Industrial unit business data whole-process integration management and control system
The project management module built with microservice technology solves the problem of insufficient business data integration and control capabilities of industrial units, realizes the full-process integration and control of business data, and improves project management efficiency and risk management capabilities.
Patent Information
- Application Number
- CN202510891035.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-06-30
- Publication Date
- 2025-09-23
AI Technical Summary
Industrial units lack the ability to integrate, supervise and integrate business data, resulting in unsatisfactory business management results. In particular, there is a lack of effective means in project budgeting, procurement plan management and supplier management, making it difficult to achieve online management and control.
Microservice technology is used to build a project management module, including project establishment, planning, procurement, control and settlement sub-modules, to achieve full-process integrated management and control of business data. Through online core processes and automated data transmission, it provides comprehensive supplier management and subcontract management functions.
It has significantly improved the efficiency of business data integration and management, reduced the error rate, provided real-time understanding of plan execution, reduced risks, met diversified management needs, and improved the project management level and operating results of industrial units.
Smart Images

Figure CN120689008A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of data integration and control, and in particular to a full-process integration and control system for business data of industrial units. Background Art
[0002] In the power industry, super-large group enterprises such as State Grid and China Southern Power Grid, in addition to the main business units as the core of the group, they also include a large number of subordinate industrial units. The main business units and industrial units are two different business segments. Among them, the industrial units are managed by the group to carry out power equipment manufacturing (such as transformers, smart meters), power engineering design and construction (such as EPC general contracting), integrated energy services (photovoltaic, energy storage, charging piles) and scientific and technological research and development. The efficient development of their business depends on the efficient integration and control of business data of various power systems and offline data.
[0003] However, the CYERP system (a new generation of information system for provincial-level industrial units) and the SG-NC system (a business application platform system for collective enterprises) commonly used by industrial units are State Grid-level deployed systems. System integration and coordination are difficult, making it difficult to efficiently integrate business data during business operations. At the same time, project budgets and procurement plans in the current business content of industrial units are mostly managed offline, and data after offline review is difficult to achieve subsequent control and understand the execution status. Furthermore, in the current business process of industrial units, there is a lack of effective control measures for supplier management, subcontract management, and the actual input of outsourced personnel, which easily breeds risks. Furthermore, pre-sales projects and quick projects in the business content of industrial units are not suitable for control in the CYERP system (a new generation of information system for provincial-level industrial units), so there is currently a lack of online control measures.
[0004] In summary, current industrial units have technical problems that lead to unsatisfactory business control effects due to insufficient capabilities in business data integration, supervision and integrated control. Summary of the Invention
[0005] In view of this, an embodiment of the present invention provides an industrial unit business data full-process integrated management and control system to solve the technical problem that the current industrial units have insufficient business data integration, supervision and integrated management capabilities, resulting in unsatisfactory business management effects.
[0006] A system for integrating and controlling the entire process of business data of industrial units, comprising a project management module, which includes a project establishment submodule, a planning submodule, a procurement submodule, a control submodule, and a settlement submodule:
[0007] The project establishment submodule is used to complete the project establishment management in the process of business development of the industrial units based on the business data obtained from the new generation information system of the provincial industrial units;
[0008] The planning submodule is used to complete the planning management of the industrial unit's business development process based on the business data obtained from the new generation information system of the provincial industrial unit;
[0009] The procurement submodule is used to complete the procurement management during the business development of industrial units based on the business data obtained from the collective enterprise business application platform system and the electrician transaction zone of the e-commerce platform;
[0010] The control submodule is used to complete the control and management of the industrial unit's business development process based on the business data obtained from the new generation information system of the provincial industrial unit;
[0011] The settlement submodule is used to complete the settlement management of the industrial unit's business operations based on the business data obtained from the financial control system;
[0012] Each sub-module in the project management module is built based on microservice technology.
