Prefabricated reinforced concrete frame column and frame structure
By setting annular grooves and outer steel pipes in precast reinforced concrete frame columns, combined with column steel end structures and connecting brackets, the problems of wet work and connection strength in the beam-column joint area were solved, achieving efficient and economical beam-column connection, and improving construction efficiency and material utilization.
Patent Information
- Application Number
- CN202610163405.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-02-05
- Publication Date
- 2026-06-26
AI Technical Summary
In existing reinforced concrete prefabricated structures, there are problems such as wet construction in the beam-column joint area, difficulty in testing connection strength, low material utilization and high cost.
Precast reinforced concrete frame columns are used. By setting annular grooves and outer steel pipes on the column steel cage, combined with column steel end structures and connecting brackets, a stable connection of beam-column nodes is achieved, reducing steel usage and simplifying the construction process.
It reduces the construction difficulty and cost of beam-column joints, improves the detectability of connection quality and material utilization, and meets the usage requirements under various working conditions.