A modular building prestressed mortise and tenon joint structure and construction method
By adopting a prestressed mortise and tenon node structure in the modular building structure and using the prestressed fastening connection between steel pipes and steel wires, the problems of efficiency and quality of the connection nodes in the existing technology are solved, and rapid installation and disassembly and efficient connection are achieved.
Patent Information
- Application Number
- CN201911281059.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-12-13
- Publication Date
- 2025-03-11
- Estimated Expiration
- 2039-12-13
AI Technical Summary
The connection node design of existing modular building structures has efficiency and quality problems, making it difficult to achieve rapid installation and disassembly and efficient connections.
Using a prestressed mortise and tenon node structure, the steel pipe is penetrated through the node and penetrated the wire therein, the wire is pretightened and concrete is poured, and prestressed to tighten the connecting node.
The rapid fastening connection of modular building units is realized, construction efficiency and quality are improved, and operation efficiency is improved through convenient operation methods.
Smart Images

Figure CN111005455B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of modular building structures, and in particular to a modular building prestressed mortise and tenon joint structure and a construction method. Background Art
[0002] Modular construction is an important trend in the development of the construction industry in recent years. As one of the most prefabricated building forms in prefabricated buildings, modular construction has gradually developed into a hot spot in my country's construction industrialization with its unique advantages in construction, management and green environmental protection. Modular structural buildings have the advantages of high degree of integration, fast and efficient assembly, etc. The connection nodes between modules have a significant impact on the overall performance of the structure, so the design of the nodes is crucial. The development history of modular building structures at home and abroad has studied the structural forms of connection nodes from the component assembly level, modular structure level and modular building level. At present, various forms of modular building structure connection nodes have appeared at home and abroad and have been applied in actual projects. Summary of the invention
[0003] In order to achieve the above object, the present invention adopts the following technical solutions:
[0004] A modular building prestressed mortise and tenon node structure comprises a unit module, wherein mortises are fixedly connected at the corners of the unit module, tenons are arranged between adjacent mortises, machined holes are arranged on the tenons and mortises, a steel pipe is arranged on the outside of the unit module, the steel pipe passes through the machined holes, and a steel wire is arranged on the outside of the unit module.
[0005] Preferably, two sleeves are provided on the outer surface of the steel pipe, and the two sleeves are fixedly connected by a connecting rod. The front sides of the two sleeves are fixedly connected to the same mounting plate, and the front side of the mounting plate is fixedly connected to a force handle.
[0006] Preferably, the two sleeves are fixedly connected to a guide ring on the sides away from each other, and the two sleeves are threadedly connected to a control screw located on the inner side of the guide ring on the sides away from each other, and the two control screws are fixedly connected to a control knob on the ends away from each other, and the end of the control screw away from the control knob passes through the sleeve and is fixedly connected to a rotating disk, an annular groove is provided on the outer surface of the rotating disk, and a mounting rail located above the control screw is fixedly connected to the inner wall of the two sleeves away from each other, and an extrusion rod is slidably connected to the inner surface of the mounting rail, and the end of the extrusion rod away from the control knob is fixedly connected to a rubber clamping plate, and the front and back sides of the extrusion rod are slidably connected to the inner surface of the annular groove through a traction rod.
[0007] Preferably, the length of the control screw is not less than eight centimeters, and the length of the thread on the outer surface of the control screw is not less than six centimeters.
[0008] Preferably, the shape of the upper surface of the force applying handle is arc-shaped, and the arc of the upper surface of the force applying handle is between one hundred and fifty degrees and one hundred and eighty degrees.
[0009] Another technical problem to be solved by the present invention is to provide a method for preparing a modular building prestressed mortise and tenon joint structure, comprising the following steps:
[0010] S1. Mechanically manufacture the tenon and the mortise, and open mechanical processing holes on the tenon and the mortise surface according to appropriate sizes;
[0011] S2. Fix the mortise to the end corner of the unit module by bolts or welding, and set eight mortises for each unit module;
[0012] S3, insert the steel wire into the steel pipe through the machined hole, and insert the steel wire in three directions: vertically, front and back, and left and right;
[0013] S4, after tightening the steel wire by applying external force, pour concrete into the steel pipe;
[0014] S5. After pouring concrete, loosen the steel wire, and the pre-tightened tension is released, and the unit modules are tightly connected together through the nodes.