[0013] Optionally, the project establishment submodule includes:
[0014] The project establishment unit is used to register, maintain, delete, query, approve and manage the records of projects that cannot be managed by the new generation information system of the provincial industrial units;
[0015] The project ledger unit is used to collect project establishment information, query details and display them for projects managed by the new generation information system of the provincial-level industrial units;
[0016] A project information unit is used to switch and view the project establishment information of the projects managed by the new generation information system of the provincial-level industrial unit and the projects built by the full-process integrated management and control system of the industrial unit's business data;
[0017] Project panorama unit, used to centrally display the core information of the project;
[0018] The general contract ledger unit is used to display and retrieve the general contract data in the new generation information system of the provincial-level industrial units.
[0019] Optionally, the planning submodule includes:
[0020] Work task decomposition unit, used to complete the milestone planning management of the project of managing the new generation information system of the provincial-level industrial units and the project of building the self-built system of the full-process integration and control of the business data of the industrial units;
[0021] A member information compilation unit is used to complete personnel planning and maintenance in the project of managing the new generation of information systems of the provincial-level industrial units and the project of self-built integrated management and control system of the whole process of business data of the industrial units;
[0022] The procurement demand preparation unit is used to complete the maintenance of procurement requirements for projects managed by the new generation of information systems of the provincial-level industrial units and projects built by the full-process integration and control system of the industrial units' business data.
[0023] Optionally, the procurement submodule includes:
[0024] The procurement plan maintenance unit is used to complete procurement plan submission, online management of technical specifications, online review, automatic review, and review by the procurement plan management committee;
[0025] The purchase requisition review unit is used to automatically review the purchase category, price estimate, delivery date, and data integrity in the purchase plan;
[0026] The bidding information unit is used to complete the online maintenance of the bidding, subcontracting, procurement model and procurement method required for procurement, and to display data by category to online industrial units and industrial groups;
[0027] Project contract unit is used to complete online review of project contract information.
[0028] Optionally, in the procurement plan maintenance unit, the planned procurement management committee adopts a batch operation mode for review.
[0029] Optionally, the control submodule includes:
[0030] The subcontract contract ledger unit is used to display and retrieve the subcontract contract data in the new generation information system of the provincial-level industrial units.
[0031] Optionally, the settlement submodule includes:
[0032] A general contract settlement unit, used to display and retrieve the general contract settlement data in the financial control system;
[0033] The subcontract settlement unit is used to display and retrieve the subcontract settlement data in the financial control system.
[0034] Optionally, the system also includes a supplier module, which is used to store supplier information and supplier personnel information, including supplier information registration, supplier information verification, supplier ledger, supplier personnel registration, supplier personnel verification, supplier personnel ledger, supplier personnel evaluation, and supplier personnel resignation.
[0035] Optionally, the system further includes a system management module, which is used to manage the internal users of the system, including organization management, user management, role management, menu management and department management.
[0036] Optionally, the system further includes a basic management module, which is used to manage the basic business master data of the system, including material management, personnel management, document management, and budget account management.
[0037] Compared with the prior art, the present invention has the following beneficial effects:
[0038] The present invention uses microservice technology to achieve the interconnected and serial control of the business data of various systems used by industrial units, supplements and improves the functions of each system, and targets the deficiencies in the existing business data control of industrial units. It brings core processes such as project budgets and procurement plans online, realizes automatic data transmission, aggregation and feedback, significantly improves efficiency and reduces error rates, and supports in-depth control of data after online review, so as to grasp the execution of plans in real time and realize process automation and intelligence. In addition, the present invention also provides comprehensive supplier management and subcontract management functions, monitors the input of outsourced personnel in real time, effectively reduces risks, and provides customized online control methods for special project types such as pre-sales projects and quick projects to meet diversified management needs. Ultimately, through the efficient integration and functional supplementation of business data in the process of industrial unit business development by the system, the whole process of integrated control of industrial unit business data is realized, the level of industrial unit project control is significantly improved, and the operating results of industrial units are ultimately improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0040] Figure 1 This is a schematic diagram of a full-process integrated management and control system for business data of an industrial unit provided in the first embodiment of the present invention;
[0041] Figure 2 It is a schematic diagram of the supplier module, system management module and basic management module provided in the second embodiment of the present invention. DETAILED DESCRIPTION
[0042] In order to make the technical problems, technical solutions and beneficial effects solved by the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments.
