Metal corrugated pipe construction device in prestressed structure

By designing an automatic construction device for metal corrugated pipes in prestressed structures, the problem of high difficulty and low efficiency of artificial casing in the prior art is solved, and the automatic docking of metal corrugated pipes and automatic cleaning of casing areas are realized, and construction efficiency and leakage protection performance are improved.

CN120175087APending Publication Date: 2025-06-20CONSTR & INSTALLATION ENG THE THIRD ENG GROUP OF CHINA RAILWAY +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510259256.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-03-06
Publication Date
2025-06-20

AI Technical Summary

Technical Problem

The casing operation of existing metal corrugated pipes relies on manual operation, which leads to casing being difficult and inefficient, and has high human work intensity, which is not conducive to the construction of prestressed structures.

Method used

A metal corrugated pipe construction device in a prestressed structure is designed, including front pipe sleeve, rear pipe sleeve, front support block, rear support block, folding arm, outer baffle, frame and other components. The carriage is driven forward to move through the power component, so that the rear pipe sleeve pushes the metal corrugated pipe for automatic sleeve, and the casing area is automatically cleaned by the brush body after the sleeve is completed.

Benefits of technology

It realizes automatic docking of metal corrugated pipes and automatic cleaning of casing areas, reducing manual operation difficulty, improving construction efficiency, and enhancing slurry leakage resistance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN120175087A_ABST
    Figure CN120175087A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of prestressed structure construction, and particularly relates to a metal corrugated pipe construction device in a prestressed structure, which comprises a front pipe sleeve, a rear pipe sleeve, a connecting rod and a connecting rod, the three front supporting blocks are arranged on the front pipe sleeve at equal intervals, and the radial positions of the front supporting blocks on the front pipe sleeve can be adjusted; the rear pipe sleeve is used for being arranged at the front end of the next metal corrugated pipe in a sleeving mode and located on the rear side of the opening end. And the multiple rear supporting blocks are sequentially arranged in the rear pipe sleeve in the circumferential direction, each rear supporting block comprises a transverse rod, and when the rear supporting blocks move inwards on the rear pipe sleeve in the radial direction to the innermost position, the transverse rods are inserted into annular grooves in the surface of the metal corrugated pipe. The device has the advantages that the casing operation of the metal corrugated pipe is facilitated, the casing operation efficiency is improved, the surface of a casing area is cleaned synchronously, and the adhesive tape winding effect is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of prestressed structure construction; specifically, the present invention relates to a construction device for metal bellows in a prestressed structure. Background Art

[0002] The metal bellows of prestressed structures is a flexible connecting material widely used in prestressed concrete structures, with a variety of excellent properties and a wide range of application fields. In the pipe threading operation of prestressed metal bellows, when performing long-distance pipe threading, it is necessary to perform docking operations on two prestressed metal bellows. The conventional method for docking metal bellows is the casing operation method, that is, after cutting a flat opening at the front end of the rear metal bellows, the opening is sleeved on the tail end of the front metal bellows, and then the casing area is tightly wrapped and covered by using winding tape to ensure stable steel strand threading and leakage prevention performance during subsequent concrete pouring.

[0003] At present, the casing operation of metal bellows still relies on manual casing by workers, usually requiring the cooperation of two to three workers. In the manual casing operation, due to the toughness and weight of the metal bellows itself, the opening part is prone to jamming with the front metal bellows, resulting in great difficulty in the casing operation, being very time-consuming and laborious. Moreover, after casing, it is necessary to clean the surface of the casing area before winding the tape. The whole process relies entirely on manual labor, resulting in low pipe threading efficiency and high labor intensity, which is not conducive to the construction of flexible connections in prestressed structures. Summary of the Invention

[0004] In view of this, the present invention provides a construction device for metal bellows in a prestressed structure, thereby solving or at least alleviating the above problems existing in the prior art.

[0005] To achieve the foregoing object, the present invention provides a construction device for metal bellows in a prestressed structure, comprising:

[0006] A front pipe sleeve for sleeving on the tail end of the already threaded metal bellows;

[0007] Three front support blocks are equidistantly arranged on the front pipe sleeve for supporting the open end of the next metal bellows from the inside out, and the front support blocks are arranged to be adjustable in the radial position of the front pipe sleeve;

[0008] A rear pipe sleeve for sleeving on the front end of the next metal bellows and located at the rear side of the open end;

[0009] A plurality of rear support blocks are sequentially arranged circumferentially inside the rear pipe sleeve. The rear support blocks include cross bars, and the rear support blocks are arranged such that when moving radially inward to the innermost position on the rear pipe sleeve, the cross bars are inserted into the annular grooves on the surface of the metal bellows;

[0010] The folding arm includes a relative end rotatably connected to the front arm and the rear arm. The front end of the front arm is rotatably connected to the front pipe sleeve, and the rear end of the rear wall is rotatably connected to the rear pipe sleeve. The front arm and the rear arm are in an open-downward "V" shape.

