Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

1125 results about "Coiled tubing" patented technology

In the oil and gas industries, coiled tubing refers to a very long metal pipe, normally 1 to 3.25 in (25 to 83 mm) in diameter which is supplied spooled on a large reel. It is used for interventions in oil and gas wells and sometimes as production tubing in depleted gas wells. Coiled tubing is often used to carry out operations similar to wirelining. The main benefits over wireline are the ability to pump chemicals through the coil and the ability to push it into the hole rather than relying on gravity. Pumping can be fairly self-contained, almost a closed system, since the tube is continuous instead of jointed pipe. For offshore operations, the 'footprint' for a coiled tubing operation is generally larger than a wireline spread, which can limit the number of installations where coiled tubing can be performed and make the operation more costly. A coiled tubing operation is normally performed through the drilling derrick on the oil platform, which is used to support the surface equipment, although on platforms with no drilling facilities a self-supporting tower can be used instead. For coiled tubing operations on sub-sea wells a mobile offshore drilling unit (MODU) e.g. semi-submersible, drillship etc. has to be utilized to support all the surface equipment and personnel, whereas wireline can be carried out from a smaller and cheaper intervention vessel. Onshore, they can be run using smaller service rigs, and for light operations a mobile self-contained coiled tubing rig can be used.

Power delivery system for pulsed power drilling

Some implementations include a system comprising at least one coiled tubing extending from a surface of a wellbore to a bottomhole assembly (BHA); a power cable to be housed either inside or outside the at least one coiled tubing and to electrically couple a power supply at the surface of the wellbore with the BHA. The BHA comprises at least one capacitor to store electrical power received from the power supply via the power cable housed in the at least one coiled tubing; and at least one electrode electrically coupled to the at least one capacitor to receive the stored electrical power from the at least one capacitor and to periodically emit pulsed power discharges into a subsurface formation to drill the wellbore based on the stored electrical power received from the at least one capacitor.
Owner:HALLIBURTON ENERGY SERVICES INC

Fracturing, gasification and carbon sequestration integrated method for thin mutual coal seam

The invention discloses a thin mutual coal seam fracturing, gasification and carbon sequestration integrated method. The method comprises the steps of geological exploration and coal seam refined evaluation; a middle horizontal well is drilled downwards from the ground; top and bottom horizontal wells are planned and drilled in the uppermost and lower sandstone stratums of the thin mutual coal seam; a plurality of top and bottom fishbone wells are drilled obliquely downwards and upwards in the top and bottom horizontal wells; oxygen-enriched water vapor is injected into the middle horizontal well through a continuous oil pipe, the oxygen-enriched water vapor is squeezed into the reservoir under the action of high pressure, and fracturing operation is conducted; initiating an underground gasification process of the coal seam, and synchronously performing extraction operation of the coal seam gas; supercritical CO2 fracturing operation is conducted on the top horizontal well and the bottom horizontal well; injecting water-based fracturing fluid into the top horizontal well and the bottom horizontal well; gasified materials generated by coal seam combustion gasification and desorbed methane gas are extracted through the middle horizontal well, and supercritical carbon dioxide injected before is sealed for a long time. According to the method, the limitation of a traditional hydraulic fracturing technology can be solved, and the transformation effect of the reservoir can be improved.
Owner:XINJIANG YAXIN COALBED METHANE 156 EXPLORATION CO LTD +1

Insulated coiled tubing for pulsed power drilling

Some implementations include a system having at least one thermally insulated coiled tubing and a bottom hole assembly (BHA) connected to the at least one thermally insulated coiled tubing. The BHA includes at least one capacitor, the at least one capacitor configured to store electrical power. The BHA also includes at least one electrode electrically coupled to the at least one capacitor, the at least one electrode configured to receive the stored electrical power from the at least one capacitor and to periodically emit pulsed power discharges into a subsurface formation.
Owner:HALLIBURTON ENERGY SERVICES INC

