A kind of transmission tower clip-on anchor bolt

By using snap-type sleeve unit and snap-bolt unit in the anchor bolts of the transmission tower, the problem of uneven settlement of the foundation caused by uneven settlement is solved, and the stability and safety of the tower are improved.

CN112376602BActive Publication Date: 2025-04-04CHINA ELECTRIC POWER RESEARCH INSTITUTE CO LTD +3
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202010736654.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-07-28
Publication Date
2025-04-04
Estimated Expiration
2040-07-28

AI Technical Summary

Technical Problem

The foundation of the transmission tower in the uneven settlement area is uneven settlement, resulting in the tower tilting, deformation, bending and even collapse.

Method used

A transmission pole tower-type anchor bolt including a hollow sleeve unit, a pad plug unit and a snap bolt unit is used. The inner wall of the sleeve unit is equipped with multiple sets of baffle components, and the snap bolt unit is fixed to the baffle component through the jaw component, and the height of the stud is adjusted to adapt to different settlement conditions.

Benefits of technology

The settlement height of the tower foundation is adjusted in the uneven settlement area, the problem of uneven settlement of the foundation is solved, the stability of the tower is improved, and the risk of collapse is avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112376602B_ABST
    Figure CN112376602B_ABST
Patent Text Reader

Abstract

The present invention provides a transmission tower clip-on anchor bolt, comprising a hollow sleeve unit, a gasket unit and a clip bolt unit; a sleeve (4) and a plurality of baffle assemblies are provided at different heights on the sleeve (4); a plate-shaped gasket unit is arranged on the upper surface of the sleeve unit, comprising a pad (14) and a tower foot plate (3) thereon, the tower foot plate (3) fixing the transmission tower leg (13); the clip bolt unit comprises a stud (1), a nut (2) and a plate-shaped clipping thorn assembly, the stud (1) fixing the clipping thorn assembly, the stud (1) passing through the gasket unit fixing the clipping thorn assembly in a baffle assembly of a suitable height in the sleeve (4). The present invention overcomes the defect of the limited length of the anchor bolt of the tower foot plate (3), adjusts the height of the stud (1) exposed outside the sleeve (4), and adds a gasket (14) to adjust the different heights of the tower leg (13) on the anchor bolt, thereby solving the problem of uneven settlement of the tower foundation of the transmission tower in uneven settlement areas.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of power equipment foundation engineering, and in particular to a transmission tower clip-on anchor bolt. Background Art

[0002] Transmission towers are usually composed of three parts: tower head, tower body and tower legs. The towers are generally made of angle steel, steel pipes, steel plates, etc., and are assembled by bolts, welding, etc. Since the tower is a structure with a large slenderness ratio, it is necessary to ensure that the tower has sufficient anti-overturning, anti-settling and anti-uplift capabilities under external load conditions such as icing, dancing, and strong winds. This ability is concentrated in the bearing capacity and stability of the tower foundation. The anchor bolts play an important role in connecting the tower and the foundation and connecting the upper and lower parts in the transmission and distribution lines, which is related to the safe operation of the entire line.

[0003] With the rapid construction of UHV lines, the UHV line network has been densely spread in every corner. The higher the line voltage level, the higher the line height. In order to ensure the stability of the tower and reduce the construction cost, the tower foundation often adopts a split structure, and the root gap between the two foundations is often more than 10m. However, this structure is very disadvantageous under uneven surface settlement.

[0004] Since the lines are inevitably affected by human engineering activities such as coal mining, road construction, salt drying, excavation, etc., the ground surface often settles unevenly. The uneven settlement of the four foundations of the tower will cause the tower to tilt, the tower material to concentrate stress, deformation and bending, and even collapse.

[0005] First, add gaskets to the anchor bolts to raise the tower legs to ensure that there is no uneven deformation between the four tower legs. However, due to the limited length of the anchor bolts at the top of the tower leg pile, this method is more suitable for smaller uneven settlements. With slightly larger uneven deformations, this solution will not work.

