Construction method for hanging coiled tubing at wellhead and plugging well completion string at well bottom
Through the combination of prefabricated suspension tiles and oil pipe suspension, combined with packer and plugger, the safety hazards and sealing problems of wellhead suspension in the continuous pipe completion process are solved, and safe and efficient bottom-hole sealing and wellhead operation are achieved. Reduced development costs.
Patent Information
- Application Number
- PCT/CN2023/136160
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-06-01
- Filing Date
- 2023-12-04
- Publication Date
- 2024-12-05
AI Technical Summary
The existing continuous pipe completion process has the problems of temporary suspension safety hazards and improper sealing of the wellhead suspension device, resulting in air leakage and corrosion perforation, and lacks safe, efficient and economical wellhead suspension and bottom-hole sealing methods.
Using a combination of prefabricated suspension tiles and oil pipe suspension, the stability of the wellhead equipment is ensured through the pressure test and well washing operations of the wellhead equipment, the bottom-hole seal is achieved using packers and plugs, reducing the suspension risk of the wellhead equipment, and through leakage Pressure tee injection sealing liquid protective sleeve and production pipe string.
It effectively avoids the safety hazards of temporary suspension of wellhead equipment, improves the bottom-hole sealing and the safety of wellhead operations, extends the equipment life and reduces development costs.
Smart Images

Figure CN2023136160_05122024_PF_FP_ABST
Abstract
Description
Construction method of coiled tubing wellhead suspension and bottom hole plugging completion string
[0001] CROSS-REFERENCE TO RELATED APPLICATIONS
[0002] This application claims the benefit of Chinese patent application No. 202310643960.9 filed on June 1, 2023, the contents of which are incorporated herein by reference. Technical Field
[0003] The present invention relates to the technical field of natural gas well completion, and in particular to a construction method for a coiled tubing wellhead suspension and well bottom plugging completion string. Background Art
[0004] With the development of tight gas / shale gas, problems such as declining production and increased water content caused by the use of tubing strings for completion and gas production have gradually become apparent, seriously affecting gas formation production. Traditional tubing pressure operations are complex and inefficient, and existing equipment has low pressure operation capabilities and is expensive. In the later stages of wellbore liquid accumulation, conventional tubing has poor liquid carrying capacity, requiring auxiliary processes for drainage and gas production, increasing development costs. Coiled tubing offers advantages such as no need for single joints, small internal diameter, and fast completion speeds, and these characteristics are also reflected in the velocity string process. Applying the inherent advantages of coiled tubing to the development of tight gas / shale gas has formed an integrated coiled tubing completion and gas production technology, leading to cost reduction and quality improvement in resource development, and safe and efficient operations, which is of great significance in the low oil price environment.
[0005] Regarding currently disclosed coiled tubing completion string processes, patent CN105064940B discloses an internal coiled tubing completion string and construction method. The string includes an internal hanger, coiled tubing, a plug, and a plugging rod. The process sequence involves installing the internal hanger in the tubing head, lowering the tubing to the designed position once, temporarily suspending the coiled tubing shear pipe, and installing a locking seating joint. A second run is performed to seat the joint and the coiled tubing into the hanger body. The wellhead tree is then restored, completing the coiled tubing completion string for production. Patent CN115162999A discloses a large-diameter coiled tubing string deployment construction method. The process sequence involves lowering the tubing to the designed position once, temporarily suspending the shear pipe, connecting the coiled tubing to the tubing hanger, and a second run is performed to seat the tubing hanger to the wellhead. The wellhead tree is then restored, completing the coiled tubing completion string for production. This method is currently the most widely used coiled tubing completion string process in oil fields and on the market. Both completion processes suffer from the following two issues:
[0006] (1) After the shearing, the coiled tubing is in a temporary hanging state. At this time, the coiled tubing is only suspended by the wellhead blowout prevention equipment, which has high safety performance requirements for the wellhead blowout prevention equipment. If the equipment suspension function fails, the coiled tubing will fall directly into the well and cause an accident. Therefore, this process has a great safety hazard.
[0007] (2) The annular passage between the coiled tubing and the wellbore is sealed only by the wellhead hanger. During the wellhead disassembly and assembly operation, the wellhead hanger is under long-term pressure. If the seal is not set properly, there is a risk of leakage and lifting, which threatens the wellhead operators. In addition, the annular passage is exposed to the production environment for a long time, and the casing and production tubing are prone to corrosion and perforation, which affects the subsequent drainage and production operations.
[0008] In response to the above-mentioned problems existing in the existing coiled tubing completion technology and in combination with the needs of the integrated coiled tubing completion and gas production technology, there is currently a lack of a safe, efficient and economical completion string technology that can suspend the coiled tubing at the wellhead and simultaneously achieve plugging at the bottom of the well.
[0009] Summary of the Invention
[0010] The purpose of the present invention is to overcome the risk problem caused by temporary suspension of coiled tubing in the prior art.
[0011] In order to achieve the above-mentioned object, the present invention provides a construction method for a coiled tubing wellhead suspension and well bottom plugging completion string, wherein the construction method comprises:
[0012] S1. Lay out the coiled tubing equipment, install the wellhead equipment, and conduct a pressure test. The wellhead equipment, from top to bottom, includes the injection head, blowout preventer, four-ram blowout preventer, blowout preventer, pressure relief tee, and operating window.
[0013] S2. Pass the coiled tubing through the injection head, install a wellbore tool string for well cleaning, lower the tubing to the designed position, and perform well cleaning operations;
[0014] S3, lifting the coiled tubing to the operating window, replacing the landing tool string for the completion string, installing a tubing hanger on the coiled tubing, running the coiled tubing, allowing the tubing hanger to drop into the wellhead spool and set, and continuing to run the coiled tubing to the designed depth;
[0015] S4. Open the operating window, install hanging slips on the coiled tubing, lower the coiled tubing so that the hanging slips fall into the tubing hanger, continue lowering the tubing until the hanging weight reaches zero, and then cut the coiled tubing.
[0016] S5. Remove the wellhead equipment, restore the gas tree, and open the plug to start production.
