Dredging and driving integrated control method for trailing suction hopper dredger

By establishing dredging soil quality model and heading control, the dredging integrated control of rake suction dredgers is solved, and the problem of low efficiency and insufficient combination of dredging control system in the existing technology is improved, and the dredging efficiency and intelligence level are improved.

CN119041503APending Publication Date: 2024-11-29NAT ENG RES CENT OF DREDGING TECH & EQUIP

Patent Information

Application Number
CN202411147575.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-21
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

The dredging control system of existing rake suction dredgers cannot achieve dredging combined optimization, resulting in low dredging efficiency and insufficient intelligence level, and the inability to effectively coordinate dredging control and ship navigation.

Method used

By establishing a dredging soil quality model, fit the relationship between different soil quality types and dredging control parameters, determine the initial and optimal dredging control parameters, combine heading control and thrust distribution, realize the dredging control of rake suction dredgers, and optimize the dredging control of rake suction dredgers. Dredging operations.

Benefits of technology

Effectively coordinate intelligent dredging systems and navigation control systems, reduce manual manipulation errors, improve dredging efficiency and safety performance, and improve intelligent dredging level.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119041503A_ABST
    Figure CN119041503A_ABST
Patent Text Reader

Abstract

The invention discloses a dredging and driving integrated control method for a trailing suction hopper dredger. The method comprises the following steps of S1, establishment of a dredging soil texture model, S2, determination of initial dredging control parameters, S3, course control, S4, acquisition of optimal dredging control parameters, S5, determination of efficiency and navigational speed, and S6, dredging and driving integrated control. According to the dredging and driving integrated control method for the trailing suction hopper dredger, an intelligent dredging system and a navigation control system of the trailing suction hopper dredger can be effectively coordinated, the trailing suction hopper dredger is controlled to carry out dredging operation along a planned path according to the optimal matching speed, and manual control errors can be effectively reduced; the intelligent dredging level is further improved, the operation safety performance of the dredger is enhanced, and the dredging operation efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of dredging control engineering, and in particular relates to a dredging and driving integrated control method for a trailing suction dredger. Background Art

[0002] The construction operation of a bucket-ladder dredger involves two major parts: dredging process control and ship navigation control. Dredging process control mainly includes controlling parameters such as the angle of the bucket head to the ground and the depth of the bucket head into the soil. Ship navigation control mainly includes controlling the ship's heading and speed. With the development of automation and intelligent technology, dredging operations of dredgers have gradually moved from fully automatic intelligence to the era of unmanned control. Compared with the intelligent level of ship navigation control, the intelligent aspect of the dredging process of bucket-ladder dredgers is relatively weak. Although existing ships are equipped with heading control systems, the system is relatively closed and cannot be combined with dredging control to achieve dredging and driving optimization, resulting in dredging efficiency still at a low level. In order to achieve automated reduction of manpower and intelligent improvement of efficiency in the construction operation of bucket-ladder dredgers, it is necessary to coordinate dredging control and ship navigation intelligence, which can be achieved by combining dredging and driving. Summary of the invention

[0003] In order to overcome the low dredging efficiency and inability to achieve dredging and driving combination optimization of the dredging ship control system in the prior art, the following technical solutions are provided:

[0004] A dredging and driving integrated control method for a trailing suction dredger comprises the following steps:

[0005] S1-Establishment of dredged soil model:

[0006] Fit the relationship between different soil types and dredging control parameters to obtain the optimal dredging control parameters corresponding to different soil types;

[0007] S2-Determination of initial dredging control parameters:

[0008] The drilling survey ship enters the construction area to conduct drilling operations, obtains soil layer information at each drilling location in the construction area, and determines the expected soil type for the initial work of the dredging operation ship based on the soil layer information and the excavation depth, and then determines the initial dredging control parameters;

[0009] S3-Heading Control:

[0010] By distributing thrust to the dredging vessel, its heading is controlled so that it can sail along the dredging route;

[0011] S4- Obtaining the best dredging control parameters:

[0012] The dredging vessel performs initial dredging operations according to the initial dredging control parameters, obtains the particle size of mud particles through the ship monitoring system of the dredging vessel, and then determines the actual soil type, and obtains the corresponding optimal dredging control parameters based on the actual soil type;

[0013] S5- Determination of efficient speed:

[0014] Determine the efficient speed by combining the optimal dredging control parameters and the drag head size information;

[0015] S6- Driving and Driving in One:

[0016] Control the dredging vessel to work at the best dredging control parameters and efficient speed, and continuously update the position of the dredging vessel.

