Method and apparatus for user distribution of subbands in a multiple access communication system

By adopting the methods of initial subband assignment, candidate pair screening, and iterative water filling algorithm in the NOMA system, the problem of the PF scheduler in balancing system capacity and user fairness is solved, and fairness and throughput improvement among users are achieved. , suitable for low-latency and quasi-constant-rate applications.

CN112236967BActive Publication Date: 2024-10-01INSTITUT MINES TELECOM TELECOM BRETAGNE +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201980029286.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Priority Date
2018-03-28
Filing Date
2019-03-20
Publication Date
2024-10-01
Estimated Expiration
2039-03-20

AI Technical Summary

Technical Problem

In the existing non-orthogonal multiple access (NOMA) system, the proportional fair (PF) scheduler is difficult to balance between improving system capacity and user fairness, resulting in some users not getting the transmission rate for a long time, and affecting the NOMA system. The particularity has not been fully considered, resulting in insufficient throughput gain for cell edge users.

Method used

Adopt a system and method that ensures users are fairly allocated resources across multiple subbands through initial subband assignment and candidate pair screening, provisional and final power allocation, prioritizing users with high channel gain, and maximizing through iterative water filling algorithms to improve overall throughput and fairness.

Benefits of technology

It achieves fairness among users and improves total throughput in the NOMA system, reduces scheduling complexity, is compatible with low-latency and quasi-constant rate applications, and provides higher system capacity and fairness performance.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112236967B_ABST
    Figure CN112236967B_ABST
Patent Text Reader

Abstract

A mechanism is proposed for assigning users to one or more of a plurality of subbands in a multiple access communication system, wherein, in an initial assignment phase, a first user is selected for a subband, for example on the basis of user priority. A user having a channel gain complementary to that of the first user is identified, and then a second subband user that maximizes a performance metric is selected to accompany the first user on the subband, the performance metric reflecting achieved throughput and / or fairness between users. The initial assignment phase may be terminated once all users have been assigned to a subband once. After the first phase is completed, the first user of each subband may be the user whose achieved total throughput is furthest from a target throughput defined for the user, wherein each user is assigned to the remaining subbands that provide the highest channel gain for the user and to which no first user is currently assigned. Mechanisms are proposed for determining user priorities, making temporary and final power allocations, and performance metrics.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to user distribution of sub-bands in a multiple access communication system such as Non-Orthogonal Multiple Access (NOMA). Background Art

[0002] With the popularity of Internet applications, it is expected that the amount of mobile traffic supported by communication networks will increase eightfold between the end of 2016 and 2022. In order to respond favorably to such constraints while maintaining a high level of user experience quality, the system capacity and user fairness for future 5th generation (5G) mobile communication systems should be greatly improved. To this end, non-orthogonal multiple access (NOMA) has recently emerged as a promising candidate for future radio access. By utilizing an additional multiplexing domain (power domain), NOMA allows cohabitation of multiple users per subband on the transmitter side above the modulation layer, which can be orthogonal frequency division multiplexing (OFDM), filter bank multi-carrier (FBMC), universal filtering multi-carrier (UFMC) or other multi-carrier schemes, and relies on interference cancellation techniques on the receiver side (e.g., successive interference cancellation (SIC)). The attractive feature of NOMA is that it targets an increase in system capacity while improving user fairness. Therefore, most existing techniques dealing with NOMA consider the proportional fairness (PF) scheduler as a multi-user scheduling scheme for trading off the total user throughput or data rate and the user fairness it provides. Examples of power allocation algorithms implemented together with a NOMA-based PF scheduler for selecting users to be assigned to each subband are presented, for example, in the following documents: "Uplink non-orthogonal access with MMSE-SIC in the presence of inter-cell interference" by Y.Endo, Y.Kishiyama, and K.Higuchi. in proc.2012IEEE Int.Symp.on.Wireless Commun.Syst,2012, or "System-Level Performance ofDownlink Non-orthogonal Multiple Access (NOMA) Under Various Environments" by Y.Saito, A.Benjebbour, Y.Kishiyama, and T.Nakamura in proc.IEEE 81st VTC,2015.

[0003] In the paper entitled "Enhancing user fairness in non-orthogonal access with successive interference cancellation for cellular downlink" (in Proc. International Conference on Communication Systems (ICCS 2012)) drafted by Umehara, J., Kishiyama, Y., Higuchi, K., the authors proposed a weighted PF-based multi-user scheduling scheme in a non-orthogonal access downlink system. A frequency block access strategy for intra-cell and cell-edge user groups in fractional frequency reuse (FFR) is proposed, which significantly improves user fairness and system frequency efficiency.

[0004] In the article titled “Design of Fair Weights for Heterogeneous Traffic Scheduling in Multichannel Wireless Networks” by Mehrjoo, M., Awad, MK, Dianati, M., Xuemin, S., IEEE Trans. Commun., 58(10) (2010), fair weights have been implemented for opportunistic scheduling of heterogeneous traffic types in OFDMA networks. To design fair weights, the proposed scheduler considers the average channel state and resource requirements in terms of traffic types. Simulation analysis illustrates the efficiency of the proposed scheme in terms of resource utilization and flexibility to changes in network characteristics due to user mobility.

[0005] In an article from Gueguen, C., Baey, S. entitled "Compensated Proportional Fair Scheduling in Multiuser OFDM Wireless Networks" (in Proc. IEEE International conference on Wireless Mobile Computing, Networking Communication (2008)), the problem of insufficient fairness encountered by the PF scheduler when mobile communications experience unequal path losses is studied. In order to alleviate this problem, a modified version of the PF scheduler that introduces a distance compensation factor has been proposed. The results show that this solution achieves both high capacity and high fairness.

[0006] In an article titled "A Weighted Proportional Fair Scheduling to Maximize Best-Effort Service Utility in Multicell Network" by Yang, C., Wang, W., Qian, Y., Zhang X. (in Proc. IEEE International Symposium on Personal, Indoor and Mobile Radio Communications (2008)), a weighted proportional fairness algorithm is proposed to maximize the best-effort service utility. The reason behind introducing the weighting factor to the PF metric is to exploit the inherent near-far diversity given by the path loss. The proposed algorithm improves both the best-effort service utility and the throughput performance while maintaining a similar complexity (when compared to the PF metric).

[0007] If we consider a downlink system with a single transmitter and receiver antenna, the system consists of: K users per cell, where the total system bandwidth B is divided into S subbands; and the maximum allowable transmit power P of the base station max Among K users, select the user set Us = {k1, k2, ..., k n ,…,k N} can be scheduled on each frequency subband s (1≤s≤S). N indicates the number of users scheduled non-orthogonally on the subband. The successive interference canceller (SIC) process as described in Fundamentals of Wireless Communication, Cambridge University Press, 2005 by D. Tse, and P. Viswanath is performed at the receiver side, and the best order of user decoding is the increasing order of the channel gain observed by the users, which is determined by the noise and inter-cell interference. Normalized, where Is user k n and the equivalent channel gain between the base station BS at subband s, and is user k n The average power of the received inter-cell interference plus Gaussian noise. Assuming successful decoding and no SIC error propagation, and assuming that the inter-cell interference is randomized so that it can be considered as white noise, then user k n The throughput at subband s Given by the following equation:

[0008]

[0009] in

[0010] K is the number of users in each cell,

[0011] B is the total system bandwidth,

[0012] k n is the nth user among K,

[0013] N is the number of users scheduled non-orthogonally on the subbands,

[0014] U s ={k1,k2,…,k n ,…,k N}, is the set of users selected for scheduling in each frequency subband,

[0015] k j Think U s The user has more than k n The channel gain,

[0016] S is the number of subbands in the system,

[0017] s is the subband under consideration (1≤s≤S).

[0018] P max is the maximum permissible transmit power,

[0019] By user k n The observed squared channel gain, normalized by noise and inter-cell interference, is Is user k n and the equivalent channel gain between the base station BS at subband s, and is at subband s by k n The received inter-cell interference plus the average power of Gaussian noise, and R s,k (t) represents the throughput of user k on subband s.

[0020] The transmit power allocation constraint is expressed by the following equation:

[0021] in Where P s Represents the amount of power allocated to subband s.

[0022] Since the scheduler in NOMA can assign subbands to more than one user simultaneously, user scheduling policies affect system efficiency and user fairness since different policies may lead to preferential treatment of certain users in order to improve the overall throughput even if it means degrading the service for other users, and vice versa.

[0023] The "proportional fairness" (PF) scheduler introduced by the above-mentioned prior art reference is considered to achieve a compromise between these two metrics. The goal of the PF scheduler is to maximize the long-term average user rate in order to ensure a balance between cell throughput and user fairness. The PF algorithm is used in LTE (Long Term Evolution) for user scheduling (assigning users to time-frequency resource blocks).