[0006] Secondly, the foundation is excavated, the foundation is lifted with a hydraulic jack, the foundation is leveled with pads under the foundation and the foundation is pushed back into place with a jack, then the tower body is connected to the foundation, and finally the foundation is backfilled. This treatment method not only has high construction requirements and a large amount of tools, but also has a complex on-site layout, a large workload and labor intensity for construction workers. It is also difficult to find pads of suitable thickness under the foundation, and the uneven settlement between the tower legs is still difficult to eliminate. Summary of the invention

[0007] In order to solve the problem in the prior art that uneven settlement of the ground surface along the transmission tower line leads to uneven settlement of the tower foundation, causing the tower to tilt or deform and bend, and even collapse in serious cases, the present invention provides a transmission tower clip-on anchor bolt, including: a hollow sleeve unit, a washer unit and a clip-on bolt unit; the sleeve unit includes a hollow tubular sleeve 4 with openings at both ends, a plurality of baffle assemblies are provided at different heights on the inner wall of the sleeve 4, and the sleeve unit is arranged on the foundation; the washer unit is a plate-shaped structure The tower leg 13 of the transmission tower is arranged on the gasket unit, and the gasket unit is arranged on the upper surface of the sleeve unit; the snap bolt unit includes a long rod-shaped columnar stud 1 and a thorn assembly, and the thorn assembly is a plate-shaped structure, which is fixed to one end of the stud 1. The stud 1 has one end of the thorn assembly that passes through the gasket unit and enters the hollow part of the sleeve unit. The thorn assembly is fixed in a baffle assembly of a suitable height in the sleeve 4 according to the height of the settlement of the sleeve unit on the foundation, and the other end of the stud 1 is fixed to the upper surface of the gasket unit.

[0008] Preferably, each group of baffle assemblies comprises a pair of long strip baffles 6, both ends of which have arc edges that match the arc inner wall of the sleeve 4, and are respectively connected to the arc edges;

[0009] The width of the baffle plate 6 is set according to the thorn assembly, and there is a gap between the baffle plate 6 and the inner wall of the sleeve 4 at the far end away from the axis of the sleeve 4.

[0010] Preferably, the spacing between adjacent baffle assemblies is 10 to 15 cm.

[0011] Preferably, the thorn assembly includes at least one pair of buckles 9 and barbs 8;

[0012] Each pair of plate-shaped buckles 9 are welded in a straight line on two sides of the same height of the bottom cylindrical surface of the buckle bolt unit;

[0013] The barb 8 is a sharp spike structure, and is welded with the barb tip facing upward to the upper surface edge of the buckle 9 which is far away from the axis of the sleeve 4 and close to the inner wall of the sleeve 4.

[0014] Preferably, the horizontal cross-sectional length of the buckle 9 is within the range of 3 / 8 to 1 / 2 of the diameter of the sleeve 4, the horizontal cross-sectional width is within the range of 1 / 4 to 3 / 4 of the diameter of the sleeve 4, and the longitudinal height is not greater than 10 cm.

[0015] Preferably, the buckle 9 has a longitudinal section that is a rectangular or right-angled trapezoidal long plate, with the long right-angled side facing horizontally upward and the short right-angled side welded longitudinally to the stud 1 .

[0016] Preferably, when there are at least two pairs of buckles 9 , the upper and lower adjacent buckles 9 at the bottom of the stud 1 are parallel, and the spacing between the upper and lower adjacent and parallel buckles 9 is consistent with the spacing between the baffles 6 at adjacent heights on the inner wall of the sleeve 4 .

[0017] Preferably, the snap-on bolt unit further includes a nut 2 , and one end of the stud 1 protruding from the sleeve 4 is threaded and is fixed to the upper surface of the gasket unit by the nut 2 .

[0018] Preferably, the length of the stud 1 is greater than the length of the sleeve 4 .

[0019] Preferably, the padding unit includes a tower foot plate 3 and a pad 14, the tower foot plate 3 is above the pad 14, the side of the tower foot plate 3 fixes the tower leg 13 of the transmission tower, and the thickness or number of the pad 14 is set according to the settlement amplitude.

[0020] Preferably, the pad 14 is in an M-shape.

[0021] Preferably, the baffle assembly also includes at least one reinforcing plate 12, which is a right-angled triangular plate-like structure, with its short right-angled side longitudinally fixed to the inner wall of the sleeve, and its long right-angled side vertically and fixed to the upper surface of the baffle 6; the baffle 6 and the two reinforcing plates 12 form a baffle groove body 5 at the inner wall of the sleeve 4 in close contact, and the baffle groove body 5 is located in the central part of the gap of the baffle 6; when the buckle assembly clamps the baffle assembly, the upward barb tip of the barb 8 is fixed in the baffle groove body 5.

