Comprehensive energy system optimization operation method considering demand response and time-sharing energy price
By adopting a two-stage optimization scheduling strategy in an integrated energy system, combining electric-thermal demand response and carbon capture-electric to gas-cogeneration subsystem, the high wind and light abandonment rate and user response factors in the existing technology are solved. The issues considered have achieved improvements in load transfer and system efficiency.
Patent Information
- Application Number
- CN202411068817.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-06
- Publication Date
- 2024-11-19
AI Technical Summary
The prior art fails to effectively utilize demand response and time-sharing energy prices in the integrated energy system, resulting in high wind and light abandonment rate, poor environmental and economic benefits of the system, and insufficient consideration of the user's response to energy price difference.
Adopting a two-stage optimization scheduling strategy, the first stage is to build an electric-thermal demand response collaborative optimization strategy on the load side, guide users to adjust their energy consumption needs through time-sharing electricity prices, and the second stage is to build a carbon capture-electric to gas-thermal power connection on the source side Subsystem production adopts a joint operation strategy to meet the Dutch side needs, considering the collaborative complementarity and carbon capture technology of multiple energy forms.
Load transfer is achieved, load fluctuations are reduced, the economic and environmental benefits of the system are improved, the coupling relationship between electricity and thermal energy on the user side is enhanced, and the system's renewable energy penetration rate and low-carbon emission reduction capabilities are improved.
Smart Images

Figure CN118982194A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of energy systems, and in particular, relates to an optimized operation method of an integrated energy system taking into account demand response and time-of-use energy prices. Background Art
[0002] Since the output of new energy sources such as wind power and photovoltaic power cannot be fully matched with the energy demand time of users on the load side, the system has a high wind and solar curtailment rate, poor environmental and economic benefits, and low user satisfaction. In this context, demand response technology came into being, which adjusts the energy demand on the load side to balance supply and demand, and provides a better solution for reasonably arranging the output of each unit on the source side of the integrated energy system, formulating a perfect day-ahead scheduling plan, realizing the optimized operation of the integrated energy system, improving economic and environmental benefits, and achieving a win-win situation for both the "source-load" side. Based on the existing domestic and foreign research content, there have been many research results in the coordinated optimization and scheduling of integrated energy systems, and there has also been positive progress in the application of demand response technology in the optimization of integrated energy systems. However, most of the existing research on demand response only considers the demand response of a single electric energy and ignores the demand response potential of other energy forms, and most of the research on demand response does not consider the psychological reaction factors of users to energy price differences. Summary of the invention
[0003] In view of the problems existing in the prior art, the purpose of the present invention is to provide a two-stage optimization scheduling strategy that is logically reasonable, easy to implement, and can fully mobilize the flexibility potential on both the source and load sides, reasonably optimize the time-of-use energy price, guide users to change their energy demand, and realize load transfer; and provide a scientific and reasonable, highly applicable, integrated energy system optimization operation method that can achieve the coordinated complementarity of multiple energy forms and consider the joint operation of carbon capture and power-to-gas technologies.
[0004] To achieve the above-mentioned purpose, the present invention adopts the following technical scheme: an optimized operation method of an integrated energy system taking into account demand response and time-of-use energy price, the method includes a two-stage optimization scheduling strategy, in which a coordinated optimization strategy for electricity-heat demand response is constructed for the load side in the first stage, and a carbon capture-power-to-gas-cogeneration subsystem is constructed for the source side in the second stage, and a joint operation strategy is adopted to meet the demand on the load side;
[0005] The load side includes the electricity and heat demand of users. According to the electricity consumption of users, a dispatch cycle is divided into three sections: peak, flat and valley. By introducing time-of-use electricity prices, users are guided to shift their electricity demand from peak hours to non-peak hours. On the basis of ensuring the energy sales department and user energy satisfaction, users are guided to adjust their energy demand by changing the time-of-use energy price, considering the coordinated optimization of electricity-heat demand response, building a heat price elasticity matrix, and optimizing the heat load curve in combination with the heat load characteristics to achieve peak shaving and valley filling.
[0006] The source side system structure includes: electricity, natural gas, heat and carbon dioxide energy forms; electrolyzers and methane reactors constitute a power-to-gas device; thermal power plants and carbon capture devices constitute a carbon capture power plant; carbon dioxide generated by thermal power plants is captured by carbon capture devices, part of the captured carbon dioxide is packaged and processed, and the remaining part is passed into the power-to-gas device as a carbon source for methanation reaction; wind power, photovoltaics, thermal power plants, batteries and cogeneration units generate electricity together to provide electricity for the electrical load; abandoned wind and solar power are used for power-to-gas conversion to methanate the captured carbon dioxide to produce natural gas and inject it into the gas grid, and together with the gas source, provide natural gas for gas boilers and cogeneration units; gas boilers, heat storage tanks and cogeneration units generate heat together to provide thermal energy for thermal loads; carbon capture power plants, power-to-gas devices and cogeneration units are aggregated into a carbon capture-power-to-gas-cogeneration subsystem.
[0007] Furthermore, the first-stage demand response types include electric energy and thermal energy, and a Logistic function is constructed to optimize the electric load, as shown in formula (1):
[0008]
[0009] Where: a, c and μ are known quantities in the Logistic function; b represents the variable parameter in the Logistic function; Δp represents the time-of-use electricity price difference; λ is the load transfer rate, which represents the actual load fluctuation after the user participates in demand response;
[0010] The optimistic response membership m is used as the probability constraint of the comprehensive load transfer rate function model based on the Logistic function; the comprehensive load transfer rate function model based on the Logistic function is shown in formulas (2)-(4):
[0011]
[0012] Where: Indicates the actual load transfer rate from peak to valley; and denote the transfer rates predicted by the pessimistic and optimistic response curves, respectively; Δp fv is the peak-valley electricity price difference; a fv and b fv Respectively represent the demarcation points of price division areas; Δλ fv Indicates the load fluctuation span corresponding to the peak-valley electricity price difference;
[0013] The load transfer amount and load value after taking demand response into account are shown in formula (5) and formula (6) respectively:
[0014]
[0015] Where: T f , Tp and T v Respectively represent the peak, flat and valley time periods; Indicates the actual load transfer rate from peak to flat, It indicates the actual load transfer rate from flat to valley; and They represent the average loads during the peak, flat and valley periods before the implementation of time-of-use electricity prices; ΔP L,t represents the load transfer amount after taking into account the demand response in period t; E L,t and They respectively represent the load values before and after the implementation of time-of-use electricity prices in period t.
[0016] Furthermore, the heat price elasticity matrix is constructed, and the elasticity coefficient is shown in formula (7):
[0017]
[0018] Where: ε t,t is the elastic coefficient; ε t,j is the cross elastic coefficient; is the initial heat load of the user at time t; ΔH L,t is the change in heat load of the user at time t; and Represent the initial heat price at time t and time j respectively; Δq t and Δq j They represent the change of heat price at time t and time j respectively;
[0019] Demand response characteristics are divided into curtailable, transferable and replaceable loads. The load changes of different types are shown in formulas (8)-(10):
[0020]
[0021]
[0022] Where: ΔH CL,t is the amount of heat load reduction change at time t; and are the parts of the initial heat load that can be reduced and transferred respectively; ε CL (t,j) is the price elasticity matrix of load demand that can be reduced; q j is the hot price at time j; ΔH TL,t is the transferable change of heat load at time t; ε TL (t,j) is the price elasticity matrix of transferable load demand; ΔE RL,t , ΔH RL,t are the changes in the replaced electrical and thermal loads respectively; are the electric and thermal loads that can be replaced by the demand response loads; he Indicates the conversion coefficient from thermal energy to electrical energy; λ eh Indicates the conversion coefficient from electrical energy to thermal energy; λ ee and λ hh All are -1;
[0023] The optimized heat load consists of three parts, as shown in formula (11):
[0024]
[0025] Where: H L,t is the optimized heat load at time t.
