Computing power and network service processing method, apparatus, and storage medium

By collecting user experience information of terminal devices in the computing power network and adjusting routing strategy, the problem of unreasonable resource allocation in the existing technology is solved, and the user experience and resource utilization efficiency is improved.

WO2024239900A1PCT designated stage expired Publication Date: 2024-11-28DATANG MOBILE COMM EQUIP CO LTD
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2024/089713
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-05-24
Filing Date
2024-04-25
Publication Date
2024-11-28

AI Technical Summary

Technical Problem

The service orchestration and strategy adjustment of existing computing power networks cannot effectively improve the user's experience, and lack of perception and feedback on the user's experience, resulting in unreasonable resource allocation and difficult to achieve user's expected experience.

Method used

The management center determines the initial computing power service routing strategy based on the business needs of the terminal equipment, and after the terminal equipment accesses the computing power service, it collects user experience information, conducts corresponding measurements and adjusts the routing strategy to optimize the user experience and resources of the computing power service use.

Benefits of technology

It improves users' experience of computing power services, makes full and rational use of computing network resources, optimizes resource allocation, and improves the value utilization of computing network resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2024089713_28112024_PF_FP_ABST
    Figure CN2024089713_28112024_PF_FP_ABST
Patent Text Reader

Abstract

Provided in the present application are a computing power and network service processing method, an apparatus, and a storage medium. The method comprises: according to a service demand of a terminal device, a management center determining an initial computing power service routing policy, and sending same to the terminal device; after the terminal device accesses a corresponding initial computing power service according to the initial computing power service routing policy, receiving user experience information sent by the terminal device about the initial computing power service; and starting corresponding measurement according to the user experience information, and determining an adjusted computing power service routing policy according to a measurement result and sending same to the terminal device, or sending feedback information to the terminal device. The present application acquires the user experience information about the initial computing power service and performs the corresponding measurement, so as to adjust the computing power service routing policy or feedback information and to specifically improve user experiences of the computing power service, and more fully and reasonably uses computing network resources and optimizes resource allocation, so as to more efficiently put the value of the computing network resources to good use.
Need to check novelty before this filing date? Find Prior Art

Description

Processing method, device and storage medium for computing power and network services

[0001] This disclosure claims priority to a Chinese patent application filed with the Patent Office of China on May 24, 2023, with application number 202310595020.7 and application name “Processing Method, Device and Storage Medium for Computing Power and Network Services,” the entire contents of which are incorporated herein by reference. Technical Field

[0002] The present disclosure relates to the field of communication technology, and more specifically, to a method, device, and storage medium for processing computing power and network services. Background Art

[0003] Computing power network is an information infrastructure integration solution that provides optimal computing power network allocation and computing network integration solutions for different types of user needs, realizing flexible allocation and scheduling of computing resources, storage resources and network resources.

[0004] In the existing technology, the computing power network service orchestration, the computing power network management center can perform computing power service orchestration and policy adjustment through computing power resource status perception on the business side and network resource status perception on the network side, but the computing power service orchestration and policy adjustment may not achieve the user's expected experience.

[0005] Summary of the Invention

[0006] The present disclosure provides a method, device and storage medium for processing computing power and network services, so as to realize the computing power network's perception of user computing power service experience data, make full and reasonable use of computing network resources, and further enhance user service experience.

[0007] In a first aspect, the present disclosure provides a method for processing computing power and network services, which is applied to a management center. The method includes:

[0008] Determine an initial computing power service routing strategy based on the service requirements of the terminal device, and send the initial computing power service routing strategy to the terminal device;

[0009] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, receiving user experience information for the initial computing power service sent by the terminal device;

[0010] Initiate corresponding measurements based on the user experience information, determine an adjusted computing power service routing strategy based on the measurement results and send it to the terminal device, or send feedback information to the terminal device.

[0011] Optionally, after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, receiving user experience information for the initial computing power service sent by the terminal device includes:

[0012] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, sending a user experience event subscription message to the terminal device, wherein the user experience event subscription message includes a user experience event type for the initial computing power service;

[0013] Receive user experience information sent by the terminal device after the user experience event type is triggered, where the user experience information includes user experience data related to the user experience event type.

[0014] Optionally, the user experience event type includes one or more of the following:

[0015] The startup time of the application for accessing the initial computing power service exceeds a first preset time period; or

[0016] The number of restarts of the application used to access the initial computing power service exceeds a first preset number; or

[0017] The number of freezes during the execution of the service through the initial computing service exceeds a second preset number; or

[0018] During the execution of the service through the initial computing power service, a single pause time exceeds a second preset time length; or

[0019] The number of execution failures during the execution of the service through the initial computing power service exceeds a third preset number; or

[0020] The connection establishment delay for accessing the initial computing power service exceeds a third preset duration; or

[0021] The success rate of establishing a connection to the initial computing power service is lower than a preset success rate; or

[0022] The frequency of connection interruptions to the initial computing power service exceeds a preset frequency.

[0023] Optionally, the user experience data includes one or more of the following:

[0024] The time when the application used to access the initial computing power service is started; or

[0025] The number of times the application used to access the initial computing power service is restarted; or

[0026] The number of freezes and monitoring time periods during the execution of the service through the initial computing power service; or

[0027] A single pause in the execution of a service through the initial computing power service; or

[0028] The number of execution failures and monitoring time period during the execution of the service through the initial computing power service; or

[0029] The connection establishment delay for accessing the initial computing power service; or

[0030] The success rate of establishing a connection to the initial computing power service; or

[0031] The frequency of connection interruptions to the initial computing power service.

[0032] Optionally, after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, the method further includes:

[0033] Establishing a computing power service mapping relationship, where the computing power service mapping relationship is a mapping relationship between one or more of the identifier of the terminal device, the identifier of the application used to access the initial computing power service, the identifier of the computing power node where the initial computing power service is located, and the identifier of the initial computing power service;

[0034] The sending of a user experience event subscription message to the terminal device includes:

[0035] Send a user experience event subscription message to the terminal device according to the computing power service mapping relationship.

[0036] Optionally, the user experience event subscription message further includes one or more of the following:

[0037] User experience event subscription message identifier, identifier of the terminal device, identifier of the application used to access the initial computing power service, and deadline for user experience event subscription.

[0038] Optionally, the sending a user experience event subscription message to the terminal device includes:

[0039] Sending the user experience event subscription message to a radio access network RAN ​​entity, so that the RAN entity sends the user experience event subscription message to the terminal device;

[0040] The receiving user experience information sent by the terminal device after the user experience event type is triggered includes:

[0041] Receive user experience information sent by the RAN entity, where the user experience information is sent by the terminal device to the RAN entity.

[0042] Optionally, after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, receiving user experience information for the initial computing power service sent by the terminal device includes:

[0043] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, receiving user experience information for the initial computing power service actively sent by the terminal device, the user experience information being information about the user's subjective feelings about the initial computing power service; or

[0044] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, a user experience information collection request for the initial computing power service is sent to the terminal device, and the terminal device sends user experience information for the initial computing power service in response to the user experience information collection request. The user experience information is the user's subjective feeling information about the initial computing power service.

[0045] Optionally, the receiving user experience information for the initial computing power service actively sent by the terminal device includes:

[0046] receiving user experience information sent by a RAN entity, where the user experience information is actively sent by the terminal device to the RAN entity; or

[0047] The sending a user experience information collection request for the initial computing power service to the terminal device, and receiving user experience information for the initial computing power service sent by the terminal device in response to the user experience information collection request, includes:

[0048] The user experience information collection request is sent to the RAN entity, so that the RAN entity sends the user experience information collection request to the terminal device and receives the user experience information sent by the RAN entity, where the user experience information is sent by the terminal device to the RAN entity in response to the user experience information collection request.

[0049] Optionally, the initiating corresponding measurement according to the user experience information includes:

[0050] Perform cause analysis based on the user experience information, determine a measurement task based on the analysis results, and execute the measurement task, wherein the measurement task includes at least one of the following: terminal device capability measurement, computing power node computing capability measurement, and network service quality measurement.

[0051] Optionally, performing cause analysis based on the user experience information, determining a measurement task based on the analysis result, and executing the measurement task includes:

[0052] Determining a predicted cause for triggering the user experience event type according to the user experience information, determining a measurement task corresponding to the predicted cause as a measurement task with the highest priority, and executing the measurement task with the highest priority;

[0053] After the highest priority measurement task is executed, if it is determined that the predicted cause is the actual cause that triggers the user experience event type, then the measurement task is terminated; or

[0054] If it is determined that the predicted cause is not the actual cause that triggers the user experience event type, other measurement tasks are performed.

[0055] Optionally, determining a predicted cause for triggering the user experience event type according to the user experience information includes:

[0056] If the user experience information is related to an application for accessing the initial computing power service, determining that the predicted cause of triggering the user experience event type is insufficient terminal device capability; or

[0057] If the user experience information is related to a freeze or execution failure during the execution of a service through the initial computing power service, then determining that the predicted cause of triggering the user experience event type is insufficient computing power of the initial computing power service and / or insufficient network service quality; or

[0058] If the user experience information is a connection problem for accessing the initial computing power service, the predicted cause of triggering the user experience event type is determined to be insufficient ability of the terminal device to access the network or mismatch of the terminal device type.

[0059] Optionally, determining an adjusted computing power service routing strategy based on the measurement result and sending the strategy to the terminal device, or sending feedback information to the terminal device, includes:

[0060] If it is determined based on the measurement results that the actual cause of triggering the user experience event type is a network reason, a new computing power service routing strategy to reach the initial computing power service is determined and sent to the terminal device; or

[0061] If it is determined based on the measurement results that the actual cause of triggering the user experience event type is the initial computing power service cause, a new computing power service is determined, a new computing power service routing strategy to reach the new computing power service is determined, and sent to the terminal device; or

[0062] If it is determined according to the measurement result that the actual cause of triggering the user experience event type is the terminal device, sending feedback information to the terminal device, the feedback information including the actual cause and / or solution; or

[0063] If it is determined based on the measurement results that the actual cause of triggering the user experience event type is the terminal device, a new computing service routing strategy to the new computing service is determined based on the terminal device capabilities, computing resource status, and network resource status, and is sent to the terminal device; or

[0064] If it is determined based on the measurement results that the actual cause of triggering the user experience event type is the terminal device, and it is determined that the terminal device cannot improve its capabilities, a new computing power service with computing power lower than that of the initial computing power service is determined, a new computing power service routing strategy to reach the new computing power service is determined, and the strategy is sent to the terminal device.

[0065] Optionally, determining an adjusted computing power service routing strategy based on the measurement result and sending the strategy to the terminal device, or sending feedback information to the terminal device, includes:

[0066] Determine an adjusted computing power service routing policy according to the measurement result, and send the adjusted computing power service routing policy to the RAN entity, so that the RAN entity sends the adjusted computing power service routing policy to the terminal device; or

[0067] The feedback information is sent to a RAN entity, so that the RAN entity sends the feedback information to the terminal device.

[0068] Optionally, determining the initial computing power service routing strategy according to the service requirements of the terminal device includes:

[0069] receiving a service requirement sent by the terminal device, and determining an initial service routing strategy according to the service requirement; or

[0070] Receive a service requirement sent by a RAN entity, where the service requirement is sent by the terminal device to the RAN entity, and determine an initial service routing strategy based on the service requirement.

[0071] Optionally, sending the initial computing power service routing policy to the terminal device includes:

[0072] The initial computing power service routing policy is sent to a RAN entity, so that the RAN entity sends the initial computing power service routing policy to the terminal device.

[0073] Optionally, the method further includes:

[0074] The initial computing power service routing policy is sent to the core network entity so that the terminal device establishes a user plane path for accessing the initial computing power service corresponding to the initial computing power service routing policy according to the initial computing power service routing policy.

[0075] Optionally, sending the initial computing power service routing policy to the terminal device further includes:

[0076] The identifier of the computing power node where the initial computing power service is located and the identifier of the initial computing power service are sent to the terminal device.

[0077] In a second aspect, the present disclosure provides a method for processing computing power and network services, which is applied to a terminal device, and the method includes:

[0078] The receiving management center determines the initial computing power service routing strategy based on the business needs of the terminal device;

[0079] Access the corresponding initial computing power service according to the initial computing power service routing policy;

[0080] Sending user experience information for the initial computing power service to the management center;

[0081] Receive the adjusted computing power service routing strategy or feedback information sent by the management center, wherein the adjusted computing power service routing strategy is the computing power service routing strategy adjusted by the management center after performing corresponding measurements based on the user experience information.

[0082] Optionally, the sending user experience information for the initial computing power service to the management center includes:

[0083] Receive a user experience event subscription message sent by the management center, wherein the user experience event subscription message includes a user experience event type for the initial computing power service;

[0084] Determine whether the user experience event type is triggered;

[0085] If it is determined that the user experience event type is triggered, user experience information for the initial computing power service is sent to the management center.

[0086] Optionally, the receiving a user experience event subscription message sent by the management center includes:

[0087] receiving the user experience event subscription message sent by the RAN entity, where the user experience event subscription message is sent by the management center to the RAN entity;

[0088] The sending of user experience information for the initial computing power service to the management center includes:

[0089] Send user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information for the initial computing power service to the management center.

[0090] Optionally, the sending user experience information for the initial computing power service to the management center includes:

[0091] Actively sending user experience information for the initial computing power service to the management center, where the user experience information is the user's subjective feeling information about the initial computing power service; or

[0092] Receive a user experience information collection request for the initial computing power service sent by the management center, and send user experience information for the initial computing power service to the management center in response to the user experience information collection request, where the user experience information is the user's subjective feeling information about the initial computing power service.

[0093] Optionally, the actively sending user experience information for the initial computing power service to the management center includes:

[0094] Actively sending user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information for the initial computing power service to the management center; or

[0095] The receiving a user experience information collection request for the initial computing power service sent by the management center, and sending the user experience information for the initial computing power service to the management center in response to the user experience information collection request, includes:

[0096] Receive a user experience information collection request for the initial computing power service sent by a RAN entity, where the user experience information collection request is actively sent by the terminal device to the RAN entity; and send user experience information for the initial computing power service to the RAN entity in response to the user experience information collection request, so that the RAN entity sends the user experience information of the initial computing power service to the management center.

[0097] Optionally, the method further includes:

[0098] Initiate terminal device computing power measurement at the management center, obtain one or more of the terminal device's load size, computing resource size, and computing resource utilization rate, and send the information to the management center; or

[0099] The management center starts measuring the ability of the terminal device to access the network, obtains one or more of the wireless access capability and the terminal device type of the terminal device, and sends the obtained information to the management center.

[0100] Optionally, the receiving the adjusted computing power service routing strategy or feedback information sent by the management center includes:

[0101] Receive the adjusted computing power service routing strategy or feedback information sent by the RAN entity, where the adjusted computing power service routing strategy or feedback information is sent by the management center to the RAN entity.

[0102] Optionally, accessing the corresponding initial computing power service according to the initial computing power service routing policy includes:

[0103] An application program for accessing the initial computing power service is started, and the initial computing power service is accessed through the application program.

[0104] Optionally, before the receiving management center determines the initial computing power service routing strategy according to the service requirements of the terminal device, the process further includes:

[0105] Sending the business requirements to the management center; or

[0106] The service requirement is sent to a RAN entity, so that the RAN entity sends the service requirement to the management center.

[0107] In a third aspect, the present disclosure provides a management center entity, including a memory, a transceiver, and a processor:

[0108] A memory for storing a computer program; a transceiver for transmitting and receiving data under the control of the processor; and a processor for reading the computer program in the memory and performing the following operations:

[0109] Determine an initial computing power service routing strategy based on the service requirements of the terminal device, and send the initial computing power service routing strategy to the terminal device;

[0110] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, receiving user experience information for the initial computing power service sent by the terminal device;

[0111] Initiate corresponding measurements based on the user experience information, determine an adjusted computing power service routing strategy based on the measurement results and send it to the terminal device, or send feedback information to the terminal device.

[0112] Optionally, after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, the processor, when receiving user experience information for the initial computing power service sent by the terminal device, is configured to:

[0113] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, sending a user experience event subscription message to the terminal device, wherein the user experience event subscription message includes a user experience event type for the initial computing power service;

[0114] Receive user experience information sent by the terminal device after the user experience event type is triggered, where the user experience information includes user experience data related to the user experience event type.

[0115] Optionally, the user experience event type includes one or more of the following:

[0116] The startup time of the application for accessing the initial computing power service exceeds a first preset time period; or

[0117] The number of restarts of the application used to access the initial computing power service exceeds a first preset number; or

[0118] The number of freezes during the execution of the service through the initial computing service exceeds a second preset number; or

[0119] During the execution of the service through the initial computing power service, a single pause time exceeds a second preset time length; or

[0120] The number of execution failures during the execution of the service through the initial computing power service exceeds a third preset number; or

[0121] The connection establishment delay for accessing the initial computing power service exceeds a third preset duration; or

[0122] The success rate of establishing a connection to the initial computing power service is lower than a preset success rate; or

[0123] The frequency of connection interruptions to the initial computing power service exceeds a preset frequency.

[0124] Optionally, the user experience data includes one or more of the following:

[0125] The time when the application used to access the initial computing power service is started; or

[0126] The number of times the application used to access the initial computing power service is restarted; or

[0127] The number of freezes and monitoring time periods during the execution of the service through the initial computing power service; or

[0128] A single pause in the execution of a service through the initial computing power service; or

[0129] The number of execution failures and monitoring time period during the execution of the service through the initial computing power service; or

[0130] The connection establishment delay for accessing the initial computing power service; or

[0131] The success rate of establishing a connection to the initial computing power service; or

[0132] The frequency of connection interruptions to the initial computing power service.

[0133] Optionally, after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, the processor is further configured to:

[0134] Establishing a computing power service mapping relationship, where the computing power service mapping relationship is a mapping relationship between one or more of the identifier of the terminal device, the identifier of the application used to access the initial computing power service, the identifier of the computing power node where the initial computing power service is located, and the identifier of the initial computing power service;

[0135] When the processor sends a user experience event subscription message to the terminal device, it is configured to:

[0136] Send a user experience event subscription message to the terminal device according to the computing power service mapping relationship.