[0022] Preferably, the sleeve unit also includes a sleeve base assembly, which includes a bottom plate 11. The bottom plate 11 is a rectangular long plate with a long side that is 3 to 5 times the diameter of the sleeve. The bottom plate 11 is horizontally placed at the bottom of the sleeve unit, and the upper surface is welded to the bottom end of the sleeve 4 to form a T-shaped structure with the sleeve 4.

[0023] Preferably, a wing plate 10 is welded at the connection portion of the T-shaped structure.

[0024] Preferably, the anchor bolt also includes a barrel-shaped truncated cone structure cast with concrete 7, the barrel-shaped truncated cone structure is arranged on the foundation, the footboard 3 is fixed on the top, the sleeve 4 is cast in the concrete 7, and the top of the sleeve 4 is flush with the upper surface of the barrel-shaped truncated cone structure.

[0025] Compared with the prior art, the present invention has the following beneficial effects:

[0026] The invention discloses a clip-on anchor bolt for a power transmission tower. In areas with complex and changeable geological conditions, the defect of limited length of the anchor bolt of a tower foot plate 3 is overcome. The height of the stud 1 exposed outside the sleeve 4 is adjusted, and a pad 14 under the tower foot plate 3 is added to adjust the different heights of the tower leg 13 on the anchor bolt, thereby realizing the adjustment of the settlement height of the tower foundation in a smaller or larger range in an uneven settlement area, and solving the problem of uneven settlement of the tower foundation of the power transmission tower in an uneven settlement area. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 A schematic diagram of a movable anchor bolt provided by the present invention when adding a gasket to adjust uneven settlement of a pole tower;

[0028] Figure 2 A schematic front view of a movable anchor bolt provided by the present invention that can correct uneven settlement of a transmission tower;

[0029] Figure 3 A schematic top view of the movable anchor bolt provided by the present invention when it can move up and down;

[0030] Figure 4 A schematic top view of the movable anchor bolt provided by the present invention when in operation;

[0031] Figure 5 A schematic diagram of the anchor bolt provided by the present invention when working without a gasket.

[0032] Description of Figure Numbers:

[0033] 1-stud; 2-nut; 3-tower foot plate; 4-sleeve; 5-baffle trough; 6-baffle; 7-concrete; 8-barb; 9-clip;

[0034] 10-wing plate; 11-bottom plate; 12-reinforcement plate; 13-tower leg; 14-pad. DETAILED DESCRIPTION

[0035] In order to better understand the present invention, the content of the present invention is further described below in conjunction with the accompanying drawings and examples.

[0036] The present invention provides a transmission tower clip-on anchor bolt, such as Figure 1As shown, it includes a hollow sleeve unit, a gasket unit and a snap-in bolt unit; the sleeve unit includes a hollow tubular sleeve 4 with openings at both ends, and a plurality of baffle assemblies are provided at different heights on the inner wall of the sleeve 4, and the sleeve unit is arranged on the foundation; the gasket unit is a plate-like structure, and the tower leg 13 of the transmission tower is arranged on the gasket unit, and the gasket unit is arranged on the upper surface of the sleeve unit; the snap-in bolt unit includes a long rod-shaped columnar stud 1 and a stinger assembly, and the stinger assembly is a plate-like structure, which is fixed to one end of the stud 1, and one end of the stud 1 having the stinger assembly passes through the gasket unit and enters the hollow part of the sleeve unit, and the stinger assembly is fixed to the baffle assembly of a suitable height in the sleeve 4 according to the height of the settlement of the sleeve unit on the foundation, and the other end of the stud 1 is fixed to the upper surface of the gasket unit. During installation, before the sleeve 4 is poured, the top of the sleeve 4 is sealed with a balloon to prevent pollutants such as concrete 7, rainwater, dust, etc. from falling into the sleeve 4 and damaging the inner wall of the sleeve 4 and the sleeve baffle assembly.

[0037] Furthermore, the outer surface of the sleeve 4 is made into an anti-slip shape, and the anti-slip measure can be welded steel bars and the like.

