Research and development verification test management method and system, computer and storage medium
By introducing the method of segmentation and automatic recording of test time in R&D design verification management, the problem that traditional methods cannot adapt to complex verification conditions is solved, and more efficient and accurate design verification testing management is achieved, and the market speed of new products is improved.
Patent Information
- Application Number
- CN202510115239.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-24
- Publication Date
- 2025-06-24
AI Technical Summary
The traditional R&D design verification management method cannot effectively adapt to the complex and changeable design verification management requirements of the automotive industry, resulting in low accuracy, completion rate and one-time pass rate of verification test plan, unbalanced laboratory test resources, resulting in a long actual cycle of R&D design verification and new products cannot be quickly launched into the market.
Provide a research and development verification test management method and system, which can automatically record the test time by receiving and subdividing the design of verification test plans, manage and evaluate according to preset assessment rules, and generate relevant reports to ensure the accuracy and completion of the test plan.
It improves the test efficiency and provides multiple indicator information, which facilitates managers to quickly grasp the status of the test, reduces labor costs, and improves the accuracy and efficiency of the test.
Smart Images

Figure CN120197857A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of automobiles, and more particularly, to a research and development type verification test management method, system, computer, and storage medium. Background Art
[0002] Research and development type verification tests indeed play a crucial role in the product development process. Verification tests can conduct substantial inspections and analyses on the quality, performance, reliability, and safety of new products or services; verification tests can help the R & D team better understand user needs and usage habits; verification tests can detect problems and defects in products at an early stage, avoid amplifying these problems in the subsequent development process, thereby reducing development costs. Design verification tests can ensure that the quality and performance of products meet requirements, optimize the user experience, reduce development costs, evaluate risks and find solutions, and promote technological breakthroughs and innovations.
[0003] The traditional research and development type design verification management method is as follows: M1 Design verification test plan formulation: Designers manually select design standards and industry regulations, formulate verification test plans, and track and transmit them through Excel spreadsheets; M2 Statistics of the implementation status of design verification, each laboratory separately manually statistics the daily test completion status; M3 First-pass rate of design verification tests, each laboratory manually calculates based on the manually counted test logs; M4 Statistics of the completion status of design verification, each laboratory manually calculates the design verification completion cycle by manually counting the final completion time of the test.
[0004] However, due to the rapid development of automotive technology, design standards and industry regulations are often updated. Compared with R & D output, the traditional design verification management method can no longer meet the requirements of such complex and changeable design verification management. There are no effective data such as the accuracy rate of verification test plans, the completion rate of verification tests, and the first-pass rate of verification tests. There are problems such as untimely transmission after changes in design verification plans, inaccurate design verification test plans, untimely completion of verification tests, and uneven distribution of laboratory test resources, resulting in a long actual cycle for research and development type design verification and the situation where new products cannot quickly enter the market. Summary of the Invention
[0005] Aiming at the deficiencies in the prior art, the purpose of the present invention is to provide a research and development type verification test management method, system, computer, and storage medium, aiming to adapt to various complex verification working conditions, improve test efficiency, provide necessary index calculation results, reduce labor costs, and improve accuracy.
[0006] To achieve the above-mentioned invention purpose, the present invention adopts the following technical solutions:
[0007] According to a first aspect of the present invention, there is provided a research and development type verification test management method, including the following steps:
[0008] Step S110: Receive the preliminary design verification test plan subdivided according to the development plan.
[0009] Step S120: Perform information setting on the received preliminary design verification test plan to form a design verification test plan. The set information includes the planned start time and the planned completion time.
[0010] Step S130: Assign the design verification test plan to the client on the user side of the corresponding laboratory personnel according to the information set in the previous step.
[0011] Step S140: Obtain the actual time data information of the laboratory personnel's actual tests on the design verification test plan.
[0012] Step S150: Conduct assessment and management according to the preset assessment rules through the design verification test plan and the actual time data information of the actual tests. The preset assessment rules are as follows:
[0013] Step S151: Obtain the estimated period and the accounting period.
[0014] Step S152: Retrieve the test standard time period from the design verification test quota library and use the test standard time period as the assessment basis for the R & D type verification test standard period.
[0015] Step S153: Use the actual time data information as the assessment basis for the actual period.
[0016] Step S154: Calculate the effective time period of the verification test as the assessment basis for the accounting period.
[0017] Step S155: Through the comparison of the estimated period, the budget period, the standard period, the actual period, and the accounting period, assess the accuracy rate of the verification test plan, the completion rate of the verification test, and the one - time passing rate of the verification test, and regularly generate reports.
