Power supply apparatus and device, control method, and storage medium
By adopting intelligent control methods in the UPS system, combining mains unit and bidirectional converter, the capacity configuration and battery life of the UPS are optimized, and the problems of low load rate and short battery life in the UPS system are solved, achieving more efficient Power management and battery life extension.
Patent Information
- Application Number
- PCT/CN2023/095951
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Filing Date
- 2023-05-24
- Publication Date
- 2024-11-28
AI Technical Summary
In actual applications, the load rate of the existing UPS system is lower than the design maximum load, resulting in excessive battery capacity configuration, wasted resources, and the UPS battery life is short and needs to be replaced frequently.
Through a control method of a power supply system, combining the mains unit, UPS unit and a bidirectional converter, the load power and mains output are judged, and the peak cutting mode, uninterrupted power supply mode or reactive power compensation mode is adopted to optimize the capacity of the UPS Configuration and battery life.
Avoid UPS overload failure, extend battery life, optimize UPS and backup energy storage capacity configuration, reduce battery discharge depth, and extend backup discharge time of uninterruptible power supply.
Smart Images

Figure CN2023095951_28112024_PF_FP_ABST
Abstract
Description
Power supply device, equipment, control method and storage medium Technical Field
[0001] The present invention relates to the field of uninterruptible power supply, and in particular to a power supply device, equipment, control method and storage medium. Background Art
[0002] An uninterruptible power supply (UPS) is a constant-voltage, constant-frequency power supply connected to a battery. It primarily provides power to computers, computer network systems, or other electronic equipment.
[0003] A bidirectional power conversion system (PCS) is a device that connects energy storage batteries and the power grid (or load) to achieve bidirectional conversion of electrical energy. It can convert the DC power of the energy storage battery into AC power and transmit it to the power grid or use it for AC loads; it can also rectify the AC power of the power grid into DC power to charge the energy storage battery.
[0004] The capacity design of existing UPSs will take into account additional redundancy under maximum load. For example, users generally require the UPS load rate to not exceed 85-90% of the maximum load. In actual UPS application scenarios, especially in the data center field, it is difficult for user loads to reach the designed maximum load. Combined with the UPS load rate requirements, this leads to over-configuration and waste of UPS capacity. Based on this, the battery capacity in the UPS is often configured according to the maximum design load capacity, such as 15 minutes of backup power supply, but it usually does not reach the maximum load, resulting in waste of battery capacity configuration. At the same time, after the UPS backup battery decays to a certain capacity, such as 80% battery capacity SOH (State of Health), the battery needs to be replaced, further wasting battery investment.
[0005] Summary of the Invention
[0006] The present invention provides a power supply device, equipment, control method and storage medium, which can optimize the capacity configuration of a UPS, solve the problems of over-capacity configuration of a UPS and extend the service life of a UPS battery.
[0007] To solve the above technical problems, the present invention adopts a technical solution: providing a control method for a power supply system, wherein the power supply system includes a mains unit, a UPS unit, a PCS unit, and a load, wherein the input end of the UPS unit is connected to the mains unit, the output end of the UPS unit is connected to the load, and the AC end of the PCS unit is connected to the input end of the UPS unit or the output end of the UPS unit. The control method includes:
[0008] Determining whether the output of the mains power unit is normal;
[0009] If yes, when the operating power of the load exceeds the preset power value, the peak shaving mode is operated to control the PCS unit and the mains unit to jointly supply power to the load;
[0010] If not, the uninterruptible power supply mode is run to control the UPS unit to supply power to the load, or the PCS unit and the UPS unit are controlled to jointly supply power to the load.
[0011] According to one embodiment of the present invention, when the operating power of the load exceeds a preset power value, running the peak shaving mode and controlling the PCS unit and the mains unit to jointly supply power to the load further includes:
[0012] Determining whether the operating power of the load exceeds the preset power value;
[0013] If so, determine whether the current time is the preset city electricity peak and valley price period;
[0014] If so, the peak shaving mode is run to control the PCS unit and the mains unit to jointly supply power to the load.
