Power management system

The power management system optimizes electric vehicle energy management by controlling non-overlapping learning and charging/discharging timings to ensure sufficient power supply, addressing the issue of simultaneous current sensor offset learning in multiple vehicles.

JP7835203B2Active Publication Date: 2026-03-25TOYOTA JIDOSHA KK
View PDF 5 Cites 0 Cited by

Patent Information

Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2023-06-21
Publication Date
2026-03-25

AI Technical Summary

Technical Problem

When multiple electric vehicles learn the offset value of a current sensor at the same timing, the charge/discharge current becomes zero, potentially leading to insufficient charging or discharging power for energy management.

Method used

A power management system that controls a plurality of electric vehicles to determine non-overlapping learning and charging/discharging start timings to minimize the number of vehicles learning at the same time, ensuring adequate power supply for energy management.

Benefits of technology

Facilitates effective energy management by suppressing excessive power decreases, maintaining power within acceptable ranges during contract periods.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007835203000001
    Figure 0007835203000001
  • Figure 0007835203000002
    Figure 0007835203000002
  • Figure 0007835203000003
    Figure 0007835203000003
Patent Text Reader

Abstract

To facilitate implementation of required energy management using a plurality of electric vehicles that learns current sensor offset values.SOLUTION: A power management system includes a plurality of electric vehicles and a control device that controls each of the plurality of electric vehicles. Each of the plurality of electric vehicles includes a power storage device and a current sensor that detects a charge and discharge current of the power storage device, and sets the charge and discharge current to zero at predetermined timing to learn an offset value of the current sensor (S11 to S15). When causing the plurality of electric vehicles to execute energy management through charging or discharging of the power storage device, the control device determines charge starting timing or discharge starting timing of each of the plurality of electric vehicles so that the number of electric vehicles executing learning at the same timing is equal to or less than a predetermined value (S21).SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to a power management system.

Background Art

[0002] Japanese Patent Application Laid-Open No. 2009-171666 (Patent Document 1) discloses a control device that starts charging a power storage device mounted on an electric vehicle and temporarily interrupts charging at predetermined time intervals to perform learning (learning of offset values) for output correction of a current sensor provided in a charge / discharge path of the power storage device.

Prior Art Documents

Patent Documents

[0003]

Patent Document 1

Summary of the Invention

Problems to be Solved by the Invention

[0004] In recent years, it has been proposed to perform energy management of a power system using a plurality of electric vehicles each equipped with a power storage device. However, when performing energy management by charging or discharging the power storage device on a plurality of electric vehicles, if a large number of electric vehicles perform learning of the offset value of the current sensor at the same timing, the charge / discharge current of the power storage device in each of these electric vehicles becomes zero (0 A), and there is a possibility that the charging power or discharging power is insufficient for the required energy management.

[0005] The present disclosure has been made to solve the above problems, and an object thereof is to facilitate execution of required energy management using a plurality of electric vehicles that learn the offset value of a current sensor.

Means for Solving the Problems

[0006] A power management system according to one embodiment of the present disclosure comprises a plurality of electric vehicles and a control device that controls each of the plurality of electric vehicles. Each of the plurality of electric vehicles has an energy storage device and a current sensor that detects the charging and discharging current of the energy storage device, and is configured to learn the offset value of the current sensor by setting the charging and discharging current to zero at a predetermined timing. When the control device causes the plurality of electric vehicles to perform energy management by charging or discharging the energy storage device, it determines the charging start timing or discharging start timing for each of the plurality of electric vehicles so that the number of electric vehicles performing learning at the same timing is less than or equal to a predetermined value. [Effects of the Invention]

[0007] According to this disclosure, it becomes easier to perform the required energy management using multiple electric vehicles that learn the offset values ​​of current sensors. [Brief explanation of the drawing]

[0008] [Figure 1] This figure shows an overview of the power management system according to an embodiment of the present disclosure. [Figure 2] This is a diagram illustrating an energy management method according to an embodiment of the present disclosure. [Figure 3] This figure shows a comparison of the actual adjusted power values ​​for the example, modified example, and comparative example. [Modes for carrying out the invention]

[0009] Embodiments of this disclosure will be described in detail with reference to the drawings. In the drawings, the same or corresponding parts are denoted by the same reference numerals, and their descriptions will not be repeated.