[0015] Compared with the prior art, the present invention has the following beneficial effects:
[0016] (1) The present invention can be used as a node in a modular building structure through the prestressed mortise and tenon joint. The node adopts a steel pipe that passes through the node and the modular building structure, and a steel wire is passed through the steel pipe. Prestress is generated by pre-tightening the steel wire and pouring concrete to achieve a fast connection node, thereby quickly fastening the modular building units together, so that the modular building modules can be quickly installed and disassembled, thereby improving the efficiency and quality of modular building construction.
[0017] (2) The present invention achieves the effect of sleeve-connecting two sleeves on the outer surface of the steel pipe, and flexibly rotates the control screw through the control knob. The rotation of the control screw causes the rotating disk to rotate and move toward the side close to the steel pipe. The movement of the rotating disk controls the extrusion rod and the rubber clamping plate to move toward the steel pipe through the traction rod, thereby playing the role of fitting the steel pipe to clamp and fix it, so as to facilitate the operation of inserting the steel pipe into the machined hole, thereby achieving the effect of improving the operation efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a structural schematic diagram of the present invention;
[0019] Figure 2 It is a schematic diagram of the internal structure of the present invention;
[0020] Figure 3 It is a schematic diagram of the tenon, mortise and steel pipe connection structure of the present invention;
[0021] Figure 4 It is a schematic diagram of the tenon and mortise structure of the present invention;
[0022] Figure 5 It is a schematic diagram of the unit module and mortise structure of the present invention;
[0023] Figure 6 It is a schematic diagram of the front view structure of the sleeve of the present invention;
[0024] Figure 7 It is a schematic diagram of the top view of the casing structure of the present invention.
[0025] In the figure: 1. unit module; 2. tenon; 3. mortise; 4. steel pipe; 5. machined hole; 6. steel wire; 7. sleeve; 8. mounting plate; 9. force handle; 10. guide ring; 11. control screw; 12. control knob; 13. rotating disk; 14. annular groove; 15. mounting slide rail; 16. extrusion rod; 17. rubber clamping plate; 18. traction rod. DETAILED DESCRIPTION
[0026] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0027] In the description of the present invention, it is necessary to understand that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.
[0028] Reference Figure 1-7 A modular building prestressed mortise and tenon node structure comprises a unit module 1, a mortise 3 is fixedly connected at the corners of the unit module 1, a tenon 2 is arranged between adjacent mortises 3, a machined hole 5 is arranged on the tenon 2 and the mortise 3, a steel pipe 4 is arranged on the outside of the unit module 1, the steel pipe 4 passes through the machined hole 5, a steel wire 6 is arranged on the outside of the unit module 1, two sleeves 7 are arranged on the outer surface of the steel pipe 4, the two sleeves 7 are fixedly connected by a connecting rod, the front of the two sleeves 7 is fixedly connected to the same mounting plate 8, the front of the mounting plate 8 is fixedly connected to a force handle 9, the upper surface of the force handle 9 is in an arc shape, and the arc of the upper surface of the force handle 9 is between one hundred and fifty degrees and one hundred and eighty degrees, which plays a role in facilitating hand grasping.
[0029] The two sleeves 7 are fixedly connected to the guide ring 10 on the side away from each other, and the two sleeves 7 are threadedly connected to the control screw 11 located on the inner side of the guide ring 10 on the side away from each other. The length of the control screw 11 is not less than eight centimeters, and the thread length of the outer surface of the control screw 11 is not less than six centimeters. The ends of the two control screws 11 away from each other are fixedly connected to the control knob 12, and the end of the control screw 11 away from the control knob 12 passes through the sleeve 7 and is fixedly connected to a rotating disk 13. An annular groove 14 is provided on the outer surface of the rotating disk 13. The inner wall of the two sleeves 7 away from each other is fixedly connected to a mounting rail 15 located above the control screw 11, and the inner surface of the mounting rail 15 is slidably connected to an extrusion rod 16, and the end of the extrusion rod 16 away from the control knob 12 is fixedly connected to a rubber clamping plate 17, and the front and back sides of the extrusion rod 16 are slidably connected to the inner surface of the annular groove 14 through a traction rod 18.
[0030] Another technical problem to be solved by the present invention is to provide a method for preparing a modular building prestressed mortise and tenon joint structure, comprising the following steps:
[0031] S1, mechanically manufacturing the tenon 2 and the mortise 3, and opening a mechanically processed hole 5 on the surface of the tenon 2 and the mortise 3 according to a suitable size;
[0032] S2, fixing the mortise 3 to the end corner of the unit module 1 by bolts or welding, and each unit module 1 is provided with eight mortises 3;
[0033] S3, insert the steel wire 6 into the steel pipe 4 through the machined hole 5, and insert the steel wire 6 in three directions: vertically, front-back, and left-right;
[0034] S4, after the steel wire 6 is tightened by applying external force, concrete is poured into the steel pipe 4;
[0035] S5. After pouring concrete, loosen the steel wire 6, and release the pre-tightened tension, so that the unit modules 1 are tightly connected together through the nodes.