[0043] It should be understood that the embodiments set forth below represent the necessary information to enable those skilled in the art to implement the embodiments and to illustrate the best mode of implementing the embodiments. After reading the following description in light of the accompanying drawings, those skilled in the art will understand the concepts of the present disclosure and will recognize applications of these concepts not specifically mentioned herein. It should be understood that these concepts and applications fall within the scope of the present disclosure and the appended claims.
[0044] It should also be understood that although the terms first, second, etc. may be used herein to describe various elements, these elements should not be limited by these terms. These terms are only used to distinguish one element from another. For example, a first element may be referred to as a second element, and similarly, a second element may be referred to as a first element without departing from the scope of this disclosure. As used herein, the term "and / or" includes any and all combinations of one or more of the related listed items.
[0045] It should also be understood that when an element is referred to as being "connected" or "coupled" to another element, it can be directly connected or coupled to the other element, or intervening elements may be present. In contrast, when an element is referred to as being "directly connected" or "directly coupled" to another element, there are no intervening elements.
[0046] It should also be understood that the terms "upper", "lower", "left", "right", "front", "back", "bottom", "middle", "center", "top", etc. may be used in this document to describe various elements, and the indicated orientation or position relationship is based on the orientation or position relationship shown in the accompanying drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or component referred to must have a specific orientation, be constructed and operated in a specific orientation, so these elements should not be restricted by these terms.
[0047] These terms are only used to distinguish one element from another. For example, a first element can be referred to as an "upper" element, and similarly, a second element can be referred to as an "upper" element based on the relative orientation of these elements without departing from the scope of the present disclosure.
[0048] It is further understood that the terms “comprises,” “includes,” “includes,” and / or “comprising” when used herein specify the presence of stated features, integers, steps, operations, elements, and / or components, but do not preclude the presence or addition of one or more other features, integers, steps, operations, elements, components, and / or groups thereof.
[0049] Unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this disclosure belongs. It will be further understood that the terms used herein should be interpreted as having a meaning consistent with their meaning in the context of this specification and the relevant art, and will not be interpreted in an idealized or overly formal sense unless expressly defined as such herein.
[0050] In the first embodiment, Figure 1 As shown, a full-process integrated management and control system for business data of industrial units is provided.
[0051] The system includes a project management module, which constructs various sub-modules according to the business development process of industrial units and based on microservice technology, including project establishment sub-module, planning sub-module, procurement sub-module, control sub-module and settlement sub-module.
[0052] Microservices technology is a software development technique that breaks large applications into a set of smaller services, each running in its own process and collaborating with each other through lightweight communication mechanisms. This architectural style helps improve the maintainability, scalability, and flexibility of applications. Building a project management module with microservices technology can complement the functionality of various systems currently used by industrial units, bridging the gaps between systems such as the CYERP system (a new generation information system for provincial-level industrial units) and the SG-NC system (a collective enterprise business application platform system). This can also address the problem of some business data not being effectively connected after collection, preventing a complete business data closed loop.
[0053] As well as Figure 1 As shown, the project establishment submodule obtains business data from the new generation information system of the provincial-level industrial units, and thereby completes the project establishment management during the business development of the industrial units; the planning submodule obtains business data from the new generation information system of the provincial-level industrial units, and thereby completes the planning management during the business development of the industrial units; the procurement submodule obtains business data from the collective enterprise business application platform system and the electrician transaction zone of the e-commerce platform, and thereby completes the procurement management during the business development of the industrial units; the control submodule obtains business data from the new generation information system of the provincial-level industrial units, and thereby completes the control management during the business development of the industrial units; the settlement submodule obtains business data from the financial control system, and thereby completes the settlement management during the business development of the industrial units.
[0054] Furthermore, in order to better complete the integrated management and control of the entire process of business data of industrial units, specific functional unit settings are made for each sub-module:
[0055] 1. Project establishment sub-module, including:
[0056] 1) Project establishment unit: used for project information registration, maintenance, deletion, query, approval, and ledger management of pre-sales projects, quick projects, and other projects that are not suitable for management in the new generation of information systems of provincial-level industrial units.
[0057] 2) Project ledger unit, used to collect project approval information and query details of regular project types managed by the new generation information system of provincial-level industrial units. Among them, the data display shall be based on the new generation information system of provincial-level industrial units.