[0017] Furthermore, the step S1-establishing the dredged soil model comprises the following steps:

[0018] S1.1- Fitting the relationship between dredging control parameters and dredge pump concentration:

[0019] The mud pump concentration and dredging control parameters can be obtained through historical monitoring data of the ship. The dredging control parameters include the depth of the drag head into the soil, the angle to the ground, the mud pump vacuum and the economic speed. The relationship between the mud pump concentration and the dredging control parameters is fitted by a multivariate nonlinear regression method.

[0020] S1.2-Fitting the relationship between mud pump concentration and drag head leakage:

[0021] The drag head leakage and mud pump concentration can be obtained through historical monitoring data of the ship, and the relationship between the two can be fitted by combining univariate linear regression analysis and least square method;

[0022] S1.3-Fitting the relationship between mud particle size, leakage rate, and drag head leakage:

[0023] The mud particle size, leakage rate, and drag head leakage can all be obtained through historical monitoring data of the ship, and the relationship between the three can be fitted based on the least squares method;

[0024] S1.4-Determination of soil type:

[0025] Different soil types are determined by the mud particle size, and the corresponding soil type is determined by the mud particle size.

[0026] S1.5-Determine the Optimal Dredging Control Parameters

[0027] A dredging soil model was established with mud particle size, leakage rate, drag head leakage and mud pump concentration as intermediate parameters. The relationship between different soil types corresponding to different mud particle sizes and dredging control parameters was obtained, and the optimal dredging control parameters corresponding to different soil types were further obtained.

[0028] Furthermore, the step S2-determination of initial dredging control parameters comprises the following steps:

[0029] S2.1-Determination of construction conditions:

[0030] Determine the dredging construction area, dredging operation route, target dredging depth and construction times according to construction requirements;

[0031] S2.2-Drilling operations and hydrological surveys:

[0032] The dredging drilling ship performs drilling operations and hydrological surveys on the dredging construction area P to obtain original environmental information; the original environmental information includes soil layer information and hydrological information;

[0033] S2.3-Determination of initial dredging control parameters:

[0034] The expected soil type during initial dredging is determined by combining soil layer information, target excavation depth and construction times, and the optimal dredging control parameters corresponding to the expected soil type are obtained from the dredging soil model as the initial dredging control parameters.

[0035] Furthermore, in the step S3-heading control, the constraints are determined by the power parameters of each propeller of the ship, and the minimum value of the thrust distribution objective function is found within the constraints, thereby obtaining the optimal thrust distribution combination.

[0036] Furthermore, the step S4-obtaining the optimal dredging control parameters comprises the following steps:

[0037] S4.1-Initial Dredging Operations

[0038] The heading of the dredging vessel is determined by step S3, and the initial dredging control parameters of the dredging vessel are determined by step S2.3. The dredging vessel enters the dredging area according to the determined heading and performs initial dredging operations according to the initial dredging control parameters.

[0039] S4.2-Determination of actual soil type

[0040] The ship monitoring system of the dredging vessel obtains the mud particle size r during the initial dredging operation, and the actual soil type corresponding to the dredging operation is obtained through the mud particle size r;

[0041] S4.3-Determination of Optimal Dredging Control Parameters

[0042] The dredging soil model established in step S1 is used to determine the optimal dredging control parameters corresponding to the actual soil type.

[0043] Furthermore, in the step S5-determination of the efficient speed, the efficient speed with the highest dredging efficiency is determined by the maximum earthwork cut by the drag head per unit time, the depth of the drag head into the soil, and the width of the drag head.