Coiled tubing drilling downhole system convenient to move and position

PCT designated stage expiredWO2025015630A1Earth drilling toolsDrilling rodsWell drillingElectric machine
Disclosed in the present invention is a coiled tubing drilling downhole system convenient to move and position. The downhole system comprises a base plate, wherein four through slots run through the bottom of the base plate, four universal wheels are provided at the bottom of the base plate, handlebars are fixed to one side of the top of the base plate, a support frame is provided above the base plate, four square tubes are fixed to the support frame, positioning and stabilizing assemblies are respectively provided inside the four square tubes, a traction roller is rotatably connected inside the support frame, and a first electric motor is fixed to one side of the support frame. The present invention relates to the technical field of oil exploration. The coiled tubing drilling downhole system convenient to move and position, by means of providing automatic soil-ramming mechanisms, automatically rams soil and gravel divided to two sides of the mouth of a borehole, and, by means of cooperation and linkage with automatic soil division assemblies, prevents loose soil and gravel around the mouth of the borehole from slipping into the borehole, thereby improving the drilling efficiency.
Owner:MAZARINE (TIANJIN) INTELLIGENT MANUFACTURING CO LTD

Real-time inference and uncertainty quantification of friction for coiled tubing operations

PCT designated stage expiredWO2025122527A1SurveyConstructionsCoiled tubingMechanics
Certain embodiments of the present disclosure include a method that includes receiving data relating to a coiled tubing operation in substantially real time during the coiled tubing operation. The method also includes iteratively generating an estimated friction coefficient between coiled tubing and a wellbore within which the coiled tubing is disposed during the coiled tubing operation based at least in part on the data relating to the coiled tubing operation. The method further includes estimating one or more parameters of the coiled tubing operation during the coiled tubing operation based at least in part on the estimated friction coefficient.
Owner:SCHLUMBERGER TECH CORP +3

Method for optimizing coiled tubing operations by combining pre-job sensitivity analysis, real-time measurement, and inference

PCT designated stage expiredWO2025096987A1SurveyDrilling rodsCoiled tubingProcess engineering
Embodiments presented provide for a method for optimizing coiled tubing operations. In embodiments, a pre-job sensitivity analysis is coupled with real-time field measurements to arrive at a decision-making process to enhance the decision making.
Owner:SCHLUMBERGER TECH CORP +3

Derrick type coiled tubing integrated sidetrack drilling operation device and operation method thereof

The derrick type continuous oil pipe integrated sidetrack drilling operation device is provided with a base, a derrick, an injection head installation support, an injection head, a lifting oil cylinder, a hydraulic clamp and a remote operation room, one side of the derrick is fully opened, the derrick and the base are both of a lightweight rigid structure, and the injection head is installed at the top of the derrick for remote control. After the base is arranged at a wellhead and is unfolded and installed, one side of the base is connected with the lifting oil cylinder, the other side of the base is in butt joint with the ramp and the pipe rack, the derrick is rapidly erected through the lifting oil cylinder, and after the injection head is hoisted to the top of the derrick, the injection head is rapidly installed and subjected to alignment adjustment through the injection head installation support and the adjusting structure. Meanwhile, the tool rod and the elevator are arranged at the injection head, the tool rod is pulled and placed through the injection head, an oil pipe column and a sucker rod can be independently lifted or lowered, the oil pipe column and the sucker rod are pushed into a ramp from one side of an opening of a derrick, integrated sidetrack drilling operation of the coiled tubing is achieved, and sidetrack drilling efficiency and operation safety of the coiled tubing are remarkably improved.
Owner:CHINA PETROLEUM & CHEMICAL CORP +1

Coiled tubing systems and methods for geothermal wells

A coiled tubing system includes a coiled tubing string configured to couple to a downhole tool to move the downhole tool along a geothermal well, an injector head configured to control movement of the coiled tubing string and the downhole tool along the geothermal well, one or more sensors configured to capture sensor data indicative of a distance traveled by the coiled tubing string along the geothermal well, and a controller configured to control operation of the injector head to move the coiled tubing string and the downhole tool to a measured depth within the geothermal well that corresponds to an intersection of a feature with the geothermal well based on the sensor data received from the one or more sensors.
Owner:SCHLUMBERGER TECH CORP