[0024] The operation of the PF scheduler is as follows: At the beginning of each scheduled time slot t, each user provides its channel status to the base station (BS). The BS can then calculate the achievable throughput for each user (depending on the power allocation strategy adopted). The PF scheduler (operating on the BS side) keeps track of the power allocated by each user at t c The average throughput achieved in the past window of length 1 is taken into account, and each user is given a priority inversely proportional to its average throughput.

[0025] At the beginning of each scheduled time slot t, each user k provides its channel gain on each subband s (s=1...S) to the base station.

[0026] The base station calculates the corresponding achievable throughput R for user k on subband s s,k (t).

[0027] At time slot t, user k* is selected to be served on subband s based on the following equation:

[0028]

[0029] The scheduler that applies this method assigns each user its historical rate T k (t) is inversely proportional to the priority. If T k If (t) is high, user k may not be assigned any transmission rate for some time slots. This is problematic for applications that require quasi-constant Quality of Experience (QoE) and may require deep buffering. For the same reason, this approach may cause difficulties for applications that require low-latency transmission.

[0030] The PF scheduling algorithm was originally designed for an orthogonal multiple access scheme (OFDMA in LTE), but was later adapted to a non-orthogonal multiple access (NOMA) scheme.

[0031] This scheduling strategy has been adopted in most of the proposed NOMA implementations. The scheduling algorithm tracks t c The average throughput per user in the past window of length T k (t), where t c Defines the throughput averaging time window (over a specified number of previous time slots). k (t) is defined as:

[0032]

[0033] Where R s,k R(t) represents the throughput of user k on subband s at time instance t. s,k (t) is calculated based on equation (1) above and may be equal to zero if user k is not scheduled on subband s.

[0034] In the case of NOMA, where N>1, the set of possible candidate users is enumerated:

[0035] N out of K users A combination U.

[0036] At the beginning of each scheduling time slot t, each user k provides its channel gain on each subband s (s=1…S) to the base station. For each candidate user set U (U∈

[0037] {U1,…,U C}), the base station calculates the corresponding throughput R for user k in the set U s,k∣U (t).

[0038] At time t, the selected set of users is:

[0039]

[0040] Where R s,k∣U (t) is the achievable throughput of user k on subband s at time t. Considering the user set U, T k (t) is the time at which user k c The average throughput in the past window of length , considering all subbands (historical rate or throughput) and assuming that the available frequency band B is divided into S subbands, the total number of users willing to communicate is K, the number of users on subband s is N (in OMA, N = 1, in NOMA, N > 1), and the total power budget is P max At the beginning of the scheduling process, all users have a throughput equal to 0, and at the beginning of each scheduling time slot t, each user k provides the base station with its channel gain h on each subband s (where s = 1...S) s,k(t), and the average throughput of user k is T k (t) is for t c It is calculated over a past window of length , considering all subbands (historical rates or throughputs).

[0041] The PF scheduler aims at long-term fairness. Since the PF scheduler gives each user a priority inversely proportional to its average throughput, it happens that some users do not get access to available resources whenever the user's historical rate is high. In this case, the user will not be assigned any transmission rate within multiple scheduling time slots. This behavior can be very problematic in applications with constraints on user throughput (e.g., quasi-constant data rate applications), or where deep buffering may be required and may be incompatible with applications requiring low-latency transmission. In addition, for the NOMA scheme, the PF scheduler does not take into account the peculiarities of NOMA: the total throughput achieved in a NOMA system increases with the difference in channel gains of pairs of users.

[0042] In general, when PF scheduling is used for user allocation in the NOMA scheme, users located near the base station can observe large user throughput gains compared to the Orthogonal Multiple Access (OMA) scheme, but almost no gain is achieved for cell-edge users.

[0043] It would therefore be desirable to identify mechanisms for addressing these issues, and in particular to provide a method for better attributing users. Summary of the invention

[0044] According to a first aspect of the present invention, a system for attributing users to one or more of a plurality of subbands in a multiple access communication system is provided. The system comprises an assignment processor adapted to: assign, as an initial subband assignment, a user excluding any user already assigned to the initial subband to a corresponding selected subband in a time slot t as a first user of the corresponding selected subband. The system further comprises a power calculator adapted to: determine, for the corresponding selected subband, a plurality of candidate pairs of users for possible assignment to the selected subband, each candidate pair of users comprising two different users, the two different users comprising a first user and a corresponding candidate second user, and temporarily assign power allocation to the selected subband for each candidate pair of users. The assignment processor is further adapted to: restrict the plurality of candidate pairs to a set of candidate pairs comprising a candidate second user, the channel gain of the candidate second user being complementary to the channel gain of the first user; and, as an initial subband assignment, assign the corresponding second subband user to a user excluding any user already assigned to the initial subband, the user belonging to a set that maximizes a performance metric, the performance metric reflecting the achieved throughput and / or fairness between users. The system is further advantageously adapted to iteratively process users for each subband until all subbands in the current time slot have been assigned.

[0045] According to a second aspect of the present invention, there is provided a method for attributing a user to one or more of a plurality of sub-bands in a multiple access communication system, the method comprising the following steps:

[0046] As an initial subband assignment, assigning users excluding any users already assigned to the initial subband to the corresponding selected subband in time slot t as the first users of the corresponding selected subband,

[0047] determining, for the respective selected subbands, a plurality of candidate pairs of users for possible assignment to the selected subbands, each candidate pair of users comprising two different users, the two different users comprising a first user and a candidate second user,

[0048] Temporarily assigning power allocation to the selected subbands for each candidate pair of users,

[0049] limiting the plurality of candidate pairs to a set of candidate pairs including a candidate second user, the channel gain of the candidate second user being complementary to the channel gain of the first user, and

[0050] Assigning, as an initial subband assignment, the corresponding second subband users to users excluding any users already assigned to the initial subband, the users belonging to the set that maximizes a performance metric reflecting achieved throughput and / or fairness among users, and

[0051] The method comprises the further steps of assigning a first user to the selected subband, temporarily assigning a power allocation to the selected subband, and then repeating the steps of:

[0052] The second user is assigned to the selected subband until all subbands in the current time slot have been assigned.

[0053] According to a development of the second aspect, the selected subband to which the user is assigned as the first user as initial subband assignment is selected as a subband providing the highest channel gain for this user to which no first user currently belongs.

[0054] According to a development of the second aspect, a complementary channel gain is a channel gain such that assigning a user having the channel gain together with a corresponding first user to the selected subband will indicate that the total subband throughput is greater than the subband throughput that can be achieved by assigning all available power to the first user as indicated by the temporary power allocation of the corresponding candidate pair of users for the corresponding subband.

[0055] According to a development of the second aspect, the set of candidate pairs is defined by considering each user excluding the user assigned as the first user in order of the respective channel gain value of each user of the selected subband, starting from the user with the highest channel gain.

[0056] where assigning the user as a second user to the selected subband along with the corresponding first user would indicate that the total subband throughput is greater than the subband throughput that could be achieved by assigning all available power for the corresponding subband to only the first user, merging the users in the set in order of corresponding channel gain values ​​and proceeding to the next user,

[0057] considering each user excluding the user assigned as the first user in order of respective channel gain values ​​for each user of the selected subband, starting with the user having the lowest channel gain, in the case where assigning the user as the second user to the selected subband with the corresponding first user would not indicate that the total subband throughput is greater than the subband throughput that could be achieved by assigning all available power for the corresponding subband to only the first user,

[0058] where assigning the user as a second user to the selected subband along with the corresponding first user would indicate that the total subband throughput is greater than the subband throughput that could be achieved by assigning all available power for the corresponding subband to only the first user, combining the user in the set and the method proceeding to consider the next user in order of corresponding channel gain values, and

[0059] In case assigning the user as a second user together with the corresponding first user to the selected subband would not indicate that the total subband throughput is greater than the subband throughput that could be achieved by assigning all available power for the corresponding subband to only the first user, the set is considered to be fully defined and the method proceeds to the step of assigning the corresponding second subband user to the selected subband.

[0060] According to a development of the second aspect, in case the set is empty, no second user is assigned to the subband corresponding to the empty set and the user assignment for the selected subband is considered complete based on the assignment of the first users only.

[0061] According to a development of the second aspect, once the user assignments for all subbands of the current time slot are considered complete, in case some users have not been assigned to any subband as an initial time slot assignment, the method comprises continuing to repeat the following steps:

[0062] - assigning the first user to the selected subband as an initial subband assignment,

[0063] - temporarily assigning power allocation to the selected subbands,

[0064] - assigning the second user to the selected subband as an initial subband assignment, and

[0065] - New subbands are selected for consecutive time slots until all users have been assigned to subbands in the current time slot.