[0044] Furthermore, the step S6 combines dredging and driving, obtains the optimal dredging parameters determined in step S4.3 to control the ship's dredging equipment, obtains the efficiency speed determined in step S5 to control the ship's power equipment, and repeats the steps S4-S5 until the dredging operation ship completes the construction operation.

[0045] The dredging and driving integrated control method of the trailing suction hopper dredger of the present invention can effectively coordinate the intelligent dredging system and navigation control system of the trailing suction hopper dredger, and manipulate the trailing suction hopper dredger to carry out dredging operations along the planned path at the optimal matching speed, which can effectively reduce manual operation errors, further improve the level of intelligent dredging, enhance the safety performance of dredger operations, and improve dredging operation efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0046] Figure 1 The present invention is a schematic diagram of the overall process of the dredging and driving integrated control method of the trailing suction hopper dredger.

[0047] Figure 2 It is a relationship diagram of the fitting degree between the dredged soil model and the actual measurement value in the dredging and driving integrated control method of the trailing suction hopper dredger of the present invention.

[0048] Figure 3 This is a comparison diagram of the errors between the dredged soil model and the actual measured values ​​in the dredging and driving integrated control method of the trailing suction hopper dredger of the present invention. DETAILED DESCRIPTION

[0049] The technical solution of the present invention is described clearly and completely with specific embodiments in conjunction with the accompanying drawings. It should be understood that the described embodiments are only used to illustrate the present invention, but not to limit the scope of the present invention.

[0050] Embodiment 1: A dredging and driving integrated control method for a trailing suction hopper dredger, such as Figure 1 As shown, the following steps are included:

[0051] S1-Establishment of dredged soil model:

[0052] Fit the relationship between different soil types and dredging control parameters to obtain the optimal dredging control parameters corresponding to different soil types;

[0053] S2-Determination of initial dredging control parameters:

[0054] The drilling survey ship enters the construction area to conduct drilling operations, obtains soil layer information at each drilling location in the construction area, and determines the expected soil type for the initial work of the dredging operation ship based on the soil layer information and the excavation depth, and then determines the initial dredging control parameters;

[0055] S3-Heading Control:

[0056] By distributing thrust to the dredging vessel, its heading is controlled so that it can sail along the dredging route;

[0057] S4- Obtaining the best dredging control parameters:

[0058] The dredging vessel performs initial dredging according to the initial dredging control parameters determined in step S2, obtains the particle size of mud particles through the ship monitoring system of the dredging vessel, and then determines the actual soil type, and obtains the corresponding optimal dredging control parameters according to the actual soil type;

[0059] S5- Determination of efficient speed:

[0060] Determine the efficient speed by combining the optimal dredging control parameters and the drag head size information;

[0061] S6- Driving and Driving in One:

[0062] Control the dredging vessel to work at the best dredging control parameters and efficient speed, and continuously update the position of the dredging vessel.

[0063] Furthermore, the step S1-establishing the dredged soil model comprises the following steps:

[0064] S1.1-Fitting the relationship between dredging control parameters and mud pump concentration C:

[0065] The mud pump concentration C and dredging control parameters can be obtained through historical monitoring data of the ship. The dredging control parameters include the soil penetration depth d of the drag head, the ground angle α, the mud pump vacuum Pa and the economic speed v. The relationship between the mud pump concentration C and the dredging control parameters is fitted by a multivariate nonlinear regression method.

[0066] S1.2-Fitting mud pump concentration C and drag head leakage C LR The relationship between:

[0067] The drag head leakage C LR The concentration of the mud pump C can be obtained through the historical monitoring data of the ship, and the relationship between the two is fitted by combining the univariate linear regression analysis and the least square method;

[0068] S1.3-Fitting mud particle size r, leakage rate Q, and drag head leakage C LR The relationship between:

[0069] The mud particle size r, leakage rate Q, and drag head leakage C LR All of them can be obtained through historical monitoring data of ships, and the relationship between the three can be fitted based on the least squares method;

[0070] S1.4-Determination of soil type:

[0071] Different soil types are determined by the mud particle size r, which is measured by a mud particle instrument disclosed in the prior art. The corresponding relationship between the mud particle size r and the soil type s is determined by the dredging rock and soil classification standard (JTJ / T 320-96) issued by the Ministry of Transport.