[0015] According to one embodiment of the present invention, when the AC end of the PCS unit is connected to the output end of the UPS unit, after determining whether the output of the mains power unit is normal, the control method further includes:
[0016] If so, when the operating power of the load does not exceed the preset power value, the reactive power compensation or peak shaving and valley filling mode is operated.
[0017] According to one embodiment of the present invention, when the operating power of the load does not exceed a preset power value, operating in the reactive power compensation or peak shaving and valley filling mode further includes:
[0018] Determining whether the operating power of the load exceeds the preset power value;
[0019] If not, determine whether the current time is the preset city electricity peak and valley price period;
[0020] If yes, run the peak shaving and valley filling mode;
[0021] If not, the reactive power compensation mode is operated.
[0022] In order to solve the above technical problems, another technical solution adopted by the present invention is: providing a power supply device, including: a controller and a bidirectional converter connected to the controller, and the controller executes the control method.
[0023] To solve the above technical problems, another technical solution adopted by the present invention is: providing a power supply device, including: a controller, a bidirectional converter connected to the controller, and a first energy storage unit connected to the bidirectional converter, and the controller executes the control method.
[0024] According to one embodiment of the present invention, the power supply device also includes a switching unit connected to the controller, and the switching unit is used to turn on / off the connection between the AC end of the bidirectional converter and the mains unit, or to turn on / off the connection between the AC end of the bidirectional converter and the load.
[0025] In order to solve the above technical problems, another technical solution adopted by the present invention is: to provide a power supply equipment, including: the power supply device and the UPS unit, the AC end of the bidirectional converter of the power supply device is connected to the input end of the UPS unit or the output end of the UPS unit.
[0026] According to one embodiment of the present invention, the UPS unit includes a rectifier, an inverter and a second energy storage unit, the AC end of the rectifier is connected to the mains unit, the DC end of the rectifier is connected to the DC end of the inverter and the second energy storage unit, the AC end of the inverter is connected to the load, and the rectifier and the inverter are both connected to the controller.
[0027] According to one embodiment of the present invention, the UPS unit includes a static switch, an inverter and a second energy storage unit, the DC end of the inverter is connected to the second energy storage unit, the AC end of the inverter is connected to the load and one end of the static switch, the other end of the static switch is connected to the output of the AC power unit, and the inverter and the static switch are both connected to the controller.
[0028] According to one embodiment of the present invention, the UPS unit includes a rectifier, an inverter, a static switch and a second energy storage unit, the AC end of the rectifier is connected to the mains power unit, the DC end of the rectifier is connected to the DC end of the inverter and the second energy storage unit, the AC end of the inverter is connected to the load and one end of the static switch, and the other end of the static switch is connected to the output of the mains power unit.
[0029] In order to solve the above technical problems, another technical solution adopted by the present invention is: providing a computer storage medium on which a computer program is stored, and when the computer program is executed by a processor, the control method of the power supply system is implemented.
