A multi-pipeline pressure flow coefficient testing device and testing method
By designing a multi-pipe pressure flow coefficient test device, using the combination of main gas pipeline assembly and test pipeline assembly, the problems of low testing efficiency and seal leakage in the prior art are solved, and efficient and accurate testing of multiple products to be tested is achieved. .
Patent Information
- Application Number
- CN202011265427.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-11-12
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2040-11-12
AI Technical Summary
The existing flow parameter inspection methods are inefficient and have a risk of seal leakage, so they cannot test multiple products to be tested at the same time, resulting in insufficient testing efficiency and accuracy.
设计一种多管道压力流量系数测试装置,包括主输气管路组件和多组测试管道组件,通过单向阀、稳压储气罐、调压阀、过滤器、电磁阀、流量传感器和压力传感器,实现气体的稳定调压和均速充气,确保测试过程中的恒定压力和流量检测。
It realizes the testing of multiple products to be tested simultaneously, which has the advantages of good stability, high testing accuracy, easy operation and high testing efficiency, avoiding the risk of seal leakage.
Smart Images

Figure CN112284649B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of nondestructive testing, and in particular to a multi-pipeline pressure flow coefficient testing device and a testing method. Background Art
[0002] With the development of industry, measuring fluid flow parameters is one of the most important links in industrial measurement. The oil and gas, petrochemical, food and beverage, medical and automotive industries have higher and higher requirements for the accuracy and range of flow measurement. In order to adapt to various uses, various types of flow meters and measurement methods have been introduced one after another. However, when the motor of new energy vehicles requires the simultaneous testing of the housing, water channel and oil channel or the test workpieces on the market need to test multiple products at the same time, the existing flow parameter inspection method is to test the pipelines to be tested one by one through the flow test instrument. The test process also requires switching the interfaces of different pipelines for sealing and testing. The efficiency of this product flow inspection process is low, and there is also the risk of leakage after multiple switching of seals. Summary of the invention
[0003] In order to overcome the deficiencies of the prior art, one of the purposes of the present invention is to provide a multi-pipeline pressure flow coefficient testing device, which can simultaneously test multiple products to be tested and has the characteristics of good stability, good test accuracy and high test efficiency.
[0004] A second object of the present invention is to provide a testing method for a multi-pipeline pressure flow coefficient testing device, which has the characteristics of easy operation and high testing efficiency.
[0005] One of the purposes of the present invention is achieved by the following technical solution:
[0006] A multi-pipeline pressure flow coefficient testing device, comprising:
[0007] A main gas pipeline assembly, the main gas pipeline assembly comprising a main gas pipeline and a one-way valve, a first pressure-stabilizing gas storage tank, a switch valve, a first pressure regulating valve and a filter sequentially installed on the main gas pipeline along the gas delivery direction, the gas inlet end of the main gas pipeline being connected to a gas source;
[0008] More than two groups of test pipeline assemblies, the test pipeline assemblies comprising a test air pipe and a first solenoid valve, a second pressure regulating valve, a flow sensor and a pressure sensor sequentially installed on the test air pipe along the gas delivery direction; the air inlet ends of the test air pipes of the more than two groups of the test pipeline assemblies are respectively connected to the air outlet ends of the main air pipe, and each test air pipe has an air outlet end for connecting with the product to be tested.
[0009] In an optional embodiment, it also includes a branch gas pipe, the air inlet end of the branch gas pipe is connected to the main gas pipe, and the connection between the branch gas pipe and the main gas pipe is located at the rear end of the filter along the gas transmission direction; the air outlet end of the branch gas pipe is connected to an external gas-using device.
[0010] In an optional embodiment, a second pressure-stabilizing gas tank and a shut-off valve are installed in sequence on the main gas pipeline along the gas delivery direction, and the second pressure-stabilizing gas tank is located at the rear end of the connection between the branch gas pipeline and the main gas pipeline along the gas delivery direction.
[0011] In an optional implementation, a pressure gauge and a pressure switch are provided on the first pressure regulating valve.
