Estimate acquisition system and estimate acquisition program

The system addresses the challenge of variable and time-consuming estimates by clustering past projects and using tailored models for each cluster, facilitating efficient and accurate estimation even with incomplete specification data.

JP2024171225APending Publication Date: 2024-12-11KK TOSHIBA
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
JP2023088187
Authority / Receiving Office
JP · JP
Patent Type
Applications
Current Assignee / Owner
Filing Date
2023-05-29
Publication Date
2024-12-11

AI Technical Summary

Technical Problem

Existing estimate acquisition systems face challenges in easily obtaining accurate estimates, especially when specification information is incomplete or unclear, leading to variability in estimates and increased man-hours for calculation.

Method used

The system employs a clustering mechanism to group past projects based on specification information, constructs two types of models (first and second models) for each cluster, and selects the appropriate model for estimation based on the project's specification information, allowing for efficient and quantitative estimation even with incomplete data.

Benefits of technology

This approach enables quick and accurate estimation by classifying projects into similar groups, using suitable models for each cluster, reducing the need for extensive manual effort and ensuring reliable estimates even with incomplete information.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 2024171225000001_ABST
    Figure 2024171225000001_ABST
Patent Text Reader

Abstract

To provide an estimate acquisition system and estimate acquisition program that can easily acquire estimations.SOLUTION: An estimate acquisition system according to an embodiment includes a clustering unit, a preprocessing unit, a model equation construction unit, a cluster designation unit, and a model equation application unit. The clustering unit clusters multiple past projects into multiple clusters. The model equation construction unit generates a first model and a second model for each of the clusters. The first model represents a correlation between specification information and cost related values. The second model represents a cost structure. The cluster designation unit designates a cluster to which past projects similar to the project to be estimated belong. The model equation application unit selects one of the first and second models for the cluster designated by the cluster designation unit based on specification information on the project to be estimated, and calculates values related to estimate items of the project to be estimated based on the selected model.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] An embodiment of the present invention relates to a quote acquisition system and a quote acquisition program. [Background technology]

[0002] When receiving an order for a product, plant, etc., a cost estimate is presented to the customer. For example, for a large plant such as a solar power generation system, a rough estimate is presented to the customer at an early stage of consideration to consider the business profitability. In order to calculate such estimates, an estimate acquisition system that uses a processing device such as a computer has been proposed. For example, Patent Document 1 describes a method of using text mining to extract construction records of similar projects from a construction record database based on the specification information of the project to be estimated, and performing multiple regression analysis on the extracted construction records to obtain a function with the specification information as the explanatory variable and the labor hours of each estimated item as the objective variable, and multiplying the labor hours obtained from this function by a predefined rate to calculate an estimate. For example, Patent Document 2 describes an estimate acquisition device that clusters the types of parts that have been used in the past, constructs an estimate model for each cluster with specification information as the explanatory variable and the estimate result as the objective variable, identifies a cluster to which projects similar to the estimated project belong based on the types of parts used in the object of estimation, and calculates an estimate by inputting the specification information into the model formula of the identified cluster. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2015-099476 A [Patent Document 2] JP 2019-101681 A Summary of the Invention [Problem to be solved by the invention]

[0004] The problem to be solved by the present invention is to provide an estimate acquisition system and an estimate acquisition program that can easily obtain an estimate. [Means for solving the problem]

[0005] The estimate acquisition system according to the embodiment includes a clustering unit, a preprocessing unit, a model formula construction unit, a cluster identification unit, and a model formula application unit. The clustering unit clusters a plurality of past cases into a plurality of clusters based on specification information related to each of the plurality of past cases. The preprocessing unit performs preprocessing on a plurality of pieces of past case information related to the plurality of past cases. The model formula construction unit constructs a first model and a second model for each of the plurality of clusters based on the plurality of pieces of past case information on which the preprocessing has been performed. Each of the plurality of pieces of past case information includes the specification information and cost value information including a plurality of estimate items. The first model represents a correlation between the specification information and values ​​related to the cost. The second model represents a cost structure corresponding to a relationship between values ​​related to the plurality of estimate items. The cluster identification unit identifies a cluster to which a past case similar to the estimate target case belongs among the plurality of clusters based on specification information of the estimate target case. The model formula application unit selects one of the first model and the second model for the cluster identified by the cluster identification unit based on the specification information of the project to be estimated, and calculates a value for an estimate item of the project to be estimated based on the selected model. [Brief description of the drawings]

[0006] [Figure 1] FIG. 1 is a schematic block diagram illustrating a quote obtaining system according to an embodiment. [Diagram 2] FIG. 2 is a schematic conceptual diagram for explaining case information. [Diagram 3] FIG. 3 is a flowchart illustrating a processing procedure of the estimate acquisition system according to the embodiment. [Figure 4]FIG. 4 is an explanatory diagram illustrating a process in the estimate acquisition system according to the embodiment. [Diagram 5] FIG. 5 is an explanatory diagram illustrating a process in the estimate acquisition system according to the embodiment. [Figure 6] FIG. 6 is an explanatory diagram illustrating a process in the estimate acquisition system according to the embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0007] Hereinafter, embodiments of the present invention will be described with reference to the drawings. The drawings are schematic or conceptual and are not necessarily the same as the actual objects. In the present specification and each drawing, the same elements as those already explained are designated by the same reference numerals, and detailed explanations are omitted as appropriate.

[0008] FIG. 1 is a schematic block diagram illustrating a quote obtaining system according to an embodiment. As shown in FIG. 1, the quote acquisition system 100 includes an input device 11, an output device 12, a computing device 20, and a storage device 30.

[0009] The storage device 30 stores a plurality of pieces of past case information 31 relating to a plurality of past cases. Note that a case refers to, for example, the manufacture or construction of an item. The scope of a case may also include the provision of an item or a service. Furthermore, the storage device 30 stores cluster information 32 that classifies the plurality of past cases into a plurality of clusters, and model formula information 33 that is a model formula that models the costs incurred for each of the plurality of past cases.