[0030] The beneficial effects of the present invention are as follows: by judging whether the output of the AC power unit is normal; if so, when the operating power of the load exceeds the preset power value, the peak shaving mode is run, and the PCS unit and the AC power unit are controlled to jointly supply power to the load, which can avoid the problem of overload failure or device damage caused by high load rate of the UPS unit; if not, the uninterruptible power supply mode is run, and the UPS unit is controlled to supply power to the load, or the PCS unit and the UPS unit are controlled to jointly supply power to the load, which can avoid the problem of overload failure or device damage caused by high load rate of the UPS unit, and within the same UPS backup discharge time, the discharge depth of the backup energy storage unit of the UPS unit is reduced to increase the service life of the UPS energy storage unit, extend the backup discharge time of the uninterruptible power supply, and thus achieve the effect of optimizing the configuration of the UPS and the backup energy storage capacity. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] FIG1 is a schematic structural diagram of a power supply system according to an embodiment of the present invention;
[0032] FIG2 is a schematic structural diagram of a power supply system according to another embodiment of the present invention;
[0033] 3 is a schematic structural diagram of a PCS unit of a power supply system according to an embodiment of the present invention;
[0034] 4 is a schematic structural diagram of a PCS unit of a power supply system according to another embodiment of the present invention;
[0035] 5 is a schematic structural diagram of a PCS unit of a power supply system according to another embodiment of the present invention;
[0036] 6 is a schematic structural diagram of a PCS unit of a power supply system according to another embodiment of the present invention;
[0037] 7 is a schematic structural diagram of a UPS unit of a power supply system according to an embodiment of the present invention;
[0038] 8 is a schematic structural diagram of a UPS unit of a power supply system according to another embodiment of the present invention;
[0039] 9 is a schematic structural diagram of an uninterruptible power supply of a power supply system according to an embodiment of the present invention;
[0040] 10 is a schematic structural diagram of an uninterruptible power supply system of another embodiment of the present invention;
[0041] 11 is a schematic structural diagram of an uninterruptible power supply system of another embodiment of the present invention;
[0042] 12 is a schematic structural diagram of a PCS unit of a power supply system according to another embodiment of the present invention;
[0043] FIG13 is a graph showing the energy storage capacity decaying over time according to an embodiment of the present invention;
[0044] 14 is a schematic diagram of the power supply state of an uninterruptible power supply mode according to an embodiment of the present invention;
[0045] FIG15 is a schematic diagram of the capacity configuration of an energy storage unit according to an embodiment of the present invention;
[0046] 16 is a schematic flow chart of a method for controlling a power supply system according to an embodiment of the present invention;
[0047] 17 is a schematic flow chart of step S2 in a method for controlling a power supply system according to an embodiment of the present invention;
[0048] 18 is a schematic flow chart of a method for controlling a power supply system according to another embodiment of the present invention;
[0049] FIG19 is a flow chart of step S4 in a method for controlling a power supply system according to an embodiment of the present invention;
[0050] FIG20 is a schematic structural diagram of a power supply device according to an embodiment of the present invention;
[0051] FIG21 is a schematic structural diagram of a power supply device according to another embodiment of the present invention;
[0052] FIG22 is a schematic structural diagram of a power supply device according to another embodiment of the present invention;
[0053] 23 is a schematic structural diagram of a power supply device according to another embodiment of the present invention;
[0054] FIG24 is a schematic diagram of the structure of a computer storage medium according to an embodiment of the present invention. DETAILED DESCRIPTION
[0055] The following will clearly and completely describe the technical solutions in the embodiments of the present invention in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. All other embodiments obtained by ordinary technicians in this field based on the embodiments of the present invention without making any creative efforts shall fall within the scope of protection of the present invention.
[0056] Figures 1 and 2 respectively provide structural schematic diagrams of a power supply system of an embodiment. The power supply system 100 includes a mains unit 10 for providing electrical energy to a load 40, a UPS unit 20 for providing uninterruptible power supply to the load 40, a PCS unit 30 for mains peak and frequency regulation and peak shaving and valley filling, and a load 40. In one application scenario, the load 40 is applied to a data center. The input end of the UPS unit 20 is connected to the mains unit 10, the output end of the UPS unit 20 is connected to the load 40, and the AC end of the PCS unit 30 is connected to the input end of the UPS unit 20 (as shown in Figure 1) or the output end of the UPS unit 20 (as shown in Figure 2).
[0057] Based on the above embodiments, in a feasible embodiment, please refer to Figures 3 and 4, the PCS unit 30 includes a controller 31 for controlling the operating status of the bidirectional converter 32 and a bidirectional converter 32 connected to the controller 31 and used to realize DC-AC bidirectional conversion, and the AC end of the bidirectional converter 32 is connected to the input end of the UPS unit 20 (as shown in Figure 3) or the output end of the UPS unit 20 (as shown in Figure 4).
