Hydraulic hose assembly fully automatic crimping production equipment
By designing the hydraulic hose assembly fully automatic pressing production equipment, the problems of low production efficiency and unstable quality caused by manual operation in the existing technology are solved, and efficient and accurate automated production is achieved.
Patent Information
- Application Number
- CN202011012120.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-09-23
- Publication Date
- 2025-03-28
- Estimated Expiration
- 2040-09-23
AI Technical Summary
The production of existing hydraulic hose assembly relies on manual operation, and there are problems such as complicated processes, large dimensional deviations, unstable buckles and buckle values, which seriously affect product quality and endanger the safety of operators.
A fully automatic pressing production equipment for hydraulic hose assembly is designed, including a central rotating workbench, hose clamping mechanism, sleeve automatic loading installation device, core automatic loading installation device, automatic riveting device and finished product automatic offline device, and fully automatic operation is achieved through servo motor and cylinder drive.
The fully automated production of hydraulic hose assembly is realized, which improves work efficiency, pressurization accuracy and safety, avoids leakage and dimensional deviation problems in manual operations, and significantly improves product quality.
Smart Images

Figure CN112388984B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of hydraulic hose assembly production, and in particular relates to a fully automatic crimping production device for a hydraulic hose assembly. Background Art
[0002] Fluid pipelines are channels for transferring fluid media. There are mainly two forms of pipelines: hoses and hard pipes, which transport fluids to other working components. They are one of the very important auxiliary components in the entire fluid operation system. Pipes need to be connected into sealed channels through different forms of joints for fluids to pass through, forming a circulation system. To form a circulation system, one end of the pipeline and the joint are combined and sealed, and the other end of the joint is connected to other joints or working components. The connection method between the pipeline and the joint is an important form for the normal passage of fluids. It must be ensured that the connection place can withstand the required pressure and has good permeability and sealing.
[0003] The hydraulic hose assembly is composed of hydraulic hoses and various types of joints through buckling. The hydraulic hose structure is mainly composed of a liquid-resistant synthetic rubber inner layer, a middle layer, a multi-layer reinforcement layer, and a weather-resistant synthetic rubber outer layer. The inner layer has the function of making the conveying medium withstand pressure and protecting the steel wire or wire fiber from erosion. The outer layer protects the reinforcement layer from damage. The reinforcement layer is a skeleton material and its function is to ensure the use pressure of the hydraulic hose.
[0004] Hydraulic hose assemblies are mainly used for mine hydraulic supports and oil field development. They are suitable for conveying petroleum-based (such as mineral oil, soluble oil, hydraulic oil, fuel oil, lubricating oil) and water-based liquids (such as emulsions, oil-water emulsions, water) and liquid transmission with certain pressure and temperature in mechanized and automated hydraulic systems in engineering construction, lifting and transportation, metallurgical forging, mining equipment, ships, injection molding machinery, agricultural machinery, various machine tools, and various industrial departments. It has a wide range of uses and a large amount of use.
[0005] However, the current production of hydraulic hose assemblies can only rely on manual operation, and the production steps include cutting and blanking of raw tubes, pre-installation of joint sleeve cores, and crimping and forming. This manual operation method has a series of problems such as complicated processes, large deviation of assembly dimensions, missing buckles, and unstable crimping values. It seriously affects product quality, easily causes production accidents, and endangers the life and health of underground operators. Summary of the invention
[0006] In order to solve the deficiencies in the prior art, the present invention provides a fully automatic crimping production equipment for a hydraulic hose assembly which saves manpower, is easy to operate, has high working efficiency, is accurate in crimping, and avoids missed crimping.
[0007] In order to solve the above technical problems, the present invention adopts the following technical scheme: fully automatic crimping production equipment for hydraulic hose assemblies, including a central bracket and a peripheral bracket arranged outside the central bracket, a hydraulic hose placement port is arranged on the front side of the peripheral bracket, a central rotating worktable rotating in a clockwise or counterclockwise direction is provided on the central bracket, a plurality of hose clamping mechanisms are evenly arrayed in a circumferential direction on the central rotating worktable, an automatic sleeve feeding and installation device, an automatic core feeding and installation device, an automatic riveting device and an automatic finished product unloading device are arranged in sequence in a clockwise or counterclockwise direction on the upper edge of the peripheral bracket, and the automatic sleeve feeding and installation device and the automatic finished product unloading device are respectively located on the left and right sides of the hydraulic hose placement port.
[0008] The central rotating worktable includes a turntable and a servo motor. The turntable is arranged horizontally. The rotation of the turntable is connected to the central bracket. The servo motor is arranged on the central bracket below the turntable. The main shaft of the servo motor is coaxially connected to the center of the turntable. A top frame is arranged at the upper end of the peripheral bracket. The top frame is provided with a threading tube arranged along the center line of the turntable. The power line and the control line are passed through the threading tube.
[0009] Each hose clamping mechanism includes a mounting seat fixedly arranged at the outer circumferential edge of the turntable, two vertical guide rails are arranged on the outer side of the mounting seat in the vertical direction, the two vertical guide rails are located on the outer side of the turntable, a vertical slide is slidably connected to the two vertical guide rails, a lifting cylinder for driving the vertical slide to move up and down along the vertical guide rail is arranged at the bottom of the mounting seat, and a left bidirectional synchronous clamping cylinder assembly and a right bidirectional synchronous clamping cylinder assembly are fixedly arranged on the front side of the vertical slide;
[0010] The left bidirectional synchronous clamping cylinder assembly and the right bidirectional synchronous clamping cylinder assembly have the same structure. Both the left bidirectional synchronous clamping cylinder assembly and the right bidirectional synchronous clamping cylinder assembly include a cylinder body and two left and right opposite claws. The left side of the left claw is connected to the left synchronous driving end of the cylinder body, and the right side of the right claw is connected to the right synchronous driving end of the cylinder body. The right end surface of the left claw and the left end surface of the right claw are both vertically provided with semicircular slots. The two semicircular slots are oppositely arranged left and right. The hole walls of the semicircular slots are vertically provided with a plurality of anti-slip arc grooves that are evenly spaced.
[0011] The tops of the clamping jaws of the left bidirectional synchronous clamping cylinder assembly and the right bidirectional synchronous clamping cylinder assembly are both provided with correction positioning pieces, which are of Z-shaped structure, and the lower part of the correction positioning piece is fixed to the top of the clamping jaw by screws, and arc-shaped correction grooves are provided on the left side of the upper part of the correction positioning piece on the left and on the right side of the upper part of the correction positioning piece on the right, and the inner diameter of the arc-shaped correction groove is equal to the inner diameter of the semicircular groove hole, and the vertical center line of the arc-shaped correction groove on the left side coincides with the vertical center line of the semicircular groove hole on the left end face of the clamping jaw on the right side of the left bidirectional synchronous clamping cylinder assembly, and the vertical center line of the arc-shaped correction groove on the right side coincides with the vertical center line of the semicircular groove hole on the right end face of the clamping jaw on the left side of the right bidirectional synchronous clamping cylinder assembly.
[0012] A height positioning mechanism is fixedly provided on the upper part of the top frame and is located directly above the correction positioning piece; the height positioning mechanism includes an angle steel connector, a positioning cylinder, a positioning plate, two contact sensors, two guide sleeves, and two guide rods. The angle steel connector is fixedly provided on the top frame, and the two guide sleeves are arranged at intervals on the left and right and are fixedly provided on the angle steel connector. The center line of the guide sleeve is provided in the vertical direction, the guide rod is inserted in the guide sleeve and is slidably connected to the inner wall of the guide sleeve, the positioning cylinder is parallel to the guide rod and is located between the two guide rods, the cylinder body of the positioning cylinder is fixedly connected to the angle steel connector through a horizontally arranged connecting plate, the positioning plate is horizontally arranged below the angle steel connector, the lower end of the telescopic rod of the positioning cylinder passes through the angle steel connector and is connected to the positioning plate, and a mounting hole that is transparent from top to bottom is respectively opened on the left and right sides of the positioning plate, a contact sensor is installed in each mounting hole, and the lower end contact of the contact sensor is located in the mounting hole.
[0013] Two sets of sleeve automatic feeding and installation devices are arranged at intervals in front and back, one of the two sets of sleeve automatic feeding and installation devices is in operation, and the other is in standby;
[0014] The sleeve automatic feeding installation device includes a sleeve automatic feeding vibration plate, a first synchronous belt horizontal driving mechanism, a first horizontal material guide trough, a first left and right sliding frame, a first front and rear sliding frame, a first lifting sliding frame and two first left and right horizontal guide rails. The two first left and right horizontal guide rails are arranged at intervals in front and back and are both arranged along the left and right directions. The first left and right sliding frame is slidably connected to the two first left and right horizontal guide rails. The first synchronous belt horizontal driving mechanism is parallel to the first left and right horizontal guide rails and is located at the front side of the frontmost first left and right horizontal guide rail. The upper half of the synchronous belt of the first synchronous belt horizontal driving mechanism is connected to the front end of the first left and right sliding frame. The first left and right sliding frame is provided with a first front and rear horizontal guide rail and a front and rear cylinder arranged along the front and rear directions. The first front and rear sliding frame is slidably connected to the first front and rear horizontal guide rails. The front and rear cylinders One end of the cylinder body is connected to the first left and right sliding frames, one end of the piston rod of the front and rear cylinders is connected to the first front and rear sliding frames, two first vertical guide rails are provided on the left side of the first front and rear sliding frames in the vertical direction, and two first lifting sliding frames are provided. The two first lifting sliding frames are respectively slidably connected to the two first vertical guide rails, and a first vertical cylinder is provided between the upper part of the first front and rear sliding frames and each first lifting sliding frame. A first clamping manipulator is provided at the bottom of each first lifting sliding frame, and the sleeve automatic feeding vibration plate is arranged on the right side of the two first left and right horizontal guide rails, and the discharge port of the sleeve automatic feeding vibration plate is connected to the right end inlet of the first horizontal material guide trough, the first horizontal material guide trough is located below the first clamping manipulator and is horizontally arranged along the left and right directions, and a first limit sensor is provided at the left end of the first horizontal material guide trough.
[0015] The core automatic feeding and installation device comprises a core automatic feeding vibration plate, a second synchronous belt horizontal driving mechanism, a second horizontal material guide trough, a second left and right sliding frame, a second front and rear sliding frame, a second lifting sliding frame and two second front and rear horizontal guide rails. The two second front and rear horizontal guide rails are arranged at intervals on the left and right and are both horizontally arranged along the front and rear direction. The second front and rear sliding frame is slidably connected to the two second front and rear horizontal guide rails. The second synchronous belt horizontal driving mechanism is parallel to the second front and rear horizontal guide rails and is located on the left side of the leftmost second front and rear horizontal guide rail. The upper half of the synchronous belt of the second synchronous belt horizontal driving mechanism is connected to the left end of the second front and rear sliding frame. The second front and rear sliding frame is provided with second left and right horizontal guide rails and left and right cylinders arranged along the left and right direction. The second left and right sliding frame is slidably connected to the second left and right horizontal guide rails. One end of the cylinder body of the cylinder is connected to the second front and rear sliding frame, one end of the piston rod of the left and right cylinders is connected to the second left and right sliding frame, two second vertical guide rails are provided on the front side of the second left and right sliding frame in the vertical direction, and two second lifting sliding frames are provided. The two second lifting sliding frames are respectively slidably connected to the two second vertical guide rails, and a second vertical cylinder is provided between the upper part of the second left and right sliding frame and each second lifting sliding frame, and a second clamping manipulator is provided at the bottom of each second lifting sliding frame. The core automatic feeding vibration plate is arranged on the rear side of the two second front and rear horizontal guide rails, and the discharge port of the core automatic feeding vibration plate is connected to the rear end inlet of the second horizontal material guide trough, the second horizontal material guide trough is located below the second clamping manipulator and is horizontally arranged along the front and rear direction, and a second limit sensor is provided at the front end of the second horizontal material guide trough.