[0072] S1.5-Determination of Optimal Dredging Control Parameters:

[0073] Based on the mud particle size r, leakage rate Q, and drag head leakage C LR And the mud pump concentration C is an intermediate parameter. Through steps S1.1-S1.4, a dredging soil model is established to obtain the relationship between different soil types corresponding to different mud particle sizes r and dredging control parameters, and further obtain the optimal dredging control parameters corresponding to different soil types.

[0074] Furthermore, the step S2-determination of initial dredging control parameters comprises the following steps:

[0075] S2.1-Determination of construction conditions:

[0076] Determine the dredging construction area P, dredging operation route L, target dredging depth D and construction times N according to construction requirements;

[0077] S2.2-Drilling operations and hydrological surveys:

[0078] The dredging drilling ship performs drilling operations and hydrological surveys on the dredging construction area P to obtain original environmental information; the original environmental information includes soil layer information and hydrological information;

[0079] S2.3-Determination of initial dredging control parameters:

[0080] The expected soil type during initial dredging is determined by combining soil layer information, target excavation depth and construction times, and the optimal dredging control parameters corresponding to the expected soil type are obtained from the dredging soil model as the initial dredging control parameters.

[0081] Furthermore, in the step S3-heading control, the constraints are determined by the power parameters of each propeller of the ship, and the minimum value of the thrust distribution objective function is found within the constraints, thereby obtaining the optimal thrust distribution combination. The detailed control process is already disclosed in the prior art and will not be described in detail.

[0082] Furthermore, the step S4-obtaining the optimal dredging control parameters comprises the following steps:

[0083] S4.1-Initial Dredging Operations:

[0084] The heading of the dredging vessel is determined by step S3, and the initial dredging control parameters of the dredging vessel are determined by step S2.3. The dredging vessel enters the dredging area according to the determined heading and performs initial dredging operations according to the initial dredging control parameters.

[0085] S4.2-Determination of actual soil type:

[0086] The ship monitoring system of the dredging vessel obtains the mud particle size r during the initial dredging operation, and the actual soil type corresponding to the dredging operation is obtained through the mud particle size r;

[0087] S4.3-Determination of Optimal Dredging Control Parameters

[0088] The dredging soil model established in step S1 is used to determine the optimal dredging control parameters corresponding to the actual soil type.

[0089] Furthermore, in the step S5-determination of the efficient speed, the efficient speed V is obtained by the following formula: max :

[0090]

[0091] Where: L m is the maximum earthwork volume cut by the rake head per unit time, d is the depth of the rake head into the soil, W d is the rake head width;

[0092] Among them, the width of the rake head is W d is a constant, which is determined by the size of the dredging rake head; the maximum amount of earthwork cut by the rake head per unit time is L m is the maximum volume of the drag head, which is also determined by the size of the drag head for dredging work; the drag head immersion depth d is obtained by step S4.3;

[0093] Furthermore, the step S6-dredging and driving integration, obtains the optimal dredging control parameters determined in step S4.3 to control the ship dredging equipment, and obtains the efficient speed V determined in step S5 max Control the ship's power equipment and repeat steps S4-S5 until the dredging operation ship completes the construction operation.

[0094] Embodiment 2: An engineering example of the dredging and driving integrated control method of a trailing suction dredger based on Embodiment 1:

[0095] Step 1- Establishment of dredged soil model:

[0096] S1.1-Fitting the relationship between dredging control parameters and mud pump concentration C:

[0097] The multivariate nonlinear regression method is used to establish the relationship between the mud pump concentration C and the dredging control parameters: the dredging control parameters include: the drag head immersion depth d, the drag head angle to the ground α, the mud pump vacuum Pa, and the economic speed v;

[0098] The mud pump concentration C and dredging control parameters obtained from the historical monitoring data of the ship are shown in Table 1:

