Integrated transformer platform and its prefabricated busbar

By designing the projection on the prefabricated busbar of the transformer table to support the steel support, the problem of unsolid and complex connection between the transformer and the distribution box in the prior art is solved, and a fast and stable connection is achieved, reducing costs and Improves insulation and sealing performance.

CN108281864BActive Publication Date: 2024-11-01TAIZHOU YONGCHUANG ELECTRIC CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201810054154.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2018-01-19
Publication Date
2024-11-01
Estimated Expiration
2038-01-19

AI Technical Summary

Technical Problem

The transformer in the existing transformer table area is connected to the integrated distribution box using cables. The installation is complicated and not firm, which poses safety risks, and the prefabricated busbar structure is complex and costly.

Method used

Design a prefabricated busbar of an integrated transformer table, which uses a raised portion to support the steel support. It has a simple structure, is convenient to install and is low in cost. It realizes conductive connection through the design of upper and lower connectors and intermediate connectors, and uses sealing grooves and The sealing ring ensures sealing.

Benefits of technology

It realizes the fast and stable connection between the transformer and the distribution box, reduces installation difficulty and cost, and improves the insulation effect and sealing performance, avoiding electrical faults and safety hazards.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN108281864B_ABST
    Figure CN108281864B_ABST
Patent Text Reader

Abstract

The present invention discloses an integrated transformer station and a prefabricated busbar thereof, the prefabricated busbar comprising a plurality of conductive busbars and an insulating layer wrapped and formed outside the conductive busbars, the prefabricated busbar comprising an upper connector, an intermediate connector and a lower connector connected as one body, the upper connector is provided with a plurality of upper connectors, the lower connector is provided with a plurality of lower connectors, the corresponding upper connectors and lower connectors are electrically connected through the conductive busbar, the intermediate connector is provided with a plurality of protrusions that can be supported and positioned on a steel support of the transformer station. The technical solution provides a protrusion on the prefabricated busbar, the prefabricated busbar is supported on a steel support for installing a transformer through the protrusion, and has a simple structure, convenient installation and low cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of transformer equipment, and in particular relates to an integrated transformer platform and a prefabricated busbar thereof. Background Art

[0002] In my country, the existing transformer substations, transformers and integrated distribution boxes are all connected by cables. Cable heads need to be made on site during installation, which is time-consuming, labor-intensive and labor-intensive. With the rapid development of the power system, the requirements for the timeliness, stability and reliability of power supply are increasing. At present, rural power grids generally use transformer substations for power supply, and the demand for transformer substations is increasing. The State Grid Corporation of China is now fully implementing the scientific development concept, building a "resource-saving and environmentally friendly" society, and vigorously improving the integrated innovation capabilities; comprehensively building a modern distribution network that is safe, reliable, durable, reasonable in structure, advanced in technology, and economically efficient. Therefore, it is imperative to develop and manufacture a busbar with a reasonable design, simple structure, and the ability to quickly solve the connection between the transformer and the integrated distribution box in the integrated substation.

[0003] The patent document with publication number CN107033318 discloses a prefabricated busbar based on an integrated transformer station, a preparation material and method, and an application thereof, which includes a copper busbar connected between a transformer module and a low-voltage distribution module, and a wrapping layer body arranged on the side of the copper busbar and used for insulating and protecting the copper busbar, and the copper busbar is inlaid with insulation and fixedly protected by the wrapping layer body. Among them, the prefabricated busbar is fixed only by connecting with the transformer and the low-voltage distribution box, so that the weight of the prefabricated busbar is concentrated on the top of the low-voltage distribution box and the electrical connection part between the prefabricated busbar and the transformer. The physical fixation is not firm enough, and the electrical connection is unreliable, which may easily cause safety hazards; and the joint between the prefabricated busbar and the top of the low-voltage distribution box is not sealed, and rain and dust may easily enter the low-voltage distribution box during outdoor use, causing safety hazards and electrical failures.

