A self-propelled trailing suction hopper dual-path parallel pipeline bow blowing barge loading system and construction method
The collaborative work of connecting dual parallel pipelines and multiple mud transportation pipelines through rake suction ships solves the problems of large water occupancy, low mud transportation efficiency and potential safety hazards in traditional construction, and achieves efficient mud transportation and safe construction operations. , improving the efficiency and safety of dredging operations.
Patent Information
- Application Number
- CN202110459194.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-04-27
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2041-04-27
AI Technical Summary
During the dredging construction process, the traditional self-propelled rake-suction vessel was affected by factors such as high waves and strong currents, long mud pipelines, and shoreline conditions that did not allow for bow blowing. As a result, the water area was occupied and the navigation of operating ships was affected. Therefore, we must cooperate with the construction. There are safety risks in the operation, and the efficiency of the dragging suction ship's mud pump cannot be fully exerted. The mud transport efficiency is low and time-consuming. There are few tonnage models of mud barges, long loading time, and high frequency of return.
A rake suction ship is used to connect dual parallel pipelines for bow blowing mud transportation, including a bow blowing mud transportation hose, a main line mud transportation pipeline, a three-way combined mud transportation transfer pipe, a first branch mud transportation pipeline, and a second branch line mud transportation pipe. Mud pipelines, bridge hoses and barge loading platforms, through multiple The coordinated work of the mud transport pipeline and the barge loading platform enables simultaneous loading of barges on both sides and alternating left and right barges, which improves the mud transport efficiency and reduces the time required for bow blowing of the rake suction ship. Real-time monitoring is also carried out through clearing the connecting pipe and the flow control valve. Monitor and dredge, and optimize the mud transport process.
It improves the efficiency of the drag suction ship's mud pump, shortens the drag suction ship's bow blowing time, increases the dredging operation time, improves the mud transport efficiency of the mud transport barge, reduces the frequency of round trips, improves construction safety, and reduces It eliminates the influence of conditions such as wind, waves and water depth, shortens the loading time, and reduces the impact of unblocking branch mud pipelines and mud pump overload.
Smart Images

Figure CN113152556B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of dredging construction, and in particular to a self-propelled trailing suction hopper vessel dual-path parallel pipeline bow blowing barge loading system and a construction method. Background Art
[0002] During the construction process of self-propelled trailing suction dredger bow blowing in river and coastal waterways, when the situation is affected by high waves and rapid currents, too long mud pipelines, the shoreline does not have bow blowing conditions, and the operating ships are frequently passing through, the trailing suction dredger bow blowing barge loading construction technology can be adopted. However, the traditional self-propelled trailing suction dredger construction technology of blowing and loading barges while dredging takes up a large area of water during the operation, which is easy to affect the passing navigation of operating ships, and is more affected by conditions such as wind and waves, and there are great safety hazards in the coordinated construction work. Although the existing trailing suction dredger pipe line bow blowing barge loading construction technology overcomes the shortcomings of the above-mentioned traditional bow blowing barge loading construction technology and can use the loading platform to realize the construction of simultaneous loading of barges on both sides and alternating loading of barges on the left and right, the maximum efficiency of the trailing suction dredger mud pump bow blowing mud delivery cannot be fully exerted, the efficiency of pipeline mud delivery is low, the trailing suction dredger bow blowing takes a long time, the mud barge tonnage models that can cooperate with it are small, the mud barge loading takes a long time, and the mud barge has a high frequency of mud transportation back and forth. Therefore, the above problems need to be solved urgently. Summary of the invention
[0003] The technical problem to be solved by the present invention is to provide a self-propelled trailing hopper vessel dual-path parallel pipeline bow blowing barge loading system and construction method, which adopts the method of connecting the trailing hopper vessel to the dual-path parallel pipeline to carry out bow blowing mud transportation, which not only makes the bow blowing performance of the trailing hopper vessel mud pump be maximized and improves the bow blowing mud transportation efficiency, but also reduces the bow blowing time of the trailing hopper vessel and increases the dredging operation time of the trailing hopper vessel.