[0066] According to a development of the second aspect, once all users have been assigned to a subband as an initial subband assignment, the method comprises the further step of assigning the user with the lowest total achieved throughput as a first user to any remaining subbands in the current time slot and to each subband in a subsequent time slot, wherein each user is assigned to the remaining subbands that provide the highest channel gain for the user and to which no first user currently belongs.

[0067] According to a development of the second aspect, the method comprises the following further step: once all users have been assigned to the initial subbands, the following further step is performed: as a first user U, assigned to any remaining subbands in the current time slot and each subband in the subsequent time slots, the user U is the user whose total throughput achieved is farthest from the corresponding target throughput defined for the user U, wherein each user is assigned to the remaining subbands that provide the highest channel gain for the user U and to which no first user currently belongs.

[0068] According to a development of the second aspect, the method may comprise the further step of sorting all users in order of priority according to a criterion before the step of assignment (e.g. channel gain, distance between the user and the base station or throughput of the user), and wherein, at the step of assignment, the assigned users are users with the highest priority, excluding any users who have been assigned to the initial subband in time slot t to the selected subband.

[0069] According to a development of the second aspect, the step of sorting all users in order of priority comprises a random sorting.

[0070] According to a development of the second aspect, the step of sorting all users in order of priority comprises sorting the users in order of the best channel gain measured for each user across all subbands for the current time slot, wherein the user given the highest priority is the user with the lowest best channel gain.

[0071] According to a development of the second aspect, the second sub-band user is selected as a candidate second user maximizing a metric subject to system throughput of a factor reflecting fairness among users.

[0072] According to a development of the second aspect, the second sub-band user is selected as the candidate second user maximizing a metric reflecting the total throughput achievable by each user pair, each user pair comprising a first user assigned to the sub-band under consideration and a respective candidate second user, as a fraction of an average throughput achieved by the same user pair over a predetermined previous period.

[0073] According to a development of the second aspect, the second subband user is selected as the candidate second user maximizing a metric reflecting the total throughput achievable by each user pair comprising the first user assigned to the subband under consideration and the respective candidate second user as a part of the sum of deviations of the throughput of each user in a predetermined previous period from the average throughput of all users in the predetermined previous period.

[0074] According to a development of the second aspect, the second sub-band user is selected as a candidate second user which maximizes a match between an average throughput per user and an average throughput of all users in a predetermined previous period.

[0075] According to a development of the second aspect, the method may comprise the additional step of assigning a final power allocation to each user of each subband.

[0076] According to a development of the second aspect, the method may comprise the further steps of calculating a final actual throughput value for each subband based on the respective first and second users and the final power allocation, and comparing the final actual throughput with the throughput achievable by only each respective user on each respective subband, and in the event that the respective final actual throughput is less than the throughput achievable by only the respective user on any respective subband, revoking the second user assigned to the respective subband and assigning all available power for the subband to the respective first user.

[0077] According to a development of the second aspect, the step of assigning a temporary power allocation and the step of assigning a final power allocation comprise the following steps:

[0078] determining a subband attenuation value that is proportional to the inverse of the square of the channel gain value for the users that belong to the selected subband and for each subband to which the user has been assigned for the current time slot,

[0079] · applying a water filling algorithm across the selected subband and each subband to which the user has been assigned for the current timeslot, using a floor for each subband defined by the corresponding subband attenuation value, and

[0080] • Calculate the temporary power allocation according to the water filling algorithm for the selected subband.

[0081] According to a development of the second aspect, the step of temporarily assigning power allocation to each subband comprises: for each subband to which the second corresponding user is to be assigned, calculating a temporary inter-subband power allocation across all subbands for which the assignment to the selected subband is considered complete plus the subband to which the second corresponding user is to be assigned by assuming a proportional distribution of the total available power across all subbands, and performing water-filling distribution of the temporary inter-subband power allocation among the subbands for which the assignment to the selected subband is considered complete plus the subband to which the second corresponding user is to be assigned based on a water-filling algorithm on the basis of the channel gain of the user assigned to each subband.

[0082] According to a third aspect of the invention there is provided a computer program comprising instructions which, when executed by a computer, cause the computer to perform one of the methods of the second aspect. BRIEF DESCRIPTION OF THE DRAWINGS

[0083] For purposes of illustration only, the above and other advantages of the present invention will now be described with reference to the accompanying drawings, in which:

[0084] Figure 1 A method of attributing a user to one or more of a plurality of sub-bands in a multiple access communication system according to an embodiment is shown;

[0085] Figure 2 Details of a method for determining temporary power allocation according to an embodiment are shown;

[0086] Figure 3 The application of the water injection algorithm for the first user combination scenario is demonstrated;

[0087] Figure 4 The steps of an exemplary optimization mechanism for obtaining a set of candidate pairs including a candidate second user whose channel gain is complementary to the channel gain of the first user are shown;

[0088] Figure 5 A system according to an embodiment is shown. DETAILED DESCRIPTION

[0089] Figure 1 A method of attributing a user to one or more of a plurality of subbands in a multi-access communication system according to an embodiment is shown. Specifically, a method of selecting a user from a pool of candidate users U to be assigned to a plurality of subbands in a time slot t in a multi-access communication system is provided. Although the following examples focus on implementations in a NOMA system, it will be appreciated that other systems may be envisioned in which the described methods are applicable.

[0090] like Figure 1 As shown, the method starts at step 100 and then proceeds to step 110 where a new time slot starts. Access rights are granted after allocating resources in time and frequency. The allocation is divided into a number of time slots. A time slot is the basic time allocation unit in a communication system. For example, in an LTE system, it is equal to 1 ms. For each time slot, subbands are sequentially allocated until the total number of subbands per time slot is reached.

[0091] This embodiment relates to an initial subband assignment for each user. As described with reference to certain other embodiments below, once all users have received an initial assignment according to this embodiment, subsequent subband assignments may occur. Exemplary details of this method will be presented in more detail below.

[0092] As shown in the figure, the method then proceeds to step 120, where, as an initial subband assignment, the user is assigned to the corresponding selected subband in the current time slot t as the first user of the corresponding selected subband. The user assigned at this step can be any user excluding the user already assigned to the initial subband.

[0093] The users to be assigned at this step may be selected as a variety of bases. In some embodiments, the method may include the following further steps: before the step of assigning, all users are sorted in order of priority according to criteria such as channel gain, distance between the user and the base station, or throughput of the user. On this basis, at step 120, the assigned users may be users with the highest priority, excluding any users who have been assigned to the initial subband in time slot t to the selected subband. In 3G and 4G systems, parameters are typically fed back from the receiver to the transmitter, which parameters have information about the quality of the channel. According to some embodiments of the present invention, this can be regarded as an indicator of the channel gain value, and it is assumed that an implementation of NOMA according to the present invention will provide a similar mechanism. Therefore, in any embodiment, while water filling is performed based on the channel gain of the user, this does not need to rely on explicit measurement of the channel gain of each user, but any values ​​that can be obtained or derived in the system can also be used, which can be regarded as indicating the channel gain of the corresponding user.

[0094] Therefore, a priority list can be used at the beginning of the allocation process for the selection of the first user on each subband. The idea behind this priority list is to have all users granted a subband (and a certain throughput) at least once at the beginning of the allocation process. At the first time slot, a priority list can be created: all K users are sorted in the base station (BS). As soon as users are selected in step 120 (or step 160 as described below), they are removed from the priority list. At subsequent time slots, only the remaining users are sorted again (update of the priority list) if the list is not empty. During the assignment process, the resulting priority list is used while at least one user has not been assigned any subband.

[0095] In some embodiments, such sorting of users in order of priority may include, for each user across all subbands, sorting the users in order of best channel gain measured for the current time slot, where the user given the highest priority is the user with the lowest best channel gain.

[0096] The lowest best channel gain (“lowest best h”) ranking provides good performance (in terms of cell edge user throughput and total cell throughput) - users can be ranked at the base station based on the channel gain experienced by the user on the available subbands, h s,k is the channel gain of user k on subband s. This can be expressed as follows: for each user k, the highest channel gain for that user is selected among the channel gains experienced on all subbands The user with the highest priority is the user with the lowest best channel gain, and vice versa.

[0097] In some embodiments, the users may be randomly selected. This may include the further step of sorting all users in order of priority according to the random sorting, which may be performed with lower processing overhead than other sorting methods.

[0098] Subband Assignment

[0099] User 1 (k1) is assigned the highest value h among all available subbands. s,k1 sub-band.

[0100] In an embodiment where users are assigned from a priority list, at this stage, if the priority list is not empty, the assigned user k1 may be removed from the list. Thus, at step 120, the selected subband to which the user is assigned as the first user may be selected as the subband to which no first user currently belongs and which provides the highest channel gain for the user. Alternatively, the subband to which the user is assigned may be randomly selected from the subbands to which no first user is currently assigned. This may include a further step of sorting all users in order of priority according to a random sort, which may be performed with a lower processing overhead than other sorting methods.