[0010] Specifically, the storage device 30 is a storage device such as a ROM (Read Only Memory) or a RAM (Random Access Memory). More specifically, the storage device 30 may include a non-volatile memory such as a DRAM (Dynamic Random Access Memory), an SRAM (Static Random Access Memory), an EEPROM (registered trademark) (Electrically Erasable Programmable Read Only Memory), or a flash memory. The storage device 30 may include a computer-readable storage medium. Also, for example, the storage device 30 stores an estimate acquisition program executed by the estimate acquisition system 100 (the calculation unit).

[0011] The calculation device 20 is configured to be able to communicate with the storage device 30. The calculation device 20 includes a calculation unit 27 and a display unit 26. The calculation unit 27 includes functional blocks (clustering unit 21, preprocessing unit 22, model formula construction unit 23, cluster identification unit 24, and model formula application unit 25) that execute the processes described below. As a result, the calculation unit 27 estimates the cost value for the case to be estimated, based on the past case information 31, cluster information 32, and model formula information 33 stored in the storage device 30.

[0012] The clustering unit 21 clusters the specification information of the past cases. The preprocessing unit 22 preprocesses the performance information of the past cases. The model formula construction unit 23 constructs, for each cluster classified by the clustering unit 21, a model (a second model described later) that represents the cost structure of the entire quotation items and a model (a first model described later) that outputs an estimate result in response to input of the specification information of the past cases, from the performance information preprocessed by the preprocessing unit 22. The cluster identification unit 24 identifies a cluster to which a case similar to the case to be estimated belongs from the clusters classified by the clustering unit 21, based on the specification information of the case to be estimated. The model formula application unit 25 selects a model formula according to the specification information of the case to be estimated from the model formulas constructed by the model formula construction unit 23 for the cluster identified by the cluster identification unit 24, and inputs the specification information of the case to be estimated to calculate an estimate. The display unit 26 displays the estimate result calculated by the model formula application unit 25.

[0013] Specifically, for example, the calculation unit 27 is a calculation circuit including a CPU (Central Processing Unit) and the like. The calculation unit 27 may include a control unit that controls each function of the estimate acquisition system 100. The calculation unit 27 may be configured to read and execute an estimate acquisition program stored in the storage device 30 and realize various processes described below by software. The display unit 26 is a display device (for example, a liquid crystal display or an organic EL display) that displays the estimate result by the calculation unit 27.

[0014] The input device 11 and the output device 12 are configured to be able to communicate with the arithmetic device 20 and the storage device 30. The input device 11 is an input means for inputting various information, such as past case information and information on the case to be estimated, to the estimate acquisition system 100. Specifically, the input device 11 is, for example, a sensor such as a touch panel, or a user interface such as a mouse or a keyboard. Alternatively, the input device 11 may be a communication module or an input terminal for receiving information from an external storage device or network. The output device 12 is a device for outputting the estimate result to the outside. The output device 12 may be, for example, a communication module or an output terminal for transmitting the estimate result to an external device or network.

[0015] FIG. 2 is a schematic conceptual diagram for explaining case information. Here, as an example, the installation (construction) of a solar power generation system is assumed as the past case P. In the example of FIG. 2, a first past case P1, a second past case P2, and a third past case P3 are illustrated as the multiple past cases P. Each piece of past case information stored in the storage device 30 is information related to each past case P. For example, the multiple pieces of past case information include first past case information related to the first past case P1, second past case information related to the second past case P2, and third past case information related to the third past case P3.

[0016] Each past case information of each past case P includes specification information SI and cost value information CI. For example, the first past case information regarding the first past case P1 includes first specification information SI1 and cost value information CI1 of the first past case. Similarly, the second past case information includes second specification information SI2 and cost value information CI2 of the second past case. The third past case information includes third specification information SI3 and cost value information CI3 of the third past case.

[0017] The specification information of a certain project is, for example, information that represents the required specifications for that project. For example, the first specification information SI1 included in the first past project information represents the required specifications for the first past project P1. The specification information SI includes information on a plurality of specification items (a predetermined number of N specification items). In FIG. 2, three specification items are exemplified as the plurality of specification items: the installation location for installing the solar power generation system, the amount of snowfall at the location for installing the solar power generation system (for example, the average amount of snowfall in a predetermined period of time), and the firmness of the ground at the location for installing the solar power generation system. Note that in the embodiment, the number (N) of specification items included in the specification information SI of the past project information is not limited to three and may be any number.

[0018] Information on each specification item can be expressed by a parameter (numeric value). When the specification item is the installation location, the parameter representing the installation location may be appropriately defined as a discrete value, such as 1 for flat land, 2 for a golf course, and 3 for a mountainous area. When the specification item is the amount of snowfall, the parameter may be a continuous value such as snow depth (cm). Alternatively, discrete values ​​may be appropriately defined, such as 1 for low snowfall and 2 for high snowfall. Information on each specification item may be input as a numerical value, or the calculation unit 27 may extract the necessary information and digitize it.

[0019] In this way, the specification information SI of the past case P is expressed as a combination of N parameters (specification values) corresponding to N predetermined specification items. In other words, the specification information SI of the past case P is data corresponding to a point in an N-dimensional space.

[0020] The cost value information CI for a past case P is the value of the cost actually incurred in that past case P (actual value). In a case that is the subject of an estimate, the cost value is the value that is the subject of an estimate, for example, the expense (amount). However, in an embodiment, it is acceptable to estimate not only the expense but also the period or the quantity of other items. The cost (estimate item) may have a correlation with the specification information and a value that changes depending on the specification information.

[0021] Cost includes multiple items (hereinafter referred to as "estimate items" for convenience) that are the subject of estimation in the project to be estimated. Cost value information includes information on the value of each estimate item. The value of each estimate item is, for example, a breakdown of the cost value. In the cost value information CI of a past project P, the value of each estimate item is the value actually required for each estimate item (actual value).

[0022] In the example of Fig. 2, for example, estimate item 1 is the cost related to a certain device, estimate item 2 is the cost related to site preparation work, estimate item 3 is the cost related to foundation work, and estimate item 4 is the cost related to mounting work. The estimate items are not limited to the above, but may be the cost of specific materials or processing, and can be set appropriately depending on the project. The number of estimate items is not limited to 4, and may be n (n is 2 or more).