[0004] In order to solve the above technical problems, the present invention adopts the following technical scheme: a self-propelled trailing suction hopper dual-channel parallel pipeline bow blowing barge loading system of the present invention, its innovation point is: it includes a bow blowing mud delivery hose, a main line mud delivery pipeline, a three-way combined mud delivery transfer pipe, a first branch line mud delivery pipeline, a second branch line mud delivery pipeline, a bridging hose and a barge loading platform; one end of the bow blowing mud delivery hose is connected to the mud pump of the trailing suction hopper ship, and the other end thereof is connected to one end of the main line mud delivery pipeline, the other end of the main line mud delivery pipeline is connected to the inlet end of the three-way combined mud delivery transfer pipe, and the two outflow ends of the three-way combined mud delivery transfer pipe are respectively connected to one end of the first branch line mud delivery pipeline and one end of the second branch line mud delivery pipeline, the other end of the first branch line mud delivery pipeline and the other end of the second branch line mud delivery pipeline are also respectively connected to the corresponding barge loading platform through a bridging hose, and the mud transport barges docked on both sides of the corresponding barge loading platform are loaded;
[0005] The main mud delivery pipeline includes several main mud delivery hoses; each of the main mud delivery hoses is coaxially arranged in sequence, and each adjacent main mud delivery hose is connected to each other; the other end of the frontmost main mud delivery hose is connected to the other end of the bow blowing mud delivery hose, and the other end of the rearmost main mud delivery hose is connected to the inlet end of the three-way combined mud delivery transfer pipe;
[0006] The structure of the first branch mud pipeline is the same as that of the second branch mud pipeline, and the first branch mud pipeline includes a relay pump, a plurality of self-floating mud hoses and a plurality of clearing connection pipes; a plurality of self-floating mud hoses are arranged at intervals at both ends of the relay pump, and each of the self-floating mud hoses is arranged coaxially at intervals in sequence, the relay pump is connected to one end of two self-floating mud hoses close to the relay pump through clearing connection pipes, and adjacent self-floating mud hoses are connected through corresponding clearing connection pipes;
[0007] The two outflow ends of the three-way combined mud transfer pipe are respectively connected to the other end of the self-floating mud transfer hose at the front end of the first branch mud transfer pipeline and the other end of the self-floating mud transfer hose at the front end of the second branch mud transfer pipeline, and the other end of the self-floating mud transfer hose at the end of the first branch mud transfer pipeline and the other end of the self-floating mud transfer hose at the end of the second branch mud transfer pipeline are respectively connected to the corresponding loading platform through a bridging hose, and the mud transport barges docked on both sides of the corresponding loading platform are respectively loaded;
[0008] Each of the clearing and plugging connecting pipes includes a steel pipe body, a circular mud discharge port, a screw hole, a sealing cover plate, a rubber water-stop gasket, a pressure sensor and a data wireless transmission device; each of the steel pipe bodies is coaxially arranged with the corresponding self-floating mud delivery hose, and connecting flanges are coaxially fitted and fixed at both ends, and are respectively connected to the corresponding self-floating mud delivery hose and the corresponding relay pump through the connecting flanges; a circular mud discharge port is vertically embedded on the side of each steel pipe body exposed above the water surface, and a sealing cover plate is also fitted on each of the circular mud discharge ports, each of the sealing cover plates is matched with the corresponding circular mud discharge port, and a number of screw holes are vertically embedded along the edge of the upper surface at intervals, and each of the screw holes vertically penetrates the corresponding steel pipe body, and is tightened by The screws are screwed together with the corresponding screw holes, and each of the sealing cover plates is screwed and fixed to the corresponding steel pipe body, and the corresponding circular mud discharge ports are tightly sealed; a rubber water-stop gasket is fitted between each of the sealing cover plates and the corresponding steel pipe body, and a pressure sensor is provided in the middle position of the lower surface of each sealing cover plate, and the sensing end of each pressure sensor is arranged toward the inside of the corresponding steel pipe body through the circular mud discharge port, and is arranged without interfering with the corresponding screw holes; a data wireless transmission device is provided in the middle position of the upper surface of each sealing cover plate, and each of the data wireless transmission devices is arranged without interfering with the corresponding screw hole, and is electrically connected to the corresponding pressure sensor, and monitors the mud pressure in the corresponding steel pipe body in real time.
[0009] Preferably, the three-way combined mud transfer pipe includes an inlet pipe, a first outlet pipe, a second outlet pipe, an inlet connecting pipe, a first outlet connecting pipe and a second outlet connecting pipe; the inlet pipe, the first outlet pipe and the second outlet pipe are arranged in a Y shape, and the three are sealed and connected and formed as a whole; the angle between the axis of the inlet pipe and the first outlet pipe is 165°, the angle between the axis of the inlet pipe and the second outlet pipe is 165°, and the angle between the axis of the first outlet pipe and the second outlet pipe is 30°; the inlet connecting pipe is coaxially arranged with the inlet pipe, and one end of it is connected to the other end of the inlet pipe; the first outflow connecting pipe is coaxially arranged with the first outlet pipe, and one end of it is connected to the other end of the first outlet pipe; the second outflow connecting pipe is coaxially arranged with the second outlet pipe, and one end of it is connected to the other end of the second outlet pipe.
[0010] Preferably, it also includes several mud pipe flow control valves; the other end of the inlet connecting pipe is connected to the other end of the main mud pipe at the end through the mud pipe flow control valve, the other end of the first outflow connecting pipe is connected to the other end of the frontmost self-floating mud pipe in the first branch mud pipeline through the mud pipe flow control valve, and the other end of the second outflow connecting pipe is connected to the other end of the frontmost self-floating mud pipe in the second branch mud pipeline through the mud pipe flow control valve.
[0011] Preferably, each of the loading platforms includes a loading combination steel pipe, a lifting platform, an electric motor, a transmission system and a flat barge; each of the lifting platforms is loaded on the corresponding flat barge, and each of the electric motors drives the corresponding lifting platform to perform lifting movements in the vertical direction through the transmission system; each of the loading combination steel pipes is installed and fixed on the corresponding lifting platform, and is connected to the other end of the self-floating mud hose at the end of the first branch mud pipeline and the other end of the self-floating mud hose at the end of the second branch mud pipeline through a bridging hose; four mud transport barges are docked on both sides of the corresponding flat barge to carry out loading operations.
[0012] Preferably, each of the barge loading combination steel pipes includes a bow blowing steel pipe, a barge loading main pipe flow control valve, a barge loading main pipe, a barge loading branch pipe, a branch pipe flow control valve and a blowing hose; each of the bow blowing steel pipes is coaxially spaced apart from the corresponding barge loading main pipe, and one end of each of the bow blowing steel pipes is connected to the corresponding bridging hose, and the other end is connected to the corresponding barge loading main pipe through the barge loading main pipe flow control valve; a number of barge loading branch pipes are vertically welded and spaced apart on the side walls on both sides of each of the barge loading main pipes along its length direction, one end of each of the barge loading branch pipes is connected to the corresponding barge loading main pipe through the branch pipe flow control valve, and a blowing hose is sleeved on the other end; the motor drives the corresponding lifting platform to perform lifting movement in the vertical direction through the transmission system to adjust the drop distance of the mud sprayed from the pipe mouth of the blowing hose.