[0018] Preferably, in step 140, the method for obtaining the time data information of the laboratory personnel's actual tests on the design verification test plan is as follows:
[0019] After each laboratory receives the design verification test task, before starting the test, the test personnel scan the start QR code, and the system automatically records it as the test start time.
[0020] When the test task is completed, the laboratory personnel scan the end QR code, and the system automatically records it as the test completion time.
[0021] Generate the time data information according to the test start time and the test completion time.
[0022] According to a second aspect of the present invention, there is provided a research and development type verification test management system, including:
[0023] A design verification test plan breakdown module, configured to receive and form a preliminary design verification test plan according to the overall design verification test design criteria and regulatory requirement criteria broken down according to the development plan;
[0024] An information setting module, configured to perform information setting on the preliminary design verification test plan to form a design verification test plan;
[0025] A distribution module, configured to assign the design verification test plan to the client on the user side of the corresponding laboratory personnel according to the set information;
[0026] A receiving and scanning module, configured to receive the actual time data information of the laboratory personnel's actual tests on the design verification test plan;
[0027] A verification test report uploading module, configured to obtain the design verification test report from the client on the user side of the laboratory personnel and perform digital storage, thereby completing the closed-loop from the design verification test plan to completion and forming a design verification test report library;
[0028] A verification test completion situation analysis module, configured to calculate at least the verification test plan accuracy rate, the verification test completion rate, and the verification test first-pass rate based on at least the design verification test plan time, the actual design verification test time, and the number of times of starting and scanning the design verification test repetitively, and form data reports from the project dimension and the product structure tree dimension.
[0029] According to a third aspect of the present invention, there is provided a computer, including:
[0030] A memory, configured to store a computer program;
[0031] A processor, configured to execute the computer program to implement the above-mentioned research and development type verification test management method.
[0032] According to a fourth aspect of the present invention, there is provided a storage medium storing computer-executable instructions, and the computer-executable instructions are used to cause a computer to execute the above-mentioned research and development type verification test management method.
[0033] Compared with the prior art, the present invention has the following beneficial effects:
[0034] Through a special process design, the present invention can adapt to a variety of complex verification working conditions, reduce cumbersome communication links, and at the same time provide multiple index information, which is convenient for managers at all levels and laboratory managers to quickly master the verification test status. By means of digitalization, the burden of manual data processing for designers and testers is reduced, and human resources are saved, etc. Description of the Drawings
[0035] Other features, objectives, and advantages of the present invention will become more apparent by reading the following detailed description of non - restrictive embodiments with reference to the accompanying drawings:
[0036] Figure 1 It is a schematic flowchart of the method described in Embodiment 1;
[0037] Figure 2 It is a schematic flowchart of the breakdown of step S150 in the method described in Embodiment 1;
[0038] Figure 3 It is a schematic diagram of the principle of the system described in Embodiment 2;
[0039] Figure 4 It is a schematic diagram of the structure of the system described in Embodiment 2. Detailed implementation manners
[0040] To make the objectives, technical solutions, and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present application. Obviously, the described embodiments are some, but not all, of the embodiments of the present application. Usually, the components of the embodiments of the present application described and illustrated in the accompanying drawings here can be arranged and designed in various different configurations.
[0041] Therefore, the following detailed description of the embodiments of the present application provided in the accompanying drawings is not intended to limit the scope of the present application claimed, but merely represents selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without creative efforts belong to the scope of protection of the present application.
[0042] It should be noted that: Similar reference numerals and letters denote similar items in the following drawings. Therefore, once an item is defined in one drawing, it does not need to be further defined and explained in subsequent drawings. In addition, all directional indications (such as up, down, left, right, front, back, bottom...) in the present application are only used to explain the relative positional relationship and movement conditions between components in a specific posture (as shown in the drawings). If the specific posture changes, the directional indications will also change accordingly.
[0043] Embodiment 1
[0044] This embodiment provides a management method for R & D verification tests. Through innovative management of R & D design verification tests, the subdivision of R & D design verification tests in the R & D department is realized, and the digital transformation of R & D design verification test work is achieved. The implementation status, completion status, test timeliness rate, and first-pass rate of R & D design verification test work in the R & D department can be measured and calculated. At the same time, based on the design standard library and regulation requirement library updated regularly by the system, the R & D department no longer determines the test scope and content based on the experience of individual personnel when formulating the design verification plan. After the control of R & D design verification tests, through this performance appraisal system, the test load of each laboratory can be measured, so that each laboratory can use test resources evenly, promoting the breakthrough and innovation of new technology R & D.