[0137] Optionally, the user experience event subscription message further includes one or more of the following:

[0138] User experience event subscription message identifier, identifier of the terminal device, identifier of the application used to access the initial computing power service, and deadline for user experience event subscription.

[0139] Optionally, when the processor sends a user experience event subscription message to the terminal device, it is configured to:

[0140] Sending the user experience event subscription message to a radio access network RAN ​​entity, so that the RAN entity sends the user experience event subscription message to the terminal device;

[0141] When the processor receives the user experience information sent by the terminal device after the user experience event type is triggered, it is configured to:

[0142] Receive user experience information sent by the RAN entity, where the user experience information is sent by the terminal device to the RAN entity.

[0143] Optionally, after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, the processor, when receiving user experience information for the initial computing power service sent by the terminal device, is configured to:

[0144] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, receiving user experience information for the initial computing power service actively sent by the terminal device, the user experience information being information about the user's subjective feelings about the initial computing power service; or

[0145] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, a user experience information collection request for the initial computing power service is sent to the terminal device, and the terminal device sends user experience information for the initial computing power service in response to the user experience information collection request. The user experience information is the user's subjective feeling information about the initial computing power service.

[0146] Optionally, when the processor receives the user experience information for the initial computing power service actively sent by the terminal device, it is configured to:

[0147] receiving user experience information sent by a RAN entity, where the user experience information is actively sent by the terminal device to the RAN entity; or

[0148] When the processor sends a user experience information collection request for the initial computing power service to the terminal device and receives user experience information for the initial computing power service sent by the terminal device in response to the user experience information collection request, the processor is configured to:

[0149] The user experience information collection request is sent to the RAN entity, so that the RAN entity sends the user experience information collection request to the terminal device and receives the user experience information sent by the RAN entity, where the user experience information is sent by the terminal device to the RAN entity in response to the user experience information collection request.

[0150] Optionally, when the processor initiates corresponding measurement according to the user experience information, it is configured to:

[0151] Perform cause analysis based on the user experience information, determine a measurement task based on the analysis results, and execute the measurement task, wherein the measurement task includes at least one of the following: terminal device capability measurement, computing power node computing capability measurement, and network service quality measurement.

[0152] Optionally, the processor performs a cause analysis based on the user experience information, determines a measurement task based on the analysis result, and executes the measurement task, and is configured to:

[0153] Determining a predicted cause for triggering the user experience event type according to the user experience information, determining a measurement task corresponding to the predicted cause as a measurement task with the highest priority, and executing the measurement task with the highest priority;

[0154] After the highest priority measurement task is executed, if it is determined that the predicted cause is the actual cause that triggers the user experience event type, then the measurement task is terminated; or

[0155] If it is determined that the predicted cause is not the actual cause that triggers the user experience event type, other measurement tasks are performed.

[0156] Optionally, when the processor determines, according to the user experience information, a predicted cause for triggering the user experience event type, it is configured to:

[0157] If the user experience information is related to an application for accessing the initial computing power service, determining that the predicted cause of triggering the user experience event type is insufficient terminal device capability; or

[0158] If the user experience information is related to a freeze or execution failure during the execution of a service through the initial computing power service, then determining that the predicted cause of triggering the user experience event type is insufficient computing power of the initial computing power service and / or insufficient network service quality; or

[0159] If the user experience information is a connection problem for accessing the initial computing power service, the predicted cause of triggering the user experience event type is determined to be insufficient ability of the terminal device to access the network or mismatch of the terminal device type.

[0160] Optionally, when the processor determines an adjusted computing power service routing strategy based on the measurement result and sends the strategy to the terminal device, or sends feedback information to the terminal device, it is configured to:

[0161] If it is determined based on the measurement results that the actual cause of triggering the user experience event type is a network reason, a new computing power service routing strategy to reach the initial computing power service is determined and sent to the terminal device; or

[0162] If it is determined based on the measurement results that the actual cause of triggering the user experience event type is the initial computing power service cause, a new computing power service is determined, a new computing power service routing strategy to reach the new computing power service is determined, and sent to the terminal device; or

[0163] If it is determined according to the measurement result that the actual cause of triggering the user experience event type is the terminal device, sending feedback information to the terminal device, the feedback information including the actual cause and / or solution; or

[0164] If it is determined based on the measurement results that the actual cause of triggering the user experience event type is the terminal device, a new computing service routing strategy to the new computing service is determined based on the terminal device capabilities, computing resource status, and network resource status, and is sent to the terminal device; or

[0165] If it is determined based on the measurement results that the actual cause of triggering the user experience event type is the terminal device, and it is determined that the terminal device cannot improve its capabilities, a new computing power service with computing power lower than that of the initial computing power service is determined, a new computing power service routing strategy to reach the new computing power service is determined, and the strategy is sent to the terminal device.

[0166] Optionally, when the processor determines an adjusted computing power service routing strategy based on the measurement result and sends the strategy to the terminal device, or sends feedback information to the terminal device, it is configured to:

[0167] Determine an adjusted computing power service routing policy according to the measurement result, and send the adjusted computing power service routing policy to the RAN entity, so that the RAN entity sends the adjusted computing power service routing policy to the terminal device; or

[0168] The feedback information is sent to a RAN entity, so that the RAN entity sends the feedback information to the terminal device.

[0169] Optionally, when the processor determines the initial computing power service routing strategy according to the service requirements of the terminal device, it is configured to:

[0170] receiving a service requirement sent by the terminal device, and determining an initial service routing strategy according to the service requirement; or

[0171] Receive a service requirement sent by a RAN entity, where the service requirement is sent by the terminal device to the RAN entity, and determine an initial service routing strategy based on the service requirement.

[0172] Optionally, when the processor sends the initial computing power service routing policy to the terminal device, it is configured to:

[0173] The initial computing power service routing policy is sent to a RAN entity, so that the RAN entity sends the initial computing power service routing policy to the terminal device.

[0174] Optionally, the processor is further configured to:

[0175] The initial computing power service routing policy is sent to the core network entity so that the terminal device establishes a user plane path for accessing the initial computing power service corresponding to the initial computing power service routing policy according to the initial computing power service routing policy.

[0176] Optionally, when the processor sends the initial computing power service routing policy to the terminal device, it is further configured to:

[0177] The identifier of the computing power node where the initial computing power service is located and the identifier of the initial computing power service are sent to the terminal device.

[0178] In a fourth aspect, the present disclosure provides a terminal device, including a memory, a transceiver, and a processor:

[0179] A memory for storing a computer program; a transceiver for transmitting and receiving data under the control of the processor; and a processor for reading the computer program in the memory and performing the following operations:

[0180] The receiving management center determines the initial computing power service routing strategy based on the business needs of the terminal device;

[0181] Access the corresponding initial computing power service according to the initial computing power service routing policy;

[0182] Sending user experience information for the initial computing power service to the management center;

[0183] Receive the adjusted computing power service routing strategy or feedback information sent by the management center, wherein the adjusted computing power service routing strategy is the computing power service routing strategy adjusted by the management center after performing corresponding measurements based on the user experience information.

[0184] Optionally, when the processor sends the user experience information for the initial computing power service to the management center, it is configured to:

[0185] Receive a user experience event subscription message sent by the management center, wherein the user experience event subscription message includes a user experience event type for the initial computing power service;

[0186] Determine whether the user experience event type is triggered;

[0187] If it is determined that the user experience event type is triggered, user experience information for the initial computing power service is sent to the management center.

[0188] Optionally, when the processor receives a user experience event subscription message sent by the management center, it is configured to:

[0189] receiving the user experience event subscription message sent by the RAN entity, where the user experience event subscription message is sent by the management center to the RAN entity;

[0190] When the processor sends the user experience information for the initial computing power service to the management center, it is configured to:

[0191] Send user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information for the initial computing power service to the management center.

[0192] Optionally, when the processor sends the user experience information for the initial computing power service to the management center, it is configured to:

[0193] Actively sending user experience information for the initial computing power service to the management center, where the user experience information is the user's subjective feeling information about the initial computing power service; or

[0194] Receive a user experience information collection request for the initial computing power service sent by the management center, and send user experience information for the initial computing power service to the management center in response to the user experience information collection request, where the user experience information is the user's subjective feeling information about the initial computing power service.

[0195] Optionally, when the processor proactively sends user experience information for the initial computing power service to the management center, it is configured to:

[0196] Actively sending user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information for the initial computing power service to the management center; or

[0197] The processor receives a user experience information collection request for the initial computing power service sent by the management center, and sends user experience information for the initial computing power service to the management center in response to the user experience information collection request, and is configured to:

[0198] Receive a user experience information collection request for the initial computing power service sent by a RAN entity, where the user experience information collection request is actively sent by the terminal device to the RAN entity; and send user experience information for the initial computing power service to the RAN entity in response to the user experience information collection request, so that the RAN entity sends the user experience information of the initial computing power service to the management center.

[0199] Optionally, the processor is further configured to:

[0200] Initiate terminal device computing power measurement at the management center, obtain one or more of the terminal device's load size, computing resource size, and computing resource utilization rate, and send the information to the management center; or

[0201] The management center starts measuring the ability of the terminal device to access the network, and then obtains one or more of the wireless access capability and the type of the terminal device, and sends the information to the management center.

[0202] Optionally, when the processor receives the adjusted computing power service routing strategy or feedback information sent by the management center, it is configured to:

[0203] Receive the adjusted computing power service routing strategy or feedback information sent by the RAN entity, where the adjusted computing power service routing strategy or feedback information is sent by the management center to the RAN entity.

[0204] Optionally, when the processor accesses the corresponding initial computing power service according to the initial computing power service routing policy, it is configured to:

[0205] An application program for accessing the initial computing power service is started, and the initial computing power service is accessed through the application program.

[0206] Optionally, before receiving the initial computing power service routing strategy determined by the management center according to the service requirements of the terminal device, the processor is further configured to:

[0207] Sending the business requirements to the management center; or

[0208] The service requirement is sent to a RAN entity, so that the RAN entity sends the service requirement to the management center.

[0209] In a fifth aspect, the present disclosure provides a computing power and network service processing device, including:

[0210] A computing power service orchestration unit, configured to determine an initial computing power service routing strategy based on the service requirements of the terminal device, and send the initial computing power service routing strategy to the terminal device;

[0211] a user experience information acquisition unit, configured to receive user experience information for the initial computing power service sent by the terminal device after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy;

[0212] A computing power service adjustment unit is used to start corresponding measurements based on the user experience information, determine the adjusted computing power service routing strategy based on the measurement results and send it to the terminal device, or send feedback information to the terminal device.

[0213] In a sixth aspect, the present disclosure provides a computing power and network service processing device, including:

[0214] A receiving unit, configured to receive an initial computing power service routing strategy determined by a management center based on the service requirements of a terminal device;

[0215] An access unit, configured to access the corresponding initial computing power service according to the initial computing power service routing policy;

[0216] A sending unit, configured to send user experience information for the initial computing power service to the management center;

[0217] The receiving unit is also used to receive the adjusted computing power service routing strategy or feedback information sent by the management center, wherein the adjusted computing power service routing strategy is the computing power service routing strategy adjusted by the management center after performing corresponding measurements based on the user experience information.

[0218] In a seventh aspect, the present disclosure provides a non-transitory readable storage medium, wherein the non-transitory readable storage medium stores a computer program, and the computer program is used to enable a processor to execute the method described in the first aspect or the second aspect above.

[0219] The processing method, device and storage medium of computing power and network services provided by the present disclosure determine the initial computing power service routing strategy according to the business needs of the terminal device through the management center, and send the initial computing power service routing strategy to the terminal device; after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing strategy, receive the user experience information for the initial computing power service sent by the terminal device; start corresponding measurements according to the user experience information, determine the adjusted computing power service routing strategy according to the measurement results and send it to the terminal device, or send feedback information to the terminal device. By obtaining the user experience information for the initial computing power service and performing corresponding measurements, the computing power service routing strategy or feedback information is adjusted, thereby improving the user experience of the computing power service in a targeted manner, and at the same time making more full and reasonable use of computing network resources, optimizing resource allocation, and more efficiently realizing the value of computing network resources.

[0220] It should be understood that the contents described in the above summary of the invention are not intended to limit the key or important features of the embodiments of the present disclosure, nor are they intended to limit the scope of the present disclosure. Other features of the present disclosure will become easier to understand through the following description. BRIEF DESCRIPTION OF THE DRAWINGS

[0221] In order to more clearly illustrate the technical solutions in the present disclosure or the prior art, a brief introduction will be given below to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present disclosure. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.

[0222] FIG1 is a schematic diagram of an application scenario of a method for processing computing power and network services provided by an embodiment of the present disclosure;

[0223] FIG2 is a flow chart of a method for processing computing power and network services provided by an embodiment of the present disclosure;

[0224] FIG3 is a flow chart of a method for processing computing power and network services provided by another embodiment of the present disclosure;

[0225] FIG4 is a flowchart of a method for processing computing power and network services provided by another embodiment of the present disclosure;

[0226] FIG5 is a signaling diagram of a method for processing computing power and network services provided by an embodiment of the present disclosure;

[0227] FIG6 is a signaling diagram of a method for processing computing power and network services provided by another embodiment of the present disclosure;

[0228] FIG7 is a structural diagram of a management center entity provided by an embodiment of the present disclosure;

[0229] FIG8 is a structural diagram of a terminal device provided by an embodiment of the present disclosure;

[0230] FIG9 is a structural diagram of a device for processing computing power and network services provided by an embodiment of the present disclosure;

[0231] FIG10 is a structural diagram of a device for processing computing power and network services provided by another embodiment of the present disclosure. DETAILED DESCRIPTION

[0232] In this disclosure, the term "and / or" describes the relationship between associated objects, indicating that three possible relationships exist. For example, A and / or B can represent: A exists alone, A and B exist simultaneously, and B exists alone. The character " / " generally indicates that the associated objects are in an "or" relationship.

[0233] In the embodiments of the present disclosure, the term "plurality" refers to two or more, and other quantifiers are similar. In addition, the terms "first," "second," etc. are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features.

[0234] In the existing technology, the research on computing power networks is currently mainly based on the bearer network. In the overall architecture of the computing power network, the computing network infrastructure layer is proposed as a new infrastructure layer of the computing power network, and the computing power service layer, computing power routing layer and computing network orchestration management layer are used as the three core functional modules to make the computing power network perceptible, controllable and manageable, realizing the perception, control and management of computing power and network resources.

[0235] The computing network supports the perception and notification of computing power and network information. Entry network nodes obtain the currently available resource status of network nodes, computing power nodes, and other node devices. Network information may include network topology, bandwidth, latency, jitter, etc.; computing power information includes computing power enablement information, deployment location, and status of nodes deployed in the network. This information can refer to capabilities such as the number of service / task connections, CPU / GPU computing power, deployment form (physical, virtual), deployment location (corresponding IP address), storage capacity, storage form, etc. It can also refer to computing power abstracted from the above basic computing power resources, which is used to reflect the currently available computing power, distribution location, and form of each node.

[0236] The computing network management center can orchestrate computing services and adjust policies through business-side computing resource status awareness and network-side network resource status awareness. However, computing service orchestration and policy adjustments lack awareness of user experience. They only aim to meet user service needs based on the computing resource status and network resource status. This can result in a poor user experience and fail to meet user expectations. For example, when a user uses XR-type interactive services, although both computing power and the network meet the user's service needs, the user experience may not be as expected (for example, insufficient computing power on the user terminal device itself, excessive service load, insufficient wireless access capabilities, mismatched terminal types, etc., resulting in the inability to achieve the expected high-bandwidth, low-latency service effect). Because the computing network lacks awareness of user experience, it cannot adjust the scheduling policy and optimize computing resources based on user experience, resulting in a poor user experience of computing services and irrational allocation of computing and network resources.

[0237] In a related technology, user experience-based mobile network quality assessment research can be conducted. This assessment targets voice, video, data, and other services, measuring key indicators related to user experience. For voice services, the connection rate, call drop rate, call setup time, and voice quality are tested through the business processes of sending requests, establishing connections, maintaining calls, and ending calls. For data services, the web page access success rate, web page first screen response time, file upload / download success rate, file upload / download time, and upload / download rate are tested through business scenarios such as web browsing, FTP / HTTP file upload and download, and software speed testing. For video services, the video playback success rate, first frame response time, number of freezes, and video playback quality are tested through live video scenarios.

[0238] However, mobile network quality evaluation based on user experience is also conducted from the perspective of network operators, using testing tools to test user experience-oriented indicators, and is not combined with computing power services.

[0239] Another related technology provides a method for evaluating Quality of Experience (QoE). QoE refers to the user's subjective perception of the quality and performance of a device, network, system, application, or service. QoE refers to the user's perceived ease or difficulty in completing the entire process. Key QoE indicators generally include: service-related indicators such as connection establishment latency, connection establishment success rate, and connection interruption frequency; and video-related indicators such as freeze frequency, startup time, average bitrate, and playback failure rate.

[0240] QoE evaluation methods include objective evaluation methods and subjective evaluation methods:

[0241] Objective evaluation methods primarily involve mapping QoE parameters to QoS (Quality of Service) parameters. Currently, there is no unified standard for measuring QoE parameters. Commonly used QoE measurement methods in the industry fall into three categories: client-side measurement, network measurement, and server-side measurement.

[0242] Client-side measurement method: Using tools to directly measure the QoE of user services at the client can provide more accurate objective data and application-layer quality indicators.

[0243] Network measurement: Network service providers can collect more and more real-time network QoS data, such as throughput, packet loss, jitter, and out-of-order traffic. However, this information cannot directly reflect the network's QoE. The main purpose of network QoE measurement is to use network QoS indicators to predict the QoE of online video.

[0244] Server measurement method: Collects each data packet on the service server and reconstructs the service session. It can analyze information such as the number of interruptions, initial startup time, duration of freezes, and bitrate switching frequency.