[0013] The invention discloses a construction method for a dual-path parallel pipeline bow-blowing barge loading system for a self-propelled trailing suction hopper vessel, the innovation of which is that it comprises the following steps:
[0014] (1) First, connect the bow blowing mud hose to the mud pump of the trailing suction hopper ship, dock the four mud transport barges at the loading positions on both sides of the corresponding flat barges, and adjust the bow blowing mud hose, bridge hose and blowing hose to the optimal state;
[0015] (2) Open the mud pipe flow control valve, the barge main flow control valve and the branch pipe flow control valve, set the speed of the trailing suction hopper mud pump to 60% of the rated speed, and then start the trailing suction hopper mud pump for the first time;
[0016] (3) After the entire mud pipeline is filled with water, adjust the speed of the mud pump of the trailing suction vessel to the rated speed, start the relay pump, and then start the bow blowing mud delivery. Monitor the pressure value of each unblocking connecting pipe in real time, and analyze and judge the blockage of the first branch mud pipeline and the second branch mud pipeline;
[0017] (4) When the pressure value of the upstream mud delivery pipe section at a certain position of the first branch mud delivery pipeline is significantly higher than that of the downstream, the pipe is blocked at that location. The corresponding relay pump, mud delivery pipe flow control valve and barge main flow control valve are closed, and the circular mud discharge ports on the upstream and downstream clearing connecting pipes closest to the blocked pipe location are opened, and then the pipe is cleared by blowing water from the ship;
[0018] (5) After the blocked pipe dredging operation is completed, the blockage clearing connecting pipe body is sealed, then the relay pump is started and the corresponding mud delivery pipe flow control valve is opened;
[0019] (6) During the above-mentioned pipe blocking and dredging operation, the branch pipe flow control valve on one side of the combined steel pipe connected to the second branch mud delivery pipeline is adjusted to the maximum opening, and a large flow rate and fast barge are carried out, while a small flow rate and slow barge are carried out on the other side;
[0020] (7) When the mud barge on one side is fully loaded, close the corresponding branch pipe flow control valve, adjust the opening of the branch pipe flow control valve on the other side, and load the barge quickly with a large flow rate; at the same time, drive the fully loaded mud barge away and drive in another empty mud barge, then adjust the opening of the branch pipe flow control valve on that side, and load the barge slowly with a small flow rate;
[0021] (8) When there is no pipe blockage, adjust the mud pipe flow control valve on the first branch mud pipe to the maximum opening, start the corresponding relay pump, and load the corresponding mud barge with a large flow rate and quickly, while controlling the second branch mud pipe to load with a small flow rate and slowly;
[0022] (9) After the two mud barges on the first branch mud pipeline are fully loaded, close the corresponding mud pipeline flow control valve and relay pump, and at the same time adjust the mud pipeline flow control valve on the second branch mud pipeline to the maximum opening, start the corresponding relay pump, and carry out large-flow rapid loading;
[0023] (10) After the two mud barges on the first branch mud pipeline are fully loaded and depart, the two empty mud barges are quickly put in place, the corresponding relay pumps and mud pipeline flow control valves are turned on and adjusted, and the barges are loaded slowly with a small flow rate;
[0024] (11) Repeat the above steps until the bow blowing of the trailing suction hopper is completed and the vessel sails away.
[0025] The present invention has a simple structure, convenient operation, safety and high efficiency, thus bringing the following beneficial effects:
[0026] (1) The present invention adopts a method of connecting a trailing suction hopper ship to a dual-path parallel pipeline for bow blowing mud transportation, which not only maximizes the bow blowing performance of the trailing suction hopper ship's mud pump and improves the bow blowing mud transportation efficiency, but also reduces the bow blowing time of the trailing suction hopper ship and increases the dredging operation time of the trailing suction hopper ship;
[0027] (2) In the dual parallel pipeline adopted by the present invention, each branch mud pipeline is connected to a loading platform through a bridging hose, and each loading platform can be loaded on both sides, so that two loading platforms can load four mud barges at the same time, thereby improving the mud transportation efficiency of the mud barges and reducing the frequency of mud transportation by the mud barges, thereby significantly improving the safety of single barge mud transportation construction;
[0028] (3) The simultaneous operation of the two branch mud pipelines and the two loading platforms in the present invention is flexible and maneuverable, and is less affected by construction conditions such as wind and waves, water depth, and navigation. It can meet the loading needs of mud barges of different tonnages, thereby shortening the loading time of the mud barges. At the same time, it also effectively reduces the effects of blockage in the branch mud pipeline, overload of the mud pump of the suction slurry vessel, and excessive distance of the mud blowing on the bow blowing loading efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0030] Figure 1 The present invention is a structural schematic diagram of a dual-path parallel pipeline bow-blowing barge loading system of a self-propelled trailing suction hopper vessel.
[0031] Figure 2 for Figure 1 Schematic diagram of the structure of the middle three-way combined mud transfer pipe.
[0032] Figure 3 for Figure 1 Schematic diagram of the structure of the medium-clearing plug connecting pipe.
