Resource control method, device and equipment

CN121050876APending Publication Date: 2025-12-02HUAWEI TECH CO LTD
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202410708211.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-05-31
Publication Date
2025-12-02

AI Technical Summary

Technical Problem

In electronic devices, when a large number of background tasks are created, it leads to uneven resource allocation, affecting system stability and user experience. Existing technologies have failed to effectively solve the problem of resource abuse.

Method used

By dividing tasks into different groups and dynamically adjusting the resource thresholds for each group, we ensure that important real-time tasks receive more resources and prevent background tasks from excessively consuming resources. We use load information to dynamically adjust resource thresholds, including time slice threshold management for CPU core time slices.

Benefits of technology

It improved system stability and user experience, prevented resource abuse, ensured resource allocation for important tasks, and enabled dynamic resource management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN121050876A_ABST
    Figure CN121050876A_ABST
Patent Text Reader

Abstract

The invention provides a resource control method, device and equipment, and relates to the technical field of terminal communication. The method comprises the steps that the electronic equipment can obtain load information, the load information is used for representing resource usage amounts corresponding to tasks in a first task group and a second task group, and the first task group comprises a real-time task corresponding to an application interacting with a user at present; a first resource threshold value corresponding to the first task group is greater than a second resource threshold value corresponding to the second task group. And when the load information meets a first condition, adjusting a first resource threshold value corresponding to the first task group to a third resource threshold value, and adjusting a second resource threshold value corresponding to the second task group to a fourth resource threshold value. By grouping the tasks differently and dynamically adjusting the resource thresholds corresponding to the groups, resource allocation corresponding to the important real-time tasks can be ensured, conditions such as lagging are avoided, and dynamic management of resources is realized. Therefore, the stability and performance of the system and the use experience of the user are improved.
Need to check novelty before this filing date? Find Prior Art

Citation Information

Cited By

  • Digital human real-time interaction system and method, storage medium and program product

    CN122205199A

  • Resource control method and apparatus, and device

    EP4783004A1

  • Resource control method and apparatus, and device

    WO2025246305A1