[0004] The patent document with publication number CN107033318 discloses a three-phase four-wire outdoor epoxy resin prefabricated busbar for an integrated transformer station, including: an upper busbar, a busbar connecting component, a fixed nut insert, an outdoor epoxy resin casting layer, an outdoor epoxy resin cover, and a lower busbar; the upper busbar is connected to the lower busbar through the busbar connecting component, and the lower busbar body is wrapped by the outdoor epoxy resin casting layer. The fixed nut insert is cast on both sides of the outdoor epoxy resin casting layer. The fixed nut insert is 4 to 8, symmetrically arranged on both sides of the outdoor epoxy resin casting layer. The busbar connecting component includes: a fastening bolt, a flat washer, a spring washer, and a nut. The outdoor epoxy resin cover is integrally cast with the outdoor epoxy resin casting layer, located at the lower part of the whole, and cooperates with the integrated distribution box. The outdoor epoxy resin cover is an umbrella-shaped cover. The prefabricated busbar is in an I-shape, with large upper and lower ends. The upper busbar is connected to the lower busbar through a busbar connecting component and is located at the upper end in a divergent shape. The lower busbar is divergent at the lower end, and the outdoor epoxy resin cover is located above the divergent shape at the lower end. In this structure, the prefabricated busbar is embedded with a fixed nut insert. In order to ensure the insulation effect and the nut insert is firmly fixed, the nut insert part is large in size, and it is fixed and connected by nuts and bolts, which is cumbersome to install and has a high cost. Summary of the invention

[0005] In order to solve the above-mentioned technical problems, the purpose of the present invention is to provide an integrated transformer platform and a prefabricated busbar thereof, wherein the prefabricated busbar is provided with a protrusion, and the prefabricated busbar is supported on a steel support for installing the transformer through the protrusion, and has a simple structure, convenient installation and low cost.

[0006] In order to achieve the above-mentioned purpose, the present invention adopts the following technical solutions:

[0007] A prefabricated busbar for an integrated transformer station comprises a plurality of conductive busbars and an insulating layer wrapped and formed outside the conductive busbars. The prefabricated busbar comprises an upper connector (12), an intermediate connector (11) and a lower connector (13) connected together in an integral manner. The upper connector (12) is provided with a plurality of upper connectors (1201), and the lower connector (13) is provided with a plurality of lower connectors (1301). The corresponding upper connectors (1201) and lower connectors (1301) are electrically conductively connected via the conductive busbars. The intermediate connector (11) is provided with a plurality of protrusions (1101) capable of being supported and positioned on a steel support of the transformer station.

[0008] Preferably, the protrusion (1101) is integrally cast with the insulating layer or fixedly mounted on the insulating layer.

[0009] Preferably, the raised portion (1101) is cylindrical, elliptical, semi-cylindrical, rectangular, annular, flange-shaped or oblique block-shaped.

[0010] Preferably, the protrusion (1101) has a contact point, a contact line or a contact surface that forms upper and lower supports with the steel support.

[0011] Preferably, the protrusions (1101) are arranged in pairs, opposite to each other left and right or front and back.

[0012] Preferably, a plug-in portion (1302) for plugging into the top of the distribution box is provided at the bottom of the lower connector (13), and a plurality of lower connectors (1301) are arranged below the plug-in portion (1302). The plug-in portion (1302) is concavely formed with a circle of sealing grooves (1304) around it, and a sealing ring (2) is provided in the sealing groove (1304).

[0013] Preferably, the prefabricated busbar is in an I-shape with large upper and lower connectors and a small middle connector.

[0014] Preferably, the prefabricated busbar comprises four conductive busbars, each conductive busbar comprising an upper connector (1201), an intermediate connector (1102) and a lower connector (1301) connected to each other, the upper connector (1201) and the lower connector (1301) being formed by the conductive busbar extending out of an insulating layer, the upper connector (1201) being provided with four upper connectors (1201), which are, from left to right, the upper connector (1201c) of phase C, the upper connector (1201b) of phase B, the upper connector (1201a) of phase A and the upper connector (1201o) of phase O, and the lower connector (1301) being provided with four lower connectors (1301), which are, from left to right, the lower connector (1301a) of phase A, the lower connector (1301b) of phase B, the lower connector (1301c) of phase C and the lower connector (1301o) of phase O.