[0017] In some embodiments, a slip tooth is provided on the inner circumferential surface of the suspension slip, the outer circumferential surface of the suspension slip is formed as a tapered surface from top to bottom, and the inner circumferential surface of the upper end of the tubing hanger is formed as a tapered surface from top to bottom to accommodate and suspend the suspension slip.
[0018] In some embodiments, the suspension slip includes two semi-tubular portions and a connector for detachably connecting the two semi-tubular portions.
[0019] In some embodiments, the tubing hanger is sealingly engaged with the wellhead spool, and the tubing hanger is fixed by a jackscrew of the wellhead spool.
[0020] In some embodiments, in S3, the replacement of the downhole tool string for the completion tubing includes: opening the operation window, disassembling the downhole tool string for well cleaning, installing a dropper, a packer, and a plug at the lower end of the coiled tubing, and hanging the tubing hanger on the packer.
[0021] In some embodiments, in S3, after the coiled tubing is continued to be lowered to the designed depth, the inside of the tubing is pressurized to set the packer at the designed position, and the coiled tubing is continued to be lowered to release a portion of the suspended weight of the injection head.
[0022] In some embodiments, S3 further includes: opening the pressure relief tee and controlling the blowout through the surface choke manifold to release the pressure above the packer, filling the annulus area with packer fluid, and making the wellhead pressure-free.
[0023] In some embodiments, in S3, continuing to lower the coiled tubing to the designed depth includes: lowering the coiled tubing at a speed not exceeding 5 m / min, and observing equipment operation when the lowering depth reaches 50 m; then continuing to lower the coiled tubing at a speed of 25-30 m / min, and performing a pull-up suspended weight test every 500 m of lowering; when the coiled tubing reaches 300 m from the designed depth, reducing the speed to 10-15 m / min, and when the coiled tubing reaches 100 m from the designed depth, reducing the speed to 5 m / min, and pulling up to the designed depth after passing the designed depth of 15 m.
[0024] In some embodiments, in S1, the switch functions of each gate of the four-gate blowout preventer are tested to be in the fully open position, and then the injection head, the blowout preventer box, the four-gate blowout preventer, the pressure relief tee, the blowout preventer, and the operation window are installed and connected to the ground high-pressure pump group pipeline to perform pressure tests on the ground pipeline and wellhead equipment.
[0025] In some embodiments, the pressure test requires increasing the pump pressure stepwise by 10%, 50%, and 100% to 35 MPa, and is qualified if the pressure is stabilized for 10 minutes and the pressure drop is less than 0.7 MPa. If a leak is found, the pump is immediately stopped and the pressure is relieved for rectification.
[0026] In some embodiments, in S2, the coiled tubing is passed through the injection head and lowered to the operating window position; the operating window is opened, the lower end of the coiled tubing is chamfered, a connector is installed, and a tensile test is performed; a motor head and a well flushing tool are installed at the lower end of the connector, the operating window is closed, and the wellhead equipment is pressure tested through a surface high-pressure pump group pipeline; the flat valve is opened, the coiled tubing is lowered to the designed depth, and the surface high-pressure pump group pipeline is started to complete the well flushing operation in the designed area.
[0027] In some embodiments, during installation of the connector, the lower end of the coiled tubing is chamfered at 45°; the connector is subjected to a 15-ton tensile test, and a displacement of less than 3-5 mm is considered acceptable.
[0028] In some embodiments, in S4, the operating window is opened, and the hanging slips are installed on the outer wall of the coiled tubing near the upper portion of the tubing hanger. The coiled tubing is continued to be lowered, and the hanging slips fall into the tubing hanger. The coiled tubing is continued to be lowered until the hanging weight of the injection head is zero, the coiled tubing does not slip, and the load is normal. The shear rams of the four-ram blowout preventer are used to shear the coiled tubing. The coiled tubing is lifted, and the load and pressure changes of the injection head are observed to verify whether the tubing shearing is successful.
[0029] In some embodiments, in S5, all equipment above the wellhead spool is removed, the coiled tubing above the hanging slips is cut with a manual cutter, the upper end of the coiled tubing is chamfered, and the cut neck and burrs are removed.
[0030] In some embodiments, a No. 1 liner and a No. 2 liner are installed in the Christmas tree, the Christmas tree is assembled, and the main valve of the Christmas tree is closed. After the plug of the plug is removed by pressurizing the pipeline of a surface high-pressure pump group, the well is shut in.
[0031] With the above technical solution, by prefabricating the hanging slips before pipe shearing, the safety hazard caused by the temporary hanging of the wellhead equipment is avoided. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] Figure 1 - Schematic diagram of coiled tubing completion string structure
[0033] Figure 2 - Schematic diagram of the coiled tubing completion string wellhead device
[0034] Figure 3 - Schematic diagram of the wellhead process of the coiled tubing completion string process
[0035] Figure 4 - Schematic diagram of coiled tubing well cleaning tool string
[0036] Figure 5 - Schematic diagram of coiled tubing completion tool string
[0037] Figure 6 - Schematic diagram of the installation process of hanging slips
[0038] Figure 7 - Schematic diagram of the coiled tubing wellhead suspension process
[0039] Figure 8 - Continuous Tubing Suspension Slip Structure
[0040] Figure 9 - Tubing hanger structure diagram
[0041] Figure 10 - Continuous tubing connector structure
[0042] Figure 11 - Coiled Tubing Release Structure
[0043] Figure 12 - Coiled Tubing Packer Structure
[0044] Figure 13 - Structure of coiled tubing plug
[0045] Figure 14 - Wellhead gas tree structure diagram
[0046] Explanation of Reference Numerals 1: Coiled Tubing; 2: Hanger Slips; 2-1: Slip Teeth; 2-2: Hanger Outer Wall; 3-Tubing Hanger; 3-1: Hanger Body; 3-2: Seal Assembly; 4: Connector; 4-1: Slip Connection; 4-2: Rubber Seal; 5: Handle; 5-1: Upper Connector; 5-2: Pin; 5-3: Lower Connector; 6: Packer; 6-1: Rivet Slips; 6-2: Annulus Sealing Rubber Sleeve ;7: plug;7-1: double-flap back-pressure valve;7-2: plug;7-3: screen, 7-4: guide head;8: injection head;9: blowout preventer box;10: four-gate blowout preventer;11-blowout preventer;12: pressure relief tee;13: operation window;14: flat valve;15: wellhead spool;16: motor head;17: well washing tool;18: gas tree;18-1: No. 1 liner;18-2: No. 2 liner. DETAILED DESCRIPTION
[0047] The following describes the specific embodiments of the present invention in detail with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are only used to illustrate and explain the present invention and are not intended to limit the present invention.