[0099] Table 1 Monitoring data of mud pump concentration C and dredging control parameters

[0100]

[0101] The dredging control parameters are used as variables to construct the equation matrix:

[0102]

[0103] Establish the standard quadratic regression equation:

[0104]

[0105] A quadratic regression model was established, and the data collected in Table 1 were entered into the equation for solution. The following fitting relationship between the concentration C of the trailing suction dredger and the dredging control parameters was obtained (1):

[0106] C=1.657+0.151α+0.416v-0.008d*Pa (1)

[0107] Step 1.2 - Fitting the rake head leakage C LR Relationship between the mud pump concentration C and the

[0108] The drag head leakage C is obtained from the ship's historical monitoring data LR The actual data of mud pump concentration C are shown in Table 2 below:

[0109] Table 2 - Drag head leakage C LR Actual data of mud pump concentration C

[0110]

[0111]

[0112] By analyzing the data in Table 2 using data analysis software such as MATLAB, the mud pump concentration and the drag head leakage C can be obtained. LR It is approximately a linear function relationship. According to the univariate linear regression analysis, the following standard univariate equation is established:

[0113] y i=a+bx i

[0114] Based on the least squares method, the normal equations are established:

[0115]

[0116] Substituting the data in Table 2 into the equation group, we can get the following mud pump concentration and drag head leakage C: LR The fitting relationship between (2)

[0117] C LR =15.24919+0.012684α+0.034944v-0.000672dP (2)

[0118] Step 1.3-Fitting the mud particle size r, leakage rate Q, and drag head leakage C LR The relationship between:

[0119] The mud particle size r, leakage rate Q, and drag head leakage C are obtained from the ship's historical monitoring data. LR The actual data is shown in Table 3 below:

[0120] Table 3 - Mud particle size r, leakage rate Q, and drag head leakage C LR Monitoring value

[0121]

[0122]

[0123] By analyzing the data in Table 3 using data analysis software such as MATLAB, the mud particle size r, leakage rate Q, and rake head leakage C can be obtained. LR The three are approximately exponentially related, and the standard exponential function equation is established as follows:

[0124] C LR =ln a Q+b ln r+c

[0125] Based on the least squares method, the following fitting relationship (3) can be obtained by substituting the collected data into the equation:

[0126]

[0127] Step 1.4 - Determination of soil type:

[0128] The relationship between the mud particle size r and the soil type s is determined by the Dredging Rock and Soil Classification Standard (JTJ / T320-96) issued by the Ministry of Transport, a partial excerpt of which is shown in Table 4 below:

[0129] Table 4 - Classification standards for dredged soil

[0130]

[0131]

[0132] Based on the mud particle size r, leakage rate Q, and drag head leakage C LR And mud pump concentration C is taken as the intermediate parameter, and a dredging soil model corresponding to dredging control parameters and different soil types is established, and the optimal dredging control parameters corresponding to different soil types are further obtained.

[0133] Step 2 - Determination of initial dredging parameters, including the following steps:

[0134] S2.2-Drilling operations and hydrological surveys:

[0135] After the drilling vessel drilled and surveyed the construction area, it was found that the original water depth in the construction area was 15m, and the design water depth of the project was 20m, so the project excavation depth was 5m. The target excavation depth was determined to be 2.5m based on the construction times of 2.

[0136] The soil layer information obtained by drilling in the initial working area is: when the depth is 2.5m, the soil layer is medium sand; when the depth is 5m, the soil is gravel sand; when the depth is 10m, the soil layer is crushed stone;

[0137] S2.3-Determination of initial dredging control parameters

[0138] The target excavation depth is 2.5 m, and the expected soil type is medium sand. The optimal dredging control parameters corresponding to medium sand are obtained from the dredging soil model as the initial dredging control parameters.

[0139] Step 4- Obtaining the optimal dredging control parameters:

[0140] The dredging vessel enters the construction area to carry out dredging work according to the initial dredging control parameters. The ship monitoring device obtains that the mud particle size r>0.075mm in the current construction area is fine sand, and the optimal dredging control parameters corresponding to the fine sand are obtained from the dredging soil model.