[0010] Figure 1 is a diagram showing an overview of a power management system according to an embodiment of the present disclosure. Referring to Figure 1, the power management system according to this embodiment performs energy management of a power grid PG. This power management system includes a vehicle group 10G including a plurality of vehicles 10, a vehicle group 20G including a plurality of vehicles 20, a supply and demand management system 100 (hereinafter referred to as "system 100"), a resource management system 200 (hereinafter referred to as "system 200"), an electric vehicle management system 300 (hereinafter referred to as "system 300"), a plurality of power supply equipment 510, and a plurality of power supply equipment 520. System 300 includes a processor 310 and a storage device 320. Although not shown in the diagram, systems 100 and 200 also include a processor and a storage device, similar to system 300.

[0011] The power grid (PG) is a power network constructed by transmission and distribution equipment. Multiple power plants are connected to the power grid (PG). Each of the power supply equipment 510 and 520 is electrically connected to the power grid (PG) and receives power from the power grid (PG). Each of the vehicles 10 and 20 is an electric vehicle (xEV) equipped with a power storage device and is configured to run using the discharged power from the power storage device. When vehicles 10 and 20 are electrically connected to the power supply equipment 510 and 520, respectively (plug-in state), they can charge their onboard batteries (power storage devices) using power supplied from the power grid (PG) through the power supply equipment 510 and 520 (power from outside the vehicle).

[0012] Vehicle 10 and power supply equipment 510 are, respectively, V1G type (a type that unilaterally receives power from the power grid PG). Power supply equipment 510 is, for example, a plug-in type power supply equipment. Vehicle 20 and power supply equipment 520 are, respectively, V2G type (a type that exchanges power in both directions with the power grid PG). Power supply equipment 520 is, for example, a cable-integrated type power supply equipment. Each of vehicles 10 and 20 is, for example, a BEV (electric vehicle). However, it is not limited to this, and the types of electric vehicles (xEVs) included in each of vehicle groups 10G and 20G are arbitrary.

[0013] System 300 is configured to communicate with each electric vehicle included in vehicle groups 10G and 20G. System 300 may communicate with vehicles 10 and 20 via wired connections through power supply equipment 510 and 520, respectively, or it may communicate directly with each of vehicles 10 and 20 via wireless communication. In addition, each electric vehicle user carries a user terminal 30. System 300 also communicates with the user terminal 30. The user terminal 30 is, for example, a smartphone, but may be any other device.

[0014] Each electric vehicle and each power supply facility shown in Figure 1 is registered in system 300. The storage device 320 stores information about each registered electric vehicle (specifications, location, status, etc.), distinguishing it by the electric vehicle's identification information (vehicle ID). In addition, each electric vehicle's user terminal 30 is also registered in system 300, linked to the vehicle ID. For example, when a user enters a driving plan or charging plan for an electric vehicle into the user terminal 30, that plan is registered in system 300, linked to the electric vehicle's identification information. The storage device 320 also stores information about each registered power supply facility (specifications, location, etc.), distinguishing it by the power supply facility's identification information.

[0015] Hereafter, all electric vehicles managed by System 300 will be collectively referred to as "electric vehicle resources." System 300 calculates the unadjusted charge / discharge power (reference value) and the amount of power that the electric vehicle resources can adjust relative to that reference value (charge / discharge capacity) and transmits this information to System 200. System 200 manages multiple distributed energy resources (hereinafter referred to as "DERs"), including electric vehicle resources. Hereafter, all DERs managed by System 200 will be collectively referred to as "EM resources." EM resources further include DERs other than electric vehicle resources (for example, stationary energy storage devices). With respect to EM resources, System 200 calculates the unadjusted charge / discharge power (reference value) and the amount of power that the EM resources can adjust relative to that reference value (charge / discharge capacity) and transmits this information to System 100. Based on the reference value and charge / discharge capacity received from System 200, System 100 conducts transactions in the electricity market. System 100 settles electricity transactions and manages transaction records. Below, we will explain tertiary adjustment power-2 as an example of a commodity traded in the electricity market.

[0016] Third-tier adjustment power-2 is traded in the supply and demand adjustment market. In the supply and demand adjustment market, trading of third-tier adjustment power-2 takes place for each of the eight blocks, which are divided into three-hour units, for example, by bidding. System 100 places bids in the supply and demand adjustment market during the period from 12:00 to 14:00 on the day before the target block. Specifically, System 100 transmits bidding information, including the product (e.g., third-tier adjustment power-2), block (one of the eight blocks), reference value, and bid amount, to the market system (not shown). The results are then notified to System 100 at 15:00 on the bidding day. If the bid for the product is successful, a contract is concluded. The person who successfully bids for third-tier adjustment power-2 in the supply and demand adjustment market is obligated (contractual obligation) to adjust the power within the range from the reference value (kW) to the contracted amount (kW) (contract adjustment range).