Systems and methods for coiled tubing drilling

Systems and methods presented herein facilitate coiled tubing operations, and generally relate to reduction of shock and vibrations to portions of the coiled tubing string. A device includes a first end configured to be disposed downstream of a bottom hole assembly of a coiled tubing drilling string; a second end configured to be disposed downstream of the first end and upstream of a drive of the coiled tubing drilling string; and a moveable valve configured to move from a first position to a second position to divert at least a portion of drilling fluid flow away from the drive when the drilling fluid flow is greater than a preset flow value or a weight on bit is less than a preset weight value and thereby reduce a rotation rate of the drive.
Owner:SCHLUMBERGER TECH CORP

Method for predicting fatigue damage degree and residual life of coiled tubing

The invention belongs to the technical field of coiled tubing life prediction, and particularly discloses a coiled tubing fatigue damage degree prediction method and a coiled tubing remaining life prediction method. The fatigue damage degree prediction method comprises the following steps: carrying out a bending fatigue test on a coiled tubing sample, and collecting a series of magnetic memory signals; preprocessing the series of magnetic memory signals and extracting a plurality of magnetic memory signal characteristic values from the magnetic memory signals; sequentially arranging the plurality of magnetic memory signal characteristic values according to the acquisition time to serve as an original data column, and establishing a grey prediction model; based on the grey prediction model and in combination with the Miner fatigue linear accumulation theory, a coiled tubing fatigue damage degree prediction model representing the relation between the magnetic memory signal characteristic value and the coiled tubing fatigue damage degree is established; and based on the established model, predicting the fatigue damage degree of the oil pipe to be detected according to the detected characteristic value of the magnetic memory signal. The fatigue damage degree prediction method can conveniently and efficiently predict the fatigue damage degree of the oil pipe to be detected.
Owner:CHINA NAT PETROLEUM CORP +1

A power delivery system for pulsed power drilling

PCT designated stage expiredWO2025023978A1SurveyConstructionsPower cableCoiled tubing
Some implementations include a system comprising at least one coiled tubing extending from a surface of a wellbore to a bottomhole assembly (BHA); a power cable to be housed either inside or outside the at least one coiled tubing and to electrically couple a power supply at the surface of the wellbore with the BHA. The BHA comprises at least one capacitor to store electrical power received from the power supply via the power cable housed in the at least one coiled tubing; and at least one electrode electrically coupled to the at least one capacitor to receive the stored electrical power from the at least one capacitor and to periodically emit pulsed power discharges into a subsurface formation to drill the wellbore based on the stored electrical power received from the at least one capacitor.
Owner:HALLIBURTON ENERGY SERVICES INC

Ultra-compact coiled tubing (UCCT) operations for geothermal field construction

The various embodiments described herein include systems and methods for constructing geothermal fields. In one aspect, a system for constructing a geothermal field comprises a coiled tubing. The coiled tubing is configured for drilling one or more boreholes of the geothermal field. The coiled tubing is configured for inserting one or more geothermal loops into the one or more boreholes. The coiled tubing is also configured for grouting the one or more geothermal loop.
Owner:BEDROCK ENERGY INC

Multi-purpose compensator system

A compensator system includes an expandable frame assembly configured to compensate for motion of a floating platform or vessel in relation to a seafloor below. The expandable frame assembly includes a retainer for supporting a tubular member and a tubular string below. When the expandable frame assembly is in a first position, a first tool assembly, such as a coiled tubing assembly, may be connected to the tubular string. Thereafter, the first tool assembly may be disconnected from the tubular string. The expandable frame assembly may then be moved into a second position, and a second tool assembly may then be connected to the tubular string.
Owner:ADVANCED TOOL & SUPPLY LLC

Water drainage, sand pumping and blockage removal device for power-free gas production pipe column and use method

