Road construction pretreatment device and construction method thereof
A pretreatment device and road construction technology, which is applied in the direction of roads, roads, road repairs, etc., can solve the problems that the strength, stability and drainage performance of the roadbed cannot be effectively improved, the comfort of vehicles is reduced, and the uneven road surface is uneven. Achieve the effect of improving compressive strength and stability, improving stability and maintaining water permeability
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2018-09-21
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the field of road subgrade construction, in particular to a road construction pretreatment device and a construction method thereof. Background technique
[0002] At present, with the development of my country's highways, especially the rapid development of high-grade highways, the comfort and flatness of the road surface has been increasingly paid attention to by people. The subgrade is an important part of the road, and it is a belt-shaped structure built according to the route position and certain technical requirements. It should bear the load transmitted from the road surface and should have sufficient strength, stability and durability. The strength and stability of the roadbed are affected by objective factors such as water, temperature, and soil quality, as well as by traffic loads, human factors such as the correctness of roadbed design, construction methods, and maintenance methods. In view of the current improvement...
Examples
Embodiment Construction
[0045] The present invention will be further described in detail below in conjunction with the accompanying drawings, so that those skilled in the art can implement it with reference to the description.
[0046] It should be understood that terms such as "having", "comprising" and "including" used herein do not exclude the presence or addition of one or more other elements or combinations thereof.
[0047] Such as Figure 1~4 As shown, the invention provides a kind of road construction pretreatment device, comprising:
[0048] Two rows of roadbed supports 10 are arranged in the roadbed along the extension direction of the roadbed 40, and the two rows of roadbed supports are respectively buried obliquely near the two sides of the roadbed, wherein, between the plurality of roadbed supports of any row of roadbed supports Evenly spaced from each other, any roadbed support body includes a plurality of support members 101 arranged end to end, the support members are elastic hollow ...