Magnetic ore dehydration is performed through the combination of magnetic drum and conveyor filter, and combined with high-pressure grinding rollers and dry magnetic separation technology, the problem of high energy and water consumption of magnetite processing is solved, and the grade and cost-effectiveness is improved , extends the service life of hematite.
Patent Information
- Application Number
- CN201980087730.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2019-07-05
- Filing Date
- 2019-08-16
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2039-08-16
AI Technical Summary
Processing magnetite usually requires a lot of energy and water, resulting in inefficient costs and lower hematite grades in the international market lead to lower pricing.
The combination of magnetic drum and conveyor filter is used to dehydrate magnetite, and the water is discharged from magnetite by magnetic attraction, and the non-magnetic material is separated by high-pressure grinding rollers and dry magnetic separation steps to reduce energy consumption. and use water.
The water content of magnetite is reduced to less than 10%, reducing the use of energy and water, improving the grade and cost-effectiveness of magnetite, and extending the service life of hematite.
Smart Images

Figure CN113272068B_ABST
Abstract
Description
Field of the Invention
[0001] The present invention relates to a method and apparatus for processing magnetite, and more particularly, but not exclusively, to a method and apparatus for processing magnetite having improved cost effectiveness by reducing energy consumption when processing the magnetite into a form suitable for international transportation. Background of the Invention
[0003] It is known to mine iron ore for use in the production of steel and the like. Iron ore is one of Australia's most important exports, however the applicant has identified a problem in which some hematite iron ores may have lower desirability and pricing in international markets due to the quality of the iron ore product and in particular the purity of the product by weight (i.e. the percentage of the product by weight which is actually iron).
[0004] Iron ore is a rock or mineral from which metallic iron can be extracted economically. Iron itself is usually found in the form of magnetite (Fe 3 O 4 , 72.4% Fe), hematite (Fe 2 O 3 , 69.9% Fe), goethite (FeO(OH), 62.9% Fe), limonite (FeO(OH)·n(H 2 O), 55% Fe) or siderite (FeCO 3 , 48.2% of Fe) is found in the form of . Although iron is the fourth most abundant element in the Earth's crust, comprising about 5%, the vast majority is bound in silicate minerals or, more rarely, carbonate minerals. The thermodynamic barriers to separating pure iron from these minerals are enormous and energy intensive, so all sources of iron used by human industry utilize relatively rare iron oxide minerals, primarily hematite.
[0005] Applicants have identified that the grade of Direct-Shipping iron-Ore (DSO) deposits (typically composed of hematite) is getting worse as the resource is used, and this lower grade is a major contributor to the decline in desirability and pricing. In contrast, applicants have identified that magnetite concentrate grades are typically in excess of 66% iron by weight, and are typically low in phosphorus, aluminum, titanium, and silica, and require a premium. However, there is a problem that processing magnetite is typically not cost-effective because it requires large amounts of energy and water. Embodiments of the present invention seek to provide a method for processing magnetite iron ore that has improved cost-effectiveness by using less energy and / or water. SUMMARY OF THE INVENTION
[0007] According to one aspect of the present invention, there is provided an apparatus for dewatering magnetite, comprising a magnetic drum arranged to cause the magnetite to compress itself toward the drum, thereby expelling water from the magnetite, wherein the apparatus comprises a conveyor belt filter arranged to cause the dewatered magnetite to be discharged from the drum and further dewatered using the conveyor belt filter, the magnetite being conveyed along the upper surface of the belt filter, whereby the magnetite compresses itself downwardly under the magnetic attraction within the magnetite, causing water to be discharged from the magnetite and drained through the conveyor belt filter, and wherein the conveyor belt filter is in the form of a vibrating belt filter.
[0008] Preferably, the apparatus comprises a vibrator for vibrating the conveyor filter.
[0009] According to another aspect of the present invention, there is provided a method of dehydrating magnetite to a moisture content of <10% w / w, comprising the step of extracting water from the magnetite by virtue of the magnetism of the magnetite, whereby the magnetite is brought together under magnetic attraction, thereby squeezing the water outwards and away from the magnetite, wherein the method comprises the following steps:
[0010] Using a magnetic drum causes the magnetite to compress itself toward the drum, thereby expelling water from the magnetite;
[0011] discharging the dewatered magnetite from the drum to a conveyor filter in the form of a vibrating belt filter; and
[0012] The magnetite is fed along a conveyor filter which allows water to drip down from the magnetite and through the belt filter.
[0013] Also disclosed is a method of processing magnetite iron ore, the method comprising the step of crushing the magnetite using high pressure grinding rollers (HPGR).
[0014] Preferably, the step of using high pressure rollers crushes the magnetite from a feed particle size distribution of at least 80 mm to a feed particle size distribution of 8 mm. More preferably, the step of using high pressure rollers crushes the magnetite from a feed particle size distribution of at least 80 mm, 100% through (F 100 80mm) feed particle size distribution is crushed to 8mm, 100% through (F 100 8mm) feed particle size distribution.