[0033] Figure 4 for Figure 1 Schematic diagram of the structure of the mid-barge combined steel pipe.
[0034] Among them, 1-bow blowing mud hose; 2-main mud hose; 3-three-way combined mud transfer pipe; 4-self-floating mud hose; 5-blocking connection pipe; 6-relay pump; 7-bridge hose; 8-barge combination steel pipe; 9-lifting platform; 10-flat barge; 11-connection flange; 12-mud transport barge; 16-inflow pipe; 17-first outflow pipe; 18-second outflow pipe; 19-inflow connection pipe; 20-first outflow Connecting pipe; 21-second outlet connecting pipe; 22-mud delivery pipe flow control valve; 23-steel pipe body; 24-circular mud outlet; 25-screw hole; 26-sealing cover plate; 27-rubber water-stop gasket; 28-data wireless transmission device; 29-bow blowing steel pipe; 30-barge main pipe flow control valve; 31-barge main pipe; 32-barge branch pipe; 33-branch pipe flow control valve; 34-blowing hose; 35-motor. DETAILED DESCRIPTION
[0035] The technical solution of the present invention will be clearly and completely described below through specific implementation methods.
[0036] The present invention discloses a self-propelled trailing suction hopper dual-channel parallel pipeline bow blowing loading and barge system, comprising a bow blowing mud delivery hose 1, a main line mud delivery pipeline, a three-way combined mud delivery transfer pipe 3, a first branch line mud delivery pipeline, a second branch line mud delivery pipeline, a bridge hose 7 and a loading and barge platform; the specific structure is as follows Figures 1 to 4 As shown, one end of the bow-blown mud hose 1 is connected to the mud pump of the suction slurry vessel, and the other end thereof is connected to one end of the main mud pipeline, the other end of the main mud pipeline is connected to the inlet end of the three-way combination mud transfer pipe 3, and the two outlet ends of the three-way combination mud transfer pipe 3 are respectively connected to one end of the first branch mud pipeline and one end of the second branch mud pipeline, the other end of the first branch mud pipeline and the other end of the second branch mud pipeline are also respectively connected to the corresponding loading and barging platforms through the bridging hose 7, and the mud transport barges 12 docked on both sides of the corresponding loading and barging platforms are loaded and barged. Among them, before the specific implementation of the bow blowing and loading construction work, first of all, according to the actual situation of the project, the performance parameter indicators such as power, head, efficiency, and speed of the mud pump and relay pump 6 of the trailing suction hopper ship are analyzed, and then the flow rate of the mud in the main mud pipeline, the first branch mud pipeline, and the second branch mud pipeline is determined according to the main characteristic parameters such as the clay mud concentration, clay particle size grading, and kinematic viscosity coefficient to be bow blown. Finally, combined with the head loss of this system, the blowing distance of the main mud pipeline and the dual parallel pipeline is calculated, so as to determine the position of the three-way combined mud transfer pipe 3.
[0037] like Figures 1 to 4As shown, the main mud delivery pipeline includes several main mud delivery hoses 2; each main mud delivery hose 2 is coaxially arranged in sequence, and each adjacent main mud delivery hose 2 is connected to each other; the other end of the frontmost main mud delivery hose 2 is connected to the other end of the bow blowing mud delivery hose 1, and the other end of the rearmost main mud delivery hose 2 is connected to the inlet end of the three-way combined mud delivery transfer pipe 3.
[0038] The structure of the first branch mud pipeline in the present invention is the same as that of the second branch mud pipeline, and the first branch mud pipeline includes a relay pump 6, a plurality of self-floating mud hoses 4 and a plurality of clearing connection pipes 5; Figure 1 As shown, a plurality of self-floating mud conveying hoses 4 are arranged at intervals at both ends of the relay pump 6, and each self-floating mud conveying hose 4 is arranged coaxially at intervals, and the relay pump 6 is connected to one end of two self-floating mud conveying hoses 4 close to the relay pump 6 through clearing connection pipes 5, and adjacent self-floating mud conveying hoses 4 are connected through corresponding clearing connection pipes 5. The specific position of the relay pump 6 can be derived based on the mud lift, the transportation resistance loss, the series characteristics of the relay pump 6, etc. The two outflow ends of the three-way combined mud transfer pipe 3 in the present invention are respectively connected to the other end of the self-floating mud transfer hose 4 at the front end of the first branch mud transfer pipeline and the other end of the self-floating mud transfer hose 4 at the front end of the second branch mud transfer pipeline, and the other end of the self-floating mud transfer hose 4 at the end of the first branch mud transfer pipeline and the other end of the self-floating mud transfer hose 4 at the end of the second branch mud transfer pipeline are respectively connected to the corresponding loading and barge platforms through bridging hoses 7, and loading and barge operations are performed on the mud transport barges 12 docked on both sides of the corresponding loading and barge platforms.
[0039] Each clearing connection pipe 5 includes a steel pipe body 23, a circular mud discharge port 24, a screw hole 25, a plugging cover plate 26, a rubber water-stop gasket 27, a pressure sensor and a data wireless transmission device 28; Figure 1 , Figure 3 As shown, each steel pipe body 23 is coaxially arranged with the corresponding self-floating mud delivery hose 4, and connecting flanges 11 are coaxially fitted and fixed at both ends, and are respectively connected to the corresponding self-floating mud delivery hose 4 and the corresponding relay pump 6 through the connecting flanges 11; a circular mud discharge port 24 is vertically embedded on the side of each steel pipe body 23 exposed to the water surface, and a sealing cover plate 26 is respectively fitted on each circular mud discharge port 24, and each sealing cover plate 26 is respectively fixed with the corresponding circular The mud discharge port 24 is matched, and a plurality of screw holes 25 are vertically embedded and opened at intervals along the edge of the upper surface. Each screw hole 25 vertically penetrates the corresponding steel pipe body 23, and each sealing cover plate 26 is screwed and fixed to the corresponding steel pipe body 23 by screwing the fastening screw with the corresponding screw hole 25, and the corresponding circular mud discharge port 24 is tightly sealed. A rubber water stop gasket 27 is also fitted between each sealing cover plate 26 and the corresponding steel pipe body 23.
