Garden design project management system
A management system and design project technology, applied in the field of garden design management, can solve problems such as complex management and complex garden design, and achieve the effect of simple management, improved efficiency and high efficiency
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- Publication Date
- 2018-11-27
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the technical field of garden design management, in particular to a management system of garden design projects. Background technique
[0002] Garden design is to use garden art and engineering techniques within a certain geographical range to create and create by transforming the terrain (or further building mountains, stacking stones, water management), planting trees, flowers and plants, building buildings, and arranging garden roads. The beautiful natural environment and the process of life and recreation. The current garden design requires the designer to go to the site to watch the layout of the garden first, then create a three-dimensional garden, and then design each link of the three-dimensional garden on the computer. After the design is completed, the project leader needs to be responsible for each link Printing review and approval is carried out. Only after the approval is passed can the employees be notified to fu...
Examples
Embodiment 1
[0032] Such as figure 1 As shown, the management system of a garden design project provided by this embodiment includes the following units:
[0033] Business receiving module 4, used to receive business information of garden design and configuration settings of team members;
[0034] The on-site three-dimensional data real-time acquisition module 1, according to the landscape design site positioning provided by the business receiving module 4, then uses high-altitude video shooting data to perform real-time acquisition of three-dimensional site data,
[0035] The garden site acquisition module 2 is used to connect with the on-site three-dimensional data real-time acquisition module 1 to obtain the internal data information of the final planned garden;
[0036] The controller 3 is used to connect with the garden site acquisition module 2, obtain real-time garden site information, and build a three-dimensional garden site, and then the people of each team department carry out ...
Embodiment 2
[0051] Such as figure 2 As shown, the present embodiment provides a management system for garden design projects. Further, the controller 3 is also connected with a design scheme modification module 10 for online modification of the scheme.
Embodiment 3
[0053] Such as image 3 As shown, in the management system of a garden design project provided by this embodiment, further, the controller 3 is also connected with an achievement sharing module 11 that performs three-dimensional display of the garden design results, so that users can view the garden design achievements online. .