[0012] In an optional embodiment, it further includes an air source device;
[0013] The main gas pipeline includes a first hose, a second hose, a first hard pipe, a third hose, a fourth hose, a second hard pipe and a multi-way pipe joint; the one-way valve is arranged on the first hose, and the air inlet end of the first hose is connected to the air outlet of the air source device; the air outlet end of the first hose is connected in sequence through the first pressure-stabilizing gas storage tank, the second hose, the first hard pipe, the third hose, the second pressure-stabilizing gas storage tank, the fourth hose, the second hard pipe and the air inlet end of the multi-way pipe joint; the switch valve, the first pressure regulating valve and the filter are installed on the first hard pipe, and the stop valve is installed on the second hard pipe;
[0014] The test air pipe includes a third hard tube, a fifth soft tube and a fourth hard tube; the air inlet end of the third hard tube is connected to one of the air outlet ends of the multi-way pipe joint, and its air outlet end is connected to the air inlet end of the fourth hard tube in turn through the fifth soft tube; the first solenoid valve, the second pressure regulating valve, the flow sensor and the pressure sensor are installed on the third hard tube.
[0015] In an optional implementation, the switch valve, the first pressure regulating valve, the second pressure regulating valve, and the flow sensor are all provided with a mounting structure for fixed connection with an external panel.
[0016] In an optional embodiment, the multi-way pipe joint is a three-way pipe with one inlet and two outlets, a four-way pipe with one inlet and three outlets, a five-way pipe with one inlet and four outlets, or a six-way pipe with one inlet and five outlets, and correspondingly, the number of the test pipe assemblies is two, three, four or five groups.
[0017] In an optional implementation, a second solenoid valve is also provided on the fourth hard tube.
[0018] The second object of the present invention is achieved by adopting the following technical solution:
[0019] A testing method for a multi-pipeline pressure flow coefficient testing device comprises the following steps:
[0020] Preparation stage: The outlet ends of two or more test air pipes are sealed and connected to the air inlets of two or more products to be tested one by one, and the air outlets of the products to be tested are connected to the atmosphere; first, the switch valve and the first solenoid valve are closed, and the air source is charged to the first pressure-stabilizing air storage tank through the one-way valve. After the preset charging time, the switch valve is opened, and the gas is pressure-regulated by the first pressure regulating valve, and then filtered through the filter to remove moisture;
[0021] Testing stage: block the gas outlets of all products to be tested, then open the first solenoid valves on each test gas pipe, and inflate the products to be tested with gas after filtering out moisture. During the test, the pressure sensor detects the air pressure of the product to be tested, and the pressure sensor sends the detected pressure information to the central controller. The central controller controls the opening of the second pressure regulating valve according to the pressure information fed back by the pressure sensor, so that the test gas pipe maintains a constant pressure; the flow rate of the product to be tested is detected by the flow sensor. After the preset test time, when the actual flow rate change value within the test time reaches the preset flow rate change value pre-stored in the central controller, the product to be tested is qualified, otherwise, it is unqualified;
[0022] Exhaust stage: After the test is completed, close the switch valve and the first solenoid valve, open the gas outlets of all products to be tested, and exhaust the gas in the test pipeline.
[0023] The flow coefficient refers to the volume flow rate or mass flow rate of the pipeline medium flowing through the valve under the test conditions and the constant pressure of the pipeline in a unit time, that is, the flow capacity. The larger the flow coefficient value, the smaller the pressure loss when the fluid flows through the valve.