[0045] Specifically, the method provided in this embodiment is as Figure 1 、 Figure 2 shown and includes the following steps:
[0046] Step S110: Receive the preliminary design verification test plan subdivided according to the development plan, and match the specific requirements of the project and the laboratory. Specifically, the development plan is dynamically associated with the latest design standards and regulation library to conform to the cutting-edge requirements in real time and meet the complex and changeable design verification management requirements.
[0047] Step S120: Set information for the received preliminary design verification test plan to form a design verification test plan. Specifically, the set information includes the planned start time and the planned completion time.
[0048] Step S130: Assign the design verification test plan to the client on the user side of the corresponding laboratory personnel according to the information set in the previous step.
[0049] Step S140: The laboratory personnel receive the design verification test plan and obtain the actual time data information of the laboratory personnel's actual tests on the design verification test plan.
[0050] Furthermore, the method for obtaining the time data information of the laboratory personnel's actual tests on the design verification test plan is as follows: After each laboratory receives the design verification test task, before the test starts, the test personnel scan the start QR code, and the system automatically records it as the test start time; when the test task is completed, the laboratory personnel scan the end QR code, and the system automatically records it as the test completion time; the time data information is generated based on the test start time and the test completion time. This process does not require manual time recording, but is automatically recorded and calculated by the system background according to the QR code scanning time information, which can avoid errors in manual filling. Subsequently, after the test personnel complete the preparation of the test report, they upload the test report to the system, and the test task for the client of the laboratory test engineer is completed in a closed loop.
[0051] Step S150, conduct assessment and management on the trial timeliness rate, the first-pass rate of the trial, etc. based on the actual time data information of the design verification plan and the actual test. Specifically, as Figure 2 shown, the sub-steps of performance assessment and management in the R & D design verification test management process include:
[0052] Step S151, obtain the estimated cycle and the accounting cycle;
[0053] Step S152, retrieve the test standard time cycle from the design verification test quota library, and use the test standard time cycle as the assessment basis for the R & D verification test standard cycle;
[0054] Step S153, use the actual time data information as the assessment basis for the actual cycle;
[0055] Step S154, calculate the effective time cycle of the verification test as the assessment basis for the accounting cycle;
[0056] Step S155, through the comparison of the estimated cycle, the budget cycle, the standard cycle, the actual cycle, and the accounting cycle, conduct assessment and management on the verification test plan accuracy rate, the verification test completion rate, and the first-pass rate of the verification test, and generate reports regularly. It should be noted that the assessment and management can also be carried out from multiple other dimensions, and this embodiment does not limit this. The system will aggregate the data of each laboratory and regularly generate a design verification test completion report from the overall project dimension or the vehicle structure tree dimension. For example, it automatically generates monthly, quarterly, and annual reports, which are accurate and efficient, and can facilitate managers at all levels and laboratory managers to quickly master the verification test status. It reduces the burden of manual data processing for designers and testers through digital means and saves human resources, etc.
[0057] The method provided in this embodiment has the advantages of adapting to various complex verification working conditions, reducing cumbersome communication links, providing index information such as the verification test plan accuracy rate, the verification test completion rate, and the first-pass rate of the verification test. At the same time, it can facilitate managers at all levels and laboratory managers to quickly master the verification test status, reduce the burden of manual data processing for designers and testers through digital means, and save human resources, etc.
[0058] Embodiment 2
[0059] This embodiment provides a R & D verification test management system, as Figure 3As shown in the figure, the system provided in this embodiment realizes information intercommunication between the design-side client and the test-side client through information interaction and transmission between the client for design engineers and the user-side client for laboratory personnel, improves the information exchange efficiency, and if there are updates, they will be transmitted in real time between the two clients. The accuracy and timeliness of the design verification plan are greatly improved, and the work complexity and workload of designers and testers are significantly reduced.
[0060] Specifically, as Figure 4 shown, the system provided in this embodiment includes:
[0061] The design verification test plan subdivision module is used to receive and form a preliminary design verification test plan according to the overall design verification test design standards and regulatory requirement standards subdivided according to the development plan.
[0062] The information setting module is used to set information for the preliminary design verification test plan, and after setting, a design verification test plan is formed.
[0063] The distribution module is used to assign the design verification test plan to the corresponding user-side client of laboratory personnel according to the set information.
[0064] The receiving and scanning module is used to receive the actual time data information of the laboratory personnel for the actual test of the design verification test plan.
[0065] The verification test report uploading module is used to obtain the design verification test report from the user-side client of laboratory personnel and perform digital storage, so as to complete the closed-loop from the design verification test plan to the completion, and form a design verification test report library.