[0040] like Figure 1 , Figure 3 As shown, a pressure sensor is also provided in the middle of the lower surface of each plugging cover plate 26, and the sensing end of each pressure sensor is arranged toward the inner direction of the corresponding steel pipe body 23 through the circular mud discharge port 24, and is arranged without interfering with the corresponding screw hole 25; a data wireless transmission device 28 is also provided in the middle of the upper surface of each plugging cover plate 26, and each data wireless transmission device 28 is arranged without interfering with the corresponding screw hole 25, and is electrically connected to the corresponding pressure sensor, and respectively monitors the mud pressure in the corresponding steel pipe body 23 in real time. The pressure sensor and the data wireless transmission device 28 in the present invention can convert the pressure value in the mud delivery pipeline into an electrical signal, and the electrical signal can be wirelessly sent to the mobile terminal for remote real-time monitoring of the mud pressure in the pipeline.
[0041] The three-way combined mud transfer pipe 3 of the present invention comprises an inlet pipe 16, a first outlet pipe 17, a second outlet pipe 18, an inlet connecting pipe 19, a first outlet connecting pipe 20 and a second outlet connecting pipe 21; Figure 1 , Figure 2 As shown, the inlet pipe 16, the first outlet pipe 17 and the second outlet pipe 18 are arranged in a Y shape, and the three are sealed and connected and integrally formed; the inlet connecting pipe 19 is arranged coaxially with the inlet pipe 16, and one end of it is connected to the other end of the inlet pipe 16; the first outlet connecting pipe 20 is arranged coaxially with the first outlet pipe 17, and one end of it is connected to the other end of the first outlet pipe 17; the second outlet connecting pipe 21 is arranged coaxially with the second outlet pipe 18, and one end of it is connected to the other end of the second outlet pipe 18. Among them, the angle between the axis of the inlet pipe 16 and the first outlet pipe 17 is 165°, the angle between the axis of the inlet pipe 16 and the second outlet pipe 18 is 165°, and the angle between the axis of the first outlet pipe 17 and the second outlet pipe 18 is 30°. Such a structural combination can make the increase of local resistance caused by pipeline bifurcation not obvious.
[0042] like Figure 1 , Figure 2 As shown, the other end of the inflow connecting pipe 19 is connected to the other end of the main mud delivery hose 2 at the end through the mud delivery pipe flow control valve 22, the other end of the first outflow connecting pipe 20 is connected to the other end of the self-floating mud delivery hose 4 at the front end of the first branch mud delivery pipeline through the mud delivery pipe flow control valve 22, and the other end of the second outflow connecting pipe 21 is connected to the other end of the self-floating mud delivery hose 4 at the front end of the second branch mud delivery pipeline through the mud delivery pipe flow control valve 22. The present invention is convenient for clearing the blockage when the pipeline bifurcation occurs by arranging the inflow connecting pipe 19, the first outflow connecting pipe 20 and the second outflow connecting pipe 21.
[0043] Each loading platform in the present invention includes a loading combined steel pipe 8, a lifting platform 9, an electric motor 35, a transmission system and a flat barge 10; Figure 1 , Figure 4 As shown, each lifting platform 9 is loaded on the corresponding flat barge 10, and each motor 35 drives the corresponding lifting platform 9 to perform lifting movement in the vertical direction through the transmission system; each barge loading combination steel pipe 8 is installed and fixed on the corresponding lifting platform 9, and is connected to the other end of the self-floating mud hose 4 at the end of the corresponding first branch mud pipeline and the other end of the self-floating mud hose 4 at the end of the corresponding second branch mud pipeline through the bridging hose 7; four mud transport barges 12 are docked on both sides of the corresponding flat barge 10 for loading operations.
[0044] Each of the combined steel pipes 8 for loading and unloading includes a bow blowing steel pipe 29, a loading and unloading main pipe flow control valve 30, a loading and unloading main pipe 31, a loading and unloading branch pipe 32, a branch pipe flow control valve 33 and a blowing hose 34; Figure 1 , Figure 4 As shown, each bow blowing steel pipe 29 is coaxially spaced with the corresponding barge loading main pipe 31, and one end of each bow blowing steel pipe 29 is connected to the corresponding bridging hose 7, and the other end is connected to the corresponding barge loading main pipe 31 through the barge loading main pipe flow control valve 30; on the side walls of each barge loading main pipe 31, a plurality of barge loading branch pipes 32 are vertically welded in sequence along the length direction, and one end of each barge loading branch pipe 32 is connected to the corresponding barge loading main pipe 31 through the branch pipe flow control valve 33, and a blowing hose 34 is sleeved on the other end; in the present invention, the motor 35 drives the corresponding lifting platform 9 to perform lifting movement in the vertical direction through the transmission system to adjust the drop distance of the mud sprayed from the pipe mouth of the blowing hose 34, thereby realizing the rapid and uniform loading of the mud transporting barge 12.
