can be passed through by a drill string 30, which can be configured, for example, as a Kelly linkage with an outer drive bar. Here, the drill string 30 has an upper suspension 32, by means of which the drill string 30 can be connected to a main cable 39. The main cable 39 can be guided by a pulley on the masthead 19 to a main winch 38 on top of the upper carriage 14. By operating the main winch 38, the drill string 30 can be moved vertically.
[0037] The slide 20 is connected to a feed cable 37 which is guided along the mast 18 above and below the slide 20 and can be actuated by a feed winch 36 which can move the slide 20 up and down along the guide of the mast 18.
[0038] Attached to the underside of the drill string 30 is an earth moving tool 34 for removing earth material, which in the exemplary embodiment shown in Figure 1 is configured as a drilling bucket. The diameter of the drilling tool is configured to allow it to be inserted into the internal cavity of the support tube 4.
[0039] A borehole may be created in the ground 1 using the earth moving machine 10. A hardenable material may be introduced into the borehole to form a foundation element in the ground 1, which is then hardened to form the foundation element. The support tube 4 may remain in the borehole as part of the foundation element, but is preferably removed from the ground 1 prior to hardening.
[0040] 2 shows an arrangement of a control unit 40 for a construction machine 10 according to the invention, in which the control unit 40 is connected by cable or wirelessly to a display device 50. The display device 50 can be configured inter alia as a screen, by means of which data regarding the operation of the construction machine 10 can be displayed in the cab of the construction machine 10.
[0041] The input device 41, which may be configured, by way of example only, as a keyboard, may be used to input a target depth during the creation of the foundation in the soil 1 into the control unit 40. Based on the input target depth and depending on the parameters of the creation of the foundation, a target arrival time for reaching the input target depth may be calculated by the control unit 40 and displayed for the machine operator on the display device 50. To determine the target arrival time, the control unit 40 may take into account parameters which may be input to the control unit 40 via various paths and / or sources.
[0042] To calculate the target time, the parameters may be provided to the control unit 40 via input device 41, from on-machine data storage 42, from off-machine data storage 44 or a central station, and / or directly from various sensor devices 48 on the earthmoving machine 10. The target time may be displayed to the machine operator via display device 50 who can then use the information to operate the earthmoving machine 10 efficiently.
Claims
1. 1. A machine for constructing a foundation in a ground (1), the machine being configured to construct holes in the ground (1) down to a specified target depth for forming at least one foundation element in the ground (1) or to directly introduce at least one foundation element into the ground (1) up to the specified target depth, A control unit (40); a display device (50) on which the control unit (40) can display data about the operation of the earthmoving machine (10); A civil engineering machine comprising: a calculation device is arranged and configured to calculate a predicted target arrival time required to reach the input target depth based on the input target depth and in response to input parameters related to the foundation construction, and to cause the display device (50) to display the predicted target arrival time; The control unit (40) or the computing device is further configured to display on the display device (50) time indication information for ordering construction materials for a later work depending on the predicted target arrival time.
2. 2. A civil engineering machine according to claim 1, Ground type, ground profile, construction method, earth moving tool (34), machine type, drive force, rotation speed of the drive (22, 26), rotation speed of said earth moving tool (34), feed force and / or feed rate, The input parameters include values for one or more of the following:
3. 2. A civil engineering machine according to claim 1, The civil engineering machine (10), characterized in that the computing device is integrated into the control unit (40) of the civil engineering machine (10) or is arranged separately from the control unit, and the computing device communicates with the control unit (40) via a data transmission device.
4. 2. A civil engineering machine according to claim 1, A civil engineering machine, characterized in that the control unit (40) or the computing device is configured to automatically record parameters by means of one or more sensor devices (48) and / or to retrieve parameters from an internal and / or external data storage device (42, 44).
5. 2. A civil engineering machine according to claim 1, The control unit (40) or the computing device is configured to adapt the input parameters to changes in conditions during the construction of the foundation, calculate the predicted target arrival time based on an updated database, and display the calculated time on the display device (50).
6. 2. A civil engineering machine according to claim 1, 2. A construction machine comprising: a work area for moving a workpiece to a target depth of about 100 mm; a work area for moving a workpiece to a target depth of about 100 mm;
7. 2. A civil engineering machine according to claim 1, 1. A civil engineering machine comprising: a data transmission device arranged to transmit parameters from an external data storage device (44) or a main office to said control unit (40) and / or from said control unit (40) to said external data storage device (44) or a main office.
8. 2. A civil engineering machine according to claim 1, 13. A construction machine, comprising: a control unit (40) or a computing device configured to allow an operator to directly view and initiate the order for construction materials displayed on the display device (50).
9. 2. A civil engineering machine according to claim 1, The control unit (40) or the computing device is configured to determine an actual construction time for reaching the target depth, compare it with the calculated predicted target reaching time, and take the comparison result into account when calculating the predicted target reaching time for constructing a subsequent foundation.
10. 2. The earth moving machine according to claim 1, further comprising: A movable conveying device (15); a mast (18) or boom arm disposed on the carrier device (15); a civil engineering tool (34) adjustably positioned on the mast (18) or the boom arm to perform civil engineering work to create the foundation and reach the target depth; and A civil engineering machine (10) comprising:
11. 2. A civil engineering machine according to claim 1, 1. An earth moving machine (10) configured as a drilling rig, a trench cutter, a grab excavator, a pile driver or a vibrator.
12. 2. A civil engineering machine according to claim 1, 10. A construction machine comprising: a display device (50) comprising at least one screen, data glasses, VR or AR glasses, a tablet, a smartphone, a head-up display and / or a glasses-type display.
13. 2. A civil engineering machine according to claim 1, 13. An earth moving machine, comprising: a control unit (40) or a computing device configured to dispatch or transmit the calculated predicted target arrival time to a main office or a remote device.
14. 2. A method for constructing a foundation in ground (1) by means of a civil engineering machine (10) according to claim 1, creating a hole in the ground (1) down to a specified target depth for forming at least one foundation element in the ground (1) or directly introducing at least one foundation element into the ground (1) up to the specified target depth; and displaying data for operating the civil engineering machine (10) on a display device (50) of the civil engineering machine (10) by a control unit (40); 1. A method comprising: Based on the specified target depth, a calculation device calculates a predicted target arrival time according to input parameters related to the foundation construction, and displays the calculated time on the display device (50) for the machine operator; The method further comprises displaying on said display device (50) time indication information for ordering construction materials for a later construction project in response to said predicted target time.
Citation Information
Patent Citations
rig for creating a cased bore and method of operating a rig
DE102015105908A1
Excavation equipment and method
EP3296467A1
Method and construction devicefor soil cultivation
EP3299523A1
Management system for agitating and mixing apparatus
JP2010048068A
Construction time forecasting system for construction machine
JP2018044415A