[0024] In an optional embodiment, the multi-pipeline pressure flow coefficient testing device further includes a branch gas pipe, the gas inlet end of the branch gas pipe is connected to the main gas pipe, and the connection between the branch gas pipe and the main gas pipe is located at the rear end of the filter along the gas delivery direction; the gas outlet end of the branch gas pipe is externally connected to a gas-using device; a second pressure-stabilizing gas storage tank and a stop valve are sequentially installed on the main gas pipe along the gas delivery direction, and the second pressure-stabilizing gas storage tank is located at the rear end of the connection between the branch gas pipe and the main gas pipe along the gas delivery direction;
[0025] Preparation stage: the outlet ends of more than two groups of test air pipes are sealed and connected to the air inlets of more than two products to be tested one by one, and the air outlets of the products to be tested are connected to the atmosphere; first, the switch valve, the stop valve and the first solenoid valve are closed, and the gas source is charged into the first pressure-stabilizing gas storage tank through the one-way valve. After the preset charging time, the switch valve is opened, and the gas is pressure-regulated by the first pressure regulating valve, and then filtered out of moisture by the filter; part of the gas with moisture filtered out enters the branch gas pipeline, and the other part of the gas enters the second pressure-stabilizing gas storage tank for gas storage;
[0026] Testing stage: block the gas outlets of all products to be tested, open the stop valve, and then open the first solenoid valves on each test gas pipe. The gas in the second pressure-stabilizing gas tank is used to inflate the products to be tested. During the test, the pressure sensor detects the air pressure of the product to be tested. The pressure sensor sends the detected pressure information to the central controller. The central controller controls the opening of the second pressure regulating valve according to the pressure information fed back by the pressure sensor, so that the test gas pipe maintains a constant pressure; the flow rate of the product to be tested is detected by the flow sensor. After the preset test time, when the actual flow rate change value within the test time reaches the preset flow rate change value pre-stored in the central controller, the product to be tested is qualified, otherwise, it is unqualified;
[0027] Exhaust stage: After the test is completed, close the switch valve, stop valve and the first solenoid valve, open the gas outlets of all products to be tested, and exhaust the gas in the test pipeline.
[0028] Compared with the prior art, the present invention has the following beneficial effects:
[0029] The multi-pipeline pressure flow coefficient test device of the present invention comprises a main gas transmission pipeline assembly and more than two groups of test pipeline assemblies. In the preparation link, the gas source inflates the first pressure-stabilizing gas storage tank through a one-way valve to stabilize the pressure. After a preset inflation time, the gas is regulated by the first pressure regulating valve to further ensure the stability of the air pressure, and then the water is filtered out by the filter to avoid the influence of the water on the test results. In the test link, the air pressure of the product to be tested is detected by the pressure sensor, and the pressure sensor sends the detected pressure information to the central controller. The central controller controls the opening of the second pressure regulating valve according to the pressure information fed back by the pressure sensor, so that the test tube maintains a constant pressure. In this process, uniform inflation can also be achieved, thereby protecting the flow sensor from over-range. The flow of the product to be tested is detected by the flow sensor. After a preset test time, when the actual flow change value within the test time reaches the preset flow change value pre-stored in the central controller, the product to be tested is qualified, otherwise, it is unqualified. Therefore, the present invention can simultaneously test multiple products to be tested, and has the advantages of good stability, good test accuracy, and high test efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 A schematic diagram of pipeline connection of a multi-pipeline pressure flow coefficient testing device according to an embodiment;
[0031] Figure 2 Another pipeline connection schematic diagram of the multi-pipeline pressure flow coefficient testing device of the embodiment;
[0032] Figure 3 It is a structural schematic diagram of a multi-pipeline pressure flow coefficient testing device of an embodiment;
[0033] Figure 4 It is a stereoscopic diagram of the switch valve, the first pressure regulating valve and the filter of the embodiment.
[0034] In the figure: 110, main gas pipeline; 111, first hose; 112, second hose; 113, first hard pipe; 114, third hose; 115, fourth hose; 116, second hard pipe; 117, multi-way pipe joint; 120, one-way valve; 130, first pressure-stabilizing gas storage tank; 140, switch valve; 150, first pressure regulating valve; 151, pressure gauge; 152, pressure switch; 160, filter; 170, second pressure-stabilizing gas storage tank; 180, stop valve; 210, test gas pipe; 211, third hard pipe; 212, fifth hose; 213, fourth hard pipe; 220, first solenoid valve; 230, second pressure regulating valve; 240, flow sensor; 250, pressure sensor; 260, second solenoid valve; 300, branch gas pipeline; 400, product to be tested; 500, gas source device; 600, installation structure. DETAILED DESCRIPTION
[0035] Below, in conjunction with the accompanying drawings and specific embodiments, the present invention is further described. It should be noted that, under the premise of no conflict, the various embodiments described below or the various technical features can be arbitrarily combined to form a new embodiment. Except for special instructions, the materials and equipment used in this embodiment can be purchased from the market. Examples of embodiments are shown in the accompanying drawings, in which the same or similar reference numerals throughout represent the same or similar elements or elements with the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present application, and the limitations of the present application cannot be understood.
