A monitoring point layout structure

By designing a monitoring point layout structure including a compression mechanism and a limit seat, the problem that the tunnel monitoring points are inconvenient for rapid disassembly and installation and maintenance is solved, and the rapid installation and disassembly of the monitoring point base is realized, which improves work efficiency and ensures the stability and accuracy of the monitoring point.

CN111962575BActive Publication Date: 2025-03-25HUNAN LIANZHI BRIDGE & TUNNEL TECH
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202010979394.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-09-17
Publication Date
2025-03-25
Estimated Expiration
2040-09-17

AI Technical Summary

Technical Problem

The layout structure of the existing tunnel monitoring point is not convenient for rapid disassembly and assembly and maintenance, resulting in low working efficiency.

Method used

A structure including a first mounting base and a monitoring point base is designed, and the rapid installation and disassembly of the monitoring point base is achieved using a pressing mechanism and a limiting seat, and the balance and stability of the base is ensured through the support base and the movable connection.

Benefits of technology

It realizes rapid disassembly and assembly and maintenance of the monitoring point base, improves work efficiency, and ensures the stability and accuracy of the monitoring point through reliable connection and support structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111962575B_ABST
    Figure CN111962575B_ABST
Patent Text Reader

Abstract

The present invention provides a monitoring point layout structure. It includes a first mounting seat and a monitoring point base arranged on a structure to be measured; the first mounting seat includes a clamping mechanism, and the monitoring point base is provided with a limit seat cooperating with the clamping mechanism, so as to realize the installation and removal of the monitoring point base; the clamping mechanism includes a first mounting block and a pull rod movably connected to the first mounting block, and an elastic member is provided between the pull rod and the first mounting block; one end of the pull rod is provided with a pressure plate cooperating with the limit seat, so as to realize the clamping of the monitoring point base. The present invention arranges the monitoring point base on the first mounting seat and limits the position through the clamping mechanism, so as to realize the rapid installation and removal of the monitoring point base, facilitate the replacement and maintenance of the monitoring point base, and improve the work efficiency; the pressure plate is clamped on the limit seat by the elastic force of the elastic member, thereby realizing the clamping of the monitoring point base.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel monitoring, and in particular to a monitoring point layout structure. Background Art

[0002] With the deepening of the understanding of the stress characteristics and complexity of underground projects, since the 1950s, the international community has begun to monitor the stability of surrounding rock and support through on-site measurement of underground projects, and use the results of on-site measurement to correct the design and guide the construction. The principle of on-site measurement is mainly to conduct numerical analysis and theoretical analysis based on the data obtained from the on-site monitoring point measurement, make a judgment closer to the engineering century, and thereby correct the support parameters and guide the construction. However, the current tunnel monitoring point layout structure is fixed on the tunnel wall by bolts, which is not convenient for disassembly and assembly. Therefore, when it is necessary to maintain the monitoring point and its layout structure, it takes a long time and the work efficiency is low.

[0003] In summary, there is an urgent need for a monitoring point layout structure to solve the problems existing in the prior art. Summary of the invention

[0004] The present invention aims to provide a monitoring point arrangement structure to solve the problem of rapid disassembly and maintenance of the monitoring points.

[0005] To achieve the above-mentioned purpose, the present invention provides a monitoring point layout structure, including a first mounting seat and a monitoring point base arranged on the structure to be measured; the first mounting seat includes a clamping mechanism, and the monitoring point base is provided with a limit seat cooperating with the clamping mechanism to realize the installation and disassembly of the monitoring point base.

[0006] Preferably, the clamping mechanism includes a first mounting block and a pull rod movably connected to the first mounting block, and an elastic member is provided between the pull rod and the first mounting block; one end of the pull rod is provided with a pressure plate cooperating with a limit seat to achieve clamping of the monitoring point base.

[0007] Preferably, the first mounting block and the pull rod are in sliding connection so as to be able to rotate relative to each other.

[0008] Preferably, a handle is provided on the pressing plate to enable the pull rod and the first mounting block to achieve relative movement.