[0038] The invention discloses a clip-on anchor bolt for a power transmission tower. In areas with complex and changeable geological conditions, the defect of limited length of the anchor bolt of a tower foot plate 3 is overcome. The height of the stud 1 exposed outside the sleeve 4 is adjusted, and a pad 14 under the tower foot plate 3 is added to adjust the different heights of the tower leg 13 on the anchor bolt, thereby realizing the adjustment of the settlement height of the tower foundation in a smaller or larger range in an uneven settlement area, and solving the problem of uneven settlement of the tower foundation of the power transmission tower in an uneven settlement area.

[0039] In the present invention, if Figure 3 and Figure 4 As shown, each baffle assembly includes a pair of long strip baffles 6, both ends of which have arc edges that match the arc inner wall of the sleeve 4; and both ends of the arc edges of the baffles 6 are connected to the arc edges respectively.

[0040] The width of the baffle 6 is set according to the thorn assembly, that is, the setting of the width of the baffle 6 not only needs to reserve sufficient space for the thorn assembly to move up and down in the sleeve 4 to adjust the height, but also requires that after the thorn assembly is rotated 90°, the baffle 6 fixes the adjusted thorn assembly so that it can be firmly connected to the baffle 6 in the sleeve 4, and there is a gap between the baffle 6 and the inner wall of the sleeve 4 at the far end away from the axis of the sleeve 4, and the size of the gap is set according to actual needs.

[0041] Furthermore, the baffle 6 can be selected to be a 1 / 4 circular steel plate.

[0042] Furthermore, the distance between each pair of baffles 6 is determined according to the length of the sleeve 4, and it is further preferred that the spacing between adjacent baffle assemblies is 10 to 15 cm, to ensure that a single thorn assembly or multiple pairs of thorn assemblies can be fixedly connected according to the assembly connection position in the space outside the multiple groups of baffle assemblies provided at different heights on the inner wall of the sleeve 4.

[0043] In the present invention, the thorn assembly includes at least one pair of buckles 9 and barbs 8; when the buckles 9 and barbs 8 include multiple pairs, the thorn assembly is fixedly connected to multiple groups of baffle assemblies provided at different heights on the inner wall of the sleeve 4, and the connection and fixation are more firm.

[0044] Each pair of plate-shaped buckles 9 are welded in a straight line on both sides of the same height of the bottom cylindrical surface of the buckle bolt unit, ensuring that each pair of plate-shaped buckles 9 can clamp multiple groups of baffle assemblies provided at different heights on the inner wall of the sleeve 4 to the maximum extent.

[0045] Furthermore, when installing the pole tower, the stud 1 is placed along the direction without the baffle 6, and the stud 1 is lowered to the bottom layer of the sleeve 4. After the stud 1 is placed in the bottom layer, the stud 1 is rotated to buckle the barb 8 into the baffle slot 5.

[0046] The barb 8 is a spike structure, with the barb tip welded upward on the upper surface edge of the buckle 9 far away from the axis of the sleeve 4 and close to the inner wall of the sleeve 4, ensuring that multiple groups of baffle assemblies at different heights fixed to the inner wall of the sleeve 4 cannot move horizontally, thereby achieving a better stabilization effect.

[0047] In the present invention, the horizontal cross-sectional length of the buckle 9 is in the range of 3 / 8 to 1 / 2 of the diameter of the sleeve 4, the horizontal cross-sectional width is in the range of 1 / 4 to 3 / 4 of the diameter of the sleeve 4, and the longitudinal height is not more than 10 cm, to ensure that the buckle 9 can be pulled out and / or fixed to the baffle assembly in the space inside the sleeve 4.

[0048] Further, when installing the stud 1, the balloon at the top of the sleeve 4 is removed, and the top opening of the sleeve 4 is sealed with a gasket unit.

[0049] In the present invention, the buckle 9 is a long plate with a rectangular or right-angled trapezoidal longitudinal section, with the long right-angled side facing horizontally upward and the short right-angled side welded longitudinally on the stud 1, so as to maximize the contact area between the upper surface of the buckle assembly and the lower surface of the baffle assembly, increase the stability of the connection between the buckle assembly and the baffle assembly, and improve the fixing effect.

[0050] In the present invention, when there are at least two pairs of clips 9, the upper and lower adjacent clips 9 at the bottom of the stud 1 are parallel, and the spacing between the upper and lower adjacent and parallel clips 9 is consistent with the spacing between the baffles 6 at adjacent heights on the inner wall of the sleeve 4, ensuring that multiple pairs of clips 9 match the paired long strip baffles 6 on the sleeve 4, avoiding the situation where the clips 9 are not fastened to the baffles 6, and ensuring that the clips 9 on the clip assembly are all fastened to the baffle assembly on the inner wall of the sleeve 4.