[0036] In the description of the present application, it should be understood that the terms "upper", "lower", "front", "back", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating positions or positional relationships, are based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as a limitation on the present application. In the description of the present application, "plurality" means two or more, unless otherwise precisely and specifically specified.
[0037] In the description of this application, it should be noted that, unless otherwise clearly specified and limited, the terms "connected", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, or it can be connected through an intermediary medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
[0038] The terms "first", "second", etc. in the specification and claims of this application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0039] Example:
[0040] Please refer to Figure 1-4 , a multi-pipeline pressure flow coefficient testing device, comprising:
[0041] A main gas pipeline assembly, the main gas pipeline assembly comprises a main gas pipeline 110 and a one-way valve 120, a first pressure-stabilizing gas storage tank 130, a switch valve 140, a first pressure regulating valve 150 and a filter 160 which are sequentially installed on the main gas pipeline along the gas delivery direction, and the gas inlet end of the main gas pipeline is connected to a gas source;
[0042] Two groups of test pipeline assemblies, the test pipeline assemblies include a test air pipe 210 and a first solenoid valve 220, a second pressure regulating valve 230, a flow sensor 240 and a pressure sensor 250 installed on the test air pipe in sequence along the gas delivery direction; the air inlet ends of the test air pipes of more than two groups of test pipeline assemblies are respectively connected to the air outlet ends of the main air pipe, and each test air pipe has an air outlet end for connecting with the product 400 to be tested.
[0043] A testing method for a multi-pipeline pressure flow coefficient testing device comprises the following steps:
[0044] Preparation stage: The outlet ends of two or more test air pipes are sealed and connected to the air inlets of two or more products to be tested one by one, and the air outlets of the products to be tested are connected to the atmosphere; first, the switch valve and the first solenoid valve are closed, and the air source is charged to the first pressure-stabilizing air storage tank through the one-way valve. After the preset charging time, the switch valve is opened, and the gas is pressure-regulated by the first pressure regulating valve, and then filtered through the filter to remove moisture;
[0045] Testing stage: block the gas outlets of all products to be tested, then open the first solenoid valves on each test gas pipe, and inflate the products to be tested with gas after filtering out moisture. During the test, the pressure sensor detects the air pressure of the product to be tested, and the pressure sensor sends the detected pressure information to the central controller. The central controller controls the opening of the second pressure regulating valve according to the pressure information fed back by the pressure sensor, so that the test gas pipe maintains a constant pressure; the flow rate of the product to be tested is detected by the flow sensor. After the preset test time, when the actual flow rate change value within the test time reaches the preset flow rate change value pre-stored in the central controller, the product to be tested is qualified, otherwise, it is unqualified;
[0046] Exhaust stage: After the test is completed, close the switch valve and the first solenoid valve, open the gas outlets of all products to be tested, and exhaust the gas in the test pipeline.
[0047] The flow coefficient refers to the volume flow rate or mass flow rate of the pipeline medium flowing through the valve under the test conditions and the constant pressure of the pipeline in a unit time, that is, the flow capacity. The larger the flow coefficient value, the smaller the pressure loss when the fluid flows through the valve.
[0048] In a preferred embodiment of the present invention, a branch gas pipe 300 is also included, the gas inlet end of the branch gas pipe is connected to the main gas pipe, and the connection between the branch gas pipe and the main gas pipe is located at the rear end of the filter along the gas transmission direction; the gas outlet end of the branch gas pipe is externally connected to a gas-using device. Specifically, the gas-using device includes equipment such as a cylinder. In this design, part of the gas in the main gas pipe is transported to the cylinder through the branch gas pipe, which is conducive to saving the space occupied by the pipeline.
[0049] In a preferred embodiment of the present invention, a second pressure-stabilizing gas storage tank 170 and a stop valve 180 are sequentially installed on the main gas pipeline along the gas delivery direction, and the second pressure-stabilizing gas storage tank is located at the rear end of the connection between the branch gas pipeline and the main gas pipeline along the gas delivery direction. The stability of the gas pressure is ensured by the second pressure-stabilizing gas storage tank. When the second pressure-stabilizing gas storage tank needs to be inspected and repaired, it is only necessary to close the stop valve, which has the advantage of convenient operation.