[0016] The automatic riveting device includes two riveting machines, and the riveting working parts of the two riveting machines are arranged vertically downward. The riveting working parts of the two riveting machines are located directly above the circle where all the hose clamping mechanisms are located. The center of the circle at the center of the turntable and the center angle of the position where the two riveting machines are located are 90°.
[0017] The finished product automatic unloading device includes an unloading guide rail, an unloading synchronous belt horizontal driving mechanism, a slide seat, a horizontal slide plate, a radial main guide rail, a radial support guide rail, a long-distance radial cylinder, a short-distance radial cylinder and a clamping claw cylinder. The unloading guide rail and the unloading synchronous belt horizontal driving mechanism are both arranged on the peripheral bracket along the left and right horizontal directions. The slide seat is slidingly arranged on the unloading guide rail. The synchronous belt of the unloading synchronous belt horizontal driving mechanism is connected to the slide seat. Two radial main guide rails are arranged in parallel. The radial main guide rail is horizontally arranged on the slide seat along the radial direction of the turntable. The horizontal slide plate is slidably connected to the radial main guide rail. An installation groove parallel to the radial main guide rail is opened on the rear side of the middle part of the horizontal slide plate. The long-distance radial cylinder is parallel to the radial main guide rail and is arranged Placed in the mounting groove, one end of the long-distance radial cylinder is connected to the sliding seat, the piston rod of the long-distance radial cylinder is connected to the horizontal slide, and a mounting seat is provided in the middle of the upper surface of the horizontal slide. The short-distance radial cylinder, the radial support guide rail and the long-distance radial cylinder are arranged in parallel, the cylinder body of the short-distance radial cylinder is fixed on the mounting seat, the radial support guide rails are respectively arranged on the left and right sides of the upper surface of the horizontal slide and are symmetrical about the short-distance radial cylinder, the cylinder body of the clamping claw cylinder is slidably connected to the radial support guide rail, and the piston rod of the short-distance radial cylinder is respectively connected to the two clamping claw cylinders through a horizontally arranged linkage plate, and a pair of clamping claws that can be opened or closed left and right for clamping the hose are provided on the rear side of each clamping claw cylinder.
[0018] Adopting the above technical scheme, the present invention is provided with eight hose clamping mechanisms, one of which is adjacent to and directly opposite to the hydraulic hose placement port, which is the hose installation station. Assuming that the hose clamping mechanism is the first hose clamping mechanism, the other seven hose clamping mechanisms are named in a clockwise direction (when looking down at the turntable) as the second hose clamping mechanism, the third hose clamping mechanism, the fourth hose clamping mechanism, the fifth hose clamping mechanism, the sixth hose clamping mechanism, the seventh hose clamping mechanism and the eighth hose clamping mechanism.
[0019] The specific working process of the present invention is as follows: an operator stands in front of the hydraulic hose placement port, and the operator installs the hose on the first hose clamping mechanism. If the hose is long, the hose is directly bent into a U-shape, and both ends of the U-shaped hose are extended upward into the mounting holes on the left and right sides of the positioning plate and contact the contact sensor. If the hose is short and not easy to bend into a U-shape, two shorter hoses can be taken at the same time and extended into the mounting holes on the left and right sides of the positioning plate respectively and contact the contact sensor. Since the upper end of the hose extended into the mounting hole on the left will bend to the right, and the upper end of the hose extended into the mounting hole on the right will bend to the left, the hose on the left is crimped with the arc-shaped correction groove of the correction positioning piece on the left, and the hose on the right is crimped with the arc-shaped correction groove of the correction positioning piece on the right, thereby Ensure that the upper end of the hose remains in a vertical setting; the contact sensor transmits the signal that the U-shaped hose is installed in place to the control system. After receiving the signal that the hose is installed in place, the control system sends a start signal to the left two-way synchronous clamping cylinder assembly and the right two-way synchronous clamping cylinder assembly of the hose clamping mechanism, and the two claws of the left two-way synchronous clamping cylinder assembly move toward each other at the same time, and the two semicircular grooves are combined into a cylindrical hole to clamp the hose on the left. At the same time, the two claws of the right two-way synchronous clamping cylinder assembly move toward each other at the same time, and the two semicircular grooves are combined into a cylindrical hole to clamp the hose on the right; then the telescopic rod of the positioning cylinder retracts upward, pulling the positioning plate upward, and the guide rod fixedly connected to the positioning plate moves upward along the guide sleeve until the mounting hole is separated from the upper end of the hose and the positioning cylinder stops retracting.
[0020] Then the servo motor starts, and the servo motor drives the turntable and the eight hose clamping mechanisms to rotate 45° counterclockwise (when looking down at the turntable) and then stop. The first hose clamping mechanism rotates to the left side of a set of sleeve automatic feeding and installation devices on the front side, and the second hose clamping mechanism rotates to the hose installation station. At this time, the telescopic rod of the positioning cylinder extends downward, driving the positioning plate to move downward to the initial positioning position, and the operator installs the hose on the second hose clamping mechanism (this process is the same as the process of installing the hose on the first hose clamping mechanism above, and will not be repeated); At the same time, the sleeve automatic feeding installation device installs the sleeve onto the upper end of the hose. The specific process of installing the sleeve is as follows: the sleeve automatic feeding vibration plate contains a number of sleeves of the same model, and the sleeve automatic feeding vibration plate conveys the sleeve to the right end of the first horizontal guide groove, and pushes the sleeve to the left through the first horizontal guide groove. After the leftmost sleeve touches the first limit sensor at the left end of the first horizontal guide groove, the first limit sensor sends a signal to the control system that the sleeve is in place, the sleeve automatic feeding vibration plate stops, and then the first synchronous belt drives horizontally. When the first clamping manipulator moves to the top of a sleeve at the far left end, the first vertical cylinder drives the first lifting and lowering sliding frame to move downward along the first vertical guide rail. After the first clamping manipulator clamps the sleeve, the first vertical cylinder drives the first lifting and lowering sliding frame to move upward along the first vertical guide rail. The first synchronous belt horizontal driving mechanism drives the first left and right sliding frames to move left along the two first left and right horizontal guide rails. The front and rear cylinders drive the first front and rear sliding frames to move forward along the first front and rear horizontal guide rail until the first clamping manipulator moves to the top of the hose. The first vertical cylinder drives the first lifting and lowering sliding frame to move downward along the first vertical guide rail. The first clamping manipulator on the first lifting and lowering sliding frame puts the sleeve downward onto the upper end of the hose; then the first clamping manipulator releases the sleeve, repeats the above action, clamps another sleeve and installs it to the other upper end of the hose. When the first clamping manipulator clamps the sleeve in the first horizontal guide groove, takes it away and installs it on the hose, the sleeve automatic feeding vibration plate pushes the sleeves to the left along the first horizontal guide groove for a distance of one sleeve and then stops.
[0021] After the sleeve is installed on the upper end of the hose on the first hose clamping mechanism, the servo motor is started again, and the servo motor drives the turntable and the eight hose clamping mechanisms to rotate 45° counterclockwise (when looking down at the turntable) and then stop. The first hose clamping mechanism rotates to the left side of a set of sleeve automatic feeding and installation devices on the rear side, the second hose clamping mechanism rotates to the left side of a set of sleeve automatic feeding and installation devices on the front side, and the third hose clamping mechanism rotates to the hose installation station. At this time, the telescopic rod of the positioning cylinder extends downward, driving the positioning plate to move downward to the initial positioning position , the operator installs the hose on the third hose clamping mechanism (this process is the same as the process of installing the hose on the first hose clamping mechanism above, and will not be repeated here); since a set of spare sleeve automatic feeding and installation devices on the rear side is temporarily not working, the first hose clamping mechanism does not need to be installed at this station, and a set of sleeve automatic feeding and installation devices on the front side installs the sleeve on the hose clamped by the second hose clamping mechanism. This operation process is the same as the operation process of installing the sleeve on the first hose clamping mechanism, and will not be repeated here.
[0022] Then the servo motor starts again, and the servo motor drives the turntable and the eight hose clamping mechanisms to rotate 45° counterclockwise (when looking down at the turntable) and then stop. The first hose clamping mechanism rotates to the core installation station on the front side of the core automatic feeding and installation device, the second hose clamping mechanism rotates to the left side of a set of sleeve automatic feeding and installation devices on the rear side, the third hose clamping mechanism rotates to the left side of a set of sleeve automatic feeding and installation devices on the front side, and the fourth hose clamping mechanism rotates to the hose installation station; at this time, the telescopic rod of the positioning cylinder extends downward, driving the positioning plate to move downward to At the initial positioning position, the operator installs the hose onto the fourth hose clamping mechanism (this process is the same as the process of installing the hose onto the first hose clamping mechanism above, so it will not be repeated); since the spare set of sleeve automatic feeding and installation devices on the rear side is temporarily not working, the second hose clamping mechanism does not need to be installed at this station, and the front set of sleeve automatic feeding and installation devices install the sleeve on the hose clamped by the third hose clamping mechanism. This operation process is the same as the operation process of installing the sleeve on the first hose clamping mechanism, so it will not be repeated here. The first hose clamping mechanism rotates to the core installation station, and the specific process of the core automatic feeding and installation device installing the core on the first hose clamping mechanism is as follows:
[0023] The core automatic feeding vibration plate contains several cores of the same model. The core automatic feeding vibration plate transports the core to the rear end entrance of the second horizontal guide trough, and pushes the core forward through the second horizontal guide trough. After a core on the front side touches the second limit sensor at the front end of the second horizontal guide trough, the second limit sensor sends a signal to the control system that the core is in place, and the core automatic feeding vibration plate stops. Then the second synchronous belt horizontal driving mechanism, the left and right cylinders and the second vertical cylinder are started. The second synchronous belt horizontal driving mechanism drives the second front and rear sliding frame to move backward along the two second front and rear horizontal guide rails, and the left and right cylinders drive the second left and right sliding frame to move to the left along the second left and right horizontal guide rails. When the second clamping manipulator moves to just above a core at the front end, the second vertical cylinder drives the second clamping manipulator to move to the left. The second lifting slide frame is driven to move downward along the second vertical guide rail. After the second clamping manipulator clamps the core, the second vertical cylinder drives the second lifting slide frame to move upward along the second vertical guide rail. The second synchronous belt horizontal drive mechanism drives the second front and rear slide frame to move rightward along the two second front and rear horizontal guide rails. The left and right cylinders drive the second left and right slide frames to move forward along the second left and right horizontal guide rails until the second clamping manipulator moves to the top of the hose. The second vertical cylinder drives the second lifting slide frame to move downward along the second vertical guide rail. The second clamping manipulator on the second lifting slide frame inserts the core downward into one of the upper ports of the hose. Then the second clamping manipulator releases the core and repeats the above action. The second clamping manipulator clamps another core and inserts it into the other upper port of the hose. In the process of the second clamping manipulator clamping the core in the second horizontal guide trough and removing it to install it on the hose, the core automatic feeding vibration plate pushes several cores forward along the second horizontal guide trough for a distance of one core and then stops.