[0015] Preferably, the upper connector (1201) extends in the front-to-back direction, and the lower connector (1301) extends in the top-to-bottom direction; the conductive busbar is a copper busbar; four intermediate connecting wires (1102) in the intermediate connector (11) are arranged in a transverse interval, and the intermediate connecting wires (1102) include a c-phase intermediate connecting wire (1102c), a b-phase intermediate connecting wire (1102b), an a-phase intermediate connecting wire (1102a), and an o-phase intermediate connecting wire (1102o); a first transverse copper busbar (1303) and a second transverse copper busbar (1305) are provided in the lower connector (13); the c-phase intermediate connecting wire (1102c) is connected to the c-phase lower connector (1301c) via the second transverse copper busbar (1305); the a-phase intermediate connecting wire (1102a) is connected to the c-phase lower connector (1301c) via the first transverse copper busbar (1306); The copper bar (1303) is connected to the lower connector (1301a) of phase a, and the first transverse copper bar (1303) and the second transverse copper bar (1305) are arranged on the front and rear sides of the lower connector (1301) and are spaced apart; the copper bar width direction of the upper connector (1201) is in the left-right direction, the copper bar width direction of the lower connector (1301) is in the front-back direction, the copper bar width direction of the middle connecting line (1102) is in the front-back direction, and the copper bar width direction of the first transverse copper bar (1303) and the second transverse copper bar (1305) is in the up-down direction; the upper connector (1201), the middle connecting line (1102), the lower connector (1301), the first transverse copper bar (1303) and the second transverse copper bar (1305) are fixed by fasteners and the gaps are filled by welding.

[0016] An integrated transformer platform comprises a transformer (5) installed above a steel support and a distribution box (3) installed below the steel support. The transformer (5) and the distribution box (3) are connected via a prefabricated busbar as described above. An upper connector (12) of the prefabricated busbar is connected to the transformer (5), and a lower connector (13) of the prefabricated busbar is connected to the distribution box (3). The prefabricated busbar is supported and positioned on the steel support via a raised portion (1101) on an intermediate connector (11).

[0017] The present invention adopts the above technical solution. The prefabricated busbar is provided with a protrusion. The prefabricated busbar is supported on a steel support for installing a transformer through the protrusion. The structure is simple and reasonable, the installation is convenient, and the cost is low. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a structural schematic diagram of the prefabricated busbar of the present invention;

[0019] Figure 2 yes Figure 1 Side view of

[0020] Figure 3 yes Figure 1 Bottom view of

[0021] Figure 4 yes Figure 1 A top view of

[0022] Figure 5 It is the AA section view;

[0023] Figure 6 It is a schematic diagram of the installation of the prefabricated busbar of the present invention;

[0024] Figure 7 yes Figure 6 A magnified view of point I;

[0025] Figure 8 yes Figure 6 Side view of

[0026] Fig. 9 It is a wiring diagram of the prefabricated busbar of the present invention (front view);

[0027] Fig.10 It is a schematic diagram of the wiring of phase C of the prefabricated busbar of the present invention (side view);

[0028] Fig.11 It is a schematic diagram of the wiring of the b-phase of the prefabricated busbar of the present invention (side view);

[0029] Fig.12 It is a schematic diagram of the wiring of phase a of the prefabricated busbar of the present invention (side view);

[0030] Fig.13 It is a structural schematic diagram of another embodiment of the prefabricated busbar of the present invention;

[0031] Fig.14 It is a structural schematic diagram of the integrated transformer platform of the present invention. DETAILED DESCRIPTION

[0032] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.

[0033] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0034] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "plurality" means two or more, unless otherwise clearly specified.

[0035] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0036] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0037] For the convenience of description, the front, back, left, right, up and down directions are defined in the present invention when the prefabricated busbar is installed on the integrated transformer platform.

[0038] like Figure 1-5 A prefabricated busbar for an integrated transformer station is shown, comprising a plurality of conductive busbars and an insulating layer wrapped around the conductive busbars. The prefabricated busbar comprises an upper connector 12, an intermediate connector 11 and a lower connector 13 which are connected as a whole. The upper connector 12 is provided with a plurality of upper connectors 1201, and the lower connector 13 is provided with a plurality of lower connectors 1301. The corresponding upper connectors 1201 and lower connectors 1301 are conductively connected via the conductive busbars. The intermediate connector 11 is provided with a plurality of protrusions 1101 which can be supported and positioned on a steel support of the transformer station.

[0039] The protrusion 1101 can be fixedly mounted on the intermediate connector 11, for example, the protrusion is fixed to a pin hole or a bolt hole on the intermediate connector 11. However, in this embodiment, the protrusion 1101 is preferably cast integrally with the insulator, which does not require secondary processing and is more secure and reliable.