[0245] The subjective evaluation method mainly reflects the user's perception of service quality through subjective evaluation methods such as user surveys and user complaint analysis.

[0246] However, the QoE evaluation method requires the use of tools on the terminal side for direct measurement. It is not integrated with the computing power network and does not have data perception and feedback for computing power services.

[0247] In order to solve the above technical problems, the present disclosure provides a method for processing computing power and network services, wherein the management center determines the initial computing power service routing strategy according to the business needs of the terminal device, and sends the initial computing power service routing strategy to the terminal device; after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing strategy, the user experience information for the initial computing power service sent by the terminal device is received; corresponding measurements are initiated according to the user experience information, and the adjusted computing power service routing strategy is determined according to the measurement results and sent to the terminal device, or feedback information is sent to the terminal device. By obtaining the user experience information for the initial computing power service and performing corresponding measurements, the computing power service routing strategy or feedback information is adjusted, thereby improving the user experience of the computing power service in a targeted manner, while making more full and reasonable use of computing network resources, optimizing resource allocation, and more efficiently realizing the value of computing network resources.

[0248] The embodiment of the present disclosure is applied to the application scenario shown in Figure 1, which includes a terminal device, a management center, and a computing power network, wherein the terminal device can send business needs to the management center, and the management center determines the initial computing power service routing strategy based on the business needs of the terminal device and sends it to the terminal device. The terminal device accesses the corresponding initial computing power service according to the initial computing power service routing strategy and sends user experience information for the initial computing power service to the management center. The management center initiates corresponding measurements based on the user experience information, determines the adjusted computing power service routing strategy based on the measurement results, and sends it to the terminal device, or sends feedback information to the terminal device.

[0249] The computing power and network service processing method disclosed in the present invention can be applied in fixed network scenarios as well as in mobile communication network scenarios.

[0250] Among them, the mobile communication network can be any mobile communication network, including but not limited to various mobile communication network systems such as 4G network, 5G network, 6G network, such as global system of mobile communication (GSM) system, code division multiple access (CDMA) system, wideband code division multiple access (WCDMA) general packet radio service (GPRS) system, long term evolution (LTE) system, LTE frequency division duplex (FDD) system, LTE time division duplex (TDD) system, long term evolution advanced (LTE-A) system, universal mobile telecommunication system (UMTS), world-wide interoperability for microwave access (WiMAX) system, 5G new radio (NR) system, etc.

[0251] The terminal device involved in the embodiments of the present disclosure may be a device that provides voice and / or data connectivity to a user. In a fixed network scenario, the terminal device may be a wired terminal device or a wireless terminal device. In a mobile communication network scenario, the terminal device may be a handheld device with wireless connection capabilities, or other processing devices connected to a wireless modem. In different systems, the name of the terminal device may also be different. For example, in a 5G system, the terminal device may be called a user equipment (UE). The wireless terminal device can communicate with one or more core networks (CN) via a radio access network (RAN). The wireless terminal device may be a mobile terminal device, such as a mobile phone (or "cellular" phone) and a computer with a mobile terminal device. For example, it may be a portable, pocket-sized, handheld, computer-built-in or vehicle-mounted mobile device that exchanges voice and / or data with the radio access network. For example, Personal Communication Service (PCS) phones, cordless phones, Session Initiated Protocol (SIP) phones, Wireless Local Loop (WLL) stations, Personal Digital Assistants (PDAs), etc. Wireless terminal devices may also be referred to as systems, subscriber units, subscriber stations, mobile stations, mobile stations, remote stations, access points, remote terminal devices, access terminal devices, user terminal devices, user agents, and user devices, but are not limited in the embodiments of the present disclosure.

[0252] The following will be combined with the accompanying drawings in the embodiments of the present disclosure to clearly and completely describe the technical solutions in the embodiments of the present disclosure. Obviously, the embodiments described are only part of the embodiments of the present disclosure and not all of the embodiments. Based on the embodiments of the present disclosure, all other embodiments obtained by ordinary technicians in this field without making any creative efforts shall fall within the scope of protection of the present disclosure.

[0253] Among them, the method and the device are based on the same application concept. Since the principles of solving problems by the method and the device are similar, the implementation of the device and the method can refer to each other, and the repeated parts will not be repeated.

[0254] Figure 2 is a flow chart of a method for processing computing power and network services provided by this embodiment. As shown in Figure 2, this embodiment provides a method for processing computing power and network services, and the execution entity is a management center.

[0255] The specific steps of this method are as follows:

[0256] S201. Determine an initial computing power service routing strategy based on the service requirements of the terminal device, and send the initial computing power service routing strategy to the terminal device.

[0257] In this embodiment, the terminal device may have certain business needs, such as rendering a video, and the terminal device may not have a video rendering function, so it can achieve video rendering by accessing a computing service. The terminal device can send the business needs to the management center, where the business needs include computing power requirements, such as the required service type, the required service resource size, etc. The business needs may also include network requirements, such as bandwidth requirements, latency requirements, etc.; further, the management center can allocate an initial computing service to the terminal device based on the business needs of the terminal device, and compose an initial computing service routing policy (that is, a routing path for the terminal device to access the initial computing service), and send the initial computing service routing policy to the terminal device. Optionally, since the computing service is deployed on a computing node, and one or more computing services may be deployed on a computing node, the initial computing service routing policy can be a routing path for the terminal device to access the computing node where the initial computing service is located. The management center will also send the identifier of the computing node where the initial computing service is located and the identifier of the initial computing service to the terminal device, so that the terminal device can access the initial computing service according to the identifier of the initial computing service after accessing the computing node.

[0258] Among them, in the fixed network scenario, the terminal device can send business requirements to the management center. After the management center receives the business requirements sent by the terminal device, it determines the initial service routing strategy based on the business requirements and sends the initial computing power service routing strategy to the terminal device; in the mobile communication network scenario, the terminal device can send business requirements to the RAN (Radio Access Network) entity, and the RAN entity sends the business requirements to the management center. After the management center receives the business requirements sent by the RAN entity, it determines the initial service routing strategy based on the business requirements. Furthermore, the management center sends the initial computing power service routing strategy to the RAN entity, and the RAN entity sends the initial computing power service routing strategy to the terminal device.

[0259] S202: After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, receive user experience information for the initial computing power service sent by the terminal device.

[0260] In this embodiment, after receiving the initial computing power service routing strategy, the terminal device can access the corresponding initial computing power service according to the initial computing power service routing strategy. Optionally, the terminal device can access the initial computing power service through an application (APP). For different computing power services, the terminal device can use the same application (APP) to access, or can use different applications (APPs) to access, and of course can also access without going through the application.

[0261] After the terminal device accesses the initial computing power service, the terminal device may send user experience information for the initial computing power service to the management center, where the user experience information for the initial computing power service may be parameter data that can reflect the user experience, such as the startup time and number of restarts of the application accessing the initial computing power service, the initial computing power service freeze duration, freeze times, and failure times, the connection establishment delay, success rate, and terminal frequency for accessing the initial computing power service; or it may be the user's subjective feeling information about the initial computing power service, such as whether the user is satisfied with the initial computing power service, the level of satisfaction, existing problems, whether to continue using the initial computing power service, suggestions, etc.

[0262] Among them, in the fixed network scenario, the terminal device can directly send the user experience information for the initial computing power service to the management center; in the mobile communication network scenario, the terminal device can send the user experience information for the initial computing power service to the RAN entity, and the RAN entity will send the user experience information for the initial computing power service to the management center.

[0263] S203: Initiate corresponding measurements based on the user experience information, determine an adjusted computing power service routing strategy based on the measurement results, and send the strategy to the terminal device, or send feedback information to the terminal device.

[0264] In this embodiment, after the management center receives the user experience information, it can initiate corresponding measurements based on the user experience information, where the measurements may include at least one of terminal device capability measurement, computing power node computing power measurement, and network service quality measurement; based on the measurement results, the cause of the user experience problem can be determined, and the computing power service routing strategy can be adjusted. When adjusting the computing power service routing strategy, the computing power resource status, network resource status, etc. can also be combined to finally obtain the adjusted computing power service routing strategy and send it to the terminal device, or send feedback information to the terminal device, such as the cause of the user experience problem and / or improvement suggestions.

[0265] Among them, in the fixed network scenario, the management center sends the adjusted computing power service routing strategy or feedback information to the terminal device; in the mobile communication network scenario, the management center can send the adjusted computing power service routing strategy or feedback information to the RAN entity, and the RAN entity will send the adjusted computing power service routing strategy or feedback information to the management center.

[0266] The method for processing computing power and network services of this embodiment is to determine the initial computing power service routing strategy according to the business needs of the terminal device through the management center, and send the initial computing power service routing strategy to the terminal device; after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing strategy, receive the user experience information for the initial computing power service sent by the terminal device; start corresponding measurements according to the user experience information, determine the adjusted computing power service routing strategy according to the measurement results and send it to the terminal device, or send feedback information to the terminal device. By obtaining the user experience information for the initial computing power service and performing corresponding measurements, the computing power service routing strategy or feedback information is adjusted, thereby improving the user experience of the computing power service in a targeted manner, and at the same time making more full and reasonable use of computing network resources, optimizing resource allocation, and more efficiently realizing the value of computing network resources.

[0267] In an optional embodiment, based on any of the above embodiments, as shown in FIG3 , after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, receiving user experience information for the initial computing power service sent by the terminal device in S202 may specifically include:

[0268] S301. After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, send a user experience event subscription message to the terminal device, wherein the user experience event subscription message includes a user experience event type for the initial computing power service;

[0269] In this embodiment, the management center can subscribe to user experience information in a subscription manner, that is, after the terminal device accesses the initial computing power service, the management center can send a user experience event subscription message to the terminal device. The user experience event subscription message includes the user experience event type for the initial computing power service. Of course, the user experience event subscription message may also include one or more of the following: user experience event subscription message identifier, terminal device identifier, identifier of the application used to access the initial computing power service, deadline for user experience event subscription (such as the computing power service expiration time, or a time point before the computing power service expiration deadline), etc.

[0270] Optionally, the user experience event type includes one or more of the following:

[0271] The startup time of the application used to access the initial computing power service exceeds the first preset time period; or

[0272] The number of restarts of the application used to access the initial computing power service exceeds a first preset number; or

[0273] The number of freezes during the execution of the service through the initial computing power service exceeds a second preset number; or

[0274] The single pause time during the execution of the service through the initial computing power service exceeds the second preset time period; or

[0275] The number of execution failures during the execution of the service through the initial computing power service exceeds a third preset number; or

[0276] The connection establishment delay for accessing the initial computing power service exceeds a third preset duration; or

[0277] The connection establishment success rate for accessing the initial computing power service is lower than the preset success rate; or

[0278] The frequency of connection interruptions to the initial computing power service exceeds the preset frequency.

[0279] Among them, in the fixed network scenario, the management center can send the user experience event subscription message directly to the terminal device; in the mobile communication network scenario, the management center can send the user experience event subscription message to the RAN entity, and the RAN entity will send the user experience event subscription message to the terminal device.

[0280] In addition, optionally, after the terminal device accesses the initial computing power service, the management center may also establish a computing power service mapping relationship. The computing power service mapping relationship is a mapping relationship between one or more of the terminal device's identifier, the application identifier used to access the initial computing power service, the identifier of the computing power node where the initial computing power service is located, and the identifier of the initial computing power service, for easy management; and when the management center sends a user experience event subscription message to the terminal device, it can determine the information required in the user experience event subscription message based on the computing power service mapping relationship, and then send the user experience event subscription message to the terminal device.

[0281] S302: Receive user experience information sent by the terminal device after the user experience event type is triggered, where the user experience information includes user experience data related to the user experience event type.

[0282] In this embodiment, the terminal device can determine whether the user experience event type is triggered based on the user experience event subscription message, and send user experience information to the management center after the user experience event type is triggered. The user experience information includes user experience data related to the user experience event type. Optionally, the user experience data includes one or more of the following:

[0283] The time the application used to access the Initial Computing Service is launched; or

[0284] The number of times the application used to access the Initial Computing Service is restarted; or

[0285] The number of freezes and monitoring time periods during the execution of the service through the initial computing power service; or

[0286] A single pause in the execution of a service through the initial computing power service; or

[0287] The number of execution failures and monitoring time periods during the execution of the service through the initial computing power service; or

[0288] The connection establishment delay to access the initial computing power service; or

[0289] The success rate of establishing connections to the initial computing power service; or

[0290] Frequency of connection interruptions to the initial computing power service.

[0291] In the fixed network scenario, the terminal device sends the user experience information to the management center; in the mobile communication network scenario, the terminal device sends the user experience information to the RAN entity, and the RAN entity sends the user experience information to the management center.

[0292] In another optional embodiment, based on any of the above embodiments, after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, receiving user experience information for the initial computing power service sent by the terminal device in S202 may specifically include:

[0293] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, user experience information for the initial computing power service actively sent by the terminal device is received, where the user experience information is the user's subjective feeling information about the initial computing power service.

[0294] In this embodiment, after the terminal device accesses the initial computing power service, the user can actively feedback user experience information for the initial computing power service to the management center, for example, through an application on the terminal device (such as an application for accessing the initial computing power service), a phone, a browser, etc., and the user experience information feedback by the user can be the user's subjective feeling information about the initial computing power service, such as whether the user is satisfied with the initial computing power service, the level of satisfaction, existing problems (such as too slow speed, unclear content, lag, audio and video out of sync, etc.), whether to continue using the initial computing power service, suggestions, etc.

[0295] In the fixed network scenario, the terminal device sends the user experience information to the management center; in the mobile communication network scenario, the terminal device sends the user experience information to the RAN entity, and the RAN entity sends the user experience information to the management center.

[0296] In another optional embodiment, based on any of the above embodiments, after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, receiving user experience information for the initial computing power service sent by the terminal device in S202 may specifically include:

[0297] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, a user experience information collection request for the initial computing power service is sent to the terminal device, and the terminal device sends user experience information for the initial computing power service in response to the user experience information collection request. The user experience information is the user's subjective feeling information about the initial computing power service.

[0298] In this embodiment, after the terminal device accesses the initial computing power service, the management center may send a user experience information collection request for the initial computing power service to the terminal device in real time or periodically. After receiving the user experience information collection request, the terminal device may input the user experience information and send it to the management center. The user experience information is the same as above, which can be the user's subjective feeling information about the initial computing power service, such as whether the user is satisfied with the initial computing power service, the degree of satisfaction, existing problems (such as too slow speed, unclear content, lag, audio and video out of sync, etc.), whether to continue using the initial computing power service, suggestions, etc.

[0299] Among them, in the fixed network scenario, the management center sends a user experience information collection request to the terminal device, and the terminal device sends the user experience information to the management center; in the mobile communication network scenario, the management center sends a user experience information collection request to the RAN entity, and the RAN entity sends the user experience information collection request to the terminal device, the terminal device sends the user experience information to the RAN entity, and the RAN entity sends the user experience information to the management center.

[0300] Based on any of the foregoing embodiments, initiating corresponding measurements according to the user experience information in S203 may specifically include:

[0301] Perform cause analysis based on the user experience information, determine a measurement task based on the analysis results, and execute the measurement task, wherein the measurement task includes at least one of the following: terminal device capability measurement, computing power node computing capability measurement, and network service quality measurement.

[0302] In this embodiment, after receiving the user experience information, a cause analysis can be performed based on the user experience information to determine the predicted cause for triggering the relevant user experience event type, that is, the most likely cause, and then determine the measurement task corresponding to the predicted cause to verify whether the predicted cause is accurate. The predicted cause may be one or more of a terminal device capability problem, an initial computing power service computing capability problem, or a network service quality problem, and then the corresponding measurement task is executed for verification.

[0303] More specifically, performing cause analysis based on the user experience information, determining a measurement task based on the analysis result, and executing the measurement task may include:

[0304] Determining a predicted cause for triggering the user experience event type according to the user experience information, determining a measurement task corresponding to the predicted cause as a measurement task with the highest priority, and executing the measurement task with the highest priority;

[0305] After the highest priority measurement task is executed, if it is determined that the predicted cause is the actual cause that triggers the user experience event type, then the measurement task is terminated; or

[0306] If it is determined that the predicted cause is not the actual cause that triggers the user experience event type, other measurement tasks are performed.

[0307] In this embodiment, the predicted cause is only the most likely cause for triggering the user experience event type, which is not necessarily accurate, and other causes may also trigger the user experience event type. Therefore, in this embodiment, when determining the measurement task, only the measurement task corresponding to the predicted cause is used as the measurement task with the highest priority, and the measurement task with the highest priority is executed first, that is, the predicted cause is verified first. If it is verified that the predicted cause is indeed the actual cause for triggering the user experience event type, the measurement task is terminated and there is no need to execute other measurement tasks; otherwise, if it is determined that the predicted cause is not the actual cause for triggering the user experience event type, other measurement tasks are executed to determine the actual cause for triggering the user experience event type.

[0308] Optionally, determining the predicted cause of triggering the user experience event type according to the user experience information may specifically include:

[0309] If the user experience information is related to an application for accessing the initial computing power service, determining that the predicted cause of triggering the user experience event type is insufficient terminal device capability; or

[0310] If the user experience information is related to a freeze or execution failure during the execution of a service through the initial computing power service, then the predicted cause of triggering the user experience event type is determined to be insufficient computing power of the initial computing power service (such as an excessively high load on the initial computing power service) and / or insufficient network service quality (such as insufficient network bandwidth); or

[0311] If the user experience information is a connection problem for accessing the initial computing power service, the predicted cause of triggering the user experience event type is determined to be insufficient ability of the terminal device to access the network or mismatch of the terminal device type.