[0058] 3) Project information unit, which is used to switch and view the project establishment information of conventional project types managed by the new generation information system of provincial-level industrial units and project types built by the industrial units' business data full-process integration and control system. It is easy to understand that the projects built by the industrial units' business data full-process integration and control system are the projects established through the above-mentioned project establishment unit.
[0059] 4) Project panorama unit, which is used to display core project-related information in a centralized manner with the project as the main line.
[0060] 5) General contract ledger unit is used to display and retrieve the general contract data collected from the new generation information system of provincial-level industrial units. The general contract data will not be changed in the industrial unit business data full-process integrated management and control system. The supplemented and maintained data will only be used in the industrial unit business data full-process integrated management and control system.
[0061] 2. Planning submodule, including:
[0062] 1) Work task decomposition unit, used to complete the milestone planning management of conventional project types for the management of the new generation of information systems for provincial-level industrial units and project types built by the full-process integration and control system of industrial units' business data, including work task maintenance and Gantt chart display and interaction.
[0063] 2) Member information compilation unit, used to complete personnel planning and maintenance for conventional project types of the new generation information system management of provincial-level industrial units and project types built by the full-process integration and control system of industrial units' business data. Personnel are divided into internal personnel and external personnel provided by partners, and data comes from the internal personnel database and the supplier personnel database.
[0064] 3) Procurement demand preparation unit, used to complete the project procurement demand maintenance for conventional project types managed by the new generation information system of provincial-level industrial units and project types built by the full-process integration and control system of industrial units' business data.
[0065] 3. Procurement submodule, including:
[0066] 1) The procurement plan maintenance unit is used to complete group procurement plan declaration, online management of technical specifications, online review, automatic review, and review by the Plan Procurement Management Committee. To ensure system operation efficiency, reduce system operation workload, and improve system usability, the review adopts batch operation mode and no longer uses workflow approval mode.
[0067] 2) The bidding information unit is used to complete the online maintenance of key information required for procurement, such as bidding, subcontracting, procurement model, procurement method, etc. It supports online industrial units and industrial groups to view data by category, and meets the procurement plan data usage of personnel at all levels.
[0068] 3) Project contract unit, which is used to seamlessly integrate data with procurement projects and their corresponding contracts, enabling online access to project contract-related information, reducing the workload of procurement data maintenance, and improving data quality and the work efficiency of relevant personnel.
[0069] 4) The procurement application review unit supports automatic review of key information such as procurement category, valuation, delivery date, and data integrity in procurement plans. This reduces the review workload for relevant personnel and improves the objectivity of the review; it also improves the quality of procurement plan review work.
[0070] 4. Control submodule, including:
[0071] 1) The subcontract contract ledger unit realizes the display and retrieval of subcontract contract data collected in the new generation information system of provincial-level industrial units. The subcontract contract data will not be changed in the industrial unit business data full-process integrated management and control system, and the supplementary and maintained data will only be used in the industrial unit business data full-process integrated management and control system.
[0072] 5. Settlement submodule, including:
[0073] 1) The general contract settlement unit realizes the display and retrieval of the general contract settlement data collected in the financial control system. The general contract settlement data will not be changed in the industrial unit business data full-process integrated control system. The supplementary and maintained data will only be used in the industrial unit business data full-process integrated control system.
[0074] 2) Subcontract contract settlement unit, which realizes the display and retrieval of subcontract contract settlement data collected in the financial control system. The subcontract contract settlement data will not be changed in the industrial unit business data full-process integrated control system. The supplemented and maintained data will only be used in the industrial unit business data full-process integrated control system.
