Comprehensive scheduling method for pre-start devices

Through the pre-start path priority device driver scheduling strategy and the adjustable sequence determination strategy, the scheduling of pre-start equipment is optimized, the impact of pre-start time on the overall processing time in the existing technology is solved, and more efficient resource utilization and scheduling optimization are achieved. .

CN111861095BInactive Publication Date: 2024-10-18HARBIN UNIV OF SCI & TECH
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202010467130.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-05-28
Publication Date
2024-10-18
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing comprehensive scheduling method does not consider the situation of pre-starting equipment and ignores the impact of pre-starting time on the overall processing time, resulting in a waste of equipment resources and low efficiency.

Method used

The pre-start path priority device driver scheduling strategy and the adjustable sequence determination strategy are adopted to optimize scheduling when the pre-start device is idle and working, respectively, to reduce the number of pre-starts and improve parallelism, and to adjust the process start time through the adjustable sequence process adjustment strategy , optimize the scheduling results.

Benefits of technology

It effectively reduces the number of pre-starts of pre-start equipment, improves the parallelism of pre-start equipment, saves time and energy, and takes into account the serial relationship between equipment and processes.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111861095B_ABST
    Figure CN111861095B_ABST
Patent Text Reader

Abstract

There is a comprehensive scheduling method for pre-start equipment. The method of the present invention comprises: first, when the pre-start equipment is in an idle state, a proposed pre-start long path priority strategy is adopted, and when the pre-start equipment is in a working state, a proposed pre-start short path priority strategy is adopted; then, a proposed adjustment sequence determination strategy is adopted to determine the process that generates the equipment idle time period as the adjustment target; finally, the process in the adjustable process sequence is adjusted by the adjustable sequence process adjustment strategy, and the process in the adjustable sequence is virtualized as a root node to form a partial processing tree with it as the root, and then the critical path of each partial processing tree is calculated, and sorted in ascending order according to the critical path, and the process on the partial processing tree with a short critical path is adjusted first, and the process on the selected adjusted partial processing tree is adjusted according to the hierarchy priority, and the device drive moment inserted in the process forward adjustment cannot affect the start processing moment of the subsequent process of other processes on the processing equipment of the moving process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical field:

[0001] The invention relates to a comprehensive scheduling method with pre-starting equipment. Background technology:

[0002] Aiming at the problem that the existence of pre-start equipment is not considered in the current comprehensive scheduling research and the influence of pre-start time on the overall processing time is ignored, a comprehensive scheduling method with pre-start equipment is proposed: first, the processes in the processing tree are scheduled by the pre-start path priority device-driven scheduling strategy. When the pre-start equipment is in an idle state, the process is scheduled according to the pre-start long path priority strategy. When the pre-start equipment is in a working state, the process is scheduled according to the pre-start short path priority strategy. All processes on the product processing tree are scheduled according to the pre-start path priority device-driven scheduling strategy to obtain the process scheduling sequence of this strategy; then, the adjustable process sequence in the above process scheduling sequence is found through the adjustable sequence determination strategy. When all processes are arranged by the device driving strategy, the equipment may be idle for a long time. The adjustable sequence determination strategy can be used to determine the equipment that first appears in the idle time period and determine the sequence that can be adjusted; finally, the processes in the adjustable process sequence are adjusted by the adjustable sequence process adjustment strategy, and the processes in the adjustable sequence are virtualized as root nodes to form a partial processing tree with it as the root. Then, the critical path of each partial processing tree is calculated and sorted in ascending order according to the critical path. The processes on the partial processing tree with a short critical path are adjusted first, and the processes on the selected adjusted partial processing tree are adjusted according to the hierarchy priority. The device driving moment inserted when the process is adjusted forward cannot affect the start processing time of the subsequent processes of other processes on the processing equipment of the moving process.

[0003] During the use of the method of the present invention, firstly, the pre-start path priority device driver scheduling strategy adopted by the present invention effectively reduces the pre-start times of the pre-start device, improves the parallelism of the pre-start device in the processing process, and provides a reasonable pre-scheduling scheme for the subsequent adjustment strategy; then, the adjustable sequence determination strategy proposed by the present invention is used to find the adjustable sequence, and the process in the adjustable sequence is adjusted to a more appropriate time for scheduling by adjusting the process adjustment strategy, so that the scheduling result is more optimized and does not affect the scheduling of subsequent processes of other processes; finally, through the adjustable sequence process adjustment strategy, the process in the adjustable sequence and the adjustment process predecessor are adjusted, and the serial relationship destroyed by the device driver is adjusted, which not only takes into account the device parallelization, but also strengthens the serial relationship between processes through this strategy. Summary of the invention:

