Basement pile-wall integrated construction structure and construction method

The basement pile-wall integrated construction addresses the inefficiency of temporary support piles by designing them as permanent structures with integrated drainage and waterproofing features, enhancing stability and preventing water ingress.

CN119177683APending Publication Date: 2024-12-24CHINA MCC5 GROUP CORP LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411482050.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-23
Publication Date
2024-12-24

AI Technical Summary

Technical Problem

Existing basement support piles are treated as temporary structures and abandoned after foundation pit projects are completed, neglecting their joint effect with the basement outer wall, leading to inefficiencies in construction and potential water seepage issues.

Method used

A basement pile-wall integrated construction structure where support piles are designed as permanent structures, integrated with a basement floor and equipped with structural side beams, water-stopping ridges, drainage ditches, and waterproof coatings, forming a unified system that includes drainage pipes and decorative elements.

Benefits of technology

The integrated system enhances the stability of the building structure by utilizing support piles as permanent elements, prevents water seepage, and facilitates subsequent construction work while providing aesthetic appeal.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119177683A_ABST
    Figure CN119177683A_ABST
Patent Text Reader

Abstract

The invention discloses a basement pile-wall integrated construction structure and a construction method. The construction structure comprises a support pile, a structure boundary beam, a water stop reverse ridge, a lining wall masonry structure, a drainage ditch, a first waterproof coating layer, a decorative aluminum plate, a maintenance louver, a second waterproof coating layer, a drainage pipe, a water guide pipe, an intercepting ditch, a basement bottom plate and a basement floor slab. The construction method comprises the following steps: support optimization; supporting construction; constructing a basement main body structure; chiseling off a waist beam; constructing a water stop reverse ridge; constructing a ditch; arranging a water pipe; and lining wall building. The construction method has the beneficial effects that the supporting piles are constructed as permanent structures, waste disposal is avoided, the additional supporting and retaining effect can be provided for the side walls of the basement, and the stability of a building structure is improved; and a space is reserved between the basement side wall and the support pile, so that subsequent construction operation is facilitated, water can be prevented, and the risk that the support pile leaks water into the side wall is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of underground building construction, and specifically relates to a basement pile-wall integrated construction structure and a construction method. Background Art

[0002] With the development of modern cities, the development and utilization of urban underground space has become a global development trend and an important indicator of urban modernization. Foundation pit support is an important engineering content in the development of underground space. In foundation pit projects with retaining structures, it also involves the joint action of soil, support structure and underground structure.

[0003] However, at present, the support piles are generally only used as temporary support structures. After the foundation pit project is completed, their role is completely ignored and they are abandoned underground. A certain distance is left between the conventional support piles and the basement outer wall to facilitate the formwork and steel bar binding, waterproofing and insulation construction of the basement outer wall. The basement outer wall and support piles are calculated according to different working conditions in the permanent stage and temporary foundation pit excavation stage, respectively, without considering their joint effect. Summary of the invention

[0004] The purpose of this application is to provide a basement pile-wall integrated construction structure and construction method, which solves the problem of abandoned temporary support piles.

[0005] The purpose of this application is achieved through the following technical solutions:

[0006] A basement pile-wall integrated construction structure includes supporting piles, a basement floor and a basement floor. The pile ends of the basement floor and the basement floor are both in contact with the supporting piles. The pile ends of the basement floor are provided with structural side beams located below. The pile ends of the basement floor and the basement floor are provided with water-stopping ridges located above. Drainage ditches are formed between the supporting piles and the water-stopping ridges on the basement floor and the basement floor. The drainage ditches on the upper and lower layers are connected by drainage pipes. The drainage ditch on the basement floor is connected to the intercepting ditch on the basement floor through a water guide pipe. A lining wall masonry structure is provided on the water-stopping ridge.

[0007] Furthermore, the base surface of the supporting pile is provided with a first waterproof coating layer.

[0008] Furthermore, the lining wall masonry structure is provided with decorative aluminum plates and / or maintenance shutters.

[0009] Furthermore, a second waterproof coating layer is provided at the bottom of the drainage ditch.

[0010] Furthermore, the drainage ditch and / or intercepting ditch is a prefabricated component or a masonry structure.

[0011] A basement pile-wall integrated construction method comprises the following steps:

[0012] The first step is support optimization, which is to optimize the design of the support structure as a permanent structure;

[0013] The second step is support construction. According to the measurement results, the support piles are constructed;

[0014] The third step is the construction of the main structure of the basement, including the construction of the basement floor and the basement floor. The pile ends of the basement floor and the basement floor are both abutted against the supporting piles, and the pile ends of the basement floor are constructed with structural side beams located below;

[0015] The fourth step is to chisel out the waist beam, and gradually chisel out the supporting waist beam of the supporting piles according to the third step, and repair the base surface of the supporting piles;

[0016] The fifth step is to construct the water-stopping ridge. A water-stopping ridge is constructed at the upper end of the piles of the basement floor and the basement floor for the second time, or the fifth step is constructed simultaneously with the third step. Drainage ditches are formed between the supporting piles and the water-stopping ridge on both the basement floor and the basement floor.