[0058] Based on the above embodiment, in one feasible embodiment, referring to Figures 5 and 6 , the PCS unit 30 further includes a first energy storage unit 33 connected to the DC terminal of the bidirectional converter 32 and used to serve as backup energy storage for the PCS unit 30. The first energy storage unit 33 may be a plurality of parallel-connected battery packs.
[0059] Based on the above embodiment, in one feasible embodiment, as shown in Figures 7 and 8 , a UPS unit 20 includes an uninterruptible power supply 21 and a second energy storage unit 22 connected to the uninterruptible power supply 21. The input of the uninterruptible power supply 21 is connected to the output of the mains power unit 10, and the output of the uninterruptible power supply 21 is connected to the load 40. In one embodiment, the second energy storage unit 22 may include a charger and a plurality of parallel battery packs connected to the charger and the discharger.
[0060] Based on the above embodiment, in one feasible embodiment, see FIG9 , the uninterruptible power supply 21 includes a rectifier 211 for AC-DC conversion and an inverter 212 for DC-AC conversion. The AC end of the rectifier 211 is connected to the mains unit 10, the DC end of the rectifier 211 is connected to the DC end of the inverter 212 and the second energy storage unit 22, the AC end of the inverter 212 is connected to the load, and both the rectifier 211 and the inverter 212 are connected to the controller 31. In one embodiment, the uninterruptible power supply 21 may be provided with an independent control unit (not shown in the figure), and the rectifier 211 and the inverter 212 may be connected to the controller 31 via the control unit. Whether the AC end of the PCS unit 30 is connected to the input end or the output end of the UPS unit 20, the structure of the UPS unit 20 is similar and will not be described in detail here.
[0061] Based on the above embodiments, in one feasible embodiment, see FIG10 , the uninterruptible power supply 21 includes a static switch 213 and an inverter 212 for controlling the on / off connection between the mains unit 10 and the load 40. The DC end of the inverter 212 is connected to the second energy storage unit 22, the AC end of the inverter 212 is connected to the load 40 and one end of the static switch 213, and the other end of the static switch 213 is connected to the output of the mains unit 10. Both the inverter 212 and the static switch 213 are connected to a controller. In one embodiment, the uninterruptible power supply 21 may be provided with an independent control unit (not shown in the figure), and the static switch 213 and the inverter 212 may be connected to the controller 31 via the control unit. Whether the AC end of the PCS unit 30 is connected to the input end or the output end of the UPS unit 20, the structure of the UPS unit 20 is similar and will not be described in detail here.
[0062] Based on the above embodiments, in one feasible embodiment, see FIG11 , the uninterruptible power supply 21 includes a rectifier 211, an inverter 212, and a static switch 213. The AC end of the rectifier 211 is connected to the mains unit 10, the DC end of the rectifier 211 is connected to the DC end of the inverter 212 and the second energy storage unit 22, the AC end of the inverter 212 is connected to the load 40 and one end of the static switch 213, and the other end of the static switch 213 is connected to the output of the mains unit 10. In one embodiment, the uninterruptible power supply 21 may be provided with an independent control unit (not shown), and the rectifier 211, inverter 212, and static switch 213 may be connected to the controller 31 via the control unit. Whether the AC end of the PCS unit 30 is connected to the input end or the output end of the UPS unit 20, the structure of the UPS unit 20 is similar and will not be described in detail here.
[0063] Based on the above embodiment, in one feasible embodiment, see FIG12 , the PCS unit 30 further includes a switching unit 34 connected to the controller 31 and configured to control the connection between the bidirectional converter 32 and the output terminal of the UPS unit 20 or the input terminal of the UPS unit 20. The connection terminal of the switching unit 34 is connected to the AC terminal of the bidirectional converter 32, the first control terminal of the switching unit 34 is connected to the output terminal of the mains unit 10, and the second control terminal of the switching unit 34 is connected to the output terminal of the UPS unit 20. The switching unit 34 is configured to turn on / off the connection between the AC terminal of the bidirectional converter 32 and the mains unit 10, or to turn on / off the connection between the AC terminal of the bidirectional converter 32 and the load 40. In one embodiment, the switching unit 34 may be a dual power automatic switching switch.