[0312] Based on the above embodiment, the step of determining the adjusted computing power service routing strategy based on the measurement result and sending it to the terminal device, or sending feedback information to the terminal device, in step S203, may specifically include:

[0313] If it is determined based on the measurement results that the actual cause of triggering the user experience event type is a network reason, a new computing power service routing strategy for reaching the initial computing power service is determined, that is, the initial computing power service remains unchanged, the routing path for the terminal device to access the initial computing power service is changed, a new computing power service routing strategy for the terminal device to reach the initial computing power service is obtained, and the new computing power service routing strategy is sent to the terminal device;

[0314] Alternatively, if it is determined based on the measurement results that the actual cause of triggering the user experience event type is the initial computing power service cause, a new computing power service is determined, and a new computing power service routing strategy for reaching the new computing power service is determined, that is, the new computing power service is replaced. Accordingly, the computing power service routing strategy also needs to be updated to the new computing power service routing strategy for reaching the new computing power service, and the new computing power service routing strategy is sent to the terminal device;

[0315] Alternatively, if it is determined according to the measurement result that the actual cause of triggering the user experience event type is the terminal device, feedback information is sent to the terminal device, where the feedback information includes the actual cause and / or solution to facilitate the user to solve the problem;

[0316] Alternatively, if it is determined based on the measurement results that the actual cause of triggering the user experience event type is the terminal device, a new computing power service routing strategy for reaching the new computing power service is determined based on the terminal device capabilities, computing power resource status, and network resource status. That is, in the case of insufficient terminal device capabilities, the management center may, based on the computing power resource status and network resource status, orchestrate a new computing power service and new network resources for the terminal device that meet the terminal device capabilities, determine a new computing power service routing strategy for reaching the new computing power service, and send the new computing power service routing strategy to the terminal device;

[0317] Alternatively, if it is determined based on the measurement results that the actual reason for triggering the user experience event type is the terminal device, and it is determined that the terminal device is unable to improve its capabilities (such as monitoring the terminal device capability reporting status for a long time and finding that the terminal device capability has not changed or has not improved), then a new computing power service with computing power lower than the initial computing power service is determined, and a new computing power service routing strategy to reach the new computing power service is determined. That is, since the terminal device is unable to improve its capabilities, in order to avoid wasting computing network resources, a new computing power service with relatively low computing power can be arranged for the terminal device, and a new computing power service routing strategy to reach the new computing power service can be determined, and the new computing power service routing strategy can be sent to the terminal device, while the initial computing power service is freed up to provide to other more urgent businesses, so that the computing network resources are fully and reasonably utilized, resource overhead is saved, and resource allocation is optimized.

[0318] Figure 4 is a flow chart of the method for processing computing power and network services provided by this embodiment. As shown in Figure 2, this embodiment provides a method for processing computing power and network services, which is executed by a terminal device and is an embodiment of the method on the terminal device side in the above embodiment.

[0319] The specific steps of this method are as follows:

[0320] S401. The receiving management center determines an initial computing power service routing strategy based on the service requirements of the terminal device;

[0321] S402: Access the corresponding initial computing power service according to the initial computing power service routing policy;

[0322] S403: Sending user experience information for the initial computing power service to the management center;

[0323] S404. Receive the adjusted computing power service routing strategy or feedback information sent by the management center, wherein the adjusted computing power service routing strategy is the computing power service routing strategy adjusted by the management center after performing corresponding measurements based on the user experience information.

[0324] In an optional embodiment, the sending of user experience information for the initial computing power service to the management center in S403 includes:

[0325] Receive a user experience event subscription message sent by the management center, wherein the user experience event subscription message includes a user experience event type for the initial computing power service;

[0326] Determine whether the user experience event type is triggered;

[0327] If it is determined that the user experience event type is triggered, user experience information for the initial computing power service is sent to the management center.

[0328] Optionally, in a scenario of a mobile communication network, the receiving a user experience event subscription message sent by the management center includes:

[0329] receiving the user experience event subscription message sent by the RAN entity, where the user experience event subscription message is sent by the management center to the RAN entity;

[0330] The sending of user experience information for the initial computing power service to the management center includes:

[0331] Send user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information for the initial computing power service to the management center.

[0332] In another optional embodiment, the sending of user experience information for the initial computing power service to the management center in S403 includes:

[0333] Actively sending user experience information for the initial computing power service to the management center, where the user experience information is the user's subjective feeling information about the initial computing power service; or

[0334] Receive a user experience information collection request for the initial computing power service sent by the management center, and send user experience information for the initial computing power service to the management center in response to the user experience information collection request, where the user experience information is the user's subjective feeling information about the initial computing power service.

[0335] Optionally, in a mobile communication network scenario, the actively sending user experience information for the initial computing power service to the management center includes:

[0336] Actively sending user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information for the initial computing power service to the management center; or

[0337] The receiving a user experience information collection request for the initial computing power service sent by the management center, and sending the user experience information for the initial computing power service to the management center in response to the user experience information collection request, includes:

[0338] Receive a user experience information collection request for the initial computing power service sent by a RAN entity, where the user experience information collection request is actively sent by the terminal device to the RAN entity; and send user experience information for the initial computing power service to the RAN entity in response to the user experience information collection request, so that the RAN entity sends the user experience information of the initial computing power service to the management center.

[0339] Based on any of the above embodiments, the method further includes:

[0340] Initiate terminal device computing power measurement at the management center, obtain one or more of the terminal device's load size, computing resource size, and computing resource utilization rate, and send the information to the management center; or

[0341] The management center starts measuring the ability of the terminal device to access the network, obtains one or more of the wireless access capability and the terminal device type of the terminal device, and sends the obtained information to the management center.

[0342] Optionally, in a mobile communication network scenario, the receiving the adjusted computing power service routing strategy or feedback information sent by the management center includes:

[0343] Receive the adjusted computing power service routing strategy or feedback information sent by the RAN entity, where the adjusted computing power service routing strategy or feedback information is sent by the management center to the RAN entity.

[0344] Based on any of the above embodiments, accessing the corresponding initial computing power service according to the initial computing power service routing policy includes:

[0345] An application program for accessing the initial computing power service is started, and the initial computing power service is accessed through the application program.

[0346] Based on any of the above embodiments, before the receiving management center determines the initial computing power service routing strategy according to the service requirements of the terminal device, the method further includes:

[0347] In a fixed network scenario, the terminal device sends the service demand to the management center; or

[0348] In a scenario of a mobile communication network, the terminal device sends the service requirement to a RAN entity, so that the RAN entity sends the service requirement to the management center.

[0349] The method embodiments on the above-mentioned terminal device side correspond to the method embodiments on the management center side. Their principles and technical effects can be found in the above-mentioned embodiments and will not be repeated here.

[0350] The above process of the embodiment of the present disclosure will be described in detail below with reference to specific examples.

[0351] Example 1

[0352] As shown in Figure 5, the signaling diagram of the method for processing computing power and network services is applied to a fixed network scenario. The specific steps are as follows:

[0353] 1) The terminal device sends business requirements to the management center;

[0354] Business requirements include computing power requirements, such as the required service type and the required service resource size. Business requirements may also include network requirements, such as bandwidth requirements and latency requirements.

[0355] 2) The management center arranges initial computing power services for terminal devices based on business needs;

[0356] The initial computing power service can be the computing resources of the computing power node or the application deployed on the computing power node;

[0357] 3) The management center sends the initial computing power service routing strategy to the terminal device;

[0358] In addition, the management center may also send the identifier of the computing power node where the initial computing power service is located and the identifier of the initial computing power service to the terminal device;

[0359] 4) Terminal devices access the initial computing power service;

[0360] Optionally, the terminal device may launch an application (APP) for accessing the initial computing power service, and then access the initial computing power service through the application;

[0361] 5) The management center monitors the status of computing nodes in real time;

[0362] 6) After the management center monitors the terminal device accessing the initial computing power service, it establishes and maintains the computing power service mapping relationship;

[0363] The computing power service mapping relationship is a mapping relationship between one or more of the terminal device identifier, the application identifier for accessing the initial computing power service, the computing power node identifier where the initial computing power service is located, and the identifier of the initial computing power service;

[0364] 7) The management center sends a user experience event subscription message to the terminal device;

[0365] The subscription message includes one or more of the following information:

[0366] User experience event subscription message identifier, terminal device identifier, identifier of the application used to access the initial computing power service, user experience event type, and user experience event subscription deadline (event reporting deadline, such as the computing power service expiration time, or a time point before the computing power service expiration deadline).

[0367] The user experience event type includes one or more of the following information:

[0368] The startup time of the application used to access the initial computing power service is too long (such as exceeding the first preset time, the specific time is determined according to actual management needs and is not specifically agreed upon here);

[0369] The application used to access the initial computing power service is restarted too many times (such as exceeding the second preset number, the specific number depends on actual management needs and is not specifically agreed upon here);

[0370] The initial computing service experiences excessive freezes during execution (e.g., exceeding a second preset number. For example, for initial computing services related to video processing, since the visual delay sensitivity of the human eye is >= 40ms, a video freeze of more than 40ms is counted as one freeze, or as otherwise specified based on management requirements);

[0371] The initial computing power service is suspended for an extended period of time during execution (such as exceeding the second preset duration, the specific duration is determined based on actual management needs and is not specifically agreed upon here);

[0372] The initial computing power service fails too many times during execution (such as exceeding a third preset number, for example, the number of video playback failures exceeds the third preset number. The specific number depends on actual management needs and is not specifically agreed upon here);

[0373] The connection establishment delay for accessing the initial computing power service is too long (such as exceeding the third preset time, the specific time is determined according to actual management needs and is not specifically agreed upon here);

[0374] The success rate of establishing connections to the initial computing power service is too low (the number of successful connections established during the statistical period / the total number of connections established, the success rate is lower than the preset success rate. The specific data depends on actual management needs and is not stipulated here);

[0375] The frequency of connection interruptions to the initial computing power service is too high (if it exceeds the preset frequency, the preset frequency can be the number of interruptions per minute. The specific data depends on actual management needs and is not stipulated here);

[0376] …etc;

[0377] 8) The terminal device starts status monitoring of the user experience event type based on the user experience event subscription message. When the user experience event type is triggered, the terminal device reports the user experience information to the management center;

[0378] User experience information includes user experience data related to user experience event types. Specific data includes one or more of the following information:

[0379] Application startup time for accessing the initial computing power service;

[0380] Number of restarts of applications used to access the initial computing power service;

[0381] The number of freezes and monitoring time periods during the execution of the service by the initial computing power service, where the monitoring time period can be accurate to seconds;

[0382] A single pause in the execution of services through the initial computing power service;

[0383] The number of execution failures and monitoring time period during the execution of the service by the initial computing power service, where the monitoring time period is accurate to seconds;

[0384] The connection establishment delay for accessing the initial computing power service;

[0385] The success rate of establishing connections to the initial computing power service;

[0386] Frequency of connection interruptions to the initial computing power service.

[0387] 9) The management center initiates corresponding measurements based on user experience information;

[0388] When user experience data is the application startup time or restart count for accessing the initial computing power service, analysis suggests that insufficient computing power on the terminal device may be the cause. In this case, terminal device capability measurements are performed on the terminal device, including one or more of the following: terminal device load, computing power resource size, and computing power resource utilization. If the measurements confirm that insufficient computing power on the terminal device is not the cause, measurements can be performed on the computing power node and / or network service quality measurements.

[0389] When user experience data includes the number of freezes, duration of a single freeze, or number of execution failures during the execution of the initial computing service, analysis suggests that insufficient network bandwidth or excessive initial computing service load may be the cause of the poor user experience. In this case, the computing capacity of the computing nodes should be measured on the service side, such as one or more of the following: computing node load, computing node resource utilization, and current computing service status; and / or QoS measurements should be performed on the network, such as one or more of the following: rate, bandwidth, and latency. If the measurements confirm that the issue is not with the network or the initial computing service, measurements can be performed on the terminal device side.

[0390] When the user experience data is connection establishment delay, connection establishment success rate, and connection interruption frequency, the analysis reason may be network access reasons or terminal device type mismatch. At this time, terminal capability measurement is performed on the terminal device side, such as testing one or more items of the terminal device's network access capability, terminal type, etc.

[0391] 10) The management center provides user feedback based on the measurement results;

[0392] 11) The management center adjusts the computing power routing strategy based on the measurement results;

[0393] There is no strict order between steps 10 and 11. Step 11 may be performed first and then step 10, or both may be performed simultaneously. Alternatively, in some cases only step 10 may be performed without step 11, or in some cases only step 11 may be performed without step 10.

[0394] The management center analyzes the actual reasons for the poor user experience based on the measurement results, and provides relevant feedback (which may include feedback analysis results, and / or adjusted computing power node identifiers, computing power service identifiers, etc.) or adjusts the computing power routing strategy based on the analysis results.

[0395] When the actual cause is a network-side issue, resulting in a poor user experience, the management center adjusts the computing power scheduling strategy in real time. Instead of changing the initial computing power service, it changes the routing path for the terminal device to access the initial computing power service and generates a new computing power routing strategy (forwarding path) to reach the initial computing power node / initial computing power service.

[0396] When the user experience on the business side is poor due to computing power issues, the management center selects a better computing node or computing service and generates a new computing routing strategy (forwarding path) to reach the new computing node / computing service;

[0397] When the user experience is poor due to reasons within the terminal device itself, such as insufficient computing power, excessive service load, insufficient wireless access capabilities, or terminal type mismatch, the system can provide feedback to the terminal device, explaining the current configuration, possible causes of the poor user experience, and suggestions for improvement. Alternatively, the system can adjust the computing power routing strategy based on the computing power resource status, network resource status, and terminal device capabilities, orchestrate a new computing power node / computing power service that matches the terminal device capabilities, and generate a new computing power routing strategy (forwarding path) to reach the new computing power node / computing power service.

[0398] Alternatively, when the user experience is poor due to the terminal device's own capabilities and the terminal device is temporarily unable to improve its capabilities (such as long-term monitoring of the terminal device's capability reporting and finding that the terminal device's capabilities have not changed or have not improved), the computing power scheduling strategy can be adjusted to adjust the original business to a computing power node that can meet user needs and has lower computing power, freeing up the resources of the original computing power node for other users' more urgent businesses, saving resource overhead, achieving full and reasonable utilization of computing network resources, and optimizing resource allocation.

[0399] Example 2

[0400] As shown in FIG6 , a signaling diagram of a method for processing computing power and network services is shown. The method for processing computing power and network services is applied to a mobile communication network scenario, where the UE is a UE. The specific steps are as follows:

[0401] 1) The UE proposes service requirements. Service requirements may include computing power requirements, such as the required service type and the required service resource size. Service requirements may also include network requirements, such as bandwidth requirements and latency requirements. Specifically, they include:

[0402] 1-1) UE sends service requirements to RAN entity;

[0403] 1-2) The RAN entity forwards the service requirements to the management center;

[0404] 2) The management center arranges initial computing power services for UEs based on business needs;

[0405] The initial computing power service can be the computing resources of the computing power node or the application deployed on the computing power node;

[0406] 3) Business needs responded to by the management center;

[0407] 3-1) The management center sends the initial computing power service routing policy to the RAN entity; in addition, the management center may also send the identifier of the computing power node where the initial computing power service is located and the identifier of the initial computing power service to the RAN entity;

[0408] 3-2) The RAN entity forwards the data received in step 3-1 to the UE;

[0409] 3-3) The management center sends the initial computing power service routing policy to the core network entity so that the UE can establish a user plane path to access the initial computing power service;

[0410] 4) The UE accesses the initial computing service and establishes a session to the initial computing service;

[0411] The session from UE to the initial computing service can be composed of UE-RAN-UPF (User Plane Function)-core network-data network. The initial computing service is located in the data network, and the session establishment process can be created by the SMF (Session Management Function) entity.

[0412] Optionally, the UE may start an application (APP) for accessing the initial computing power service, and then access the initial computing power service through the application;

[0413] 5) The management center monitors the status of computing nodes in real time;

[0414] 6) After the management center monitors the UE accessing the initial computing power service, it establishes and maintains the computing power service mapping relationship;

[0415] The computing power service mapping relationship is a mapping relationship between one or more of the following: the UE identifier, the application identifier for accessing the initial computing power service, the computing power node identifier where the initial computing power service is located, and the identifier of the initial computing power service;

[0416] 7) The management center subscribes to user experience events;

[0417] 7-1) The network management center sends a user experience event subscription message to the RAN entity;

[0418] 7-2) The RAN entity forwards the user experience event subscription message to the UE; the user experience event subscription message may be the same as step 7 in Example 1;

[0419] 8) The UE starts status monitoring of the user experience event type based on the user experience event subscription message. When the user experience event type is triggered, the UE reports the user experience information to the management center; the user experience information may be the same as step 8 in Example 1;

[0420] 8-1) The UE sends user experience information to the RAN entity;

[0421] 8-2) The RAN entity forwards the user experience information to the network management center;

[0422] 9) The management center initiates corresponding measurements based on user experience information;

[0423] When user experience data is the application startup time or restart count for accessing the initial computing power service, analysis suggests that insufficient UE computing power may be the cause. In this case, UE capability measurements are performed on the UE side, such as one or more of the following: UE load, computing power resource size, and computing power resource utilization. If the measurements confirm that insufficient UE computing power is not the cause, measurements can be performed on the computing power node side and / or network service quality measurements can be performed.

[0424] When user experience data includes the number of freezes, single freeze duration, and number of execution failures during the execution of the initial computing service, analysis suggests that insufficient network bandwidth or excessive initial computing service load may be the cause of the poor user experience. In this case, computing capacity measurements of computing nodes are performed on the service side, such as one or more of computing node load, computing node resource utilization, and current computing service status. And / or QoS measurements are performed on the network, such as one or more of rate, bandwidth, and latency. If the measurements confirm that the problem is not with the network or the initial computing service, measurements can be performed on the UE side.

[0425] When the user experience data is connection establishment delay, connection establishment success rate, and connection interruption frequency, the analysis reason may be network access reasons or UE type mismatch. At this time, terminal capability measurement is performed on the UE side, such as testing one or more of the UE's network access capability, terminal type, etc.