[0026] Furthermore, in the first stage, the objective function is established for the electric load with the minimum fluctuation amplitude and the maximum user satisfaction as multiple objectives. The time-of-use electricity price and the electric load are used as decision variables, and the minimum electric load fluctuation is used as the objective function 1, as shown in formula (12):
[0027]
[0028] Where: T represents the scheduling period;
[0029] The maximum user satisfaction is taken as the second objective function, as shown in formula (13):
[0030] maxF2=U com ·U eco (13)
[0031] When considering user satisfaction, user comfort and user economy are included, as shown in formulas (14)-(15):
[0032]
[0033] Where: U com and U eco They represent the user's energy comfort and economy respectively; and c t They represent the time-of-use electricity prices before and after optimization at time t respectively;
[0034] Before and after the implementation of time-of-use electricity prices, it is necessary to ensure that the total energy sales of the energy sales department and the total user load fluctuate within the allowable range. The constraint conditions are shown in formula (16):
[0035]
[0036] Where: δ is the load fluctuation;
[0037] In order to avoid the situation where the energy price is reversed between peak and valley, it is necessary to constrain the energy price ratio between peak and valley periods within the allowable range. The constraint condition is shown in formula (16):
[0038] c min ≤c f / c v ≤c max (17)
[0039] Where: c max 、c min are the upper and lower limits of energy price ratio respectively; c f 、c v They are the energy prices during peak and valley periods respectively;
[0040] There is a coupling characteristic in the energy consumption mode of users. After the implementation of time-of-use electricity price, users will also change their own heat demand. When considering the flexibility of heat load, the change of heat load will be affected by the change of electric load, and there are upper and lower limit constraints for each part of the change, as shown in formulas (18)-(20):
[0041]
[0042] Where: α1, α2 and α3 are the proportion coefficients of the load participating in demand response to the total load, which are determined according to the actual energy consumption.
[0043] Furthermore, the carbon capture energy consumption in the carbon capture-power-to-gas-cogeneration subsystem includes system operation energy consumption and fixed energy consumption. The model output and its expression are shown in formulas (21)-(23):
[0044] E GN,t =E G,t -E CCS,t (twenty one)
[0045] E CCS,t =E CCS,r,t +E CCS,s,t (twenty two)
[0046] E P2G,t =Q WT,t +Q PV,t (twenty three)
[0047] Where: E GN,t and E G,t are the net output and equivalent output of the carbon capture power plant during period t; E CCS,t and E CCS,r,t are the total energy consumption and operating energy consumption of the carbon capture power plant during period t; E CCS,s,t is the fixed energy consumption of the carbon capture power plant, which is a fixed value; E P2G,t is the energy consumption of the power-to-gas device during period t; Q WT,t and QPV,t are the abandoned wind and abandoned solar power provided to the power-to-gas device during period t respectively;
[0048] The amount of carbon dioxide captured by the carbon capture power plant in the system is shown in formula (24):
[0049]
[0050] Where: Q CCS,t is the total amount of carbon dioxide captured by the carbon capture power plant during period t; The operating energy consumption of a carbon capture plant per unit of carbon dioxide captured;
[0051] According to the law of conservation of mass, the volume of carbon dioxide consumed by the power-to-gas device is equal to the volume of natural gas generated. The amount of carbon dioxide consumed and the total amount of natural gas generated in time period t are shown in formulas (25)-(26) respectively:
[0052] G P2G,t =3.6η P2G E P2G,t / H g (25)
[0053] Q P2G,t =ρG P2G,t (26)
[0054] Where: G P2G,t Q is the volume of natural gas produced by the power-to-gas device during period t; P2G,t is the total amount of carbon dioxide consumed; η P2G is the conversion efficiency; H g is the calorific value of natural gas; ρ is the density of carbon dioxide;
[0055] The heat load is supplied by the combined heat and power unit and the gas boiler consuming natural gas to produce heat. The expressions of the combined heat and power unit and the gas boiler are shown in formulas (27)-(29):
[0056] E CHP,t =G CHP,t H g η CHP,e (27)
[0057] H CHP,t =G CHP,t H g η CHP,h (28)
[0058] H GB,t =G GB,t H g η GB (29)
[0059] Where: E CHP,t and HCHP,t are the electrical power and thermal power output of the cogeneration unit at time t; H GB,t is the thermal power output of the gas boiler at time t; G CHP,t and G GB,t are the volumes of natural gas consumed by the cogeneration unit and the gas boiler at time t; η CHP,e , η CHP,h and η GB They are the electrical efficiency of the combined heat and power unit, the thermal efficiency of the combined heat and power unit, and the thermal efficiency of the gas boiler;
[0060] Energy storage equipment added to the system can adjust the flexible response of electric energy and thermal energy and reduce the impact of uncertainty of renewable energy generation on the system. The energy storage equipment includes batteries and heat storage tanks. The modeling is shown in formulas (30)-(31):
[0061]
[0062] Where: S ES,t and S TS,t are the energy storage of the battery and the heat storage tank at the end of period t, S ES,t-1 and S TS,t-1 are the energy storage of the battery and the heat storage tank at the end of the t-1 period; δ ES and δ TS E is the electric energy loss rate and heat energy loss rate of the energy storage equipment; ESC,t 、E ESD,t are the charging and discharging efficiency of the battery at time t; H TSC,t and H TSD,t are the charging and discharging efficiencies of the heat storage tank at time t; η ESC , η ESD are the charging and discharging efficiency of the battery respectively; η TSC , η TSD They are the charging and discharging efficiency of the heat storage tank respectively.
[0063] Furthermore, the total operating cost F of the carbon capture-power-to-gas-cogeneration subsystem is minimized, and the optimal scheduling model is constructed considering the constraints of each aggregation unit, as shown in formula (32):
[0064]
[0065] In the formula, f BUY The cost of purchasing energy; is the carbon trading cost; f OP is the system operation and maintenance cost; sell For the revenue from energy sales;
[0066] The energy purchase cost includes the electricity purchase cost and the gas purchase cost as shown in formulas (33)-(34):
[0067]
[0068] G BUY,t =G CHP,t +G GB,t -G P2G,t (34)
[0069] Where: c g The fixed price for purchasing a unit of natural gas from the natural gas market; e is the electricity purchase price; G BUY,t and E BUY,t They are the gas and electricity purchases during period t respectively;
[0070] Carbon trading costs include tiered carbon trading costs and carbon sequestration costs, as shown in formulas (35)-(36):
[0071]
[0072] Where: c cs A fixed price for each unit of CO2 stored; for the tiered carbon trading costs;
[0073] The system operation and maintenance cost is shown in formula (37):
[0074] f OP =λ1E WT,t +λ2E PV,t (37)
[0075] Where: λ1 and λ2 are the unit maintenance costs of wind turbines and photovoltaic power stations respectively; E WT,t 、E PV,t They are wind power and photovoltaic power generation on-grid power at time t respectively;
[0076] Energy sales revenue includes heat sales price and electricity sales price:
[0077]
[0078] Where: s h,t 、s e,t H is the time-of-use heat price and electricity price in the optimized period t; L,t 、E L,t They are the heat and electricity loads in period t after optimization.