[0023] Fig. 3 is a flowchart illustrating a processing procedure of the estimate obtaining system according to the embodiment. Fig. 4 to Fig. 6 are explanatory diagrams illustrating processing in the estimate obtaining system according to the embodiment.

[0024] For example, as a prerequisite for starting a processing procedure, all specification information (information on all specification items) and actual results (values ​​of all estimated items) of past case P are stored in the storage device 30 (past case information) in a completed state.

[0025] 3, in step S101, specification information (e.g., information on N specification items) required for model formula construction is extracted from all specification information of past case information. For example, it is assumed that the specification information required for model formula construction is defined in advance. The past case information from which specification information is to be extracted can also be selected by the user, taking into consideration the implementation time of the past case, etc.

[0026] Thereafter, the clustering unit 21 performs clustering based on one or more types of specification information (specification items) of the selected past cases. Specifically, for example, in step S102 shown in FIG. 3, clustering of the past cases is performed using the specification information extracted from the selected past case information. As an algorithm for performing clustering, the user can select a known one, such as the k-means method or the Ward method. The user can also select an arbitrary number of clusters. A known method, such as the elbow method, may be used as a reference for determining the number of clusters. The number of clusters may be automatically determined using a known method, such as the x-means method. The number of clusters obtained as a result of clustering, information (cluster information 32) such as the cluster to which each case belongs, etc. are stored in the storage device 30. The performance value of each case belonging to each cluster is obtained from the storage device 30 (past case information 31).

[0027] 4, the clustering unit 21 clusters a plurality of past cases P into a plurality of clusters Ck based on the specification information SI related to each of the plurality of past cases P. That is, the clustering unit 21 clusters a plurality of past cases P into a plurality of clusters Ck based on at least a portion of information of all specification items (information of one or more (e.g., N) specification items). Here, k is an integer from 1 to K that represents the cluster number. That is, the plurality of clusters Ck include a first cluster C1 to a K-th cluster CK.

[0028] Each cluster Ck is classified into a plurality of past cases P. In other words, the plurality of past cases P are classified into the m-th cluster Ck. k Past case P k m k Including m k is the number of past cases P belonging to the kth cluster Ck, from 1 to M. k is an integer.

[0029] Specifically, the first cluster C1 (Group A) includes the first past case P11 to the M1 past case P1M1. Similarly, the second cluster C2 (Group B) includes the first past case P21 to the M2 past case P2M2. Similarly, the K-th cluster CK (Group C) includes the first past case P11 to the M2 past case P2M2. K 1~M K Past case P K M K are classified.

[0030] Thereafter, the pre-processing unit 22 normalizes the performance information of the selected past projects by the parameter that has the greatest influence on cost fluctuations, calculates the average value and standard deviation of the performance values ​​of each estimate item for each cluster classified by the clustering unit 21, and sorts the estimate items by the average value. For example, in step S103 shown in FIG. 3, the performance values ​​of each estimate item of each project are normalized by the parameter that has the greatest influence on cost fluctuations. For example, in a solar power generation business, the power generation capacity, which indicates the power generation scale, has the greatest influence on cost fluctuations, so the performance values ​​are normalized by the power generation capacity. For each cluster, the normalized performance values ​​of each project are used to calculate the average value μ and standard deviation σ of each estimate item. Then, the estimate items are sorted by cluster in ascending or descending order by the average value μ.

[0031] That is, for example, the pre-processing unit 22 normalizes the cost value of each past project information (the value of each estimate item) with a reference value based on each past project information. Each reference value may be an index value that indicates the magnitude of the cost value of each past project P. For example, each reference value may be based on information of at least one specification item of the specification information SI of each past project P. Specifically, as described above, the power generation capacity (watts) may be set as the reference value for each past project P. For example, the value of each estimate item of a past project P (actual value) is divided by the power generation capacity (reference value) of the past project P to normalize the value of each estimate item of the past project P.

[0032] Alternatively, each reference value may be based on the cost value of each past case P. For example, the value of the estimate item having the largest value among multiple estimate items in each past case may be set as the reference value. Alternatively, for example, the value of a specific estimate item in each past case P may be set as the reference value.

[0033] 4, the value of each estimate item of the first past case P11 in the first cluster C1 is normalized by a first reference value (e.g., divided by the first reference value). This first reference value is based on the first past case information of the first past case P11, for example, on the parameters of the specification items of the first past case information or on the cost value information CI1.

[0034] Similarly, the values ​​of each estimate item of the second past case P12 to the M1st past case P1M1 in the first cluster C1 are normalized by the second reference value to the Mth reference value, respectively. The second reference value to the Mth reference value are based on the past case information of the second past case P12 to the M1st past case P1M1, respectively.

[0035] The preprocessing unit 22 normalizes the value of each estimate item for each past case P classified into the second cluster C2 to the K-th cluster CK, in the same manner as in the first cluster C1, by a reference value based on the past case information of that past case P.

[0036] Note that normalization may be performed not only by dividing each value by a reference value, but also by using other methods. For example, normalization may be performed in each past case P, in which the maximum value of the values ​​of multiple estimate items is set to 1 and the minimum value is set to 0, or the average value of multiple estimate items is set to 0 and the standard deviation is set to 1. Also, in the embodiment, pre-processing such as normalization is not necessarily performed and may be omitted, or may be performed as necessary.

[0037] Continuing the explanation using the processing in the first cluster C1 shown in Fig. 4 as an example, the pre-processing unit 22 calculates the average value of the first estimate items of the M1 past cases P included in the first cluster C1 (i.e., the average value of the normalized estimate item 1 value of the first past case P11, the normalized estimate item 1 value of the second past case P12, ..., and the normalized estimate item 1 value of the M1 past case P1M1). In addition, the pre-processing unit 22 calculates the standard deviation of the first estimate items of the M1 past cases P included in the first cluster C1. Similarly, the pre-processing unit 22 calculates the average value and standard deviation of each of the second to n-th estimate items in the first cluster C1.