[0101] For the purposes of this description, the achieved throughput is equal to the average throughput achieved by a user over a predefined historical period, and for the current time slot, the expected throughput is the sum of the achievable throughputs for users on each subband to which the user has been attributed. The achieved throughput may or may not include the expected throughput.

[0102] On the basis of these embodiments using priority lists, and taking into account that when a user is assigned to a subband (as the first or second user), the user is removed from the list, the selection of the first user in the initial subband assignment phase as discussed above can be described in terms of the priority list being non-empty (i.e., all users have not yet been assigned a subband, or equivalently, any throughput), in which case the selection of the next user to be assigned to the subband as user 1 can be performed according to the order given by the priority list. Similarly, when the priority list is empty (all users have now been assigned a subband, or equivalently, non-zero throughput), an alternative selection mechanism can be envisioned as described below.

[0103] The method then proceeds from step 120 to step 130, where a plurality of candidate pairs of users are determined for possible assignment to the selected subband, wherein each candidate pair of users includes two different users, including a first user (as assigned to the subband at step 120) and a candidate second user.

[0104] At step 140, a temporary power allocation is assigned to the selected subbands for each candidate pair of users.

[0105] Power can be distributed equally among subbands, although there are many alternative methods of allocating power to subbands (e.g., water filling), or it can be distributed equally among users within a subband (e.g., FPA - fixed power allocation, FTPA - fractional transmit power allocation, or full search power allocation), all of which are compatible with and included in the present disclosure.

[0106] In order to further improve the achieved system performance in NOMA, the problem of optimally distributing users in subbands should be addressed. This may lead to improved user fairness and / or increased achieved system throughput.

[0107] The achievable throughput for users k1 and k2 is a function of the power allocated to each user, as defined in Equation 1 above.

[0108] Several strategies may be applied to the distribution of the available power of a subband among the users belonging to that subband, for example:

[0109] Intra-subband PA: Fixed Power Allocation (FPA)

[0110] Partial Transmit Power Allocation (FTPA)

[0111] Full Search Power Allocation (FSPA)

[0112] Similarly, the total available transmission power can be distributed among the subbands by various mechanisms. One example is an equal distribution based on power. Alternatively, according to certain alternative embodiments, temporary PA can be performed during the pairing process. This provides an opportunity to try to identify the best power distribution between users.

[0113] In some embodiments, a temporary iterative water filling method may be applied to obtain a temporary distribution to be calculated using the same iterative water filling method, where the total power quantity P max will be distributed in all S sub-bands.

[0114] Conventional waterfilling requires a global optimization for all users and all sub-bands and is therefore incompatible with the sequential approach of the present invention.

[0115] Using a specific plan, water filling can be applied in a sequential manner: users are selected sequentially, but the final power allocation is performed only at the end of the process (when all users have been selected).Throughput can be calculated only at the end of the user selection process.

[0116] It can be assumed that the power assigned to the first s subbands (1≤s≤S) is equal to s×Pmax A variation of this waterfilling process is applied in the case of P / S, where the sth subband is the subband selected for consideration, S is the total number of available subbands, and P max is the total amount of power distributed among all S subbands.

[0117] On this basis, P max / S is assigned to the first subband, and no further inter-subband calculation is required for this subband. In successive iterations, the inter-subband power allocation s×P for the sth subband assigned in the time slot (s>1) is temporarily assigned across the first s subbands. max / S. In these later iterations, when there is more than one subband to consider, the power is redistributed among all s subbands using an iterative water-filling procedure as described in more detail below.

[0118] Initially, subband attenuation values ​​for a set of candidate users are obtained, which are proportional to the inverse of the square of the gain of the selected channel, corresponding for each combination to the highest value of the channel gain value associated with the users in the candidate set.

[0119] Alternatively, the subband attenuation value may be equal to the total transmission bandwidth multiplied by the noise power, divided by the square of the selected channel gain value multiplied by the total number of subbands, or where N0 is the noise power (equal for all subbands) and is the channel gain for user k* showing the highest channel gain among a given user combination on the subband currently being considered, s specifies the particular subband being considered, and S is the total number of subbands.

[0120] A temporary power assignment may then be calculated for the subband under consideration. This is calculated using a water filling algorithm across the selected subband and each previously selected subband, using a floor for each subband defined by the corresponding subband attenuation value.

[0121] The water filling algorithm can be viewed as implicitly ensuring that the total power assigned across the carrier under consideration and all other subbands to which the user has been assigned is equal to a proportional portion of the total power budget, assuming, as discussed above, that the power per subband for the total power budget is equal to s×P max The shares of / S are equal and are such that, for each subband considered so far, the sum of the power temporarily assigned to this subband and the subband attenuation value of this subband is constant.

[0122] Specifically, the waterline level is predicted based on the previous level (as determined for the subbands allocated so far) and the channel gain of the considered user scheduled on the current subband s.

[0123] The total transmit power s×P is optimally shared among s subbands if the following conditions are met: max / S to maximize the achieved throughput:

[0124]

[0125] Where P j represents the amount of power allocated to subband j, W s is the waterline of the distribution phase s, and Is a user The channel gain of the user The highest channel gain among scheduled users on subband j is shown.

[0126] During the allocation process, among the allocated subbands based on (5), at each allocation stage i, the total transmit power s×P max / The proportional part of S, we get:

[0127]

[0128] It can be rewritten as:

[0129]

[0130] When allocating power to the next subband (denoted by s+1), since a proportional amount of the total power is redistributed by the scheduler, only when , otherwise it will keep its old value and W s+1 =W. When the waterline is updated, the total transmit power (s+1)P max The proportional part of / S is distributed at stage s+1 as follows:

[0131]

[0132] Therefore, using equation (7) and equation (8), the following equation holds:

[0133]

[0134] Then, the waterline at stage s+1 can be formulated as:

[0135]

[0136] Therefore, at each s-th step of the scheduling process, for each candidate user set U, the waterline level is derived from the following equation:

[0137]

[0138] in is the user showing the highest channel gain among the scheduled users in set U on subband s. Once the waterline level of the actual stage s is determined, the power P can then be temporarily assigned to each candidate set U using the following equation s,U :

[0139]

[0140] Figure 2 Details of a method of determining a temporary power allocation according to an embodiment are shown. Figure 2 A possible implementation of step 140 is shown in more detail. As shown, the method starts at step 230 before proceeding to step 241, where a new second candidate user is selected. The method then proceeds to step 242, where a subband attenuation value proportional to the inverse of the square of the channel gain value is determined for each candidate pair of users of the selected subband and each subband to which the user has been attributed for the current time slot. The subband attenuation value may have been determined for the first user, and the subband attenuation value will be available from a previous iteration for the subband to which the user pair has been assigned, so that determining these values ​​may include retrieving them from a memory. The method then proceeds to step 243, where a water filling algorithm is applied across the selected subband and each subband to which the user has been attributed for the current time slot, using the lower limit of each subband defined by the corresponding subband attenuation value. The method then proceeds to step 244, where a temporary power allocation is calculated according to a water filling algorithm for the selected subband, assuming a proportional distribution of the total available power across all subbands, and a water filling distribution of the temporary inter-subband power allocation is performed among the subbands for which the assignment of the selected subband is considered complete, plus the subbands for which the second corresponding user will be assigned. The method then proceeds to step 245, where it is determined whether power allocations have been obtained for the current subband for all candidate pairs of users, and if there are still user pairs, returns to step 241, or otherwise terminates at step 250.

[0141] Figure 3 The application of water injection for the first user combination scenario is demonstrated.

[0142] like Figure 3 As shown, the calculation is performed based on the first of the sub-band attenuation values ​​calculated at step 120 .

[0143] like Figure 3 As shown, the subband attenuation values ​​of each of the subbands (the current subband and the two previous subbands) are shown to be arranged adjacent to each other in order of size, with the subband on the left having the lowest subband attenuation value and the subband on the right having the highest subband attenuation value.

[0144] Therefore, in Figure 3 , the current subband with the first subband attenuation value 310 is located to the left of the other subbands. According to equations 10 and 11 above, a proportional portion of the total power budget can be temporarily distributed among the subbands so that the power assigned to the carrier under consideration and all other subbands to which users have been assigned is equal to the proportional portion of the total power budget and so that, for each subband, the sum of the power temporarily assigned to the subband and the subband attenuation value of the subband is a constant. It will be appreciated that although the water filling algorithm implies a water filling algorithm with respect to Figure 3 The described manner distributes power, but it is not necessary to explicitly solve the above mentioned equations in order to provide a power value for the subband 310 under consideration to become available.