[0079] Furthermore, the carbon capture-power-to-gas-combined heat and power subsystem constraints include carbon capture power plant-power-to-gas device operation constraints, combined heat and power unit operation constraints, gas boiler operation constraints, battery constraints, heat storage tank constraints, electric power balance constraints, and thermal power balance constraints;
[0080] The operating constraints of the carbon capture power plant-power-to-gas unit are shown in equations (39)-(43):
[0081] E GN,min ≤E GN,t ≤E GN,max (39)
[0082] E P2G,min ≤E P2G,t ≤E P2G,max (40)
[0083] |E GN,t -E GN,t-1 |≤ΔE GN (41)
[0084] |E P2G,t -E P2G,t-1 |≤ΔE P2G (42)
[0085] 0≤Q P2G,t ≤Q CCS,t (43)
[0086] Where: E GN,max 、E GN,min are the upper and lower limits of the net output of the carbon capture power plant, E GN,t is the net output of the carbon capture power plant at time t, E GN,t-1 is the net output of the carbon capture power plant at time t-1; E P2G,max 、E P2G,min are the upper and lower limits of the energy consumption of the power-to-gas device, E P2G,t is the energy consumption of the power-to-gas device during period t, E P2G,t-1 is the energy consumption of the power-to-gas device during period t-1; ΔE GN and ΔE P2G They are the ramp rate constraints for the carbon capture plant and the power-to-gas unit, respectively;
[0087] The operating constraints of the cogeneration unit are shown in formulas (44)-(47):
[0088] E CHP,min ≤E CHP,t ≤E CHP,max (44)
[0089] H CHP,min ≤H CHP,t ≤H CHP,max (45)
[0090] |E CHP,t -E CHP,t-1 |≤ΔE CHP (46)
[0091] |H CHP,t -H CHP,t-1 |≤ΔHCHP (47)
[0092] Where: E CHP,max 、E CHP,min are the upper and lower limits of the power generation of the cogeneration unit, H CHP,min , H CHP,max are the upper and lower limits of the heat generation power of the cogeneration unit; E CHP,t is the power generated by the cogeneration unit at time t, E CHP,t-1 is the power generated by the cogeneration unit at time t-1; H CHP,t is the heat generation power of the cogeneration unit at time t, H CHP,t-1 is the heat generation power of the cogeneration unit at time t-1, ΔE CHP , ΔH CHP They are the power generation and thermal power ramping constraints of the cogeneration unit respectively;
[0093] The operating constraints of gas boilers are shown in formulas (48)-(49):
[0094] H GB,min ≤H GB,t ≤H GB,max (48)
[0095] |H GB,t -H GB,t-1 |≤ΔH GB (49)
[0096] Where: H GB,max , H GB,min are the upper and lower limits of the heating power of the gas boiler; H GB,t is the heating power of the gas boiler at time t, H GB,t-1 is the heating power of the gas boiler at time t-1, |H GB,t -H GB,t-1 |≤ΔH GB It is the ramp constraint of the heat generation power of the gas boiler;
[0097] The battery constraints are shown in formulas (50)-(54):
[0098] 0≤E ESC,t ≤E ESC,max μ ESC,t (50)
[0099] 0≤E ESD,t ≤E ESD,max μ ESD,t (51)
[0100] 0≤μ ESC,t +μ ESD,t ≤1 (52)
[0101] SES,min ≤S ES,t ≤S ES,max (53)
[0102] S ES,1 =S ES,24 (54)
[0103] Where: E ESC,max 、E ESD,max are the maximum charging and discharging power of the battery respectively; μ ESC,t , μ ESD,t They represent the charging and discharging status of the battery at time t; S ES,max , S ES,min They are the maximum and minimum values of the battery storage capacity respectively; S ES,1 , S ES,24 Respectively represent the battery capacity at the beginning and end of the day;
[0104] The constraints of the heat storage tank are consistent with those of the battery;
[0105] The electrical power and thermal power balance constraints are shown in formulas (55)-(56):
[0106] E WT,t +E PV,t +E BUY,t +E CHP,t +E GN,t +E ESD,t =E L,t +E ESC,t (55)
[0107] H CHP,t +H GB,t +H TSD,t =H L,t +H TSC,t (56)
[0108] Where: E WT,t 、E PV,t are the wind and solar grid-connected power in period t respectively.
[0109] The two-stage optimization operation method of the integrated energy system proposed in the present invention taking into account the electricity-heat demand response and time-of-use energy price has the following advantages:
[0110] First, a demand response optimization strategy that takes into account the coordinated optimization of time-of-use energy prices and electricity-heat demand response is constructed. The proposed strategy can strengthen the coupling relationship between electricity and thermal energy on the user side, effectively improve the problem of large peak-to-valley difference in system load, reduce load fluctuations, achieve peak shaving and valley filling, and smooth the load curve, providing better conditions for the reasonable and effective operation of the integrated energy system and is easy to implement;
[0111] 2. Considering the joint operation method of the carbon capture power plant and the power-to-gas device, a carbon capture-power-to-gas-combined heat and power unit subsystem model is proposed, and a multi-power plant joint operation strategy is adopted to give full play to the time-shift characteristics of batteries and heat storage tanks, effectively improve the system coupling degree and renewable energy penetration rate, and reduce the actual total carbon emissions of the system. Its optimized operation method is scientific and reasonable, highly applicable, and has good effects, and has good engineering application prospects. BRIEF DESCRIPTION OF THE DRAWINGS
[0112] The accompanying drawings herein are used to provide a further understanding of the present invention and constitute a part of the present application. The exemplary embodiments of the present invention and their descriptions are used to understand the present invention and do not constitute improper limitations of the present invention. In the accompanying drawings:
[0113] Figure 1 A Logistic function diagram for demand response optimization in an embodiment;
[0114] Figure 2 It is a structural diagram of the comprehensive energy system in the embodiment;
[0115] Figure 3 This is an energy flow diagram of the carbon capture power plant-power-to-gas device system in the embodiment;
[0116] Figure 4 The wind power forecast output and initial electric and thermal load diagram for a typical day in the embodiment;
[0117] Figure 5 This is a comparison diagram of electrical loads before and after optimization in the embodiment;
[0118] Figure 6 This is a comparison diagram of heat loads before and after optimization in the embodiment;
[0119] Figure 7 This is the power balance diagram of the unit generated in scenario 1 in the embodiment;
[0120] Figure 8 This is the power balance diagram of the unit generated in scenario 2 in the embodiment;
[0121] Fig. 9 This is the power balance diagram of the unit generated in scenario 3 in the embodiment;
[0122] Fig.10 This is the power balance diagram of the unit generated in scenario 4 in the embodiment;
[0123] Fig.11 This is the heat generation power balance diagram of the unit in scenario 1 in the embodiment;
[0124] Fig.12 This is the heat generation power balance diagram of the unit in scenario 2 in the embodiment;
[0125] Fig.13 This is the heat generation power balance diagram of the unit in scenario 3 in the embodiment;
[0126] Fig.14 This is the heat generation power balance diagram of the unit in scenario 4 in the embodiment;
[0127] Fig.15 This is a comparison chart of actual carbon emissions for each scenario in the embodiment. DETAILED DESCRIPTION
[0128] The technical solution of the present invention is further described below in conjunction with the accompanying drawings and embodiments, but is not limited thereto. Any modification or equivalent replacement of the technical solution of the present invention that does not depart from the spirit and scope of the technical solution of the present invention should be included in the protection scope of the present invention.
[0129] Reference Figure 1 As shown in Table 1, the present invention proposes an optimized operation method for an integrated energy system taking into account demand response and time-of-use energy price, which can reasonably adjust the load demand of users, and intuitively provide a multi-energy conversion coupling relationship between various devices on the premise of meeting the electricity and heat load demand of users. The electric load includes the electricity used in the system and the electricity used by users, which is provided by the carbon capture power plant and the wind turbine; the natural gas input gas boiler provides the heat load of the system. In order to achieve low-carbon emission reduction and wind abandonment, the thermal power unit is transformed into a carbon capture power plant. Through the interaction between the carbon capture power plant and the P2G unit, based on the characteristics of CO2 collected by the carbon capture power plant being used by P2G, CO2 and P2G are coupled to realize the carbon cycle of the system, which reduces the raw material cost of P2G and improves the low-carbon emission reduction capability of the system. On the other hand, it further enhances the peak load regulation capability of the power system and effectively reduces the occurrence of wind abandonment.