[0040] The shape of the protrusion 1101 can be various, including but not limited to cylindrical, elliptical, semi-cylindrical, rectangular, annular, flange or inclined block, as long as the protrusion 1101 has a contact point, contact line or contact surface that forms upper and lower support with the steel support. As a preference, the present invention provides two implementation modes: one implementation mode of the protrusion 1101 is an inclined block shape, such as Figure 1 , Figure 2 Another embodiment is cylindrical, such as Fig.13 As shown. If considering the installation method of opening a hole or a groove on the steel support to position and cooperate with the protrusion 1101 to support the prefabricated busbar, a cylindrical protrusion is preferred to facilitate the opening of the hole / groove to cooperate with it.

[0041] In order to firmly and reliably support the prefabricated busbar, the protrusions 1101 are generally arranged in pairs opposite to each other left and right or front and back. Two, four, or even more protrusions 1101 can be arranged.

[0042] like Figure 6-8 As shown, the bottom of the lower connector 13 is provided with a plug-in portion 1302 for plugging into the top of the distribution box, and a plurality of lower connectors 1301 are arranged below the plug-in portion 1302. The plug-in portion 1302 is concave around to form a circle of sealing grooves 1304, and a sealing ring 2 is arranged in the sealing groove 1304. The top of the distribution box 3 is provided with an opening for plugging the lower connector 13 of the prefabricated busbar, and the hole wall of the opening is turned up to form a flange 31, which is embedded in the sealing groove of the lower connector 13 of the prefabricated busbar and abuts against the sealing ring 2.

[0043] In this embodiment, the prefabricated busbar is in an I-shape with large upper and lower connectors and a small middle connector. However, the prefabricated busbar of the present invention is not limited to the I-shape, but may be in any other shape.

[0044] like Figure 5 , Fig. 9As shown, the prefabricated busbar includes four conductive busbars, each of which includes an upper connector 1201, an intermediate connector 1102 and a lower connector 1301 connected to each other. The upper connector 1201 and the lower connector 1301 are formed by the conductive busbar extending out of the insulating layer. The upper connector 12 is provided with four upper connectors 1201, which are the upper connector 1201c of the c phase, the upper connector 1201b of the b phase, the upper connector 1201a of the a phase and the upper connector 1201o of the o phase from left to right. The lower connector 13 is provided with four lower connectors 1301, which are the lower connector 1301a of the a phase, the lower connector 1301b of the b phase, the lower connector 1301c of the c phase and the lower connector 1301o of the o phase from left to right. All the upper connectors 1201 extend in the front-to-back direction, and all the lower connectors 1301 extend in the up-down direction. The conductive busbar is a copper busbar.

[0045] like Figure 5 , Fig. 9 As shown, four intermediate connecting wires 1102 are arranged in a horizontal interval in the intermediate connecting body 11, and the intermediate connecting wires 1102 include a c-phase intermediate connecting wire 1102c, a b-phase intermediate connecting wire 1102b, an a-phase intermediate connecting wire 1102a, and an o-phase intermediate connecting wire 1102o. A first horizontal copper bar 1303 and a second horizontal copper bar 1305 are provided in the lower connecting body 13, as shown in FIG. Fig.12 As shown, the c-phase intermediate connecting line 1102c is connected to the c-phase lower connecting head 1301c through the second transverse copper bus 1305, as shown in FIG. Fig.10 As shown, the a-phase intermediate connecting line 1102a is connected to the a-phase lower connecting head 1301a through the first transverse copper bar 1303, as shown in FIG. Fig.11 , Fig. 9 As shown, the b-phase middle connecting wire 1102b is directly connected to the b-phase lower connector 1301b, the o-phase middle connecting wire 1102o is directly connected to the o-phase lower connector 1301o, and the first transverse copper bar 1303 and the second transverse copper bar 1305 are respectively arranged on the front and rear sides of the lower connector 1301 and spaced apart. The copper bar width direction of the upper connector 1201 is the left-right direction, the copper bar width direction of the lower connector 1301 is the front-back direction, the copper bar width direction of the middle connecting wire 1102 is the front-back direction, and the copper bar width direction of the first transverse copper bar 1303 and the second transverse copper bar 1305 is the up-down direction. In this way, the four conductive busbars are arranged at intervals in the upper connector and the middle connector, and there is no cross-transposition. The cross-transposition of the a-phase and the c-phase is realized by setting the front and back transverse copper bars in the lower connector. Compared with the prior art (CN107033318A), the volume is more compact, the structure is more reasonable, and the insulation distance between the copper bars is larger and the insulation effect is good.