[0011] The outer baffle is arranged directly above the rear arm, and the upper surface of the rear arm is in close contact with the lower surface of the outer baffle. It is used to prevent the folding arm from folding during the process of sleeving the open end with the tail end of the metal bellows that has been passed through. When the open end is sleeved with the deepest position of the tail end of the metal bellows that has been passed through, the rear arm disengages from the outer baffle.

[0012] The machine frame is provided with a sliding frame at the rear end. The rear pipe sleeve is installed on the sliding frame. The outer baffle is installed at the rear end of the machine frame. Both the sliding frame and the front pipe sleeve are slidably installed on the machine frame. A power assembly for driving the sliding frame to displace forward is arranged between the sliding frame and the machine frame.

[0013] In a metal bellows construction device of a prestressed structure as described above, optionally, a receiving groove for receiving a front support block is provided on the inner wall surface of the front pipe sleeve. The front support block includes a front block body and a front bolt. The front block body is arranged in an "L" shape structure, and the radial part of the front block body is slidably arranged in the receiving groove. The outer side of the axial part of the front block body is connected to the inner end of the front bolt, and the front bolt is threadedly connected to the front pipe sleeve.

[0014] In a metal bellows construction device of a prestressed structure as described above, optionally, the rear support block further includes a rear frame body and a rear rotating frame. The rear frame body is slidably installed radially inside the rear pipe sleeve. The rear rotating frame is in a "cross" shape. The center of the rear rotating frame is rotatably installed on the inner end of the rear frame body. A cross bar is provided at each of the four ends of the rear rotating frame, and two adjacent cross bars can be inserted into two adjacent ring grooves on the surface of the metal bellows simultaneously.

[0015] In a metal bellows construction device of a prestressed structure as described above, optionally, an arc-shaped through groove is provided on the rear pipe sleeve. An inner baffle is passed through the arc-shaped through groove. The inner baffle is located directly below the rear arm. The front end of the inner baffle is flush with the front end of the outer baffle. The inner baffle is used to prevent the rear frame body from displacing outward. The rear end of the inner baffle and the rear end of the outer baffle are fixedly connected by a connecting block. The connecting block is slidably installed at the rear end of the machine frame, and a rear bolt for adjusting the position of the connecting block in the front-rear direction is arranged between the connecting block and the machine frame.

[0016] In the metal corrugated pipe construction device of a prestressed structure as described above, optionally, sliding seats that are slidably engaged with the frame are provided on both sides of the front pipe sleeve. The rear pipe sleeve includes an outer sleeve body and an inner sleeve body. The outer sleeve body is fixedly installed on the sliding seat. The inner sleeve body is rotatably installed inside the outer sleeve body. The rear frame body is slidably installed on the inner sleeve body. And the inner compression spring is connected to the inner sleeve body. A swing arm is provided at the bottom end of the inner sleeve body. A strip-shaped groove is formed in the swing arm. A rotating arm is slidably inserted through the strip-shaped groove. One end of the rotating arm is connected to the power assembly. And the power assembly is used to drive the rotating arm to rotate.

[0017] In the metal corrugated pipe construction device of a prestressed structure as described above, optionally, mounting grooves are provided on two cross bars that are spaced apart from each other on the rear rotating frame. Brush bodies are installed in the mounting grooves. The brush bodies on adjacent rear rotating frames are staggered in the rotating direction of the rear rotating frame.

[0018] In the metal corrugated pipe construction device of a prestressed structure as described above, optionally, outer extension parts and inner extension parts respectively extend circumferentially at both ends of the outer side surface of the rear frame body. The outer extension parts at the opposite ends of adjacent rear frame bodies overlap on the outside of the inner extension parts. The outer side surface of one rear frame body is in close contact with the inner side surface of the inner baffle. An inner compression spring is provided between the outer side surface of at least one rear frame body and the inner sleeve body.

[0019] In the metal corrugated pipe construction device of a prestressed structure as described above, optionally, the power assembly includes a forward and reverse motor, a gear set, and a lead screw. The forward and reverse motor is installed on the sliding seat. The lead screw is threadedly inserted through the sliding seat. And both ends of the lead screw are rotatably connected to the frame. The gear set is arranged between the power shaft of the forward and reverse motor and the lead screw. One end of the rotating arm is connected to the power shaft of the forward and reverse motor.

[0020] In the metal corrugated pipe construction device of a prestressed structure as described above, optionally, an auxiliary pipe sleeve is provided at the front end of the frame. The rear end of the corrugated pipe that has been inserted is inserted into the auxiliary pipe sleeve. A collar extends from the front end face of the front pipe sleeve. The inner diameter of the collar is adapted to the outer diameter of the metal corrugated pipe.