[0051] Furthermore, in order to improve the stress of the stud 1, the buckles 9 on the stud 1 are welded in pairs from bottom to top. The data is determined according to actual needs, and 3 pairs can be continuously welded from the bottom of the sleeve 4.

[0052] In the present invention, the snap-on bolt unit also includes a nut 2. The end of the stud 1 exposed from the sleeve 4 is threaded and fixed to the upper surface of the gasket unit through the nut 2. The nut thread and the size of the nut are set according to actual needs.

[0053] Furthermore, the nut 2 may be a two-cornered bilateral shape or a hexagonal hexagonal shape.

[0054] In the present invention, the length of the stud 1 is greater than the length of the sleeve 4. Figure 2 As shown, in order to improve the force of the stud 1 and the sleeve 4, the length of the sleeve 4 and the stud 1 is increased as much as possible, the sleeve 4 is at least 1.5m long, and the exposed length of the stud 1 tower foundation reserves space for fixing the tower foot plate 3. The length of the stud 1 is ensured to be long enough, so that when the uneven stratum settles significantly, there is enough length to be pulled out and adjusted from the sleeve 4, thereby enhancing the adaptability to the settlement of the uneven stratum.

[0055] Furthermore, if the exposed stud 1 is long enough, just loosen the nut 2 and add a pad 14 under the tower leg plate; if the exposed stud 1 is not long enough, it is necessary to loosen the nut 2 of the pole tower foundation, press the stud 1 downward, make the barb 8 withdraw from the baffle slot 5, rotate the stud 1 ninety degrees, lift the stud 1 upward to a suitable height by the spacing of several baffles 6 as required, rotate it ninety degrees again, clip the stud 1 buckle 9 into the baffle 6, and further fix the barb 8 at the far end of the buckle 9 in the baffle slot 5.

[0056] In the present invention, if Figure 5 As shown, the padding unit includes a tower foot plate 3 and a pad 14. The tower foot plate 3 is above the pad 14. The side of the tower foot plate 3 fixes the tower leg 13 of the transmission tower. The thickness or number of the pad 14 is set according to the settlement amplitude. The pad 14 can be a rectangular steel plate with a hole of the same diameter as the stud 1 reserved, and pads 14 of different thicknesses are provided according to the settlement amplitude, and the number is determined according to actual needs.

[0057] Furthermore, when uneven settlement of the four tower legs is detected, the foundation with the largest settlement is found and the amount of height adjustment of the foundation is determined.

[0058] In the present invention, the pad 14 is in an M-shaped form, which ensures that there is no need to remove the nut 2. It is only necessary to loosen the nut 2, raise and correct the tower foundation, and pad the pad 14 with corresponding thickness and number according to the settlement amplitude.

[0059] Furthermore, the pad plate 14 may also be a steel plate as required.

[0060] In the present invention, if Figure 2 As shown, the baffle assembly also includes at least one reinforcing plate 12, which is a right-angled triangular plate-like structure, with its short right-angled side longitudinally fixed to the inner wall of the sleeve, and its long right-angled side vertically and fixed to the upper surface of the baffle 6; the baffle 6 and the two reinforcing plates 12 form a baffle groove body 5 at the inner wall of the sleeve 4 in close contact, and the baffle groove body 5 is located in the central part of the gap of the baffle 6; when the buckle assembly clamps the baffle assembly, the upward barb tip of the barb 8 is fixed in the baffle groove body 5.

[0061] Furthermore, the length of the reinforcing plate 12 is about 3 / 8 of the diameter of the sleeve 4, and can be a steel plate. It is further preferred that there are two pairs of steel plates on each baffle.

[0062] The reinforcing plate 12 on the baffle assembly enhances the stability of the baffle assembly on the inner wall of the sleeve 4 and enhances the fixing effect of the baffle assembly.

[0063] Furthermore, the flat steel plate can be bent into two semicircles, and after the baffle plate 6 and the reinforcing plate 12 are welded, they are welded into a cylindrical shape.