[0048] Example 1
[0049] This solution provides a construction method for coiled tubing wellhead suspension and bottom hole plugging completion string, wherein the construction method includes:
[0050] S1. Lay out the coiled tubing 1 operating equipment, install the wellhead equipment, and conduct a pressure test. The wellhead equipment, from top to bottom, includes the injection head 8, blowout preventer box 9, four-gate blowout preventer 10, lubricant pipe 11, pressure relief tee 12, and operating window 13, as shown in FIG2 .
[0051] S2, passing the coiled tubing 1 through the injection head 8, installing a wellbore tool string for well cleaning, lowering the tubing to the designed position, and performing well cleaning operations;
[0052] S3: Lift the coiled tubing 1 to the operating window 13, replace the downhole tool string for the completion string, install the tubing hanger 3 on the coiled tubing 1, lower the coiled tubing 1, allow the tubing hanger 3 to fall into the wellhead spool 15 and be set, and continue lowering the coiled tubing 1 to the designed depth;
[0053] S4. Open the operating window 13, install the hanging slips 2 on the coiled tubing 1, lower the coiled tubing 1 so that the hanging slips 2 fall into the tubing hanger 3, continue lowering the tubing 1 until the hanging weight reaches zero, and then cut the coiled tubing 1.
[0054] S5. Remove the wellhead equipment, restore the Christmas tree 18, remove the plug 7 and put the gas into production.
[0055] The tubing hanger 3 is movably mounted on the coiled tubing 1. Therefore, when the coiled tubing 1 is lowered, the tubing hanger 3 can be set by landing on the wellhead spool 15. As shown in Figures 6 and 7 , the hanging slips 2 are fixed to the coiled tubing 1 and can be held in the tubing hanger 3 as the coiled tubing 1 moves downward, thereby suspending the coiled tubing 1 on the tubing hanger 3 and eliminating the risks associated with temporary suspension.
[0056] In this solution, by prefabricating the hanging slips before pipe shearing, the safety hazards caused by the temporary hanging of wellhead equipment are avoided.
[0057] As shown in Figures 8 and 9 , the inner circumference of the suspension slips 2 is provided with slip teeth 2-1. The outer circumference of the suspension slips 2 is formed into a tapered surface from top to bottom. The inner circumference of the upper end of the tubing hanger 3 is also formed into a tapered surface from top to bottom to accommodate and suspend the suspension slips 2. As shown in Figure 8 , the suspension slips 2 engage with the outer wall of the coiled tubing 1 via the slip teeth 2-1. The outer circumference cooperates with the inner circumference of the tubing hanger 3 to axially support the suspension slips 2 through the tubing hanger 3. After the coiled tubing 1 is connected to the suspension slips 2 by its own weight, the suspension slips 2 then suspend the coiled tubing 1 at the wellhead via the tubing hanger 3.
[0058] As shown in FIG9 , the tubing hanger 3 includes a hanger body 3 - 1 and a sealing assembly 3 - 2 , wherein the sealing groove on the inner circumference matches the outer circumference of the suspension slip 2 .
[0059] The suspension slips 2 comprise two semi-tubular sections and a connector for detachably connecting the two semi-tubular sections. As shown in Figure 8, the suspension slips 2 are primarily composed of two semi-tubular sections, detachably connected by a connector. This structure facilitates installation of the suspension slips 2 on the coiled tubing 1.
[0060] The tubing hanger 3 is sealingly engaged with the wellhead spool 15 and secured via the jackscrews of the wellhead spool 15. As shown in Figure 14 , the tubing hanger 3 is positioned within the wellhead spool 15, with its outer periphery sealingly engaged with the inner periphery of the wellhead spool 15 to achieve a seal. The wellhead spool 15 is secured relative to the tubing hanger 3 by radial jackscrews.
[0061] In S3, replacing the wellbore tool string for the completion tubing string includes opening the operating window 13, removing the wellbore tool string used for cleaning the well, installing the release handle 5, packer 6, and plug 7 at the lower end of the coiled tubing 1, and hanging the tubing hanger 3 on the packer 6, as shown in Figure 5. The release handle 5, packer 6, and plug 7 constitute the completion tool string. After removing the wellbore tool string through the operating window 13, the completion tool string is installed at the lower end of the coiled tubing 1.
[0062] As shown in Figure 11, the release 5 adopts a mechanical release structure, which includes an upper joint 5-1, a pin 5-2 and a lower joint 5-3 from top to bottom. It is installed between the connector 4 and the packer 6. When the tool string at the bottom end of the coiled tubing 1 is stuck, the pin 5-2 is sheared by lifting the tubing string to achieve the release operation of the coiled tubing 1.
[0063] As shown in FIG12 , the packer 6 is installed between the release handle 5 and the plugger 7 . By applying pressure inside the pipe, the annulus passage between the coiled tubing 1 and the casing at the position of the packer 6 can be plugged.
[0064] As shown in Figure 13, the plug 7 adopts a functional integrated design, which includes a double-flap back-pressure valve 7-1, a plug 7-2, a screen 7-3 and a guide head 7-4 from top to bottom. The double-flap back-pressure valve 7-1 is located at the front end of the plug 7-2 and is constrained in an open state by a control sleeve. By throwing a ball to knock off the control sleeve, the double-flap back-pressure valve 7-1 is started to lift the pipe under pressure. The plug 7-2 is placed at the end of the plug 7 to achieve internal sealing of the pipe. The fixed pin is sheared by pressure and the plug 7-2 is pumped down for production. The screen 7-3 is located at the lower end of the functional area of the plug 7 and adopts a grid-shaped design. The grid spacing can be adjusted according to production needs. The guide head 7-4 is located at the tail end of the plug 7, connected to the screen 7-3, and fixed by the rivets.