The invention relates to the technical field of natural gas well exploitation, in particular to a water drainage, sand pumping and plug removal device for a power-free gas production pipe column and a using method. According to the technical scheme, the water inlet end of the lower portion of a nozzle is connected with a power water inlet formed in the outer wall of a pump body, a center pipe is arranged at the lower end of the nozzle, the water outlet end of the upper portion of the nozzle is communicated with a formation liquid inlet cavity, an expansion rubber barrel is arranged on the lower side of the pump body, and an upper pressure transmission hole is formed between the expansion rubber barrel and the center pipe; a slip rubber sleeve is arranged on the lower side of the pump body, a slip piece is arranged on the outer side of the slip rubber sleeve, a lower pressure transmission hole is formed between the slip rubber sleeve and the central pipe, and a formation liquid suction inlet is formed in the lower end of the pump body. A washing pipe is arranged at the bottom of the central pipe, and a sand suspending nozzle is arranged at the bottom of the washing pipe. The device has the beneficial effects that under the condition that a gas production pipe column is not moved, a continuous oil pipe is put into an inner cavity of the gas production pipe column to drive the device to pump sand, the sand pumping and plug removal requirements special for a natural gas well are met, and the well control safety and environmental protection problems of the natural gas well are avoided.
Owner:山东成林石油工程技术有限公司

Pulsed-power drilling system with integrated power and communication coiled tubing conveyance

Disclosed embodiments relate to a pulsed-power drilling system, in which a pulsed-power drill is conveyed downhole and operated via coiled tubing. The coiled tubing may be configured to simultaneously transmit power and drilling fluid downhole. For example, the coiled tubing may include a flexible hollow fluid tube configured to transport drilling fluid therein, and a flexible cable tube disposed within the fluid tube. The cable tube may have one or more cable disposed within protective tubing, protecting the cables from drilling fluid in the fluid tube. Methods of making and using such coiled tubing with pulsed-power drills are also disclosed.
Owner:HALLIBURTON ENERGY SERVICES INC

Preparation method of high-strength cold-rolled titanium strip coil for coiled tubing

The invention relates to the technical field of titanium strip coils, in particular to a preparation method of a high-strength cold-rolled titanium strip coil for coiled tubing, which comprises the following steps: S1, cold rolling: a hot-rolled pickled coil with the thickness of 5.5-6.5 mm is subjected to cold rolling by adopting 20 rollers, and the hot-rolled pickled coil comprises the following components in percentage by mass: 0.26-0.33% of Fe, 0.27-0.33% of O and the balance of Ti; s2, degreasing is conducted, specifically, the titanium strip coil obtained after cold rolling is subjected to degreasing treatment; s3, annealing is conducted, specifically, a vertical bell-type furnace is filled with argon for protection for annealing treatment, furnace cooling is conducted after annealing is completed, and a titanium strip coil with the thickness being 3-4.5 mm for the coiled tubing is obtained; a cold rolling mode is adopted, the thickness of the titanium strip coil is rolled to 3.0-4.5 mm, a bell-type furnace annealing mode is adopted, an oxide layer is prevented from being generated on the surface, the bending performance of the titanium strip is enhanced, cracks are prevented from being formed on the surface during pipe manufacturing, the compressive strength, the yield strength and the ductility of the product are high, and the bending angle (6T) is large.
Owner:新疆湘润新材料科技有限公司

Method and Apparatus For Magnetic Ranging While Drilling

Methods, devices and systems are disclosed for magnetically ranging while drilling with a coiled tubing unit or drill pipe by way of a an electrically conducive but environmentally electrically insulated wire installed through a coiled tubing spool or drill pipe complete with electrically insulative subs in the coiled tubing bottom hole assembly or drill pipe. The method and systems allow for the injection of excitation current into the formation by way of selectively electrifying various drill stem components, thereby facilitating current collection on a target tubular which radially emanates a magnetic field about the target well tubular(s). The method and devices allow for the construction of complex downhole current injection configurations which allow for modification of the bottom hole assembly to maximize target well signal generation in the presence of adverse environmental conditions.
Owner:GUNNAR LLLP

Flexible composite coiled tubing resistant to scratch and erosion

The utility model relates to a continuous pipe, belongs to the technical field of oil and gas development, and particularly discloses a scratch-resistant and erosion-resistant flexible composite continuous pipe which comprises a central pipe, a transition layer, a reinforcing layer, a tensile layer and an outer protective layer which are sequentially arranged from inside to outside, and a wear-resistant and erosion-resistant epoxy resin inner coating is sprayed on the surface of an inner cavity of the central pipe. The outer protective layer is made of a scratch-resistant alloy steel material, so that the strength of the whole pipe is improved; the transition layer is made of nitrile rubber; the reinforcing layer and the tensile layer are formed by weaving composite material belts reinforced by special fiber belts, and a signal cable and a power cable are fixedly arranged in the reinforcing layer and the tensile layer respectively. The composite material continuous pipe can obviously improve the scratch resistance and the fluid erosion resistance of the inner wall, is beneficial to saving materials, improves the utilization rate of the existing composite material continuous pipe material, and is suitable for various oil and gas exploitation.
Owner:CNPC BOHAI DRILLING ENG +1