[0066] The verification test completion situation analysis module is used to calculate index information such as the verification test plan accuracy rate, the verification test completion rate, and the verification test first-pass rate according to data such as the design verification test plan, the actual time of the design verification test, and the number of times of starting the scan of the design verification test, and form data reports from the project dimension and the product structure tree dimension.
[0067] Embodiment 3
[0068] This embodiment provides a computer, including:
[0069] A memory for storing a computer program;
[0070] A processor for executing the computer program to implement a research and development type verification test management method described in Embodiment 1.
[0071] It should be noted that the above explanation of the implementation manner and beneficial effects of the method in Embodiment 1 also applies to this embodiment. To avoid redundancy, it will not be elaborated in detail here.
[0072] Example 4
[0073] This embodiment provides a storage medium, which is a computer-readable storage medium storing computer-executable instructions for causing a computer to execute the research and development type verification test management method described in Embodiment 1.
[0074] As a non-transitory computer-readable storage medium, a memory can be used to store non-transitory software programs and non-transitory computer-executable programs. In addition, the memory can include high-speed random access memory and can also include non-transitory memory, such as at least one magnetic disk storage device, a flash memory device, or other non-transitory solid-state storage devices. In some embodiments, the memory can include memories remotely located relative to the processor, and these remote memories can be connected to the processor through a network. Examples of the above networks include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.
[0075] It should be noted that the explanations of the implementation manners and beneficial effects of the above-mentioned method in Embodiment 1 are also applicable to this embodiment. To avoid redundancy, no detailed elaboration will be made here.
[0076] The specific embodiments of the present invention have been described above. Through the above description, relevant staff can make various changes and modifications completely within the scope not deviating from the technical idea of this invention.
Claims
1. A research and development verification test management method, characterized in that: The steps include: Step S110, receiving a preliminary design verification test plan subdivided according to the development plan; Step S120, setting information for the received preliminary design verification test plan to form a design verification test plan, wherein the set information includes a plan start time and a plan completion time; Step S130, assigning the design verification test plan to the user-side client of the corresponding laboratory personnel according to the information set in the previous step; Step S140, obtaining actual time data information of laboratory personnel performing actual tests on the design verification test plan; Step S150, by designing and verifying the test plan and the actual time data information of the actual test, assessment and management are performed according to the preset assessment rules, and the preset assessment rules are: Step S151, obtaining the estimated period and the accounting period; Step S152, taking out a test standard time period from the design verification test quota library, and using the test standard time period as the assessment basis for the R&D verification test standard period; Step S153, the actual time data information is used as the assessment basis of the actual period; Step S154, calculating the effective time period of the verification test as the assessment basis of the accounting period; Step S155, by comparing the estimated cycle, budget cycle, standard cycle, actual cycle and accounting cycle, the accuracy of the verification test plan, the completion rate of the verification test, and the first-time pass rate of the verification test are evaluated, and reports are generated regularly.
2. The R&D verification test management method according to claim 1, characterized in that: In step 140, the method for obtaining the time data information of the laboratory personnel performing the actual test on the design verification test plan is: After each laboratory receives the design verification test task, the test personnel scan the start QR code before starting the test, and the system automatically records it as the test start time; When the test task is completed, the laboratory staff scans the QR code and the system automatically records it as the test completion time; The time data information is generated according to the test start time and the test completion time.
3. A research and development verification test management system, characterized in that: include: The design verification test plan subdivision module is used to receive and form a preliminary design verification test plan based on the overall design verification test design standards and regulatory requirements subdivided according to the development plan; An information setting module is used to set information for a preliminary design verification test plan to form a design verification test plan; The sending module is used to assign the design verification test plan to the user-side client of the corresponding laboratory personnel according to the set information; A receiving scanning module is used to receive the actual time data information of the actual test of the design verification test plan by the laboratory personnel; The verification test report upload module is used to obtain the design verification test report from the user-side client of the laboratory personnel and store it digitally, thereby completing the closed loop of the design verification test from planning to completion and forming a design verification test report library; The verification test completion analysis module is used to calculate the verification test plan accuracy, verification test completion rate, and verification test one-time pass rate based on at least the design verification test plan time, the design verification test actual time, and the design verification test startup scan repetition times, and form data reports from the project dimension and product structure tree dimension.
4. A computer, characterized in that: include: Memory for storing computer programs; A processor, used to execute the computer program to implement the R&D verification test management method described in any one of claims 1-2.
5. A storage medium, characterized in that: Computer executable instructions are stored, and the computer executable instructions are used to enable a computer to execute the R&D verification test management method described in any one of claims 1-2.