[0065] Furthermore, in step S3, after the coiled tubing 1 is further lowered to the designed depth, pressure is applied to the tubing to set the packer 6 at the designed position. The coiled tubing 1 is then lowered further to release some of the deadweight of the injection head 8. When the lower end of the coiled tubing 1 reaches the designed depth, pressure is applied to the tubing 1 to set the packer 6 on the casing. The coiled tubing 1 is then lowered further, releasing some of the deadweight of the injection head 8. The packer 6 enables the coiled tubing to function as a completion string to seal the downhole annulus, enabling development of specific production intervals.
[0066] Furthermore, step S3 further includes: opening the pressure relief tee 12 and controlling the blowout through the surface choke manifold to release the pressure above the packer 6, filling the annulus with packer fluid, and rendering the wellhead pressure-free. Injecting packer fluid into the annulus protects the casing and production tubing, ensuring safe operation at the wellhead without pressure.
[0067] In S3, continuing to lower the coiled tubing 1 to the designed depth includes: lowering the coiled tubing 1 at a speed not exceeding 5 m / min, observing the equipment operation when the lowering depth reaches 50 m; then continuing to lower the coiled tubing 1 at a speed of 25 m / min, performing a pull-up and suspended weight test every 500 m of lowering; reducing the speed to 10 m / min when the coiled tubing 1 reaches 300 m from the designed depth, and then reducing the speed to 5 m / min when the coiled tubing 1 reaches 100 m from the designed depth, and then lifting the coiled tubing 15 m above the designed depth to the designed depth. When lowering the coiled tubing 1, first lower the tubing at a slower speed, then lower it at a faster speed, perform a suspended weight test, and finally lower the tubing at a slower speed again, and only lift it up after the tubing depth exceeds the designed depth.
[0068] In S1, the gate switch functions of the four-gate blowout preventer 10 are tested to fully open the gates. Then, the injection head 8, the blowout preventer box 9, the four-gate blowout preventer 10, the pressure relief tee 12, the lubricator 11, and the operating window 13 are installed and connected to the surface high-pressure pump group pipeline to perform pressure tests on the surface pipeline and wellhead equipment. Pressure tests are performed on the surface high-pressure pump group pipeline (see Figure 3) to detect leaks.
[0069] Furthermore, the pressure test requires increasing the pump pressure by 10%, 50%, and 100% to 35MPa. A pass mark is achieved when the pressure remains stable for 10 minutes and the pressure drop is less than 0.7MPa. If a leak is detected, the pump must be immediately stopped and the pressure must be relieved for rectification. During the pressure test, the pressure is gradually increased. Once the maximum pressure is reached, it must be maintained for a specified period of time. If a leak is detected, rectification and repair are required.
[0070] In S2, the coiled tubing 1 is passed through the injection head 8 and lowered to the operating window 13. The operating window 13 is opened, the lower end of the coiled tubing 1 is chamfered, the connector 4 is installed, and a tensile test is performed. Referring to Figure 4, a motor head 16 and a well cleaning tool 17 are installed at the lower end of the connector 4. The operating window 13 is closed, and the wellhead equipment is pressure tested via the surface high-pressure pump assembly pipeline. The flat valve 14 is opened, the coiled tubing 1 is lowered to the designed depth, and the surface high-pressure pump assembly pipeline is activated to complete the well cleaning operation in the designed area. As shown in Figure 4, the motor head 16 and well cleaning tool 17 are installed at the lower end of the connector 4. As shown in Figure 10, the connector 4 adopts a rubber seal design, comprising, from top to bottom, a slip connection 4-1 and a rubber seal 4-2. It is installed at the bottom of the coiled tubing 1, allowing the coiled tubing 1 to be connected to the downhole tool assembly.
[0071] Furthermore, during the installation of the connector 4, the lower end of the coiled tubing 1 was chamfered 45°. The connector 4 was subjected to a 15t tensile test, with displacement of less than 3-5mm considered acceptable. The coiled tubing 1 was chamfered to facilitate connection with the connector 4, and the connector 4 was subjected to a tensile test to confirm its connection strength.
[0072] In S4, the operating window 13 is opened, and the hanging slips 2 are installed on the outer wall of the coiled tubing 1 near the top of the tubing hanger 3. The coiled tubing 1 is continued to be lowered, and the hanging slips 2 fall into the tubing hanger 3. The coiled tubing 1 is further lowered until the hanging weight of the injection head 8 is zero and there is no slippage or abnormal load on the coiled tubing 1. The shear rams of the four-ram blowout preventer 10 are used to shear the coiled tubing 1. The coiled tubing 1 is lifted and the load and pressure changes on the injection head 8 are observed to verify the success of the shearing. After the hanging slips 2 are installed on the coiled tubing 1, the coiled tubing 1 is lowered so that the hanging slips 2 are suspended on the tubing hanger 3. The coiled tubing 1 is further lowered until the downward pulling force exerted by the coiled tubing 1 on the injection head 8 is zero, and the coiled tubing 1 is sheared. The coiled tubing 1 is lifted above the shearing position to determine whether the coiled tubing 1 has been sheared.
[0073] In S5, all equipment above the wellhead spool 15 is removed, the coiled tubing 1 above the hanging slips 2 is cut with a manual cutter, the upper end of the coiled tubing 1 is chamfered, and the neck and burrs of the cut tubing are removed.
[0074] The No. 1 and No. 2 liners are installed in the Christmas tree 18, the Christmas tree 18 is assembled, and the main valve of the Christmas tree 18 is closed. The surface high-pressure pump assembly pipeline is used to pressurize the plug 7-2 of the plug 7, and the well is shut in. Referring to Figure 14 , the Christmas tree 18 comprises a multi-segment structure. Before connecting the multi-segment structure, the No. 1 and No. 2 liners 18-1 and 18-2 are installed therein, so that the No. 1 and No. 2 liners 18-1 and 18-2 are connected to the coiled tubing 1. The multi-segment structure is then connected, and the main valve of the Christmas tree 18 is closed. The surface high-pressure pump assembly pipeline is used to pressurize the plug 7-2 of the plug 7, connecting the reservoir and the coiled tubing 1, and shutting in the well.