[0021] The metal corrugated pipe construction device of a prestressed structure of the present invention, by using the cooperation of the front pipe sleeve, the rear pipe sleeve, the front support block, and the rear support block, can automatically perform the casing operation while keeping the open end in a flared state, reducing the difficulty of manual operation, improving the docking efficiency of the metal corrugated pipe. And by using the rear pipe sleeve, the rear support block, and the brush body, it can automatically perform the surface cleaning operation of the casing area after the casing operation is completed, improving the tape winding effect and the anti-leakage slurry performance. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] With reference to the accompanying drawings, the disclosure of the present invention will become more apparent. It should be understood that these drawings are for illustrative purposes only and are not intended to limit the scope of protection of the present invention. In the drawings:

[0023] Figure 1 It is a schematic diagram of the present invention during casing operation.

[0024] Figure 2 For the present invention Figure 1 An enlarged view of part A in it.

[0025] Figure 3 For the present invention Figure 1 An enlarged view of part B in it.

[0026] Figure 4 For the present invention Figure 1 A side view of the construction device of the metal corrugated pipe in the prestressed structure of the present invention.

[0027] Figure 5 It is a schematic diagram of the front pipe sleeve of the present invention.

[0028] Figure 6 For the present invention Figure 4 A rear view of the rear pipe sleeve and the carriage in it.

[0029] Figure 7 For the present invention Figure 4 A front view of the inner sleeve body and the rear support block in it.

[0030] Figure 8 For the present invention Figure 4 A schematic diagram of the rear support block in it.

[0031] Figure 9 It is a schematic structural diagram of the rear support block of the present invention.

[0032] Figure 10 For the present invention Figure 9 A schematic diagram of the rear support block after being disassembled in it.

[0033] Figure 11 It is a schematic structural diagram of the inner sleeve body of the present invention.

[0034] Reference numerals: 1, front pipe sleeve; 2, front support block; 2-1, front block body; 2-2, front bolt; 3, open end; 4, rear pipe sleeve; 4-1, outer sleeve body; 4-2, inner sleeve body; 5, rear support block; 5-1, cross bar; 5-2, rear frame body; 5-3, rear rotating frame; 5-4, outer extension part; 5-5, inner extension part; 6, annular groove; 7, folding arm; 7-1, front arm; 7-2, rear arm; 8, outer baffle; 9, frame; 10, sliding frame; 11, power assembly; 11-1, forward and reverse motor; 11-2, gear set; 11-3, lead screw; 12, storage groove; 13, arc-shaped through groove; 14, inner baffle; 15, connecting block; 16, rear bolt; 17, sliding seat; 18, swing arm; 19, strip-shaped groove; 20, rotating arm; 21, mounting groove; 22, brush body; 23, inner compression spring; 24, auxiliary pipe sleeve; 25, collar. Detailed implementation manners

[0035] Next, the technical solutions in the embodiments of the present invention will be described clearly and completely. Apparently, the described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

[0036] As Figures 1 to 11 shown, the present invention provides a construction device for metal corrugated pipes in a prestressed structure, including: a front pipe sleeve 1, which is used to sleeve the tail end of the already penetrated metal corrugated pipe; when docking the metal corrugated pipes, it is used to fix the tail end of the already penetrated metal corrugated pipe. Three front support blocks 2 are equidistantly arranged on the front pipe sleeve 1, which are used to support the open end 3 of the next metal corrugated pipe from the inside to the outside, and the front support block 2 is set to be adjustable in the radial position of the front pipe sleeve 1; the front support block 2 expands the open end 3 of the next metal corrugated pipe, so that the size of the open end 3 remains in a state greater than the tail end of the already penetrated metal corrugated pipe. Furthermore, it is convenient for the open end 3 to smoothly sleeve the tail end of the already penetrated metal corrugated pipe.

[0037] A rear pipe sleeve 4 is used to sleeve the front end of the next metal corrugated pipe and is located behind the open end 3. The rear pipe sleeve 4 and the front pipe sleeve 1 are coaxial. A plurality of rear support blocks 5 are sequentially arranged along the circumference inside the rear pipe sleeve 4. The rear support block 5 includes a cross bar 5-1. The rear support block 5 is set such that when it moves radially inward to the innermost position on the rear pipe sleeve 4, the cross bar 5-1 is inserted into the annular groove 6 on the surface of the metal corrugated pipe.

[0038] In this embodiment, the rear pipe sleeve 4 clamps the outside of the next metal corrugated pipe through the rear support block 5, and the open end 3 of the next metal corrugated pipe is expanded into an outward-expanded state by the front support block 2. By the forward displacement of the rear pipe sleeve 4, the open end 3 sleeves the rear end of the already penetrated metal corrugated pipe, realizing the docking of the two metal corrugated pipes.

[0039] The folding arm 7 includes a relative end rotatably connected to the front arm 7-1 and the rear arm 7-2. The front end of the front arm 7-1 is rotatably connected to the front pipe sleeve 1, and the rear end of the rear wall is rotatably connected to the rear pipe sleeve 4. The front arm 7-1 and the rear arm 7-2 are in a "V" shape with the opening facing downward. The folding arm 7 is in an unfolded state in the initial state. At this time, the folding arm 7 is in the state of the longest overall length, so that the distance between the front pipe sleeve 1 and the rear pipe sleeve 4 is in the maximum state.