[0130] Table 1 Logistic function curve parameters
[0131]
[0132] By changing the value of the variable parameter to adjust the span of the load transfer rate change, the Logistic function model is shown in formula (1):
[0133]
[0134] Where: a, c and μ represent the known quantities in the Logistic function respectively; b represents the variable parameter in the Logistic function; Δp represents the time-of-use electricity price difference; λ is the load transfer rate, which represents the actual load fluctuation after the user participates in demand response;
[0135] Taking the load transfer during the peak and valley periods as an example, the trapezoidal part of the bar graph adopts a large-scale semi-step membership function, which indicates the probability that the user meets the optimistic response estimate, which is a value between 0 and 1, thereby reflecting the optimistic response membership m corresponding to different energy price differences; the curve part represents the load transfer rate under different energy price differences. In the response area, as the energy price difference gradually increases, the user's response enthusiasm is mobilized, the load transfer rate gradually increases, and it is more inclined to the optimistic response curve. Therefore, it is necessary to consider the optimistic response membership as a probability constraint of the comprehensive load transfer rate function model based on the Logistic function. The comprehensive load transfer rate function model based on the Logistic function is shown in formulas (2)-(4):
[0136]
[0137] Where: Indicates the actual load transfer rate from peak to valley; and denote the transfer rates predicted by the pessimistic and optimistic response curves, respectively; Δp fv is the peak-valley electricity price difference; a fv and b fv Respectively represent the demarcation points of price division areas; Δλ fv Indicates the load fluctuation span corresponding to the peak-valley electricity price difference;
[0138] The load transfer amount and load value after taking demand response into account are shown in formula (5) and formula (6) respectively:
[0139]
[0140] Where: T f , T p and T v Respectively represent the peak, flat and valley time periods; Indicates the actual load transfer rate from peak to flat, It indicates the actual load transfer rate from flat to valley; and They represent the average loads during the peak, flat and valley periods before the implementation of time-of-use electricity prices; ΔP L,t represents the load transfer amount after taking into account the demand response in period t; E L,t and They respectively represent the load values before and after the implementation of time-of-use electricity prices at time t.
[0141] The heat price elasticity matrix is constructed by referring to the electricity price elasticity matrix. The elasticity coefficient is shown in formula (7):
[0142]
[0143] Where: ε t,tis the elastic coefficient; ε t,j is the cross elastic coefficient; is the initial heat load of the user at time t; ΔH L,t is the change in user load at time t; and Respectively represent the initial heat price at time t and time j; Δq t and Δq j They represent the change of heat price at time t and time j respectively;
[0144] Demand response characteristics are divided into curtailable, transferable and replaceable loads. By comparing the difference before and after the change of heat price in the same period, users can choose whether to reduce heat load, which is a curtailable load; when the heat price increases, users are guided to transfer the heat load during peak hours to non-peak hours, which is a transferable load, but no load transfer will occur during the peak heat price period; by comparing the heat price and electricity price at the same time, for a certain type of load that can be directly powered by electricity or heat, users can choose not to use other forms of energy, or choose to use lower-priced energy to meet their own needs, thereby realizing the mutual substitution of electricity and heat energy. The load changes of different types are shown in formulas (8)-(10):
[0145]
[0146] Where: ΔH CL,t is the amount of heat load reduction change at time t; and are the parts of the initial heat load that can be reduced and transferred respectively; ε CL (t,j) is the price elasticity matrix of load demand that can be reduced; q j is the hot price at time j; ΔH TL,t is the transferable change of heat load at time t; ε TL (t,j) is the price elasticity matrix of transferable load demand; ΔE RL,t , ΔH RL,t are the changes in the replaced electrical and thermal loads respectively; are the electric and thermal loads that can be replaced by the demand response loads; he Indicates the conversion coefficient from thermal energy to electrical energy; λ eh Indicates the conversion coefficient from electrical energy to thermal energy; λ ee and λ hh All are -1.
[0147] The optimized heat load consists of three parts, as shown in formula (11):
[0148]
[0149] Where: HL,t is the optimized heat load at time t.
[0150] In the first stage, for the load side, since the user's participation in the energy price incentive demand response is entirely voluntary, the user load demand response shows a strong randomness and has certain fuzzy properties. Its actual energy demand response is roughly between the optimistic and pessimistic response prediction values. On the basis of ensuring the energy sales department and the user's energy satisfaction, the user is guided to adjust his energy demand by changing the time-of-use energy price, considering the coordinated optimization of electricity-heat demand response, establishing a heat price elasticity matrix with reference to the electricity price, and optimizing the heat load curve in combination with the heat load characteristics. In the second stage, for the source side, part of the carbon dioxide generated by the thermal power plant is captured by the carbon capture power plant. Part of the captured carbon dioxide is packaged and processed, and the rest is passed into the power-to-gas device as a high-quality carbon source for methanation reaction; the power generation parts of wind power, photovoltaic, thermal power plants, batteries and cogeneration units together provide electricity for the electrical load; the abandoned wind and solar power are used for power-to-gas conversion to methanate the captured carbon dioxide to produce natural gas and inject it into the gas grid, and together with the gas source, provide natural gas for gas boilers and cogeneration units; the heat generation parts of gas boilers, heat storage tanks and cogeneration units together provide thermal energy for thermal loads; the carbon capture power plant, power-to-gas device and cogeneration unit are aggregated into a carbon capture-power-to-gas-cogeneration subsystem.
[0151] In the first stage, the objective function is established for the electric load with the minimum fluctuation amplitude and the maximum user satisfaction as multiple objectives. The time-of-use electricity price and the electric load are used as decision variables, and the minimum load fluctuation is used as the objective function 1, as shown in formula (12):
[0152]
[0153] Where: T represents the scheduling period;
[0154] The maximum user satisfaction is taken as the second objective function, as shown in formula (13):
[0155] maxF2=U com ·U eco (13)
[0156] When considering user satisfaction, user comfort and user economy are included, as shown in formulas (14)-(15):
[0157]
[0158]
[0159] Where: U com and U eco They represent the user's energy comfort and economy respectively; and c tThey represent the time-sharing energy prices before and after optimization at time t respectively;
[0160] Before and after the implementation of time-of-use energy prices, it is necessary to ensure that the total energy sales of the energy sales department and the total user load fluctuate within the allowable range. The constraint conditions are shown in formula (16):
[0161]
[0162] Where: δ is the load fluctuation.
[0163] In order to avoid the situation where the energy price is reversed between peak and valley, it is necessary to constrain the energy price ratio between peak and valley periods within the allowable range. The constraint condition is shown in formula (16):
[0164] c min ≤c f / c v ≤c max (17)
[0165] Where: c max 、c min are the upper and lower limits of energy price ratio respectively; c f 、c v They are energy prices during peak and valley periods respectively.
[0166] There is a coupling characteristic in the energy consumption mode of users. After the implementation of time-of-use electricity price, users will also change their own heat demand. When considering the flexibility of heat load, the change of heat load will be affected by the change of electric load, and there are upper and lower limit constraints for each part of the change, as shown in equations (18)-(20).
[0167]
[0168] Where: α1, α2 and α3 are the proportion coefficients of the load participating in demand response to the total load, which are determined according to the actual energy consumption.