[0024] Then the servo motor starts again, and the servo motor drives the turntable and the eight hose clamping mechanisms to rotate 45° counterclockwise (when looking down at the turntable) and then stop. The first hose clamping mechanism installed with the sleeve and the core rotates to the bottom of the first riveting press, the second hose clamping mechanism rotates to the core installation station on the front side of the core automatic feeding and installation device, the third hose clamping mechanism rotates to the left side of a set of sleeve automatic feeding and installation devices on the rear side, the fourth hose clamping mechanism rotates to the left side of a set of sleeve automatic feeding and installation devices on the front side, and the fifth hose clamping mechanism rotates to the hose installation station; at this time, the positioning cylinder The telescopic rod extends downward, driving the positioning plate to move downward to the initial positioning position, and the operator installs the hose on the fifth hose clamping mechanism (this process is the same as the process of installing the hose on the first hose clamping mechanism above, and will not be repeated); a set of sleeve automatic feeding and installation devices on the front side installs the sleeve on the hose clamped by the fourth hose clamping mechanism (this operation process is the same as the operation process of installing the sleeve on the first hose clamping mechanism, and will not be repeated here), and since a set of spare sleeve automatic feeding and installation devices on the rear side is temporarily not working, the third hose clamping mechanism does not need to be operated at this station The second hose clamping mechanism rotates to the core installation station, and the core automatic feeding and installation device performs the core installation on the second hose clamping mechanism. The specific process is the same as the process of installing the core on the first hose clamping mechanism, and no further description is given: the first hose clamping mechanism rotates to the riveting station under the first riveting machine, and the first riveting machine performs riveting (buttoning) operations on the core, sleeve and upper end of the hose on the first hose clamping mechanism. The specific riveting process is: the lifting cylinder is started, and the lifting cylinder drives the vertical slide to move upward along the vertical guide rail, and the left bidirectional synchronous The first clamping cylinder assembly and the right bidirectional synchronous clamping cylinder assembly also move upward, which drives the hose, sleeve and core to move upward to the inside of the riveting part at the bottom of the riveting press. The riveting press starts to crimp the core, sleeve and hose end into one piece, and then the lifting cylinder is started again. The lifting cylinder drives the vertical slide to move downward along the vertical guide rail to the initial position, and the left bidirectional synchronous clamping cylinder assembly and the right bidirectional synchronous clamping cylinder assembly fixed on the front side of the vertical slide also move downward, so that the crimped hose, sleeve and core are separated from the riveting press; the first riveting press only crimps one end of the hose.
[0025] Then the servo motor starts again, and the servo motor drives the turntable and the eight hose clamping mechanisms to rotate 45° counterclockwise (when looking down at the turntable) and then stop. The first hose clamping mechanism that buckles the sleeve, core and hose as one rotates to the position between the first riveting machine and the second riveting machine, and the second hose clamping mechanism installed with the sleeve and core rotates to the bottom of the first riveting machine. The third hose clamping mechanism rotates to the core installation station on the front side of the core automatic feeding and installation device, the fourth hose clamping mechanism rotates to the left side of a set of spare sleeve automatic feeding and installation devices on the rear side, the fifth hose clamping mechanism rotates to the left side of a set of sleeve automatic feeding and installation devices on the front side, and the sixth hose clamping mechanism rotates to the hose installation station; at this time, the telescopic rod of the positioning cylinder extends downward, driving the positioning plate to move downward to the initial positioning position, and the operator installs the hose on the sixth hose clamping mechanism (this process is the same as the process of installing the hose on the first hose clamping mechanism above, without 1. The second hose clamping mechanism rotates to the riveting station below the first riveting machine, and the first riveting machine performs riveting (buttoning) operations on the core, sleeve and upper end of the hose on the second hose clamping mechanism. The riveting operation process is the same as the riveting operation of the first riveting machine on the core, sleeve and hose on the second hose clamping mechanism, and the riveting operation process is the same as the riveting operation of the first riveting machine on the core, sleeve and hose on the second hose clamping mechanism, and the riveting operation process is the same as the riveting operation of the first riveting machine on the core, sleeve and hose on the second hose clamping mechanism, and the riveting operation process is the same as the riveting operation of the first riveting machine on the core, sleeve and hose on the second hose clamping mechanism, and the riveting operation process is the same as the riveting operation of the first riveting machine on the core, sleeve and hose on the second hose clamping mechanism, and the riveting operation process is the same as the riveting operation of the first riveting machine on the core, sleeve and hose on the second hose clamping mechanism, and the riveting operation process is the same as the riveting operation of the first riveting machine on the core, sleeve and hose on the second hose clamping mechanism, and the riveting operation process is the same as the riveting operation of the first riveting machine on the core, sleeve and hose on the second hose clamping mechanism, and the riveting operation process is the same as the riveting operation of the first riveting machine on the core, sleeve and hose on the second hose clamping mechanism, and the
[0026] Then the servo motor starts again, and the servo motor drives the turntable and the eight hose clamping mechanisms to rotate 45° counterclockwise (when looking down at the turntable) and then stop. The first hose clamping mechanism with one end of the hose buckled and connected to the sleeve and the core rotates to the bottom of the second riveting machine, and the second hose clamping mechanism with one end of the hose buckled and connected to the sleeve and the core rotates to the position between the first riveting machine and the second riveting machine. The third hose clamping mechanism with the sleeve and the core installed rotates to the right below the first riveting machine, and the fourth hose clamping mechanism rotates to the front of the automatic core feeding and installation device. At the core installation station on the side, the fifth hose clamping mechanism rotates to the left side of a set of spare sleeve automatic feeding and installation devices on the rear side, the sixth hose clamping mechanism rotates to the left side of a set of sleeve automatic feeding and installation devices on the front side, and the seventh hose clamping mechanism rotates to the hose installation station; at this time, the telescopic rod of the positioning cylinder extends downward, driving the positioning plate to move downward to the initial positioning position, and the operator installs the hose on the seventh hose clamping mechanism (this process is the same as the process of installing the hose on the first hose clamping mechanism above, and will not be repeated); a set of sleeve automatic feeding and installation on the front side The device performs a sleeve installation operation on the hose clamped by the sixth hose clamping mechanism (this operation process is the same as the operation process of installing the sleeve on the first hose clamping mechanism, which will not be repeated here). Since a set of sleeve automatic feeding and installation devices for spare at the rear side is temporarily not working, the fifth hose clamping mechanism does not need to perform installation operations on this position; the fourth hose clamping mechanism rotates to the core installation position, and the specific process of the core automatic feeding and installation device installing the core on the fourth hose clamping mechanism is the same as the process of installing the core on the first hose clamping mechanism, which will not be repeated here: the third hose clamping mechanism The tube clamping mechanism rotates to the riveting station under the first riveting machine, and the first riveting machine performs riveting (crocking) operations on the core, sleeve and upper end of the hose on the third hose clamping mechanism. The riveting operation process is the same as the riveting operation of the core, sleeve and hose on the second hose clamping mechanism by the first riveting machine, which will not be repeated here; at the same time, the second riveting machine performs riveting operations on the unriveted ends of the hoses on the first hose clamping mechanism. The riveting operation process is the same as the riveting operation of the core, sleeve and hose on the first hose clamping mechanism by the first riveting machine, which will not be repeated here.
[0027] Then the servo motor starts again, and the servo motor drives the turntable and the eight hose clamping mechanisms to rotate 45° counterclockwise (when looking down at the turntable) and then stop. The first hose clamping mechanism with both ends of the hose pressed and connected to the sleeve and the core rotates to the unloading station on the right rear side of the finished product automatic unloading device. The second hose clamping mechanism with one end of the hose pressed and connected to the sleeve and the core rotates to the bottom of the second riveting machine. The third hose clamping mechanism with one end of the hose pressed and connected to the sleeve and the core rotates to the position between the first riveting machine and the second riveting machine, and the fourth hose clamping mechanism with the sleeve and the core installed is installed. The fifth hose clamping mechanism rotates to the right below the first riveting press, the fifth hose clamping mechanism rotates to the core installation station on the front side of the core automatic feeding and installation device, the sixth hose clamping mechanism rotates to the left side of a set of spare sleeve automatic feeding and installation devices on the rear side, the seventh hose clamping mechanism rotates to the left side of a set of sleeve automatic feeding and installation devices on the front side, and the eighth hose clamping mechanism rotates to the hose installation station; at this time, the telescopic rod of the positioning cylinder extends downward, driving the positioning plate to move downward to the initial positioning position, and the operator installs the hose on the eighth hose clamping mechanism (this process is the same as the above process of installing the hose on the first hose clamping mechanism The process is the same as that of the seventh hose clamping mechanism, which will not be repeated here); a set of sleeve automatic feeding and installation devices on the front side installs the sleeve on the hose clamped by the seventh hose clamping mechanism (this operation process is the same as the operation process of installing the sleeve on the first hose clamping mechanism, which will not be repeated here), and since a set of sleeve automatic feeding and installation devices on the back side are temporarily not working, the sixth hose clamping mechanism does not need to be installed at this station; the fifth hose clamping mechanism rotates to the core installation station, and the specific process of the core automatic feeding and installation device installing the core on the fifth hose clamping mechanism is the same as that of the first hose clamping mechanism installing the core The process is the same and will not be repeated here: the fourth hose clamping mechanism rotates to the riveting station below the first riveting machine, and the first riveting machine performs riveting (buttoning) operations on the core, sleeve and upper end of the hose on the fourth hose clamping mechanism. The riveting operation process is the same as the riveting operation of the core, sleeve and hose on the first hose clamping mechanism by the first riveting machine, and will not be repeated here; the second riveting machine performs riveting operations on the unriveted end of the hose on the second hose clamping mechanism, and the riveting operation process is the same as the riveting operation of the core, sleeve and hose on the first hose clamping mechanism by the first riveting machine, and will not be repeated here;At the same time, the finished product automatic offline device presses both ends of the hose to connect the sleeve and the core to carry out offline conveying. The specific process of offline conveying is as follows: the offline synchronous belt horizontal drive mechanism starts, driving the slide to move to the right along the offline guide rail. When it moves into place, the offline synchronous belt horizontal drive mechanism stops. At this time, the center line of the long-distance radial cylinder is vertically crossed with the center line of the turntable. The long-distance radial cylinder on the slide drives the horizontal slide to move along the radial main guide toward the center of the turntable. When the long-distance radial cylinder extends to the set length, it stops, and the short-distance radial cylinder drives the two clamps through the linkage plate. The cylinder moves toward the center of the turntable along the radial support rail, and the two pairs of clamps set on the rear side of the clamp cylinder clamp the two hoses, and then the clamps of the left and right bidirectional synchronous clamping cylinder assemblies release the clamped hoses, and then the short-distance radial cylinder drives the two clamp cylinders to move to the left, and the long-distance radial cylinder drives the horizontal slide to move to the left. At the same time, the horizontal drive mechanism of the offline synchronous belt drives the slide to move to the left along the offline guide rail, so that the riveted hose products are transported out of the peripheral bracket, and the two pairs of clamps of the clamp cylinder release the two hoses, so that the finished hydraulic hose assembly is offline. ;
[0028] Then the servo motor starts again, and the servo motor drives the turntable and the eight hose clamping mechanisms to rotate 45° counterclockwise (when looking down at the turntable) and then stop. At this time, the turntable has rotated 360°, and the above working process is repeated, that is, the first hose clamping mechanism with no load (no hose clamped) rotates to the hose installation station, and the two ends of the hose are buckled and connected to the sleeve and the core. The second hose clamping mechanism rotates to the unloading station on the right rear side of the finished product automatic unloading device, and one end of the hose is buckled and connected to the sleeve and the core. The third hose clamping mechanism rotates The fourth hose clamping mechanism that is connected to the sleeve and the core by pressing one end of the hose is rotated to the position between the first riveting machine and the second riveting machine. The fifth hose clamping mechanism installed with the sleeve and the core is rotated to the position directly below the first riveting machine. The sixth hose clamping mechanism is rotated to the core installation position in front of the core automatic feeding and installation device. The seventh hose clamping mechanism is rotated to the left side of a spare sleeve automatic feeding and installation device at the rear side. The eighth hose clamping mechanism is rotated to a sleeve automatic feeding and installation device at the front side. The left side is placed; at this time, the telescopic rod of the positioning cylinder extends downward, driving the positioning plate to move downward to the initial positioning position, and the operator installs the hose on the first hose clamping mechanism; a set of sleeve automatic feeding and installation devices on the front side installs the sleeve on the hose clamped by the eighth hose clamping mechanism. Since the spare set of sleeve automatic feeding and installation devices on the rear side is temporarily not working, the seventh hose clamping mechanism does not need to be installed at this position; the sixth hose clamping mechanism rotates to the core installation position to install the core: the fifth hose clamping mechanism The structure rotates to the riveting station below the first riveting machine, and the first riveting machine performs riveting (crocking) operations on the core, sleeve and upper end of the hose on the fifth hose clamping mechanism; the second riveting machine performs riveting operations on the unriveted ends of the hoses on the third hose clamping mechanism; at the same time, the finished product automatic off-line device crimps both ends of the hose on the second hose clamping mechanism to connect the sleeve and the core to perform off-line conveying operations on the finished products. The specific procedures of the off-line conveying operations are the same as the off-line operations of the hoses on the first hose clamping mechanism mentioned above, and will not be repeated.