[0017] The sixth step is ditch construction, which involves waterproofing the inside of the drainage ditch and fixing the main body of the drainage ditch, and fixing the intercepting ditch on the basement floor;

[0018] Step 7: Install water pipes, connect the drainage pipes between the drainage ditches on the upper and lower floors, and connect the water pipes between the drainage ditches on the basement floor and the intercepting ditches on the basement floor;

[0019] The eighth step is lining wall construction, which involves constructing the lining wall masonry structure on the water stop ridge.

[0020] Furthermore, the fourth step of repairing the base surface of the supporting piles includes: repairing the damage on the base surface of the supporting piles caused by chiseling out the supporting waist beam; cleaning and repairing the base surface of the supporting piles with cement mortar to perform surface trimming and leveling; sealing local leaks and anchor holes with waterproof materials; and applying waterproof coating on the base surface of the supporting piles by spraying and / or manual brushing.

[0021] Furthermore, in the sixth step, the drainage ditch body and / or intercepting ditch are prefabricated parts or masonry structures.

[0022] Furthermore, in the eighth step, decorative aluminum plates are installed on the lining wall masonry structure to decorate and beautify the lining wall.

[0023] Furthermore, in the eighth step, maintenance shutters are installed on the lining wall masonry structure to serve as later maintenance openings.

[0024] Beneficial effects of this application:

[0025] (1) The support piles are constructed as permanent structures to avoid abandonment and can also provide additional support and enclosure for the basement side walls, thereby increasing the stability of the building structure.

[0026] (2) Leaving space between the basement side wall and the supporting piles not only facilitates subsequent construction work, but also provides waterproofing and water blocking, avoiding the risk of water seepage from the supporting piles into the side wall.

[0027] The aforementioned main scheme of the present application and its further options can be freely combined to form multiple schemes, all of which are schemes that can be adopted and claimed for protection in the present application; and in the present application, (non-conflicting options) can also be freely combined with each other and with other options. After understanding the scheme of the present application, those skilled in the art can understand that there are many combinations based on the prior art and common knowledge, all of which are technical schemes to be protected by the present application, and they are not exhaustively listed here. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is a schematic diagram of the structure of this application.

[0029] In the figure: 1-support piles, 2-structural side beams, 3-water-stopping ridges, 4-lining wall masonry structure, 5-drainage ditches, 6-first waterproof coating layer, 7-decorative aluminum plate, 8-inspection shutters, 9-second waterproof coating layer, 10-drainage pipes, 11-water guide pipes, 12-intercepting ditches, 13-basement bottom slabs, 14-basement floor slabs. DETAILED DESCRIPTION

[0030] The following non-limiting examples are provided to illustrate the present application.

[0031] Example 1

[0032] refer to Figure 1 As shown, a basement pile-wall integrated construction structure includes supporting piles 1, structural side beams 2, water-stopping ridges 3, lining wall masonry structures 4, drainage ditches 5, a first waterproof coating layer 6, decorative aluminum plates 7, inspection shutters 8, a second waterproof coating layer 9, drainage pipes 10, water guide pipes 11, intercepting ditches 12, basement bottom plates 13 and basement floor plates 14.

[0033] The supporting piles 1 can adopt various forms of foundation pit supporting structures, which can support and enclose the foundation pit slopes. The base surface (inner end surface) of the supporting piles 1 is sprayed with a first waterproof coating layer 6 (penetrating crystalline material), and the pile gaps, leaking points and anchor holes at various locations on the base surface of the supporting piles 1 are sealed to form a complete and good waterproof surface.

[0034] The structural side beams 2, the basement floor 13 and the basement floor 14 are all reinforced concrete structures. The pile ends of the basement floor 13 and the basement floor 14 are in contact with the supporting piles 1, so as to realize the combination of the supporting piles 1 and the main structure of the basement. The pile ends of the basement floor 14 are provided with structural side beams 2 located below, which are also in contact with the supporting piles 1, and the structural side beams 2 support and reinforce the floor at the pile ends.

[0035] The pile ends of the basement bottom plate 13 and the basement floor plate 14 are provided with a water-stopping ridge 3 located above. The water-stopping ridge 3 is a reinforced concrete structure, forming a water-blocking and water-resistant building main body. The water-stopping ridge 3 can be constructed at the same time as the construction of the basement main structure, or it can be constructed a second time after the construction of the basement main structure is completed.

