A concrete pile production system
By designing the concrete pile production system of I, II and III in three-span and two workshops, and using the original facilities and equipment to form two cycle production lines, the existing technology has been solved, which has low efficiency, high labor and poor safety. The problem is to achieve efficient production and safe process flow.
Patent Information
- Application Number
- CN202010619921.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-07-01
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2040-07-01
AI Technical Summary
The existing three-span and two-workshop concrete pile production process is low, has a lot of labor, is high in labor intensity and is poor in safety. It cannot be effectively transformed into a circular assembly line, and it cannot effectively distinguish the working space between machines and people, which poses safety risks.
A three-span and two-line concrete pile production system was designed, using the original large-scale facilities such as mixing buildings, centrifuges, steaming and raising pools, and Islap I, II and III spans, respectively, with pumping areas and centrifugal respectively. The area, tensioning area, steaming and raising area, tail plate removal area and pile pile pile area, and efficient transportation and processing of materials and molds are achieved through mold handling equipment and spreaders, forming two cycle production lines to improve automation and safety.
The rationalization of process material flow has been achieved, the frequency of crossover of air handling equipment has been reduced, the degree of equipment automation has been improved, the number of labor has been significantly reduced, and the production efficiency has been improved. One concrete pile can be produced on average per minute, and it has effectively distinguished workers from The operating space of the machine improves the safety of the construction site.
Smart Images

Figure CN111618992B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of building materials, and in particular to a three-span two-line concrete pile production system. Background Art
[0002] At present, some pipe pile workshops are divided into three spans, with one span on each side used as a production workshop, and the middle span is used to produce steel cages, which are supplied to two production workshops respectively. This kind of workshop has extensive production process, many workers, high labor intensity, and poor safety. With the advancement of technology, suitable concrete pile workshops with larger space can already achieve circular assembly line production, but similar to the above three spans and two workshops, due to the location of the mixing plant in the middle span and the limited workshop area, there has been no effective and feasible way to transform the design into two circular assembly lines. With the current labor cost increasing day by day, there is an increasing demand to design a set of circular assembly line production process for this type of workshop, maintain the production capacity of the original two workshops, improve the degree of automation, reduce the number of workers, and reduce labor intensity.
[0003] The Chinese utility model patent "Three-span two-line system for preparing precast concrete piles" with patent number 201821089889.5 and application date July 10, 2018, includes a cage loading area, a first mold-closing partition, a first tensioning partition, a first feeding partition, a first centrifugal partition, a first steam-curing partition, a first demoulding and pile-turning partition and a first cleaning partition to form a precast concrete pile production line, and a cage loading area, a second mold-closing partition, a second tensioning partition, a second feeding partition, a second centrifugal partition, a second steam-curing partition, a second demoulding and pile-turning partition and a second cleaning partition to form another precast concrete pile production line. The cage loading area, the first mold-closing partition and the first tensioning partition are arranged longitudinally to form a The first longitudinal conveyor line, the first demoulding and piling partition, the first centrifugal partition and the first steaming and curing partition are longitudinally distributed to form the second longitudinal conveyor line, the second demoulding and piling partition, the second tensioning partition, the second feeding partition, the second centrifugal partition and the second steaming and curing partition are longitudinally distributed to form the third longitudinal conveyor line, the first cleaning partition is arranged between the first demoulding and piling partition and the cage installation area to form the first transverse conveyor line, the second cleaning partition is arranged between the second demoulding and piling partition and the cage installation area to form the second transverse conveyor line, the second mold closing partition is arranged between the cage installation area and the second tensioning partition to form the third transverse conveyor line, and the first feeding partition is arranged between the first tensioning partition and the first centrifugal partition to form the fourth transverse conveyor line. The disadvantage of this three-span two-line system is that the steps are relatively cumbersome and the production efficiency is not high.