[0045] A construction method of a dual-path parallel pipeline bow-blowing barge loading system of a self-propelled trailing suction hopper vessel of the present invention comprises the following steps:
[0046] (1) First, connect the bow blowing mud hose 1 to the mud pump of the trailing suction hopper ship, dock the four mud transport barges 12 at the loading positions on both sides of the corresponding flatbed barge 10, and adjust the bow blowing mud hose 1, the bridge hose 7 and the blowing hose 34 to the optimal state.
[0047] (2) Open the mud pipe flow control valve 22, the loading main flow control valve 30 and the branch pipe flow control valve 33, set the speed of the trailing suction hopper mud pump to 60% of the rated speed, and then start the trailing suction hopper mud pump for the first time.
[0048] (3) After the entire mud pipeline is filled with water, adjust the speed of the mud pump of the bucket suction vessel to the rated speed, start the relay pump 6, and then start the bow blowing mud delivery. Monitor the pressure value of each unblocking connecting pipe 5 in real time, and analyze and judge the blockage of the first branch mud pipeline and the second branch mud pipeline.
[0049] (4) When the pressure value of the upstream mud delivery pipe section at a certain position of the first branch mud delivery pipeline is significantly higher than that of the downstream, pipe blockage occurs at that location. The corresponding relay pump 6, mud delivery pipe flow control valve 22 and barge main flow control valve 30 are closed, and the circular mud discharge ports 24 on the upstream and downstream clearing connecting pipes 5 closest to the blocked pipe location are opened, and then the pipe is cleared by blowing water from the ship.
[0050] (5) After the pipe blocking and unblocking operation is completed, the pipe body of the unblocking connecting pipe 5 is sealed, and then the relay pump 6 is started and the flow control valve 22 of the corresponding mud delivery pipe is opened.
[0051] (6) During the above-mentioned pipe blocking and unblocking operation, the branch pipe flow control valve 33 on one side of the combined loading and barging steel pipe 8 connected to the second branch mud delivery pipeline is adjusted to the maximum opening, and a large flow rate and fast barging are carried out, while a small flow rate and slow barging are carried out on the other side.
[0052] (7) After the mud barge 12 on one side is fully loaded, the corresponding branch pipe flow control valve 33 is closed, the opening of the branch pipe flow control valve 33 on the other side is adjusted, and a large flow rate and fast barge loading is performed; at the same time, the fully loaded mud barge 12 is driven away, and another empty mud barge 12 is driven in, and then the opening of the branch pipe flow control valve 33 on this side is adjusted, and a small flow rate and slow barge loading is performed.
[0053] (8) When there is no pipe blockage, adjust the mud pipe flow control valve 22 on the first branch mud pipe to the maximum opening, start the corresponding relay pump 6, and load the corresponding mud barge 12 with a large flow rate and quickly, while controlling the second branch mud pipe to load with a small flow rate and slowly.
[0054] (9) After the two mud barges 12 on the first branch mud pipeline are fully loaded, close the corresponding mud pipeline flow control valve 22 and relay pump 6. At the same time, adjust the mud pipeline flow control valve 22 on the second branch mud pipeline to the maximum opening, start the corresponding relay pump 6, and carry out large-flow rapid loading.
[0055] (10) After the two mud barges 12 on the first branch mud pipeline are fully loaded and depart, the two empty mud barges 12 are quickly put in place, the corresponding relay pumps 6 and mud pipeline flow control valves 22 are turned on and adjusted, and a small flow rate and slow loading are performed.
[0056] (11) If pipe blockage occurs, proceed according to the above steps (4) to (7). If pipe blockage does not occur and the pipe blockage is cleared, proceed according to the above steps (8) to (10) until the bow blowing of the trailing suction hopper is completed and the vessel leaves.
[0057] The present invention has a simple structure, convenient operation, safety and high efficiency, thus bringing the following beneficial effects:
[0058] (1) The present invention adopts a method of connecting a trailing suction hopper ship to a dual-path parallel pipeline for bow blowing mud transportation, which not only maximizes the bow blowing performance of the trailing suction hopper ship's mud pump and improves the bow blowing mud transportation efficiency, but also reduces the bow blowing time of the trailing suction hopper ship and increases the dredging operation time of the trailing suction hopper ship;
[0059] (2) In the dual parallel pipeline adopted by the present invention, each branch mud transport pipeline is connected to a loading platform through a bridge hose 7, and each loading platform can be loaded on both sides, so that two loading platforms can load four mud transport barges 12 at the same time, thereby improving the mud transport efficiency of the mud transport barges 12 and reducing the frequency of mud transporting by the mud transport barges 12, thereby significantly improving the safety of single barge mud transport construction;
[0060] (3) The simultaneous operation of the two branch mud pipelines and the two loading platforms in the present invention is flexible and maneuverable, and is less affected by construction conditions such as wind and waves, water depth, and navigation, and can meet the loading needs of mud barges 12 of different tonnages, thereby shortening the loading time of the mud barges 12. At the same time, it also effectively reduces the effects of blockage in the branch mud pipeline, overload of the mud pump of the suction slurry vessel, and excessive distance of the mud blowing on the bow blowing loading efficiency.
[0061] The embodiments described above are merely descriptions of preferred implementation modes of the present invention, and are not intended to limit the concept and scope of the present invention. Without departing from the design concept of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary engineering technicians in the field should fall within the protection scope of the present invention. The technical contents for which protection is sought in the present invention have been fully recorded in the technical requirements.