[0169] The second stage, refer to Figure 2 and Figure 3 , a traditional thermal power plant equipped with carbon capture equipment becomes a carbon capture power plant. The constructed integrated energy system includes carbon capture-power-to-gas-cogeneration subsystem, where the carbon capture energy consumption includes system operation energy consumption and fixed energy consumption. The model output and its expression are shown in formulas (21)-(23):
[0170] E GN,t =E G,t -E CCS,t (twenty one)
[0171] E CCS,t =E CCS,r,t +E CCS,s,t (twenty two)
[0172] E P2G,t =Q WT,t +Q PV,t (twenty three)
[0173] Where: E GN,t and E G,t are the net output and equivalent output of the carbon capture power plant during period t; E CCS,t and E CCS,r,t are the total energy consumption and operating energy consumption of the carbon capture power plant during period t; E CCS,s,t The fixed energy consumption of the carbon capture power plant is a constant value; E P2G,t is the energy consumption of the power-to-gas device during period t; Q WT,t and Q PV,t are the abandoned wind and abandoned solar power provided to the power-to-gas device during period t respectively;
[0174] The amount of carbon dioxide captured by the carbon capture power plant in the system is shown in formula (24):
[0175]
[0176] Where: Q CCS,t is the total amount of carbon dioxide captured by the carbon capture power plant during period t; The operating energy consumption of a carbon capture plant per unit of carbon dioxide captured;
[0177] The natural gas generated from power-to-gas can be supplied to the upper gas grid for consumption and heat production by gas boilers and cogeneration units, and the difference in demand can be traded or stored in the natural gas network. It can be seen that power-to-gas equipment has a large flexibility margin in absorbing renewable energy. According to the law of conservation of mass, the volume of carbon dioxide consumed by the power-to-gas device is equal to the volume of natural gas generated. The amount of carbon dioxide consumed and the total amount of natural gas generated in time period t are shown in formulas (25)-(26) respectively:
[0178] G P2G,t =3.6η P2G E P2G,t / H g (25)
[0179] Q P2G,t =ρG P2G,t (26)
[0180] Where: G P2G,t Q is the volume of natural gas produced by the power-to-gas device during period t; P2G,t is the total amount of carbon dioxide consumed; η P2G is the conversion efficiency; H g is the calorific value of natural gas; ρ is the density of carbon dioxide.
[0181] The heat load is supplied by the combined heat and power unit and the gas boiler consuming natural gas to produce heat. The expressions of the combined heat and power unit and the gas boiler are shown in formulas (27)-(29):
[0182] E CHP,t =G CHP,t H g η CHP,e (27)
[0183] H CHP,t =G CHP,t H g η CHP,h (28)
[0184] H GB,t =G GB,t H g η GB (29)
[0185] Where: E CHP,t and H CHP,t are the electrical power and thermal power output of the cogeneration unit during period t; H GB,t G is the thermal power output of the gas boiler during period t; CHP,t and G GB,t are the volumes of natural gas consumed by the cogeneration unit and gas boiler during period t; η CHP,e , η CHP,h and η GB They are the electrical efficiency of the combined heat and power unit, the thermal efficiency of the combined heat and power unit, and the thermal efficiency of the gas boiler;
[0186] Energy storage equipment added to the system can adjust the flexible response of electric energy and thermal energy, and reduce the impact of uncertainty of new energy generation such as wind power and photovoltaic power on the system. The energy storage equipment includes batteries and heat storage tanks. The energy storage equipment modeling is shown in formulas (30)-(31):
[0187]
[0188] Where: S ES,t , S TS,t are the energy storage of the battery and the heat storage tank at the end of period t, S ES,t-1 , S TS,t-1 are the energy storage of the battery and the heat storage tank at the end of the t-1 period; δ ES , δ TS E is the electrical and thermal energy loss rate of the energy storage equipment; ESC,t 、E ESD,t are the charging and discharging efficiency of the battery at time t; H TSC,t , H TSD,t are the heat storage tank’s charging and discharging efficiencies at time t; η ESC , η ESDare the charging and discharging efficiency of the battery respectively; η TSC , η TSD They are the charging and discharging efficiency of the heat storage tank respectively.
[0189] To minimize the total system operating cost F, the optimal scheduling model is constructed by considering the constraints of each aggregation unit, as shown in formula (32):
[0190]
[0191] In the formula, f BUY The cost of purchasing energy; is the carbon trading cost; f OP is the system operation and maintenance cost; sell For the revenue from energy sales;
[0192] The energy purchase cost includes the electricity purchase cost and the gas purchase cost as shown in formulas (33)-(34):
[0193]
[0194] G BUY,t =G CHP,t +G GB,t -G P2G,t (34)
[0195] Where: c g The fixed price for purchasing a unit of natural gas from the natural gas market; e is the electricity purchase price; G BUY,t and E BUY,t are the gas and electricity purchases during period t respectively.
[0196] Carbon trading costs include tiered carbon trading costs and carbon sequestration costs, as shown in formulas (35)-(36):
[0197]
[0198] Where: c cs A fixed price for each unit of CO2 stored; for the tiered carbon trading costs;
[0199] The system operation and maintenance cost is shown in formula (37):
[0200] f OP =λ1E WT,t +λ2E PV,t (37)
[0201] Where: λ1 and λ2 are the unit maintenance costs of wind turbines and photovoltaic power stations respectively; E WT,t 、E PV,t They are wind power and photovoltaic power generation on-grid power at time t respectively;
[0202] Energy sales revenue includes heat sales price and electricity sales price:
[0203]
[0204] Where: s h,t 、s e,t is the time-of-use heat price and electricity price in the optimized period t; E L,t , H L,t They are the heat and electricity loads in period t after optimization.
[0205] Each aggregation unit includes carbon capture power plant-power-to-gas system operation constraints, cogeneration unit operation constraints, gas boiler operation constraints, battery constraints, heat storage tank constraints, electric power balance constraints, and thermal power balance constraints;
[0206] The operating constraints of the carbon capture power plant-power-to-gas unit are shown in equations (39)-(43):
[0207] E GN ,min≤E GN ,t≤E GN ,max (39)
[0208] E P2G,min ≤E P2G,t ≤E P2G,max (40)
[0209] |E GN,t -E GN,t-1 |≤ΔE GN (41)
[0210] |E P2G,t -E P2G,t-1 |≤ΔE P2G (42)
[0211] 0≤Q P2G,t ≤Q CCS,t (43)
[0212] Where: E GN,max 、E GN,min are the upper and lower limits of the net output of the carbon capture power plant, E GN,t is the net output of the carbon capture power plant at time t, E GN,t-1 is the net output of the carbon capture power plant at time t-1; E P2G,max 、E P2G,min are the upper and lower limits of the energy consumption of the power-to-gas device, E P2G,t is the energy consumption of the power-to-gas device during period t, E P2G,t-1 is the energy consumption of the power-to-gas device during period t-1; ΔE GN and ΔE P2GThey are the ramp rate constraints for the carbon capture plant and the power-to-gas unit, respectively;
[0213] The operating constraints of the cogeneration unit are shown in formulas (44)-(47):
[0214] E CHP,min ≤E CHP,t ≤E CHP,max (44)
[0215] H CHP,min ≤H CHP,t ≤H CHP,max (45)
[0216] |E CHP,t -E CHP,t-1 |≤ΔE CHP (46)
[0217] |H CHP,t -H CHP,t-1 |≤ΔH CHP (47)
[0218] Where: E CHP,max 、E CHP,min are the upper and lower limits of the power generation of the cogeneration unit, H CHP,min , H CHP,max are the upper and lower limits of the heat generation power of the cogeneration unit; E CHP,t is the power generated by the cogeneration unit at time t, E CHP,t-1 is the power generated by the cogeneration unit at time t-1; H CHP,t is the heat generation power of the cogeneration unit at time t, H CHP,t-1 is the heat generation power of the cogeneration unit at time t-1, ΔE CHP , ΔH CHP They are the power generation and thermal power ramping constraints of the cogeneration unit respectively;
[0219] The operating constraints of gas boilers are shown in formulas (48)-(49):
[0220] H GB,min ≤H GB,t ≤H GB,max (48)
[0221] |H GB,t -H GB,t-1 |≤ΔH GB (49)
[0222] Where: H GB,max , H GB,min are the upper and lower limits of the heating power of the gas boiler; H GB,t is the heating power of the gas boiler at time t, H GB,t-1is the heating power of the gas boiler at time t-1, |H GB,t -H GB,t-1 |≤ΔH GB It is the ramp constraint of the heat generation power of the gas boiler;
[0223] The energy storage device constraints are shown in formulas (50)-(54):
[0224] 0≤E ESC,t ≤E ESC,max μ ESC,t (50)
[0225] 0≤E ESD,t ≤E ESD,max μ ESD,t (51)
[0226] 0≤μ ESC,t +μ ESD,t ≤1 (52)
[0227] S ES,min ≤S ES,t ≤S ES,max (53)
[0228] S ES,1 =S ES,24 (54)
[0229] Where: E ESC,max 、E ESD,max are the maximum charging and discharging power of the battery respectively; μ ESC,t , μ ESD,t They represent the charging and discharging status of the battery at time t; S ES,max , S ES,min They are the maximum and minimum values of the battery storage capacity respectively; S ES,1 , S ES,24 They represent the beginning and end values of the battery capacity at one day respectively; the constraints of the heat storage tank are consistent with those of the battery;
[0230] The electrical power and thermal power balance constraints are shown in formulas (55)-(56):
[0231] E WT,t +E PV,t +E BUY,t +E CHP,t +E GN,t +E ESD,t =E L,t +E ESC,t (55)
[0232] H CHP,t +H GB,t +H TSD,t =H L,t +H TSC,t(56)
[0233] Where: E WT,t 、E PV,t are the wind and solar grid-connected power in period t respectively.