[0141] Step 5 - Determination of efficient speed:

[0142] The efficient speed V is obtained from the following formula: max :

[0143]

[0144] Step 6- Dredging and Driving:

[0145] The dredging vessel controls the ship's dredging equipment according to the determined optimal dredging parameters and the ship's speed V maxControl the ship's power equipment and repeat steps 2 to 5 until the dredging ship completes the construction work.

[0146] Implementation effect: To verify the dredged soil model

[0147] (1) Verify the linear significance of the dredged soil model

[0148] The F test is performed on the fitting equation of dredged soil, and the following Table 5 is obtained:

[0149] Table 5 - Analysis of variance table

[0150]

[0151] It can be seen from Table 5 that the linearity of the fitting equation is very significant.

[0152] (2) Verifying the dredged soil model with actual ship monitoring values

[0153] The real ship monitoring data of the whole day on September 2, 2018 is compared with the fitting equation. Figure 2 It indicates the degree of fit between the fitting equation and the actual data. Figure 3 Represents the error between the fitting equation and the actual data, combined with Figure 2 and Figure 3 It can be found that the relative errors of the fitting equations are all within 5%, which meets the requirements.

[0154] In the actual dredging process, the present invention establishes a dredging soil model to obtain the relationship between different soil types and different dredging control parameters, thereby obtaining the optimal dredging control parameters. The optimal dredging control parameters include the drag head immersion depth d, the ground angle α, the mud pump vacuum Pa and the economic speed v. At the same time, the efficient speed V is determined by combining the drag head size information and the drag head immersion depth d. max When the dredging vessel is sailing at the economic speed V, the leakage of the drag head is minimal, ensuring the economy of the dredging work. max When sailing, the drag head works at the highest efficiency, ensuring the efficiency of dredging work.

[0155] The above description is only a preferred embodiment of the present invention and does not limit the present invention in any form. Any simple modification, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention are within the scope of the technical solution of the present invention.

Claims

1. A dredging and driving integrated control method for a trailing suction hopper dredger, characterized in that: The steps include: S1-Establishment of dredged soil model: Fit the relationship between different soil types and dredging control parameters to obtain the optimal dredging control parameters corresponding to different soil types; S2-Determination of initial dredging control parameters: The drilling survey ship enters the construction area to conduct drilling operations, obtains soil layer information at each drilling location in the construction area, and determines the expected soil type for the initial work of the dredging operation ship based on the soil layer information and the excavation depth, and then determines the initial dredging control parameters; S3-Heading Control: By distributing thrust to the dredging vessel, its heading is controlled so that it can sail along the dredging route; S4- Obtaining the best dredging control parameters: The dredging vessel performs initial dredging operations according to the initial dredging control parameters, obtains the particle size of mud particles through the ship monitoring system of the dredging vessel, and then determines the actual soil type, and obtains the corresponding optimal dredging control parameters based on the actual soil type; S5- Determination of efficient speed: Determine the efficient speed by combining the optimal dredging control parameters and the drag head size information; S6- Driving and Driving in One: Control the dredging vessel to work at the best dredging control parameters and efficient speed, and continuously update the position of the dredging vessel.

2. The dredging and driving integrated control method of a trailing suction hopper dredger according to claim 1, characterized in that: The step S1-establishing the dredged soil model comprises the following steps: S1.1- Fitting the relationship between dredging control parameters and dredge pump concentration: The mud pump concentration and dredging control parameters can be obtained through historical monitoring data of the ship. The dredging control parameters include the depth of the drag head into the soil, the angle to the ground, the mud pump vacuum and the economic speed. The relationship between the mud pump concentration and the dredging control parameters is fitted by a multivariate nonlinear regression method. S1.2-Fitting the relationship between mud pump concentration and drag head leakage: The drag head leakage and mud pump concentration can be obtained through historical monitoring data of the ship, and the relationship between the two can be fitted by combining univariate linear regression analysis and least square method; S1.3-Fitting the relationship between mud particle size, leakage rate, and drag head leakage: The mud particle size, leakage rate, and drag head leakage can all be obtained through historical monitoring data of the ship, and the relationship between the three can be fitted based on the least squares method; S1.4-Determination of soil type: Different soil types are determined by the mud particle size, and the corresponding soil type is determined by the mud particle size. S1.5-Determine the Optimal Dredging Control Parameters A dredging soil model was established with mud particle size, leakage rate, drag head leakage and mud pump concentration as intermediate parameters. The relationship between different soil types corresponding to different mud particle sizes and dredging control parameters was obtained, and the optimal dredging control parameters corresponding to different soil types were further obtained.