[0004] The purpose of the present invention is to provide a comprehensive scheduling method with pre-start equipment. In view of the fact that the current comprehensive scheduling research does not consider the situation of pre-start equipment and ignores the impact of pre-start time on the overall processing time, a comprehensive scheduling method with pre-start equipment is proposed. The purpose of the comprehensive scheduling method with pre-start equipment is to save time and improve work efficiency by reducing the impact of pre-start time on the overall processing time, and also save more energy. The method first schedules all processes on the processing tree according to the pre-start path priority device driving strategy. When the pre-start device is in an idle state, the proposed pre-start long path priority strategy is adopted to make the pre-start device enter the processing state as late as possible, so that the processes on the pre-start device are more compact, thereby reducing the number of pre-start times of the pre-start device; when the pre-start device is in a working state, the proposed pre-start short path priority strategy is adopted to make the processes on the pre-start device reach the pre-start device as early as possible when it is in its working state, so as to reduce the number of pre-start times and achieve the purpose of improving the parallelism of the pre-start device; then the adjustable sequence determination strategy is used to determine the process sequence that can be adjusted; finally, the adjustable sequence process adjustment strategy is used to adjust the start processing time of the processes in the adjustable process sequence according to the critical path, so as to optimize the scheduling results of the pre-start path priority device driving scheduling strategy, and finally obtain a feasible and effective scheduling scheme.

[0005] The above purpose is achieved through the following technical solutions:

[0006] A comprehensive scheduling method for a pre-start device is characterized in that the method comprises the following steps: first, scheduling the processes in a processing tree by a pre-start path priority device driver scheduling strategy, wherein when the pre-start device is in an idle state, the process is scheduled according to a pre-start long path priority strategy, and when the pre-start device is in a working state, the process is scheduled according to a pre-start short path priority strategy, and all processes on the product processing tree are scheduled according to the pre-start path priority device driver scheduling strategy to obtain a process scheduling sequence of the strategy; then, an adjustable process sequence in the process scheduling sequence is found by an adjustable sequence determination strategy, and all processes are scheduled by using the pre-start path priority device driver strategy. When the equipment is idle for a long time, the adjustable sequence determination strategy can be used to determine the equipment that first appears in the idle time period and determine the sequence that can be adjusted. Finally, the adjustable sequence process adjustment strategy is used to adjust the processes in the adjustable process sequence, and the processes in the adjustable sequence are virtualized as root nodes to form a partial processing tree with it as the root. Then, the critical path of each partial processing tree is calculated and sorted in ascending order according to the critical path. The processes on the partial processing trees with short critical paths are adjusted first, and the processes on the selected adjusted partial processing trees are adjusted according to the hierarchy priority. The device drive moment inserted in the process forward adjustment cannot affect the start processing time of the subsequent processes of other processes on the processing equipment of the moving process.

[0007] The comprehensive scheduling method for a pre-start device is described, and the specific implementation steps of the scheduling method are as follows:

[0008] Step 1: Input the information of equipment, process, processing time, and pre-start time, and establish the constraint relationship table of all processes;

[0009] Step 2: Schedule all processes in the product processing technology tree according to the pre-start path priority device driver scheduling strategy to form a process scheduling sequence of the strategy;

[0010] Step 3: Determine the number of equipment n required for product processing;

[0011] Step 4: According to the scheduling sequence of the current process, find and confirm the equipment that needs to be adjusted and the adjustable process sequence in the current scheduling sequence through the adjustable sequence confirmation strategy;

[0012] Step 5: Adjust the processes in the adjustable process sequence determined in step 4 through the adjustable sequence process adjustment strategy;

[0013] Step 6: n = n-1;

[0014] Step 7: When n>=1, return to step 4, otherwise, go to step 8;

[0015] Step 8: Output the Gantt chart and process sequence;

[0016] Step 9: End.

[0017] The described comprehensive scheduling method with pre-start devices proposes a pre-start path priority device driver scheduling strategy in order to reduce the number of pre-start times of the pre-start devices and improve the parallelism of the pre-start devices. This strategy adopts the proposed pre-start long path priority strategy when the pre-start device is in an idle state, so that the pre-start device enters the processing state as late as possible, making the process on the pre-start device more compact, thereby reducing the number of pre-start times of the pre-start device; when the pre-start device is in a working state, the proposed pre-start short path priority strategy is adopted, so that the process on the pre-start device reaches the pre-start device as early as possible when it is in its working state, thereby reducing the number of pre-start times and achieving the purpose of improving the parallelism of the pre-start device.