[0145] Thus, as shown, a first temporary power allocation 301 is made for the subband currently being considered, a second temporary power allocation 302 is implied for subband 1, and a third temporary power allocation 303 is implied for subband 2, such that in each case the sum of each temporary power allocation with the corresponding subband attenuation value will be equal to a constant value 304, and the sum of the three values ​​301, 302, 303 is equal to a proportional portion of the transmission power budget. It will be appreciated that the implicit power allocation for the subbands not being considered is not actually retained for those other subbands. In particular, user allocations for those subbands may be performed on the basis of the temporary power allocations performed for those subbands while they are being considered, and where appropriate, a new final power allocation may be performed once all user assignments are complete.

[0146] This approach is similar to filling water into a container with an uneven bottom (as dictated by the different sub-band attenuation values). Given a specific amount of water (which corresponds to the total transmit power budget), it will naturally find its own water level so that the depth at any point dictates the power allocation for the underlying sub-bands.

[0147] This represents a reasonable mechanism for power distribution, since it makes sense to invest most of the power in the sub-bands with the highest channel gain (and thus the lowest sub-band attenuation value), since allocating on this basis ensures the highest possible overall throughput.

[0148] The step of assigning a temporary power allocation may comprise the step of: for each subband to which the second corresponding user is to be assigned, calculating a temporary inter-subband power allocation across all subbands for which the assignment of the selected subband is considered complete plus the subband for which the second corresponding user is to be assigned. The temporary inter-subband power allocation may be obtained by performing a water-filling distribution of the temporary inter-subband power allocation among the subbands for which the assignment of the selected subband is considered complete plus the subband for which the second corresponding user is to be assigned, assuming a proportional distribution of the total available power across all subbands and based on a water-filling algorithm based on the channel gain of the users assigned to each subband.

[0149] At step 150, the plurality of candidates is limited to a set of candidate pairs that include a candidate second user whose channel gain is complementary to the channel gain of the first user.

[0150] A complementary channel gain is a channel gain such that assigning a user having the channel gain together with a corresponding first user to the selected subband would indicate that the total subband throughput is greater than the subband throughput achievable by assigning all available power (as indicated by the temporary power allocations for the corresponding candidate pair of users for the corresponding subband) to the first user.

[0151] In some embodiments, utilizing the fact that the total throughput in the NOMA system increases with the difference in channel gains of the paired users, the complementary second user may be a candidate second user that shows a large difference in channel gain with respect to the first user k1. In some embodiments, utilizing the fact that the total throughput in the NOMA system increases with the difference in channel gains of the paired users, the complementary second user may be a candidate second user whose channel gain is different from the channel gain of the first user k1.

[0152] Different mechanisms for identifying such complementary users can be envisaged. In a first "brute force" implementation, channel gain values ​​can be calculated for all users k2 (excluding the already selected first user k1) for the subband s (for which the second corresponding user is to be assigned), and for each candidate second user k2, the achievable throughput of k1 and k2 on s is calculated.

[0153] It will be appreciated that the achievable throughput of k1 and k2 depends on the intra-subband and inter-subband power allocation strategies.

[0154] On this basis, only a subset S2 of user k2 needs to be retained so that the cumulative achievable throughput of k1 and k2 on subband s is greater than the throughput of k1 alone (i.e., the OMA case). If no user k2 can satisfy this condition Then the method can simply adopt OMA, where user k1 occupies the currently selected sub-band s.

[0155] In addition to the brute-force method described above, other methods are possible.

[0156] Figure 4 Steps are shown for an exemplary optimization mechanism for obtaining a set of candidate pairs including a candidate second user whose channel gain is complementary to that of the first user.

[0157] As Figure 4 shown, a specific and simplified implementation is provided that does not require the calculation of throughput values for all users.

[0158] Specifically, the method starts at step 450 and then proceeds to step 451, where the sub-band throughput (OMA scenario) achievable by assigning all available power for the corresponding sub-band to only the first user is calculated. In Figure 4 this, the throughput value is designated as A. The method then proceeds to step 452, where the candidate second user with the highest channel gain is selected for consideration, and then continues to step 453, where the sub-band throughput achievable by assigning the available power for the corresponding sub-band to the first user and the selected candidate second user is calculated. In Figure 4 this, the throughput value is designated as B. At step 454, it is determined whether assigning the candidate second user as the second user together with the corresponding first user to the selected sub-band will indicate that the total sub-band throughput is greater than the sub-band throughput achievable by assigning all available power for the corresponding sub-band to only the first user, i.e., whether B is greater than A. In the case where B is greater than A, the method proceeds to step 455, where the candidate second user is incorporated into the set of candidate pairs, and then the next user is selected in order of the corresponding channel gain value (i.e., the user with the next highest channel gain) and the loop returns to step 453.

[0159] In the following cases, the method proceeds to step 456: It is determined at step 454 that assigning the user as the second user together with the corresponding first user to the selected sub-band will not indicate that the total sub-band throughput is greater than the sub-band throughput achievable by assigning all available power for the corresponding sub-band to only the first user (B = <A). This represents the inference that if a particular candidate user cannot provide an increase in throughput, successive candidate second users with lower channel gains will get closer and closer to the channel gain of the first user and will therefore necessarily provide lower total throughput. On this basis, subsequent candidate second users can be ignored without specific processing.

[0160] It will be understood that steps 452 to 455 start from the assumption that the first user has a lower channel gain, such that the complementary second user will have a high channel gain. The reverse scenario can also be possible, where the first user has a high channel gain, such that the complementary second user will have a low channel gain. The following steps apply the corresponding logic to this scenario.

[0161] At step 456, the candidate second user with the lowest channel gain is selected. The method then proceeds to step 457, at which the sub-band throughput that can be achieved by assigning the selected candidate second user together with the corresponding first user to the selected sub-band is determined. In Figure 4 this throughput value is designated as B. At step 458, it is determined whether assigning the candidate second user as the second user together with the corresponding first user to the selected sub-band will indicate that the total sub-band throughput is greater than the sub-band throughput that can be achieved by assigning all available power to only the first user for the corresponding sub-band, i.e., whether B is greater than A. In the case where B is greater than A, the method proceeds to step 459, at which the candidate second user is incorporated into the set of candidate pairs, and then the next user (i.e., the user with the next lowest channel gain) is selected in order of the corresponding channel gain values and the process loops back to step 457.

[0162] In the following case, the method terminates at step 460: it is determined at step 458 that assigning the user as the second user together with the corresponding first user to the selected sub-band will not indicate that the total sub-band throughput is greater than the sub-band throughput that can be achieved by assigning all available power to only the first user for the corresponding sub-band (B = < A). This represents the inference that if a particular candidate user cannot provide an increase in throughput, successive candidate second users with higher channel gains will get closer and closer to the channel gain of the first user and will therefore necessarily provide a lower total throughput. On this basis, subsequent candidate second users can be ignored without specific processing.

[0163] Therefore, Figure 4 the steps of

[0164] · In the case where assigning the user as the second user together with the corresponding first user to the selected sub-band will indicate that the total sub-band throughput is greater than the sub-band throughput that can be achieved by assigning all available power to only the first user for the corresponding sub-band, the user is incorporated into the set and the next user is considered in order of the corresponding channel gain values.

[0165] In the event that assigning the user as a second user to the selected subband along with the corresponding first user would not indicate that the total subband throughput is greater than the subband throughput achievable by assigning all available power to only the first user for the corresponding subband, consider each user (excluding the user assigned as the first user) in order of their respective channel gain values ​​for the selected subband. The process may start with the user having the lowest channel gain.

[0166] The method may combine the user in the set if assigning the user as a second user to the selected subband along with the corresponding first user would indicate that the total subband throughput is greater than the subband throughput achievable by assigning all available power to only the first user for the corresponding subband. The method may then proceed to the next user in order of corresponding channel gain values.

[0167] In the event that assigning the user as a second user to the selected subband along with the corresponding first user would not indicate that the total subband throughput is greater than the subband throughput achievable by assigning all available power to only the first user for the corresponding subband, the method may consider the set to be fully defined and proceed to the step of assigning the corresponding second subband user to the selected subband.

[0168] It will be appreciated that this may be accomplished via a series of different logic flows with equivalent effects. For example, the method may start by working with the candidate second user with the lowest channel gain, then consider candidate second users with high channel gain, or the two methods may be performed independently or in parallel. The determination of the subband throughput achievable by only the first user may be performed at any convenient juncture prior to step 454 where the value is required.

[0169] Figure 1 The method then proceeds from step 150 to step 160, where corresponding second subband users (as initial subband assignments) are assigned to users (excluding any users already assigned to the initial subband) that belong to the set that maximizes a performance metric that reflects achieved throughput and / or fairness among users.