[0009] Preferably, the elastic member is sleeved on the pull rod, one end of the elastic member is connected to or abuts against the pull rod, and the other end of the elastic member is connected to or abuts against the first mounting block.

[0010] Preferably, the first mounting seat further includes a first mounting groove, and the monitoring point base is provided with a first plug-in block matching the first mounting groove to achieve the installation of the monitoring point base.

[0011] Preferably, a monitoring point layout structure also includes a support base; the support base is movably connected to the monitoring point base to achieve balanced support for the monitoring point base.

[0012] Preferably, a monitoring point layout structure further includes a second mounting seat disposed on the structure to be measured, wherein the second mounting seat is movably connected to the support seat to achieve installation of the support seat.

[0013] Preferably, the second mounting seat is provided with a second mounting groove, and the support seat is provided with a second plug-in block matching the second mounting groove, so as to realize the installation of the support seat.

[0014] Preferably, the two ends of the support seat are respectively provided with a first hinge seat and a second hinge seat connected to the monitoring point base and the second plug block, so as to realize the support angle adjustment of the support seat.

[0015] The application of the technical solution of the present invention has the following beneficial effects:

[0016] (1) In the present invention, by setting the monitoring point base on the first mounting base and limiting it through the clamping mechanism, the monitoring point base can be quickly installed and disassembled, which is convenient for replacing and maintaining the monitoring point base and improving work efficiency.

[0017] (2) In the present invention, an elastic member is arranged between the pull rod and the first mounting block, and a pressure plate cooperating with the limit seat of the monitoring point base is arranged at one end of the pull rod. The elastic force of the elastic member is used to press the limit seat, thereby pressing the monitoring point base.

[0018] (3) In the present invention, the pull rod and the first mounting block can slide and rotate relative to each other, which facilitates the rotation of the pull rod when installing the monitoring point base and avoids the pressure plate on the pull rod blocking the first mounting groove, which makes it difficult to insert the first plug block.

[0019] (4) In the present invention, a handle is provided on the pressure plate, which facilitates the operator to lift and rotate the pull rod and the pressure plate.

[0020] (5) In the present invention, the elastic member is sleeved on the pull rod, and the elastic member applies pressure or tension to the pull rod or the pressure plate, thereby achieving compression of the monitoring point base.

[0021] (6) In the present invention, by setting a first mounting groove on the first mounting seat and setting a first plug block matching the first mounting groove on the monitoring point base, it is beneficial to improve the connection reliability between the monitoring point base and the first mounting seat, avoid the monitoring point base from falling when the clamping mechanism fails, and ensure the installation accuracy of the monitoring point base.

[0022] (7) In the present invention, by providing a support base movably connected to the monitoring point base, a stable support structure is formed so that the monitoring point base is in a horizontal state.

[0023] (8) In the present invention, by providing a second mounting seat movably connected to the supporting seat on the structure to be tested, it is convenient to quickly disassemble and assemble the supporting seat, thereby improving work efficiency.

[0024] (9) In the present invention, by providing a second mounting groove on the second mounting seat and providing a second plug-in block matching the second mounting groove on the support seat, the support seat can be quickly installed and removed.

[0025] (10) In the present invention, by arranging a first hinge seat and a second hinge seat at both ends of the support seat, the hinge connection with the monitoring point base and the second mounting seat is achieved, which facilitates the adjustment of the support angle of the support seat.