[0050] In a preferred embodiment of the present invention, a pressure gauge 151 and a pressure switch 152 are provided on the first pressure regulating valve 150. When the pressure gauge shows that the pressure is too high, the central controller controls the first pressure regulating valve 150 to adjust the air pressure. At the same time, when the air pressure exceeds the preset value, the pressure switch will automatically cut off to play a protective role.
[0051] In a preferred embodiment of the present invention, it further includes an air source device 500;
[0052] The main gas transmission pipe 110 includes a first hose 111, a second hose 112, a first hard pipe 113, a third hose 114, a fourth hose 115, a second hard pipe 116 and a multi-way pipe joint 117; a one-way valve is arranged on the first hose, and the air inlet end of the first hose is connected to the air outlet of the air source device; the air outlet end of the first hose is connected in sequence through the first pressure-stabilizing gas storage tank, the second hose, the first hard pipe, the third hose, the second pressure-stabilizing gas storage tank, the fourth hose, the second hard pipe and the air inlet end of the multi-way pipe joint; the switch valve, the first pressure regulating valve and the filter are installed on the first hard pipe, and the stop valve is installed on the second hard pipe;
[0053] The test air pipe 210 includes a third hard tube 211, a fifth soft tube 212 and a fourth hard tube 213; the air inlet end of the third hard tube is connected to one of the air outlet ends of the multi-way pipe joint, and its air outlet end is connected to the air inlet end of the fourth hard tube through the fifth soft tube in turn; the first solenoid valve, the second pressure regulating valve, the flow sensor and the pressure sensor are installed on the third hard tube.
[0054] In this design, by arranging the first hose, the second hose, the third hose, and the fourth hose to connect the first pressure-stabilizing gas tank and the second pressure-stabilizing gas tank, it is convenient to arrange the first pressure-stabilizing gas tank and the second pressure-stabilizing gas tank with larger volumes outside the machine body. In addition, the third hard pipe and the fourth hard pipe are connected by the fifth hose, so that the third hard pipe and the fourth hard pipe can be arranged separately, which is beneficial to reducing the arrangement of the pipeline and reasonably utilizing the space.
[0055] In a preferred embodiment of the present invention, the switch valve, the first pressure regulating valve, the second pressure regulating valve and the flow sensor are all provided with a mounting structure 600 for fixed connection with an external plate. Such a design has the advantages of convenient installation and small space occupation.
[0056] In a preferred embodiment of the present invention, the multi-way pipe joint is a three-way pipe with one inlet and two outlets, and correspondingly, the number of the test pipe assemblies is two groups.
[0057] In a preferred embodiment of the present invention, the fourth hard pipe is further provided with a second electromagnetic valve 260. With this design, when the test pipeline needs to be inspected and repaired, the second electromagnetic valve can be closed, which has the advantage of convenient operation.
[0058] Reference Figure 2 This embodiment also provides a testing method for a multi-pipeline pressure flow coefficient testing device, comprising the following steps:
[0059] Preparation stage: the outlet ends of more than two groups of test air pipes are sealed and connected to the air inlets of more than two products to be tested one by one, and the air outlets of the products to be tested are connected to the atmosphere; first, the switch valve, the stop valve and the first solenoid valve are closed, and the gas source is charged into the first pressure-stabilizing gas storage tank through the one-way valve. After the preset charging time, the switch valve is opened, and the gas is pressure-regulated by the first pressure regulating valve, and then filtered out of moisture by the filter; part of the gas with moisture filtered out enters the branch gas pipeline, and the other part of the gas enters the second pressure-stabilizing gas storage tank for gas storage;
[0060] Testing stage: block the gas outlets of all products to be tested, open the stop valve, and then open the first solenoid valves on each test gas pipe. The gas in the second pressure-stabilizing gas tank is used to inflate the products to be tested. During the test, the pressure sensor detects the air pressure of the product to be tested. The pressure sensor sends the detected pressure information to the central controller. The central controller controls the opening of the second pressure regulating valve according to the pressure information fed back by the pressure sensor, so that the test gas pipe maintains a constant pressure; the flow rate of the product to be tested is detected by the flow sensor. After the preset test time, when the actual flow rate change value within the test time reaches the preset flow rate change value pre-stored in the central controller, the product to be tested is qualified, otherwise, it is unqualified;
[0061] Exhaust stage: After the test is completed, close the switch valve, stop valve and the first solenoid valve, open the gas outlets of all products to be tested, and exhaust the gas in the test pipeline.