[0029] Then the turntable rotates and operates in a cycle, so that the hose, sleeve and core are installed, crimped and unloaded continuously.
[0030] The sleeve automatic feeding vibration plate and the core automatic feeding vibration plate are auxiliary feeding equipment for automatic assembly or automatic processing machinery, referred to as the parts feeding device. This is an existing mature technology, and the specific structure will not be described in detail. The working principle of the vibration plate: frequency converter, motor, to achieve automatic conveying.
[0031] The strokes of the cylinder and synchronous belt horizontal drive mechanism in the present invention are limited by sensors or limit switches. After receiving signals from the sensors or limit switches, the control system sends start and stop instructions to the cylinder and synchronous belt horizontal drive mechanism.
[0032] The riveting press is also a commonly used equipment, and the specific structure will not be described in detail.
[0033] Since the models of sleeves are different, a spare sleeve automatic loading and installation device is set up. The two sets of sleeve automatic loading and installation devices respectively contain different sleeves, which makes switching convenient.
[0034] The correction positioning piece serves to straighten the upper end of the hose and prevent it from tilting, making it convenient to insert the sleeve and the core vertically when installing them.
[0035] In summary, the hydraulic hose can realize a series of fully automated operations from pre-installed sleeves, cores, to crimping and offline. The outer bracket is equipped with a safety isolation device to ensure safe operation. The control system is operated by touch screen and automatically controlled to achieve coordinated and synchronous operation of the central rotating workbench, double-claw pneumatic clamping hose clamping mechanism, sleeve automatic feeding and installation device, core automatic feeding and installation device, automatic riveting device and finished product automatic offline device, which can greatly improve the crimping production efficiency of hydraulic hoses, sleeves and cores, and avoid problems such as manual missed crimping and inaccurate crimping dimensions.
[0036] The invention has reasonable design, simple structure, easy manufacturing and simple operation, and provides a fully automated production device for hydraulic hose crimping production. It has strong versatility, greatly improves the efficiency of hydraulic hose crimping operations, ensures crimping quality, has strong adaptability and is easy to promote and apply. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] Figure 1 It is a three-dimensional structural schematic diagram of the present invention;
[0038] Figure 2 is a top view of the present invention;
[0039] Figure 3 It is a three-dimensional structural schematic diagram of the hose clamping mechanism;
[0040] Figure 4 It is a structural schematic diagram of the sleeve automatic feeding and installation device;
[0041] Figure 5 yes Figure 1 An enlarged structural diagram of the automatic core feeding and installation device at A in the middle;
[0042] Figure 6 This is a schematic diagram of the sleeve when it is placed in the first horizontal guide trough;
[0043] Figure 7 This is a schematic diagram of the core when it is placed in the second horizontal guide trough;
[0044] Figure 8 yes Figure 1 The enlarged view of point B in the middle;
[0045] Fig. 9 This is a schematic diagram of the structure of the finished product automatic off-line device;
[0046] Fig.10 It is a planar structural schematic diagram of the hose clamping mechanism;
[0047] Fig.11 yes Figure 8 3D structural diagram of the correction positioning parts. DETAILED DESCRIPTION
[0048] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.
[0049] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0050] In the present invention, unless otherwise clearly specified and limited, the terms "set", "install", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection; it can be a mechanical connection; it can be a direct connection or an indirect connection through an intermediate medium, or it can be a connection of an electrical line or a signal. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0051] In addition, the terms "first", "second", etc. are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0052] like Figure 1-Figure 9As shown, the fully automatic crimping production equipment for the hydraulic hose assembly of the present invention comprises a central bracket and a peripheral bracket 2 arranged outside the central bracket, a hydraulic hose placement opening 3 is arranged on the front side of the peripheral bracket 2, a central rotating worktable rotating in a counterclockwise direction is provided on the central bracket, a plurality of hose clamping mechanisms are evenly arrayed in a circumferential direction on the central rotating worktable, an automatic sleeve feeding and installation device 5, an automatic core feeding and installation device 6, an automatic riveting device 7 and an automatic finished product unloading device 8 are arranged in sequence in a counterclockwise direction on the upper edge of the peripheral bracket 2, and the automatic sleeve feeding and installation device 5 and the automatic finished product unloading device 8 are respectively located on the right and left sides of the hydraulic hose placement opening 3.
[0053] The central rotating worktable includes a turntable 9 and a servo motor 10. The turntable 9 is arranged horizontally, and the rotation of the turntable 9 is connected to the central bracket. The servo motor 10 is arranged on the central bracket below the turntable 9, and the main shaft of the servo motor 10 is coaxially connected to the center of the turntable 9. A top frame is arranged at the upper end of the peripheral bracket 2, and a threading tube 11 arranged along the center line of the turntable 9 is arranged on the top frame. The threading tube 11 is threaded with power lines and control lines.
[0054] Each hose clamping mechanism includes a mounting seat 12 fixed at the outer circumferential edge of the turntable 9, and two vertical guide rails 13 are provided on the outer side of the mounting seat 12 in the vertical direction. The two vertical guide rails 13 are located on the outer side of the turntable 9, and a vertical slide 14 is slidably connected to the two vertical guide rails 13. A lifting cylinder 15 is provided at the bottom of the mounting seat 12 for driving the vertical slide 14 to move up and down along the vertical guide rail 13. A left bidirectional synchronous clamping cylinder assembly 16 and a right bidirectional synchronous clamping cylinder assembly 17 are fixed on the front side of the vertical slide 14; the left bidirectional synchronous clamping cylinder assembly 16 and the right bidirectional synchronous clamping cylinder assembly 17 are both conventional technologies, and the specific structure will not be repeated.
[0055] The left bidirectional synchronous clamping cylinder assembly 16 and the right bidirectional synchronous clamping cylinder assembly 17 have the same structure. Both the left bidirectional synchronous clamping cylinder assembly 16 and the right bidirectional synchronous clamping cylinder assembly 17 include a cylinder body and two left and right opposite claws 18. The left side of the left claw 18 is connected to the left synchronous driving end of the cylinder body, and the right side of the right claw 18 is connected to the right synchronous driving end of the cylinder body. The right end surface of the left claw 18 and the left end surface of the right claw 18 are both vertically provided with semicircular slots. The two semicircular slots are oppositely arranged on the left and right sides, and the hole walls of the semicircular slots are vertically provided with a plurality of anti-slip arc grooves 19 arranged evenly at intervals.
[0056] A correction positioning piece 20 is provided on the top of the claw 18 on the right side of the left bidirectional synchronous clamping cylinder assembly 16 and the left side of the right bidirectional synchronous clamping cylinder assembly 17. The correction positioning piece 20 is a Z-shaped structure. The lower part of the correction positioning piece 20 is fixed to the top of the claw 18 by screws. The left side of the upper left part of the correction positioning piece 20 on the left side and the right side of the upper right part of the correction positioning piece 20 on the right side are both provided with an arc-shaped correction groove 79. The inner diameter of the arc-shaped correction groove 79 is equal to the inner diameter of the semicircular groove hole. The vertical center line of the arc-shaped correction groove 79 on the left side coincides with the vertical center line of the semicircular groove hole on the left end face of the claw 18 on the right side of the left bidirectional synchronous clamping cylinder assembly 16, and the vertical center line of the arc-shaped correction groove 79 on the right side coincides with the vertical center line of the semicircular groove hole on the right end face of the claw 18 on the left side of the right bidirectional synchronous clamping cylinder assembly 17.
[0057] A height positioning mechanism is fixedly arranged on the upper part of the top frame and is located directly above the correction positioning member 20; the height positioning mechanism includes an angle steel connector 21, a positioning cylinder 22, a positioning plate 23, two contact sensors 26, two guide sleeves 24, and two guide rods 25. The angle steel connector 21 is fixedly arranged on the top frame, and the two guide sleeves 24 are arranged at intervals on the left and right and are fixedly arranged on the angle steel connector 21. The center line of the guide sleeve 24 is arranged in the vertical direction, and the guide rod 25 is inserted into the guide sleeve 24 and is slidably connected to the inner wall of the guide sleeve 24. The positioning cylinder 22 Parallel to the guide rod 25 and located between the two guide rods 25, the cylinder body of the positioning cylinder 22 is fixedly connected to the angle steel connector 21 through a horizontally arranged connecting plate, and the positioning plate 23 is horizontally arranged below the angle steel connector 21. The lower end of the telescopic rod of the positioning cylinder 22 passes through the angle steel connector 21 and is connected to the positioning plate 23. The left and right sides of the positioning plate 23 are respectively provided with an installation hole that is transparent from top to bottom. A contact sensor 26 is installed in each installation hole, and the lower end contact of the contact sensor 26 is located in the installation hole.