Hydraulic control and hydraulic drive coiled tubing tractor

The invention provides a hydraulic control and hydraulic drive coiled tubing tractor. The problems that an existing tractor is complex in structure and low in control stability are solved. The first piston cylinder, the second piston cylinder and the third piston cylinder are sequentially arranged on the center pipe in the length direction of the center pipe. Connecting rod supporting mechanisms are arranged at the ends, away from the second piston cylinder, of the first piston cylinder and the third piston cylinder, and the first piston cylinder and the third piston cylinder are used for controlling the two connecting rod supporting mechanisms to be folded and unfolded alternately; the first piston cylinder and the second piston cylinder are installed on the center pipe, the third piston cylinder is installed on a piston rod of the second piston cylinder, a hydraulic control driving assembly used for controlling the first piston cylinder, the second piston cylinder and the third piston cylinder to move is installed on the outer wall of the center pipe, and a drilling fluid inlet is formed in the side wall of the center pipe and communicated with the liquid inlet end of the hydraulic control driving assembly. The single telescopic hydraulic cylinder is adopted, the traction period is shortened, the traction speed is increased, meanwhile, only the pressure of drilling fluid needs to be controlled in the traction process of the tractor, and the system operation stability is high.
Owner:CHONGQING UNIVERSITY OF SCIENCE AND TECHNOLOGY

Coiled tubing bottom seal dragging pressure test leakage finding packer and using method thereof

The invention belongs to the technical field of petroleum and natural gas exploration and development, and particularly relates to a coiled tubing bottom seal dragging pressure testing and leakage finding packer and a using method thereof, and the pressure testing and leakage finding packer comprises an upper centralizer, a pressure balancing mechanism, a setting packing mechanism and a lower centralizer which are coaxially and sequentially connected in a threaded mode. The pressure balance mechanism comprises a sleeve shell assembly and a pressure relief assembly. A pressure relief opening is formed in the side face of the sleeve shell assembly, and the pressure relief assembly is arranged in the sleeve shell assembly. The setting packing mechanism comprises a central pipe; a rubber sleeve assembly, a slip assembly and a centralizing assembly are sequentially installed on the basis of the center pipe from top to bottom, the rubber sleeve assembly is movably connected with the center pipe in an axial limiting mode, the slip assembly is fixedly connected with the centralizing assembly, and the centralizing assembly is movably connected with the center pipe based on the track pipe groove. According to the technical scheme, pressure bearing reasons and leakage point positions which cannot be found out by dragging pressure testing for multiple times in one-time well entering can be achieved, and it is guaranteed that follow-up fracturing construction operation of the shale gas well is safely and efficiently carried out.
Owner:CHINA NAT PETROLEUM CORP +1

Coiled tubing bottom packer and coiled tubing dragging fracturing process pipe column with bottom seal

The utility model provides a coiled tubing bottom packer and a coiled tubing dragging fracturing process pipe column with a bottom seal, the coiled tubing bottom packer comprises a core shaft, an anti-jacking anchoring mechanism, a rubber sleeve and a seat clamping tile, the left end of the core shaft is connected with an upper joint, and a packing sealing assembly is installed at the right end of the core shaft; the anti-jacking anchor fluke mechanism comprises an anchor fluke base and an anchor fluke, the anchor fluke is installed in the anchor fluke base, an inner hole is formed in the left end of the anchor fluke base in the axial direction, and the packing sealing mechanism can be fixed in the inner hole; the rubber sleeve is installed on the anchor fluke base, the rubber sleeve has a certain elastic deformation performance and can expand and contract, a cone is arranged on the right side of the rubber sleeve, and a seating slip is arranged on the right side of the cone. The coiled tubing dragging fracturing process pipe column with the bottom seal comprises the coiled tubing bottom packer. According to the coiled tubing bottom packer, coiled tubing bottom seal dragging fracturing construction can be continuously carried out under a high pump stopping pressure block.
Owner:CHINA NAT PETROLEUM CORP +1