[0046] The upper connector 1201, the middle connecting wire 1102, the lower connector 1301, the first transverse copper bar 1303 and the second transverse copper bar 1305 are fixed by fasteners and the gaps are filled by welding. After the connection between the two copper bars is fixed by fasteners, there will inevitably be gaps. Filling the gaps by welding can prevent resin from entering the gaps and affecting the load capacity and electrical performance of the conductive busbar.

[0047] In this embodiment, Figure 10-12 As shown, the first transverse copper bar 1303 and the second transverse copper bar 1305 are staggered in vertical arrangement, which not only facilitates installation but also has a better insulation effect.

[0048] In the present invention, the insulating layer outside the conductive busbar is cast by outdoor flame-retardant epoxy resin.

[0049] A method for preparing a prefabricated busbar for an integrated transformer station comprises the following steps:

[0050] 1) Raw material processing:

[0051] An outdoor flame-retardant epoxy resin comprising the following components in parts by weight: 30-50 parts of alicyclic epoxy resin, 1-15 parts of aluminum hydroxide, 30-50 parts of silicon powder, and 4-20 parts of halogen-free flame retardant; each component is added into a reaction tank, stirred and mixed at a temperature of 50-120° C. for 60-120 minutes, and then degassed and dehydrated under a vacuum condition of 50-1000 Pa for more than 8 hours, and the mixture is discharged as the outdoor flame-retardant epoxy resin;

[0052] An outdoor flame retardant curing agent comprising the following components in parts by weight: 30-50 parts of methyl hexahydrophthalic anhydride, 1-15 parts of aluminum hydroxide, 30-50 parts of silicon powder, and 4-15 parts of halogen-free flame retardant; each component is added into a reaction tank, stirred and mixed at a temperature of 70-120° C. for 60-120 minutes, and then degassed and dehydrated under a vacuum condition of 50-1000 Pa for more than 8 hours, and the mixture is released as the outdoor flame retardant curing agent;

[0053] 2) The upper connector 1201, the middle connecting wire 1102, the lower connector 1301, the first transverse copper busbar 1303 and the second transverse copper busbar 1305 are fixedly connected and inserted into the casting mold to complete the molding; the outdoor flame retardant epoxy resin and the outdoor flame retardant curing agent are mixed in a ratio of 1:1 and injected into the mold to cast the prefabricated busbar and complete the curing.

[0054] The manufacturing and production of one-time formed (prefabricated) busbars can adopt the epoxy resin automatic pressure gel process (APG process) or the epoxy resin vacuum casting process.

[0055] When the epoxy resin automatic pressure gel process (APG process) is adopted: the above outdoor flame retardant epoxy resin and outdoor flame retardant curing agent are added to the mixing tank with a temperature of 25-40°C respectively, and mixed for 60-120 minutes with an anchor stirring paddle or a spiral lifting umbrella cap stirring paddle under vacuum conditions of 50-500Pa, and the stirring speed is 40-120 rpm. After the treatment is completed, the prefabricated busbar is cast in the mold that has been loaded, the mold temperature is 150-190°C, and the mold molding curing time is 20-80 minutes; after the mold is opened, the prefabricated busbar that has been formed is placed in an oven or a curing furnace for secondary curing, and cured at a temperature of 125-190°C for at least 8 hours.

[0056] The uniqueness of the epoxy resin automatic pressure gelation process (APG) technology is that it achieves the purpose of forced supplementation of curing shrinkage by continuously applying constant pressure to the epoxy resin mixture. This process is completed in a mold at a very high temperature, so that the highly reactive epoxy resin mixture can be quickly gelled in a short time. Therefore, the product surface is defect-free, the internal stress is low, the solidified material is dense and consistent, the dimensional accuracy is high, the electromechanical properties are excellent, and the product qualification rate is high. Since the gelation time is generally completed within a few minutes to tens of minutes (depending on the size of the mold), the mold utilization rate can be greatly improved and the production cycle can be shortened. Since the APG process is carried out in an overall closed system device, it has little pollution to the environment, saves energy and saves work time.