[0064] In one embodiment, when the operating power of the load 40 does not exceed a preset power value, the controller 31 controls the first control end of the switching unit 34 to be connected to the output of the AC power unit 10, and the second control end of the switching unit 34 to be disconnected from the output end of the UPS unit 20. If the output of the AC power unit 10 is normal, the controller 31 controls the bidirectional converter 32 to operate in a reactive compensation mode.
[0065] In another embodiment, when the operating power of the load 40 does not exceed the preset power value, the controller 31 controls the first control end of the switching unit 34 to be connected to the output of the mains unit 10, and the second control end of the switching unit 34 to be disconnected from the output end of the UPS unit 20. If the output of the mains unit 10 is normal, and the current time is a preset mains peak and valley electricity price period (the preset mains peak and valley period includes a preset mains peak electricity period and a preset mains valley electricity period, the preset mains peak electricity period refers to a high electricity price period, and the preset mains valley electricity period refers to a low electricity price period), then During the preset mains peak power period, the first energy storage unit 33 is discharged through the bidirectional converter 32 and the switching unit 34 to supply power to the load 40 and other loads directly connected to the mains unit 10, thereby improving the load utilization rate of the discharge capacity of the bidirectional converter 32; during the preset mains valley power period, the mains unit 10 charges the first energy storage unit 33 through the switching unit 34 and the bidirectional converter 32. In this embodiment, the first energy storage unit 33 does not need to be charged through the UPS unit 20, thereby reducing charging loss and capacity configuration of the UPS unit 20.
[0066] In another embodiment, when the operating power of the load 40 exceeds a preset power value, the controller 31 controls the first control terminal of the switching unit 34 to be disconnected from the output of the mains unit 10, and the second control terminal of the switching unit 34 to be connected to the output terminal of the UPS unit 20. If the output of the mains unit 10 is normal, the peak-shaving mode is operated. The peak-shaving mode controls the bidirectional converter 32 to jointly supply power to the load 40 with the mains unit 10. The outputs of the bidirectional converter 32 and the mains unit 10 are synchronized, with the same phase, frequency, and voltage. The output power of the mains unit 10 is the preset power value, and the output power of the bidirectional converter 32 is the difference between the operating power and the preset power value, which is used as a compensation output to cut the peak of the mains unit 10, thereby reducing the output power of the UPS unit 20.
[0067] In another embodiment, when the operating power of the load 40 exceeds a preset power value, the controller 31 controls the first control terminal of the switching unit 34 to disconnect from the output of the mains unit 10, and connects the second control terminal of the switching unit 34 to the output of the UPS unit 20. If the output of the mains unit 10 is abnormal, the uninterruptible power supply mode is activated, and the bidirectional converter 32 and the UPS unit 20 are controlled to jointly supply power to the load 40. The outputs of the bidirectional converter 32 and the UPS unit 20 are synchronized, with the same phase, frequency, and voltage. The output power of the bidirectional converter 32 is the preset rated power, and the output power of the UPS unit 20 is the difference between the operating power and the preset rated power. This can extend the uninterruptible power supply time of the load 40, or reduce the depth of discharge of the backup battery of the UPS unit (i.e., the second energy storage unit 22) under the same uninterruptible power backup time, thereby extending the backup battery service life of the UPS unit 20 (as shown in Figures 13 and 14), thereby optimizing the UPS and backup energy storage capacity and extending the backup energy storage service life (as shown in Figure 15). As shown in Figures 13 and 14, the backup battery capacity of the UPS unit 20 decays over time. By supplementing the backup power supply of the UPS unit 20 through the bidirectional converter 32 using the first energy storage unit 33, the service life of the backup battery of the UPS unit 20 can be extended from Ta to Tb without reducing the backup power supply time guarantee for the load 40. As shown in Figure 15, because part of the capacity of the first energy storage unit 33 is used to supplement the capacity of the battery that provides backup power to the UPS unit 20, within the normal operating power range of the bidirectional converter 32, the larger the battery capacity configured to supplement the backup power supply of the UPS unit 20, the smaller the battery capacity of the UPS unit 20 backup power supply can be configured, or the battery capacity of the UPS unit 20 backup power supply can be configured to extend the service life and allow for greater capacity decay, thereby maintaining the battery capacity required for the backup power supply time of the load 40. This can optimize the UPS and backup energy storage capacity configuration and extend the backup energy storage service life.