[0036] A space is left between the water-stopping ridge 3 and the supporting pile 1, so that a drainage ditch 5 is formed between the supporting pile 1 and the water-stopping ridge 3 on the basement bottom plate 13 and the basement floor 14. The drainage ditch 5 is used to store water to prevent the seepage water from continuing to flow inward, that is, to block water at the drainage ditch 5.

[0037] A second waterproof coating layer 9 (polymer cement material) is provided at the bottom of the drainage ditch 5 to waterproof the bottom of the ditch and prevent the accumulated water from continuing to seep out from the structural gap. The main bodies of the drainage ditch 5 and the intercepting ditch 12 are prefabricated parts or masonry structures.

[0038] The drainage ditches 5 on the upper and lower layers are connected by drainage pipes 10 (DN50, PVC material), and the seepage water accumulated in the upper layer continues to flow downward until all the seepage water is gathered in the drainage ditches 5 on the basement floor 13. The drainage ditches 5 on the basement floor 13 are connected with the intercepting ditches 12 on the basement floor 13 through water guide pipes 11 (DN50, PVC material), and the seepage water finally enters the intercepting ditches 12 and is discharged from the basement building body through the intercepting ditches 12.

[0039] A lining wall masonry structure 4 is provided on the water stop sill 3. The lining wall masonry structure 4 formed by masonry forms the side wall of the basement and forms a building structure together with the support piles 1. A decorative aluminum plate 7 and a maintenance shutter 8 are provided on the lining wall masonry structure 4. The decorative aluminum plate 7 can be detachably installed on the lining wall masonry structure 4 to beautify and decorate the lining wall, and can be detached and replaced. The maintenance shutter 8 is preferably made of aluminum alloy and serves as a later maintenance port.

[0040] Example 2

[0041] refer to Figure 1 As shown, a basement pile-wall integrated construction method, for the basement pile-wall integrated construction structure of Example 1, includes the following steps.

[0042] The first step is support optimization, which is to optimize the design of the support structure as a permanent structure.

[0043] The second step is support construction. According to the measurement results, the support pile 1 is constructed.

[0044] The third step is the construction of the main structure of the basement, including the construction of the basement floor 13 and the basement floor 14. The pile ends of the basement floor 13 and the basement floor 14 are both in contact with the supporting piles 1, and the pile ends of the basement floor 14 are provided with structural side beams 2 located below.

[0045] The fourth step is to chisel out the waist beam. Following the third step (basement main structure construction), the supporting waist beam of the supporting pile 1 is gradually chiseled out, and the base surface of the supporting pile 1 is repaired.

[0046] Repairing the base surface of the supporting pile 1 includes: repairing the damage on the base surface of the supporting pile 1 caused by chiseling out the supporting waist beam; cleaning and repairing the base surface of the supporting pile 1 with cement mortar to perform surface trimming and leveling; sealing local leaks and anchor holes with waterproof materials; applying waterproof coating on the base surface of the supporting pile 1, spraying and / or manually brushing, spraying the supporting pile body and the fittings twice, and manually brushing locally to form a first waterproof coating layer 6.

[0047] The fifth step is to construct the water stop ridge, and the water stop ridge 3 located above the pile ends of the basement bottom slab 13 and the basement floor slab 14 is constructed for the second time, or the fifth step (water stop ridge construction) and the third step (basement main structure construction) are constructed simultaneously. A space is left between the water stop ridge 3 and the supporting pile 1, and a drainage ditch 5 is formed between the supporting pile 1 and the water stop ridge 3 on the basement bottom slab 13 and the basement floor slab 14.

[0048] The sixth step is to construct the drainage ditch, waterproof the drainage ditch 5 and fix the main body of the drainage ditch, and fix the intercepting ditch 12 on the basement floor 13. The main bodies of the drainage ditch 5 and the intercepting ditch 12 are prefabricated parts or masonry structures. The bottom of the drainage ditch 5 is provided with a second waterproof coating layer 9 (polymer cement material) for waterproofing the bottom of the ditch to prevent the accumulated water from continuing to seep out from the structural gap.

[0049] The seventh step is to install water pipes, connect the drainage pipe 10 between the drainage ditches 5 on the upper and lower layers, and connect the water pipe 11 between the drainage ditch 5 on the basement floor 13 and the intercepting ditch 12 on the basement floor 13. The seepage water accumulated in the upper layer continues to flow downward until all the seepage water is gathered in the drainage ditch 5 on the basement floor 13, and the seepage water in the drainage ditch 5 on the basement floor 13 finally enters the intercepting ditch 12 and is discharged from the basement building body through the intercepting ditch 12.