[0004] The Chinese utility model patent "A Concrete Pipe Pile Production Line" with patent number 201320655775.3 and application date October 23, 2013, includes the entire production line workshop consisting of three spans: left, middle and right. The left span workshop is sequentially provided with tensioning area, centrifugal area, steaming area, tensioning area, edge wire disassembly area and high-pressure steaming area along the longitudinal direction of the workshop from front to back; the middle span workshop is sequentially provided with material distribution area, cover mold storage area, cage reinforcement stacking area, cage reinforcement assembly area, cage installation area, pile hanging and mold cleaning area, head and tail plate disassembly and product inspection area along the longitudinal direction of the workshop from front to back; The span workshop is equipped with a mixing plant, a rolling welding area / pier head area, and an end plate production area in sequence from front to back along the longitudinal direction of the workshop; the side wire removal area of the left span workshop extends to the middle span workshop; the rolling welding area of the right span workshop extends to the middle span workshop; a concrete pump is provided under the mixing plant, and a metering material distribution vehicle and a pipe mold conveyor are provided in the material distribution area; a side wire removal chain machine is provided in the side wire removal area along the horizontal direction of the workshop; a side wire removal device is provided on the side wire removal chain machine, and the side wire removal device is located at the connection between the left span workshop and the right span workshop. The disadvantage of this production process is that it is impossible to distinguish between the working space of the machine and the human, which may bring safety hazards.
[0005] In view of this, a new concrete pile production system needs to be designed to overcome the above problems. Summary of the invention
[0006] The present invention provides a new concrete pile production system in a three-span double-line concrete production workshop in order to arrange two circulating production lines in the original limited space and utilize the original large facilities such as mixing plants, centrifuges, steam curing tanks, autoclaves, etc. to reduce the transformation cost.
[0007] A concrete pile production system comprises span I, span II and span III; span I and span III are symmetrically arranged.
[0008] The first span is provided with a first workshop pumping area, a first workshop centrifugal area, a first workshop tensioning area, a first workshop steaming area, a first workshop tailboard removal area, and a first workshop pile stacking area;
[0009] The III span is provided with a second workshop pumping area, a second workshop centrifugal area, a second workshop tensioning area, a second workshop steaming area, a second workshop tailboard removal area, and a second workshop pile stacking area;
[0010] The II span is provided with a concrete pile demoulding area, a mold cleaning area, a steel cage mold insertion area, a mold diversion area and a mixing plant;
[0011] A concrete mixing area is provided under the mixing building in the II span, and the concrete mixing area is connected to the first workshop pumping area and the second workshop pumping area respectively;
[0012] The first workshop pumping area, the first workshop centrifugal area, the first workshop steaming area, and the first workshop tail plate removal area in the I span form a first concrete pile production line, and the second workshop pumping area, the second workshop centrifugal area, the second workshop steaming area, and the second workshop tail plate removal area in the III span form a second concrete pile production line;
[0013] The molds are respectively merged into the II span through the first concrete pile production line and the second concrete pile production line, and pass through the concrete pile demoulding area, the mold cleaning area, the steel cage mold entry area and the mold diversion area to form a concrete pile processing line. Finally, the molds enter the first workshop tensioning area or the second workshop tensioning area to complete the concrete pile production.
[0014] Preferably, the production line directions of spans I and III are consistent, and opposite to the processing line direction of span II.
[0015] Preferably, the mixing building is connected to the pumping area of the first workshop and the pumping area of the second workshop respectively through a material placing flat car arranged under the mixing building.
[0016] Preferably, the mold is transported from the pumping area of the first workshop to the steaming area of the first workshop via the centrifugal area of the first workshop by mold handling equipment; the mold is transported from the pumping area of the second workshop to the steaming area of the second workshop via the centrifugal area of the second workshop by mold handling equipment, and the mold handling equipment is provided with at least one hanger.
[0017] Preferably, the concrete pile demoulding area includes two layers, wherein the upper layer is an upper mold conveyor, and the lower layer is a lower mold conveyor, and an upper mold handling device is arranged above the upper mold conveyor to transfer the upper mold to the upper mold conveyor, and the upper mold handling device is provided with at least one hanger.
[0018] Preferably, a pile handling device is provided above the lower mold conveyor for transferring concrete piles, and the pile handling device is provided with at least one hanger.
[0019] Preferably, a mold cleaning area is provided between the upper mold conveyor and the lower mold conveyor for cleaning the mold and spraying a release agent.
[0020] Preferably, the steel cage handling equipment is arranged above the steel cage forming area to transfer the steel cage, and the steel cage handling equipment is provided with at least one hoist.