[0057] When using the epoxy resin vacuum pouring process: add the above outdoor flame retardant epoxy resin and outdoor flame retardant curing agent to the final mixing tank of the epoxy resin vacuum pouring equipment respectively, the final mixing tank temperature is 50-70℃, and the mixture is mixed for 60-120 minutes with a spiral lifting umbrella-shaped stirring paddle under vacuum conditions of 50-500Pa, and the stirring speed is 40-120 rpm. At the same time, put the molded mold into a pouring tank at a temperature of 70-100℃ and treat it under vacuum of 50-500Pa for 20-60 minutes. When the outdoor flame retardant epoxy resin formula and the processing time of the mold meet the requirements, the final mixing tank and the pouring tank still maintain the previous vacuum conditions, open the pouring valve, pour slowly, and pause pouring for 2-5 minutes after pouring for 2-5 minutes to degas, and then continue pouring. The pouring is completed in about 10-40 minutes, and the vacuum is maintained for another 5-15 minutes before the vacuum is released and the bus is taken out of the oven. After the mold is opened, the prefabricated bus is placed in an oven or curing furnace for secondary curing at a temperature of 125-140°C for at least 8 hours.

[0058] The prefabricated busbar for the integrated transformer station of the present invention has been tested experimentally: tensile strength ≥9MPa, elongation at break ≥300﹪, elastic modulus ≥3MPa, Shore A hardness ≥50, volume resistivity ≥10 16Ω·cm, dielectric loss ≤0.03, breakdown strength ≥35kV / mm, and flame retardant grade meets the American flame retardant material standard ANS / UL94V0.

[0059] The following tests were performed on the prefabricated busbar of the present invention, and the test process and test results are as follows:

[0060] 1. Power frequency withstand voltage test

[0061] (1) Test voltage between phases and to ground of prefabricated busbar: 2.5kV / 5s;

[0062] (2) During the test, there is no breakdown, flashover or discharge.

[0063] 2. Lightning impulse test

[0064] (1) Apply 1.2 / 50μs impulse voltage 5 times to each polarity of the prefabricated busbar, with an interval of at least 1s. The test impulse voltage is: 6kV (full wave).

[0065] (2) During the test, there is no breakdown, flashover or discharge.

[0066] 3. Temperature rise test

[0067] (1) The temperature rise test of transformer, prefabricated busbar and integrated distribution box should be carried out simultaneously.

[0068] (2) The conductor temperature rise of the bus duct, bus connector and busbar connection of the prefabricated bus shall not exceed 60K, and the surface temperature rise of the insulating material shall not exceed 10K.

[0069] 4. Electrical clearance and creepage distance test:

[0070] Electrical clearance: 15mm; creepage distance: 14mm.

[0071] 5. Reliability test and corrosion resistance test:

[0072] (1) Test process

[0073] ①Wet heat cycle test

[0074] The temperature is 40℃±3℃, the relative humidity is 95%, and the test time is 24h.

[0075] ②Salt spray test

[0076] The temperature is 35℃±2℃ and the test time is 24h.

[0077] (2) Test results

[0078] After the test, rinse with water for 5 minutes, then use a hair dryer to remove water drops, and store under normal use conditions for 2 hours. After inspection: ① No obvious rust or cracks. ② No obvious deformation or cracks at the junction of different insulating materials and the junction of conductors and insulating materials. ③ After the test, the power frequency withstand voltage test is qualified.

[0079] 6. Temperature change test of reliability test:

[0080] Low temperature: -25℃±3℃, high temperature: 40℃±2℃, test time at low and high temperature: 2h, test cycle number: 3 times.

[0081] After the test, the product was left to stand for 2 hours under normal atmospheric conditions and then inspected. The inspection showed that: ① there were no obvious cracks, damage, or rust. ② the power frequency withstand voltage test was qualified after the test.