[0234] Based on the establishment of a collaborative optimization model that takes into account electricity and heat demand response, this paper sets four scenarios for analysis according to different demand response optimization types. The target energy sales department is randomly selected to predict the user's electricity and heat load data based on historical data on a certain day, and the load and wind and solar output are obtained. Figure 4 The present invention uses the CPLEX solver in the optimization software MATLAB to optimize the solution, and performs system optimization scheduling with 24 hours a day as a complete cycle. The purchase price of electricity and gas is 0.4 yuan / (kW·h) and 2.2 yuan / m 3 The user energy consumption period division and initial energy price are shown in Table 2, and the key equipment parameters of the system are shown in Table 3.
[0235] Table 2 Energy consumption period division and initial energy price
[0236]
[0237] Table 3 System key equipment parameters
[0238]
[0239] In order to verify the effectiveness and rationality of the proposed strategy in the low-carbon economy, the present invention takes the consideration of single demand response and whether to consider the coordinated optimization of electric and thermal demand response in the first stage as the main variables when all the second stage optimizations are carried out, and sets four comparative scenarios for example simulation:
[0240] Scenario 1: Demand response optimization is not considered;
[0241] Scenario 2: Only considering electricity demand response and time-of-use electricity price optimization;
[0242] Scenario 3: Only considering heat demand response and time-of-use heat price optimization;
[0243] Scenario 4: Consider the coordinated optimization of electricity and heat demand response and time-of-use energy prices.
[0244] The system operation result data under the above four scenarios are shown in Table 4.
[0245] Table 4 Comparison of running results in different scenarios
[0246]
[0247] The results show that the actual carbon emissions of scenario 1, which does not consider the electric and thermal demand response, are the highest. Compared with scenario 1, scenario 2 and scenario 3 consider the single electric and thermal demand response respectively, and the total operating costs increase by 13.65% and 10.46%, respectively, and the actual carbon emissions decrease by 44.45% and 40.11%, respectively. This is because the addition of demand response has tapped the flexible adjustment potential of load-side resources, and the adjustment of time-of-use energy prices has also increased the revenue of energy sales departments. The addition of a stepped carbon trading mechanism can effectively constrain the system source side to reduce the output of units with higher carbon emissions, choose to use cleaner energy to meet the needs of the load side, and take into account the economic and environmental benefits of the system.
[0248] Scenario 4 takes into account the coordinated optimization of electric and thermal demand response. Compared with scenarios 2 and 3, the total system operating cost is reduced by 8.95% and 5.59%, respectively, and the actual carbon emissions are reduced by 11.31% and 17.73%, respectively, and the energy sales revenue is increased by 1.44% compared with scenario 2. The results show that the effective coordinated optimization of electric and thermal demand response can greatly release the system's flexible adjustment capabilities, strengthen the coupling relationship between the electric and thermal systems, coordinate the output of the source-side units with the balance of electric and thermal power as a constraint, reduce the system's operating costs, and recycle carbon, thereby achieving system energy conservation and emission reduction.
[0249] Figure 5 The electric load curves before and after optimization. As shown in the figure, as the time-of-use electricity price difference increases, the user's electricity demand decreases, and the energy demand is met by consuming other forms of energy. It can be seen that the electric load curve after the dual-objective optimization taking into account load fluctuations and user energy satisfaction is smoother than the initial load curve, and the peak-shaving and valley-filling effect is obvious.
[0250] Figure 6 is the load change curve before and after the heat load demand response. As the outdoor temperature rises during the day, the heat load demand decreases, while at night, the outdoor temperature drops compared to the daytime, and the user's demand for heat load gradually increases. In general, the battery is continuously charged during low electricity price periods, discharged during peak electricity consumption periods, and charged during off-peak periods, which can better meet the electricity demand during peak periods.
[0251] Figures 7 to 10 The electrical output power balance diagram for the four different scenarios is designed. Figure 7 , Figure 8 , Fig. 9 and Fig.10They correspond to Scenario 1, Scenario 2, Scenario 3 and Scenario 4 respectively, in which each power supply equipment generates electricity reasonably in each time period to meet the energy demand of users and the requirements of operation constraints. In general, the battery is continuously charged during the low electricity price period, discharged during the peak electricity consumption period, and charged during the off-peak period, which can better meet the electricity demand during the peak period. During the off-peak period, renewable energy such as wind power and photovoltaic power is not fully absorbed, and the abandoned wind and solar power are consumed by P2G devices, which improves the wind and solar power absorption rate of the system.
[0252] Figures 11 to 14 Thermal output power balance diagram for 4 different scenarios designed. Fig.11 , Fig.12 , Fig.13 and Fig.14 They correspond to scenario 1, scenario 2, scenario 3 and scenario 4 respectively. As can be seen from the figure, the output of CHP units in scenario 4 is significantly reduced compared with the other three scenarios, and most of the heat load is supplied by GB. This is because the carbon emissions generated by the operation of CHP units are higher than those of GB units. In order to achieve the best economic and environmental benefits of system operation, GB with less carbon emissions is preferred for heating, avoiding the use of high-carbon equipment to generate a large amount of carbon emissions. During the low load period, the heat storage tank is continuously charged and released during peak hours to meet the heat load demand and reduce the total cost of system operation.
[0253] Fig.15 The actual total carbon emissions and carbon trading amount comparison chart of different scenarios. Under the constraints of the tiered carbon trading mechanism, the output of high carbon emission units on the source side is reduced. The total carbon emissions of the system in scenario 4 are reduced by 39.28%, 16% and 14.64% respectively compared with the other scenarios. The addition of carbon capture equipment can capture 50%-60% of the CO2 emitted by the unit through the flue gas pipeline, which greatly reduces the actual total carbon emissions and carbon trading amount of IES. The results show that the carbon trading mechanism can greatly promote the increase of carbon trading volume and guide the source side to reduce carbon emissions. It also confirms the effectiveness of considering demand response for environmental benefits.
[0254] Although the present invention has been described above in conjunction with the accompanying drawings, the present invention is not limited to the above-mentioned specific embodiments, which are illustrative rather than restrictive. Under the guidance of the present invention, ordinary technicians in this field can also make other forms without departing from the purpose of the invention, which are all within the protection of the present invention.