[0018] In the above-mentioned comprehensive scheduling method with pre-started equipment, the equipment driver always searches in the current schedulable parallel process when searching for schedulable processes, which increases the waiting time between serial processes and destroys the close serial connection between processes. Therefore, an adjustable sequence process adjustment strategy based on process seriality is proposed for the equipment driver result, that is, the process in the adjustable process sequence found according to the adjustable process determination strategy is adjusted through the critical path to adjust its start processing time. The method of the present invention combines the two, firstly improving the parallelism of the equipment through the pre-start path priority equipment driver scheduling strategy, and then taking into account the serial connection between processes through the adjustable process adjustment strategy.

[0019] Beneficial effects:

[0020] 1. The present invention analyzes the comprehensive scheduling problem of the pre-start device, and reduces the pre-start times of the pre-start device and improves the parallelism of the pre-start device through the pre-start path priority device driver scheduling strategy. This strategy adopts the proposed pre-start long path priority strategy when the pre-start device is in an idle state, so that the pre-start device enters the processing state as late as possible, making the process on the pre-start device more compact, thereby reducing the pre-start times of the pre-start device; when the pre-start device is in a working state, the proposed pre-start short path priority strategy is adopted, so that the process on the pre-start device reaches the pre-start device as early as possible when it is in its working state, thereby reducing the pre-start times and achieving the purpose of improving the parallelism of the pre-start device.

[0021] 2. In the present invention, the device driver always searches in the current schedulable parallel process when searching for a schedulable process, which increases the waiting time between serial processes and destroys the close serial connection between processes. For this reason, an adjustable sequence process adjustment strategy based on process seriality is proposed for the device driver result, that is, the process in the adjustable process sequence found according to the adjustable process determination strategy is adjusted through the critical path to adjust its start processing time. The method of the present invention first improves the parallelism of the device through the pre-start path priority device driver scheduling strategy, and then takes into account the serial connection between processes through the adjustable process adjustment strategy. Description of the drawings:

[0022] Attached Figure 1 It is the algorithm flow chart of the present invention.

[0023] Attached Figure 2 It is a flowchart for implementing the pre-boot path priority device driver scheduling strategy.

[0024] Attached Figure 3 It is a flow chart for implementing the adjustable sequence determination strategy.

[0025] Attached Figure 4 It is a flow chart for implementing the adjustable sequence process adjustment strategy.

[0026] Attached Figure 5 It is a process tree illustration of the present invention.

[0027] Attached Figure 6 Pre-boot path priority device driver scheduling strategy for attached Figure 5 The Gantt chart of the process tree scheduling results is shown.

[0028] Attached Figure 7 The present invention is directed to Figure 5 Gantt chart of the scheduling results of the process tree is shown.

[0029] Attached Figure 8 It is the pre-start path priority device driver scheduling strategy device driver schedule. Specific implementation method:

[0030] Embodiment 1:

[0031] There is no research on the comprehensive scheduling problem of pre-start equipment. In fact, in actual processing and production, some equipment needs to be preheated before processing. For example, precision machine tools need to idle and preheat to reach thermal equilibrium before processing workpieces. This process is called pre-start. If the pre-start equipment is pre-started repeatedly, it will cause a waste of time and equipment resources. Therefore, reducing the number of pre-starts is a key point to solve the comprehensive scheduling problem of pre-start equipment.

[0032] Embodiment 2:

[0033] A comprehensive scheduling method for a pre-start device is characterized in that the method comprises the following steps: first, scheduling the processes in a processing tree by a pre-start path priority device driver scheduling strategy, wherein when the pre-start device is in an idle state, the process is scheduled according to a pre-start long path priority strategy, and when the pre-start device is in a working state, the process is scheduled according to a pre-start short path priority strategy, and all processes on the product processing tree are scheduled according to the pre-start path priority device driver scheduling strategy to obtain a process scheduling sequence of the strategy; then, an adjustable process sequence in the process scheduling sequence is found by an adjustable sequence determination strategy, and all processes are scheduled by using the pre-start path priority device driver strategy. When the equipment is idle for a long time, the adjustable sequence determination strategy can be used to determine the equipment that first appears in the idle time period and determine the sequence that can be adjusted. Finally, the adjustable sequence process adjustment strategy is used to adjust the processes in the adjustable process sequence, and the processes in the adjustable sequence are virtualized as root nodes to form a partial processing tree with it as the root. Then, the critical path of each partial processing tree is calculated and sorted in ascending order according to the critical path. The processes on the partial processing trees with short critical paths are adjusted first, and the processes on the selected adjusted partial processing trees are adjusted according to the hierarchy priority. The device drive moment inserted in the process forward adjustment cannot affect the start processing time of the subsequent processes of other processes on the processing equipment of the moving process.