[0170] Now that a set of complementary candidate pairs of users is available, Figure 1 The method may proceed to selecting one of these candidate pairs of users to ultimately attribute the selected second candidate user to the selected subband.

[0171] At step 160, the second subband user may be selected as a candidate second user, maximizing a metric reflecting system throughput, subject to a factor reflecting fairness among users.

[0172] There are a variety of metrics suitable for the second user's selection, subject to factors reflecting fairness between users, examples of which will be presented in the following part of the description.

[0173] A first example of a metric suitable for use at step 160 is referred to as a "Flexible Throughput vs Fairness Maximization Metric" (FTFMM).

[0174] According to the FTFMM metric, select the second user k2 that maximizes the metric

[0175]

[0176] in

[0177] ·R s,k (t)(and the corresponding R s,k1 (t)) is the achievable throughput for user k (resp. k1) on subband s when paired with k1 (resp. k).

[0178] ·R k,tot (t)(and the corresponding R k1,tot (t)) is the expected throughput of user k at time t. c The historical throughput in the past window of length R k (t)(corresponding t and R k1 (t)).

[0179]

[0180] Where T k (t) is the time at which user k c The average throughput in the past window of length,

[0181] ·R k (t) (expected throughput) is the sum of the achievable throughput for user k on each subband to which user k has been assigned in the current time slot.

[0182] Maximization of this metric tends to favor user pairs with high NOMA throughput and / or low historical throughput.

[0183] Therefore, the numerator represents the NOMA throughput on subband s with a given pair of users, and the denominator represents the weighted cumulative historical throughput of those same users.

[0184] Parameters a and b are optional and may take values ​​between 0 and 1 in order to provide a mechanism for changing the relative importance of fairness on the one hand and throughput on the other.

[0185] If a = 0, the historical throughput of the second candidate user is not considered in the metric, and the selection of user k2 is based only on the maximization of the NOMA throughput on the current sub-band (since user k1 is fixed).

[0186] If b = 0, user k2 is selected by considering both the NOMA throughput and the historical throughput of user k2. This metric ensures a balance between fairness for k2 and NOMA throughput on the current sub-band s.

[0187] In other cases (0 < a, b < 1), the historical throughput of user k1 is considered in the denominator to reduce the impact of the historical throughput of user k2.

[0188] Maximization of this metric tends to favor user pairs with high NOMA throughput, and / or low historical throughput and / or low NOMA throughput loss, compared to an OMA configuration with only user k1.

[0189] User selection based on the foregoing metric typically involves identifying the user that minimizes or maximizes the metric. It will be understood that since the metric is presented as one factor divided by another, whether the desired user maximizes or minimizes the metric will depend on which factor is used as the numerator and which as the denominator. Generally, this can be referred to as identifying the user that produces an extreme value in the ratio between two factors.

[0190] Thus, this is an example of a metric suitable for use in the selection of a second user for a specific sub-band, where the second sub-band user is selected as the candidate second user that produces an extreme value in the metric, which reflects the ratio between the total throughput achievable by each user pair (including the first user assigned to the sub-band under consideration and the corresponding candidate second user) and the average throughput achieved by the same user pair over a predetermined previous time period.

[0191] A second example of a metric suitable for use at step 160 is referred to as the "Fairness Maximization Metric" (FMM). According to this metric, user k2 is selected that minimizes the following metric:

[0192]

[0193] ·R k′,tot is the historical throughput of user k' in a past window of length t, taking into account the predicted throughput of user k' at time t c and where, if user k' has not been assigned any sub-band in the current allocation time slot t

[0194]

[0195] If user k' has not been assigned any sub-band in the current allocation time slot t

[0196]

[0197] is R calculated on all users k′,tot The average value of (t).

[0198] Minimization of this metric tends to favor user k2, which makes the historical throughput of each user as close as possible to the average throughput of all users. When the metric is equal to zero, perfect fairness is achieved.

[0199] In equation (13), the candidate second user k under consideration does not appear explicitly in the numerator or denominator, but it is actually considered via the expected throughput R k′ (t) for the historical throughput value R k′,tot (t) and AVG(t).

[0200] Showing an example:

[0201] o In the case of equal power allocation: only the historical throughput value of the candidate second user k under consideration and the historical throughput value R of the selected first user k1 k,tot (t) and Depending on the choice of user k,

[0202] o In the case of iterative waterfilling (as described above): the choice of user k has an effect on R k,tot (t) and and R of user k' that has been allocated in the current time slot t k′,tot All values ​​of (t) are affected.

[0203] Therefore, this is an example of a metric suitable for use in the selection of second users for a particular subband, wherein the second subband users are selected as candidate second users that produce an extreme value in the match between the average throughput of each user and the average throughput of all users within a predetermined previous period.

[0204] A third example of a metric suitable for use at step 160 is a variation of the flexible throughput vs fairness maximization metric, where user k2 is selected that minimizes the following metric:

[0205]

[0206] The minimization metric tends to favor users k2 that have historical throughputs for each user close to the average throughput of all users and / or have higher NOMA throughput. Thus, this metric represents a combination of aspects of the previous metrics to provide a balance between fairness and throughput.

[0207] This metric calculation requires a power allocation to the PA (temporary or final, depending on the PA strategy).

[0208] Therefore, this is an example of a metric suitable for use in the selection of second users for a particular subband, wherein the second subband users are selected as candidate second users that produce extreme values ​​in a metric that reflects the ratio between: the total throughput achievable by each user pair (including the first user assigned to the subband under consideration and the corresponding candidate second user) and the sum of the deviations of each user's throughput in a predetermined previous time period from the average throughput of all users in the predetermined previous time period.

[0209] It has been experimentally shown that the FTFMM metric (where the a weighting factor is set to 0 and the b weighting factor is set to 1) has a significantly lower probability of being used than the FTFMM metric (where the a weighting factor is set to 0.5 and the b weighting factor is set to 0.5). Figure 1 The embodiments performed by the inventors of the method provide a smaller benefit in fairness for each additional subband, using the FTFMM metric (where the a weighting factor is set to 0.5 and the b weighting factor is set to 0.5) in turn provides a smaller benefit in fairness for each additional subband than using the FTFMM metric (where the a weighting factor is set to 1 and the b weighting factor is set to 0), and the FMM metric provides the greatest benefit in fairness for each additional subband. All embodiments provide significant improvements over conventional proportional fairness.

[0210] It has been experimentally shown that the FTFMM metric (where the a weighting factor is set to 0 and the b weighting factor is set to 1) has a significantly lower performance than the FTFMM metric (where the a weighting factor is set to 0.5 and the b weighting factor is set to 0.5). Figure 1 Embodiments of the method provide a smaller benefit in fairness per additional user per unit, employing the FTFMM metric (where the a weighting factor is set to 0.5 and the b weighting factor is set to 0.5) in turn provides a smaller benefit in fairness per additional user per unit than employing the FTFMM metric (where the a weighting factor is set to 1 and the b weighting factor is set to 0), while the FMM metric provides the largest benefit in fairness per additional user per unit. All embodiments provide significant improvements over conventional proportional fairness in NOMA, which in turn provides advantages over OMA in the test scenario.

[0211] It has been experimentally shown that the FTFMM metric (where the a weighting factor is set to 1 and the b weighting factor is set to 0) has a significantly higher accuracy than the FTFMM metric (where the a weighting factor is set to 0.5 and the b weighting factor is set to 0.5). Figure 1 Implementations of the method converge to optimal fairness faster, using the FTFMM metric (wherein the a weighting factor is set to 0.5 and the b weighting factor is set to 0.5) which in turn converge to optimal fairness faster than using the FTFMM metric (wherein the a weighting factor is set to 0 and the b weighting factor is set to 1), and the FMM metric provides the fastest convergence on optimal fairness.

[0212] All embodiments of the present invention provide significant improvements over conventional proportional fairness in NOMA (reaching Gini fairness of 0.1 in less than 10ms or less), except for the FTFMM metric where the a weighting factor is set to 0 and the b weighting factor is set to 1, which shows relatively small improvements.

[0213] The FTFMM metric and the FMM metric with the a weighting factor set to 1 and the b weighting factor set to 0 show significantly smoother, less bursty user throughput levels over time.

[0214] It has been experimentally shown that the FTFMM metric (where the a weighting factor is set to 0 and the b weighting factor is set to 1) Figure 1 Implementations of the method provide significant throughput improvements (approximately 40%) for all numbers of subbands, while adopting the FTFMM metric (where the a weighting factor is set to 0.5 and the b weighting factor is set to 0.5, or where the a weighting factor is set to 1 and the b weighting factor is set to 0) provides some improvements (approximately 10%), while the FMM metric provides less significant improvements compared to conventional proportional fairness. When considering the throughput for different numbers of users, the same general distribution is the same, and although the performance differences are limited in the case of a small number of users (10 in the experiments), the performance differences grow rapidly when the FTFMM metric is adopted (where the a weighting factor is set to 0 and the b weighting factor is set to 1 for larger user counts).