[0038] Furthermore, the preprocessing unit 22 performs a sorting process to sort the multiple quotation items in the first cluster C1 in ascending (or descending) order of the calculated average value. For example, in the graph Gr2 illustrated on the right side of Fig. 4, multiple quotation items are arranged from the left side of the graph in ascending order of normalized performance values ​​(average values ​​of normalized quotation items).

[0039] In other words, the sorting process is a process of assigning a number (numeric value) from 1 to n to each of multiple estimate items in ascending (or descending) order of average value. For example, in the first cluster C1, a number from 1 to n is assigned to each estimate item in ascending (or descending) order of average value, such that 1 is assigned to the estimate item with the largest average value among multiple estimate items, 2 is assigned to the estimate item with the second largest average value, ..., n is assigned to the estimate item with the nth largest average value. In the sorting process, each estimate item is assigned a number from 1 to n that indicates the order of magnitude (smallness) of the average value of each estimate item. For example, an estimation model M102 representing a cost structure is constructed from a graph in which the average values ​​of the estimation items are plotted in sorted order, as in the graph Gr2 illustrated in Fig. 4. By sorting the average values ​​of the estimation items, the degree of the model formula representing the cost structure can be lowered.

[0040] The pre-processing unit 22 performs similar processing for the second to K-th clusters. That is, in each of the multiple clusters Ck, the pre-processing unit 22 calculates the average value and standard deviation of values ​​for each of the multiple quotation items in the multiple past cases P, and sorts the multiple quotation items according to the average values.

[0041] In this way, the preprocessing unit 22 processes a plurality of past cases P (first past case P k 1~M k Past case P k M k ), the average and standard deviation of the normalized values ​​of the first estimate item for the multiple past cases P, the average and standard deviation of the normalized values ​​of the second estimate item for the multiple past cases P, and the average and standard deviation of the normalized values ​​of the n-th estimate item for the multiple past cases P. The pre-processing unit 22 performs a sorting process in which the multiple estimate items in the cluster Ck are numbered from 1 to n in ascending (or descending) order of average value.

[0042] Thereafter, the model formula construction unit 23 constructs a model formula for each estimate item in the clusters classified by the clustering unit 21, with the specification information as the explanatory variable and the estimate result as the objective variable. For example, in step S104 shown in Fig. 3, one or more pieces of specification information (specification items) that affect cost fluctuations are defined for each estimate item. The specification information and normalized performance values ​​defined for each estimate item of each project included in each cluster are acquired, and an estimate model M101 (see Fig. 4) is constructed that estimates the cost of each estimate item by multiple regression analysis with the normalized performance values ​​as the objective variable and the specification information as the explanatory variable.

[0043] That is, for example, the model formula construction unit 23 constructs a first model M1 (e.g., a plurality of estimation models M101) for each of a plurality of clusters Ck based on a plurality of pieces of past case information related to each of a plurality of past cases P. The first model M1 of a certain cluster Ck is a model that represents the correlation between the specification information of the past case P of the cluster Ck and a value related to cost. That is, for example, the first model M1 for the first cluster C1 represents the correlation between the specification information of the multiple past cases P of the first cluster C1 and a value related to cost of the multiple past cases P of the first cluster C1. The first model M1 is a model that receives specification information as an input and outputs a value related to cost as an estimation result.

[0044] In the embodiment, the "cost value" (value related to the estimate item) is a value obtained by performing a predetermined conversion process on the cost value (value of the estimate item) such as the amount or period that is the final target of the estimate. In this example, the "cost value" is the normalized cost value as described above. However, if conversion processes such as normalization are omitted, the cost value may be a cost value that has not been converted such as by normalization.

[0045] 4, the first model M1 (plurality of estimation models M101) includes n estimation models, namely, a first estimation model M1011 to an n-th estimation model M101n. The first estimation model M1011 to the n-th estimation model M101n correspond to the first estimation item (estimate item 1) to the n-th estimation item (estimate item n), respectively.

[0046] As shown in Fig. 4, the first estimation model M1011 represents the correlation between information on at least a portion (referred to as the first specification part) of the N specification items and values ​​(normalized actual values) related to the first estimation items of multiple past projects P. In the example of Fig. 4, the first specification part is one specification item. The specification value V1 is the parameter value of that one specification item. The first estimation model M1011 represents the correlation between the specification value V1 and values ​​related to the first estimation items of multiple past projects P.

[0047] Similarly, the nth estimation model M101n represents the correlation between information on at least a portion (referred to as the nth specification part) of N specification items and a value (normalized actual value) related to the nth estimation item of multiple past projects P. In the example of FIG. 4, the nth specification part is two specification items. The specification value VN-1 and the specification value VN are the parameter values ​​of the two specification items. The nth estimation model M101n represents the correlation between the two specification values ​​VN-1, VN and a value related to the nth estimation item of multiple past projects P.

[0048] As an example, the j-th estimation model M101j (j is an integer from 1 to n) of the k-th cluster is y kj =a kj1 x kj1 +a kj2 x kj2 +··· (1) It can be expressed by the following model formula: kj is the value for the jth quotation item. x kj1 , x kj2 . . . are the specification values ​​of each specification item included in the jth specification part (at least a part of the N specification items). kj1 , a kj2 ... is a constant. The specification items included in the jth specification part are appropriately determined from N specification items. The number of specification items included in the jth specification part is an appropriate number from 1 to N. Each estimation model may be derived by machine learning such as supervised learning. Note that the model formula is not limited to a first-order polynomial, and for example, the degree of the model formula may be second order or higher.

[0049] Furthermore, the model formula construction unit 23 plots the average values ​​of each estimate item in the clusters classified by the clustering unit 21 on a graph in the order in which they were sorted, and constructs a model formula representing the cost structure of the cluster by regression analysis. For example, in step S104 shown in Fig. 3, the values ​​of the normalized average values ​​μ of the actual results obtained for each estimate item of each cluster in step S103 are plotted on a graph in the order in which they were sorted, and an estimation model M102 (see Fig. 4) representing the cost structure of the cluster is constructed by regression analysis with the average values ​​μ of the actual results as the objective variable and the estimate items as the explanatory variables. By sorting the estimate items by the average values ​​μ, it is possible to lower the degree of the estimation model to be constructed by comparison before sorting.