[0040] The outer baffle 8 is arranged directly above the rear arm 7-2, and the upper surface of the rear arm 7-2 is in close contact with the lower surface of the outer baffle 8. It is used to prevent the folding arm 7 from folding during the process of sleeving the open end 3 on the tail end of the metal bellows that has been passed through. And when the open end 3 is sleeved on the deepest position of the tail end of the metal bellows that has been passed through, the rear arm 7-2 disengages from the outer baffle 8. In this embodiment, the outer baffle 8 can prevent the folding arm 7 from folding, ensure that the front pipe sleeve 1 and the long pipe sleeve are in the state of the longest distance, and ensure that the open end 3 can be sleeved on the tail end of the metal bellows that has been passed through to the deepest state.

[0041] The frame 9 is provided with a sliding carriage 10 at the rear end. The rear pipe sleeve 4 is installed on the sliding carriage 10. The outer baffle 8 is installed at the rear end of the frame 9. Both the sliding carriage 10 and the front pipe sleeve 1 are slidably installed on the frame 9. A power assembly 11 for driving the sliding carriage 10 to move forward is arranged between the sliding carriage 10 and the frame 9. Under the driving action of the power assembly 11, the rear pipe sleeve 4 is driven to move forward by the sliding carriage 10, so that the open end 3 is sleeved on the tail end of the metal bellows that has been passed through.

[0042] Through this embodiment, the frame 9 is placed at the pipe-penetrating inlet of the penetrated metal bellows. The tail end of the previously penetrated metal bellows is inserted into the front pipe sleeve 1, and the front end of the next metal bellows to be penetrated passes through the rear pipe sleeve 4. Then the front end of the next metal bellows to be penetrated is cut to form an open end 3.

[0043] Operate the front support block 2. After the front support block 2 is inserted into the open end 3, use the front support block 2 to pull the open end 3 outward, so that the open end 3 remains in the outward-expanded state. Then use the rear support block 5 to clamp and fix the next metal bellows to be penetrated. At this time, the folding arm 7 is in the longest state, the rear pipe sleeve 4 is located behind the open end 3, and the rear arm 7-2 is located in the outer baffle 8. Through the power assembly 11, the sliding carriage 10 drives the rear pipe sleeve 4 to move forward. At this time, the rear pipe sleeve 4 pushes the next metal bellows to be penetrated forward, and the open end 3 is sleeved on the tail end of the previous metal bellows.

[0044] During this process, since the folding arm 7 is in the longest state and the outer baffle 8 can prevent the folding arm 7 from folding back. Furthermore, during the forward displacement of the rear sleeve 4, the front sleeve 1 will synchronously move forward. The front sleeve 1 moves forward on the tail end of the previously inserted metal bellows, and the open end 3 is always kept in a state of outward expansion through the front support block 2.

[0045] A receiving groove 12 for receiving the front support block 2 is provided on the inner wall surface of the front sleeve 1. The front support block 2 includes a front block body 2-1 and a front bolt 2-2. The front block body 2-1 is arranged in an "L" shape, and the radial part of the front block body 2-1 is slidably arranged in the receiving groove 12. The outer side surface of the axial part of the front block body 2-1 is connected to the inner end of the front bolt 2-2, and the front bolt 2-2 is threadedly connected to the front sleeve 1. After the rear end of the front block body 2-1 is inserted into the open end 3, by rotating the front bolt 2-2, the front block body 2-1 moves outward, and the open end 3 can be expanded outward. During the process of the front block body 2-1 moving outward, it moves into the receiving groove 12. Furthermore, after the open end 3 is expanded, the open end 3 can be clamped on the inner wall surface of the front sleeve 1 by the front block body 2-1, improving the fixing effect on the open end 3 and preventing the open end 3 from detaching from the front block body 2-1 during the casing process.

[0046] The rear support block 5 further includes a rear frame body 5-2 and a rear rotating frame 5-3. The rear frame body 5-2 is slidably installed radially inside the rear sleeve 4. The rear rotating frame 5-3 is in a "cross" shape, and the center of the rear rotating frame 5-3 is rotatably installed on the inner end of the rear frame body 5-2. A cross bar 5-1 is provided at each of the four ends of the rear rotating frame 5-3, and two adjacent cross bars 5-1 can be simultaneously inserted into two adjacent ring grooves 6 on the surface of the metal bellows respectively.

[0047] During the casing process, the rear frame body 5-2 is located at the innermost position of the rear sleeve 4. At this time, the rear rotating frame 5-3 cannot rotate. Furthermore, during the casing process, the cross bar 5-1 clamps the metal bellows and pushes the metal bellows forward.