[0068] FIG16 is a flow chart of a method for controlling a power supply system according to an embodiment of the present invention. It should be noted that the method of the present invention is not limited to the flow chart shown in FIG16 if substantially the same result is achieved. As shown in FIG16 , the method includes the following steps:
[0069] Step S1: Determine whether the output of the AC power unit is normal.
[0070] In step S1, an abnormality in the mains power unit may affect the output power, voltage, or current of the mains power unit. This embodiment can determine whether the output of the mains power unit is normal based on the output power, voltage, or current. Abnormal conditions of the mains power unit include, but are not limited to, power surges, high voltage breakthroughs, transient overvoltages, voltage sags, low voltages, mains power interruptions, and noise interference. If the output of the mains power unit is normal, step S2 is executed. If the output of the mains power unit is abnormal, step S3 is executed.
[0071] Step S2: If yes, when the operating power of the load exceeds the preset power value, the peak shaving mode is run to control the PCS unit and the AC power unit to jointly supply power to the load.
[0072] In step S2, the controller can directly obtain the operating power of the load or obtain the operating power of the load through the intermediate storage. The first energy storage unit supplies power to the load through the PCS unit, and the AC unit supplies power to the load through the UPS unit. The output power of the AC unit is a preset power value, and the output power of the PCS unit is the difference between the operating power and the preset power value. The PCS unit acts as a compensation output to cut the peak of the AC unit, which can avoid the problem of overload failure or device damage caused by high load rate of the UPS unit.
[0073] Furthermore, referring to FIG. 17 , step S2 may further include the following steps:
[0074] Step S21: Determine whether the operating power of the load exceeds a preset power value.
[0075] Step S22: If yes, determine whether the current time is a preset peak and valley electricity price period.
[0076] Step S23: If yes, run the peak shaving mode and control the PCS unit and the AC power unit to jointly supply power to the load.
[0077] This embodiment operates in peak shaving mode during preset utility power peak and valley price periods, thereby saving electricity operating costs.
[0078] Step S3: If not, run the uninterruptible power supply mode, control the UPS unit to supply power to the load, or control the PCS unit and the UPS unit to jointly supply power to the load.
[0079] In step S3, if the AC end of the PCS unit is connected to the input end of the UPS unit, the uninterruptible power supply mode is to control the UPS unit to supply power to the load; if the AC end of the PCS unit is connected to the output end of the UPS unit, the uninterruptible power supply mode is to control the PCS unit and the UPS unit to jointly supply power to the load. In this embodiment, the first energy storage unit supplies power to the load through the PCS unit, and the second energy storage unit supplies power to the load jointly through the UPS unit. This embodiment can avoid the problem of overload failure or device damage caused by a high load rate of the UPS unit, and reduce the discharge depth of the backup energy storage unit of the UPS unit within the same UPS backup discharge time to increase the life of the UPS energy storage unit, extend the backup discharge time of the uninterruptible power supply, and thus achieve the effect of optimizing the configuration of the UPS and backup energy storage capacity.
[0080] This embodiment controls the PCS unit and the UPS unit to jointly supply power to the load when the output of the mains unit is abnormal. Furthermore, under the same discharge time, the service life of the second energy storage unit can be optimized and the discharge time of the uninterruptible power supply can be extended.
[0081] Based on the above embodiment, in a feasible embodiment, referring to FIG. 18 , after step S1, the following steps are further included:
[0082] Step S4: If yes, then when the operating power of the load does not exceed the preset power value, the reactive power compensation or peak shaving and valley filling mode is operated.