[0026] In addition to the above-described purposes, features and advantages, the present invention has other purposes, features and advantages. The present invention will be further described in detail with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] The drawings constituting a part of this application are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0028] Figure 1 It is a structural schematic diagram of a monitoring point layout structure of an embodiment of the present application;

[0029] Figure 2 yes Figure 1 A schematic diagram of the connection between the first mounting base and the monitoring point base;

[0030] Figure 3 yes Figure 1 A schematic diagram of the connection between the second mounting base and the supporting base;

[0031] Among them, 1. first mounting seat, 1.1. clamping mechanism, 1.1.1. first mounting block, 1.1.2. pull rod, 1.1.3. elastic member, 1.1.4. pressure plate, 1.1.5. handle, 1.2. first mounting groove, 1.3. first screw, 2. monitoring point base, 2.1. limit seat, 2.2. first plug-in block, 2.3. horizontal rod, 3. support seat, 3.1. second plug-in block, 3.2. first articulated seat, 3.3. second articulated seat, 3.4. support rod, 4. second mounting seat, 4.1. second mounting groove, 4.2. second mounting block, 4.3. second screw. DETAILED DESCRIPTION

[0032] The embodiments of the present invention are described in detail below with reference to the accompanying drawings, but the present invention can be implemented in many different ways as defined and covered by the claims.

[0033] Example:

[0034] See also Figures 1 to 3 , a monitoring point layout structure, this embodiment is applied to the monitoring point layout on the tunnel wall.

[0035] A monitoring point arrangement structure includes a first mounting seat 1 and a monitoring point base 2 arranged on a structure to be measured. In this embodiment, the first mounting seat 1 is installed on a tunnel wall through a first screw 1.3; the first mounting seat 1 includes a clamping mechanism 1.1, and the monitoring point base 2 is provided with a limit seat 2.1 that cooperates with the clamping mechanism 1.1. By inserting the limit seat 2.1 into the clamping mechanism 1.1, the monitoring point base 2 can be quickly installed and disassembled. Figure 1 As shown, it is convenient to disassemble, assemble and maintain the monitoring point base 2, thereby improving work efficiency.

[0036] The clamping mechanism 1.1 comprises a first mounting block 1.1.1 and a pull rod 1.1.2 movably connected to the first mounting block 1.1.1, an elastic member 1.1.3 is arranged between the pull rod 1.1.2 and the first mounting block 1.1.1; one end of the pull rod 1.1.2 is provided with a pressing plate 1.1.4 cooperating with a limit seat 2.1 to achieve clamping of the monitoring point base 2. In this embodiment, the pull rod 1.1.2 is arranged through the first mounting block 1.1.1, and both ends of the pull rod 1.1.2 exceed the first mounting block 1. 1.1, the elastic member 1.1.3 is arranged at one end of the pull rod 1.1.2, the two ends of the elastic member 1.1.3 are respectively against or connected to the pull rod 1.1.2 and the first mounting block 1.1.1, and a pressure plate 1.1.4 is arranged at the end of the pull rod 1.1.2 away from the elastic member 1.1.3, and the pressure plate 1.1.4 is stuck in the limit seat 2.1 of the horizontal rod 2.3 of the monitoring point base 2, and the elastic force of the elastic member 1.1.3 is used to press the horizontal rod 2.3 to prevent the monitoring point base 2 from escaping from the first mounting seat 1.

[0037] The first mounting block 1.1.1 and the pull rod 1.1.2 are in a sliding connection that can rotate relative to each other. In this embodiment, the matching part of the pull rod 1.1.2 and the first mounting block 1.1.1 is a cylindrical structure. The pull rod 1.1.2 can slide in the height direction on the first mounting block 1.1.1 and can also rotate relative to the first mounting block 1.1.1, so as to facilitate rotating the pull rod 1.1.2 when installing the monitoring point base 2, thereby preventing the pressure plate 1.1.4 from blocking the first mounting groove 1.2 on the first mounting block 1.1.1, making it inconvenient to insert the first plug block 2.2.

[0038] The pressing plate 1.1.4 is provided with a handle 1.1.5, which is convenient for the operator to lift and rotate the pull rod 1.1.2, so that the pull rod 1.1.2 and the first mounting block 1.1.1 can achieve relative movement, thereby completing the installation and pressing of the monitoring point base 2.