[0062] Other embodiments:
[0063] The multi-way pipe joint is a multi-way pipe with one inlet and three outlets, a five-way pipe with one inlet and four outlets, or a six-way pipe with one inlet and five outlets or more output pipes, and correspondingly, the number of test pipe assemblies is three groups, four groups, five groups or more groups. Although only certain components and embodiments of the present application have been illustrated and described, many modifications and changes (e.g., changes in the size, size, structure, shape and proportion of each component, installation arrangement, material use, color, orientation, etc.) can be imagined by those skilled in the art without actually departing from the scope and spirit of the claims.
[0064] Finally, it should be noted that the above-mentioned implementation modes are only preferred embodiments of the present invention and cannot be used to limit the scope of protection of the present invention. Any non-substantial changes and substitutions made by technicians in this field on the basis of the present invention are within the scope of protection required by the present invention.
Claims
1. A multi-pipeline pressure flow coefficient testing device, characterized in that: include: A main gas pipeline assembly, the main gas pipeline assembly comprising a main gas pipeline and a one-way valve, a first pressure-stabilizing gas storage tank, a switch valve, a first pressure regulating valve and a filter sequentially installed on the main gas pipeline along the gas delivery direction, the gas inlet end of the main gas pipeline being connected to a gas source; More than two groups of test pipeline assemblies, the test pipeline assemblies comprising a test gas pipe and a first solenoid valve, a second pressure regulating valve, a flow sensor and a pressure sensor sequentially installed on the test gas pipe along the gas delivery direction; the gas inlet ends of the test gas pipes of the more than two groups of the test pipeline assemblies are respectively connected to the gas outlet ends of the main gas delivery pipe, and each test gas pipe has a gas outlet end for communicating with the product to be tested; During the test, the pressure sensor detects the air pressure of the product to be tested, and the pressure sensor sends the detected pressure information to the central controller. The central controller controls the opening of the second pressure regulating valve based on the pressure information fed back by the pressure sensor, so that the test air tube maintains a constant pressure.
2. The multi-pipeline pressure flow coefficient testing device according to claim 1, characterized in that: It also includes a branch gas pipe, the air inlet end of which is connected to the main gas pipe, and the connection between the branch gas pipe and the main gas pipe is located at the rear end of the filter along the gas transmission direction; the air outlet end of the branch gas pipe is connected to an external gas-using device.
3. The multi-pipeline pressure flow coefficient testing device according to claim 2, characterized in that: A second pressure-stabilizing gas storage tank and a stop valve are sequentially installed on the main gas pipeline along the gas delivery direction, and the second pressure-stabilizing gas storage tank is located at the rear end of the connection between the branch gas pipeline and the main gas pipeline along the gas delivery direction.
4. The multi-pipeline pressure flow coefficient testing device according to claim 1, characterized in that: The first pressure regulating valve is provided with a pressure gauge and a pressure switch.
5. The multi-pipeline pressure flow coefficient testing device according to claim 3, characterized in that: Also includes an air source device; The main gas pipeline includes a first hose, a second hose, a first hard pipe, a third hose, a fourth hose, a second hard pipe and a multi-way pipe joint; the one-way valve is arranged on the first hose, and the air inlet end of the first hose is connected to the air outlet of the air source device; the air outlet end of the first hose is connected in sequence through the first pressure-stabilizing gas storage tank, the second hose, the first hard pipe, the third hose, the second pressure-stabilizing gas storage tank, the fourth hose, the second hard pipe and the air inlet end of the multi-way pipe joint; the switch valve, the first pressure regulating valve and the filter are installed on the first hard pipe, and the stop valve is installed on the second hard pipe; The test air pipe includes a third hard tube, a fifth soft tube and a fourth hard tube; the air inlet end of the third hard tube is connected to one of the air outlet ends of the multi-way pipe joint, and its air outlet end is connected to the air inlet end of the fourth hard tube in turn through the fifth soft tube; the first solenoid valve, the second pressure regulating valve, the flow sensor and the pressure sensor are installed on the third hard tube.