[0058] Two sets of sleeve automatic feeding and installation devices 5 are arranged at intervals in front and back, one set of the two sets of sleeve automatic feeding and installation devices 5 is in operation, and the other set is in standby;
[0059] The sleeve automatic feeding installation device 5 includes a sleeve automatic feeding vibration plate (not shown), a first synchronous belt horizontal driving mechanism 27 (conventional technology), a first horizontal guide trough 28, a first left and right sliding frame 29, a first front and rear sliding frame 30, a first lifting sliding frame 31 and two first left and right horizontal guide rails 32. The two first left and right horizontal guide rails 32 are arranged at intervals in the front and rear and are both arranged in the left and right direction. The first left and right sliding frame 29 is slidably connected to the two first left and right horizontal guide rails 32. The first synchronous belt horizontal driving mechanism 27 is parallel to the first left and right horizontal guide rails 32 and is located at the front side of the frontmost first left and right horizontal guide rail 32. The upper half of the synchronous belt of the first synchronous belt horizontal driving mechanism 27 is connected to the front end of the first left and right sliding frame 29. The first left and right sliding frame 29 is provided with a first front and rear horizontal guide rail 33 and a front and rear cylinder 34 arranged in the front and rear direction. The first front and rear sliding frame 30 is slidably connected to the first front and rear horizontal guide rail 33. One end of the cylinder body of the rear cylinder 34 is connected to the first left and right sliding frame 29, one end of the piston rod of the front and rear cylinder 34 is connected to the first front and rear sliding frame 30, two first vertical guide rails 35 are provided on the left side of the first front and rear sliding frame 30 in the vertical direction, and two first lifting sliding frames 31 are provided. The two first lifting sliding frames 31 are respectively slidably connected to the two first vertical guide rails 35, and a first vertical cylinder 36 is provided between the upper part of the first front and rear sliding frame 30 and each first lifting sliding frame 31, and each first lifting sliding frame 31 is provided with a first clamping manipulator 37 (existing conventional technology), and the sleeve automatic feeding vibration plate is arranged on the right side of the two first left and right horizontal guide rails 32, and the discharge port of the sleeve automatic feeding vibration plate is connected to the right end inlet of the first horizontal guide trough 28, and the first horizontal guide trough 28 is located below the first clamping manipulator 37 and is horizontally arranged along the left and right direction. A first limit sensor is provided at the left end of the first horizontal guide trough 28.
[0060] The core automatic feeding and installation device 6 includes a core automatic feeding vibration plate, a second synchronous belt horizontal driving mechanism 39, a second horizontal guide trough 40, a second left and right sliding frame 41, a second front and rear sliding frame 42, a second lifting sliding frame 43 and two second front and rear horizontal guide rails 44, the two second front and rear horizontal guide rails 44 are arranged at intervals on the left and right and are both horizontally arranged along the front and rear direction, the second front and rear sliding frame 42 is slidably connected to the two second front and rear horizontal guide rails 44, the second synchronous belt horizontal driving mechanism 39 is parallel to the second front and rear horizontal guide rails 44 and is located on the left side of the leftmost second front and rear horizontal guide rail 44, the upper half of the synchronous belt of the second synchronous belt horizontal driving mechanism 39 is connected to the left end of the second front and rear sliding frame 42, the second front and rear sliding frame 42 is provided with a second left and right horizontal guide rail 45 and a left and right cylinder 46 arranged along the left and right direction, the second left and right sliding frame 41 is slidably connected to the second left and right horizontal guide rails 45, the left and right cylinder 46 One end of the cylinder body is connected to the second front and rear sliding frame 42, one end of the piston rod of the left and right cylinder 46 is connected to the second left and right sliding frame 41, the front side of the second left and right sliding frame 41 is provided with two second vertical guide rails 47 in the vertical direction, and the second lifting sliding frame 43 is provided with two, and the two second lifting sliding frames 43 are respectively slidably connected to the two second vertical guide rails 47, a second vertical cylinder 48 is provided between the upper part of the second left and right sliding frame 41 and each second lifting sliding frame 43, each second lifting sliding frame 43 is provided with a second clamping manipulator 49 (which is an existing mature technology), the core automatic feeding vibration plate is arranged on the rear side of the two second front and rear horizontal guide rails 44, the discharge port of the core automatic feeding vibration plate is connected to the rear end inlet of the second horizontal material guide trough 40, the second horizontal material guide trough 40 is located below the second clamping manipulator 49 and is arranged horizontally along the front and rear direction, and a second limit sensor is provided at the front end of the second horizontal material guide trough 40.
[0061] The automatic riveting device 7 includes two riveting machines, and the riveting working parts of the two riveting machines are arranged vertically downward. The riveting working parts of the two riveting machines are located directly above the circle where all the hose clamping mechanisms are located. The center of the circle of the turntable 9 and the center angle of the position where the two riveting machines are located are 90°.
[0062] The finished product automatic offline device 8 includes an offline guide rail 50, an offline synchronous belt horizontal driving mechanism 51 (existing technology), a slide 52, a horizontal slide 53, a radial main guide rail 54, a radial support guide rail 55, a long-distance radial cylinder 56, a short-distance radial cylinder 57 and a clamping claw cylinder 58. The offline guide rail 50 and the offline synchronous belt horizontal driving mechanism 51 are both arranged on the peripheral bracket 2 along the left and right horizontal directions. The slide 52 is slidably arranged on the offline guide rail 50. The synchronous belt of the offline synchronous belt horizontal driving mechanism 51 is connected to the slide 52. Two radial main guide rails 54 are arranged in parallel. The radial main guide rails 54 are horizontally arranged on the slide 52 along the radial direction of the turntable 9. The horizontal slide 53 is slidably connected to the radial main guide rail 54. A mounting groove 59 parallel to the radial main guide rail 54 is opened on the rear side of the middle part of the horizontal slide 53. The long-distance radial cylinder 56 is parallel to the radial main The guide rail 54 is arranged in the mounting groove 59, one end of the long-distance radial cylinder 56 is connected to the slide 52, the piston rod of the long-distance radial cylinder 56 is connected to the horizontal slide 53, and a mounting seat 12 is provided in the middle of the upper surface of the horizontal slide 53. The short-distance radial cylinder 57, the radial support guide rail 55 and the long-distance radial cylinder 56 are arranged in parallel, the cylinder body of the short-distance radial cylinder 57 is fixed on the mounting seat 12, the radial support guide rails 55 are respectively arranged on the left and right sides of the upper surface of the horizontal slide 53 and are symmetrical about the short-distance radial cylinder 57, the cylinder body of the clamping cylinder 58 is slidably connected to the radial support guide rail 55, and the piston rod of the short-distance radial cylinder 57 is respectively connected to the two clamping cylinders 58 through the horizontally arranged linkage plate 60, and the rear side of each clamping cylinder 58 is provided with a pair of clamping jaws 80 that can be opened or closed left and right for clamping the hose 61.
[0063] There are eight hose clamping mechanisms in the present invention, one of which is adjacent to and facing the hydraulic hose placement port 3, which is the hose installation station. Assuming that the hose clamping mechanism is the first hose clamping mechanism 62, the other seven hose clamping mechanisms are named in a clockwise direction (when looking down at the turntable 9) as the second hose clamping mechanism 63, the third hose clamping mechanism 64, the fourth hose clamping mechanism 65, the fifth hose clamping mechanism 66, the sixth hose clamping mechanism 67, the seventh hose clamping mechanism 68 and the eighth hose clamping mechanism 69.
[0064] The specific working process of the present invention is as follows: the operator stands at the front side of the hydraulic hose placement port 3, and the operator installs the hose 61 on the first hose clamping mechanism 62. If the hose 61 is long, the hose 61 is directly bent into a U shape, and both ends of the U-shaped hose 61 extend upward into the mounting holes on the left and right sides of the positioning plate 23 and contact the contact sensor 26. If the hose 61 is short and not easy to be bent into a U shape, two shorter hoses 61 can be taken at the same time and inserted into the mounting holes on the left and right sides of the positioning plate 23 respectively and contact the contact sensor 26. Since the upper end of the hose 61 inserted into the mounting hole on the left will bend to the right, and the upper end of the hose 61 inserted into the mounting hole on the right will bend to the left, the hose 61 on the left is crimped with the arc-shaped correction groove 79 of the left correction positioning piece 20, and the hose 61 on the right is crimped with the arc-shaped correction groove 79 of the right correction positioning piece 20, And ensure that the upper end of the hose 61 remains in a vertical setting; the contact sensor 26 transmits the signal that the U-shaped hose 61 is installed in place to the control system. After the control system receives the signal that the hose 61 is installed in place, it sends a start signal to the left bidirectional synchronous clamping cylinder assembly 16 and the right bidirectional synchronous clamping cylinder assembly 17 of the hose clamping mechanism, and the two claws 18 of the left bidirectional synchronous clamping cylinder assembly 16 move toward each other at the same time, and the two semicircular grooves are combined into a cylindrical hole to clamp the hose 61 on the left side. At the same time, the two claws 18 of the right bidirectional synchronous clamping cylinder assembly 17 move toward each other at the same time, and the two semicircular grooves are combined into a cylindrical hole to clamp the hose 61 on the right side; then the telescopic rod of the positioning cylinder 22 shrinks upward, pulling the positioning plate 23 upward, and the guide rod 25 fixedly connected to the positioning plate 23 moves upward along the guide sleeve 24 until the mounting hole is separated from the upper end of the hose 61 and the positioning cylinder 22 stops shrinking.