[0048] An arc-shaped through groove 13 is provided on the rear sleeve 4. An inner baffle 14 is inserted into the arc-shaped through groove 13. The inner baffle 14 is located directly below the rear arm 7-2. The front end of the inner baffle 14 is flush with the front end of the outer baffle 8. The inner baffle 14 is used to prevent the rear frame body 5-2 from moving outward. The rear end of the inner baffle 14 is fixedly connected to the rear end of the outer baffle 8 through a connecting block 15. The connecting block 15 is slidably installed at the rear end of the frame 9, and a rear bolt 16 for adjusting the position of the connecting block 15 in the front-rear direction is provided between the connecting block 15 and the frame 9.

[0049] During the process of the rear sleeve 4 pushing the metal bellows forward for displacement, the inner baffle 14 is displaced within the arc-shaped through groove 13, and the inner baffle 14 blocks against the outer side surface of the rear frame body 5-2, which is used to keep the rear frame body 5-2 at the innermost position of the rear sleeve 4. Furthermore, during the casing operation, the cross bar 5-1 can stably clamp and push the metal bellows for the casing operation.

[0050] The connecting block 15 synchronously mounts the inner baffle 14 and the outer baffle 8 on the frame 9. By operating the rear bolt 16 to adjust the position of the connecting block 15, the positions of the outer baffle 8 and the inner baffle 14 can be adjusted in the front-back direction, and further, the forward displacement distance when the rear arm 7-2 and the rear sleeve 4 disengage from the inner baffle 14 and the outer baffle 8 can be adjusted to make an adaptive adjustment according to the stroke of the casing.

[0051] On both sides of the front sleeve 1, there are sliding seats 17 that are slidably matched with the frame 9. The rear sleeve 4 includes an outer sleeve body 4-1 and an inner sleeve body 4-2. The outer sleeve body 4-1 is fixedly installed on the sliding seat 17, the inner sleeve body 4-2 is rotatably installed within the outer sleeve body 4-1, the rear frame body 5-2 is slidably installed on the inner sleeve body 4-2, and the inner compression spring 23 is connected to the inner sleeve body 4-2. At the bottom end of the inner sleeve body 4-2, there is a swing arm 18. A strip-shaped groove 19 is formed within the swing arm 18, and a rotating arm 20 is slidably inserted through the strip-shaped groove 19. One end of the rotating arm 20 is connected to the power assembly 11, and the power assembly 11 is used to drive the rotating arm 20 to rotate.

[0052] In this embodiment, the sliding seat 17 is used to carry the forward displacement of the front sleeve 1 on the frame 9. During the process of the power assembly 11 driving the rotating arm 20 to rotate, the rotating arm 20 drives the inner sleeve body 4-2 to reciprocally swing within the outer sleeve body 4-1 through the strip-shaped groove 19 and the swing arm 18. Furthermore, during the casing operation, the rear support block 5 not only pushes the metal bellows forward, but also drives the metal bellows to reciprocally rotate, which is more convenient for the open end 3 to be sleeved on the tail end of the metal bellows that has been penetrated, and is more convenient for the effective progress of the casing operation. The outer sleeve body 4-1 can carry the entire rear sleeve 4 to stably displace forward through the stable forward displacement on the frame 9.

[0053] On two of the cross bars 5-1 on the rear rotating frame 5-3 that are spaced apart, there are installation grooves 21, and brush bodies 22 are installed within the installation grooves 21. The brush bodies 22 on adjacent rear rotating frames 5-3 are staggeredly distributed in the rotating direction of the rear rotating frame 5-3.

[0054] In this embodiment, after the casing operation is completed, the rear frame body 5-2 is disengaged from the inner baffle 14. As the rear pipe sleeve 4 continues to move forward, the folding arm 7 begins to fold, and the rear rotating frame 5-3 can rotate. During the rotation of the rear rotating frame 5-3, the cross bar 5-1 and the brush body 22 on the rear frame body 5-2 will successively pass through the annular groove 6 on the surface of the open end 3, and cooperate with the reciprocating rotation of the inner sleeve body 4-2 to repeatedly clean the surface of the casing area, so as to improve the winding effect of the subsequent tape, and further improve the docking effect of the pipeline after the casing operation and improve the anti-leakage slurry performance. At the same time, during the process of the brush body 22 cleaning the surface of the casing area, a part of the cross bar 5-1 is located in the annular groove 6 of the metal bellows, which can stably press the open end 3 against the outside of the tail end of the penetrated metal bellows to ensure the stability of the casing area.