[0426] 10) The management center provides user feedback based on the measurement results;

[0427] 10-1) The network management center sends feedback information to the RAN entity (which may include feedback analysis results and / or adjusted computing power node identifiers, computing power service identifiers, etc.);

[0428] 10-2) The RAN entity forwards the feedback information to the UE;

[0429] 11) The management center adjusts the computing power routing strategy based on the measurement results;

[0430] There is no strict order between steps 10 and 11. Step 11 may be performed first and then step 10, or both may be performed simultaneously. Alternatively, in some cases only step 10 may be performed without step 11, or in some cases only step 11 may be performed without step 10.

[0431] The method for adjusting user feedback or computing power scheduling policy is the same as steps 10-11 in Example 1.

[0432] Example 3

[0433] This example provides another method for processing computing power and network services. This example differs from Examples 1 and 2 above in that the terminal device can proactively send user experience information for the initial computing power service to the management center, such as through an application, phone, browser, etc. on the terminal device, or the management center can send a user experience information collection request for the initial computing power service to the terminal device in real time or periodically. After receiving the user experience information collection request, the terminal device sends the user experience information for the initial computing power service to the management center. The user experience information for the initial computing power service can be the user's subjective perception of the initial computing power service. For example, the user experience information can include one or more of the following:

[0434] Whether the user is satisfied with the initial computing power service;

[0435] The satisfaction level with the initial computing power service (the specific level is set according to actual needs, such as a 5-point system, a number of stars, etc.);

[0436] Problems with the initial computing power service (such as slow speed, unclear content, lag, audio and video asynchrony, etc.);

[0437] Whether to continue using the initial computing power service;

[0438] Suggestions on initial computing power services, etc.

[0439] In this example, the steps of the terminal device reporting business needs, the management center determining the initial computing power service routing strategy based on the business needs of the terminal device and sending it to the terminal device, and the terminal device accessing the initial computing power service are the same as steps 1-6 in the above example 1 or example 2. The steps of the management center initiating response measurement and adjustment and / or feedback of the computing power routing strategy based on the user experience information fed back by the terminal device are the same as steps 9-11 in the above example 1 or example 2.

[0440] FIG7 is a structural diagram of a management center entity according to an embodiment of the present disclosure. The management center entity provided in this embodiment can execute the processing flow provided by the management center side method embodiment. As shown in FIG7 , the management center entity 700 includes a memory 701 , a transceiver 702 , and a processor 703 .

[0441] In FIG7 , the bus architecture may include any number of interconnected buses and bridges, specifically linking together various circuits of one or more processors represented by processor 703 and memory represented by memory 701. The bus architecture may also link together various other circuits such as peripheral devices, voltage regulators, and power management circuits, which are well known in the art and are therefore not further described herein. The bus interface provides an interface. The transceiver 702 may be a plurality of components, i.e., a transmitter and a receiver, providing a unit for communicating with various other devices over a transmission medium, such as a wireless channel, a wired channel, an optical cable, or the like. The processor 703 is responsible for managing the bus architecture and general processing, and the memory 701 may store data used by the processor 703 when performing operations.

[0442] The processor 703 may be a central processing unit (CPU), an application specific integrated circuit (ASIC), a field programmable gate array (FPGA), or a complex programmable logic device (CPLD). The processor may also adopt a multi-core architecture.

[0443] The memory 701 is used to store computer programs; the transceiver 702 is used to send and receive data under the control of the processor 703; the processor 703 is used to read the computer program in the memory 701 and perform the following operations:

[0444] Determine an initial computing power service routing strategy based on the service requirements of the terminal device, and send the initial computing power service routing strategy to the terminal device;

[0445] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, receiving user experience information for the initial computing power service sent by the terminal device;

[0446] Initiate corresponding measurements based on the user experience information, determine an adjusted computing power service routing strategy based on the measurement results and send it to the terminal device, or send feedback information to the terminal device.

[0447] Optionally, after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, the processor 703, when receiving user experience information for the initial computing power service sent by the terminal device, is configured to:

[0448] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, sending a user experience event subscription message to the terminal device, wherein the user experience event subscription message includes a user experience event type for the initial computing power service;

[0449] Receive user experience information sent by the terminal device after the user experience event type is triggered, where the user experience information includes user experience data related to the user experience event type.

[0450] Optionally, the user experience event type includes one or more of the following:

[0451] The startup time of the application for accessing the initial computing power service exceeds a first preset time period; or

[0452] The number of restarts of the application used to access the initial computing power service exceeds a first preset number; or

[0453] The number of freezes during the execution of the service through the initial computing service exceeds a second preset number; or

[0454] During the execution of the service through the initial computing power service, a single pause time exceeds a second preset time length; or

[0455] The number of execution failures during the execution of the service through the initial computing power service exceeds a third preset number; or

[0456] The connection establishment delay for accessing the initial computing power service exceeds a third preset duration; or

[0457] The success rate of establishing a connection to the initial computing power service is lower than a preset success rate; or

[0458] The frequency of connection interruptions to the initial computing power service exceeds a preset frequency.

[0459] Optionally, the user experience data includes one or more of the following:

[0460] The time when the application used to access the initial computing power service is started; or

[0461] The number of times the application used to access the initial computing power service is restarted; or

[0462] The number of freezes and monitoring time periods during the execution of the service through the initial computing power service; or

[0463] A single pause in the execution of a service through the initial computing power service; or

[0464] The number of execution failures and monitoring time period during the execution of the service through the initial computing power service; or

[0465] The connection establishment delay for accessing the initial computing power service; or

[0466] The success rate of establishing a connection to the initial computing power service; or

[0467] The frequency of connection interruptions to the initial computing power service.

[0468] Optionally, after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, the processor 703 is further configured to:

[0469] Establishing a computing power service mapping relationship, where the computing power service mapping relationship is a mapping relationship between one or more of the identifier of the terminal device, the identifier of the application used to access the initial computing power service, the identifier of the computing power node where the initial computing power service is located, and the identifier of the initial computing power service;

[0470] When the processor 703 sends the user experience event subscription message to the terminal device, it is configured to:

[0471] Send a user experience event subscription message to the terminal device according to the computing power service mapping relationship.

[0472] Optionally, the user experience event subscription message further includes one or more of the following:

[0473] User experience event subscription message identifier, identifier of the terminal device, identifier of the application used to access the initial computing power service, and deadline for user experience event subscription.

[0474] Optionally, when the processor 703 sends the user experience event subscription message to the terminal device, it is configured to:

[0475] Sending the user experience event subscription message to a radio access network RAN ​​entity, so that the RAN entity sends the user experience event subscription message to the terminal device;

[0476] When the processor 703 receives the user experience information sent by the terminal device after the user experience event type is triggered, it is configured to:

[0477] Receive user experience information sent by the RAN entity, where the user experience information is sent by the terminal device to the RAN entity.

[0478] Optionally, after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, the processor 703, when receiving user experience information for the initial computing power service sent by the terminal device, is configured to:

[0479] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, receiving user experience information for the initial computing power service actively sent by the terminal device, the user experience information being information about the user's subjective feelings about the initial computing power service; or

[0480] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, a user experience information collection request for the initial computing power service is sent to the terminal device, and the terminal device sends user experience information for the initial computing power service in response to the user experience information collection request. The user experience information is the user's subjective feeling information about the initial computing power service.

[0481] Optionally, when the processor 703 receives the user experience information for the initial computing power service actively sent by the terminal device, it is configured to:

[0482] receiving user experience information sent by a RAN entity, where the user experience information is actively sent by the terminal device to the RAN entity; or

[0483] When the processor 703 sends a user experience information collection request for the initial computing power service to the terminal device and receives the user experience information for the initial computing power service sent by the terminal device in response to the user experience information collection request, it is configured to:

[0484] The user experience information collection request is sent to the RAN entity, so that the RAN entity sends the user experience information collection request to the terminal device and receives the user experience information sent by the RAN entity, where the user experience information is sent by the terminal device to the RAN entity in response to the user experience information collection request.

[0485] Optionally, when initiating corresponding measurement according to the user experience information, the processor 703 is configured to:

[0486] Perform cause analysis based on the user experience information, determine a measurement task based on the analysis results, and execute the measurement task, wherein the measurement task includes at least one of the following: terminal device capability measurement, computing power node computing capability measurement, and network service quality measurement.

[0487] Optionally, the processor 703 performs a cause analysis based on the user experience information, determines a measurement task based on the analysis result, and executes the measurement task, and is configured to:

[0488] Determining a predicted cause for triggering the user experience event type according to the user experience information, determining a measurement task corresponding to the predicted cause as a measurement task with the highest priority, and executing the measurement task with the highest priority;

[0489] After the highest priority measurement task is executed, if it is determined that the predicted cause is the actual cause that triggers the user experience event type, then the measurement task is terminated; or

[0490] If it is determined that the predicted cause is not the actual cause that triggers the user experience event type, other measurement tasks are performed.

[0491] Optionally, when the processor 703 determines, according to the user experience information, a predicted cause for triggering the user experience event type, it is configured to:

[0492] If the user experience information is related to an application for accessing the initial computing power service, determining that the predicted cause of triggering the user experience event type is insufficient terminal device capability; or

[0493] If the user experience information is related to a freeze or execution failure during the execution of a service through the initial computing power service, then determining that the predicted cause of triggering the user experience event type is insufficient computing power of the initial computing power service and / or insufficient network service quality; or

[0494] If the user experience information is a connection problem for accessing the initial computing power service, the predicted cause of triggering the user experience event type is determined to be insufficient ability of the terminal device to access the network or mismatch of the terminal device type.

[0495] Optionally, the processor 703 determines an adjusted computing power service routing strategy based on the measurement result and sends the strategy to the terminal device, or sends feedback information to the terminal device, and is configured to:

[0496] If it is determined based on the measurement results that the actual cause of triggering the user experience event type is a network reason, a new computing power service routing strategy to reach the initial computing power service is determined and sent to the terminal device; or

[0497] If it is determined based on the measurement results that the actual cause of triggering the user experience event type is the initial computing power service cause, a new computing power service is determined, a new computing power service routing strategy to reach the new computing power service is determined, and sent to the terminal device; or

[0498] If it is determined according to the measurement result that the actual cause of triggering the user experience event type is the terminal device, sending feedback information to the terminal device, the feedback information including the actual cause and / or solution; or

[0499] If it is determined based on the measurement results that the actual cause of triggering the user experience event type is the terminal device, a new computing service routing strategy to the new computing service is determined based on the terminal device capabilities, computing resource status, and network resource status, and is sent to the terminal device; or

[0500] If it is determined based on the measurement results that the actual cause of triggering the user experience event type is the terminal device, and it is determined that the terminal device cannot improve its capabilities, a new computing power service with computing power lower than that of the initial computing power service is determined, a new computing power service routing strategy to reach the new computing power service is determined, and the strategy is sent to the terminal device.

[0501] Optionally, the processor 703 determines an adjusted computing power service routing strategy based on the measurement result and sends the strategy to the terminal device, or sends feedback information to the terminal device, and is configured to:

[0502] Determine an adjusted computing power service routing policy according to the measurement result, and send the adjusted computing power service routing policy to the RAN entity, so that the RAN entity sends the adjusted computing power service routing policy to the terminal device; or

[0503] The feedback information is sent to a RAN entity, so that the RAN entity sends the feedback information to the terminal device.

[0504] Optionally, when determining the initial computing power service routing strategy according to the service requirements of the terminal device, the processor 703 is configured to:

[0505] receiving a service requirement sent by the terminal device, and determining an initial service routing strategy according to the service requirement; or

[0506] Receive a service requirement sent by a RAN entity, where the service requirement is sent by the terminal device to the RAN entity, and determine an initial service routing strategy based on the service requirement.

[0507] Optionally, when the processor 703 sends the initial computing power service routing policy to the terminal device, it is configured to:

[0508] The initial computing power service routing policy is sent to a RAN entity, so that the RAN entity sends the initial computing power service routing policy to the terminal device.

[0509] Optionally, the processor 703 is further configured to:

[0510] The initial computing power service routing policy is sent to the core network entity so that the terminal device establishes a user plane path for accessing the initial computing power service corresponding to the initial computing power service routing policy according to the initial computing power service routing policy.

[0511] Optionally, when the processor 703 sends the initial computing power service routing policy to the terminal device, it is further configured to:

[0512] The identifier of the computing power node where the initial computing power service is located and the identifier of the initial computing power service are sent to the terminal device.

[0513] The management center entity provided in the embodiments of the present disclosure can be specifically used to execute the above-mentioned method embodiments on the management center side, and the specific functions will not be repeated here.

[0514] FIG8 is a structural diagram of a terminal device according to an embodiment of the present disclosure. The terminal device provided in this embodiment can execute the processing flow provided in the terminal device side method embodiment. As shown in FIG8 , the terminal device 800 includes a memory 801 , a transceiver 802 , and a processor 803 .

[0515] In FIG8 , the bus architecture may include any number of interconnected buses and bridges, specifically linking together various circuits of one or more processors represented by processor 803 and memory represented by memory 801. The bus architecture may also link together various other circuits such as peripheral devices, voltage regulators, and power management circuits, which are well known in the art and are therefore not further described herein. The bus interface provides an interface. The transceiver 802 may be a plurality of components, i.e., a transmitter and a receiver, providing a unit for communicating with various other devices over a transmission medium, such as a wireless channel, a wired channel, an optical cable, or the like. The processor 803 is responsible for managing the bus architecture and general processing, and the memory 801 may store data used by the processor 803 when performing operations.

[0516] The processor 803 may be a central processing unit (CPU), an application specific integrated circuit (ASIC), a field programmable gate array (FPGA), or a complex programmable logic device (CPLD). The processor may also adopt a multi-core architecture.

[0517] The memory 801 is used to store computer programs; the transceiver 802 is used to send and receive data under the control of the processor 803; the processor 803 is used to read the computer program in the memory 801 and perform the following operations:

[0518] The receiving management center determines the initial computing power service routing strategy based on the business needs of the terminal device;

[0519] Access the corresponding initial computing power service according to the initial computing power service routing policy;

[0520] Sending user experience information for the initial computing power service to the management center;

[0521] Receive the adjusted computing power service routing strategy or feedback information sent by the management center, wherein the adjusted computing power service routing strategy is the computing power service routing strategy adjusted by the management center after performing corresponding measurements based on the user experience information.

[0522] Optionally, when the processor 803 sends the user experience information for the initial computing power service to the management center, it is configured to:

[0523] Receive a user experience event subscription message sent by the management center, wherein the user experience event subscription message includes a user experience event type for the initial computing power service;

[0524] Determine whether the user experience event type is triggered;

[0525] If it is determined that the user experience event type is triggered, user experience information for the initial computing power service is sent to the management center.

[0526] Optionally, when the processor 803 receives the user experience event subscription message sent by the management center, it is configured to:

[0527] receiving the user experience event subscription message sent by the RAN entity, where the user experience event subscription message is sent by the management center to the RAN entity;

[0528] When the processor 803 sends the user experience information for the initial computing power service to the management center, it is configured to:

[0529] Send user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information for the initial computing power service to the management center.

[0530] Optionally, when the processor 803 sends the user experience information for the initial computing power service to the management center, it is configured to:

[0531] Actively sending user experience information for the initial computing power service to the management center, where the user experience information is the user's subjective feeling information about the initial computing power service; or

[0532] Receive a user experience information collection request for the initial computing power service sent by the management center, and send user experience information for the initial computing power service to the management center in response to the user experience information collection request, where the user experience information is the user's subjective feeling information about the initial computing power service.

[0533] Optionally, when the processor 803 proactively sends the user experience information for the initial computing power service to the management center, it is configured to:

[0534] Actively sending user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information for the initial computing power service to the management center; or

[0535] The processor 803 receives a user experience information collection request for the initial computing power service sent by the management center, and sends user experience information for the initial computing power service to the management center in response to the user experience information collection request, and is configured to:

[0536] Receive a user experience information collection request for the initial computing power service sent by a RAN entity, where the user experience information collection request is actively sent by the terminal device to the RAN entity; and send user experience information for the initial computing power service to the RAN entity in response to the user experience information collection request, so that the RAN entity sends the user experience information of the initial computing power service to the management center.

[0537] Optionally, the processor 803 is further configured to:

[0538] Initiate terminal device computing power measurement at the management center, obtain one or more of the terminal device's load size, computing resource size, and computing resource utilization rate, and send the information to the management center; or

[0539] The management center starts measuring the ability of the terminal device to access the network, and obtains one or more of the wireless access capability and the type of the terminal device, and sends the information to the management center.

[0540] Optionally, when the processor 803 receives the adjusted computing power service routing strategy or feedback information sent by the management center, it is configured to:

[0541] Receive the adjusted computing power service routing strategy or feedback information sent by the RAN entity, where the adjusted computing power service routing strategy or feedback information is sent by the management center to the RAN entity.

[0542] Optionally, when accessing the corresponding initial computing power service according to the initial computing power service routing policy, the processor 803 is configured to:

[0543] An application program for accessing the initial computing power service is started, and the initial computing power service is accessed through the application program.

[0544] Optionally, before receiving the initial computing power service routing strategy determined by the management center according to the service requirements of the terminal device, the processor 803 is further configured to:

[0545] Sending the business requirements to the management center; or

[0546] The service requirement is sent to a RAN entity, so that the RAN entity sends the service requirement to the management center.

[0547] The terminal device provided by the embodiment of the present disclosure can be specifically used to execute the method embodiment on the terminal device side mentioned above, and the specific functions will not be repeated here.

[0548] Figure 9 is a structural diagram of a computing power and network service processing device provided in an embodiment of the present disclosure. The computing power and network service processing device provided in this embodiment can execute the processing flow provided in the method embodiment on the management center side. As shown in Figure 9, the computing power and network service processing device 900 includes: a computing power service orchestration unit 901, a user experience information acquisition unit 902, and a computing power service adjustment unit 903.

[0549] The computing power service orchestration unit 901 is configured to determine an initial computing power service routing strategy based on the service requirements of the terminal device, and send the initial computing power service routing strategy to the terminal device;

[0550] The user experience information acquisition unit 902 is configured to receive user experience information for the initial computing power service sent by the terminal device after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy;

[0551] The computing power service adjustment unit 903 is used to start corresponding measurements according to the user experience information, determine the adjusted computing power service routing strategy according to the measurement results and send it to the terminal device, or send feedback information to the terminal device.