[0021] Preferably, the mold handling equipment can respectively lift or place the empty mold in the tensioning area of the first workshop or the tensioning area of the second workshop, the centrifuged mold in the centrifugal area of the first workshop or the centrifugal area of the second workshop, and the mold after the fabric is finished in the pumping area of the first workshop or the pumping area of the second workshop. Beneficial Effects
[0022] The material flow direction of the process of the present invention is reasonable, the division of labor between the aerial handling equipment is clear, and the frequency of mutual avoidance is greatly reduced; the automation level of the equipment has the potential to be further improved, and the overall number of workers is significantly reduced. Specifically, using the production process of the present invention, one concrete pile can be produced in an average of one minute, and compared with the prior art, the efficiency is significantly improved; at the same time, the operating space of workers and machines is distinguished, making the construction site safer. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 This is the process plan of a three-span, two-line workshop;
[0024] Figure 2 This is a schematic diagram of the mid-span;
[0025] Figure 3 This is a schematic diagram of mold handling equipment.
[0026] The meanings of the numbers in the figure are as follows: 1. Concrete mixing area; 2. Pumping area of the second workshop; 3. Pumping area of the first workshop; 4. Centrifugal area of the first workshop; 5. Tensioning area of the first workshop; 6. Steaming and curing area of the first workshop; 7. Tail board removal area of the first workshop; 8. Pile stacking area of the first workshop; 9. Centrifugal area of the second workshop; 10. Tensioning area of the second workshop; 11. Steaming and curing area of the second workshop; 12. Tail board removal area of the second workshop; 13. Pile stacking area of the second workshop; 14. Head board removal area; 15. Concrete pile demoulding area; 16. Mold cleaning area; 16-1 lower mold conveyor; 1 6-2 Upper mold conveyor; 17. Rebar cage feeding area; 18. Mold diversion area; 19. Rebar cage forming area; 20. Lower mold; 21. Upper mold; 22. Rebar cage; 30. Rebar cage handling equipment; 31. Upper mold handling equipment; 32. Pile handling equipment; 33. Mold handling equipment; 34. Material distribution flat car; 34-1. Material distribution flat car with built-in transverse machine; 35. First fixed handover point; 36. Second fixed handover point; 40-1. Empty mold; 40-2. Mold after centrifugation; 40-3. Mold after material distribution; 41. I span; 42. II span; 43. III span; 44 Mixing plant. DETAILED DESCRIPTION
[0027] The production process cycle of a concrete pile includes the following steps: concrete material, centrifugation, steam curing, removal of tail plate, removal of mold bolts, removal of upper mold, hanging out concrete pile, cleaning of upper and lower molds, spraying mold release agent on upper and lower molds, clamping steel bars and feeding them into the inner cavity, mold closing, tightening mold bolts, tensioning. Then enter the next production process cycle of concrete piles.
[0028] The hoisted concrete piles also need to undergo head plate removal operations to enter the pile stacking area for stacking, and finally enter the autoclave or finished product yard.
[0029] In the present invention, three-span operation lines are provided, and span I 41, span II 42 and span III 43 are provided in sequence from bottom to top.
[0030] Concrete material is processed in span II 42, and after completion, it enters span I 41 or span III 43 to carry out the following steps: centrifugation, steam curing, removal of tail plate, removal of mold bolts, and after completion, it flows from span I 41 or span III 43 into span II 42 to carry out the following steps: remove the upper mold, hang out the concrete pile, clean the upper mold 21 and the lower mold 20, spray the release agent on the upper mold 21 and the lower mold 20, clamp the steel cage 22 and send it into the inner cavity, close the mold, and tighten the mold bolts. Finally, it flows into span I 41 or span III 43 for tensioning operation.
[0031] The present invention will be further described below in conjunction with the accompanying drawings.
[0032] like Figure 1 As shown, this process utilizes the material distributing flat car of the original mixing plant for distributing materials, and utilizes the original equipment of the original production workshop, i.e., the I span 41 or the III span 43 for operation. The I span 41 or the III span 43 are symmetrically arranged, and the I span 41 is provided with the first workshop pumping area 3, the first workshop centrifugal area 4, the first workshop tensioning area 5, the first workshop steaming area 6, the first workshop tail plate removal area 7, and the first workshop pile stacking area 8 in sequence from right to left; since the III span 43 is symmetrically arranged with the I span 41, the III span 43 is provided with the second workshop pumping area 2, the second workshop centrifugal area 9, the second workshop tensioning area 10, the second workshop steaming area 11, the second workshop tail plate removal area 12, and the second workshop pile stacking area 13 in sequence from right to left.
[0033] A II span 42 is arranged between the I span 41 and the III span 43. The II span 42 is provided with a concrete pile demoulding area 15, a mold cleaning area 16, a steel cage mold insertion area 17, a mold diversion area 18 and a mixing plant 44 from left to right.