[0065] Then the servo motor 10 starts, and the servo motor 10 drives the turntable 9 and the eight hose clamping mechanisms to rotate 45° counterclockwise (when looking down at the turntable 9) and then stop. The first hose clamping mechanism 62 rotates to the left side of a set of sleeve automatic feeding and installation devices 5 on the front side, and the second hose clamping mechanism 63 rotates to the hose installation station. At this time, the telescopic rod of the positioning cylinder 22 extends downward, driving the positioning plate 23 to move downward to the initial positioning position, and the operator installs the hose 61 on the second hose clamping mechanism 63 (this process is the same as the process of installing the hose 61 on the first hose clamping mechanism 62 above, and will not be repeated); at the same time, the sleeve automatically The feeding installation device 5 installs the sleeve 70 onto the upper end of the hose 61. The specific process of installing the sleeve 70 is as follows: a plurality of sleeves 70 of the same model are contained in the sleeve automatic feeding vibration plate, and the sleeve automatic feeding vibration plate conveys the sleeve 70 to the right end of the first horizontal guide groove 28, and pushes the sleeve 70 to the left through the first horizontal guide groove 28. After the leftmost sleeve 70 touches the first limit sensor at the left end of the first horizontal guide groove 28, the first limit sensor sends a signal to the control system that the sleeve 70 is in place, and the sleeve automatic feeding vibration plate stops, and then the first synchronous belt horizontal drive mechanism 27, the front and rear cylinders 34 and the first vertical When the air cylinder 36 is started, the first synchronous belt horizontal driving mechanism 27 drives the first left and right sliding frame 29 to move rightward along the two first left and right horizontal guide rails 32, and the front and rear air cylinders 34 drive the first front and rear sliding frame 30 to move backward along the first front and rear horizontal guide rails 33. When the first clamping manipulator 37 moves to the top of the leftmost sleeve 70, the first vertical cylinder 36 drives the first lifting sliding frame 31 to move downward along the first vertical guide rail 35. After the first clamping manipulator 37 clamps the sleeve 70, the first vertical cylinder 36 drives the first lifting sliding frame 31 to move upward along the first vertical guide rail 35. The first synchronous belt horizontal driving mechanism The first left and right slide frame 29 is driven by the front and rear cylinders 34 to move forward along the first front and rear horizontal guide rails 33 until the first clamping manipulator 37 moves to the top of the rubber tube 61. The first vertical cylinder 36 drives the first lifting slide frame 31 to move downward along the first vertical guide rails 35. The first clamping manipulator 37 on the first lifting slide frame 31 sets the sleeve 70 downward onto the upper end of the rubber tube 61. Then the first clamping manipulator 37 releases the sleeve 70 and repeats the above action to clamp another sleeve 70 and install it on the other upper end of the rubber tube 61. In the process of the first clamping manipulator 37 clamping the sleeve 70 in the first horizontal guide groove 28 and removing it to install it on the rubber tube 61, the sleeve automatic feeding vibration plate pushes a plurality of sleeves 70 to the left along the first horizontal guide groove 28 by a distance of one sleeve 70 and then stops.
[0066] After the sleeve 70 is installed on the upper end of the hose 61, the servo motor 10 is started again, and the servo motor 10 drives the turntable 9 and the eight hose clamping mechanisms to rotate 45° counterclockwise (when looking down at the turntable 9) and then stop. The first hose clamping mechanism 62 rotates to the left side of a set of sleeve automatic feeding and installation devices 5 on the rear side, the second hose clamping mechanism 63 rotates to the left side of a set of sleeve automatic feeding and installation devices 5 on the front side, and the third hose clamping mechanism 64 rotates to the hose installation station. At this time, the telescopic rod of the positioning cylinder 22 extends downward, driving the positioning plate 23 to move downward to the initial positioning position, and the operator Install the hose 61 onto the third hose clamping mechanism 64 (this process is the same as the process of installing the hose 61 onto the first hose clamping mechanism 62 above, and will not be repeated here); since the spare set of sleeve automatic feeding and installation devices 5 on the rear side is temporarily not working, the first hose clamping mechanism 62 does not need to be installed at this work station, and the front set of sleeve automatic feeding and installation devices 5 installs the sleeve 70 on the hose 61 clamped by the second hose clamping mechanism 63. This operation process is the same as the operation process of installing the sleeve 70 on the first hose clamping mechanism 62, and will not be repeated here.
[0067] Then the servo motor 10 is started again, and the servo motor 10 drives the turntable 9 and the eight hose clamping mechanisms to rotate 45° counterclockwise (when looking down at the turntable 9) and then stop, the first hose clamping mechanism 62 rotates to the core installation station on the front side of the core automatic feeding and installation device 6, the second hose clamping mechanism 63 rotates to the left side of a set of sleeve automatic feeding and installation devices 5 on the rear side, the third hose clamping mechanism 64 rotates to the left side of a set of sleeve automatic feeding and installation devices 5 on the front side, and the fourth hose clamping mechanism 65 rotates to the hose installation station; at this time, the telescopic rod of the positioning cylinder 22 extends downward, driving the positioning plate 23 to move downward At the initial positioning position, the operator installs the hose 61 onto the fourth hose clamping mechanism 65 (this process is the same as the process of installing the hose 61 onto the first hose clamping mechanism 62, and will not be repeated); since the spare set of sleeve automatic feeding and installation devices 5 on the rear side is temporarily not working, the second hose clamping mechanism 63 does not need to be installed at this station, and the front set of sleeve automatic feeding and installation devices 5 install the sleeve 70 on the hose 61 clamped by the third hose clamping mechanism 64. This operation process is the same as the operation process of installing the sleeve 70 on the first hose clamping mechanism 62, and will not be repeated here. The first hose clamping mechanism 62 rotates to the core installation station, and the specific process of the core automatic feeding and installation device 6 installing the core 71 on the first hose clamping mechanism 62 is as follows:
[0068] The core automatic feeding vibration plate contains a number of cores 71 of the same model, and the core automatic feeding vibration plate transports the core 71 to the rear end entrance of the second horizontal guide trough 40, and pushes the core 71 forward through the second horizontal guide trough 40. After a core 71 at the front side touches the second limit sensor at the front end of the second horizontal guide trough 40, the second limit sensor sends a signal to the control system that the core 71 is in place, and the core automatic feeding vibration plate stops. Then the second synchronous belt horizontal drive mechanism 39, the left and right cylinders 46 and the second vertical cylinder 48 are started, and the second synchronous belt horizontal drive mechanism 39 drives the second front and rear sliding frame 42 to move backward along the two second front and rear horizontal guide rails 44, and the left and right cylinders 46 drive the second left and right sliding frame 41 to move left along the second left and right horizontal guide rails 45. When the second clamping manipulator 49 moves to just above a core 71 at the front end, the second vertical cylinder 48 drives the second lifting and sliding The frame 43 moves downward along the second vertical guide rail 47. After the second clamping manipulator 49 clamps the core 71, the second vertical cylinder 48 drives the second lifting slide frame 43 to move upward along the second vertical guide rail 47. The second synchronous belt horizontal drive mechanism 39 drives the second front and rear slide frame 42 to move rightward along the two second front and rear horizontal guide rails 44. The left and right cylinders 46 drive the second left and right slide frames 41 to move forward along the second left and right horizontal guide rails 45 until the second clamping manipulator 49 moves to the top of the hose 61. The second vertical cylinder 48 drives the second lifting slide frame 43 to move downward along the second vertical guide rail 47. The second clamping manipulator 49 on the second lifting slide frame 43 inserts the core 71 downward into one of the upper ports of the hose 61; then the second clamping manipulator 49 releases the core 71, and repeats the above actions. The second clamping manipulator 49 clamps another core 71 and inserts it into the other upper port of the hose 61. When the second clamping robot 49 clamps the core 71 in the second horizontal guide trough 40 and removes it to install it into the hose 61, the core automatic feeding vibration plate pushes the cores 71 forward along the second horizontal guide trough 40 by a distance of one core 71 and then stops.
[0069] Then the servo motor 10 is started again, and the servo motor 10 drives the turntable 9 and the eight hose clamping mechanisms to rotate 45° counterclockwise (when looking down at the turntable 9) and then stop, and the first hose clamping mechanism 62 installed with the sleeve 70 and the core 71 rotates to the bottom of the first riveting machine, the second hose clamping mechanism 63 rotates to the core 71 installation station on the front side of the core automatic feeding and installation device 6, the third hose clamping mechanism 64 rotates to the left side of a set of sleeve automatic feeding and installation devices 5 on the rear side, the fourth hose clamping mechanism 65 rotates to the left side of a set of sleeve automatic feeding and installation devices 5 on the front side, and the fifth hose clamping mechanism 66 rotates to the hose installation station; at this time, the telescopic rod of the positioning cylinder 22 The positioning plate 23 extends downward, driving the positioning plate 23 to move downward to the initial positioning position, and the operator installs the hose 61 onto the fifth hose clamping mechanism 66 (this process is the same as the process of installing the hose 61 onto the first hose clamping mechanism 62, and will not be repeated); a set of sleeve automatic feeding and installation devices 5 on the front side install the sleeve 70 on the hose 61 clamped by the fourth hose clamping mechanism 65 (this operation process is the same as the operation process of installing the sleeve 70 on the first hose clamping mechanism 62, and will not be repeated here), and since the set of sleeve automatic feeding and installation devices 5 on the back side are temporarily not working, the third hose clamping mechanism 64 does not need to be installed at this station; the second The hose clamping mechanism 63 rotates to the installation position of the core 71. The specific process of the core automatic feeding and installation device 6 installing the core 71 on the second hose clamping mechanism 63 is the same as the process of installing the core 71 on the first hose clamping mechanism 62, and no further description is given: the first hose clamping mechanism 62 rotates to the riveting position below the first riveting machine, and the first riveting machine performs riveting (buttoning) operations on the core 71, sleeve 70 and upper end of the hose 61 on the first hose clamping mechanism 62. The specific riveting process is: the lifting cylinder 15 is started, and the lifting cylinder 15 drives the vertical slide 14 to move upward along the vertical guide rail 13. The left bidirectional synchronous clamping cylinder assembly fixed on the front side of the vertical slide 14 16 and the right two-way synchronous clamping cylinder assembly 17 also move upward, thereby driving the hose 61, sleeve 70 and core 71 to move upward to the inside of the riveting part at the bottom of the riveting press. The riveting press is started to crimp the core 71, sleeve 70 and the end of the hose 61 into one, and then the lifting cylinder 15 is started again. The lifting cylinder 15 drives the vertical slide 14 to move downward along the vertical guide rail 13 to the initial position, and the left two-way synchronous clamping cylinder assembly 16 and the right two-way synchronous clamping cylinder assembly 17 fixed on the front side of the vertical slide 14 also move downward, so that the crimped hose 61, sleeve 70 and core 71 are separated from the riveting press; the first riveting press only crimps one end of the hose 61.
[0070] Then the servo motor 10 is started again, and the servo motor 10 drives the turntable 9 and the eight hose clamping mechanisms to rotate 45° counterclockwise (when looking down at the turntable 9) and then stop. The first hose clamping mechanism 62, which is a combination of the sleeve 70, the core 71 and the hose 61, rotates to a position between the first riveting press and the second riveting press. The second hose clamping mechanism 63, which is equipped with the sleeve 70 and the core 71, rotates to the position directly below the first riveting press. The third hose clamping mechanism 64 rotates to the core 71 installation position on the front side of the core automatic feeding and installation device 6. , the fourth hose clamping mechanism 65 rotates to the left side of a set of spare sleeve automatic feeding and installation devices 5 at the rear side, the fifth hose clamping mechanism 66 rotates to the left side of a set of sleeve automatic feeding and installation devices 5 at the front side, and the sixth hose clamping mechanism 67 rotates to the hose installation station; at this time, the telescopic rod of the positioning cylinder 22 extends downward, driving the positioning plate 23 to move downward to the initial positioning position, and the operator installs the hose 61 on the sixth hose clamping mechanism 67 (this process is the same as the process of installing the hose 61 on the first hose clamping mechanism 62 above, without The sleeve automatic feeding and installation device 5 on the front side installs the sleeve 70 on the hose 61 clamped by the fifth hose clamping mechanism 66 (the operation process is the same as the operation process of installing the sleeve 70 on the first hose clamping mechanism 62, which will not be repeated here). Since the spare sleeve automatic feeding and installation device 5 on the rear side is temporarily not working, the fourth hose clamping mechanism 65 does not need to be installed at this station; the third hose clamping mechanism 64 rotates to the core 71 installation station, and the core automatic feeding and installation device 6 installs the sleeve 70 on the first hose clamping mechanism 62. The specific process of installing the core 71 by the third hose clamping mechanism 64 is the same as the process of installing the core 71 by the first hose clamping mechanism 62, which will not be repeated here: the second hose clamping mechanism 63 rotates to the riveting station under the first riveting machine, and the first riveting machine performs riveting (buttoning) operations on the core 71, sleeve 70 and the upper end of the hose 61 on the second hose clamping mechanism 63. The riveting operation process is the same as the riveting operation of the first riveting machine on the core 71, sleeve 70 and hose 61 on the second hose clamping mechanism 63, which will not be repeated here.