[0055] Outer extension parts 5-4 and inner extension parts 5-5 are respectively extended circumferentially at both ends of the outer side surface of the rear frame body 5-2. The outer extension parts 5-4 at the relative ends of adjacent two rear frame bodies 5-2 overlap on the outside of the inner extension parts 5-5. The outer side surface of one rear frame body 5-2 is in close contact with the inner side surface of the inner baffle 14, and an inner compression spring 23 is arranged between the outer side surface of at least one rear frame body 5-2 and the inner sleeve body 4-2. In this embodiment, through the outer extension parts 5-4 and the inner extension parts 5-5, all the rear frame bodies 5-2 can move synchronously outward or inward along the radial direction of the rear pipe sleeve 4. The inner compression spring 23 provides an inward elastic force for the rear frame body 5-2 to ensure that during the rotation of the rear rotating frame 5-3, the cross bar 5-1 and the brush body 22 can stably insert into the respective annular grooves 6 passing by in sequence.

[0056] The power assembly 11 includes a forward and reverse motor 11-1, a gear set 11-2 and a lead screw 11-3. The forward and reverse motor 11-1 is installed on the sliding seat 17. The lead screw 11-3 is threadedly penetrated through the sliding seat 17, and both ends of the lead screw 11-3 are rotatably connected to the frame 9. The gear set 11-2 is arranged between the power shaft of the forward and reverse motor 11-1 and the lead screw 11-3. One end of the rotating arm 20 is connected to the power shaft of the forward and reverse motor 11-1. In this embodiment, by starting the forward and reverse motor 11-1 to rotate forward or reverse, on the one hand, the lead screw 11-3 can be driven to rotate forward or reverse through the gear set 11-2, so as to control the forward displacement of the rear pipe sleeve 4 and the front pipe sleeve 1 for the casing operation, control the forward displacement of the rear pipe sleeve 4 relative to the front pipe sleeve 1 to realize the surface cleaning operation of the casing area, or control the backward reset of the front pipe sleeve 1 and the rear pipe sleeve 4. On the other hand, by driving the rotating arm 20 to rotate, the metal bellows can be driven to rotate reciprocally during the casing operation, which is more convenient for the casing operation, and drive the brush body 22 to reciprocally displace in the annular groove 6 to realize the cleaning operation of the casing area.

[0057] An auxiliary bushing 24 is provided at the front end of the frame 9. The rear end of the metal bellows that has been passed through is inserted into the auxiliary bushing 24. A collar 25 extends from the front end face of the front bushing 1, and the inner diameter of the collar 25 is adapted to the outer diameter of the metal bellows. The auxiliary bushing 24 is used to cooperate with the front bushing 1 to support and position the metal bellows that has been passed through at two points simultaneously, ensuring that the tail end of the metal bellows that has been passed through is in a horizontal state, which is more convenient for the casing operation. During the casing operation and the cleaning operation of the casing area, the collar 25 enables the rear bushing 4 to move more stably on the surface of the metal bellows, improving the smoothness of the casing and the cleaning operation of the surface of the casing area.

[0058] When the metal bellows construction device in this embodiment is applied to the butt joint operation of the metal bellows, the working process is as follows:

[0059] Step 1: Place the device at the pipe-passing inlet of the metal bellows. The front bushing 1 and the rear bushing 4 are in a state of the maximum distance. The rear arm 7-2 is located between the inner baffle 14 and the outer baffle 8, and the rear end face of the rear bushing 4 contacts the front side face of the connecting block 15.

[0060] Step 2: Pass the tail end of the previously passed metal bellows through the auxiliary bushing 24 and insert it into the front bushing 1. Pass the front end of the next metal bellows to be passed through the rear bushing 4, so that the cross bar 5-1 is inserted into one of the annular grooves 6, then cut an opening in it, and insert the opening end 3 into the front bushing 1.

[0061] Step 3: When inserting the opening end 3 into the front bushing 1, make the front end of the opening end 3 sleeve the rear end of the front block 2-1, and then operate the front bolt 2-2 to displace the front block 2-1 outward, and use the front block 2-1 to expand and clamp the opening end 3 on the inner surface of the front bushing 1.

[0062] Step 4: Start the forward and reverse motor 11-1 to rotate forward. On the one hand, the forward and reverse motor 11-1 drives the lead screw 11-3 to rotate through the gear set 11-2. The lead screw 11-3 drives the rear bushing 4 to move forward through the carriage 10. By inserting the cross bar 5-1 into the annular groove 6 of the next metal bellows to be passed through, the rear bushing 4 can push the next metal bellows to be passed through to move forward. On the other hand, it drives the inner sleeve 4-2 to rotate reciprocally through the rotating arm 20 and the swing arm 18, so that the opening end 3 rotates reciprocally. At this time, the opening end 3 begins to sleeve the tail end of the previously passed metal bellows to perform the casing operation.