Claims
1. A self-propelled trailing suction hopper dual-path parallel pipeline bow blowing barge loading system, Features: It comprises a bow-blown mud delivery hose, a main-line mud delivery pipeline, a three-way combined mud delivery transfer pipe, a first branch-line mud delivery pipeline, a second branch-line mud delivery pipeline, a bridging hose and a loading platform; one end of the bow-blown mud delivery hose is connected to a mud pump of a drag-suction vessel, and the other end thereof is connected to one end of the main-line mud delivery pipeline, the other end of the main-line mud delivery pipeline is connected to the inlet end of the three-way combined mud delivery transfer pipe, and the two outflow ends of the three-way combined mud delivery transfer pipe are respectively connected to one end of the first branch-line mud delivery pipeline and one end of the second branch-line mud delivery pipeline, the other end of the first branch-line mud delivery pipeline and the other end of the second branch-line mud delivery pipeline are also respectively connected to the corresponding loading platform through a bridging hose, and the loading operation is performed on the mud transport barges parked on both sides of the corresponding loading platform; The main mud delivery pipeline includes several main mud delivery hoses; each of the main mud delivery hoses is coaxially arranged in sequence, and each adjacent main mud delivery hose is connected to each other; the other end of the frontmost main mud delivery hose is connected to the other end of the bow blowing mud delivery hose, and the other end of the rearmost main mud delivery hose is connected to the inlet end of the three-way combined mud delivery transfer pipe; The structure of the first branch mud pipeline is the same as that of the second branch mud pipeline, and the first branch mud pipeline includes a relay pump, a plurality of self-floating mud hoses and a plurality of clearing connection pipes; a plurality of self-floating mud hoses are arranged at intervals at both ends of the relay pump, and each of the self-floating mud hoses is arranged coaxially at intervals in sequence, the relay pump is connected to one end of two self-floating mud hoses close to the relay pump through clearing connection pipes, and adjacent self-floating mud hoses are connected through corresponding clearing connection pipes; The two outflow ends of the three-way combined mud transfer pipe are respectively connected to the other end of the self-floating mud transfer hose at the front end of the first branch mud transfer pipeline and the other end of the self-floating mud transfer hose at the front end of the second branch mud transfer pipeline, and the other end of the self-floating mud transfer hose at the end of the first branch mud transfer pipeline and the other end of the self-floating mud transfer hose at the end of the second branch mud transfer pipeline are respectively connected to the corresponding loading platform through a bridging hose, and the mud transport barges docked on both sides of the corresponding loading platform are respectively loaded; Each of the clearing and plugging connecting pipes includes a steel pipe body, a circular mud discharge port, a screw hole, a sealing cover plate, a rubber water-stop gasket, a pressure sensor and a data wireless transmission device; each of the steel pipe bodies is coaxially arranged with the corresponding self-floating mud delivery hose, and connecting flanges are coaxially fitted and fixed at both ends, and are respectively connected to the corresponding self-floating mud delivery hose and the corresponding relay pump through the connecting flanges; a circular mud discharge port is vertically embedded on the side of each steel pipe body exposed above the water surface, and a sealing cover plate is also fitted on each of the circular mud discharge ports, each of the sealing cover plates is matched with the corresponding circular mud discharge port, and a number of screw holes are vertically embedded along the edge of the upper surface at intervals, and each of the screw holes vertically penetrates the corresponding steel pipe body, and is tightened by The screws are screwed together with the corresponding screw holes, and each of the sealing cover plates is screwed and fixed to the corresponding steel pipe body, and the corresponding circular mud discharge ports are tightly sealed; a rubber water-stop gasket is fitted between each of the sealing cover plates and the corresponding steel pipe body, and a pressure sensor is provided in the middle position of the lower surface of each sealing cover plate, and the sensing end of each pressure sensor is arranged toward the inside of the corresponding steel pipe body through the circular mud discharge port, and is arranged without interfering with the corresponding screw holes; a data wireless transmission device is provided in the middle position of the upper surface of each sealing cover plate, and each of the data wireless transmission devices is arranged without interfering with the corresponding screw hole, and is electrically connected to the corresponding pressure sensor, and monitors the mud pressure in the corresponding steel pipe body in real time.
2. A dual-path parallel pipeline bow-blowing barge loading system for a self-propelled trailing suction hopper vessel according to claim 1, Features: The three-way combined mud transfer pipe includes an inlet pipe, a first outlet pipe, a second outlet pipe, an inlet connecting pipe, a first outlet connecting pipe and a second outlet connecting pipe; the inlet pipe, the first outlet pipe and the second outlet pipe are arranged in a Y shape, and the three are sealed and connected and formed as a whole; the angle between the axis of the inlet pipe and the first outlet pipe is 165°, the angle between the axis of the inlet pipe and the second outlet pipe is 165°, and the angle between the axis of the first outlet pipe and the second outlet pipe is 30°; the inlet connecting pipe is coaxially arranged with the inlet pipe, and one end of it is connected to the other end of the inlet pipe; the first outflow connecting pipe is coaxially arranged with the first outlet pipe, and one end of it is connected to the other end of the first outlet pipe; the second outflow connecting pipe is coaxially arranged with the second outlet pipe, and one end of it is connected to the other end of the second outlet pipe.