3. The dredging and driving integrated control method of a trailing suction hopper dredger according to claim 1, characterized in that: The step S2-determination of initial dredging control parameters comprises the following steps: S2.1-Determination of construction conditions: Determine the dredging construction area, dredging operation route, target dredging depth and construction times according to construction requirements; S2.2-Drilling operations and hydrological surveys: The dredging drilling ship performs drilling operations and hydrological surveys on the dredging construction area P to obtain original environmental information; the original environmental information includes soil layer information and hydrological information; S2.3-Determination of initial dredging control parameters: The expected soil type during initial dredging is determined by combining soil layer information, target excavation depth and construction times, and the optimal dredging control parameters corresponding to the expected soil type are obtained from the dredging soil model as the initial dredging control parameters.

4. The dredging and driving integrated control method of a trailing suction hopper dredger according to claim 1, characterized in that: In the step S3-heading control, the constraints are determined by the power parameters of each propeller of the ship, and the minimum value of the thrust distribution objective function is found within the constraints, thereby obtaining the optimal thrust distribution combination.

5. The dredging and driving integrated control method of a trailing suction hopper dredger according to claim 4, characterized in that: The step S4-obtaining the optimal dredging control parameters comprises the following steps: S4.1-Initial Dredging Operations The heading of the dredging vessel is determined by step S3, and the initial dredging control parameters of the dredging vessel are determined by step S2.

3. The dredging vessel enters the dredging area according to the determined heading and performs initial dredging operations according to the initial dredging control parameters. S4.2-Determination of Actual Soil Type The ship monitoring system of the dredging vessel obtains the mud particle size r during the initial dredging operation, and the actual soil type corresponding to the dredging operation is obtained through the mud particle size r; S4.3-Determination of Optimal Dredging Control Parameters The dredging soil model established in step S1 is used to determine the optimal dredging control parameters corresponding to the actual soil type.

6. The dredging and driving integrated control method of a trailing suction hopper dredger according to claim 5, characterized in that: In the step S5-determination of the efficient speed, the efficient speed with the highest dredging efficiency is determined by the maximum earthwork cut by the drag head per unit time, the depth of the drag head into the soil, and the width of the drag head.

7. The dredging and driving integrated control method of a trailing suction hopper dredger according to claim 6, characterized in that: The step S6 - dredging and driving are integrated, obtaining the optimal dredging parameters determined in step S4.3 to control the ship's dredging equipment, obtaining the efficiency speed determined in step S5 to control the ship's power equipment, and repeating the steps S4-S5 until the dredging operation ship completes the construction operation.

Citation Information

Patent Citations

  • Full-automatic control method of dredging rake pipe of drag suction dredger

    CN108442444A

  • Full-automatic control system for dredging pipe operation of trailing suction hopper dredger

    CN108442445A

  • Full-automatic dredging control system and method for trailing suction hopper dredger

    CN108442446A

  • Equipo sumergido de dragado autónomo

    ES2684359A1

  • Wing dredger

    GB8802907D0

Cited By

  • Intelligent dredging method, device and equipment for trailing suction dredger with maximum yield as target and storage medium

    CN120006795A

  • Intelligent control method for drag arm and drag head of drag suction dredger

    CN120010250A

  • Layered dredging path planning method and device for trailing suction dredger, dredger and medium

    CN120121060A

  • Dredging path planning method and device of trailing suction dredger, dredger and medium

    CN120124834A