[0552] Optionally, after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, the user experience information acquiring unit 902 receives the user experience information for the initial computing power service sent by the terminal device, and is configured to:

[0553] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, sending a user experience event subscription message to the terminal device, wherein the user experience event subscription message includes a user experience event type for the initial computing power service;

[0554] Receive user experience information sent by the terminal device after the user experience event type is triggered, where the user experience information includes user experience data related to the user experience event type.

[0555] Optionally, the user experience event type includes one or more of the following:

[0556] The startup time of the application for accessing the initial computing power service exceeds a first preset time period; or

[0557] The number of restarts of the application used to access the initial computing power service exceeds a first preset number; or

[0558] The number of freezes during the execution of the service through the initial computing service exceeds a second preset number; or

[0559] During the execution of the service through the initial computing power service, a single pause time exceeds a second preset time length; or

[0560] The number of execution failures during the execution of the service through the initial computing power service exceeds a third preset number; or

[0561] The connection establishment delay for accessing the initial computing power service exceeds a third preset duration; or

[0562] The success rate of establishing a connection to the initial computing power service is lower than a preset success rate; or

[0563] The frequency of connection interruptions to the initial computing power service exceeds a preset frequency.

[0564] Optionally, the user experience data includes one or more of the following:

[0565] The time when the application used to access the initial computing power service is started; or

[0566] The number of times the application used to access the initial computing power service is restarted; or

[0567] The number of freezes and monitoring time periods during the execution of the service through the initial computing power service; or

[0568] A single pause in the execution of a service through the initial computing power service; or

[0569] The number of execution failures and monitoring time period during the execution of the service through the initial computing power service; or

[0570] The connection establishment delay for accessing the initial computing power service; or

[0571] The success rate of establishing a connection to the initial computing power service; or

[0572] The frequency of connection interruptions to the initial computing power service.

[0573] Optionally, after the terminal device accesses the corresponding initial computing service according to the initial computing service routing policy, the computing power service orchestration unit 901 is further configured to:

[0574] Establishing a computing power service mapping relationship, where the computing power service mapping relationship is a mapping relationship between one or more of the identifier of the terminal device, the identifier of the application used to access the initial computing power service, the identifier of the computing power node where the initial computing power service is located, and the identifier of the initial computing power service;

[0575] When the user experience information acquisition unit 902 sends a user experience event subscription message to the terminal device, it is used to:

[0576] Send a user experience event subscription message to the terminal device according to the computing power service mapping relationship.

[0577] Optionally, the user experience event subscription message further includes one or more of the following:

[0578] User experience event subscription message identifier, identifier of the terminal device, identifier of the application used to access the initial computing power service, and deadline for user experience event subscription.

[0579] Optionally, when the user experience information acquisition unit 902 sends a user experience event subscription message to the terminal device, it is configured to:

[0580] Sending the user experience event subscription message to a radio access network RAN ​​entity, so that the RAN entity sends the user experience event subscription message to the terminal device;

[0581] When receiving the user experience information sent by the terminal device after the user experience event type is triggered, the user experience information acquiring unit 902 is configured to:

[0582] Receive user experience information sent by the RAN entity, where the user experience information is sent by the terminal device to the RAN entity.

[0583] Optionally, after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, the user experience information acquiring unit 902 receives the user experience information for the initial computing power service sent by the terminal device, and is configured to:

[0584] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, receiving user experience information for the initial computing power service actively sent by the terminal device, the user experience information being information about the user's subjective feelings about the initial computing power service; or

[0585] After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, a user experience information collection request for the initial computing power service is sent to the terminal device, and the terminal device sends user experience information for the initial computing power service in response to the user experience information collection request. The user experience information is the user's subjective feeling information about the initial computing power service.

[0586] Optionally, when receiving the user experience information for the initial computing power service actively sent by the terminal device, the user experience information acquiring unit 902 is configured to:

[0587] receiving user experience information sent by a RAN entity, where the user experience information is actively sent by the terminal device to the RAN entity; or

[0588] When the user experience information acquisition unit 902 sends a user experience information collection request for the initial computing power service to the terminal device and receives the user experience information for the initial computing power service sent by the terminal device in response to the user experience information collection request, it is configured to:

[0589] The user experience information collection request is sent to the RAN entity, so that the RAN entity sends the user experience information collection request to the terminal device and receives the user experience information sent by the RAN entity, where the user experience information is sent by the terminal device to the RAN entity in response to the user experience information collection request.

[0590] Optionally, when initiating corresponding measurement according to the user experience information, the computing power service adjustment unit 903 is configured to:

[0591] Perform cause analysis based on the user experience information, determine a measurement task based on the analysis results, and execute the measurement task, wherein the measurement task includes at least one of the following: terminal device capability measurement, computing power node computing capability measurement, and network service quality measurement.

[0592] Optionally, when performing cause analysis based on the user experience information, determining a measurement task based on the analysis result, and executing the measurement task, the computing power service adjustment unit 903 is configured to:

[0593] Determining a predicted cause for triggering the user experience event type according to the user experience information, determining a measurement task corresponding to the predicted cause as a measurement task with the highest priority, and executing the measurement task with the highest priority;

[0594] After the highest priority measurement task is executed, if it is determined that the predicted cause is the actual cause that triggers the user experience event type, then the measurement task is terminated; or

[0595] If it is determined that the predicted cause is not the actual cause that triggers the user experience event type, other measurement tasks are performed.

[0596] Optionally, when determining a predicted cause of triggering the user experience event type according to the user experience information, the computing power service adjustment unit 903 is configured to:

[0597] If the user experience information is related to an application for accessing the initial computing power service, determining that the predicted cause of triggering the user experience event type is insufficient terminal device capability; or

[0598] If the user experience information is related to a freeze or execution failure during the execution of a service through the initial computing power service, then determining that the predicted cause of triggering the user experience event type is insufficient computing power of the initial computing power service and / or insufficient network service quality; or

[0599] If the user experience information is a connection problem for accessing the initial computing power service, the predicted cause of triggering the user experience event type is determined to be insufficient ability of the terminal device to access the network or mismatch of the terminal device type.

[0600] Optionally, when the computing power service adjustment unit 903 determines the adjusted computing power service routing strategy according to the measurement result and sends it to the terminal device, or sends feedback information to the terminal device, it is configured to:

[0601] If it is determined based on the measurement results that the actual cause of triggering the user experience event type is a network reason, a new computing power service routing strategy to reach the initial computing power service is determined and sent to the terminal device; or

[0602] If it is determined based on the measurement results that the actual cause of triggering the user experience event type is the initial computing power service cause, a new computing power service is determined, a new computing power service routing strategy to reach the new computing power service is determined, and sent to the terminal device; or

[0603] If it is determined according to the measurement result that the actual cause of triggering the user experience event type is the terminal device, sending feedback information to the terminal device, the feedback information including the actual cause and / or solution; or

[0604] If it is determined based on the measurement results that the actual cause of triggering the user experience event type is the terminal device, a new computing service routing strategy to the new computing service is determined based on the terminal device capabilities, computing resource status, and network resource status, and is sent to the terminal device; or

[0605] If it is determined based on the measurement results that the actual cause of triggering the user experience event type is the terminal device, and it is determined that the terminal device cannot improve its capabilities, a new computing power service with computing power lower than that of the initial computing power service is determined, a new computing power service routing strategy to reach the new computing power service is determined, and the strategy is sent to the terminal device.

[0606] Optionally, when the computing power service adjustment unit 903 determines the adjusted computing power service routing strategy according to the measurement result and sends it to the terminal device, or sends feedback information to the terminal device, it is configured to:

[0607] Determine an adjusted computing power service routing policy according to the measurement result, and send the adjusted computing power service routing policy to the RAN entity, so that the RAN entity sends the adjusted computing power service routing policy to the terminal device; or

[0608] The feedback information is sent to a RAN entity, so that the RAN entity sends the feedback information to the terminal device.

[0609] Optionally, when determining the initial computing service routing strategy based on the service requirements of the terminal device, the computing service orchestration unit 901 is configured to:

[0610] receiving a service requirement sent by the terminal device, and determining an initial service routing strategy according to the service requirement; or

[0611] Receive a service requirement sent by a RAN entity, where the service requirement is sent by the terminal device to the RAN entity, and determine an initial service routing strategy based on the service requirement.

[0612] Optionally, when sending the initial computing service routing policy to the terminal device, the computing power service orchestration unit 901 is configured to:

[0613] The initial computing power service routing policy is sent to a RAN entity, so that the RAN entity sends the initial computing power service routing policy to the terminal device.

[0614] Optionally, the computing power service orchestration unit 901 is further configured to:

[0615] The initial computing power service routing policy is sent to the core network entity so that the terminal device establishes a user plane path for accessing the initial computing power service corresponding to the initial computing power service routing policy according to the initial computing power service routing policy.

[0616] Optionally, when sending the initial computing service routing policy to the terminal device, the computing power service orchestration unit 901 is further configured to:

[0617] The identifier of the computing power node where the initial computing power service is located and the identifier of the initial computing power service are sent to the terminal device.

[0618] The computing power and network service processing device provided by the embodiment of the present disclosure can be specifically used to execute the method embodiment on the management center side mentioned above, and the specific functions will not be repeated here.

[0619] Figure 10 is a block diagram of a computing power and network service processing device provided by an embodiment of the present disclosure. The computing power and network service processing device provided by this embodiment can execute the processing flow provided by the aforementioned method embodiment on the terminal device side. As shown in Figure 10, the computing power and network service processing device 1000 includes: a receiving unit 1001, an access unit 1002, and a sending unit 1003.

[0620] The receiving unit 1001 is configured to receive an initial computing power service routing strategy determined by the management center according to the service requirements of the terminal device;

[0621] Access unit 1002, configured to access the corresponding initial computing power service according to the initial computing power service routing policy;

[0622] A sending unit 1003 is configured to send user experience information for the initial computing power service to the management center;

[0623] The receiving unit 1001 is also used to receive the adjusted computing power service routing strategy or feedback information sent by the management center, wherein the adjusted computing power service routing strategy is the computing power service routing strategy adjusted by the management center after performing corresponding measurements based on the user experience information.

[0624] Optionally, when sending the user experience information for the initial computing power service to the management center, the sending unit 1003 is configured to:

[0625] Receiving, through the receiving unit 1001, a user experience event subscription message sent by the management center, wherein the user experience event subscription message includes a user experience event type for the initial computing power service;

[0626] Determine whether the user experience event type is triggered;

[0627] If it is determined that the user experience event type is triggered, user experience information for the initial computing power service is sent to the management center.

[0628] Optionally, when receiving the user experience event subscription message sent by the management center, the receiving unit 1001 is configured to:

[0629] receiving the user experience event subscription message sent by the RAN entity, where the user experience event subscription message is sent by the management center to the RAN entity;

[0630] When sending the user experience information for the initial computing power service to the management center, the sending unit 1003 is configured to:

[0631] Send user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information for the initial computing power service to the management center.

[0632] Optionally, when sending the user experience information for the initial computing power service to the management center, the sending unit 1003 is configured to:

[0633] Actively sending user experience information for the initial computing power service to the management center, where the user experience information is the user's subjective feeling information about the initial computing power service; or

[0634] The receiving unit 1001 receives a user experience information collection request for the initial computing power service sent by the management center, and in response to the user experience information collection request, sends user experience information for the initial computing power service to the management center, where the user experience information is the user's subjective feeling information about the initial computing power service.

[0635] Optionally, when the sending unit 1003 actively sends the user experience information for the initial computing power service to the management center, it is configured to:

[0636] Actively sending user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information for the initial computing power service to the management center; or

[0637] The sending unit 1003, when receiving the user experience information collection request for the initial computing power service sent by the management center through the receiving unit 1001 and sending the user experience information for the initial computing power service to the management center in response to the user experience information collection request, is configured to:

[0638] The receiving unit 1001 receives a user experience information collection request for the initial computing power service sent by the RAN entity, and the user experience information collection request is actively sent by the terminal device to the RAN entity; in response to the user experience information collection request, the user experience information for the initial computing power service is sent to the RAN entity, so that the RAN entity sends the user experience information of the initial computing power service to the management center.

[0639] Optionally, the sending unit 1003 is further configured to:

[0640] Initiate terminal device computing power measurement at the management center, obtain one or more of the terminal device's load size, computing resource size, and computing resource utilization rate, and send the information to the management center; or

[0641] The management center starts measuring the ability of the terminal device to access the network, and then obtains one or more of the wireless access capability and the type of the terminal device, and sends the information to the management center.

[0642] Optionally, when receiving the adjusted computing power service routing strategy or feedback information sent by the management center, the receiving unit 1001 is configured to:

[0643] Receive the adjusted computing power service routing strategy or feedback information sent by the RAN entity, where the adjusted computing power service routing strategy or feedback information is sent by the management center to the RAN entity.

[0644] Optionally, when accessing the corresponding initial computing power service according to the initial computing power service routing policy, the access unit 1002 is configured to:

[0645] An application program for accessing the initial computing power service is started, and the initial computing power service is accessed through the application program.

[0646] Optionally, before the receiving management center determines the initial computing power service routing strategy according to the service requirements of the terminal device, the sending unit 1003 is further configured to:

[0647] Sending the business requirements to the management center; or

[0648] The service requirement is sent to a RAN entity, so that the RAN entity sends the service requirement to the management center.

[0649] The computing power and network service processing device provided by the embodiments of the present disclosure can be specifically used to execute the method embodiments on the terminal device side mentioned above, and the specific functions will not be repeated here.

[0650] It should be noted that the division of units in the above embodiments of the present disclosure is illustrative and is merely a logical functional division. In actual implementation, other division methods may be used. Furthermore, the functional units in the various embodiments of the present disclosure may be integrated into a single processing unit, or each unit may exist physically separately, or two or more units may be integrated into a single unit. The above-mentioned integrated units may be implemented in the form of hardware or software functional units.

[0651] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a processor-readable storage medium. Based on this understanding, the technical solution of the present disclosure is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a storage medium, including a number of instructions for enabling a computer device (which can be a personal computer, a server, or a network device, etc.) or a processor to execute all or part of the steps of the method described in each embodiment of the present disclosure. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.

[0652] An embodiment of the present disclosure provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and the computer program is used to enable a processor to execute the above method embodiment.

[0653] Among them, the computer-readable storage medium can be any available medium or data storage device that can be accessed by the processor, including but not limited to magnetic storage (such as floppy disks, hard disks, magnetic tapes, magneto-optical disks (MO)), optical storage (such as CDs, DVDs, BDs, HVDs, etc.), and semiconductor storage (such as ROM, EPROM, EEPROM, non-volatile memory (NAND FLASH), solid-state drives (SSDs)), etc.

[0654] Those skilled in the art will appreciate that the embodiments of the present disclosure may be provided as methods, systems, or computer program products. Therefore, the present disclosure may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Furthermore, the present disclosure may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to magnetic disk storage and optical storage, etc.) containing computer-usable program code.

[0655] The present disclosure is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present disclosure. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer-executable instructions. These computer-executable instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device produce a device for implementing the functions specified in one or more processes in the flowchart and / or one or more boxes in the block diagram.

[0656] These processor-executable instructions may also be stored in a processor-readable memory that can direct a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the processor-readable memory produce a product including an instruction device that implements the functions specified in one or more processes in the flowchart and / or one or more boxes in the block diagram.

[0657] These processor-executable instructions may also be loaded onto a computer or other programmable data processing device so that a series of operational steps are executed on the computer or other programmable device to produce a computer-implemented process, whereby the instructions executed on the computer or other programmable device provide steps for implementing the functions specified in one or more processes in the flowchart and / or one or more boxes in the block diagram.

[0658] Obviously, those skilled in the art may make various changes and modifications to the present disclosure without departing from the spirit and scope of the present disclosure. Thus, if these modifications and variations of the present disclosure fall within the scope of the claims of the present disclosure and their equivalents, the present disclosure is intended to include these modifications and variations.

Claims

1. A method for processing computing power and network services, It is characterized in that Applied to a management center, the method includes: Determine an initial computing power service routing strategy according to the service requirements of the terminal device, and send the initial computing power service routing strategy to the terminal device; After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, receiving user experience information for the initial computing power service sent by the terminal device; Initiate corresponding measurements according to the user experience information, determine an adjusted computing power service routing strategy according to the measurement results and send it to the terminal device, or send feedback information to the terminal device.

2. The method according to claim 1, It is characterized in that After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, receiving user experience information for the initial computing power service sent by the terminal device includes: After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, sending a user experience event subscription message to the terminal device, wherein the user experience event subscription message includes a user experience event type for the initial computing power service; Receive user experience information sent by the terminal device after the user experience event type is triggered, where the user experience information includes user experience data related to the user experience event type.

3. The method according to claim 2, It is characterized in that The user experience event types include one or more of the following: The startup time of the application used to access the initial computing power service exceeds a first preset time period; or The number of restarts of the application used to access the initial computing power service exceeds a first preset number; or The number of freezes during the execution of the service by the initial computing service exceeds a second preset number; or During the execution of the service by the initial computing service, a single freeze time exceeds a second preset time length; or The number of execution failures during the execution of the service by the initial computing power service exceeds a third preset number; or The connection establishment delay for accessing the initial computing power service exceeds a third preset time duration; or The connection establishment success rate for accessing the initial computing power service is lower than a preset success rate; or The frequency of connection interruptions to the initial computing power service exceeds a preset frequency.

4. The method according to claim 3, It is characterized in that The user experience data includes one or more of the following: The startup time of the application used to access the initial computing power service; or The number of restarts of the application used to access the initial computing power service; or The number of freezes and monitoring time periods during the execution of the service by the initial computing service; or A single freeze time during the execution of the service by the initial computing power service; or The number of execution failures and monitoring time period during the execution of the service by the initial computing service; or The delay in establishing a connection to the initial computing service; or The success rate of establishing a connection to access the initial computing power service; or The frequency of connection interruptions to the initial computing service.