[0064] In the present invention, the sleeve unit also includes a sleeve base assembly, and the sleeve base assembly includes a bottom plate 11. The bottom plate 11 is a rectangular long plate with a long side that is 3 to 5 times the diameter of the sleeve. It is horizontally placed at the bottom of the sleeve unit, and the upper surface is welded to seal the bottom end of the sleeve 4 to form a T-shaped structure with the sleeve 4. The bottom plate 11 is welded to seal the bottom end of the sleeve 4 to ensure that the space inside the sleeve 4 is not filled due to uneven stratum settlement, thereby affecting the extraction and movement of the snap assembly in the sleeve 4 and the fixing of the baffle assembly.

[0065] Furthermore, the bottom cover plate 11 may be a steel plate.

[0066] In the present invention, the T-shaped structure connection part is welded with a wing plate 10, and more preferably, the wing plate 10 can be a steel bar or a steel plate. The wing plate 10 further enhances the stability and firmness of the connection between the bottom plate 11 and the sleeve 4.

[0067] In the present invention, the anchor bolt also includes a barrel-shaped conical structure cast with concrete 7, the barrel-shaped conical structure is arranged on the foundation, and the footboard 3 is fixed on the top, the sleeve 4 is cast in the concrete 7, and the top of the sleeve 4 is flush with the upper surface of the barrel-shaped conical structure. The barrel-shaped conical structure cast with concrete 7 protects the sleeve unit from being affected by the external environment and enhances the stability and firmness of the sleeve unit.

[0068] Furthermore, the pole tower foundation formed by pouring concrete 7 is a column foundation structure with a bottom diameter smaller than an upper diameter.

[0069] Compared with the prior art, the present invention also has the following beneficial effects:

[0070] The present invention avoids the complex construction means of excavating the foundation and then backfilling the foundation required by the traditional method, and solves the problems of high construction requirements, large amount of tools and equipment, complex on-site layout, large workload and labor intensity of construction personnel.

[0071] The invention solves the problem that it is difficult to find a cushion block of suitable thickness under the foundation, resulting in uneven settlement thickness between tower legs, which is still difficult to eliminate.

[0072] The device has a simple structure, low cost, convenient construction and a wide range of applications. When constructing a pole tower in an area where uneven settlement may occur, the scheme of the present invention is adopted to perform adjustments when uneven settlement occurs.

[0073] Obviously, the described embodiments are only some embodiments of the present invention, but not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0074] The word "exemplary" is used exclusively herein to mean "serving as an example, embodiment, or illustration." Any embodiment described herein as "exemplary" is not necessarily to be construed as being preferred or advantageous over other embodiments. Although various aspects of the embodiments are shown in the drawings, the drawings are not necessarily drawn to scale unless otherwise noted.

[0075] The above are merely embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention are included in the scope of the claims of the present invention to be approved.

Claims

1. A transmission tower clip-on anchor bolt, characterized in that: It includes a hollow sleeve unit, a gasket unit and a snap bolt unit; The sleeve unit comprises a hollow tubular sleeve (4) with openings at both ends, a plurality of baffle assemblies are provided at different heights on the inner wall of the sleeve (4), and the sleeve unit is arranged on a foundation; The gasket unit is a plate-shaped structure, the tower leg (13) of the transmission tower is arranged on the gasket unit, and the gasket unit is arranged on the upper surface of the sleeve unit; The snap-on bolt unit comprises a long rod-shaped columnar stud (1) and a thorn assembly, wherein the thorn assembly is a plate-shaped structure fixed to one end of the stud (1), and the stud (1) has one end of the thorn assembly passing through the gasket unit and entering the hollow part of the sleeve unit, and the thorn assembly is fixed to a baffle assembly of a suitable height in the sleeve (4) according to the height of the sleeve unit sinking on the foundation, and the other end of the stud (1) is fixed to the upper surface of the gasket unit; The snap-on bolt unit further comprises a nut (2); one end of the stud (1) protruding from the sleeve (4) is threaded and is fixed to the upper surface of the gasket unit via the nut (2); The length of the stud (1) is greater than the length of the sleeve (4); Each set of baffle assemblies comprises a pair of long strip baffles (6), both ends of the baffles (6) having arc edges that match the arc inner wall of the sleeve (4); The arc edges at both ends of the baffle (6) are respectively connected to the arc inner wall of the sleeve (4); The width of the baffle (6) is set according to the thorn assembly, and a gap is formed between the baffle (6) and the inner wall of the sleeve (4) at the far end away from the axis of the sleeve (4); The thorn assembly comprises at least one pair of buckles (9) and barbs (8); Each pair of plate-shaped clips (9) are welded in a straight line on two sides of the same height of the bottom cylindrical surface of the clip bolt unit; The barb (8) is a sharp barb structure, and is welded with the barb tip facing upwards to the upper surface edge of the buckle (9) which is far away from the axis of the sleeve (4) and close to the inner wall of the sleeve (4); The baffle assembly further comprises at least one reinforcing plate (12), the reinforcing plate (12) being a right-angled triangular plate-shaped structure, the short right-angled side of the plate surface being longitudinally fixed to the inner wall of the sleeve, and the long right-angled side being perpendicular and fixed to the upper surface of the baffle (6); the baffle (6) and the two reinforcing plates (12) are closely attached to the inner wall of the sleeve (4) to form a baffle groove body (5), the baffle groove body (5) being located at the central part of the gap of the baffle (6); when the buckle assembly is fastened to the baffle assembly, the upwardly directed thorn tip of the barb (8) is fixed in the baffle groove body (5); If the exposed stud (1) is long enough, the nut (2) can be directly loosened and a pad (14) can be added under the tower leg plate; if the exposed stud (1) is not long enough, the nut (2) of the tower foundation needs to be loosened, the stud (1) is pressed downward, the barb (8) is withdrawn from the baffle groove (5), the stud (1) is rotated 90 degrees, the stud (1) is lifted upward by the spacing of several baffles (6) as required, and it is rotated 90 degrees again, the buckle (9) on the stud (1) is inserted into the baffle (6), and the barb (8) at the far end of the buckle (9) is further fixed in the baffle groove (5).