[0050] The eighth step is to build the lining wall. The lining wall masonry structure 4 is constructed on the water stop anti-slope 3. A decorative aluminum plate 7 is installed on the lining wall masonry structure 4 to decorate and beautify the lining wall. An inspection shutter 8 is installed on the lining wall masonry structure 4 as a later inspection port.

[0051] The aforementioned basic examples and their further selected examples can be freely combined to form multiple embodiments, all of which are embodiments that can be adopted and claimed for protection in this application. In the scheme of this application, each selected example can be arbitrarily combined with any other basic examples and selected examples.

[0052] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present application should be included in the protection scope of the present application.

Claims

1. A basement pile-wall integrated construction structure, comprising support piles (1), characterized in that: The invention also comprises a basement floor (13) and a basement floor (14), the pile ends of the basement floor (13) and the basement floor (14) are both in contact with the support piles (1), the pile ends of the basement floor (14) are provided with a structural side beam (2) located below, the pile ends of the basement floor (13) and the basement floor (14) are provided with a water stop ridge (3) located above, drainage ditches (5) are formed between the support piles (1) and the water stop ridge (3) on the basement floor (13) and the basement floor (14), the drainage ditches (5) on the upper and lower layers are connected through a drainage pipe (10), the drainage ditches (5) on the basement floor (13) are connected with the intercepting ditch (12) on the basement floor (13) through a water guide pipe (11), and a lining wall masonry structure (4) is provided on the water stop ridge (3).

2. The basement pile-wall integrated construction structure according to claim 1 is characterized by: The base surface of the support pile (1) is provided with a first waterproof coating layer (6).

3. The basement pile-wall integrated construction structure according to claim 1 is characterized by: The lining wall masonry structure (4) is provided with a decorative aluminum plate (7) and / or an inspection shutter (8).

4. The basement pile-wall integrated construction structure according to claim 1 is characterized by: A second waterproof coating layer (9) is provided at the bottom of the drainage ditch (5).

5. The basement pile-wall integrated construction structure according to claim 1 or 4, characterized in that: The drainage ditch (5) and / or intercepting ditch (12) are prefabricated parts or masonry structures.

6. A basement pile-wall integrated construction method, characterized in that: The steps include: The first step is support optimization, which is to optimize the design of the support structure as a permanent structure; The second step is support construction, which involves constructing support piles (1) based on the measurement results; The third step is to construct the main structure of the basement, including the construction of the basement bottom plate (13) and the basement floor plate (14). The pile ends of the basement bottom plate (13) and the basement floor plate (14) are both in contact with the support piles (1), and the pile ends of the basement floor plate (14) are provided with structural side beams (2) located below. The fourth step is to chisel out the waist beam, and gradually chisel out the supporting waist beam of the supporting pile (1) according to the third step, and repair the base surface of the supporting pile (1); The fifth step is to construct a water-stopping ridge, and to construct a water-stopping ridge (3) located above the pile ends of the basement bottom plate (13) and the basement floor plate (14) for the second time, or the fifth step is carried out simultaneously with the third step, and a drainage ditch (5) is formed between the supporting piles (1) and the water-stopping ridge (3) on both the basement bottom plate (13) and the basement floor plate (14); The sixth step is to construct the drainage ditch, waterproof the drainage ditch (5) and install and fix the drainage ditch body, and install and fix the intercepting ditch (12) on the basement floor (13); The seventh step is to install water pipes, connect the drainage pipe (10) between the drainage ditches (5) on the upper and lower floors, and connect the water conduit (11) between the drainage ditch (5) on the basement floor (13) and the intercepting ditch (12) on the basement floor (13); The eighth step is to construct the lining wall, and construct the lining wall masonry structure (4) on the water stop anti-ridge (3).

7. The basement pile-wall integrated construction method according to claim 6 is characterized by: The fourth step of repairing the base surface of the supporting pile (1) includes: repairing the damage on the base surface of the supporting pile (1) caused by chiseling out the supporting waist beam; cleaning and repairing the base surface of the supporting pile (1) with cement mortar to perform surface finishing and leveling; sealing local leaks and anchor holes with waterproof materials; and applying waterproof coating on the base surface of the supporting pile (1) by spraying and / or manually brushing.

8. The basement pile-wall integrated construction method according to claim 6 is characterized by: In the sixth step, the main body of the drainage ditch (5) and / or the intercepting ditch (12) are prefabricated parts or masonry structures.

9. The basement pile-wall integrated construction method according to claim 6, characterized in that: In the eighth step, a decorative aluminum plate (7) is installed on the lining wall masonry structure (4) to decorate and beautify the lining wall.

10. The basement pile-wall integrated construction method according to claim 6 or 9, characterized in that: In the eighth step, a maintenance shutter (8) is installed on the lining wall masonry structure (4) to serve as a later maintenance opening.