Claims
1. A method for optimizing the operation of an integrated energy system taking into account demand response and time-of-use energy pricing, characterized in that: The method includes a two-stage optimization scheduling strategy. In the first stage, a coordinated optimization strategy for electricity and heat demand response is constructed for the load side. In the second stage, a carbon capture-power-to-gas-cogeneration subsystem is constructed for the source side, and a joint operation strategy is adopted to meet the load side demand. The load side includes user electricity and heat demand. Based on user electricity consumption, a scheduling cycle is divided into three periods: peak, flat, and valley. By introducing time-of-use electricity prices, users are guided to shift their electricity demand from peak to off-peak periods. On the basis of ensuring the satisfaction of energy sales departments and users, users are guided to adjust their energy demand by changing the time-of-use energy price. Considering the coordinated optimization of electricity and heat demand response, a heat price elasticity matrix is constructed, and the heat load curve is optimized in combination with heat load characteristics to achieve peak shaving and valley filling. The source-side system structure includes: electricity, natural gas, heat and carbon dioxide energy forms; the electrolyzer and methane reactor constitute a power-to-gas device; the thermal power plant and the carbon capture device constitute a carbon capture power plant; the carbon dioxide generated by the thermal power plant is captured by the carbon capture device, a part of the captured carbon dioxide is packaged and processed, and the remaining part is passed into the power-to-gas device as a carbon source for methanation reaction; wind power, photovoltaic power, thermal power plant, battery and cogeneration unit generate electricity together to provide electricity for the electrical load; the abandoned wind and solar power are used for power-to-gas conversion to methanate the captured carbon dioxide to produce natural gas and inject it into the gas grid, and together with the gas source, provide natural gas for the gas boiler and cogeneration unit; the gas boiler, heat storage tank and cogeneration unit generate heat together to provide thermal energy for the thermal load; the carbon capture power plant, power-to-gas device and cogeneration unit are aggregated into a carbon capture-power-to-gas-cogeneration subsystem.
2. The method for optimizing the operation of an integrated energy system taking into account demand response and time-of-use energy pricing according to claim 1, characterized in that: The demand response types in the first stage include electricity and heat. A logistic function is constructed to optimize the electric load, as shown in formula (1): Where: a, c, and μ are known quantities in the logistic function; b represents the variable parameter in the logistic function; Δp represents the time-of-use electricity price difference; λ is the load transfer rate, which represents the actual load fluctuation after the user participates in demand response. The optimistic response membership degree m is used as the probability constraint of the comprehensive load transfer rate function model based on the Logistic function. The comprehensive load transfer rate function model based on the Logistic function is shown in formulas (2)-(4): Where: Indicates the actual load transfer rate from peak to valley; and denote the transfer rates predicted by the pessimistic and optimistic response curves, respectively; Δp fv is the peak-valley electricity price difference; a fv and b fv Respectively represent the price division area dividing points; Δλ fv Indicates the load fluctuation span corresponding to the peak-valley electricity price difference; The load transfer amount and load value after taking demand response into account are shown in formula (5) and formula (6) respectively: Where: T f 、T p and T v Represent peak, flat and valley time periods respectively; Indicates the actual load transfer rate from peak to flat, It represents the actual load transfer rate from flat to valley; and They represent the average load values during the peak, flat and valley periods before the implementation of time-of-use electricity prices; ΔP L,t represents the load transfer amount generated after taking demand response into account during period t; E L,t and They represent the load values before and after the implementation of time-of-use electricity prices in period t.
3. The method for optimizing the operation of an integrated energy system taking into account demand response and time-of-use energy pricing according to claim 2, characterized in that: Construct the heat price elasticity matrix, and the elasticity coefficient is shown in formula (7): Where: ε t,t is the elastic coefficient; ε t,j is the cross elastic coefficient; is the initial heat load of the user at time t; ΔH L,t is the change in heat load of the user at time t; and represents the initial heat price at time t and time j respectively; Δq t and Δq j They represent the change in heat price at time t and time j respectively; Demand response characteristics are divided into curtailable, transferable and replaceable loads. The load changes of different types are shown in formulas (8)-(10): Where: ΔH CL,t is the amount of heat load reduction that can be achieved at time t; and They are the parts of the initial heat load that can be reduced and transferred respectively; ε CL (t,j) is the price elasticity matrix of load demand that can be reduced; q j is the heat price at time j; ΔH TL,t is the transferable change of heat load at time t; ε TL (t, j) is the price elasticity matrix of transferable load demand; ΔE RL,t , ΔH RL,t are the changes in the replaced electrical and thermal loads respectively; are the electric and thermal loads that can be replaced by demand response respectively; λ he Indicates the conversion coefficient from thermal energy to electrical energy; λ eh Indicates the conversion coefficient from electrical energy to thermal energy; λ ee and λ hh All are -1; The optimized heat load consists of three parts, as shown in formula (11): Where: H L,t is the heat load after optimization at time t.
4. The method for optimizing the operation of an integrated energy system taking into account demand response and time-of-use energy pricing according to claim 3, characterized in that: In the first stage, the objective function is established with the minimum fluctuation amplitude and the maximum user satisfaction as the multi-objectives for the electric load. The time-of-use electricity price and the electric load are used as decision variables, and the minimum electric load fluctuation is used as the first objective function, as shown in formula (12): Where: T represents the scheduling period; The maximum user satisfaction is taken as the second objective function, as shown in formula (13): maxF2=U com ·IN eco (13) When considering user satisfaction, user comfort and user economy are included, as shown in formulas (14)-(15): Where: U com and U eco Respectively represent the user's energy comfort and economy; and c t They represent the time-of-use electricity prices before and after optimization at time t respectively; Before and after the implementation of time-of-use electricity prices, it is necessary to ensure that the total energy sales of the energy sales department and the total user load fluctuate within the allowable range. The constraint conditions are shown in formula (16): Where: δ is the load fluctuation; In order to avoid the situation where energy prices are reversed between peak and valley periods, it is necessary to constrain the energy price ratio between peak and valley periods within the allowable range. The constraint conditions are shown in formula (16): c min ≤c f / c v ≤c max (17) Where: c max 、c min are the upper and lower limits of energy price ratio respectively; c f 、c v They are energy prices during peak and valley periods respectively; There is a coupling characteristic in the energy consumption mode of users. After the implementation of time-of-use electricity price, users will also change their own heat demand. When considering the flexibility of heat load, the change of heat load will be affected by the change of electricity load, and the changes of each part are subject to upper and lower limits, as shown in formulas (18)-(20): Where: α1, α2 and α3 are the proportion coefficients of the load participating in demand response to the total load, which are determined according to the actual energy consumption situation.