[0050] That is, for example, the model formula construction unit 23 constructs a second model (estimate model M102) for each of the multiple clusters Ck based on multiple past case information related to each of the multiple past cases P. The estimate model M102 of a certain cluster Ck represents the cost structure in the multiple past cases P belonging to the cluster Ck. For example, the second model for the first cluster C1 represents the cost structure in the multiple past cases P of the first cluster C1. The cost structure indicates the relationship between values ​​related to multiple estimate items.

[0051] That is, for example, as shown in graph Gr2 in FIG. 4, the estimation model M102 for the first cluster C1 represents the correlation between the numerical values ​​(numbers indicating the order of magnitude) assigned to each of the multiple estimation items by the above-mentioned sorting process for the first cluster C1 and the average value of the values ​​for each of the multiple estimation items in the first cluster C1.

[0052] As an example, the estimation model M102 of the k-th cluster is y k = α k x 2 +β k x+γ k (2) It can be expressed as a model formula like this. x is the numerical value given to the quotation item by the sorting process. y kis the value (average value) for the xth estimate item. α k , β k , γ k is a constant. The estimation model may be derived by machine learning such as supervised learning. The model formula is not limited to a quadratic formula, and may be, for example, a linear formula or a cubic or higher order formula.

[0053] Furthermore, the cluster identification unit 24 performs clustering based on one or more types of specification information (specification items) of the project to be estimated, and identifies the cluster to which the project to be estimated belongs from the clusters clustered by the clustering unit 21. Specifically, for example, in step S105 shown in FIG. 3, clustering is performed using the specification information of the project to be estimated, and the cluster to which the project to be estimated belongs is identified. The specification information of the project to be estimated is input by the user using, for example, the input device 11. The input specification information of the project to be estimated may be insufficient compared to the specification information extracted in step S102. If the specification information is insufficient, a (default) value set in advance may be assigned to the missing specification information, and clustering may be performed using that value.

[0054] That is, the specification information of the project to be estimated includes information on at least some of the N specified specification items. As with the past project P described above, the specification information of the project to be estimated may include information on all N specification items, or may include information on only some of the N specification items. In this way, the specification information of the project to be estimated may be insufficient information that does not include information on some of the N specification items.

[0055] 5, the cluster identification unit 24 calculates the distance Lk (e.g., Euclidean distance) between a point EP representing the specification information of the project to be estimated and the center of gravity of each cluster Ck in an N-dimensional space formed from N specification items. That is, the cluster identification unit 24 calculates the distance L1 between the point EP and the center of gravity of the first cluster C1, the distance L2 between the point EP and the center of gravity of the second cluster C2, and the distance LK between the point EP and the center of gravity of the K-th cluster CK. Then, the cluster identification unit 24 identifies the cluster Ck having the center of gravity that is the shortest distance from the point EP.

[0056] In this manner, the cluster identifying unit 24 identifies, from among the multiple clusters Ck, a cluster to which a past case similar to the project to be estimated belongs (a cluster to which the project to be estimated belongs), based on the specification information of the project to be estimated.

[0057] Furthermore, the model formula application unit 25 calculates an estimate by selecting and applying an appropriate model from the model formula constructed by the model formula construction unit 23 based on the specification information of the item to be estimated. Specifically, for example, in step S106 shown in FIG. 3, the model formula constructed in step S104 is applied to the specification information of the item to be estimated input in step S105 to calculate an estimate. The model formula to be applied is determined for each estimate item. For example, if the specification information input in step S105 satisfies the explanatory variables of the estimation model M101 constructed in step S104, the estimation model M101 is applied to calculate an estimate. For example, if the specification information input in step S105 does not satisfy the explanatory variables constructed in step S104, the estimation model M102 is applied to calculate an estimate.

[0058] In this way, the model formula application unit 25 selects one of the first model (estimation model M101) for the cluster identified by the cluster identification unit 24 and the second model (estimation model M102) for the cluster based on the specification information of the project to be estimated, and calculates values ​​related to the estimate items of the project to be estimated based on the selected model.

[0059] That is, the model formula application unit 25 performs a process of calculating a value related to one of the first to n-th estimation items based on one of the estimation models M101 (first model) corresponding to the one of the estimation items and the estimation model M102. The model formula application unit 25 performs this process for each of the multiple estimation items.

[0060] 6 illustrates an example of calculation of values ​​related to estimation items b1 to b10 in the model formula application unit 25. Note that the estimation items b1 to b10 are each one of the first to n-th estimation items. 6, a bar with dotted hatching indicates that the value of the estimate item is calculated based on the estimation model M101, and a bar with diagonal hatching indicates that the value of the estimate item is calculated based on the estimation model M102.

[0061] For example, the estimation model M101 corresponding to the estimate item b1 is a model that estimates a value related to the estimate item b1 by inputting information on at least a portion of the N specification items (referred to as the specification part of the estimate item b1). The example in FIG. 6 is a case where the specification information of the project to be estimated includes information on all the specification items included in the specification part of the estimate item b1. In other words, the specification information of the project to be estimated satisfies the explanatory variables of the estimation model M101 corresponding to the estimate item b1. In this case, as shown in FIG. 6, a value related to the estimate item b1 is estimated based on the estimation model M101.

[0062] For example, the estimation model M101 corresponding to the estimate item b4 is a model that estimates a value related to the estimate item b4 by inputting information on at least a portion of the N specification items (referred to as the specification portion of the estimate item b4). The example in FIG. 6 is a case in which the specification information of the project to be estimated does not include information on at least a portion of the specification items included in the specification portion of the estimate item b4. In other words, the specification information of the project to be estimated does not satisfy the explanatory variables of the estimation model M101 corresponding to the estimate item b4. In this case, as shown in FIG. 6, the value related to the estimate item b4 is estimated based on the estimation model M102. For example, the numerical value (number indicating the order of magnitude) assigned to the estimate item b4 in the above-mentioned sorting process is applied to the model formula of the estimation model M102.