[0075] Based on the functional unit settings of each submodule described above, after a project is approved in the new-generation information system for provincial-level industrial units, the system in this embodiment can collect project approval information into the system, allowing users to query project approvals and view project information within the system. Furthermore, budgeting, outsourcing, and personnel planning can be performed for the project. After the project manager prepares the cost budget, they can adjust the budget through budget changes, which also take effect after approval by the department head, the responsible leader, the operations management department, and the group business department. After the project contract is signed in the new-generation information system for provincial-level industrial units, the system can also collect contract information into the system, allowing users to query and view details of general contracts and subcontracts within the system. After the project plan is reviewed and approved, a purchase requisition is generated based on the project plan, and information such as purchase requisition batches, technical specifications, sub-bids, and subcontracts is maintained. The purchase plan is approved by the department head, the responsible leader, the operations management department, and the group planning and procurement committee. The collected general contract and subcontract settlement data from the financial control system can be displayed and retrieved. The general contract settlement data remains unchanged within the system, and the supplementary and maintained data is only used within the system.
[0076] In the second embodiment, Figure 2 As shown, the full-process integrated management and control system for industrial unit business data can also include a supplier module, a system management module and a basic management module.
[0077] Among them, the supplier module stores supplier information and supplier personnel information and integrates it with the system, including supplier information registration, supplier information verification, supplier ledger, supplier personnel registration, supplier personnel verification, supplier personnel ledger, supplier personnel evaluation, and supplier personnel resignation.
[0078] The system management module implements the management of internal system users, mainly including organization management, user management, role management, menu management, department management, etc.
[0079] The basic management module implements the basic master data management of the system business, mainly including material management, personnel management, budget account management and document management.
[0080] Based on the system structure in the above embodiment, the following uses a pre-sales project as an example to illustrate the business development process of an industrial unit:
[0081] 1. The project manager shall enter the project information of the pre-sales project during the project establishment, including: project name, project amount, project leader, project location, project overview and other information, and submit it for project approval after confirmation.
[0082] 2. The department head shall review and approve the submitted basic project information.
[0083] 3. After the project is completed and the contract is signed in the new generation information system of provincial-level industrial units, department heads and other roles will display and retrieve the general contracting contract data collected by the new generation information system of provincial-level industrial units.
[0084] 4. After the approval is completed, the project manager will maintain the member information, work task breakdown, procurement information, and submit it for approval.
[0085] 5. The submitted approval information shall be reviewed and approved by the department head, the person in charge, the person in charge of the operations management department, and the group business department in turn.
[0086] 6. After all approvals are completed, the project manager will generate the procurement plan.
[0087] 7. After the project completes the contract signing in the new generation information system of provincial-level industrial units, department heads and other roles will display and retrieve the subcontract contract data collected by the new generation information system of provincial-level industrial units.
[0088] 8. The generated procurement plan is maintained by the business specialists including procurement application batches, technical specifications, bid division, subcontracting and other information
[0089] 9. The maintained procurement plan shall be approved in turn by the department head, the person in charge, the director of the operations management department, and the group business department.
[0090] 10. The financial director reviews the general contract and subcontract settlement data collected from the financial control system.
[0091] This system complements and improves the functions of the CYERP system (a new generation information system for provincially managed industrial units), the SG-NC system (a collective enterprise business application platform), the ETP system (an e-commerce platform for electrician transactions), the personnel attendance management system, and the financial control system. Without modifying the existing system functions, it uses microservices technology to achieve interconnected and cascaded control of business data across various systems used by industrial units. This addresses shortcomings in existing business data management for industrial units by bringing core processes such as project budgeting and procurement planning online, enabling automatic data transmission, aggregation, and feedback, significantly improving efficiency and reducing error rates. It also supports in-depth control of online audited data, providing real-time visibility into plan execution and achieving process automation and intelligence. Furthermore, the system provides comprehensive supplier and subcontract management capabilities, enabling real-time monitoring of outsourced personnel input to effectively mitigate risk. It also offers customized online control methods for specialized project types, such as pre-sales and quick projects, to meet diverse management needs. Ultimately, through the system's efficient integration and functional supplementation of business data throughout the industrial unit's operations, it achieves integrated control of the entire business process, significantly improving project management and ultimately enhancing the unit's operational effectiveness.
[0092] The embodiments described above are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. These modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the various embodiments of the present invention, and should all be included in the scope of protection of the present invention.