[0034] Embodiment 3:

[0035] The above-mentioned comprehensive scheduling method for a pre-start device is shown in the attached algorithm flow chart. Figure 1 As shown, the specific implementation steps of the scheduling method are as follows:

[0036] Specific implementation steps

[0037] Step 1: Input the information of equipment, process, processing time, and pre-start time, and establish the constraint relationship table of all processes;

[0038] Step 2: Schedule all processes in the product processing technology tree according to the pre-start path priority device driver scheduling strategy to form a process scheduling sequence of the strategy;

[0039] Step 3: Determine the number of equipment n required for product processing;

[0040] Step 4: According to the scheduling sequence of the current process, find and confirm the equipment that needs to be adjusted and the adjustable process sequence in the current scheduling sequence through the adjustable sequence confirmation strategy;

[0041] Step 5: Adjust the processes in the adjustable process sequence determined in step 4 through the adjustable sequence process adjustment strategy;

[0042] Step 6: n = n-1;

[0043] Step 7: When n>=1, return to step 4, otherwise, go to step 8;

[0044] Step 8: Output the Gantt chart and process sequence;

[0045] Step 9: End.

[0046] Embodiment 4:

[0047] In the above-mentioned comprehensive scheduling method with pre-start devices, a pre-start path priority device driver scheduling strategy is proposed in order to reduce the number of pre-start times of the pre-start devices and improve the parallelism of the pre-start devices. This strategy adopts the proposed pre-start long path priority strategy when the pre-start device is in an idle state, so that the pre-start device enters the processing state as late as possible, making the process on the pre-start device more compact, thereby reducing the number of pre-start times of the pre-start device; when the pre-start device is in a working state, the proposed pre-start short path priority strategy is adopted, so that the process on the pre-start device reaches the pre-start device as early as possible when it is in its working state, thereby reducing the number of pre-start times and achieving the purpose of improving the parallelism of the pre-start device.

[0048] In the above-mentioned comprehensive scheduling method with pre-start equipment, the device driver always searches in the current schedulable parallel process when searching for a schedulable process, which increases the waiting time between serial processes and destroys the close serial connection between processes. For this reason, an adjustable sequence process adjustment strategy based on process seriality is proposed for the device driver result, that is, the process in the adjustable process sequence found according to the adjustable process determination strategy is adjusted through the critical path to adjust its start processing time. The method of the present invention combines the two, firstly improving the parallelism of the equipment through the pre-start path priority device driver scheduling strategy, and then taking into account the serial connection between processes through the adjustable process adjustment strategy.

[0049] Embodiment 5:

[0050] The above-mentioned comprehensive scheduling method with pre-start devices, pre-start path priority device driver scheduling strategy module: In view of the comprehensive scheduling problem with pre-start devices, the present invention proposes to first arrange the processing procedures according to the device driver strategy with pre-start path priority, and provide an initial scheduling process sequence for the subsequent adjustment strategy. The strategy implementation flow chart is as follows Figure 2 shown.

[0051] Embodiment 6:

[0052] The above-mentioned comprehensive scheduling method for pre-start equipment has an adjustable sequence determination strategy module: the initial sequence when the adjustable sequence determination strategy is used for the first time is obtained by the device drive strategy with pre-start path priority, and then each process sequence that calls the adjustable sequence determination strategy is a scheduling sequence adjusted by the adjustable sequence process adjustment strategy. First, the device that first appears in the idle time period is confirmed through the device drive time and the status of the device. The device that first appears in the idle time period and the processes processed after this time period can be regarded as an adjustable sequence. After each device completes the adjustable sequence adjustment, the idle time on the device needs to be ignored when the adjustable sequence confirmation strategy is called next time. This strategy can determine the process sequence that needs to be adjusted each time the device is idle. The flow chart for implementing this strategy is as follows Figure 3 shown.