[0215] Naturally, the values ​​obtained in different configurations will vary based on the system configuration and other experimental conditions.

[0216] Although, as discussed above, a certain number of exemplary metrics have been presented, it will be appreciated that many variations of these general approaches are contemplated, any of which may be selected based on the relative importance of different operating parameters in a particular implementation.

[0217] like Figure 1As shown, the method then determines at step 170 whether all subbands have been considered, and if there are still subbands to be considered, returns to step 120, or returns to step 110. On this basis, the method can be considered to include the following further steps and then repeating the following steps: assigning a first user to the selected subband; temporarily assigning a power allocation to the selected subband; and assigning a second user to the selected subband until all subbands in the current time slot have been assigned.

[0218] Assigning users to one or more of a plurality of subbands in a multiple access communication system Figure 1 The proposed method achieves fairness among users at any time scale of interest and reduces the convergence time towards the required fairness performance, wherein short-term fairness is achieved, which is particularly beneficial when quasi-constant user rates are required, does not require deep buffering and is compatible with low latency constraints. In addition, it provides higher total cell throughput than the classical PF scheduler. It can be associated with unequal power allocation techniques such as water injection. For the NOMA scheme, the number of tested user pairs for each subband affiliation is reduced, resulting in reduced complexity compared to PF.

[0219] As mentioned above, Figure 1 Embodiments of the invention relate to initial subband assignments for each user. Once all users have received the initial assignments, subsequent subband assignments may then occur according to further mechanisms. This may occur in the context of selecting user 1 among a set of users that need to communicate as the user that experiences the lowest total achieved throughput, or alternatively, selecting user 1 among a set of users that need to communicate as the user that experiences the largest distance between its predicted throughput and its target throughput.

[0220] In either case, on the basis where, at step 160, the set of assignable users is empty, no second user is assigned to the subband corresponding to the empty set, and on the basis of the assignment of only the first user, the user assignment for the selected subband is considered complete.

[0221] On this basis, once user assignment is considered complete for all subbands of the current time slot, in the event that some users have not yet been assigned to any subband as an initial time slot assignment, the method may include and continue to repeat the following further steps: assigning a first user to the selected subband as an initial subband assignment, temporarily assigning power allocation to the selected subband, and assigning a second user to the selected subband as an initial subband assignment, and selecting new subbands for consecutive time slots until all users have been assigned to subbands in the current time slot.

[0222] As mentioned above, Figure 1 Embodiments of the invention relate to initial subband assignments for each user. Once all users have received the initial assignments, subsequent subband assignments may then occur according to further mechanisms. In particular, once all users have been assigned to subbands as an initial subband assignment, any remaining subbands in the current time slot and each subband in subsequent time slots may be assigned to first users, i.e., users with the lowest total achieved throughput, wherein each user is assigned to the remaining subbands that do not currently have any first users attributed to them and that provide the highest channel gain for the user. This method may be applicable, in particular, in the case where no throughput targets are assigned to users.

[0223] Alternatively, once all users have been assigned to the initial subbands, for any remaining subbands in the current time slot and each subband in subsequent time slots, a user may be assigned as the first user whose achieved total throughput is furthest from the corresponding target throughput defined for the user, wherein each user is assigned to the remaining subbands to which no first user currently belongs that provide the highest channel gain for the user. This approach may be applicable, in particular, in the case of assigning throughput targets to users.

[0224] The separate process for initial subband allocation advantageously helps ensure that all users are served quickly, thereby reducing service delays in a quasi-optimal manner. After this initial phase, users can be served according to system / user requirements (e.g., on a best effort or target throughput basis). The initial phase as described above allows for improved short-term fairness, and subsequent phases help ensure high throughput and good long-term fairness.

[0225] The method may include an additional step of assigning the final power allocation to each user of each subband. This additional step may be performed, for example, for each subband once all user allocations are complete for that subband in the current time slot. The final power allocation may be performed by a final iteration of the water filling method as described above.

[0226] The following further steps may be provided: calculating a final actual throughput value for each subband based on the respective first and second users assigned to each subband and the final power allocation for the subband, and comparing the final actual throughput with the throughput achievable by only each respective user on each respective subband, and in case the respective final actual throughput is less than the throughput achievable by only the respective user on any respective subband, revoking the second user assigned to the respective subband and allocating all available power to the respective first user for the subband.

[0227] Figure 5 As shown in the figure, a system 500 for attributing users to one or more of a plurality of sub-bands in a multiple access communication system is provided, the system 500 comprising:

[0228] A user sorter 501 is adapted to sort users in order of priority according to criteria (e.g., channel gain, distance between user and base station, or throughput of user). As shown, users are stored in a first data structure 510 presenting a user list 511, which is sorted by the user sorter 501.

[0229] The system 500 further comprises an assignment processor 503 adapted to assign, as an initial subband assignment, a user with the highest priority (excluding any user already assigned to the initial subband) to a corresponding selected subband in time slot t as the first user of the corresponding selected subband. The selected subband to which each user is assigned is selected by the assignment process as the subband to which no first user currently belongs, providing the highest channel gain for the user. Therefore, the assignment processor 503 accesses the user list 511 to obtain priority information for selecting the first user, and also accesses the second data structure 520 presenting the subband list 521 to register the assignment in the associated subband assignment space 522.

[0230] The system 500 further comprises a power calculator 502 adapted to determine, for the respective selected subbands, a plurality of candidate pairs of users for possible assignment to the selected subbands, each candidate pair of users comprising two different users comprising a first user selected by the assignment processor 503 and a respective candidate second user, and to temporarily assign a power allocation to the selected subband for each candidate pair of users. Thus, the power calculator 502 accesses the second data structure 520 to register a power assignment to each candidate pair of users as stored in the selected subband assignment space 522. In some embodiments, depending on the method employed for determining the intra-subband power allocation, the power calculator may also access the user list 511 to obtain a channel gain value associated with the respective user in the associated user channel gain space 512.

[0231] The assignment processor 503 may be further adapted to restrict the plurality of candidate pairs to a set of candidate pairs including a candidate second user whose channel gain is complementary to the channel gain of the first user, and assign the corresponding second subband user to the user (excluding any user already assigned to the initial subband) as an initial subband assignment, the user belonging to a set that maximizes a performance metric that reflects achieved throughput and / or fairness among users. Therefore, the assignment processor 503 may access the second data structure 520 to cancel the candidate pair designation associated with a non-complementary combination of users. Figure 5 The candidate pair grouping is represented by lines 530. As shown, the first user is linked by a bold line. Candidate second users are represented by other lines, so that each candidate pair includes the bold line and any other lines. Dashed lines represent candidate second users that are not complementary to the first user and are therefore excluded from the operation of the assigned processor.

[0232] The system 500 is adapted to iteratively process users for each subband until all subbands in the current time slot have been assigned. For the same reason, the system 500 can sequentially process subsequent time slots.

[0233] It will be appreciated that alternative groupings of functionality may be envisioned to achieve equivalent operations.

[0234] For example, Figure 5 The system is shown as being associated with a cellular telephone tower (e.g., a base transceiver station). The skilled person will appreciate that equivalent functionality may be equally implemented in a communication device such as a telephone handset or in other parts of a communication network such as a base station controller, a mobile switching center, etc.

[0235] It will be understood that Figure 5 The system or any equivalent functional grouping may be further adapted to implement the above referenced Figures 1 to 4 Any combination of any one of the described method steps corresponds to a function.

[0236] The disclosed methods and / or functional groupings may take the form of a fully hardware embodiment (e.g., an FPGA), a fully software embodiment (e.g., for controlling a system according to the invention), or an embodiment containing both hardware and software elements. Software embodiments include, but are not limited to, firmware, resident software, microcode, and the like. The invention may take the form of a computer program product accessible from a computer usable or computer readable medium that provides program code for use by or in conjunction with a computer or instruction execution system. A computer usable or computer readable medium may be any device that can contain, store, communicate, propagate, or transmit a program for use by or in conjunction with an instruction execution system, device, or apparatus. The medium may be an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system (or device or apparatus) or a propagation medium.

[0237] Thus, according to certain embodiments therein, a mechanism is provided for assigning users to one or more of a plurality of subbands in a multiple access communication system, wherein in an initial assignment phase, a first user is selected for a subband, for example on the basis of user priority. A user having a channel gain complementary to that of the first user is identified, and then a second subband user is selected that maximizes a performance metric reflecting achieved throughput and / or fairness between users to accompany the first user on the subband. Once all users have been assigned to a subband once, the initial assignment phase may terminate. After completion of the first phase, the first user of each subband may be the user whose achieved total throughput is furthest from a target throughput defined for that user, wherein each user is assigned to the remaining subbands to which no first user is currently assigned that provide the highest channel gain for that user.