[0017] When System 100 wins a bid for a product, it registers the reference value in the market system by the submission deadline (for example, one hour before the start time of the block in which the bid was won). System 100 sequentially receives market request signals from the market system requesting energy management for the block in which the bid was won (the contract period). The market request signals indicate the power request value that the market system arbitrarily requests within the contract adjustment range. During the contract period, System 100 performs energy management so that the actual adjusted power follows the power request value.

[0018] The market system verifies every 30 minutes (frames) that System 100 (the successful bidder) is adjusting according to the commands (market request signals) within the agreed adjustment range (response performance) during the contract period. If the power requirement changes during the contract period, the successful bidder changes the output to that value within the response time for the product requirement. However, the output may deviate from the power requirement as long as it is within the acceptable range. Also, if the power requirement remains the same during the contract period, the successful bidder will continue to output according to that power requirement for at least the duration of the product requirement. For tertiary adjustment power-2, the response time is within 45 minutes, and the duration is 3 hours (6 frames). If the successful bidder uses an energy storage device to perform energy management, the successful bidder's output will be charging (increased demand) or discharging (increased supply) corresponding to the requested energy management (product). If non-conformity to the requirements is found, the successful bidder will be subject to a prescribed penalty fee.

[0019] In the example shown in FIG. 1, the period from time t1 to time t2 corresponds to the agreed period, and the range from the reference value to the agreed quantity Y corresponds to the agreed adjustment range. Line L10 shows the transition of the power demand value. Line L11 shows a power value (lower limit value of the allowable range) that is smaller than the power demand value by the allowable width. Line L12 shows a power value (upper limit value of the allowable range) that is larger than the power demand value by the allowable width. The allowable width is, for example, 10% of the agreed quantity Y. The market system transmits a market demand signal to the winning bidder at time t0, which is 45 minutes before the response time from time t1. In the example shown in FIG. 1, the initial power demand value is the agreed quantity Y, and the power demand value is changed at time t3. The range from time t0 to the time when the response time elapses (response allowance A), the range from time t3 to the time when the response time elapses (response allowance B), and the range corresponding to the allowable width shown by lines L11 and L12 (increase / decrease allowance) correspond to the range that satisfies the requirements (allowable range).

[0020] When system 100 receives a market demand signal, it determines the adjustment amount (upper instruction amount) necessary to execute the energy management required by the market demand signal, and based on the obtained upper instruction amount, determines the power demand value (resource instruction amount) required for the EM resource. Then, system 100 transmits a first request signal indicating the agreed requirements (agreed quantity, agreed period, allowable range, etc.) and the resource instruction amount to system 200. When system 200 receives the first request signal, it determines the adjustment amount (charge / discharge required amount) necessary for the resource instruction amount, and based on the obtained charge / discharge required amount, determines the power demand value (fleet instruction amount) required for the electric vehicle resource. Then, system 200 transmits a second request signal indicating the agreed requirements and the fleet instruction amount to system 300. System 300 controls the electric vehicle resource so that the energy management required by the second request signal is executed by the process shown in FIG. 2 described later. According to such a hierarchical structure (tree structure), energy management can be requested from many consumers. The EM resource may function as a VPP (virtual power plant).

[0021] FIG. 2 is a diagram for explaining the energy management method according to this embodiment. "S" in the flowchart means step.

[0022] Referring to FIG. 2, each of the vehicles 10 and 20 includes a battery 51 (drive battery), an ECU (electronic control unit) 52, a current sensor 53 for detecting a current flowing through the battery 51, a voltage sensor 54 for detecting the voltage of the battery 51, and a temperature sensor 55 for detecting the temperature of the battery 51. The detection results by each sensor are input to the ECU 52. The ECU 52 includes a processor and a storage device (not shown), and records the detection results by each sensor in the storage device. Also, in each of the vehicles 10 and 20, when charging and discharging of the battery 51 (specifically, charging of the battery 51 by power from outside the vehicle or discharging of the battery 51 to outside the vehicle) is started, the ECU 52 starts the processing flow of S11 to S15 described below.