[0075] Example 2
[0076] This solution provides a construction method for coiled tubing wellhead suspension and bottom hole plugging completion string, wherein the construction method includes:
[0077] S1. Lay out the coiled tubing 1 operating equipment, install the wellhead equipment, and conduct a pressure test. The wellhead equipment, from top to bottom, includes the injection head 8, blowout preventer box 9, four-gate blowout preventer 10, lubricant pipe 11, pressure relief tee 12, and operating window 13, as shown in FIG2 .
[0078] S2, passing the coiled tubing 1 through the injection head 8, installing a wellbore tool string for well cleaning, lowering the tubing to the designed position, and performing well cleaning operations;
[0079] S3: Lift the coiled tubing 1 to the operating window 13, replace the downhole tool string for the completion string, install the tubing hanger 3 on the coiled tubing 1, lower the coiled tubing 1, allow the tubing hanger 3 to fall into the wellhead spool 15 and be set, and continue lowering the coiled tubing 1 to the designed depth;
[0080] S4. Open the operating window 13, install the hanging slips 2 on the coiled tubing 1, lower the coiled tubing 1 so that the hanging slips 2 fall into the tubing hanger 3, continue lowering the tubing 1 until the hanging weight reaches zero, and then cut the coiled tubing 1.
[0081] S5. Remove the wellhead equipment, restore the Christmas tree 18, remove the plug 7 and put the gas into production.
[0082] The tubing hanger 3 is movably mounted on the coiled tubing 1. Therefore, when the coiled tubing 1 is lowered, the tubing hanger 3 can be set by landing on the wellhead spool 15. As shown in Figures 6 and 7 , the hanging slips 2 are fixed to the coiled tubing 1 and can be held in the tubing hanger 3 as the coiled tubing 1 moves downward, thereby suspending the coiled tubing 1 on the tubing hanger 3 and eliminating the risks associated with temporary suspension.
[0083] In this solution, by prefabricating the hanging slips before pipe shearing, the safety hazards caused by the temporary hanging of wellhead equipment are avoided.
[0084] As shown in Figures 8 and 9 , the inner circumference of the suspension slips 2 is provided with slip teeth 2-1. The outer circumference of the suspension slips 2 is formed into a tapered surface from top to bottom. The inner circumference of the upper end of the tubing hanger 3 is also formed into a tapered surface from top to bottom to accommodate and suspend the suspension slips 2. As shown in Figure 8 , the suspension slips 2 engage with the outer wall of the coiled tubing 1 via the slip teeth 2-1. The outer circumference cooperates with the inner circumference of the tubing hanger 3 to axially support the suspension slips 2 through the tubing hanger 3. After the coiled tubing 1 is connected to the suspension slips 2 by its own weight, the suspension slips 2 then suspend the coiled tubing 1 at the wellhead via the tubing hanger 3.
[0085] As shown in FIG9 , the tubing hanger 3 includes a hanger body 3 - 1 and a sealing assembly 3 - 2 , wherein the sealing groove on the inner circumference matches the outer circumference of the suspension slip 2 .
[0086] The suspension slips 2 comprise two semi-tubular sections and a connector for detachably connecting the two semi-tubular sections. As shown in Figure 8, the suspension slips 2 are primarily composed of two semi-tubular sections, detachably connected by a connector. This structure facilitates installation of the suspension slips 2 on the coiled tubing 1.
[0087] The tubing hanger 3 is sealingly engaged with the wellhead spool 15 and secured via the jackscrews of the wellhead spool 15. As shown in Figure 14 , the tubing hanger 3 is positioned within the wellhead spool 15, with its outer periphery sealingly engaged with the inner periphery of the wellhead spool 15 to achieve a seal. The wellhead spool 15 is secured relative to the tubing hanger 3 by radial jackscrews.
[0088] In S3, replacing the wellbore tool string for the completion tubing string includes opening the operating window 13, removing the wellbore tool string used for cleaning the well, installing the release handle 5, packer 6, and plug 7 at the lower end of the coiled tubing 1, and hanging the tubing hanger 3 on the packer 6, as shown in Figure 5. The release handle 5, packer 6, and plug 7 constitute the completion tool string. After removing the wellbore tool string through the operating window 13, the completion tool string is installed at the lower end of the coiled tubing 1.
[0089] As shown in Figure 11, the release 5 adopts a mechanical release structure, which includes an upper joint 5-1, a pin 5-2 and a lower joint 5-3 from top to bottom. It is installed between the connector 4 and the packer 6. When the tool string at the bottom end of the coiled tubing 1 is stuck, the pin 5-2 is sheared by lifting the tubing string to achieve the release operation of the coiled tubing 1.
[0090] As shown in FIG12 , the packer 6 is installed between the release handle 5 and the plugger 7 . By applying pressure inside the pipe, the annulus passage between the coiled tubing 1 and the casing at the position of the packer 6 can be plugged.
[0091] As shown in Figure 13, the plug 7 adopts a functional integrated design, which includes a double-flap back-pressure valve 7-1, a plug 7-2, a screen 7-3 and a guide head 7-4 from top to bottom. The double-flap back-pressure valve 7-1 is located at the front end of the plug 7-2 and is constrained in an open state by a control sleeve. By throwing a ball to knock off the control sleeve, the double-flap back-pressure valve 7-1 is started to lift the pipe under pressure. The plug 7-2 is placed at the end of the plug 7 to achieve internal sealing of the pipe. The fixed pin is sheared by pressure and the plug 7-2 is pumped down for production. The screen 7-3 is located at the lower end of the functional area of the plug 7 and adopts a grid-shaped design. The grid spacing can be adjusted according to production needs. The guide head 7-4 is located at the tail end of the plug 7, connected to the screen 7-3, and fixed by the rivets.
[0092] Furthermore, in step S3, after the coiled tubing 1 is further lowered to the designed depth, pressure is applied to the tubing to set the packer 6 at the designed position. The coiled tubing 1 is then lowered further to release some of the deadweight of the injection head 8. When the lower end of the coiled tubing 1 reaches the designed depth, pressure is applied to the tubing 1 to set the packer 6 on the casing. The coiled tubing 1 is then lowered further, releasing some of the deadweight of the injection head 8. The packer 6 enables the coiled tubing to function as a completion string to seal the downhole annulus, enabling development of specific production intervals.