5. The method for optimizing the operation of an integrated energy system taking into account demand response and time-of-use energy pricing according to claim 4, characterized in that: The carbon capture energy consumption in the carbon capture-power-to-gas-cogeneration subsystem includes system operation energy consumption and fixed energy consumption. The model output and its expression are shown in formulas (21)-(23): AND GN,t =And G,t -AND CCS,t (21) AND CCS,t =And CCS,r,t +E CCS,s,t (22) E P2G,t =Q WT,t +Q PV,t (23) Where: E GN,t and E G,t are the net output and equivalent output of the carbon capture power plant during period t; E CCS,t and E CCS,r,t are the total energy consumption and operating energy consumption of the carbon capture power plant during period t; E CCS,s,t is the fixed energy consumption of the carbon capture power plant, which is a fixed value; E P2G,t is the energy consumption of the power-to-gas device during period t; Q WT,t and Q PV,t are the abandoned wind and solar power provided to the power-to-gas device during period t; The amount of carbon dioxide captured by the carbon capture power plant in the system is shown in formula (24): Where: Q CCS,t is the total amount of carbon dioxide captured by the carbon capture power plant during period t; The operating energy consumption of a carbon capture power plant per unit of carbon dioxide captured; According to the law of conservation of mass, the volume of carbon dioxide consumed by the power-to-gas device is equal to the volume of natural gas generated. The amount of carbon dioxide consumed and the total amount of natural gas generated in time period t are shown in formulas (25) and (26), respectively: G P2G,t =3.6η P2G E P2G,t / H g (25) Q P2G,t =ρG P2G,t (26) Where: G P2G,t is the volume of natural gas produced by the power-to-gas device during period t; Q P2G,t is the total amount of carbon dioxide consumed; η P2G is the conversion efficiency; H g is the calorific value of natural gas; ρ is the density of carbon dioxide; The heat load is supplied by the combined heat and power unit and the gas boiler consuming natural gas to generate heat. The expressions of the combined heat and power unit and the gas boiler are shown in formulas (27)-(29): E CHP,t =G CHP,t H g or CHP,e (27) H CHP,t =G CHP,t H g η CHP,h (28) H GB,t =G GB,t H g η GB (29) Where: E CHP,t and H CHP,t are the electrical power and thermal power output of the cogeneration unit at time t; H GB,t is the thermal power output of the gas boiler at time t; G CHP,t and G GB,t are the volumes of natural gas consumed by the cogeneration unit and gas boiler at time t, respectively; η CHP,e ,η CHP,h and η GB They are the electrical efficiency of the cogeneration unit, the thermal efficiency of the cogeneration unit and the thermal efficiency of the gas boiler; Energy storage equipment added to the system can adjust the flexible response of electrical energy and thermal energy, reducing the impact of uncertainty in renewable energy generation on the system. Energy storage equipment includes batteries and heat storage tanks, and the modeling is shown in formulas (30)-(31): Where: S ES,t and S TS,t are the energy storage of the battery and the heat storage tank at the end of period t, S ES,t-1 and S TS,t-1 are the energy storage of the battery and the heat storage tank at the end of the t-1 period; δ ES and δ TS is the electric energy loss rate and heat energy loss rate of the energy storage equipment; E ESC,t 、E ESD,t are the charge and discharge efficiency of the battery at time t; H TSC,t and H TSD,t are the charging and discharging efficiencies of the heat storage tank at time t; η ESC ,η ESD are the charging and discharging efficiency of the battery respectively; η TSC ,η TSD are the charging and discharging efficiencies of the heat storage tank respectively.
6. The method for optimizing the operation of an integrated energy system taking into account demand response and time-of-use energy pricing according to claim 5, characterized in that: The total operating cost F of the carbon capture-power-to-gas-cogeneration subsystem is minimized. Considering the constraints of each aggregation unit, an optimal scheduling model is constructed, as shown in formula (32): Where, f BUY The cost of purchased energy; is the carbon trading cost; f OP is the system operation and maintenance cost; f sell For the revenue from energy sales; The energy purchase cost includes the electricity purchase cost and the gas purchase cost as shown in formulas (33)-(34): G BUY,t =G CHP,t +G GB,t -G P2G,t (34) Where: c g The fixed price for purchasing a unit of natural gas from the natural gas market; c e is the electricity purchase price; G BUY,t and E BUY,t are the gas and electricity purchases during period t, respectively; Carbon trading costs include tiered carbon trading costs and carbon sequestration costs, as shown in formulas (35)-(36): Where: c cs A fixed price for each unit of CO2 stored; is the tiered carbon trading cost; The system operation and maintenance cost is shown in formula (37): f OP =λ1E WT,t +λ2E PV,t (37) Where: λ1 and λ2 are the unit maintenance costs of wind turbines and photovoltaic power stations respectively; E WT,t 、E PV,t are the wind power and photovoltaic power generation grid-connected power at time t respectively; Energy sales revenue includes heat sales price and electricity sales price: Where: s h,t 、s e,t is the time-of-use heat price and electricity price in period t after optimization; H L,t 、E L,t are the heat and electricity loads in period t after optimization.
7. The method for optimizing the operation of an integrated energy system taking into account demand response and time-of-use energy pricing according to claim 6, characterized in that: The carbon capture-power-to-gas-combined heat and power subsystem constraints include the carbon capture power plant-power-to-gas device operation constraints, the combined heat and power unit operation constraints, the gas boiler operation constraints, the battery constraints, the heat storage tank constraints, the electric power balance constraints, and the thermal power balance constraints; The operating constraints of the carbon capture power plant-power-to-gas unit are shown in equations (39)-(43): AND GN ,min≤E GN ,t≤E GN ,max (39) AND P2G,min ≤E P2G,t ≤E P2G,max (40) |And GN,t -AND GN,t-1 |≤ΔE GN (41) |And P2G,t -AND P2G,t-1 |≤ΔE P2G (42) 0≤Q P2G,t ≤Q CCS,t (43) Where: E GN,max 、E GN,min are the upper and lower limits of the net output of the carbon capture power plant, E GN,t is the net output of the carbon capture power plant at time t, E GN,t-1 is the net output of the carbon capture power plant at time t-1; E P2G,max 、E P2G,min are the upper and lower limits of the energy consumption of the power-to-gas device, E P2G,t is the energy consumption of the power-to-gas device during period t, E P2G,t-1 is the energy consumption of the power-to-gas device during period t-1; ΔE GN and ΔE P2G are the ramp rate constraints for the carbon capture plant and the power-to-gas unit, respectively; The operating constraints of the cogeneration unit are shown in formulas (44)-(47): AND CHP,min ≤E CHP,t ≤E CHP,max (44) H CHP,min ≤H CHP,t ≤H CHP,max (45) |And CHP,t -AND CHP,t-1 \≤ΔE CHP (46) |H CHP,t -H CHP,t-1 |≤ΔH CHP (47) Where: E CHP,max 、E CHP,min are the upper and lower limits of the power generation of the cogeneration unit, H CHP,min 、H CHP,max are the upper and lower limits of the heat generation power of the cogeneration unit; E CHP,t is the power generated by the cogeneration unit at time t, E CHP,t-1 is the power generated by the cogeneration unit at time t-1; H CHP,t is the heat production power of the cogeneration unit at time t, H CHP,t-1 is the heat production power of the cogeneration unit at time t-1, ΔE CHP , ΔH CHP They are the power generation and thermal power ramping constraints of the cogeneration unit respectively; The operating constraints of gas boilers are shown in formulas (48)-(49): H GB,min ≤H GB,t ≤H GB,max (48) |H GB,t -H GB,t-1 |≤ΔH GB (49) Where: H GB,max 、H GB,min are the upper and lower limits of the heating power of the gas boiler; H GB,t is the heating power of the gas boiler at time t, H GB,t-1 is the heating power of the gas boiler at time t-1, |H GB,t -H GB,t-1 |≤ΔH GB It is the ramp constraint of the heating power of the gas boiler; The battery constraints are shown in formulas (50)-(54): 0≤E ESC,t ≤E ESC,max m ESC,t (50) 0≤E ESD,t ≤E ESD,max m ESD,t (51) 0≤μ ESC,t +m ESD,t ≤1 (52) S ES,min ≤S ES,t ≤S ES,max (53) S ES,1 =S ES,24 (54) Where: E ESC,max 、E ESD,max are the maximum charging and discharging power of the battery respectively; μ ESC,t 、μ ESD,t They represent the charge and discharge status of the battery at time t; S ES,max 、S ES,min They are the maximum and minimum values of battery storage capacity respectively; S ES,1 、S ES,24 Respectively represent the battery capacity at the beginning and end of the day; The constraints of the heat storage tank are consistent with those of the battery; The electrical power and thermal power balance constraints are shown in formulas (55)-(56): AND WT,t +E PV,t +E BUY,t +E CHP,t +E GN,t +E ESD,t =And L,t +E ESC,t (55) H CHP,t +H GB,t +H TSD,t =H L,t +H TSC,t (56) Where: E WT,t 、E PV,t are the wind and solar power connected to the grid during period t respectively.
Citation Information
Cited By
Building project electric power resource intelligent scheduling method and system
CN119990692A