[0023] In S11, the ECU 52 determines whether the learning timing has arrived. In this embodiment, learning for output correction of the current sensor 53 is periodically executed. The learning timing arrives every time a predetermined time elapses during charging and discharging of the battery 51. When the learning timing arrives (YES in S11), learning is executed by the processes of S12 to S14.

[0024] In S12, the ECU 52 stops (interrupts) the charging and discharging of the battery 51. As a result, the charging and discharging current of the battery 51 becomes zero (0 A). Subsequently, in S13, the ECU 52 learns (acquires and records) the offset value (output value when no current is flowing) of the current sensor 53. Then, the ECU 52 corrects (calibrates) the detection error of the current sensor 53 based on the obtained offset value. The ECU 52 may set a correction coefficient in the current sensor 53. After that, in S14, the ECU 52 resumes the charging and discharging of the battery 51.

[0025] When the above learning (S12-S14) is performed, the process proceeds to S15. Also, even if the learning timing has not yet arrived (NO in S11), the process proceeds to S15. In S15, the ECU 52 determines whether or not the charging and discharging of the battery 51 is complete. If the charging and discharging of the battery 51 is to continue (NO in S15), the process returns to S11. On the other hand, when the charging and discharging of the battery 51 is complete (YES in S15), the above processing flow (S11-S15) ends.

[0026] When system 300 receives a second request signal requesting the start of EM (Energy Management), it starts the processing flow S21 to S26. System 300 causes the electric vehicle resources (multiple electric vehicles) to perform charging or discharging of the energy storage device (battery 51) corresponding to the energy management requested by the second request signal, in the manner described below.

[0027] In S21, the system 300 determines the charging start timing or discharging start timing for each of the multiple electric vehicles so that the number of electric vehicles performing learning at the same time is less than or equal to a predetermined value. The system 300 then instructs each electric vehicle used for EM to start charging or discharging at the determined timing. Specifically, the system 300 remotely controls each electric vehicle. The system 300 transmits control commands to each electric vehicle. The predetermined value may be one vehicle, two to nine vehicles, or ten or more vehicles. If the predetermined value is one vehicle, each electric vehicle performs learning of the offset value of the current sensor 53 independently.

[0028] In the following S22, the system 300 determines whether or not the detection timing has arrived. If the detection timing has arrived (YES in S22), the system 300 detects the power value of the electric vehicle resources (vehicle group power) in S23. The system 300 may obtain the power value from each electric vehicle or from the power meters (e.g., smart meters) at each charging / discharging station. The detection timing arrives every predetermined time (e.g., 1 minute) after the start of EM.

[0029] In the following S24, the system 300 determines whether or not the instruction timing has arrived. The instruction timing arrives at the start of EM. Thereafter, the instruction timing arrives every predetermined time (for example, 1 minute). When the instruction timing arrives (YES in S24), the system 300 determines the power command value to the electric vehicle resources in S25 so that the power value of the electric vehicle resources follows the power request value indicated by the second request signal. The system 300 then sends a control command to each electric vehicle used in EM so that the vehicle group power becomes the above power command value. The system 300 may also apportion the power command value to the electric vehicle resources among the electric vehicles. Each electric vehicle performs charging or discharging of the energy storage device according to the control command from the system 300. However, when the aforementioned learning timing arrives, each electric vehicle performs the aforementioned learning (S12~S14) regardless of the control command. In other words, in each electric vehicle, the aforementioned learning control takes precedence over the control command.

[0030] In the following S26, system 300 determines whether or not EM (Energy Management) has finished. For example, EM ends when the agreed period (time t1 to time t2) has elapsed. If EM is to continue (NO in S26), the process returns to S22. If the agreed period ends (YES in S26), the above processing flow (S21 to S26) ends.

[0031] In the example shown in Figure 2, the electric vehicle resource performs an EM corresponding to the agreed amount Y. Line L20 shows the progression of the power request value requested by the second request signal from the electric vehicle resource. Line L21 shows the actual adjusted power (group power) by the electric vehicle resource. In this embodiment, in S21 and S25, the charging and discharging start timing of each electric vehicle and the power command value to the electric vehicle resource are determined so that the group power remains within an acceptable range. For example, system 300 measures the group power every minute (S23) and determines the power command value to the electric vehicle resource so that the 5-minute average group power does not exceed the acceptable range. System 300 determines the slope of the group power at the start of EM, taking the acceptable range into consideration. In addition, system 300 determines the charging and discharging start timing of each electric vehicle so that the learning timings of each electric vehicle used for EM do not overlap. However, it is permissible for the learning timings to overlap for a predetermined number of electric vehicles or less.