[0093] Furthermore, step S3 further includes: opening the pressure relief tee 12 and controlling the blowout through the surface choke manifold to release the pressure above the packer 6, filling the annulus with packer fluid, and rendering the wellhead pressure-free. Injecting packer fluid into the annulus protects the casing and production tubing, ensuring safe operation at the wellhead without pressure.
[0094] In S3, continuing to lower the coiled tubing 1 to the designed depth includes: lowering the coiled tubing 1 at a speed not exceeding 5 m / min, observing the equipment operation when the lowering depth reaches 50 m; then continuing to lower the coiled tubing 1 at a speed of 30 m / min, performing a pull-up and suspended weight test every 500 m of lowering; reducing the speed to 15 m / min when the coiled tubing 1 reaches 300 m from the designed depth, and then reducing the speed to 5 m / min when the coiled tubing 1 reaches 100 m from the designed depth, and then lifting the coiled tubing 15 m above the designed depth to the designed depth. When lowering the coiled tubing 1, first lower the tubing at a slower speed, then lower it at a faster speed, perform a suspended weight test, and finally lower the tubing at a slower speed again, and only lift it up after the tubing depth exceeds the designed depth.
[0095] In S1, the gate switch functions of the four-gate blowout preventer 10 are tested and placed in the fully open position. Then, the injection head 8, the blowout preventer cartridge 9, the four-gate blowout preventer 10, the pressure relief tee 12, the lubricator 11, and the operating window 13 are installed and connected to the surface high-pressure pump group pipeline to perform pressure tests on the surface pipeline and wellhead equipment. Pressure tests are performed on the surface high-pressure pump group pipeline to detect leaks.
[0096] Furthermore, the pressure test requires increasing the pump pressure by 10%, 50%, and 100% to 35MPa. A pass mark is achieved when the pressure remains stable for 10 minutes and the pressure drop is less than 0.7MPa. If a leak is detected, the pump must be immediately stopped and the pressure must be relieved for rectification. During the pressure test, the pressure is gradually increased. Once the maximum pressure is reached, it must be maintained for a specified period of time. If a leak is detected, rectification and repair are required.
[0097] In S2, the coiled tubing 1 is passed through the injection head 8 and lowered to the operating window 13. The operating window 13 is opened, the lower end of the coiled tubing 1 is chamfered, the connector 4 is installed, and a tensile test is performed. Referring to Figure 4, a motor head 16 and a well cleaning tool 17 are installed at the lower end of the connector 4. The operating window 13 is closed, and the wellhead equipment is pressure tested via the surface high-pressure pump assembly pipeline. The flat valve 14 is opened, the coiled tubing 1 is lowered to the designed depth, and the surface high-pressure pump assembly pipeline is activated to complete the well cleaning operation in the designed area. As shown in Figure 4, the motor head 16 and well cleaning tool 17 are installed at the lower end of the connector 4. As shown in Figure 10, the connector 4 adopts a rubber seal design, comprising, from top to bottom, a slip connection 4-1 and a rubber seal 4-2. It is installed at the bottom of the coiled tubing 1, allowing the coiled tubing 1 to be connected to the downhole tool assembly.
[0098] Furthermore, during the installation of the connector 4, the lower end of the coiled tubing 1 was chamfered 45°. The connector 4 was subjected to a 15t tensile test, with displacement of less than 3-5mm considered acceptable. The coiled tubing 1 was chamfered to facilitate connection with the connector 4, and the connector 4 was subjected to a tensile test to confirm its connection strength.
[0099] In S4, the operating window 13 is opened, and the hanging slips 2 are installed on the outer wall of the coiled tubing 1 near the top of the tubing hanger 3. The coiled tubing 1 is continued to be lowered, and the hanging slips 2 fall into the tubing hanger 3. The coiled tubing 1 is further lowered until the hanging weight of the injection head 8 is zero and there is no slippage or abnormal load on the coiled tubing 1. The shear rams of the four-ram blowout preventer 10 are used to shear the coiled tubing 1. The coiled tubing 1 is lifted and the load and pressure changes on the injection head 8 are observed to verify the success of the shearing. After the hanging slips 2 are installed on the coiled tubing 1, the coiled tubing 1 is lowered so that the hanging slips 2 are suspended on the tubing hanger 3. The coiled tubing 1 is further lowered until the downward pulling force exerted by the coiled tubing 1 on the injection head 8 is zero, and the coiled tubing 1 is sheared. The coiled tubing 1 is lifted above the shearing position to determine whether the coiled tubing 1 has been sheared.
[0100] In S5, all equipment above the wellhead spool 15 is removed, the coiled tubing 1 above the hanging slips 2 is cut with a manual cutter, the upper end of the coiled tubing 1 is chamfered, and the neck and burrs of the cut tubing are removed.
[0101] The No. 1 and No. 2 liners are installed in the Christmas tree 18, the Christmas tree 18 is assembled, and the main valve of the Christmas tree 18 is closed. The surface high-pressure pump assembly pipeline is used to pressurize the plug 7-2 of the plug 7, and the well is shut in. Referring to Figure 14 , the Christmas tree 18 comprises a multi-segment structure. Before connecting the multi-segment structure, the No. 1 and No. 2 liners 18-1 and 18-2 are installed therein, so that the No. 1 and No. 2 liners 18-1 and 18-2 are connected to the coiled tubing 1. The multi-segment structure is then connected, and the main valve of the Christmas tree 18 is closed. The surface high-pressure pump assembly pipeline is used to pressurize the plug 7-2 of the plug 7, connecting the reservoir and the coiled tubing 1, and shutting in the well.
[0102] The following describes a method for constructing a coiled tubing wellhead suspension and bottom hole plugging completion string according to a preferred embodiment of this solution, including the following steps:
[0103] Step 1: Arrange the coiled tubing equipment according to recommended practices for coiled tubing operations in oil and gas wells. Dismantle the existing wellhead assembly, retaining only the flat plate valve 14. Test the opening and closing functions of the gates of the four-gate blowout preventer 10, ensuring that they are fully open. As shown in Figure 2, install the injection head 8, blowout preventer cartridge 9, four-gate blowout preventer 10, pressure relief tee 12, lubricant pipe 11, and operating window 13 on the flat plate valve 14. As shown in Figure 3, connect the surface pipelines and conduct pressure tests on the surface high-pressure pump assembly pipeline and wellhead. The pressure test requires increasing the pump pressure in steps of 10%, 50%, and 100% to 35 MPa. Maintain the pressure for 10 minutes. A pressure drop of less than 0.7 MPa is considered acceptable. If a leak is detected, immediately stop the pump, relieve the pressure, and rectify the problem.