[0053] Embodiment 7:

[0054] The above-mentioned comprehensive scheduling method with pre-start equipment, adjustable sequence process adjustment strategy module: the adjustable sequence process adjustment strategy adjusts the process in the adjustable sequence determined by the adjustable sequence determination strategy. First, the process in the adjustable sequence is virtualized as a root node to form a partial processing tree with it as the root, and then the critical path of each partial processing tree is calculated, and sorted in ascending order according to the critical path, and the processes on the partial processing tree with a short critical path are adjusted first. The processes on the selected adjusted partial processing tree are adjusted according to the hierarchy priority, and the device drive time inserted in the process forward adjustment cannot affect the start processing time of the subsequent processes of other processes on the processing equipment of the moving process.

[0055] The first insertable moment of a process must meet two conditions. First, the moment must be a device drive moment when the process immediately preceding the process is completed. Second, the process must not affect the start time of the subsequent process on the device after the moment is inserted. If the above conditions cannot be met, the process cannot be inserted at this moment. The process will continue to traverse backwards to find the next drive moment of the device until the moment that meets the above two conditions is found to insert the process. The flow chart of this strategy implementation is as follows Figure 4 shown.

[0056] Embodiment 8:

[0057] The above-mentioned comprehensive scheduling method for a pre-start device is as follows: Figure 5 As shown in the figure, it is a process tree diagram of a complex product G. There are 19 processes in total, which can be processed on 3 devices. The attribute information of each process is different. The symbols in the rectangular box mean: product process name / processing equipment name / processing time.

[0058] The following will be combined with the attached Figure 5 The specific execution flow of this method is explained with the process tree diagram in FIG.

[0059] Embodiment 9:

[0060] Each of the above process attributes has different information. The symbols in the rectangular box mean: product process name / processing equipment name / processing time. Figure 1 The specific steps of the method are as follows:

[0061] The above-mentioned comprehensive scheduling method for a pre-start device is used below to schedule the attached Figure 1 The process tree diagram in the example is used to execute the scheduling, and the algorithm flow chart is shown in the attached Figure 3 The specific steps of the method are as follows:

[0062] Step 1: Input the information of equipment, process, processing time, and pre-start time, and establish the constraint relationship table of all processes;

[0063] Step 2: Schedule all processes in the product processing tree according to the pre-start path priority device driver scheduling strategy to form a process scheduling sequence of the strategy. The pre-start path priority device driver scheduling strategy device driver schedule is as shown in the attached Figure 8 The corresponding Gantt chart is shown in the attached Figure 6 As shown;

[0064] Step 3: Determine the number of equipment n required for product processing, Figure 5 The number of equipment required for the process tree is 3, n = 3;

[0065] Step 4: According to the scheduling sequence of the current process, the adjustable sequence confirmation strategy is used to find and confirm the equipment that needs to be adjusted, as well as the adjustable process sequence in the current scheduling sequence. According to the adjustable sequence determination strategy, it is determined that the equipment that first appears in the idle time period is M3, and the obtained adjustment process sequence is {A5, A8, A4, A2};

[0066] Step 5: Adjust the processes in the adjustable process sequence determined in step 4 through the adjustable sequence process adjustment strategy. According to the adjustable sequence process adjustment strategy, the four nodes are used as virtual roots to form partial processing trees, and the critical path length of each partial processing tree is calculated respectively, and the critical path length is sorted in ascending order. The sorting results are A8, A5, A4, and A2. The processes on the partial processing tree with A8 as the root are adjusted. According to the layer priority strategy, the processes on the partial processing tree with A8 as the root are sorted. The sorting results are A19, A14, A15, and A8. First, A Process 19 starts at t=0 and does not need to be adjusted. Secondly, process A14 is the subsequent process of A19 and can only be scheduled after A19 is completed. After A19 is completed, the first device drive time of device M1 where A14 is located is t=5. If it is inserted at this moment, it is determined whether the insertion will affect the start time of the subsequent process of the same sequence processed by device M1 after this. If it does, find the next drive moment of M1. If it does not, insert this moment. At this time, the insertion of A14 at t=5 does not affect the subsequent processes of other processes and is successfully inserted. Repeat the adjustment of processes A15 and A8 in this way, and repeat the adjustment process of A8 for A5, A4 and A2 to complete the adjustment of the processes in the adjustable sequence on device M3.

[0067] Step 6: n = 3-1;

[0068] Step 7: When n>=1, return to step 4, otherwise, execute step 8 to complete the process adjustment on equipment M1 and M2;

[0069] Step 8: Output the Gantt chart and process sequence. Figure 5 The Gantt chart of the scheduling results of the process tree is shown in the attached Figure 7 As shown;

[0070] Step 9: End.