[0034] More specifically, the process flow of span I 41 is as follows: the mold is placed on the material distribution flat car 34 in the first workshop pumping area 3, enters the mixing building 44 under the concrete mixing area 1, injects concrete, and returns to the first workshop pumping area 3 after filling. The mold is transported to the first workshop centrifugal area 4 by the mold transporting equipment 33 for centrifugal operation. After centrifugation, the mold is transported to the first fixed intersection 35 located on the side of the steaming and curing area 6 of the first workshop by the mold transporting equipment 33 again, and the rubber plug at the tail of the mold to prevent the concrete from flowing out is pulled out, and then the mold is transported to the steaming and curing area 6 of the first workshop by the overhead crane for stacking and steaming. After the steaming and curing is completed, the mold is transported by the overhead crane to the tail board removal area 7 of the first workshop for tail board removal. After the tail board is removed, the mold is merged from span I 41 into span II 42, and the mold bolts are removed during the merging process.
[0035] Since span III 43 and span I 41 are symmetrically arranged, their process flow is basically the same: the mold is placed on the material distribution flat car 34 in the pumping area 2 of the second workshop, enters the mixing building 44 under the concrete mixing area 1, injects concrete, and returns to the pumping area 2 of the second workshop after filling. The mold is transported to the centrifugal area 9 of the second workshop by the mold transporting equipment 33 for centrifugal operation. After centrifugation, the mold is transported to the second fixed intersection 36 located on the side of the steaming and curing area 11 of the second workshop by the mold transporting equipment 33 again, and the rubber plug at the tail of the mold to prevent the concrete from flowing out is pulled out, and then the mold is transported to the steaming and curing area 11 of the second workshop by the overhead crane for stacking and steaming. After the steaming and curing is completed, the mold is transported by the overhead crane to the tail board removal area 12 of the second workshop for tail board removal. After the tail board is removed, the mold is merged from span III 43 into span II 42, and the mold bolts are removed during the merging process.
[0036] The process flow of span II 42 is as follows: the molds collected from span I 41 and span III 43 are grouped together, and the molds of the same group are transported to the concrete pile demoulding area 15 by the ground transfer equipment. The concrete pile demoulding area 15 includes an upper and lower layer, the upper layer is provided with an upper mold conveyor 16-2, and the lower layer is provided with a lower mold conveyor 16-1. The functions of the upper mold conveyor 16-2 and the lower mold conveyor 16-1 are to respectively convey the upper mold and the lower mold carried thereon to move forward in the same direction. After the mold enters the concrete pile demoulding area 15, the ground transfer equipment first places the mold on the lower mold conveyor 16-1, and the upper mold handling equipment 31 arranged above the lower mold conveyor 16-1 lifts the upper mold 21 of the mold and transports it to the upper mold conveyor 16-2. At this time, the concrete piles arranged inside the upper mold 21 and the lower mold 20 are exposed because the upper mold 21 is lifted, and the concrete piles are lifted by the pile handling equipment 32 and transferred to the head plate removal area 14, where the head plate removal operation is performed on the concrete piles. The concrete piles after the head plate is removed are diverted to the I span 41 and the III span 43, and transported to the first workshop pile stacking area 8 and the second workshop pile stacking area 13 respectively.
[0037] A mold cleaning area 16 is provided between the upper mold conveyor 16 - 2 and the lower mold conveyor 16 - 1 . The mold cleaning area 16 uses high-pressure water equipment to clean the upper mold 21 and the lower mold 20 and spray a release agent.
[0038] After that, the upper mold 21 and the lower mold 20 enter the steel cage forming area 19. A steel cage handling device 30 is provided at the upper part of the steel cage forming area 19. The steel cage handling device 30 clamps the steel cage 22 and transports it to the lower mold 20. Subsequently, the upper mold handling device 31 transports the upper mold 21 to the top of the lower mold 20 for mold closing. The mold after mold closing is transferred by the ground transfer equipment to the first workshop tensioning area 5 and the second workshop tensioning area 10 of the I span 41 and the III span 43, and the mold closing bolts are tightened during the merging process.