[0039] The elastic member 1.1.3 is sleeved on the pull rod 1.1.2, the telescopic direction of the elastic member 1.1.3 is consistent with the sliding direction of the pull rod 1.1.2, one end of the elastic member 1.1.3 is connected to or abuts against the pull rod 1.1.2, and the other end of the elastic member 1.1.3 is connected to or abuts against the first mounting block 1.1.1; see Figure 2 When the elastic member 1.1.3 is arranged on the top surface of the first mounting block 1.1.1, one end of the elastic member 1.1.3 can be connected to the pressure plate 1.1.4, and the other end of the elastic member 1.1.3 can be connected to the top surface of the first mounting block 1.1.1. The elastic member 1.1.3 applies tension to the pressure plate 1.1.4 (that is, the initial state of the elastic member 1.1.3 is in a stretched state) to achieve compression of the monitoring point base 2; when the elastic member 1.1.3 is arranged on the bottom surface of the first mounting block 1.1.1, the two ends of the elastic member 1.1.3 respectively abut against or are connected to the bottom surface of the first mounting block 1.1.1 and the limiting surface of the bottom end of the pull rod 1.1.2, and the elastic member 1.1.3 applies pressure to the limiting surface of the bottom end of the pull rod 1.1.2 (that is, the initial state of the elastic member 1.1.3 is in a compressed state) to achieve compression of the monitoring point base 2; see Figure 2 In this embodiment, the elastic member 1.1.3 is a spring, and the elastic member 1.1.3 is arranged on the bottom surface of the first mounting block 1.1.1 to avoid affecting the clamping effect of the clamping mechanism 1.1 on the horizontal rod 2.3 when the height specification of the elastic member 1.1.3 is greater than the height specification of the horizontal rod 2.3.

[0040] See also Figure 2 The first mounting seat 1 also includes a first mounting groove 1.2. The monitoring point base 2 is provided with a first plug block 2.2 matching the first mounting groove 1.2 to realize the installation of the monitoring point base 2, improve the connection reliability between the monitoring point base 2 and the first mounting seat 1, and prevent the monitoring point base 2 from falling due to failure of the clamping mechanism 1.1. In order to ensure the installation and positioning accuracy of the monitoring point base 2, the cross-section of the first mounting groove 1.2 along the insertion direction can be selected from a non-circular shape to avoid the first plug block 2.2 from rotating in the first mounting groove 1.2 and affecting the installation accuracy of the monitoring point base 2. In this embodiment, the cross-section of the first mounting groove 1.2 along the insertion direction is rectangular.

[0041] See also Figure 1 and Figure 3A monitoring point layout structure also includes a support seat 3 and a second mounting seat 4; the support seat 3 is movably connected to the monitoring point base 2 to achieve balanced support for the monitoring point base 2. In this embodiment, the support seat 3 and the monitoring point base 2 are hinged to form a triangular stable support structure. The second mounting seat 4 is installed on the structure to be measured (i.e., the tunnel wall) through a second screw 4.3. The second mounting seat 4 is movably connected to the support seat 3 to achieve the installation of the support seat 3.

[0042] The second mounting seat 4 is provided with a second mounting groove 4.1, and the support seat 3 is provided with a second plug-in block 3.1 matching the second mounting groove 4.1, so as to realize the rapid installation and removal of the support seat 3.

[0043] The support seat 3 includes a support rod 3.4, and the two ends of the support rod 3.4 are respectively provided with a first hinge seat 3.2 and a second hinge seat 3.3 connected to the monitoring point base 2 and the second plug block 3.1, so as to adjust the support angle of the support seat 3 according to the tunnel wall structure, and the installation position of the second mounting seat 4 should be determined according to the support angle of the support seat 3, so that the horizontal rod 2.3 of the monitoring point base 2 and the monitoring point located on the horizontal rod 2.3 are always in a horizontal state.