[0063] During the casing operation, the rear arm 7-2 slides closely along the lower surface of the outer baffle 8, which can prevent the folding arm 7 from folding. Furthermore, the folding arm 7 is used to make the front pipe sleeve 1 follow the rear pipe sleeve 4 and move forward synchronously. The top surface of the rear frame body 5-2 located at the top is closely attached to the lower surface of the inner baffle 14 and is restricted to the innermost position on the rear pipe sleeve 4. Through the cooperation of the outer extension part 5-4 and the inner extension part 5-5, all the rear frame bodies 5-2 are located at the innermost position of the rear pipe sleeve 4, and the cross bar 5-1 is stably inserted into the ring groove 6 where it was originally inserted and cannot rotate. Furthermore, a stable thrust is provided for the casing operation to ensure that the open end 3 can stably sleeve the tail end of the metal bellows that has been penetrated until the casing reaches the deepest state, completing the casing operation.

[0064] After the rear arm 7-2 disengages from the outer baffle 8, as the rear pipe sleeve 4 continues to move forward, the folding arm 7 begins to fold, causing the rear pipe sleeve 4 to approach the front pipe sleeve 1. During this process, since the rear frame body 5-2 disengages from the inner baffle 14, the rear frame body 5-2 can rotate when passing through each ring groove 6 on the surface of the casing area.

[0065] Among them, corresponding to the same ring groove 6, among two adjacent rear support blocks 5, one rear support block 5 has the cross bar 5-1 inserted into the ring groove 6, while the other rear support block 5 has the brush body 22 inserted into the ring groove 6. Combining with the reciprocating rotation of the inner sleeve body 4-2, the brush body 22 sweeps the surface of the casing area and the inside of the ring groove 6.

[0066] After the casing area is completed, the folding arm 7 folds to the limit state, and the rear pipe sleeve 4 contacts the front pipe sleeve 1 and pushes the front pipe sleeve 1 to move forward, causing both the front pipe sleeve 1 and the rear pipe sleeve 4 to disengage from the casing area. This facilitates the subsequent tape winding operation.

[0067] Step Five: After the tape winding is completed, perform the pipe threading operation on the next metal bellows to be penetrated. After the penetration operation is completed, start the forward and reverse motor 11-1 to reverse, so that the front pipe sleeve 1 and the rear pipe sleeve 4 return to the initial state, facilitating the next pipeline docking operation.

[0068] In summary, after applying the metal bellows construction device with the prestressed structure of this embodiment, in the pipeline docking operation of penetrating the metal bellows, there is no need for manual holding of the pipeline for casing operation. The front pipe sleeve 1 and the rear pipe sleeve 4 automatically realize the casing operation under the action of the power assembly 11. At the same time, after the casing operation is completed, the surface of the casing area can be cleaned to improve the effect of the subsequent tape winding operation, improve the stability of the pipeline docking and the anti-leakage slurry performance.

[0069] The technical scope of the present invention is not limited to the content in the above description. Those skilled in the art can make various deformations and modifications to the above embodiments without departing from the technical idea of the present invention, and these deformations and modifications should all fall within the scope of the present invention.

Claims

1. A metal corrugated pipe construction device in a prestressed structure, characterized in that: include: A front pipe sleeve (1) is used to be sleeved on the rear end of the metal corrugated pipe that has been installed; Three front support blocks (2) are equidistantly arranged on the front sleeve (1) and are used to support the open end (3) of a metal bellows from the inside out. The front support blocks (2) are arranged so that the radial position of the front sleeve (1) can be adjusted; A rear pipe sleeve (4) is used to be sleeved on the front end of the next metal bellows and is located at the rear side of the open end (3); A plurality of rear support blocks (5) are sequentially arranged along the circumferential direction inside the rear sleeve (4), the rear support blocks (5) comprising a cross bar (5-1), and the rear support blocks (5) are arranged so that when the rear support blocks (5) move radially inward to the innermost position on the rear sleeve (4), the cross bar (5-1) is inserted into the annular groove (6) on the surface of the metal bellows; The folding arm (7) comprises a front arm (7-1) and a rear arm (7-2) which are rotatably connected at opposite ends, the front end of the front arm (7-1) being rotatably connected to the front pipe sleeve (1), and the rear end of the rear wall being rotatably connected to the rear pipe sleeve (4), and the front arm (7-1) and the rear arm (7-2) being in a "V" shape with the opening facing downward; An outer baffle (8) is arranged directly above the rear arm (7-2), and the upper surface of the rear arm (7-2) is in close contact with the lower surface of the outer baffle (8), and is used to prevent the folding arm (7) from being folded in half when the opening end (3) is covered with the tail end of the metal bellows, and when the opening end (3) is covered with the tail end of the metal bellows at the deepest position, the rear arm (7-2) is separated from the outer baffle (8); A frame (9), a slide (10) is arranged at the rear end of the frame (9), the rear pipe sleeve (4) is mounted on the slide (10), the outer baffle (8) is mounted at the rear end of the frame (9), the slide (10) and the front pipe sleeve (1) are both slidably mounted on the frame (9), and a power assembly (11) for driving the slide (10) to move forward is arranged between the slide (10) and the frame (9).

