Fengshui joint scheduling method considering the accumulation process of weather forecast uncertainty
An uncertainty and weather forecasting technology, applied in climate change adaptation, data processing applications, instruments, etc., can solve the problems of insufficient capacity adjustment capacity of hydropower stations, little hydropower self-benefit, waste of water energy, etc., to improve resources. Optimize configuration capabilities, promote new energy consumption, and achieve the effect of coordinated operation
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2021-09-07
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the field of wind power control, in particular to a wind-water joint scheduling method considering the accumulation process of weather forecast uncertainty. Background technique
[0002] The development and utilization of renewable energy is an important way to deal with global climate change and energy shortages, but at the same time, due to the volatility and uncontrollability of wind energy resources, the problem of wind power consumption has become increasingly prominent. According to statistics, from 2011 to 2015 The annual national average wind abandonment rate reached 13.4%, and in 2016 the national wind abandonment rate reached 17.1%.
[0003] Hydropower and wind energy resources have good seasonal complementarity, and the storage capacity adjustment capacity of the reservoir and the rapid response characteristics of the hydropower unit enable the hydropower output to track and compensate the output change of wind power...
Examples
Embodiment Construction
[0094] The present invention will be further described in detail below in conjunction with the accompanying drawings.
[0095]The invention discloses a wind-water joint scheduling method considering the accumulation process of weather forecast uncertainty, which includes the following steps:
[0096] S1. Taking the minimum fluctuation of the joint output of wind and water power generation, the minimum water waste of hydropower in the joint output of wind and water power generation, and the guarantee of the output of the hydropower station in the joint output of wind and water power generation as the goal, establish the long-term joint scheduling objective function of wind and water:
[0097]
[0098] in, E. t-s (P wk.t ) represents the output expectation of the kth wind farm in the (t-1,t) period based on the forecast wind speed of the kth wind farm in the future (t-1,t) period released at time s, P wk.t Indicates the actual output of the kth wind farm in the (t-1,t) pe...