[0044] The method of using the above monitoring point layout structure is as follows: according to the setting position of the tunnel monitoring point, the first mounting seat 1 and the second mounting seat 4 are installed on the tunnel wall, and the hinged monitoring point base 2 and the support seat 3 are connected to the first mounting seat 1 and the second mounting seat 4. When installing the monitoring point base 2, by turning the handle 1.1.5, the pressure plate 1.1.4 is adjusted to a position that does not overlap with the first installation groove 1.2, and the first plug block 2.2 is inserted into the first installation groove 1.2, and the handle 1.1.5 is lifted and turned to make the pressure plate 1.1.4 above the limit seat 2.1 and then released. The pressure plate 1.1.4 is inserted into the limit seat 2.1 to press the horizontal rod 2.3, and the monitoring point base 2 can be installed on the first mounting seat 1; when installing the support seat 3, adjust the position of the support seat 3 so that the second plug block 3.1 is inserted into the second mounting groove 4.1, and the support seat 3 can be installed on the second mounting seat 4, and the measurement of the tunnel wall monitoring point can be started; when the monitoring point base 2 needs to be dismantled or maintained, the pressure plate 1.1.4 is disengaged from the limit seat 2.1 by lifting and turning the handle 1.1.5, and the first plug block 2.2 and the second plug block 3.1 can be pulled out.

[0045] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A monitoring point layout structure, characterized in that: It comprises a first mounting seat (1) and a monitoring point base (2) arranged on a structure to be measured; the first mounting seat (1) comprises a clamping mechanism (1.1), and the monitoring point base (2) is provided with a limit seat (2.1) cooperating with the clamping mechanism (1.1) to realize the installation and removal of the monitoring point base (2); The clamping mechanism (1.1) comprises a first mounting block (1.1.1) and a pull rod (1.1.2) movably connected to the first mounting block (1.1.1); an elastic member (1.1.3) is provided between the pull rod (1.1.2) and the first mounting block (1.1.1); and a pressure plate (1.1.4) cooperating with a limit seat (2.1) is provided at one end of the pull rod (1.1.2) to achieve clamping of the monitoring point base (2).

2. A monitoring point layout structure according to claim 1, characterized in that: The first mounting block (1.1.1) and the pull rod (1.1.2) are in sliding connection so as to be capable of relative rotation.

3. A monitoring point layout structure according to claim 1, characterized in that: The pressing plate (1.1.4) is provided with a handle (1.1.5) for enabling the pull rod (1.1.2) and the first mounting block (1.1.1) to achieve relative movement.

4. A monitoring point layout structure according to claim 1, characterized in that: The elastic member (1.1.3) is sleeved on the pull rod (1.1.2), one end of the elastic member (1.1.3) is connected to or abuts against the pull rod (1.1.2), and the other end of the elastic member (1.1.3) is connected to or abuts against the first mounting block (1.1.1).

5. The monitoring point layout structure according to claim 1, characterized in that: The first mounting seat (1) further comprises a first mounting groove (1.2), and the monitoring point base (2) is provided with a first plug-in block (2.2) matching the first mounting groove (1.2) to realize the installation of the monitoring point base (2).

6. The monitoring point layout structure according to claim 1, characterized in that: It also comprises a support base (3); the support base (3) is movably connected to the monitoring point base (2) to achieve balanced support for the monitoring point base (2).

7. A monitoring point layout structure according to claim 6, characterized in that: It also comprises a second mounting seat (4) arranged on the structure to be tested, wherein the second mounting seat (4) is movably connected to the support seat (3) to realize the installation of the support seat (3).

8. A monitoring point layout structure according to claim 7, characterized in that: The second mounting seat (4) is provided with a second mounting groove (4.1), and the support seat (3) is provided with a second plug-in block (3.1) matching the second mounting groove (4.1) to realize the installation of the support seat (3).

9. A monitoring point layout structure according to claim 8, characterized in that: The two ends of the support seat (3) are respectively provided with a first hinge seat (3.2) and a second hinge seat (3.3) connected to the monitoring point base (2) and the second plug block (3.1), so as to achieve support angle adjustment of the support seat (3).

Citation Information

Patent Citations

  • Stamping die capable of keeping pressing leftover material parts of plates

    CN109332497A

  • Structure is laid to tunnel monitoring point

    CN207315442U

  • Monitoring point layout structure

    CN212670671U