Systems and methods for optimization of wellbore operations of producing wells

Systems and methods for performing an intervention operation in a wellbore using a friction reducer fluid include a coiled tubing insertable into the wellbore, a pump operable to pump the friction reducer fluid through the coiled tubing and into the wellbore, and sensors operable to detect wellbore conditions. A controller including a processor is operable to automatically predict a wellbore depth at which the coiled tubing will incur a lock-up in the future based on the wellbore conditions and control the pump to pump the friction reducer fluid though the coiled tubing and into the wellbore to prevent the future lock-up.
Owner:HALLIBURTON ENERGY SERVICES INC

Systems and methods for automated coiled tubing drilling operations

PCT designated stage expiredWO2024263839A1SurveyDrilling rodsThermodynamicsWell drilling
Systems and methods presented herein facilitate automation of coiled tubing drilling (CTD) operations. For example, a computer-implemented method includes performing a drilling operation via a CTD system; detecting data relating to one or more operating parameters of the drilling operation via one or more sensors of the CTD system during the drilling operation; and automatically adjusting at least one adjustable operating parameter of the drilling operation based on the detected data during the drilling operation.
Owner:SCHLUMBERGER TECH CORP +3

Systems and methods for producing hydrocarbons downhole and performing deep transient testing using coiled tubing

Systems and methods presented herein facilitate coiled tubing operations, and generally relate to conveying, via coiled tubing, a downhole well tool into a wellbore extending through a hydrocarbon-bearing reservoir, and performing a plurality of downhole well operations (production operations, perforation operations, testing operations, clean out operations, and so forth) using the downhole well tool. In general, the plurality of downhole well operations may be performed using the downhole well tool while maintaining full well control and without removing the downhole well tool from the wellbore.
Owner:SCHLUMBERGER TECH CORP

Whipstock integrated to completion string for coiled tubing operations

A system includes coiled tubing connected to a bottom hole assembly, a latching tool removably connected to the completion string using a completion shear pin, configured to connect to the bottom hole assembly, having a stationary portion and a rotational portion overlayed on top of the stationary portion, wherein a first position of the latching tool comprises the rotational portion movably disposed around an outer circumferential surface of the stationary portion and a second position of the latching tool comprises the rotational portion immovably disposed around the outer circumferential surface of the stationary portion, a milling section connected to the latching tool and configured to receive weight and rotational movement from the coiled tubing to sidetrack the well when the latching tool is in the second position, and a whipstock removably connected to the milling section via a mill shear pin and having anchor slips configured to jut out into and engage with an inner circumferential surface of the well when an anchor shear pin is broken.
Owner:SAUDI ARABIAN OIL CO

Underground centralizing device and method for casing deformation well

The invention provides an underground centralizing device and method for a casing deformation well, and relates to the technical field of oil exploitation equipment, and the underground centralizing device comprises a coiled tubing, at least two sleeves, a connecting rod mechanism and a contact area increasing mechanism. A convex ring is arranged on the outer wall of the coiled tubing, the sleeve is slidably sleeved on the coiled tubing, and the convex ring is located in the sleeve to form a pressure cavity. The connecting rod mechanism is connected to the sleeve and used for expanding outwards when the sleeve moves relatively. The sleeves are close to each other by pressing the coiled tubing, and the connecting rod mechanism is driven to expand towards the well wall to achieve righting. The contact area increasing mechanism increases the contact area with the well wall through linkage cooperation of a gear, a rack and a top plate, and the connecting rod is prevented from sinking into the well wall. A mechanical connecting rod structure is adopted to replace a traditional air bag type centralizer, the influence of the gravity effect on the centralizing effect is effectively avoided, and it is ensured that the coiled tubing is accurately kept in the center position of a shaft.
Owner:XINJIANG PETROLEUM ADMINISTRATION BUREAU +1

Quantitative feeding tool and method for methane in-situ combustion explosion fracturing combustion improver