[0071] Then the servo motor 10 is started again, and the servo motor 10 drives the turntable 9 and the eight hose clamping mechanisms to rotate 45° counterclockwise (when looking down at the turntable 9) and then stop. The first hose clamping mechanism 62, on which one end of the hose 61 is buckled and connected to the sleeve 70 and the core 71, rotates to the bottom of the second riveting press, and the second hose clamping mechanism 63, on which one end of the hose 61 is buckled and connected to the sleeve 70 and the core 71, rotates to a position between the first riveting press and the second riveting press, and the third hose clamping mechanism 64, on which the sleeve 70 and the core 71 are installed, rotates to the position directly below the first riveting press, and the fourth hose clamping mechanism 65 rotates to the position where the core is automatically loaded and installed. At the installation position of the core 71 on the front side of the device 6, the fifth hose clamping mechanism 66 rotates to the left side of a set of spare sleeve automatic feeding installation devices 5 on the rear side, the sixth hose clamping mechanism 67 rotates to the left side of a set of sleeve automatic feeding installation devices 5 on the front side, and the seventh hose clamping mechanism 68 rotates to the hose installation position; at this time, the telescopic rod of the positioning cylinder 22 extends downward, driving the positioning plate 23 to move downward to the initial positioning position, and the operator installs the hose 61 on the seventh hose clamping mechanism 68 (this process is the same as the process of installing the hose 61 on the first hose clamping mechanism 62 above, and will not be repeated); a set of sleeve automatic feeding installation devices on the front side 5 The sleeve 70 is installed on the hose 61 clamped by the sixth hose clamping mechanism 67 (the operation process is the same as the operation process of installing the sleeve 70 on the first hose clamping mechanism 62, which will not be repeated here). Since the spare sleeve automatic feeding and installation device 5 on the rear side is temporarily not working, the fifth hose clamping mechanism 66 does not need to be installed at this position; the fourth hose clamping mechanism 65 rotates to the core 71 installation position, and the specific process of the core automatic feeding and installation device 6 installing the core 71 on the fourth hose clamping mechanism 65 is the same as the process of installing the core 71 on the first hose clamping mechanism 62, which will not be repeated here: the third hose clamping mechanism 66 The mechanism 64 rotates to the riveting station below the first riveting machine, and the first riveting machine performs riveting (buttoning) operations on the core 71, sleeve 70 and upper end of the hose 61 on the third hose clamping mechanism 64. The riveting operation process is the same as the riveting operation of the core 71, sleeve 70 and hose 61 on the second hose clamping mechanism 63 by the first riveting machine, and will not be repeated here; at the same time, the second riveting machine performs riveting operations on the unriveted end of the hose 61 on the first hose clamping mechanism 62. The riveting operation process is the same as the riveting operation of the core 71, sleeve 70 and hose 61 on the first hose clamping mechanism 62 by the first riveting machine, and will not be repeated here.
[0072] Then the servo motor 10 is started again, and the servo motor 10 drives the turntable 9 and the eight hose clamping mechanisms to rotate 45° counterclockwise (when looking down at the turntable 9) and then stop. The first hose clamping mechanism 62, on which both ends of the hose 61 are buckled and connected to the sleeve 70 and the core 71, rotates to the unloading station on the right rear side of the finished product automatic unloading device 8, and the second hose clamping mechanism 63, on which one end of the hose 61 is buckled and connected to the sleeve 70 and the core 71, rotates to the bottom of the second riveting press, and the third hose clamping mechanism 64, on which one end of the hose 61 is buckled and connected to the sleeve 70 and the core 71, rotates to the position between the first riveting press and the second riveting press, and the fourth hose clamping mechanism 64, on which the sleeve 70 and the core 71 are installed, rotates to the position between the first riveting press and the second riveting press. The hose clamping mechanism 65 rotates to the bottom of the first riveting press, the fifth hose clamping mechanism 66 rotates to the core 71 installation position on the front side of the core automatic feeding and installation device 6, the sixth hose clamping mechanism 67 rotates to the left side of a set of spare sleeve automatic feeding and installation devices 5 on the rear side, the seventh hose clamping mechanism 68 rotates to the left side of a set of sleeve automatic feeding and installation devices 5 on the front side, and the eighth hose clamping mechanism 69 rotates to the hose installation position; at this time, the telescopic rod of the positioning cylinder 22 extends downward, driving the positioning plate 23 to move downward to the initial positioning position, and the operator installs the hose 61 on the eighth hose clamping mechanism 69 (this process is the same as the above installation of the hose 61 on the first hose clamping mechanism 6 2, no further description is given); a set of sleeve automatic feeding and installation devices 5 on the front side installs the sleeve 70 on the hose 61 clamped by the seventh hose clamping mechanism 68 (this operation process is the same as the operation process of installing the sleeve 70 on the first hose clamping mechanism 62, no further description is given here), since a set of sleeve automatic feeding and installation devices 5 on the back side are temporarily not working, the sixth hose clamping mechanism 67 does not need to be installed at this station; the fifth hose clamping mechanism 66 rotates to the core 71 installation station, and the specific process of the core automatic feeding and installation device 6 installing the core 71 on the fifth hose clamping mechanism 66 is the same as the process of installing the core 71 on the first hose clamping mechanism 62 The process is the same and will not be repeated here: the fourth hose clamping mechanism 65 rotates to the riveting station below the first riveting machine, and the first riveting machine performs riveting (buttoning) operation on the core 71, sleeve 70 and upper end of the hose 61 on the fourth hose clamping mechanism 65. The riveting operation process is the same as the riveting operation of the core 71, sleeve 70 and hose 61 on the first hose clamping mechanism 62 by the first riveting machine, and will not be repeated here; the second riveting machine performs riveting operation on the unriveted end of the hose 61 on the second hose clamping mechanism 63, and the riveting operation process is the same as the riveting operation of the core 71, sleeve 70 and hose 61 on the first hose clamping mechanism 62 by the first riveting machine, and will not be repeated here;At the same time, the finished product automatic offline device 8 presses both ends of the hose 61 to connect the upper sleeve 70 and the core 71 to carry out offline conveying operation. The specific process of offline conveying operation is as follows: the offline synchronous belt horizontal driving mechanism 51 is started, driving the slide 52 to move to the right along the offline guide rail 50. When it moves into place, the offline synchronous belt horizontal driving mechanism 51 stops. At this time, the center line of the long-distance radial cylinder 56 is vertically intersected with the center line of the turntable 9. The long-distance radial cylinder 56 on the slide 52 drives the horizontal slide 53 to move along the radial main guide rail 54 toward the center of the turntable 9. When the long-distance radial cylinder 56 is extended to the set length, it stops, and the short-distance radial cylinder 57 drives the two clamping claw cylinders 5 through the linkage plate 60. 8 moves along the radial support guide rail 55 toward the center of the turntable 9, and the two pairs of clamping claws 80 set on the rear side of the clamping claw cylinder 58 clamp the two rubber hoses 61, and then the clamping claws 18 of the left two-way synchronous clamping cylinder assembly 16 and the right two-way synchronous clamping cylinder assembly 17 release the rubber hoses 61 that have been clamped, and then the short-distance radial cylinder 57 drives the two clamping claw cylinders 58 to move left, and the long-distance radial cylinder 56 drives the horizontal slide 53 to move left, and at the same time, the offline synchronous belt horizontal driving mechanism 51 drives the slide 52 to move left along the offline guide rail 50, so that the riveted rubber hose 61 finished product is transported out of the peripheral bracket 2, and the two pairs of clamping claws 80 of the clamping claw cylinder 58 release the two rubber hoses 61, so that the rubber hose 61 finished product is offline. ;
[0073] Then the servo motor 10 is started again, and the servo motor 10 drives the turntable 9 and the eight hose clamping mechanisms to rotate 45° counterclockwise (when looking down at the turntable 9) and then stop. At this time, the turntable 9 has rotated 360°, and the above working process is repeated, that is, the first hose clamping mechanism 62 with no load (no hose 61 clamped) rotates to the hose installation station, and the second hose clamping mechanism 63 with both ends of the hose 61 buckled and connected to the sleeve 70 and the core 71 rotates to the unloading station on the right rear side of the finished product automatic unloading device 8, and one end of the hose 61 is buckled and connected to the third hose clamping mechanism 64 of the sleeve 70 and the core 71 The fourth hose clamping mechanism 65 rotates to the bottom of the second riveting press, one end of the hose 61 is buckled and connected to the sleeve 70 and the core 71, and rotates to the position between the first riveting press and the second riveting press. The fifth hose clamping mechanism 66 installed with the sleeve 70 and the core 71 rotates to the bottom of the first riveting press. The sixth hose clamping mechanism 67 rotates to the core 71 installation position on the front side of the core automatic feeding and installation device 6, the seventh hose clamping mechanism 68 rotates to the left side of a set of spare sleeve automatic feeding and installation devices 5 on the rear side, and the eighth hose clamping mechanism 69 rotates to a set of sleeve automatic feeding and installation devices on the front side. 5 is placed on the left side; at this time, the telescopic rod of the positioning cylinder 22 extends downward, driving the positioning plate 23 to move downward to the initial positioning position, and the operator installs the hose 61 on the first hose clamping mechanism 62; a set of sleeve automatic feeding and installation devices 5 on the front side install the sleeve 70 on the hose 61 clamped by the eighth hose clamping mechanism 69. Since a set of sleeve automatic feeding and installation devices 5 on the rear side are temporarily not working, the seventh hose clamping mechanism 68 does not need to be installed at this station; the sixth hose clamping mechanism 67 rotates to the core 71 installation station to install the core 71: the fifth hose clamping mechanism 66 rotates to the riveting station below the first riveting machine, and the first riveting machine performs riveting (buttoning) operations on the core 71, the sleeve 70 and the upper end of the hose 61 on the fifth hose clamping mechanism 66; the second riveting machine performs riveting operations on the unriveted ends of the hose 61 on the third hose clamping mechanism 64; at the same time, the finished product automatic offline device 8 buckles and connects the two ends of the hose 61 on the second hose clamping mechanism 63 with the sleeve 70 and the core 71 for offline conveying operations. The specific process of the offline conveying operation is the same as the offline operation of the hose 61 on the first hose clamping mechanism 62 mentioned above, and will not be repeated.