[0104] Step 2: Pass the coiled tubing 1 through the injection head 8 and lower it to the access window 13. Open the access window 13, chamfer the lower end of the coiled tubing 1, and install the connector 4. During installation, chamfer the lower end of the coiled tubing 1 at a 45° angle to ensure the tubing 1 is vertical as much as possible to avoid damaging the sealing ring. After installation, perform a tensile test. A displacement of less than 3-5mm under a 15t tensile test is considered acceptable. As shown in Figure 4, install the motor head 16 and well cleaning tool 17 at the lower end of the connector 4. Close the access window 13, and pressure test the wellhead equipment using the surface high-pressure pump line. Open the flat valve 14, lower the tubing to the designed depth, and start the surface pump to complete the well cleaning operation in the designed area, ensuring a clean wellbore interior.
[0105] Step 3: Hoist the coiled tubing 1 to the operating window 13 and close the flat valve 14. Open the operating window 13, remove the motor head 16 and well cleaning tool 17, install the release handle 5, packer 6, and plug 7 at the lower end of the connector 4, and hang the tubing hanger 3 on the packer 6, as shown in Figure 5. Place the downhole tool string into the lubricant preventer 11. Close the operating window 13 and test the downhole tool string pressure using the surface high-pressure pump line. Open the flat valve 14 and slowly lower the tubing. The tubing hanger 3 will drop into the wellhead spool 15 and set the seal with the top screw. The coiled tubing 1 continues to be lowered slowly through the tubing hanger 3, at a speed not exceeding 5 m / min. At a depth of 50 m, observe the equipment operation. Once the equipment is operating normally, lower the tubing at a constant speed of 25 m / min. Perform a pull-up test every 500 m, noting changes in the pressure of the coiled tubing 1. At 300 m from the designed depth, reduce the speed to 10 m / min. At 100 m from the designed depth, reduce the speed to 5 m / min. After descending 15 m, pull the tubing back to the designed depth. Pressurize the tubing to set the packer 6 at the designed position. Continue lowering the coiled tubing 1, releasing one-third of the maximum weight of the injector head 8. Ensure that the packer 6 is operating normally and seals the annulus. Open the pressure relief tee 12 and control the blowdown through the surface choke manifold to release pressure above the packer 6. Once pressure is released, inject packer fluid until the annulus is completely filled and the wellhead is pressure-free.
[0106] Step 4: As shown in Figure 6, open the operating window 13 and install the hanging slips 2 on the outer wall of the coiled tubing 1 near the top of the tubing hanger 3. As shown in Figure 7, lower the coiled tubing 1. The hanging slips 2 drop into the inner groove of the tubing hanger 3. Continue lowering the tubing until the hanging weight of the injection head 8 is zero, the coiled tubing 1 does not slip, and the load is normal. Then, use the shear rams of the four-ram BOP 10 to shear the tubing. Lift the tubing and observe the load and pressure changes on the injection head 8 to verify the success of the shearing.
[0107] Step 5: Remove all equipment above the wellhead spool 15. Use a manual cutter to cut the coiled tubing 1 above the hanging slips 2. Chamfer the top end of the coiled tubing 1 and remove any constrictions and burrs. Install liner No. 1 18-1 and liner No. 2 18-2 in the Christmas tree 18, as shown in Figure 14. Restore the wellhead and close the main valve of Christmas tree 18. Pressurize the pipeline with the surface high-pressure pump until a sudden drop in wellhead pressure is detected. Ensure that plug 7-2 of plugging device 7 is removed and shut in the well.
[0108] The preferred embodiments of the present invention have been described in detail above with reference to the accompanying drawings. However, the present invention is not limited thereto. Within the scope of the technical concept of the present invention, the technical solution of the present invention may be subjected to a variety of simple modifications, including combining the various specific technical features in any suitable manner. To avoid unnecessary repetition, the present invention will not further describe various possible combinations. However, these simple modifications and combinations should also be regarded as disclosed in the present invention and fall within the scope of protection of the present invention.
Claims
1. A construction method for a coiled tubing wellhead suspension and well bottom plugging completion string, It is characterized in that The construction method comprises: S1, placing the coiled tubing (1) operation equipment, installing the wellhead equipment and conducting a pressure test, wherein the wellhead equipment from top to bottom includes an injection head (8), a blowout preventer box (9), a four-gate blowout preventer (10), a blowout preventer (11), a pressure relief tee (12), and an operating window (13); S2, passing the coiled tubing (1) through the injection head (8), installing a well-entry tool string for well cleaning, lowering the tubing to the designed position, and performing well cleaning operations; S3, lifting the coiled tubing (1) to the operating window (13), replacing the well-entry tool string for the completion string, setting a tubing hanger (3) on the coiled tubing (1), lowering the coiled tubing (1), allowing the tubing hanger (3) to fall into the wellhead spool (15) and seal it, and continuing to lower the coiled tubing (1) to the designed depth; S4, opening the operating window (13), installing the hanging slip (2) on the coiled tubing (1), lowering the coiled tubing (1) so that the hanging slip (2) falls into the tubing hanger (3), and continuing to lower the hanging slip (2) until the hanging weight reaches zero, and then cutting the coiled tubing (1); S5, remove the wellhead equipment, restore the gas tree (18), open the plug (7) and start production.
2. The method for constructing a coiled tubing wellhead suspension and well bottom plugging completion string according to claim 1, It is characterized in that The inner circumferential surface of the suspension slip (2) is provided with slip teeth (2-1), the outer circumferential surface of the suspension slip (2) is formed as a tapered surface from top to bottom, and the inner circumferential surface of the upper end of the oil pipe hanger (3) is formed as a tapered surface from top to bottom to accommodate and suspend the suspension slip (2).