2. The anchor bolt according to claim 1, characterized in that: The distance between adjacent baffle assemblies is 10 to 15 cm.

3. The anchor bolt according to claim 1, characterized in that: The horizontal cross-sectional length of the buckle (9) is within the range of 3 / 8 to 1 / 2 of the diameter of the sleeve (4), the horizontal cross-sectional width is within the range of 1 / 4 to 3 / 4 of the diameter of the sleeve (4), and the longitudinal height is not greater than 10 cm.

4. The anchor bolt according to claim 3, characterized in that: The buckle (9) has a longitudinal cross-section of a rectangular or right-angled trapezoidal long plate, with the long right-angled side facing horizontally upward and the short right-angled side longitudinally welded to the stud (1).

5. The anchor bolt according to claim 4, characterized in that: When there are at least two pairs of the buckles (9), the buckles (9) adjacent to each other at the bottom of the stud (1) are parallel, and the spacing between the buckles (9) adjacent to each other and parallel to each other is consistent with the spacing between the baffles (6) at adjacent heights on the inner wall of the sleeve (4).

6. The anchor bolt according to claim 1, characterized in that: The padding unit comprises a tower foot plate (3) and a pad plate (14); the tower foot plate (3) is above the pad plate (14); the side of the tower foot plate (3) is used to fix the tower leg (13) of the transmission tower; and the thickness or number of the pad plates (14) is set according to the settlement amplitude.

7. The anchor bolt according to claim 6, characterized in that: The pad (14) is in an M-shaped form.

8. The anchor bolt according to claim 1, characterized in that: The sleeve unit further comprises a sleeve base assembly, wherein the sleeve base assembly comprises a bottom plate (11), the bottom plate (11) being a rectangular long plate, the long side of which is 3 to 5 times the diameter of the sleeve, and being horizontally placed at the bottom of the sleeve unit, the bottom end of the sleeve (4) being welded to the upper surface thereof, so as to form a T-shaped structure with the sleeve (4).

9. The anchor bolt according to claim 8, characterized in that: A wing plate (10) is welded to the connection portion of the T-shaped structure.

10. The anchor bolt according to claim 6, characterized in that: The anchor bolt also includes a barrel-shaped truncated cone structure cast with concrete (7), the barrel-shaped truncated cone structure being arranged on the foundation, with a tower foot plate (3) fixed on the top, the sleeve (4) being cast in the concrete (7), and the top of the sleeve (4) being flush with the upper surface of the barrel-shaped truncated cone structure.

Citation Information

Patent Citations

  • Adjusting device for differential settlement of power transmission tower

    CN106760903A

  • Height-adjustable tower leg connecting device of pole tower

    CN202273244U