The invention discloses a quantitative throwing tool and method for a methane in-situ burning explosion fracturing combustion improver. The throwing tool comprises an inner barrel, a piston B and an outer barrel, the center of the upper end of the inner cylinder is fixedly connected with an air inlet pipeline B, and the bottom is provided with an inner cylinder bottom plate; a spraying hole is formed in the center area of the inner cylinder bottom plate, and a constant pressure plug is installed in the spraying hole. The piston B is assembled in the inner barrel; a plurality of perforations B are formed in the barrel body of the outer barrel, and an outer barrel bottom plate is arranged at the bottom of the outer barrel; the outer cylinder coaxially sleeves the inner cylinder, and the upper end of the outer cylinder is fixedly connected with the upper end of the inner cylinder. The method comprises the steps of installing the bridge plug in the shaft; the putting tool is put down to the position where the reservoir is located through a shaft by using a coiled tubing; a sealed putting section is formed at the position where the putting tool is located through the packer and the bridge plug; and the piston moves downwards until the combustion improver is completely filled into the sealed feeding section. According to the tool and the method, the pre-stored combustion improver can be conveniently and quantitatively put in a specific position.
Owner:CHINA UNIV OF MINING & TECH

Horizontal well separation pressure drive mining method

The invention relates to the technical field of oil exploitation methods, in particular to a horizontal well separation pressure drive exploitation method which comprises the following steps: (1) preferably selecting an oil reservoir suitable for a target; (2) selecting a horizontal well with insufficient stratum energy after production for a period of time, and injecting water into the horizontal well; (3) injecting water into the tail end of the horizontal section of the horizontal well; (4) after water injection of the tail end is completed, water injection of the horizontal section is continued, and operation is circulated until water injection of the whole horizontal section is completed through the continuous oil pipe; during water injection, water injection parameters of the horizontal well are adjusted in time according to reservoir characteristics, and injection-production balance is formed. According to the horizontal well level-separated pressure-drive mining method, the influence of parameters such as oil reservoir physical properties and reservoir rock brittleness on water injection huff and puff development is considered, the injection pressure, the injection amount and the soaking time are optimized and researched while the injection mode is improved, and the method has the advantages that the development efficiency is improved, and the development cost is reduced. The method has important guiding significance for improving the recovery ratio through horizontal well water injection huff and puff.
Owner:PETROCHINA CO LTD

Systems and methods for automated coiled tubing drilling operations

Systems and methods presented herein facilitate automation of coiled tubing drilling (CTD) operations. For example, a computer-implemented method includes performing a drilling operation via a CTD system; detecting data relating to one or more operating parameters of the drilling operation via one or more sensors of the CTD system during the drilling operation; and automatically adjusting at least one adjustable operating parameter of the drilling operation based on the detected data during the drilling operation.
Owner:SCHLUMBERGER TECH CORP

Integrated fracturing fluid flowback and throttling drainage and mining downhole tool

The invention relates to an integrated fracturing fluid flowback and throttling drainage and production downhole tool which comprises a water drainage and gas production assembly, a fracturing fluid flowback assembly and a throttling production assembly from top to bottom, the water drainage and gas production assembly comprises an upper barrel and an expansion alloy upper connector, a silicon-chromium alloy spring and an upper sliding sleeve are arranged in the upper barrel, and a lower sliding sleeve is arranged in the lower barrel. The top end of the silicon-chromium alloy spring is fixed to the bottom end of the expansion alloy upper connector, and the bottom end of the silicon-chromium alloy spring is fixed to the top end of the upper sliding sleeve. The integrated fracturing fluid flow-back and throttling drainage and production downhole tool integrates three functions of fracturing fluid flow-back, throttling production and drainage gas production, is arranged at the tail end of a continuous oil pipe, can sequentially complete three procedures of fracturing fluid flow-back, throttling production and drainage gas production through single-trip continuous oil pipe operation, meets the requirements of rapid pipe lifting, convenient tool replacement and the like, and is suitable for large-scale popularization and application. The current situation that the function of a current downhole tool is single is improved, the tedious steps of frequently pulling a tubular column and replacing the downhole tool are reduced, manpower and material resources are saved, and the natural gas development cost is greatly reduced.
Owner:XI'AN PETROLEUM UNIVERSITY