[0083] In step S4, the reactive power compensation mode refers to the bidirectional converter being used as a reactive power compensation device. The peak shaving and valley filling mode refers to the bidirectional converter operating to discharge during peak hours of the mains and charge during valley hours of the mains.
[0084] Furthermore, referring to FIG. 19 , step S4 may further include the following steps:
[0085] Step S41: Determine whether the operating power of the load exceeds a preset power value.
[0086] Step S42: If not, determine whether the current time is a preset mains power peak or off-peak period.
[0087] The preset mains peak and valley periods in this embodiment include preset mains peak periods and preset mains valley periods. If the current time is the preset mains peak and valley periods, step S43 is executed; if the current time is not the preset mains peak and valley periods, step S44 is executed.
[0088] Step S43: If yes, run the peak shaving and valley filling mode.
[0089] In this embodiment, if the current time is during a preset mains peak period, the PCS unit is controlled to operate in a discharge mode; if the current time is during a preset mains off-peak period, the PCS unit is controlled to operate in a charging mode. This embodiment can save electricity operating costs by controlling the PCS unit to discharge during preset mains peak periods and charge during preset mains off-peak periods.
[0090] Step S44: If not, the reactive power compensation mode is operated.
[0091] In this step, the bidirectional converter can compensate for reactive power and increase the output power factor to close to 1.
[0092] Please refer to Figure 20. The present invention further provides a power supply device 200. The power supply device 200 includes: a controller 31 and a bidirectional converter 32 connected to the controller 31. The controller 31 executes the control method described in steps S1 to S4 above.
[0093] Please refer to Figure 21. The present invention also provides a power supply device 300, which includes: a controller 31, a bidirectional converter 32 connected to the controller 31, and a first energy storage unit 33 connected to the bidirectional converter 32. The controller 31 executes the control method described in steps S1 to S4 above.
[0094] Further, referring to Figure 22, the power supply device 300 also includes a switching unit 34 connected to the controller 31, and the switching unit 34 is used to turn on / off the connection between the AC end of the bidirectional converter 32 and the AC power unit, or to turn on / off the connection between the AC end of the bidirectional converter 32 and the load.
[0095] Please refer to Figure 23. The present invention also provides a power supply device 400, which includes: the above-mentioned power supply device 300 and a UPS unit 20, and the AC end of the bidirectional converter 32 of the power supply device 300 is connected to the input end of the UPS unit 20 or the output end of the UPS unit 20.
[0096] Refer to Figure 24, which is a schematic diagram of the structure of a computer storage medium according to an embodiment of the present invention. The computer storage medium according to an embodiment of the present invention stores a program file 2401 capable of implementing all of the above methods, wherein the program file 2401 can be stored in the above computer storage medium in the form of a software product, including a number of instructions for causing a computer device (which can be a personal computer, server, or network device, etc.) or a processor to execute all or part of the steps of the method described in each embodiment of the present invention. The aforementioned computer storage medium includes: various media that can store program code, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, or terminal devices such as a computer, server, mobile phone, and tablet.
[0097] In the several embodiments provided by the present invention, it should be understood that the disclosed systems, devices, and methods can be implemented in other ways. For example, the device embodiments described above are merely illustrative. For example, the division of units is merely a logical function division. In actual implementation, there may be other division methods, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. In addition, the mutual coupling or direct coupling or communication connection shown or discussed can be through some interface, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0098] In addition, the functional units in the various embodiments of the present invention may be integrated into a single processing unit, each unit may exist physically separately, or two or more units may be integrated into a single unit. The aforementioned integrated units may be implemented in the form of hardware or software functional units.