[0082] like Fig.14 An integrated transformer platform shown includes a transformer 5 installed above a steel support and a distribution box 3 installed below the steel support. The transformer 5 and the distribution box 3 are connected via the prefabricated busbar as described above. The upper connector 12 of the prefabricated busbar is connected to the transformer 5, and the lower connector 13 of the prefabricated busbar is connected to the distribution box 3. The prefabricated busbar is supported on the steel support via the raised portion 1101 on the intermediate connector 11. In this embodiment, the steel support includes a first channel steel 41, a second channel steel 42, and a third channel steel 43. The first channel steel 41 is fixedly connected to the electric pole, the second channel steel 42 is fixedly connected to the first channel steel 41 and is used to fix the transformer 5, and the third channel steel 43 is fixed on the second channel steel 42. Preferably, the prefabricated busbar is arranged on two parallel third channel steels 43, and the raised portion 1101 of the prefabricated busbar is supported on the top of the third channel steel 43. In other installation methods, the third channel steel 43 is provided with a hole or a groove, and the protrusion 1101 of the prefabricated busbar cooperates with the hole or the groove on the third channel steel 43 to achieve support, which can not only achieve weight support, but also achieve position fixation to prevent the prefabricated busbar from shaking. The first channel steel 41, the second channel steel 42 and the third channel steel 43 can also be angle steel, I-beam or other shaped support members.

[0083] like Figure 6-8 As shown, the top of the distribution box 3 is provided with an opening for inserting the lower connector 13 of the prefabricated busbar, and the hole wall of the opening is turned up to form a flange 31, which is embedded in the sealing groove of the lower connector 13 of the prefabricated busbar and abuts against the sealing ring 2.

[0084] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.