[0238] The methods and processes may be implemented via a computer application or service, an application programming interface (API), a library, and / or other computer program products or any combination of such entities.

[0239] It will be understood that the configuration and / or method described herein is exemplary in nature, and these specific embodiments or examples should not be considered as restrictive, because many variations are possible. The specific routine or method described herein can represent one or more of any number of processing strategies. Therefore, the various actions shown and / or described can be performed in parallel or omitted in the sequence shown and / or described, in other sequences. Similarly, the order of the process described above can be changed.

[0240] The subject matter of the present disclosure includes all novel and nonobvious combinations and subcombinations of the various processes, systems and configurations, and other features, functions, acts, and / or properties disclosed herein, and any and all equivalents thereof.

Claims

1. A system for assigning users to one or more of a plurality of subbands in a multiple access communication system, the system comprising: an assignment processor adapted to assign, as an initial subband assignment, users excluding any users already assigned to the initial subband to a corresponding selected subband in time slot t as first users of the corresponding selected subband, a power calculator adapted to determine, for the corresponding selected subband, a plurality of candidate pairs of users for possible assignment to the selected subband, each candidate pair of users comprising two different users, the two different users comprising the first user and a corresponding candidate second user, and to temporarily assign power allocation to the selected subband for each candidate pair of users, the assignment processor further adapted to: restrict the plurality of candidate pairs to a set of candidate pairs comprising a candidate second user, the channel gain of the candidate second user being the same as the channel gain of the first user complementary; and assigning, as an initial subband assignment, corresponding second subband users to users excluding any users already assigned to the initial subband, the users belonging to a set that maximizes a performance metric reflecting achieved throughput and / or fairness among users, and wherein the system is further adapted to process users of each subband until all subbands in a current time slot have been assigned, wherein a complementary channel gain is a channel gain such that assigning a user having the channel gain to the selected subband along with the corresponding first user will indicate that a total subband throughput is greater than a subband throughput that would be achievable by assigning, for the corresponding subband, all available power as indicated by a temporary power allocation for the corresponding candidate pair of users to the first user.

2. A method for assigning a user to one or more of a plurality of sub-bands in a multiple access communication system, the method comprising the steps of: As an initial subband assignment, assigning users excluding any users already assigned to the initial subband to a corresponding selected subband in time slot t, as first users of the corresponding selected subband, determining a plurality of candidate pairs of users for the corresponding selected subband for possible assignment to the selected subband, each candidate pair of users including two different users, the two different users including the first user and a corresponding candidate second user, temporarily assigning power allocation to the selected subband for each candidate pair of users, limiting the plurality of candidate pairs to a set of candidate pairs including a candidate second user, the channel gain of the candidate second user being complementary to the channel gain of the first user, and assigning the corresponding second subband users to any users excluding any users already assigned to the initial subband as the first users of the corresponding selected subband. a user of any user, the user belonging to a set that maximizes a performance metric, the performance metric reflecting the achieved throughput and / or fairness between users, and the method comprising the further steps of and then repeating the steps of: assigning a first user to the selected subband, temporarily assigning a power allocation to the selected subband, assigning a second user to the selected subband until all subbands in a current time slot have been assigned, wherein a complementary channel gain is a channel gain such that assigning a user having the channel gain together with the corresponding first user to the selected subband will indicate that a total subband throughput is greater than a subband throughput that can be achieved by assigning all available power as indicated by the temporary power allocation for the corresponding candidate pair of users to the first user for the corresponding subband.

3. The method according to claim 2, wherein: The selected subband to which the user is assigned as a first user as an initial subband assignment is selected as a subband that provides the highest channel gain for that user and to which no first user is currently attributed.

4. The method according to any one of claims 2 to 3, wherein: defining the set of candidate pairs by considering each user excluding the user assigned as the first user, starting with the user having the highest channel gain, in order of the corresponding channel gain values ​​for each user of the selected subband, merging the users in the set and proceeding to the next user in order of the corresponding channel gain values ​​if assigning the user as the second user to the selected subband with the corresponding first user would indicate that the total subband throughput is greater than the subband throughput that could be achieved by assigning all available power for the corresponding subband to only the first user; In the case where assigning the user as a second user to the selected subband with the corresponding first user would not indicate that a total subband throughput is greater than a subband throughput that can be achieved by assigning all available power for the corresponding subband to only the first user, proceed to consider each user excluding the user assigned as the first user in order of respective channel gain values ​​for each user of the selected subband, starting with the user having the lowest channel gain; in the case where assigning the user as a second user to the selected subband with the corresponding first user would indicate that a total subband throughput is greater than a subband throughput that can be achieved by assigning all available power for the corresponding subband to only the first user, merge the users in the set and proceed to the next user in order of respective channel gain values; and in the case where assigning the user as a second user to the selected subband along with the corresponding first user would not indicate that the total subband throughput is greater than the subband throughput that could be achieved by assigning all available power for the corresponding subband to only the first user, the set is considered to be fully defined and proceed to the step of assigning the corresponding second subband user to the selected subband.

5. The method according to any one of claims 2 to 3, wherein: Once all users have been assigned to subbands as an initial subband assignment, the user with the lowest total achieved throughput is assigned as the first user to any remaining subbands in the current time slot and each subband in subsequent time slots, wherein each user is assigned to the remaining subbands that provide the highest channel gain for the user and to which no first user currently belongs.

6. The method according to any one of claims 2 to 3, wherein: Once all users have been assigned to the initial subbands, the following further steps are performed: assigning users as first users to any remaining subbands in the current time slot and to each subband in subsequent time slots for which the total throughput achieved by the users differs the most from the corresponding target throughput defined for the users, wherein each user is assigned to the remaining subbands that provide the highest channel gain for the user and to which no first users are currently attributed.

7. The method according to any one of claims 2 to 3, comprising the further step of: prior to the step of assigning, sorting all users in the order of the best channel gain measured for each user across all subbands for the current time slot, wherein, The user given the highest priority is the user with the lowest best channel gain, and wherein, at the step of assigning, the assigned user is the user with the highest priority excluding any user already assigned to the initial subband to the selected subband in time slot t.

8. The method according to any one of claims 2 to 3, wherein: The second subband user is selected as the candidate second user, and the candidate second user maximizes a metric reflecting system throughput subject to a factor reflecting fairness among users.

9. The method according to any one of claims 2 to 3, wherein: The second subband user is selected as the candidate second user, the candidate second user maximizing a metric reflecting a total throughput achievable by each user pair, each user pair comprising a first user assigned to the subband under consideration and a corresponding candidate second user, as a fraction of an average throughput achieved by the user pair over a predetermined previous period.

10. The method according to any one of claims 2 to 3, wherein: The second subband user is selected as the candidate second user, the candidate second user maximizing a metric reflecting a total throughput achievable by each user pair, each user pair comprising a first user assigned to the subband under consideration and a corresponding candidate second user, as part of a sum of deviations of each user's throughput during a predetermined previous time period relative to an average throughput of all users during the predetermined previous time period.

11. The method according to any one of claims 2 to 3, wherein: The second sub-band user is selected as the candidate second user, the candidate second user maximizing a match between an average throughput of each user and an average throughput of all users in a predetermined previous time period.

12. The method according to any of claims 2 to 3, comprising the additional step of assigning a final power allocation to each user of each sub-band.

13. The method according to claim 12, wherein: The step of assigning temporary power allocation and the step of assigning final power allocation include the following steps: determining a subband attenuation value that is proportional to the following value: the inverse of the square of the channel gain value of the user belonging to the selected subband and each subband to which the user has already belonged for the current time slot, using a lower limit for each subband defined by the corresponding subband attenuation value, across the selected subband and each subband to which the user has already belonged for the current time slot, applying a water filling algorithm, and calculating a temporary power allocation for the selected subband according to the water filling algorithm.

14. The method according to any one of claims 2 to 3, wherein: The step of temporarily assigning power allocation to each subband includes: for each subband to which the second corresponding user will be assigned, by assuming that the total available power is distributed proportionally across all subbands, calculating a temporary inter-subband power allocation across all the following subbands: the assignment for the selected subband is considered to be completed, plus the subband to which the second corresponding user will be assigned; and based on a water filling algorithm based on the channel gain of the user assigned to each subband, performing a water filling distribution of the temporary inter-subband power allocation between the following subbands: the assignment for the selected subband is considered to be completed, plus the subband to which the second corresponding user will be assigned.

15. A computer program product comprising instructions which, when executed by a computer, cause the computer to perform the method according to any one of claims 2 to 14.