[0063] In this manner, for example, the first estimation model M1011 represents the correlation between the first specification portion, which is at least a part of the N specification items, and values ​​related to the first estimation items of a plurality of past cases. When the specification information of the project to be estimated includes all of the specification items included in the first specification portion, the model formula application unit 25 selects the first estimation model M1011 and applies the specification information of the project to be estimated to the first estimation model M1011 to estimate a value related to the first estimation item of the project to be estimated. On the other hand, when the specification information of the project to be estimated does not include at least a part of the specification items included in the first specification portion, the model formula application unit 25 selects the estimation model M102 (second model) and estimates a value related to the first estimation item of the project to be estimated based on the estimation model M102.

[0064] The value estimated in this manner is a value to which a predetermined conversion process (such as the normalization described above) has been applied. In step S106, in order to calculate a final value such as a monetary amount, the value to which the predetermined conversion process has been applied may be appropriately converted inversely. For example, when the pre-processing unit 22 normalizes the value by the power generation capacity as described above, the estimated value (normalized value) may be multiplied by the power generation capacity of the project to be estimated.

[0065] The effects of the estimate acquisition system according to the embodiment will be described. As described above, in the embodiment, two models, the first and second models, are constructed for each cluster. Then, according to the specification information of the project to be estimated, one of the first and second models for the cluster to which the past project similar to the project to be estimated belongs is selected, and a value related to the estimate item is calculated based on the selected model. In this way, since the estimate result can be obtained by calculating the estimate based on one of the first and second models, it becomes possible to easily obtain the estimate. For example, even if it is difficult to estimate using the other of the first and second models, the estimate result can be obtained. Also, for example, the estimate result may be obtained by selecting a more suitable model according to the specification information of the project to be estimated.

[0066] For example, in the early stages of considering a product or a plant, an estimate may be made when the specifications are unclear. In such cases, the estimate is made based on the experience and knowledge of the estimator, and therefore the estimate results may vary depending on the estimator, and when the estimation conditions are complicated, it may take a long time to calculate the estimate. Therefore, a reference example estimate calculation system using a calculation processing device such as a computer has been proposed. In the reference example estimate calculation system, similar past performance information is obtained based on the specification information of the item to be estimated, a model formula is constructed based on the obtained performance information with the specification information as an explanatory variable, and the specification information of the item to be estimated is input into the model formula to calculate an estimate. However, if the input specification information of the item to be estimated does not satisfy the specification information that is the explanatory variable of the model, it is difficult to calculate an estimate.

[0067] In contrast, in the embodiment, for example, each project is classified into a plurality of clusters based on the specification information, and for each cluster, a model formula (estimation model M101) that estimates the cost of each estimate item and a model formula (estimation model M102) that represents the cost structure of all estimate items in the cluster are constructed. Based on the specification information of the project to be estimated, a cluster to which similar projects belong is identified, and if the specification information of the project to be estimated satisfies the explanatory variables of the estimation model M101, the model formula of the estimation model M101 is applied, and if it is insufficient, the model formula of the estimation model M102 is applied. This makes it possible to perform quantitative and efficient estimation, for example, even for items that lack specification information at the estimation stage. For example, even if specification information is insufficient, it is possible to calculate a quantitative rough estimate based on past performance and reduce the man-hours required for calculating an estimate.

[0068] In the embodiment, the preprocessing unit 22 normalizes the cost value of each of the multiple past case information based on each of the multiple past case information. This makes it easier to handle the data of the multiple past cases together and build a model, even when the scales of the multiple past cases are different from each other. Furthermore, as described above, the preprocessing unit 22 sorts the multiple estimate items according to the average value. This makes it possible to lower the degree of the model formula. For example, the model formula building unit 23 plots the relationship between the order in which the preprocessing unit 22 sorted the multiple estimate items and the average value of the values ​​related to each of the multiple estimate items in each cluster Ck on a graph, and builds the second model by regression analysis. This makes it possible to lower the degree of the model formula.

[0069] In the embodiment, a decision is made as to which model to select for each estimate item, and an estimate result is calculated. That is, for example, the model formula application unit 25 selects one of the estimation models M101 and M102 corresponding to one of the multiple estimate items based on the specification information of the project to be estimated. Then, the model formula application unit 25 calculates a value related to that one of the multiple estimate items based on the selected model. The model formula application unit 25 performs this process for each estimate item. This makes it possible to estimate using a more suitable model for each estimate item.

[0070] According to the embodiment, for example, by inputting specification information of the project to be estimated, it is possible to automatically classify the project into groups of similar projects. In addition, by switching the model formula to be applied depending on the state of the specification information to be input, it is possible to calculate an estimate even when the specification information is insufficient, for example, at the initial stage of the estimate.

[0071] The example in Fig. 6 is a case where the specification information of the project to be estimated satisfies the explanatory variables of the estimation model M101 corresponding to the estimation item b6. The bar represented by a dashed line for the estimation item b6 in Fig. 6 illustrates an estimated value for the estimation item b6 calculated based on the estimation model M101 corresponding to the estimation item b6. Here, as in the example in Fig. 6, when the estimated value based on the estimation model M101 differs from the trend of the cluster, the estimated value may be treated as an outlier, and an estimated value may be calculated based on the estimation model M102.

[0072] For example, when the difference between the estimated value of an estimate item calculated based on the estimation model M102 and the estimated value of the estimate item calculated based on the estimation model M101 is greater than a predetermined value, the estimated value based on the estimation model M101 is determined to be an outlier. This predetermined value can be determined based on the standard deviation σ of the estimate item calculated by the preprocessing unit 22, for example, 3σ.

[0073] Furthermore, the reliability of the estimation model M101 corresponding to the estimation item may be calculated based on the standard deviation σ or the number of samples of the estimation item. For example, the smaller the standard deviation σ, the higher the reliability, and the larger the number of samples, the higher the reliability. Based on the reliability, an outlier determination may be appropriately performed for the estimated value of the estimation item based on the estimation model M101. For example, an estimated value of an estimation item based on the estimation model M101 whose reliability is lower than a predetermined value is determined to be an outlier. When an estimation item based on the estimation model M101 is determined to be an outlier, an estimated value based on the estimation model M102 may be adopted for the estimation item.