3. The method for constructing a coiled tubing wellhead suspension and well bottom plugging completion string according to claim 2, It is characterized in that The suspension slip (2) comprises two semi-tubular parts and a connecting piece for detachably connecting the two semi-tubular parts.
4. The method for constructing a coiled tubing wellhead suspension and well bottom plugging completion string according to claim 2, It is characterized in that The tubing hanger (3) is sealingly engaged with the wellhead spool (15), and the tubing hanger (3) is fixed by means of a top screw of the wellhead spool (15).
5. The method for constructing a coiled tubing wellhead suspension and well bottom plugging completion string according to claim 2, It is characterized in that In S3, the replacement of the downhole tool string for the completion tubing string includes: opening the operation window (13), disassembling the downhole tool string for well cleaning, installing a release hand (5), a packer (6), and a plug (7) at the lower end of the coiled tubing (1), and hanging the tubing hanger (3) on the packer (6).
6. The method for constructing a coiled tubing wellhead suspension and well bottom plugging completion string according to claim 5, It is characterized in that In S3, after the coiled tubing (1) is further lowered to the designed depth, the inside of the tubing is pressurized so that the packer (6) is set at the designed position, and the coiled tubing (1) is further lowered to release a portion of the suspended weight of the injection head (8).
7. The method for constructing a coiled tubing wellhead suspension and well bottom plugging completion string according to claim 6, It is characterized in that The step S3 also includes: opening the pressure relief tee (12) and controlling the blowout through the ground throttle manifold to release the pressure on the upper part of the packer (6), filling the annular area with packer fluid, and making the wellhead pressure-free.
8. The method for constructing a coiled tubing wellhead suspension and well bottom plugging completion string according to claim 2, It is characterized in that In S3, the step of continuing to lower the coiled tubing (1) to the designed depth comprises: lowering the coiled tubing (1) at a speed not exceeding 5 m / min, and observing the operation of the equipment when the lowering depth reaches 50 m; continuing to lower the coiled tubing (1) at a speed of 25-30 m / min, and performing a lifting and hanging weight test every 500 m during the lowering process; when the coiled tubing is lowered to 300 m from the designed depth, reducing the speed to 10-15 m / min, and when the coiled tubing is lowered to 100 m from the designed depth, reducing the speed to 5 m / min, and lifting the coiled tubing to the designed depth after the coiled tubing has been lowered to 15 m.
9. The method for constructing a coiled tubing wellhead suspension and well bottom plugging completion string according to claim 2, It is characterized in that In S1, the switch functions of each gate of the four-gate blowout preventer (10) are tested to make it fully open, and then the injection head (8), the blowout preventer box (9), the four-gate blowout preventer (10), the pressure relief tee (12), the blowout preventer (11), and the operating window (13) are installed and connected to the surface high-pressure pump group pipeline to perform pressure testing on the surface pipeline and wellhead equipment.
10. The method for constructing a coiled tubing wellhead suspension and well bottom plugging completion string according to claim 9, It is characterized in that The pressure test requires increasing the pump pressure step by step by 10%, 50%, and 100% to 35MPa. The test is qualified if the pressure is stabilized for 10 minutes and the pressure drop is less than 0.7MPa. If leakage is found, the pump is stopped immediately to release the pressure and make corrections.
11. The method for constructing a coiled tubing wellhead suspension and well bottom plugging completion string according to claim 1, It is characterized in that In S2, the coiled tubing (1) is passed through the injection head (8) and lowered to the position of the operation window (13); the operation window (13) is opened, the lower end of the coiled tubing (1) is chamfered, the connector (4) is installed, and a tension test is performed; a motor head (16) and a well cleaning tool (17) are installed at the lower end of the connector (4), the operation window (13) is closed, and the wellhead equipment is pressure tested through a surface high-pressure pump group pipeline; the flat valve (14) is opened, the coiled tubing (1) is lowered to the designed depth, and the surface high-pressure pump group pipeline is started to complete the well cleaning operation in the designed area.
12. The method for constructing a coiled tubing wellhead suspension and well bottom plugging completion string according to claim 11, It is characterized in that During the installation of the connector (4), the lower end of the coiled tube (1) is chamfered at 45°; the connector (4) is subjected to a 15-ton tensile test, and a displacement of less than 3-5 mm is considered qualified.
13. The method for constructing a coiled tubing wellhead suspension and well bottom plugging completion string according to claim 1, It is characterized in that In S4, the operation window (13) is opened, and the hanging slip (2) is installed on the outer wall of the coiled tubing (1) and close to the upper part of the tubing hanger (3); the coiled tubing (1) is continuously lowered, and the hanging slip (2) falls into the tubing hanger (3); the coiled tubing (1) is continuously lowered until the hanging weight of the injection head (8) is zero and the coiled tubing (1) has no slippage and no abnormal load; the shear ram of the four-ram blowout preventer (10) is used to shear the coiled tubing (1), and the coiled tubing (1) is lifted and the load and pressure changes of the injection head (8) are observed to verify whether the shearing is successful.
14. The method for constructing a coiled tubing wellhead suspension and well bottom plugging completion string according to claim 1, It is characterized in that In S5, all equipment above the wellhead spool (15) is removed, the coiled tubing (1) above the hanging slips (2) is cut off with a manual cutter, the upper end of the coiled tubing (1) is chamfered, and the necking and burrs of the cut tubing are removed.
15. The method for constructing a coiled tubing wellhead suspension and well bottom plugging completion string according to claim 14, It is characterized in that Install No. 1 liner (18-1) and No. 2 liner (18-2) in the gas tree (18), assemble the gas tree (18), close the main valve of the gas tree (18); and shut down the well after the plug (7-2) of the plug (7) is removed by pumping pressure through the pipeline of the ground high-pressure pump group.
Citation Information
Patent Citations
Method and apparatus for inserting a tubing hanger into a live well
CA2338097A1
Method for suspending speed tubular column of continuous oil tube
CN104018796A
Three-slip continuous oil pipe hanger
CN104453768A
Large-diameter continuous gas production pipe column putting construction method
CN115162999A
Double-slip type well mouth coiled tubing hanging device
CN203603824U
Cited By
Yield increasing method and system for sand-carrying flowback of nitrogen foam fluid
CN122257744A