[0074] Then rotating disk 9 rotates and cycles. So just rubber hose 61, sleeve 70 and core 71 are constantly installed, buckled and put off the line operation.
[0075] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. Hydraulic hose assembly fully automatic crimping production equipment, characterized by: It comprises a central support and a peripheral support arranged outside the central support, a hydraulic hose placement opening is arranged on the front side of the peripheral support, a central rotating worktable rotating in a clockwise or counterclockwise direction is arranged on the central support, a plurality of hose clamping mechanisms are arranged in a uniform array along the circumferential direction on the central rotating worktable, an automatic sleeve feeding and installation device, an automatic core feeding and installation device, an automatic riveting and pressing device and an automatic finished product unloading device are arranged in sequence in a clockwise or counterclockwise direction on the upper edge of the peripheral support, and the automatic sleeve feeding and installation device and the automatic finished product unloading device are respectively located on the left and right sides of the hydraulic hose placement opening; The central rotating worktable includes a turntable and a servo motor. The turntable is horizontally arranged and rotatably connected to the central bracket. The servo motor is arranged on the central bracket below the turntable. The main shaft of the servo motor is coaxially connected to the center of the turntable. A top frame is arranged at the upper end of the peripheral bracket. A threading tube is arranged along the center line of the turntable on the top frame. A power line and a control line are passed through the threading tube. Each hose clamping mechanism includes a mounting seat fixedly arranged at the outer circumferential edge of the turntable, two vertical guide rails are arranged on the outer side of the mounting seat in the vertical direction, the two vertical guide rails are located on the outer side of the turntable, a vertical slide is slidably connected to the two vertical guide rails, a lifting cylinder for driving the vertical slide to move up and down along the vertical guide rail is arranged at the bottom of the mounting seat, and a left bidirectional synchronous clamping cylinder assembly and a right bidirectional synchronous clamping cylinder assembly are fixedly arranged on the front side of the vertical slide; The left bidirectional synchronous clamping cylinder assembly and the right bidirectional synchronous clamping cylinder assembly have the same structure. Both the left bidirectional synchronous clamping cylinder assembly and the right bidirectional synchronous clamping cylinder assembly include a cylinder body and two left and right opposite claws. The left side of the left claw is connected to the left synchronous driving end of the cylinder body, and the right side of the right claw is connected to the right synchronous driving end of the cylinder body. The right end surface of the left claw and the left end surface of the right claw are both vertically provided with semicircular slots. The two semicircular slots are oppositely arranged left and right. The hole walls of the semicircular slots are vertically provided with a plurality of anti-slip arc grooves that are evenly spaced. The tops of the clamping jaws of the left bidirectional synchronous clamping cylinder assembly and the right bidirectional synchronous clamping cylinder assembly are both provided with correction positioning pieces, the correction positioning pieces are of a Z-shaped structure, the lower part of the correction positioning pieces is fixed to the top of the clamping jaws by screws, the upper left side of the left correction positioning piece and the upper right side of the right correction positioning piece are both provided with arc-shaped correction grooves, the inner diameter of the arc-shaped correction groove is equal to the inner diameter of the semicircular groove hole, the vertical center line of the arc-shaped correction groove on the left side coincides with the vertical center line of the semicircular groove hole on the left end face of the clamping jaw on the right side of the left bidirectional synchronous clamping cylinder assembly, and the vertical center line of the arc-shaped correction groove on the right side coincides with the vertical center line of the semicircular groove hole on the right end face of the clamping jaw on the left side of the right bidirectional synchronous clamping cylinder assembly; A height positioning mechanism is fixedly provided on the upper part of the top frame and is located directly above the correction positioning piece; the height positioning mechanism includes an angle steel connector, a positioning cylinder, a positioning plate, two contact sensors, two guide sleeves, and two guide rods. The angle steel connector is fixedly provided on the top frame, and the two guide sleeves are arranged at intervals on the left and right and are fixedly provided on the angle steel connector. The center line of the guide sleeve is provided in the vertical direction, and the guide rod is inserted in the guide sleeve and is slidably connected to the inner wall of the guide sleeve. The positioning cylinder is parallel to the guide rod and is located between the two guide rods. The cylinder body of the positioning cylinder is fixedly connected to the angle steel connector through a horizontally provided connecting plate, and the positioning plate is horizontally provided below the angle steel connector. The lower end of the telescopic rod of the positioning cylinder passes through the angle steel connector and is connected to the positioning plate. A mounting hole that is transparent from top to bottom is respectively provided on the left and right sides of the positioning plate, and a contact sensor is installed in each mounting hole, and the lower end contact of the contact sensor is located in the mounting hole; The core automatic feeding and installation device comprises a core automatic feeding vibration plate, a second synchronous belt horizontal driving mechanism, a second horizontal material guide trough, a second left and right sliding frame, a second front and rear sliding frame, a second lifting sliding frame and two second front and rear horizontal guide rails. The two second front and rear horizontal guide rails are arranged at intervals on the left and right and are both horizontally arranged along the front and rear direction. The second front and rear sliding frame is slidably connected to the two second front and rear horizontal guide rails. The second synchronous belt horizontal driving mechanism is parallel to the second front and rear horizontal guide rails and is located on the left side of the leftmost second front and rear horizontal guide rail. The upper half of the synchronous belt of the second synchronous belt horizontal driving mechanism is connected to the left end of the second front and rear sliding frame. The second front and rear sliding frame is provided with second left and right horizontal guide rails and left and right cylinders arranged along the left and right direction. The second left and right sliding frame is slidably connected to the second left and right horizontal guide rails. One end of the cylinder body of the cylinder is connected to the second front and rear sliding frame, one end of the piston rod of the left and right cylinder is connected to the second left and right sliding frame, two second vertical guide rails are provided on the front side of the second left and right sliding frame in the vertical direction, and two second lifting sliding frames are provided. The two second lifting sliding frames are respectively slidably connected to the two second vertical guide rails, and a second vertical cylinder is provided between the upper part of the second left and right sliding frame and each second lifting sliding frame, and a second clamping manipulator is provided at the bottom of each second lifting sliding frame. The core automatic feeding vibration plate is arranged on the rear side of the two second front and rear horizontal guide rails, and the discharge port of the core automatic feeding vibration plate is connected to the rear end inlet of the second horizontal material guide trough, the second horizontal material guide trough is located below the second clamping manipulator and is horizontally arranged along the front and rear direction, and a second limit sensor is provided at the front end of the second horizontal material guide trough.
2. The fully automatic crimping production equipment for hydraulic hose assemblies according to claim 1 is characterized by: Two sets of sleeve automatic feeding and installation devices are arranged at intervals in front and back, one of the two sets of sleeve automatic feeding and installation devices is in operation, and the other is in standby; The sleeve automatic feeding installation device includes a sleeve automatic feeding vibration plate, a first synchronous belt horizontal driving mechanism, a first horizontal material guide trough, a first left and right sliding frame, a first front and rear sliding frame, a first lifting sliding frame and two first left and right horizontal guide rails. The two first left and right horizontal guide rails are arranged at intervals in front and back and are both arranged along the left and right directions. The first left and right sliding frame is slidably connected to the two first left and right horizontal guide rails. The first synchronous belt horizontal driving mechanism is parallel to the first left and right horizontal guide rails and is located at the front side of the frontmost first left and right horizontal guide rail. The upper half of the synchronous belt of the first synchronous belt horizontal driving mechanism is connected to the front end of the first left and right sliding frame. The first left and right sliding frame is provided with a first front and rear horizontal guide rail and a front and rear cylinder arranged along the front and rear directions. The first front and rear sliding frame is slidably connected to the first front and rear horizontal guide rails. The front and rear cylinders One end of the cylinder body is connected to the first left and right sliding frames, one end of the piston rod of the front and rear cylinders is connected to the first front and rear sliding frames, two first vertical guide rails are provided on the left side of the first front and rear sliding frames in the vertical direction, and two first lifting sliding frames are provided. The two first lifting sliding frames are respectively slidably connected to the two first vertical guide rails, and a first vertical cylinder is provided between the upper part of the first front and rear sliding frames and each first lifting sliding frame. A first clamping manipulator is provided at the bottom of each first lifting sliding frame, and the sleeve automatic feeding vibration plate is arranged on the right side of the two first left and right horizontal guide rails, and the discharge port of the sleeve automatic feeding vibration plate is connected to the right end inlet of the first horizontal material guide trough, the first horizontal material guide trough is located below the first clamping manipulator and is horizontally arranged along the left and right directions, and a first limit sensor is provided at the left end of the first horizontal material guide trough.
3. The fully automatic crimping production equipment for hydraulic hose assemblies according to claim 1 is characterized in that: The automatic riveting device includes two riveting machines, and the riveting working parts of the two riveting machines are arranged vertically downward. The riveting working parts of the two riveting machines are located directly above the circle where all the hose clamping mechanisms are located. The center of the circle at the center of the turntable and the center angle of the position where the two riveting machines are located are 90°.
4. The fully automatic crimping production equipment for hydraulic hose assemblies according to claim 1 is characterized by: The finished product automatic unloading device includes an unloading guide rail, an unloading synchronous belt horizontal driving mechanism, a slide seat, a horizontal slide plate, a radial main guide rail, a radial support guide rail, a long-distance radial cylinder, a short-distance radial cylinder and a clamping claw cylinder. The unloading guide rail and the unloading synchronous belt horizontal driving mechanism are both arranged on the peripheral bracket along the left and right horizontal directions. The slide seat is slidingly arranged on the unloading guide rail. The synchronous belt of the unloading synchronous belt horizontal driving mechanism is connected to the slide seat. Two radial main guide rails are arranged in parallel. The radial main guide rail is horizontally arranged on the slide seat along the radial direction of the turntable. The horizontal slide plate is slidably connected to the radial main guide rail. An installation groove parallel to the radial main guide rail is opened on the rear side of the middle part of the horizontal slide plate. The long-distance radial cylinder is parallel to the radial main guide rail and is arranged Placed in the mounting groove, one end of the long-distance radial cylinder is connected to the sliding seat, the piston rod of the long-distance radial cylinder is connected to the horizontal slide, and a mounting seat is provided in the middle of the upper surface of the horizontal slide. The short-distance radial cylinder, the radial support guide rail and the long-distance radial cylinder are arranged in parallel, the cylinder body of the short-distance radial cylinder is fixed on the mounting seat, the radial support guide rails are respectively arranged on the left and right sides of the upper surface of the horizontal slide and are symmetrical about the short-distance radial cylinder, the cylinder body of the clamping claw cylinder is slidably connected to the radial support guide rail, and the piston rod of the short-distance radial cylinder is respectively connected to the two clamping claw cylinders through a horizontally arranged linkage plate, and a pair of clamping claws that can be opened or closed left and right for clamping the hose are provided on the rear side of each clamping claw cylinder.
Citation Information
Patent Citations
Flexible pipe assembly machine
CN102145452A
Full-automatic rubber tube assembling machine
CN109571010A
Full-automatic buckling production equipment for hydraulic hose assembly
CN213891321U