[0074] Each component, such as the functional blocks described in the embodiments, is a functional concept and does not necessarily have to be physically configured as illustrated. Some or all of the multiple functional blocks may be consolidated as appropriate, or each functional block may be divided into multiple blocks. Part of each functional block may be moved to another block. Each component of the embodiments may be functionally or physically distributed or integrated as appropriate.

[0075] Moreover, the embodiment may be an estimate acquisition program that causes a computer to execute the estimate acquisition method described in the above-mentioned flowchart. The estimate acquisition system 100 executes each of the above-mentioned processes based on the estimate acquisition program. However, a part or all of the estimate acquisition method according to the embodiment may be executed based on the operation of hardware that does not require a program. Moreover, the program is not limited to the form of a program (form provided in the computer) for making the computer execute the above-mentioned method, but may be in the form of a computer-readable recording medium. Examples of the recording medium include CD-ROM (-R / -RW), optical magnetic disk, HD (hard disk), DVD-ROM (-R / -RW / -RAM), FD (flexible disk), flash memory, similar recording media, and various other ROMs, RAMs, etc. As long as the recording medium is readable by the computer or the embedded system, the storage format may be any form. The computer can realize the same operation as the above-mentioned embodiment by reading the program from the recording medium and making the CPU execute the instructions described in the program based on the program. Of course, when the computer acquires or reads the program, it may acquire or read it through a network. In addition, an OS (operating system) running on a computer based on instructions from a program installed on a computer or embedded system from a recording medium, database management software, MW (middleware) operating on a network, etc. may execute some of the processes for realizing the embodiment. Furthermore, the recording medium in the embodiments is not limited to a recording medium independent of a computer or an embedded system, but also includes a recording medium in which a program transmitted via a LAN, the Internet, or the like is downloaded and stored or temporarily stored. The number of recording media is not limited to one, and the recording medium in the embodiments also includes cases in which the processing in the embodiments is executed from multiple recording media. The recording media may have any configuration. In addition, the computer or embedded system in the embodiments is for executing each process in the embodiments based on a program stored in a recording medium, and may be any configuration of a device consisting of a personal computer, a microcomputer, etc., or a system in which multiple devices are connected to a network. Furthermore, the computer in the embodiments is not limited to a personal computer but also includes an arithmetic processing unit, a microcomputer, etc. included in information processing equipment, and is a general term for equipment or devices that can realize the functions in the embodiments by a program.

[0076] The embodiment may include the following features. (Configuration 1) a clustering unit that clusters a plurality of past cases into a plurality of clusters based on specification information relating to each of the plurality of past cases; a pre-processing unit that performs pre-processing on a plurality of pieces of past case information related to the plurality of past cases; a model formula construction unit that constructs a first model and a second model for each of the plurality of clusters based on the plurality of pieces of past case information that have been preprocessed, each of the plurality of pieces of past case information includes the specification information and cost value information including a plurality of estimate items, the first model represents a correlation between the specification information and the value related to the cost, and the second model represents a cost structure corresponding to a relationship between values ​​related to the plurality of estimate items; a cluster identification unit that identifies, from among the plurality of clusters, a cluster to which a past project similar to the project to be estimated belongs, based on specification information of the project to be estimated; a model formula application unit that selects one of the first model and the second model for the cluster identified by the cluster identification unit based on the specification information of the project to be estimated, and calculates a value related to an estimate item of the project to be estimated based on the selected model; A quote acquisition system comprising: (Configuration 2) 2. The estimate obtaining system according to configuration 1, wherein the preprocessing unit normalizes the cost value of each of the plurality of pieces of past case information based on each of the plurality of pieces of past case information. (Configuration 3) 3. The quotation obtaining system according to configuration 2, wherein the pre-processing unit calculates an average value of values ​​for each of the plurality of quotation items in the plurality of past cases in each of the plurality of clusters, and sorts the plurality of quotation items according to the average value. (Configuration 4) 4. The estimate obtaining system according to configuration 3, wherein the model formula construction unit constructs the second model for each of the plurality of clusters based on a relationship between an order in which the pre-processing unit sorts the plurality of estimate items and the average value of values ​​related to each of the plurality of estimate items. (Configuration 5) the first model includes a plurality of estimation models; each of the plurality of estimation models represents a correlation between the specification information of the plurality of past cases and a value related to each of the plurality of estimation items; The estimate obtaining system according to any one of configurations 1 to 4, wherein the model formula application unit selects one of an estimation model corresponding to one of the estimation items from among the plurality of estimation models or the second model based on the specification information of the project to be estimated, and performs a process of calculating a value related to the one of the estimation items of the project to be estimated based on the selected model, for each of the plurality of estimation items. (Configuration 6) The specification information of each of the plurality of past cases includes information on a plurality of specification items, the plurality of estimation models includes a first estimation model corresponding to a first estimation item, the first estimation model represents a correlation between a first specification portion, which is at least a part of the plurality of specification items, and values ​​related to the first estimation items of the plurality of past projects; The model equation application unit is selecting the first estimation model when the specification information of the project to be estimated includes all of the specification items included in the first specification portion, and applying the specification information of the project to be estimated to the first estimation model to estimate a value related to the first estimation item of the project to be estimated; the second model is selected when the specification information of the project to be estimated does not include at least a portion of the specification items included in the first specification portion, and a value related to the first quotation item of the project to be estimated is estimated based on the second model. (Configuration 7) A process of clustering a plurality of past cases into a plurality of clusters based on specification information relating to each of the plurality of past cases; performing pre-processing on a plurality of past case information related to the plurality of past cases; A process of constructing a first model and a second model for each of the plurality of clusters based on the plurality of pieces of past case information that have been pre-processed, each of the plurality of pieces of past case information includes the specification information and cost value information including a plurality of estimate items, the first model represents a correlation between the specification information and the value related to the cost, and the second model represents a cost structure corresponding to a relationship between values ​​related to the plurality of estimate items; a process of identifying, from among the plurality of clusters, a cluster to which a past project similar to the project to be estimated belongs, based on specification information of the project to be estimated; selecting one of the first model and the second model for the identified cluster based on the specification information of the project to be estimated, and calculating a value related to an estimate item of the project to be estimated based on the selected model; A quote acquisition program that causes a computer to execute the above.