2. A metal corrugated pipe construction device in a prestressed structure as claimed in claim 1, characterized in that: The inner wall surface of the front sleeve (1) is provided with a receiving groove (12) for receiving the front support block (2); the front support block (2) comprises a front block body (2-1) and a front bolt (2-2); the front block body (2-1) is arranged in an "L"-shaped structure, and the radial part of the front block body (2-1) is slidably arranged in the receiving groove (12); the outer side surface of the axial part of the front block body (2-1) is connected to the inner end of the front bolt (2-2), and the front bolt (2-2) is threadedly connected to the front sleeve (1).

3. A metal corrugated pipe construction device in a prestressed structure as claimed in claim 1, characterized in that: The rear support block (5) further comprises a rear frame body (5-2) and a rear rotating frame (5-3); the rear frame body (5-2) is radially slidably mounted on the inner side of the rear pipe sleeve (4); the rear rotating frame (5-3) is in a "cross" shape; the center of the rear rotating frame (5-3) is rotatably mounted on the inner side end of the rear frame body (5-2); each of the four ends of the rear rotating frame (5-3) is provided with a cross bar (5-1), and two adjacent cross bars (5-1) can be simultaneously inserted into two adjacent annular grooves (6) on the surface of the metal bellows.

4. A metal corrugated pipe construction device in a prestressed structure as claimed in claim 3, characterized in that: The rear pipe sleeve (4) is provided with an arc-shaped through groove (13), an inner baffle (14) is inserted into the arc-shaped through groove (13), the inner baffle (14) is located directly below the rear arm (7-2), the front end of the inner baffle (14) is flush with the front end of the outer baffle (8), the inner baffle (14) is used to prevent the rear frame body (5-2) from moving outward, the rear end of the inner baffle (14) is fixedly connected to the rear end of the outer baffle (8) through a connecting block (15), the connecting block (15) is slidably mounted on the rear end of the frame (9), and a rear bolt (16) for adjusting the position of the connecting block (15) in the front-rear direction is provided between the connecting block (15) and the frame (9).

5. A metal corrugated pipe construction device in a prestressed structure as claimed in claim 4, characterized in that: The front sleeve (1) is provided with a slide seat (17) on both sides thereof which is slidably matched with the frame (9); the rear sleeve (4) comprises an outer sleeve (4-1) and an inner sleeve (4-2); the outer sleeve (4-1) is fixedly mounted on the slide seat (17); the inner sleeve (4-2) is rotatably mounted in the outer sleeve (4-1); the rear frame (5-2) is slidably mounted on the inner sleeve (4-2); the inner pressure spring (23) is connected to the inner sleeve (4-2); a swing arm (18) is provided at the bottom end of the inner sleeve (4-2); a strip groove (19) is provided in the swing arm (18); a rotating arm (20) is slidably penetrated in the strip groove (19); one end of the rotating arm (20) is connected to a power assembly (11); and the power assembly (11) is used to drive the rotating arm (20) to rotate.

6. A metal corrugated pipe construction device in a prestressed structure as claimed in claim 5, characterized in that: Two of the cross bars (5-1) on the rear rotating frame (5-3) that are spaced apart are provided with mounting grooves (21), brush bodies (22) are mounted in the mounting grooves (21), and the brush bodies (22) on two adjacent rear rotating frames (5-3) are staggered in the rotation direction of the rear rotating frame (5-3).

7. A metal corrugated pipe construction device in a prestressed structure as claimed in claim 5, characterized in that: An outer extension portion (5-4) and an inner extension portion (5-5) are respectively extended in the circumferential direction at both ends of the outer side surface of the rear frame body (5-2); the outer extension portion (5-4) located at the opposite ends of two adjacent rear frames (5-2) overlaps the outer side surface of the inner extension portion (5-5); the outer side surface of one of the rear frames (5-2) is tightly attached to the inner side surface of the inner baffle (14); and an inner pressure spring (23) is provided between the outer side surface of at least one of the rear frames (5-2) and the inner sleeve body (4-2).

8. A metal corrugated pipe construction device in a prestressed structure as claimed in claim 5, characterized in that: The power assembly (11) comprises a forward and reverse motor (11-1), a gear set (11-2) and a lead screw (11-3); the forward and reverse motor (11-1) is mounted on a slide seat (17); the lead screw (11-3) is threadedly inserted into the slide seat (17); both ends of the lead screw (11-3) are rotatably connected to a frame (9); the gear set (11-2) is arranged between a power shaft of the forward and reverse motor (11-1) and the lead screw (11-3); and one end of the rotating arm (20) is connected to the power shaft of the forward and reverse motor (11-1).

9. A metal corrugated pipe construction device in a prestressed structure as claimed in claim 1, characterized in that: The front end of the frame (9) is provided with an auxiliary pipe sleeve (24), and the rear end having been penetrated by the corrugated pipe is penetrated in the auxiliary pipe sleeve (24). The front end surface of the front pipe sleeve (1) is extended with a collar (25), and the inner diameter of the collar (25) is adapted to the outer diameter of the metal corrugated pipe.