[0071] Embodiment 10:

[0072] The above comprehensive scheduling method for pre-starting equipment is compared with examples:

[0073] The product processing completion time using the method proposed in the present invention is 36 working hours. The reason why the method of the present invention has a good effect is that the pre-start path priority device driver scheduling strategy adopted by the present invention effectively reduces the pre-start times of the pre-start device, improves the parallelism of the pre-start device in the processing process, and provides a reasonable pre-scheduling scheme for the subsequent adjustment strategy; the adjustable sequence determination strategy proposed by the present invention is used to find the adjustable sequence, and the process in the adjustable sequence is adjusted to a more appropriate time for scheduling by adjusting the process adjustment strategy, so that the scheduling result is more optimized and does not affect the scheduling of subsequent processes of other processes; through the adjustable sequence process adjustment strategy, the process in the adjustable sequence and the adjustment process predecessor are adjusted, and the serial relationship destroyed by the device driver is adjusted, which not only takes into account the parallelization of the equipment, but also strengthens the serial relationship between processes through this strategy.

[0074] Therefore, the scheduling method proposed in the present invention solves the comprehensive scheduling problem of the existence of pre-start devices.

Claims

1. A comprehensive scheduling method for the presence of pre-start devices, Its characteristics are The method comprises the following steps: firstly, in order to reduce the number of pre-starting times of pre-starting equipment and improve the parallelism of pre-starting equipment, a pre-starting path priority device driver scheduling strategy is proposed, and the processes in the processing tree are scheduled by the pre-starting path priority device driver scheduling strategy. When the pre-starting equipment is in an idle state, the strategy schedules the processes according to the pre-starting long path priority strategy, so that the pre-starting equipment enters the processing state as late as possible, and the processes on the pre-starting equipment are more compact, so as to reduce the number of pre-starting times of the pre-starting equipment. When the pre-starting equipment is in a working state, the processes are scheduled according to the pre-starting short path priority strategy. All processes on the product processing tree are scheduled according to the pre-starting path priority device driver scheduling strategy, so that the processes on the pre-starting equipment reach the pre-starting equipment as early as possible when it is in its working state, so as to reduce the number of pre-starting times and achieve the purpose of improving the parallelism of the pre-starting equipment, thereby obtaining the process scheduling sequence of the strategy; then, through the adjustable sequence The determination strategy is used to find the adjustable process sequence in the process scheduling sequence. When all processes are arranged using the device drive strategy with pre-start path priority, the equipment may be idle for a long time. The adjustable sequence determination strategy can be used to determine the equipment that first appears in the idle time period and determine the sequence that can be adjusted. Finally, the processes in the adjustable process sequence are adjusted using the adjustable sequence process adjustment strategy. The processes in the adjustable sequence are virtualized as root nodes to form a partial processing tree with it as the root. Then, the critical path of each partial processing tree is calculated and sorted in ascending order according to the critical path. The processes on the partial processing tree with a short critical path are adjusted first. The processes on the selected adjusted partial processing tree are adjusted according to the hierarchy priority. The device drive moment inserted in the process forward adjustment cannot affect the start processing moment of the subsequent processes of other processes on the processing equipment of the mobile process. The comprehensive scheduling method with pre-start equipment and the specific implementation steps of the scheduling method are as follows: Step 1: Input the information of equipment, process, processing time, and pre-start time, and establish the constraint relationship table of all processes; Step 2: Schedule all processes in the product processing technology tree according to the pre-start path priority device driver scheduling strategy to form a process scheduling sequence of the strategy; Step 3: Determine the number of equipment n required for product processing; Step 4: According to the scheduling sequence of the current process, find and confirm the equipment that needs to be adjusted and the adjustable process sequence in the current scheduling sequence through the adjustable sequence confirmation strategy; Step 5: Adjust the processes in the adjustable process sequence determined in step 4 through the adjustable sequence process adjustment strategy; Step 6: n=n-1; Step 7: When n>=1, return to step 4, otherwise, go to step 8; Step 8: Output the Gantt chart and process sequence; Step 9: End.

Citation Information

Patent Citations

  • Optimizing and dispatching method of energy consumption of flexible flow shop with associated adjustment time and sequence

    CN104391488A

  • Device drive integrated dispatching method for adjusting devices during idle time period

    CN104732355A

  • Scheduling method, scheduling program, and scheduling system

    JP2010257383A