[0077] According to the embodiment, it is possible to provide an estimate obtaining system and an estimate obtaining program that can easily obtain an estimate.

[0078] Although some embodiments of the present invention have been illustrated above, these embodiments are presented as examples and are not intended to limit the scope of the invention. These novel embodiments can be implemented in various other forms, and various omissions, substitutions, modifications, etc. can be made without departing from the gist of the invention. These embodiments and their modifications are included in the scope and gist of the invention, and are included in the scope of the invention and its equivalents described in the claims. [Explanation of symbols]

[0079] 11: Input device 12: Output device 20: Arithmetic device 21: Clustering Department 22: Pre-processing section 23: Model formula construction section 24: Cluster Identification Part 25: Model formula application section 26: Display section 27: Arithmetic section 30: Storage device 31:Past case information 32: Cluster information 33: Model information 100: Estimate acquisition system C1: First cluster C2: Second cluster CI, CI1 to CI3: Cost value information CK: Kth cluster Ck: Cluster Gr2: Graph L1, L2, LK, Lk: distance M1: First model M101: Estimation Model M1011: First estimation model M101j: jth estimation model M101n: nth estimation model M102: Estimation Model P:Past cases P1~P3: 1st~3 past cases P11~P1M1: 1st~M1 past cases P21~P2M2: 1st~M2 past cases P K 1~P K M K :1st~M K Past cases P k 1~P k m k :1st~mth k Past cases S101~S106: Step SI: Specification information SI1~SI3: 1st~3rd specification information V1, VN, VN-1: Specification value b1~b10: Quote items

Claims

1. a clustering unit that clusters a plurality of past cases into a plurality of clusters based on specification information relating to each of the plurality of past cases; a pre-processing unit that performs pre-processing on a plurality of pieces of past case information related to the plurality of past cases; a model formula construction unit that constructs a first model and a second model for each of the plurality of clusters based on the plurality of pieces of past case information that have been preprocessed, each of the plurality of pieces of past case information includes the specification information and cost value information including a plurality of estimate items, the first model represents a correlation between the specification information and the value related to the cost, and the second model represents a cost structure corresponding to a relationship between values ​​related to the plurality of estimate items; a cluster identification unit that identifies, from among the plurality of clusters, a cluster to which a past project similar to the project to be estimated belongs, based on specification information of the project to be estimated; a model formula application unit that selects one of the first model and the second model for the cluster identified by the cluster identification unit based on the specification information of the project to be estimated, and calculates a value related to an estimate item of the project to be estimated based on the selected model; A quote acquisition system comprising:

2. The estimate obtaining system according to claim 1 , wherein the preprocessing unit normalizes the cost value of each of the plurality of pieces of past case information based on each of the plurality of pieces of past case information.

3. 3. The quotation obtaining system according to claim 2, wherein the preprocessing unit calculates an average value of values ​​for each of the plurality of quotation items in the plurality of past cases for each of the plurality of clusters, and sorts the plurality of quotation items according to the average value.

4. 4. The estimate obtaining system according to claim 3, wherein the model formula construction unit constructs the second model for each of the plurality of clusters based on a relationship between an order in which the preprocessing unit sorts the plurality of estimate items and the average value of values ​​related to each of the plurality of estimate items.

5. the first model includes a plurality of estimation models; each of the plurality of estimation models represents a correlation between the specification information of the plurality of past cases and a value related to each of the plurality of estimation items; 3. The estimate obtaining system according to claim 1 or 2, wherein the model formula application unit selects one of an estimation model corresponding to one of the plurality of estimation items from among the plurality of estimation models or the second model based on the specification information of the project to be estimated, and performs a process of calculating a value related to the one of the plurality of estimation items of the project to be estimated based on the selected model, for each of the plurality of estimation items.

6. The specification information of each of the plurality of past cases includes information on a plurality of specification items, the plurality of estimation models includes a first estimation model corresponding to a first estimation item, the first estimation model represents a correlation between a first specification portion which is at least a part of the plurality of specification items and values ​​related to the first estimation items of the plurality of past cases; The model equation application unit is selecting the first estimation model when the specification information of the project to be estimated includes all of the specification items included in the first specification portion, and applying the specification information of the project to be estimated to the first estimation model to estimate a value related to the first estimation item of the project to be estimated; 6. The quotation obtaining system according to claim 5, wherein, when the specification information of the project to be quoted does not include at least a portion of the specification items included in the first specification portion, the second model is selected, and a value related to the first quotation item of the project to be quoted is estimated based on the second model.

7. A process of clustering a plurality of past cases into a plurality of clusters based on specification information relating to each of the plurality of past cases; performing pre-processing on a plurality of past case information related to the plurality of past cases; a process of constructing a first model and a second model for each of the plurality of clusters based on the plurality of pieces of past case information that have been preprocessed, each of the plurality of pieces of past case information includes the specification information and cost value information including a plurality of estimate items, the first model represents a correlation between the specification information and the value related to the cost, and the second model represents a cost structure corresponding to a relationship between values ​​related to the plurality of estimate items; a process of identifying a cluster to which a past project similar to the project to be estimated belongs, from among the plurality of clusters, based on specification information of the project to be estimated; selecting one of the first model and the second model for the identified cluster based on the specification information of the project to be estimated, and calculating a value related to an estimate item of the project to be estimated based on the selected model; A quote acquisition program that causes a computer to execute the above.

Citation Information

Patent Citations

  • Approximate estimate preparation system and approximate estimate preparation method

    JP2015099476A

  • Quotation acquisition device, quotation acquisition method, and program

    JP2019101681A