5. The method according to claim 2, It is characterized in that After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, the method further includes: Establishing a computing power service mapping relationship, wherein the computing power service mapping relationship is a mapping relationship between one or more of an identifier of the terminal device, an identifier of an application for accessing the initial computing power service, an identifier of a computing power node where the initial computing power service is located, and an identifier of the initial computing power service; The sending of a user experience event subscription message to the terminal device includes: Send a user experience event subscription message to the terminal device according to the computing power service mapping relationship.

6. The method according to claim 2, It is characterized in that The user experience event subscription message may also include one or more of the following: The user experience event subscription message identifier, the identifier of the terminal device, the identifier of the application used to access the initial computing power service, and the deadline for user experience event subscription.

7. The method according to any one of claims 2 to 6, It is characterized in that The sending of a user experience event subscription message to the terminal device includes: Sending the user experience event subscription message to a radio access network RAN ​​entity, so that the RAN entity sends the user experience event subscription message to the terminal device; The receiving the user experience information sent by the terminal device after the user experience event type is triggered includes: Receive user experience information sent by the RAN entity, where the user experience information is sent by the terminal device to the RAN entity.

8. The method according to claim 1, It is characterized in that After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, receiving user experience information for the initial computing power service sent by the terminal device includes: After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing strategy, receiving user experience information for the initial computing power service actively sent by the terminal device, the user experience information being the user's subjective feeling information about the initial computing power service; or After the terminal device accesses the corresponding initial computing service according to the initial computing service routing policy, The terminal device sends a user experience information collection request for the initial computing power service, and the terminal device sends user experience information for the initial computing power service in response to the user experience information collection request, where the user experience information is the user's subjective feeling information about the initial computing power service.

9. The method according to claim 8, It is characterized in that The receiving the user experience information for the initial computing power service actively sent by the terminal device includes: receiving user experience information sent by a RAN entity, where the user experience information is actively sent by the terminal device to the RAN entity; or The sending a user experience information collection request for the initial computing power service to the terminal device, and receiving user experience information for the initial computing power service sent by the terminal device in response to the user experience information collection request, includes: The user experience information collection request is sent to the RAN entity, so that the RAN entity sends the user experience information collection request to the terminal device, and receives the user experience information sent by the RAN entity, where the user experience information is sent by the terminal device to the RAN entity in response to the user experience information collection request.

10. The method according to claim 1, It is characterized in that The starting corresponding measurement according to the user experience information includes: Perform cause analysis based on the user experience information, determine a measurement task based on the analysis result, and execute the measurement task, wherein the measurement task includes at least one of the following: terminal device capability measurement, computing power node computing capability measurement, and network service quality measurement.

11. The method according to claim 10, It is characterized in that The performing cause analysis according to the user experience information, determining a measurement task according to the analysis result, and executing the measurement task includes: Determining a predicted cause for triggering the user experience event type according to the user experience information, determining a measurement task corresponding to the predicted cause as a measurement task with the highest priority, and executing the measurement task with the highest priority; After the highest priority measurement task is executed, if it is determined that the predicted cause is the actual cause that triggers the user experience event type, then the measurement task is terminated; or If it is determined that the predicted reason is not the actual reason that triggers the user experience event type, other measurement tasks are performed.

12. The method according to claim 11, It is characterized in that The determining, according to the user experience information, a predicted reason for triggering the user experience event type includes: If the user experience information is information related to an application used to access the initial computing power service, determining that the predicted cause of triggering the user experience event type is insufficient terminal device capability; or If the user experience information is related to a freeze or failure in the process of executing the service through the initial computing service information, it is determined that the predicted cause of triggering the user experience event type is insufficient computing power of the initial computing service and / or insufficient network service quality; or If the user experience information is a connection problem for accessing the initial computing power service, then the predicted cause for triggering the user experience event type is determined to be insufficient ability of the terminal device to access the network or mismatch of the terminal device type.

13. The method according to claim 11, It is characterized in that The determining the adjusted computing power service routing strategy according to the measurement result and sending it to the terminal device, or sending feedback information to the terminal device, includes: If it is determined according to the measurement result that the actual cause of triggering the user experience event type is a network cause, a new computing power service routing strategy to reach the initial computing power service is determined and sent to the terminal device; or If it is determined according to the measurement result that the actual cause of triggering the user experience event type is the initial computing service cause, a new computing service is determined, a new computing service routing strategy to reach the new computing service is determined, and sent to the terminal device; or If it is determined according to the measurement result that the actual cause of triggering the user experience event type is the terminal device, sending feedback information to the terminal device, the feedback information including the actual cause and / or solution; or If it is determined according to the measurement results that the actual cause of triggering the user experience event type is the terminal device, a new computing service routing strategy to reach the new computing service is determined according to the terminal device capabilities, computing resource status, and network resource status, and sent to the terminal device; or If it is determined based on the measurement results that the actual cause of triggering the user experience event type is the terminal device, and it is determined that the terminal device cannot improve its capabilities, a new computing power service with computing power lower than that of the initial computing power service is determined, a new computing power service routing strategy to reach the new computing power service is determined, and the new computing power service is sent to the terminal device.

14. The method according to claim 1, It is characterized in that The determining the adjusted computing power service routing strategy according to the measurement result and sending it to the terminal device, or sending feedback information to the terminal device, includes: Determine an adjusted computing power service routing policy according to the measurement result, and send the adjusted computing power service routing policy to the RAN entity, so that the RAN entity sends the adjusted computing power service routing policy to the terminal device; or The feedback information is sent to a RAN entity, so that the RAN entity sends the feedback information to the terminal device.

15. The method according to claim 1, It is characterized in that Determining the initial computing power service routing strategy according to the service requirements of the terminal device includes: receiving a service requirement sent by the terminal device, and determining an initial service routing strategy according to the service requirement; or receiving a service requirement sent by a RAN entity, wherein the service requirement is sent by the terminal device to the RAN entity, And determine the initial service routing strategy based on the business requirements.

16. The method according to claim 1, It is characterized in that The sending the initial computing power service routing strategy to the terminal device includes: The initial computing power service routing policy is sent to a RAN entity, so that the RAN entity sends the initial computing power service routing policy to the terminal device.

17. The method according to claim 16, It is characterized in that Also includes: The initial computing power service routing policy is sent to the core network entity so that the terminal device establishes a user plane path for accessing the initial computing power service corresponding to the initial computing power service routing policy according to the initial computing power service routing policy.

18. The method according to claim 1, It is characterized in that The sending the initial computing power service routing strategy to the terminal device also includes: The identifier of the computing power node where the initial computing power service is located and the identifier of the initial computing power service are sent to the terminal device.

19. A method for processing computing power and network services, It is characterized in that Applied to a terminal device, the method comprises: The receiving management center determines the initial computing service routing strategy based on the business needs of the terminal device; Access the corresponding initial computing power service according to the initial computing power service routing policy; Sending user experience information for the initial computing power service to the management center; Receive the adjusted computing power service routing strategy or feedback information sent by the management center, wherein the adjusted computing power service routing strategy is the computing power service routing strategy adjusted by the management center after performing corresponding measurements based on the user experience information.

20. The method according to claim 19, It is characterized in that The sending of user experience information for the initial computing power service to the management center includes: Receiving a user experience event subscription message sent by the management center, wherein the user experience event subscription message includes a user experience event type for the initial computing power service; Determine whether the user experience event type is triggered; If it is determined that the user experience event type is triggered, user experience information for the initial computing power service is sent to the management center.

21. The method according to claim 20, It is characterized in that The receiving a user experience event subscription message sent by the management center includes: receiving the user experience event subscription message sent by the RAN entity, where the user experience event subscription message is sent by the management center to the RAN entity; The sending of user experience information for the initial computing power service to the management center includes: Send user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information for the initial computing power service to the management center.

22. The method according to claim 19, It is characterized in that The sending of user experience information for the initial computing power service to the management center includes: Actively sending user experience information for the initial computing power service to the management center, where the user experience information is the user's subjective feeling information about the initial computing power service; or Receive a user experience information collection request for the initial computing power service sent by the management center, and send user experience information for the initial computing power service to the management center in response to the user experience information collection request, where the user experience information is the user's subjective feeling information about the initial computing power service.

23. The method according to claim 22, It is characterized in that The actively sending the user experience information for the initial computing power service to the management center includes: Actively sending user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information for the initial computing power service to the management center; or The receiving a user experience information collection request for the initial computing power service sent by the management center, and sending the user experience information for the initial computing power service to the management center in response to the user experience information collection request, includes: Receive a user experience information collection request for the initial computing power service sent by a RAN entity, where the user experience information collection request is actively sent by the terminal device to the RAN entity; and in response to the user experience information collection request, send user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information of the initial computing power service to the management center.

24. The method according to any one of claims 19 to 23, It is characterized in that The method further comprises: Initiate terminal device computing capacity measurement at the management center, obtain one or more of the load size, computing resource size, and computing resource utilization rate of the terminal device, and send them to the management center; or The management center starts measuring the ability of the terminal device to access the network, and then obtains one or more of the wireless access capability and the type of the terminal device, and sends the information to the management center.

25. The method according to any one of claims 19 to 23, It is characterized in that The receiving the adjusted computing power service routing strategy or feedback information sent by the management center includes: Receive the adjusted computing power service routing strategy or feedback information sent by the RAN entity, where the adjusted computing power service routing strategy or feedback information is sent by the management center to the RAN entity.

26. The method according to any one of claims 19 to 23, It is characterized in that The accessing the corresponding initial computing power service according to the initial computing power service routing policy includes: An application program for accessing the initial computing power service is started, and the initial computing power service is accessed through the application program.

27. The method according to any one of claims 19 to 23, It is characterized in that Before the receiving management center determines the initial computing power service routing strategy according to the service requirements of the terminal device, it also includes: Sending the business requirement to the management center; or The service requirement is sent to the RAN entity, so that the RAN entity sends the service requirement to the management center.

28. A management center entity, It is characterized in that Including memory, transceiver, processor: A memory for storing a computer program; a transceiver for transmitting and receiving data under the control of the processor; and a processor for reading the computer program in the memory and performing the following operations: Determine an initial computing power service routing strategy according to the service requirements of the terminal device, and send the initial computing power service routing strategy to the terminal device; After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, receiving user experience information for the initial computing power service sent by the terminal device; Initiate corresponding measurements according to the user experience information, determine an adjusted computing power service routing strategy according to the measurement results and send it to the terminal device, or send feedback information to the terminal device.

29. The management center entity according to claim 28, It is characterized in that The processor, when receiving user experience information for the initial computing power service sent by the terminal device after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, is used to: After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, sending a user experience event subscription message to the terminal device, wherein the user experience event subscription message includes a user experience event type for the initial computing power service; Receive user experience information sent by the terminal device after the user experience event type is triggered, where the user experience information includes user experience data related to the user experience event type.

30. The management center entity according to claim 29, It is characterized in that The user experience event types include one or more of the following: The startup time of the application for accessing the initial computing power service exceeds a first preset time period; or The number of restarts of the application used to access the initial computing power service exceeds a first preset number; or The number of freezes during the execution of the service by the initial computing service exceeds a second preset number; or During the execution of the service by the initial computing service, a single freeze time exceeds a second preset time length; or The number of execution failures during the execution of the service by the initial computing power service exceeds a third preset number; or The connection establishment delay for accessing the initial computing power service exceeds a third preset time duration; or The connection establishment success rate for accessing the initial computing power service is lower than a preset success rate; or The frequency of connection interruptions to the initial computing power service exceeds a preset frequency.

31. The management center entity according to claim 30, It is characterized in that The user experience data includes one or more of the following: The startup time of the application used to access the initial computing power service; or The number of restarts of the application used to access the initial computing power service; or The number of freezes and monitoring time periods during the execution of the service by the initial computing service; or A single freeze time during the execution of the service by the initial computing power service; or The number of execution failures and monitoring time period during the execution of the service by the initial computing service; or The delay in establishing a connection to the initial computing service; or The success rate of establishing a connection to access the initial computing power service; or The frequency of connection interruptions to the initial computing service.

32. The management center entity according to claim 29, It is characterized in that The processor is further configured to: after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy: Establishing a computing power service mapping relationship, wherein the computing power service mapping relationship is a mapping relationship between one or more of an identifier of the terminal device, an identifier of an application for accessing the initial computing power service, an identifier of a computing power node where the initial computing power service is located, and an identifier of the initial computing power service; When the processor sends a user experience event subscription message to the terminal device, it is used to: Send a user experience event subscription message to the terminal device according to the computing power service mapping relationship.

33. The management center entity according to claim 29, It is characterized in that The user experience event subscription message may also include one or more of the following: The user experience event subscription message identifier, the identifier of the terminal device, the identifier of the application used to access the initial computing power service, and the deadline for user experience event subscription.

34. The management center entity according to any one of claims 29 to 33, It is characterized in that When the processor sends a user experience event subscription message to the terminal device, it is used to: Sending the user experience event subscription message to a radio access network RAN ​​entity, so that the RAN entity sends the user experience event subscription message to the terminal device; When the processor receives the user experience information sent by the terminal device after the user experience event type is triggered, it is used to: Receive user experience information sent by the RAN entity, where the user experience information is sent by the terminal device to the RAN entity.

35. The management center entity according to claim 28, It is characterized in that The processor, when receiving user experience information for the initial computing power service sent by the terminal device after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, is used to: After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing strategy, receiving user experience information for the initial computing power service actively sent by the terminal device, the user experience information being the user's subjective feeling information about the initial computing power service; or After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing strategy, a user experience information collection request for the initial computing power service is sent to the terminal device, and the terminal device sends user experience information for the initial computing power service in response to the user experience information collection request, where the user experience information is the user's subjective feeling information about the initial computing power service.

36. The management center entity according to claim 35, It is characterized in that When the processor receives the user experience information for the initial computing power service actively sent by the terminal device, it is used to: receiving user experience information sent by a RAN entity, where the user experience information is actively sent by the terminal device to the RAN entity; or When the processor sends a user experience information collection request for the initial computing power service to the terminal device and receives user experience information for the initial computing power service sent by the terminal device in response to the user experience information collection request, it is used to: The user experience information collection request is sent to the RAN entity, so that the RAN entity sends the user experience information collection request to the terminal device, and receives the user experience information sent by the RAN entity, where the user experience information is sent by the terminal device to the RAN entity in response to the user experience information collection request.

37. The management center entity according to claim 28, It is characterized in that When the processor starts corresponding measurement according to the user experience information, it is used to: Perform cause analysis based on the user experience information, determine a measurement task based on the analysis result, and execute the measurement task, wherein the measurement task includes at least one of the following: terminal device capability measurement, computing power node computing capability measurement, and network service quality measurement.

38. The management center entity according to claim 37, It is characterized in that The processor performs cause analysis according to the user experience information, determines a measurement task according to the analysis result, and executes the measurement task, for: Determining a predicted cause for triggering the user experience event type according to the user experience information, determining a measurement task corresponding to the predicted cause as a measurement task with the highest priority, and executing the measurement task with the highest priority; After the highest priority measurement task is executed, if it is determined that the predicted cause is the actual cause that triggers the user experience event type, then the measurement task is terminated; or If it is determined that the predicted reason is not the actual reason that triggers the user experience event type, other measurement tasks are performed.

39. The management center entity according to claim 38, It is characterized in that When the processor determines, according to the user experience information, a predicted cause for triggering the user experience event type, it is configured to: If the user experience information is information related to an application used to access the initial computing power service, determining that the predicted cause of triggering the user experience event type is insufficient terminal device capability; or If the user experience information is related to freeze or execution failure during the execution of the service by the initial computing power service, determining that the predicted cause of triggering the user experience event type is insufficient computing power of the initial computing power service and / or insufficient network service quality; or If the user experience information is a connection problem for accessing the initial computing power service, then the predicted cause for triggering the user experience event type is determined to be insufficient ability of the terminal device to access the network or mismatch of the terminal device type.

40. The management center entity according to claim 38, It is characterized in that The processor determines the adjusted computing power service routing strategy according to the measurement result and sends it to the terminal device, or sends feedback information to the terminal device, and is used to: If it is determined according to the measurement result that the actual cause of triggering the user experience event type is a network cause, a new computing power service routing strategy to reach the initial computing power service is determined and sent to the terminal device; or If it is determined according to the measurement result that the actual cause of triggering the user experience event type is the initial computing service cause, a new computing service is determined, a new computing service routing strategy to reach the new computing service is determined, and sent to the terminal device; or If it is determined according to the measurement result that the actual cause of triggering the user experience event type is the terminal device, feedback information is sent to the terminal device, where the feedback information includes the actual cause and / or solution; or If it is determined according to the measurement results that the actual cause of triggering the user experience event type is the terminal device, a new computing service routing strategy to reach the new computing service is determined according to the terminal device capability, computing resource status, and network resource status, and sent to the terminal device; or If it is determined based on the measurement results that the actual cause of triggering the user experience event type is the terminal device, and it is determined that the terminal device cannot improve its capabilities, a new computing power service with computing power lower than that of the initial computing power service is determined, a new computing power service routing strategy to reach the new computing power service is determined, and the new computing power service is sent to the terminal device.

41. The management center entity according to claim 28, It is characterized in that The processor determines the adjusted computing power service routing strategy according to the measurement result and sends it to the terminal device, or sends feedback information to the terminal device, and is used to: Determine an adjusted computing power service routing strategy according to the measurement result, and send the adjusted computing power service routing strategy to the RAN entity, so that the RAN entity sends the adjusted computing power service routing strategy to the terminal device; or The feedback information is sent to a RAN entity, so that the RAN entity sends the feedback information to the terminal device.

42. The management center entity according to claim 28, It is characterized in that When the processor determines the initial computing power service routing strategy according to the service requirements of the terminal device, it is used to: Receiving the service demand sent by the terminal device, and determining an initial service routing strategy according to the service demand; or Receive a service requirement sent by a RAN entity, where the service requirement is sent by the terminal device to the RAN entity, and determine an initial service routing strategy according to the service requirement.