[0039] like Figure 3 As shown, after the prestressing tensioning operation is completed in the first workshop tensioning area 5 or the second workshop tensioning area 10, it is placed on the horizontal conveyor and waits to be transported to the material distribution flat car. After the mold handling equipment 33 puts down the centrifuged mold 40-2 that has been centrifuged at the first fixed intersection 35 or the second fixed intersection 36, it lifts the empty mold 40-1 and transfers it to the material distribution flat car 34, and at the same time lifts the mold 40-3 that has finished distributing, and then transfers the mold after distributing to the centrifugal area to start the next round of production process.
[0040] Among them, the steel cage handling equipment 30, the upper mold handling equipment 31, the pile handling equipment 32, and the mold handling equipment 33 are all provided with double-station hoists, which can lift two molds at the same time or one mold during operation.
Claims
1. A concrete pile production system, comprising span I (41), span II (42) and span III (43); the span I (41) and span III (43) are symmetrically arranged, the span I (41) is provided with a first workshop pumping area (3), a first workshop centrifugal area (4), a first workshop tensioning area (5), a first workshop steaming area (6), a first workshop tail plate removal area (7), and a first workshop pile stacking area (8); the span III (43) is provided with a second workshop pumping area (2), a second workshop centrifugal area (9), a second workshop tensioning area (10), a second workshop steaming area (11), a second workshop tail plate removal area (12), and a second workshop pile stacking area (13); the span II (42) is provided with a concrete pile demoulding area (15), a mold cleaning area (16), a steel cage mold insertion area (17), a mold diversion area (18) and a mixing plant (44); characterized in that, A concrete mixing area (1) is arranged under the mixing building (44) in the II span (42), and the concrete mixing area (1) is connected to the first workshop pumping area (3) and the second workshop pumping area (2) respectively; the first workshop pumping area (3), the first workshop centrifugal area (4), the first workshop steaming area (6), and the first workshop tail plate removal area (7) in the I span (41) form a first concrete pile production line, and the second workshop pumping area (2), the second workshop centrifugal area (9), the second workshop steaming area (11), and the second workshop tail plate removal area (12) of the III span (43) form a second concrete pile production line; the molds are respectively introduced into the II span (42) through the first concrete pile production line and the second concrete pile production line, and then pass through the concrete pile demoulding area (15), the mold cleaning area (16), the steel cage mold entry area (17) and the mold diversion area (18) to form a concrete pile processing line, and finally the molds enter the first workshop tensioning area (5) or the second workshop tensioning area (10) to complete the concrete pile production; The production lines of spans I (41) and III (43) are in the same direction, which is opposite to the processing line direction of span II (42); they are respectively connected to the first workshop pumping area (3) and the second workshop pumping area (2) through a material placing flat car arranged under the mixing building (44).
2. The concrete pile production system according to claim 1, characterized in that: The mold is transported from the first workshop pumping area (3) through the first workshop centrifugal area (4) to the first workshop steaming area (6) by the mold transporting equipment (33); the mold is transported from the second workshop pumping area (2) through the second workshop centrifugal area (9) to the second workshop steaming area (11) by the mold transporting equipment (33), and the mold transporting equipment (33) is provided with at least one lifting device.
3. The concrete pile production system according to claim 1, characterized in that: The concrete pile demoulding area (15) comprises two layers, wherein the upper layer is an upper mold conveyor (16-2), and the lower layer is a lower mold conveyor (16-1). An upper mold handling device (31) is arranged above the upper mold conveyor (16-2) for transferring the upper mold (21) to the upper mold conveyor (16-2), and the upper mold handling device (31) is provided with at least one lifting device.
4. The concrete pile production system according to claim 3, characterized in that: A pile handling device (32) is arranged above the lower mold conveyor (16-1) for transferring concrete piles, and the pile handling device (32) is provided with at least one lifting device.
5. The concrete pile production system according to claim 3, characterized in that: A mold cleaning area (16) is provided between the upper mold conveyor (16-2) and the lower mold conveyor (16-1) for cleaning the mold and spraying a mold release agent.
6. The concrete pile production system according to claim 1, characterized in that: The steel cage handling device (30) is arranged above the steel cage forming area (19) for transferring the steel cage, and the steel cage handling device (30) is provided with at least one lifting device.
7. The concrete pile production system according to claim 2, characterized in that: The mold handling equipment (33) can respectively lift or place the empty mold (40-1) in the first workshop tensioning area (5) or the second workshop tensioning area (10), the centrifuged mold (40-2) in the first workshop centrifugal area (4) or the second workshop centrifugal area (9), and the finished mold (40-3) in the first workshop pumping area (3) or the second workshop pumping area (2).