Claims
1. A system for the integrated management and control of the entire process of business data of industrial units, characterized by: The system includes a project management module, which includes a project establishment submodule, a planning submodule, a procurement submodule, a control submodule, and a settlement submodule: The project establishment submodule is used to complete the project establishment management in the process of business development of the industrial units based on the business data obtained from the new generation information system of the provincial industrial units; The planning submodule is used to complete the planning management of the industrial unit's business development process based on the business data obtained from the new generation information system of the provincial industrial unit; The procurement submodule is used to complete the procurement management during the business development of industrial units based on the business data obtained from the collective enterprise business application platform system and the electrician transaction zone of the e-commerce platform; The control submodule is used to complete the control and management of the industrial unit's business development process based on the business data obtained from the new generation information system of the provincial industrial unit; The settlement submodule is used to complete the settlement management of the industrial unit's business operations based on the business data obtained from the financial control system; Each sub-module in the project management module is built based on microservice technology.
2. The whole-process integrated management and control system for industrial unit business data according to claim 1 is characterized in that: The project establishment submodule includes: The project establishment unit is used to register, maintain, delete, query, approve and manage the records of projects that cannot be managed by the new generation information system of the provincial industrial units; The project ledger unit is used to collect project establishment information, query details and display them for projects managed by the new generation information system of the provincial-level industrial units; A project information unit is used to switch and view the project establishment information of the projects managed by the new generation information system of the provincial-level industrial unit and the projects built by the full-process integrated management and control system of the industrial unit's business data; Project panorama unit, used to centrally display the core information of the project; The general contract ledger unit is used to display and retrieve the general contract data in the new generation information system of the provincial-level industrial units.
3. The whole-process integrated management and control system for industrial unit business data according to claim 1 is characterized in that: The planning submodule includes: Work task decomposition unit, used to complete the milestone planning management of the project of managing the new generation information system of the provincial-level industrial units and the project of building the self-built system of the full-process integration and control of the business data of the industrial units; A member information compilation unit is used to complete personnel planning and maintenance in the project of managing the new generation of information systems of the provincial-level industrial units and the project of self-built integrated management and control system of the whole process of business data of the industrial units; The procurement demand preparation unit is used to complete the maintenance of procurement requirements for projects managed by the new generation of information systems of the provincial-level industrial units and projects built by the full-process integration and control system of the industrial units' business data.
4. The industrial unit business data full process integrated management and control system according to claim 1 is characterized in that: The procurement submodule includes: The procurement plan maintenance unit is used to complete procurement plan submission, online management of technical specifications, online review, automatic review, and review by the procurement plan management committee; The purchase requisition review unit is used to automatically review the purchase category, price estimate, delivery date, and data integrity in the purchase plan; The bidding information unit is used to complete the online maintenance of the bidding, subcontracting, procurement model and procurement method required for procurement, and to display data by category to online industrial units and industrial groups; Project contract unit is used to complete online review of project contract information.
5. The whole-process integrated management and control system for industrial unit business data according to claim 4 is characterized in that: In the procurement plan maintenance unit, the planned procurement management committee adopts a batch operation mode for review.
6. The industrial unit business data full process integrated management and control system according to claim 1 is characterized in that: The control submodule includes: The subcontract contract ledger unit is used to display and retrieve the subcontract contract data in the new generation information system of the provincial-level industrial units.
7. The industrial unit business data full process integrated management and control system according to claim 1 is characterized in that: The settlement submodule includes: A general contract settlement unit, used to display and retrieve the general contract settlement data in the financial control system; The subcontract settlement unit is used to display and retrieve the subcontract settlement data in the financial control system.
8. The industrial unit business data full process integrated management and control system according to any one of claims 1 to 7, characterized in that: The system also includes a supplier module, which is used to store supplier information and supplier personnel information. The supplier information and supplier personnel information include supplier information registration, supplier information verification, supplier ledger, supplier personnel registration, supplier personnel verification, supplier personnel ledger, supplier personnel evaluation, and supplier personnel resignation.
9. The industrial unit business data full process integrated management and control system according to any one of claims 1 to 7, characterized in that: The system further comprises a system management module, which is used to manage the internal users of the system, including organization management, user management, role management, menu management and department management.
10. The industrial unit business data full process integrated management and control system according to any one of claims 1 to 7, characterized in that: The system also includes a basic management module, which is used to manage the basic business master data of the system, including material management, personnel management, document management and budget account management.