6. The multi-pipeline pressure flow coefficient testing device according to claim 5, characterized in that: The switch valve, the first pressure regulating valve, the second pressure regulating valve and the flow sensor are all provided with mounting structures for fixed connection with the external plate.
7. The multi-pipeline pressure flow coefficient testing device according to claim 5, characterized in that: The multi-way pipe joint is a three-way pipe with one inlet and two outlets, a four-way pipe with one inlet and three outlets, a five-way pipe with one inlet and four outlets, or a six-way pipe with one inlet and five outlets. Correspondingly, the number of the test pipe assemblies is two, three, four or five groups.
8. The multi-pipeline pressure flow coefficient testing device according to claim 5, characterized in that: The fourth hard tube is also provided with a second solenoid valve.
9. A method for testing a multi-pipeline pressure flow coefficient testing device as claimed in claim 1, characterized in that: The following steps are involved: Preparation stage: The outlet ends of two or more test air pipes are sealed and connected to the air inlets of two or more products to be tested one by one, and the air outlets of the products to be tested are connected to the atmosphere; first, the switch valve and the first solenoid valve are closed, and the air source is charged to the first pressure-stabilizing air storage tank through the one-way valve. After the preset charging time, the switch valve is opened, and the gas is pressure-regulated by the first pressure regulating valve, and then filtered through the filter to remove moisture; Testing stage: block the gas outlets of all products to be tested, then open the first solenoid valves on each test air pipe, and inflate the products to be tested with the gas after filtering out moisture. During the test, the pressure sensor detects the air pressure of the product to be tested, and the pressure sensor sends the detected pressure information to the central controller. The central controller controls the opening of the second pressure regulating valve according to the pressure information fed back by the pressure sensor, so that the test air pipe maintains a constant pressure; the flow rate of the product to be tested is detected by the flow sensor. After the preset test time, when the actual flow rate change value within the test time reaches the preset flow rate change value pre-stored in the central controller, the product to be tested is qualified, otherwise, it is unqualified; Exhaust stage: After the test is completed, close the switch valve and the first solenoid valve, open the gas outlets of all products to be tested, and exhaust the gas in the test pipeline.
10. The testing method of the multi-pipeline pressure flow coefficient testing device according to claim 9, characterized in that: The multi-pipeline pressure flow coefficient testing device also includes a branch gas pipeline, the gas inlet end of the branch gas pipeline is connected to the main gas pipeline, and the connection between the branch gas pipeline and the main gas pipeline is located at the rear end of the filter along the gas delivery direction; the gas outlet end of the branch gas pipeline is externally connected to a gas-using device; a second pressure-stabilizing gas storage tank and a stop valve are sequentially installed on the main gas pipeline along the gas delivery direction, and the second pressure-stabilizing gas storage tank is located at the rear end of the connection between the branch gas pipeline and the main gas pipeline along the gas delivery direction; Preparation stage: the outlet ends of more than two groups of test air pipes are sealed and connected to the air inlets of more than two products to be tested one by one, and the air outlets of the products to be tested are connected to the atmosphere; first, the switch valve, the stop valve and the first solenoid valve are closed, and the gas source is charged into the first pressure-stabilizing gas storage tank through the one-way valve. After the preset charging time, the switch valve is opened, and the gas is pressure-regulated by the first pressure regulating valve, and then filtered out of moisture by the filter; part of the gas with moisture filtered out enters the branch gas pipeline, and the other part of the gas enters the second pressure-stabilizing gas storage tank for gas storage; Testing stage: block the gas outlets of all products to be tested, open the stop valve, and then open the first solenoid valves on each test air pipe. The gas in the second pressure-stabilizing gas tank is used to inflate the products to be tested. During the test, the pressure sensor detects the air pressure of the product to be tested. The pressure sensor sends the detected pressure information to the central controller. The central controller controls the opening of the second pressure regulating valve according to the pressure information fed back by the pressure sensor, so that the test air pipe maintains a constant pressure; the flow rate of the product to be tested is detected by the flow sensor. After the preset test time, when the actual flow rate change value within the test time reaches the preset flow rate change value pre-stored in the central controller, the product to be tested is qualified, otherwise, it is unqualified; Exhaust stage: After the test is completed, close the switch valve, stop valve and the first solenoid valve, open the gas outlets of all products to be tested, and exhaust the gas in the test pipeline.