43. The management center entity according to claim 28, It is characterized in that When the processor sends the initial computing power service routing strategy to the terminal device, it is used to: The initial computing power service routing policy is sent to a RAN entity, so that the RAN entity sends the initial computing power service routing policy to the terminal device.

44. The management center entity according to claim 43, It is characterized in that The processor is further configured to: The initial computing power service routing policy is sent to the core network entity so that the terminal device establishes a user plane path for accessing the initial computing power service corresponding to the initial computing power service routing policy according to the initial computing power service routing policy.

45. The management center entity according to claim 28, It is characterized in that When the processor sends the initial computing power service routing strategy to the terminal device, it is also used to: The identifier of the computing power node where the initial computing power service is located and the identifier of the initial computing power service are sent to the terminal device.

46. ​​A terminal device, It is characterized in that Including memory, transceiver, processor: A memory for storing a computer program; a transceiver for transmitting and receiving data under the control of the processor; and a processor for reading the computer program in the memory and performing the following operations: The receiving management center determines the initial computing service routing strategy based on the business needs of the terminal device; Access the corresponding initial computing power service according to the initial computing power service routing policy; Sending user experience information for the initial computing power service to the management center; Receive the adjusted computing service routing strategy or feedback information sent by the management center, wherein the adjustment The subsequent computing power service routing strategy is the computing power service routing strategy adjusted by the management center after performing corresponding measurements based on the user experience information.

47. The terminal device according to claim 46, It is characterized in that When the processor sends the user experience information for the initial computing power service to the management center, it is used to: Receiving a user experience event subscription message sent by the management center, wherein the user experience event subscription message includes a user experience event type for the initial computing power service; Determine whether the user experience event type is triggered; If it is determined that the user experience event type is triggered, user experience information for the initial computing power service is sent to the management center.

48. The terminal device according to claim 47, It is characterized in that When the processor receives the user experience event subscription message sent by the management center, it is used to: receiving the user experience event subscription message sent by the RAN entity, where the user experience event subscription message is sent by the management center to the RAN entity; When the processor sends the user experience information for the initial computing power service to the management center, it is used to: Send user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information for the initial computing power service to the management center.

49. The terminal device according to claim 46, It is characterized in that When the processor sends the user experience information for the initial computing power service to the management center, it is used to: Actively sending user experience information for the initial computing power service to the management center, where the user experience information is the user's subjective feeling information about the initial computing power service; or Receive a user experience information collection request for the initial computing power service sent by the management center, and send user experience information for the initial computing power service to the management center in response to the user experience information collection request, where the user experience information is the user's subjective feeling information about the initial computing power service.

50. The terminal device according to claim 49, It is characterized in that When the processor actively sends the user experience information for the initial computing power service to the management center, it is used to: Actively sending user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information for the initial computing power service to the management center; or The processor receives a user experience information collection request for the initial computing power service sent by the management center, and sends user experience information for the initial computing power service to the management center in response to the user experience information collection request, for: receiving a user experience information collection request for the initial computing power service sent by a RAN entity, wherein the user entity The terminal device actively sends a user experience information collection request to the RAN entity; in response to the user experience information collection request, the RAN entity sends the user experience information for the initial computing power service, so that the RAN entity sends the user experience information of the initial computing power service to the management center.

51. The terminal device according to any one of claims 46 to 50, It is characterized in that The processor is further configured to: Initiate terminal device computing capacity measurement at the management center, obtain one or more of the load size, computing resource size, and computing resource utilization rate of the terminal device, and send them to the management center; or The management center starts measuring the ability of the terminal device to access the network, and then obtains one or more of the wireless access capability and the type of the terminal device, and sends the information to the management center.

52. The terminal device according to any one of claims 46 to 50, It is characterized in that When the processor receives the adjusted computing power service routing strategy or feedback information sent by the management center, it is used to: Receive the adjusted computing power service routing strategy or feedback information sent by the RAN entity, where the adjusted computing power service routing strategy or feedback information is sent by the management center to the RAN entity.

53. The terminal device according to any one of claims 46 to 50, It is characterized in that When the processor accesses the corresponding initial computing power service according to the initial computing power service routing policy, it is used to: An application program for accessing the initial computing power service is started, and the initial computing power service is accessed through the application program.

54. The terminal device according to any one of claims 46 to 50, It is characterized in that Before receiving the initial computing power service routing strategy determined by the management center according to the service requirements of the terminal device, the processor is further used to: Sending the business requirement to the management center; or The service requirement is sent to the RAN entity, so that the RAN entity sends the service requirement to the management center.

55. A device for processing computing power and network services, It is characterized in that include: A computing power service orchestration unit, configured to determine an initial computing power service routing strategy according to a service requirement of a terminal device, and send the initial computing power service routing strategy to the terminal device; A user experience information acquisition unit, configured to receive user experience information for the initial computing power service sent by the terminal device after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy; A computing power service adjustment unit is used to start corresponding measurements according to the user experience information, determine an adjusted computing power service routing strategy according to the measurement results and send it to the terminal device, or send feedback information to the terminal device.

56. The device according to claim 55, It is characterized in that The user experience information acquisition unit is configured to, when receiving the user experience information for the initial computing power service sent by the terminal device after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy: After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy, sending a user experience event subscription message to the terminal device, wherein the user experience event subscription message includes a user experience event type for the initial computing power service; Receive user experience information sent by the terminal device after the user experience event type is triggered, where the user experience information includes user experience data related to the user experience event type.

57. The device according to claim 56, It is characterized in that The user experience event types include one or more of the following: The startup time of the application used to access the initial computing power service exceeds a first preset time period; or The number of restarts of the application used to access the initial computing power service exceeds a first preset number; or The number of freezes during the execution of the service by the initial computing service exceeds a second preset number; or During the execution of the service by the initial computing service, a single freeze time exceeds a second preset time length; or The number of execution failures during the execution of the service by the initial computing power service exceeds a third preset number; or The connection establishment delay for accessing the initial computing power service exceeds a third preset time duration; or The connection establishment success rate for accessing the initial computing power service is lower than a preset success rate; or The frequency of connection interruptions to the initial computing power service exceeds a preset frequency.

58. The device according to claim 57, It is characterized in that The user experience data includes one or more of the following: The startup time of the application used to access the initial computing power service; or The number of restarts of the application used to access the initial computing power service; or The number of freezes and monitoring time periods during the execution of the service by the initial computing service; or A single freeze time during the execution of the service by the initial computing power service; or The number of execution failures and monitoring time period during the execution of the service by the initial computing service; or The delay in establishing a connection to the initial computing service; or The success rate of establishing a connection to access the initial computing power service; or The frequency of connection interruptions to the initial computing service.

59. The device according to claim 56, It is characterized in that The computing power service orchestration unit is further used, after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy: Establishing a computing power service mapping relationship, wherein the computing power service mapping relationship is a mapping relationship between one or more of an identifier of the terminal device, an identifier of an application for accessing the initial computing power service, an identifier of a computing power node where the initial computing power service is located, and an identifier of the initial computing power service; When the user experience information acquisition unit sends a user experience event subscription message to the terminal device, it is used to: Send a user experience event subscription message to the terminal device according to the computing power service mapping relationship.

60. The device according to claim 56, It is characterized in that The user experience event subscription message may also include one or more of the following: The user experience event subscription message identifier, the identifier of the terminal device, the identifier of the application used to access the initial computing power service, and the deadline for user experience event subscription.

61. The device according to any one of claims 56 to 60, It is characterized in that When the user experience information acquisition unit sends a user experience event subscription message to the terminal device, it is used to: Sending the user experience event subscription message to a radio access network RAN ​​entity, so that the RAN entity sends the user experience event subscription message to the terminal device; When the user experience information acquisition unit receives the user experience information sent by the terminal device after the user experience event type is triggered, it is used to: Receive user experience information sent by the RAN entity, where the user experience information is sent by the terminal device to the RAN entity.

62. The device according to claim 55, It is characterized in that The user experience information acquisition unit is configured to, when receiving the user experience information for the initial computing power service sent by the terminal device after the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing policy: After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing strategy, receiving user experience information for the initial computing power service actively sent by the terminal device, the user experience information being the user's subjective feeling information about the initial computing power service; or After the terminal device accesses the corresponding initial computing power service according to the initial computing power service routing strategy, a user experience information collection request for the initial computing power service is sent to the terminal device, and the terminal device sends user experience information for the initial computing power service in response to the user experience information collection request, where the user experience information is the user's subjective feeling information about the initial computing power service.

63. The device according to claim 62, It is characterized in that When receiving the user experience information for the initial computing power service actively sent by the terminal device, the user experience information acquisition unit is used to: receiving user experience information sent by a RAN entity, where the user experience information is actively sent by the terminal device to the RAN entity; or When the user experience information acquisition unit sends a user experience information collection request for the initial computing power service to the terminal device and receives the user experience information for the initial computing power service sent by the terminal device in response to the user experience information collection request, it is used to: The user experience information collection request is sent to a RAN entity so that the RAN entity collects the user experience information. An information collection request is sent to the terminal device, and user experience information sent by the RAN entity is received, where the user experience information is sent by the terminal device to the RAN entity in response to the user experience information collection request.

64. The device according to claim 55, It is characterized in that When the computing power service adjustment unit starts corresponding measurement according to the user experience information, it is used to: Perform cause analysis based on the user experience information, determine a measurement task based on the analysis result, and execute the measurement task, wherein the measurement task includes at least one of the following: terminal device capability measurement, computing power node computing capability measurement, and network service quality measurement.

65. The device according to claim 64, It is characterized in that When the computing power service adjustment unit performs cause analysis according to the user experience information, determines the measurement task according to the analysis result, and executes the measurement task, it is used to: Determining a predicted cause for triggering the user experience event type according to the user experience information, determining a measurement task corresponding to the predicted cause as a measurement task with the highest priority, and executing the measurement task with the highest priority; After the highest priority measurement task is executed, if it is determined that the predicted cause is the actual cause that triggers the user experience event type, then the measurement task is terminated; or If it is determined that the predicted reason is not the actual reason that triggers the user experience event type, other measurement tasks are performed.

66. The device according to claim 65, It is characterized in that When determining the predicted cause of triggering the user experience event type according to the user experience information, the computing power service adjustment unit is used to: If the user experience information is information related to an application used to access the initial computing power service, determining that the predicted cause of triggering the user experience event type is insufficient terminal device capability; or If the user experience information is related to freeze or execution failure during the execution of the service by the initial computing power service, determining that the predicted cause of triggering the user experience event type is insufficient computing power of the initial computing power service and / or insufficient network service quality; or If the user experience information is a connection problem for accessing the initial computing power service, then the predicted cause for triggering the user experience event type is determined to be insufficient ability of the terminal device to access the network or mismatch of the terminal device type.

67. The device according to claim 65, It is characterized in that When the computing power service adjustment unit determines the adjusted computing power service routing strategy according to the measurement result and sends it to the terminal device, or sends feedback information to the terminal device, it is used to: If it is determined according to the measurement result that the actual cause of triggering the user experience event type is a network cause, a new computing power service routing strategy to reach the initial computing power service is determined and sent to the terminal device; or If it is determined according to the measurement results that the actual cause of triggering the user experience event type is the initial computing service cause, a new computing service is determined, a new computing service routing strategy to reach the new computing service is determined, and sent to the Terminal equipment; or If it is determined according to the measurement result that the actual cause of triggering the user experience event type is the terminal device, feedback information is sent to the terminal device, where the feedback information includes the actual cause and / or solution; or If it is determined according to the measurement results that the actual cause of triggering the user experience event type is the terminal device, a new computing service routing strategy to reach the new computing service is determined according to the terminal device capability, computing resource status, and network resource status, and sent to the terminal device; or If it is determined based on the measurement results that the actual cause of triggering the user experience event type is the terminal device, and it is determined that the terminal device cannot improve its capabilities, a new computing power service with computing power lower than that of the initial computing power service is determined, a new computing power service routing strategy to reach the new computing power service is determined, and the new computing power service is sent to the terminal device.

68. The device according to claim 55, It is characterized in that When the computing power service adjustment unit determines the adjusted computing power service routing strategy according to the measurement result and sends it to the terminal device, or sends feedback information to the terminal device, it is used to: Determine an adjusted computing power service routing strategy according to the measurement result, and send the adjusted computing power service routing strategy to the RAN entity, so that the RAN entity sends the adjusted computing power service routing strategy to the terminal device; or The feedback information is sent to a RAN entity, so that the RAN entity sends the feedback information to the terminal device.

69. The device according to claim 55, It is characterized in that When determining the initial computing service routing strategy according to the service requirements of the terminal device, the computing service orchestration unit is used to: Receiving the service demand sent by the terminal device, and determining an initial service routing strategy according to the service demand; or Receive a service requirement sent by a RAN entity, where the service requirement is sent by the terminal device to the RAN entity, and determine an initial service routing strategy according to the service requirement.

70. The device according to claim 55, It is characterized in that When sending the initial computing service routing policy to the terminal device, the computing service orchestration unit is used to: The initial computing power service routing policy is sent to a RAN entity, so that the RAN entity sends the initial computing power service routing policy to the terminal device.

71. The device according to claim 70, It is characterized in that The computing service orchestration unit is also used for: The initial computing power service routing policy is sent to the core network entity so that the terminal device establishes a user plane path for accessing the initial computing power service corresponding to the initial computing power service routing policy according to the initial computing power service routing policy.

72. The device according to claim 55, It is characterized in that When sending the initial computing service routing policy to the terminal device, the computing service orchestration unit is further used to: The identifier of the computing power node where the initial computing power service is located and the identifier of the initial computing power service are sent to the terminal device.

73. A processing device for computing power and network services, It is characterized in that include: A receiving unit, used to receive an initial computing power service routing strategy determined by a management center according to a service requirement of a terminal device; An access unit, configured to access a corresponding initial computing power service according to the initial computing power service routing policy; A sending unit, configured to send user experience information for the initial computing power service to the management center; The receiving unit is also used to receive the adjusted computing power service routing strategy or feedback information sent by the management center, wherein the adjusted computing power service routing strategy is the computing power service routing strategy adjusted by the management center after performing corresponding measurements based on the user experience information.

74. The device according to claim 73, It is characterized in that When the sending unit sends the user experience information for the initial computing power service to the management center, it is used to: Receiving a user experience event subscription message sent by the management center, wherein the user experience event subscription message includes a user experience event type for the initial computing power service; Determine whether the user experience event type is triggered; If it is determined that the user experience event type is triggered, user experience information for the initial computing power service is sent to the management center.

75. The device according to claim 74, It is characterized in that When receiving the user experience event subscription message sent by the management center, the receiving unit is used to: receiving, by a receiving unit, the user experience event subscription message sent by a RAN entity, wherein the user experience event subscription message is sent by the management center to the RAN entity; When the sending unit sends the user experience information for the initial computing power service to the management center, it is used to: Send user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information for the initial computing power service to the management center.

76. The device according to claim 73, It is characterized in that When the sending unit sends the user experience information for the initial computing power service to the management center, it is used to: Actively sending user experience information for the initial computing power service to the management center, where the user experience information is the user's subjective feeling information about the initial computing power service; or The receiving unit receives a user experience information collection request for the initial computing power service sent by the management center, and sends a user experience information collection request for the initial computing power service to the management center in response to the user experience information collection request. User experience information, where the user experience information is the user's subjective feeling information about the initial computing power service.

77. The device according to claim 76, It is characterized in that When the sending unit actively sends the user experience information for the initial computing power service to the management center, it is used to: Actively sending user experience information for the initial computing power service to the RAN entity, so that the RAN entity sends the user experience information for the initial computing power service to the management center; or The sending unit receives the user experience information collection request for the initial computing power service sent by the management center through the receiving unit, and sends the user experience information for the initial computing power service to the management center in response to the user experience information collection request, for: A user experience information collection request for the initial computing power service sent by the RAN entity is received through a receiving unit, and the user experience information collection request is actively sent by the terminal device to the RAN entity; in response to the user experience information collection request, user experience information for the initial computing power service is sent to the RAN entity, so that the RAN entity sends the user experience information of the initial computing power service to the management center.

78. The device according to any one of claims 73 to 77, It is characterized in that The sending unit is also used for: Initiate terminal device computing capacity measurement at the management center, obtain one or more of the load size, computing resource size, and computing resource utilization rate of the terminal device, and send them to the management center; or The management center starts measuring the ability of the terminal device to access the network, and then obtains one or more of the wireless access capability and the type of the terminal device, and sends the information to the management center.

79. The device according to any one of claims 73 to 77, It is characterized in that When receiving the adjusted computing power service routing strategy or feedback information sent by the management center, the receiving unit is used to: Receive the adjusted computing power service routing strategy or feedback information sent by the RAN entity, where the adjusted computing power service routing strategy or feedback information is sent by the management center to the RAN entity.

80. The device according to any one of claims 73 to 77, It is characterized in that When the access unit accesses the corresponding initial computing power service according to the initial computing power service routing policy, it is used to include: An application program for accessing the initial computing power service is started, and the initial computing power service is accessed through the application program.

81. The device according to any one of claims 73 to 77, It is characterized in that Before the receiving management center determines the initial computing power service routing strategy according to the service requirements of the terminal device, the sending unit is further used to: Sending the business requirement to the management center; or The service requirement is sent to the RAN entity, so that the RAN entity sends the service requirement to the management center.

82. A non-transitory readable storage medium, It is characterized in that The non-transitory readable storage medium stores a computer program, and the computer program is used to enable a processor to execute the method according to any one of claims 1 to 27.

Citation Information

Patent Citations

  • Processing method and device of computing power and network service, and storage medium

    CN119030972A

  • Charging method based on user experience quality strategy in next generation network

    CN101610493A

  • Management and decision-making method for computing resources based on NWDAF

    CN115499859A

  • Wireless computing power scheduling method and device, network function and storage medium

    CN118200981A

  • User experience policy management and optimisation of telecommunications networks

    US20160156520A1