[0099] The above are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention description and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A control method for a power supply system, characterized in that: The power supply system comprises a mains unit, a UPS unit, a PCS unit and a load, wherein the input end of the UPS unit is connected to the mains unit, the output end of the UPS unit is connected to the load, the AC end of the PCS unit is connected to the input end of the UPS unit or the output end of the UPS unit, and the control method comprises: Determining whether the output of the AC power unit is normal; If yes, when the operating power of the load exceeds the preset power value, the peak shaving mode is operated to control the PCS unit and the mains unit to jointly supply power to the load; If not, the uninterruptible power supply mode is operated to control the UPS unit to supply power to the load, or the PCS unit and the UPS unit are controlled to jointly supply power to the load.
2. The control method according to claim 1, characterized in that: When the operating power of the load exceeds a preset power value, the peak shaving mode is operated, and the PCS unit is controlled to jointly supply power to the load with the mains unit, and the step of: Determining whether the operating power of the load exceeds the preset power value; If yes, determine whether the current time is the preset city electricity peak and valley electricity price period; If yes, the peak shaving mode is run to control the PCS unit and the AC power unit to jointly supply power to the load.
3. The control method according to claim 1, characterized in that: When the AC end of the PCS unit is connected to the output end of the UPS unit, after determining whether the output of the mains unit is normal, the control method further includes: If so, when the operating power of the load does not exceed the preset power value, the reactive power compensation or peak shaving and valley filling mode is operated.
4. The control method according to claim 3, characterized in that: When the operating power of the load does not exceed the preset power value, operating in reactive power compensation or peak shaving and valley filling mode further includes: Determining whether the operating power of the load exceeds the preset power value; If not, determine whether the current time is the preset city electricity peak and valley electricity price period; If yes, the peak shaving and valley filling mode is operated; If not, the reactive power compensation mode is operated.
5. A power supply device, characterized in that: include: A controller and a bidirectional converter connected to the controller, wherein the controller executes the control method according to any one of claims 1 to 4.
6. A power supply device, characterized in that: include: A controller, a bidirectional converter connected to the controller, and a first energy storage unit connected to the bidirectional converter, wherein the controller executes the control method according to any one of claims 1 to 4.
7. The power supply device according to claim 6, characterized in that: The power supply device also includes a switching unit connected to the controller, and the switching unit is used to turn on / off the connection between the AC end of the bidirectional converter and the mains unit, or to turn on / off the connection between the AC end of the bidirectional converter and the load.
8. A power supply device, characterized in that: include: According to the power supply device and UPS unit as described in any one of claims 6-7, the AC end of the bidirectional converter of the power supply device is connected to the input end of the UPS unit or the output end of the UPS unit.
9. The power supply device according to claim 8, characterized in that: The UPS unit includes a rectifier, an inverter and a second energy storage unit. The AC end of the rectifier is connected to the AC power unit, the DC end of the rectifier is connected to the DC end of the inverter and the second energy storage unit, the AC end of the inverter is connected to the load, and the rectifier and the inverter are both connected to the controller.
10. The power supply device according to claim 8, characterized in that: The UPS unit includes a static switch, an inverter and a second energy storage unit. The DC end of the inverter is connected to the second energy storage unit, the AC end of the inverter is connected to the load and one end of the static switch, the other end of the static switch is connected to the output of the AC power unit, and the inverter and the static switch are both connected to the controller.
11. The power supply device according to claim 8, characterized in that: The UPS unit includes a rectifier, an inverter, a static switch and a second energy storage unit. The AC end of the rectifier is connected to the AC power unit, the DC end of the rectifier is connected to the DC end of the inverter and the second energy storage unit, the AC end of the inverter is connected to the load and one end of the static switch, and the other end of the static switch is connected to the output of the AC power unit.
12. A computer storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the control method of the power supply system according to any one of claims 1 to 4 is implemented.
Citation Information
Patent Citations
Mixed UPS (uninterrupted power supply) energy storage system and method thereof
CN106451513A
Power supply terminal, power supply control method, control device and storage medium
CN115498685A
Power conversion system
JP2005027430A
Cited By
Elevator energy-saving control system and control method
CN119853132A
Control method of energy storage system and power system
CN120320374A