[0085] Although the embodiments of the present invention have been shown and described above, it is understood that the above embodiments are exemplary and cannot be understood as limiting the present invention. A person skilled in the art may change, modify, replace and modify the above embodiments within the scope of the present invention without departing from the principles and purpose of the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A prefabricated busbar for an integrated transformer station, comprising a plurality of conductive busbars and an insulating layer wrapped and formed outside the conductive busbars, the prefabricated busbar comprising an upper connector (12), an intermediate connector (11) and a lower connector (13) connected together, the upper connector (12) being provided with a plurality of upper connectors (1201), the lower connector (13) being provided with a plurality of lower connectors (1301), the corresponding upper connectors (1201) and lower connectors (1301) being electrically conductively connected via the conductive busbars, characterized in that: The intermediate connecting body (11) is provided with a plurality of protrusions (1101) capable of being supported and positioned on a steel support member of a transformer platform; The prefabricated busbar is in an I-shape with large upper and lower connectors and a small middle connector; The bottom of the lower connector (13) is provided with a plug-in portion (1302) for plugging into the top of the distribution box, and a plurality of lower connectors (1301) are arranged below the plug-in portion (1302). The plug-in portion (1302) is concave around a circle of sealing grooves (1304), and a sealing ring (2) is provided in the sealing groove (1304); The prefabricated busbar comprises four conductive busbars, each conductive busbar comprising an upper connector (1201), an intermediate connector (1102) and a lower connector (1301) connected to each other, the upper connector (1201) and the lower connector (1301) being formed by the conductive busbar extending out of an insulating layer, the upper connector (1201) being provided with four upper connectors (1201), which are, from left to right, a C-phase upper connector (1201c), a B-phase upper connector (1201b), an A-phase upper connector (1201a) and an O-phase upper connector (1201o), and the lower connector (1301) being provided with four lower connectors (1301), which are, from left to right, an A-phase lower connector (1301a), a B-phase lower connector (1301b), a C-phase lower connector (1301c) and an O-phase lower connector (1301o); The upper connector (1201) extends in the front-to-back direction, and the lower connector (1301) extends in the top-to-bottom direction; the conductive busbar is a copper busbar; four intermediate connecting wires (1102) in the intermediate connector (11) are arranged in a transverse interval, and the intermediate connecting wires (1102) include a c-phase intermediate connecting wire (1102c), a b-phase intermediate connecting wire (1102b), an a-phase intermediate connecting wire (1102a), and an o-phase intermediate connecting wire (1102o); a first transverse copper busbar (1303) and a second transverse copper busbar (1305) are provided in the lower connector (13); the c-phase intermediate connecting wire (1102c) is connected to the c-phase lower connector (1301c) via the second transverse copper busbar (1305); the a-phase intermediate connecting wire (1102a) is connected to the c-phase lower connector (1301c) via the first transverse copper busbar (1306); The transverse copper bar (1303) is connected to the lower connector (1301a) of phase a, and the first transverse copper bar (1303) and the second transverse copper bar (1305) are arranged on the front and rear sides of the lower connector (1301) and are spaced apart; the width direction of the copper bar of the upper connector (1201) is the left-right direction, the width direction of the copper bar of the lower connector (1301) is the front-back direction, the width direction of the copper bar of the middle connecting line (1102) is the front-back direction, and the width direction of the copper bar of the first transverse copper bar (1303) and the second transverse copper bar (1305) is the up-down direction; in this way, the four conductive busbars are arranged at intervals in the upper connector and the middle connector, and are straight up and down without cross-transposition, and the cross-transposition of phase a and phase c is achieved in the lower connector by arranging the front and back transverse copper bars; The upper connector (1201), the middle connecting line (1102), the lower connector (1301), the first transverse copper bar (1303) and the second transverse copper bar (1305) are fixed by fasteners and the gaps are filled by welding; The preparation steps of the prefabricated busbar are as follows: 1) Raw material processing: An outdoor flame-retardant epoxy resin comprising the following components in parts by weight: 30-50 parts of alicyclic epoxy resin, 1-15 parts of aluminum hydroxide, 30-50 parts of silicon powder, and 4-20 parts of halogen-free flame retardant; each component is added into a reaction tank, stirred and mixed at a temperature of 50-120° C. for 60-120 minutes, and then degassed and dehydrated under a vacuum condition of 50-1000 Pa for more than 8 hours, and the mixture is discharged as the outdoor flame-retardant epoxy resin; An outdoor flame retardant curing agent comprising the following components in parts by weight: 30-50 parts of methyl hexahydrophthalic anhydride, 1-15 parts of aluminum hydroxide, 30-50 parts of silicon powder, and 4-15 parts of halogen-free flame retardant; each component is added into a reaction tank, stirred and mixed at a temperature of 70-120° C. for 60-120 minutes, and then degassed and dehydrated under a vacuum condition of 50-1000 Pa for more than 8 hours, and the mixture is released as the outdoor flame retardant curing agent; 2) The upper connector (1201), the middle connector (1102), the lower connector (1301), the first transverse copper bar (1303) and the second transverse copper bar (1305) are fixedly connected and inserted into a casting mold to complete the molding; the outdoor flame retardant epoxy resin and the outdoor flame retardant curing agent are mixed in a ratio of 1:1 and injected into the mold to cast the prefabricated busbar and complete the curing; wherein the epoxy resin automatic pressure gel process is used for one-time molding: the outdoor flame retardant epoxy resin and the outdoor flame retardant curing agent are separately mixed and processed to form the prefabricated busbar; Add to the mixing tank with a temperature of 25-40℃, mix with an anchor stirring paddle or a spiral lifting umbrella-shaped stirring paddle for 60-120 minutes under vacuum conditions of 50-500Pa, and the stirring speed is 40-120 rpm. After the treatment is completed, cast the prefabricated busbar in the mold that has been loaded, the mold temperature is 150-190℃, and the mold molding curing time is 20-80 minutes; after opening the mold, put the formed prefabricated busbar into an oven or curing furnace for secondary curing, and cure it at a temperature of 125-190℃ for at least 8 hours.

2. The prefabricated busbar for an integrated transformer station according to claim 1, characterized in that: The protrusion (1101) is integrally cast with the insulating layer or fixedly mounted on the insulating layer.

3. The prefabricated busbar for an integrated transformer station according to claim 1, characterized in that: The raised portion (1101) is cylindrical, elliptical, semi-cylindrical, rectangular, annular, flange or oblique block shaped.

4. The prefabricated busbar for an integrated transformer station according to claim 1, characterized in that: The protrusion (1101) has a contact point, a contact line or a contact surface that forms upper and lower supports with the steel support member.

5. The prefabricated busbar for an integrated transformer station according to claim 1, characterized in that: The protrusions (1101) are arranged in pairs, opposite to each other left and right or front and back.

6. An integrated transformer platform, comprising a transformer (5) installed above a steel support and a distribution box (3) installed below the steel support, characterized in that: The transformer (5) and the distribution box (3) are connected via a prefabricated busbar as described in any one of claims 1 to 5, the upper connector (12) of the prefabricated busbar is connected to the transformer (5), the lower connector (13) of the prefabricated busbar is connected to the distribution box (3), and the prefabricated busbar is supported and positioned on a steel support by a raised portion (1101) on the intermediate connector (11).