[0036] The present invention can be used as a node in a modular building structure through a prestressed mortise and tenon node. The node adopts a steel pipe 4 that passes through the node and the modular building structure, and a steel wire 6 is passed through the steel pipe 4. Prestress is generated by pre-tightening the steel wire 6 and pouring concrete to achieve a fast connection node, thereby quickly fastening the modular building units together, so that the modular building modules can be quickly installed and disassembled, thereby achieving the effect of improving the efficiency and quality of modular building construction.
[0037] The present invention achieves the effect of sleeve-connecting the two sleeves 7 on the outer surface of the steel pipe 4, and flexibly rotates the control screw 11 through the control knob 12. The rotation of the control screw 11 causes the rotating disk 13 to rotate and move toward the side close to the steel pipe 4. The movement of the rotating disk 13 controls the extrusion rod 16 and the rubber clamping plate 17 to move toward the steel pipe 4 through the traction rod 18, thereby fitting the steel pipe 4 to clamp and fix it, thereby facilitating the operation of inserting the steel pipe 4 into the machined hole 5, thereby achieving the effect of improving the operating efficiency.
[0038] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
[0039] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
Claims
1. A modular building prestressed mortise and tenon joint structure, comprising a unit module (1), characterized in that: The corners of the unit module (1) are fixedly connected with mortises (3), tenons (2) are provided between adjacent tenons (3), and machined holes (5) are provided on the tenons (2) and the tenons (3), a steel pipe (4) is provided on the outside of the unit module (1), the steel pipe (4) passes through the machined holes (5), and a steel wire (6) is provided on the outside of the unit module (1); two sleeves (7) are provided on the outer surface of the steel pipe (4), the two sleeves (7) are fixedly connected by a connecting rod, the front faces of the two sleeves (7) are fixedly connected with the same mounting plate (8), and the front faces of the mounting plate (8) are fixedly connected with a force application handle (9); the two sleeves (7) are fixedly connected with a guide ring (10) on the sides away from each other, and the two sleeves (7) are threadedly connected on the sides away from each other. A control screw (11) is provided on the inner side of the guide ring (10); the ends of the two control screws (11) away from each other are fixedly connected to a control knob (12); the ends of the control screws (11) away from the control knob (12) penetrate through a sleeve (7) and are fixedly connected to a rotating disk (13); an annular groove (14) is provided on the outer surface of the rotating disk (13); a mounting rail (15) located above the control screws (11) is fixedly connected to the inner walls of the two sleeves (7) away from each other; an extrusion rod (16) is slidably connected to the inner surface of the mounting rail (15); the end of the extrusion rod (16) away from the control knob (12) is fixedly connected to a rubber clamping plate (17); the front and back surfaces of the extrusion rod (16) are slidably connected to the inner surface of the annular groove (14) via a traction rod (18).
2. A modular building prestressed mortise and tenon joint structure according to claim 1, characterized in that: The length of the control screw (11) is not less than eight centimeters, and the length of the thread on the outer surface of the control screw (11) is not less than six centimeters.
3. A modular building prestressed mortise and tenon joint structure according to claim 1, characterized in that: The upper surface of the force applying handle (9) is in the shape of an arc, and the arc of the upper surface of the force applying handle (9) is between one hundred and fifty degrees and one hundred and eighty degrees.
4. A construction method for a modular building prestressed mortise and tenon joint structure as claimed in any one of claims 1 to 3, characterized in that: The following steps are involved: S1, mechanically manufacturing the tenon (2) and the mortise (3), and opening mechanical processing holes (5) on the surfaces of the tenon (2) and the mortise (3) according to appropriate sizes; S2, fixing the mortise (3) to the end corner of the unit module (1) by means of bolts or welding, and each unit module (1) is provided with eight mortises (3); S3, inserting the steel pipe (4) into the steel wire (6) through the machined hole (5), and inserting the steel wire (6) in three directions: vertically, front-to-back, and left-to-right; S4, after tightening the steel wire (6) by applying an external force, pouring concrete into the steel pipe (4); S5. After pouring concrete, loosen the steel wire (6) to release the pre-tightened tension, and the unit modules (1) are tightly connected together through the nodes.
Citation Information
Patent Citations
Fabricated steel structure modular campsite house building system
CN209145000U
Modular building prestress mortise and tenon joint structure
CN211850023U
Combined integrated block
CN2633998Y