[0032] Figure 3 is a diagram comparing graphs showing the changes in vehicle group power for the example and modified example (lines L21, L21A) with a graph showing the changes in vehicle group power for the comparative example (line L22).

[0033] Referring to Figure 3, in the comparative example, all electric vehicles used in the EM start charging and discharging of the energy storage device at the same time, and each electric vehicle performs learning of the offset value of the current sensor at the same time. As a result, as shown by line L22, the actual adjustment power (vehicle group power) is lower than the acceptable range. In contrast, in the embodiment, system 300 determines the charging and discharging start timing of each electric vehicle used in the EM so that the learning timings of each electric vehicle do not overlap (S21). As a result, as shown by line L21, an excessive decrease in the actual adjustment power (vehicle group power) is suppressed, and the vehicle group power remains within the acceptable range during the contract period.

[0034] As described above, the power management system according to this embodiment comprises a plurality of electric vehicles (vehicles 10, 20) and a control device (system 300) that controls each of the plurality of electric vehicles. Each of the plurality of electric vehicles has an energy storage device (battery 51) and a current sensor 53 that detects the charging and discharging current of the energy storage device, and learns the offset value of the current sensor 53 by setting the charging and discharging current to zero at a predetermined timing (S11~S15). When the control device has the plurality of electric vehicles perform energy management by charging or discharging the energy storage device, it determines the charging start timing or discharging start timing for each of the plurality of electric vehicles so that the number of electric vehicles that perform learning at the same timing is less than or equal to a predetermined value (S21). With this configuration, the decrease in charging power or discharging power caused by the above learning is suppressed. Therefore, it becomes easier to perform the requested energy management using the plurality of electric vehicles.

[0035] In the modified version, vehicle 10 is a vehicle with zero-point correction, and vehicle 20 is a vehicle without zero-point correction. That is, of vehicles 10 and 20, only vehicle 10 (with zero-point correction) executes the aforementioned processing flow (S11 to S15). Vehicle 20 (without zero-point correction) does not perform the aforementioned learning while the energy storage device is charging or discharging. In the system 300 according to this modified version, in S21, charging or discharging of the energy storage devices may be started for multiple vehicles 10 used for EM so that the learning timings do not overlap, while charging or discharging of the energy storage devices may be started for multiple vehicles 20 used for EM at the same timing (for example, time t1). Even with this modified version, as shown by line L21A, an excessive decrease in actual adjustment power (vehicle group power) is suppressed, and it becomes possible to keep the vehicle group power within an acceptable range during the contract period.

[0036] Alternatively, a TSO (Grid System Operator) may request energy management instead of the electricity market. Systems 100, 200, and 300 are each implemented on an on-premise server, but may also be implemented on the cloud. The functions of each system may be contained in a single device.

[0037] The embodiments disclosed herein should be considered in all respects to be illustrative and not restrictive. The scope of the present invention is indicated by the claims rather than by the description of the embodiments above, and all modifications within the meaning and scope equivalent to the claims are intended to be included. [Explanation of symbols]

[0038] 10,20 Vehicles, 51 Batteries, 52 ECUs, 53 Current Sensors, 100 Supply and Demand Management Systems, 200 Resource Management Systems, 300 Electric Vehicle Management Systems, 510,520 Power Supply Equipment, PG Power Systems.

Claims

[Claim 1] A power management system including a plurality of electric vehicles and a control device for controlling each of the plurality of electric vehicles, Each of the aforementioned multiple electric vehicles has a power storage device and a current sensor that detects the charging and discharging current of the power storage device, and is configured to learn the offset value of the current sensor by setting the charging and discharging current to zero at a predetermined timing. The control device is a power management system that, when causing the plurality of electric vehicles to perform energy management by charging or discharging the energy storage device, determines the charging start timing or discharging start timing for each of the plurality of electric vehicles so that the number of electric vehicles performing the learning at the same time is less than or equal to a predetermined value.

Citation Information

Patent Citations

  • Power unit for vehicle

    JP2009171666A

  • Charging device of vehicle

    JP2019106834A

  • Electrical power system

    JP2021018066A

  • Power management system

    JP2024179574A

  • Method and system for compensating for current sensor offset of inverter

    US20170149354A1