3. A dual-path parallel pipeline bow-blowing barge loading system for a self-propelled trailing suction hopper vessel according to claim 2, Features: It also includes several mud pipe flow control valves; the other end of the inlet connecting pipe is connected to the other end of the main mud pipe at the end through the mud pipe flow control valve, the other end of the first outflow connecting pipe is connected to the other end of the front end self-floating mud pipe in the first branch mud pipeline through the mud pipe flow control valve, and the other end of the second outflow connecting pipe is connected to the other end of the front end self-floating mud pipe in the second branch mud pipeline through the mud pipe flow control valve.
4. A dual-path parallel pipeline bow-blowing barge loading system for a self-propelled trailing suction hopper vessel according to claim 1, Features: Each of the loading platforms includes a loading combination steel pipe, a lifting platform, an electric motor, a transmission system and a flat barge; each of the lifting platforms is loaded on the corresponding flat barge, and each of the electric motors drives the corresponding lifting platform to perform lifting movements in the vertical direction through the transmission system; each of the loading combination steel pipes is installed and fixed on the corresponding lifting platform, and is connected to the other end of the self-floating mud hose at the end of the first branch mud pipeline and the other end of the self-floating mud hose at the end of the second branch mud pipeline through a bridging hose; four mud transport barges are docked on both sides of the corresponding flat barge to carry out loading operations.
5. A dual-path parallel pipeline bow-blowing barge loading system for a self-propelled trailing suction hopper vessel according to claim 4, Features: Each of the barge loading and unloading combined steel pipes comprises a bow blowing steel pipe, a barge loading and unloading main pipe flow control valve, a barge loading and unloading main pipe, a barge loading and unloading branch pipe, a branch pipe flow control valve and a blowing hose; each of the bow blowing steel pipes is coaxially spaced apart from the corresponding barge loading and unloading main pipe, and one end of each of the bow blowing steel pipes is connected to the corresponding bridging hose, and the other end is connected to the corresponding barge loading and unloading main pipe through the barge loading and unloading main pipe flow control valve; a number of barge loading and unloading branch pipes are vertically welded and spaced apart on the side walls on both sides of each of the barge loading and unloading main pipes along the length direction thereof, one end of each of the barge loading and unloading branch pipes is connected to the corresponding barge loading and unloading main pipe through the branch pipe flow control valve, and a blowing hose is sleeved on the other end thereof; the motor drives the corresponding lifting platform to perform lifting and lowering motion in the vertical direction through the transmission system to adjust the drop distance of the mud sprayed from the pipe mouth of the blowing hose.
6. A construction method for a dual-path parallel pipeline bow-blowing barge loading system for a self-propelled trailing suction hopper vessel according to any one of claims 1 to 5, Features The following steps are involved: (1) First, connect the bow blowing mud hose to the mud pump of the trailing suction hopper ship, dock the four mud transport barges at the loading positions on both sides of the corresponding flat barges, and adjust the bow blowing mud hose, bridge hose and blowing hose to the optimal state; (2) Open the mud pipe flow control valve, the barge main flow control valve and the branch pipe flow control valve, set the speed of the trailing suction hopper mud pump to 60% of the rated speed, and then start the trailing suction hopper mud pump for the first time; (3) After the entire mud pipeline is filled with water, adjust the speed of the mud pump of the trailing suction vessel to the rated speed, start the relay pump, and then start the bow blowing mud delivery. Monitor the pressure value of each unblocking connecting pipe in real time, and analyze and judge the blockage of the first branch mud pipeline and the second branch mud pipeline; (4) When the pressure value of the upstream mud delivery pipe section at a certain position of the first branch mud delivery pipeline is significantly higher than that of the downstream, the pipe is blocked at that location. The corresponding relay pump, mud delivery pipe flow control valve and barge main flow control valve are closed, and the circular mud discharge ports on the upstream and downstream clearing connecting pipes closest to the blocked pipe location are opened, and then the pipe is cleared by blowing water from the ship; (5) After the blocked pipe dredging operation is completed, the blockage clearing connecting pipe body is sealed, then the relay pump is started and the corresponding mud delivery pipe flow control valve is opened; (6) During the above-mentioned pipe blocking and dredging operation, the branch pipe flow control valve on one side of the combined steel pipe connected to the second branch mud delivery pipeline is adjusted to the maximum opening, and a large flow rate and fast barge are carried out, while a small flow rate and slow barge are carried out on the other side; (7) When the mud barge on one side is fully loaded, close the corresponding branch pipe flow control valve, adjust the opening of the branch pipe flow control valve on the other side, and load the barge quickly with a large flow rate; at the same time, drive the fully loaded mud barge away and drive in another empty mud barge, then adjust the opening of the branch pipe flow control valve on that side, and load the barge slowly with a small flow rate; (8) When there is no pipe blockage, adjust the mud pipe flow control valve on the first branch mud pipe to the maximum opening, start the corresponding relay pump, and load the corresponding mud barge with a large flow rate and quickly, while controlling the second branch mud pipe to load with a small flow rate and slowly; (9) After the two mud barges on the first branch mud pipeline are fully loaded, close the corresponding mud pipeline flow control valve and relay pump, and at the same time adjust the mud pipeline flow control valve on the second branch mud pipeline to the maximum opening, start the corresponding relay pump, and carry out large-flow rapid loading; (10) After the two mud barges on the first branch mud pipeline are fully loaded and depart, the two empty mud barges are quickly put in place, the corresponding relay pumps and mud pipeline flow control valves are turned on and adjusted, and the barges are loaded slowly with a small flow rate; (11) Repeat the above steps until the bow blowing of the trailing suction hopper is completed and the vessel sails away.