[0015] In the case of at least one specific make / model of machine, the step of using a high pressure grinding roller comprises using a high pressure grinding roller having a pressure of 4 N / mm 2 The high pressure grinding roller is a 2.4 m diameter x 2.2 m wide roller operating at a pressure of 1000 g and a roller speed of 2.7 m / s.
[0016] Preferably, the step of using a screen to produce a consistent product and the step of using a dry magnetic separation (DMS) unit to discard non-magnetic materials are also included. More preferably, the dry magnetic separation unit has a composite material construction drum. Optionally, the drum can be formed of other materials such as carbon fiber or kevlar.
[0017] Preferably the method further comprises the step of passing the particles through an air classifier which separates the fines supplied to the bag house from the coarse particles which are supplied back to the further high pressure grinding rolls for separating the particles from the bag house. 100 6-8mm grinding to P 80 60-100μm.
[0018] According to another aspect of the present invention, there is provided an apparatus for processing magnetite iron ore, the apparatus comprising a dry magnetic separation (DMS) unit having a composite fabrication drum, the dry magnetic separation unit being used to discard non-magnetic material.
[0019] Preferably, the apparatus for processing magnetite iron ore comprises a high pressure grinding roller (HPGR) for crushing the magnetite. More preferably, the apparatus for processing magnetite iron ore comprises a dry screen for separating undersize particles from oversize particles, the oversize particles being recycled back through the high pressure grinding roller.
[0020] Even more preferably, the apparatus for processing magnetite iron ore comprises additional high pressure grinding rollers (HPGR) for separating the particles from the F 100 6-8mm grinding to P 80 60-100 μm; and an air classifier for separating the material to be extracted from the material to be fed back to the additional high pressure grinding rolls for additional grinding.
[0021] According to another aspect of the present invention, there is provided an apparatus for processing magnetite iron ore, the apparatus comprising a first high pressure grinding roller for crushing the magnetite, a dry screen for selectively feeding material back to the first high pressure grinding roller, an air classifier for selectively feeding coarse material to a second high pressure grinding roller, a second high pressure grinding roller for further grinding the magnetite and returning material to the air classifier, and a dry magnetic separation (DMS) unit for discarding non-magnetic material, wherein the dry magnetic separation unit is outside two feed and return loops associated with the first high pressure grinding roller and the second high pressure grinding roller.
[0022] Also disclosed is an apparatus for processing magnetite iron ore, the apparatus comprising an upstream cyclone separator and a mill for grinding particles, wherein the upstream cyclone separator is arranged to operate as a flow diverter by diverting overflow material of the upstream cyclone separator to bypass the mill and by supplying underflow material of the upstream cyclone separator to the mill.
[0023] Preferably, the mill is in the form of a High Intensity Grinding mill (HIG mill).
[0024] Preferably, the mill is arranged in the apparatus without any return feed path to the mill.
[0025] In one form, the cyclone separator is arranged to divert approximately 25% of the material to bypass the mill.
[0026] Preferably, the cyclone separator is arranged to divert finely ground material around the mill to prevent over-grinding of feed material and thereby reduce overall mill power consumption.
[0027] In a preferred form, the mill is configured to operate in a relatively low energy grinding mode in which difficult particles are allowed to pass through the open circuit configuration at above a target grind size to be processed and / or discarded by subsequent processing steps.
[0028] Preferably, the apparatus comprises a downstream deslime thickener, wherein the downstream deslime thickener is supplied with material from the mill and the overflow from the upstream cyclone separator. More preferably, the downstream deslime thickener is arranged to deslime material from the mill and the overflow from the upstream cyclone separator at an ascending rate to discard silica and non-magnetic material.
[0029] Preferably, the downstream desliming concentrator is arranged to deslim material from the mill and from the overflow of the upstream cyclone at an ascending rate, discarding silica and non-magnetic material with a relatively low loss of magnetic material compared to the mass loss. More preferably, the downstream desliming concentrator is arranged to deslim material from the mill and from the overflow of the upstream cyclone at a high ascending rate of 8-10 m / h, discarding silica and non-magnetic material with a relatively low loss of magnetic material compared to the mass loss.
[0030] Preferably, the downstream desliming thickener is arranged such that overflow from the downstream desliming thickener is diverted to the tailings storage facility, while underflow from the downstream desliming thickener is supplied onwards for further processing.
[0031] Preferably, the apparatus comprises a magnetic separator arranged to convey magnetic material to said concentrate cyclone and to divert non-magnetic material to a tailings storage facility. More preferably, said magnetic separator provides wet magnetic separation.
[0032] Also disclosed is an apparatus for processing magnetite iron ore, the apparatus comprising a mill for grinding ore particles, wherein the mill is in the form of a Vertical Stirred Mill (VSM).
[0033] In a preferred form, the second circuit grinds harder to grind material that has passed through the first mill circuit; the mill product from the first mill circuit is further processed to remove non-magnetic material (via a desliming thickener and a cleaner magnetic separator), with the magnetic concentrate stream being further classified via a cyclone separator (to remove fine particles) and a high frequency low amplitude vibrating screen, with the high frequency low amplitude vibrating screen upstream being used as feed to a second stage open circuit mill system.
[0034] More preferably, although the secondary open circuit mill system operates in a higher energy grinding mode than the primary circuit, the feed to the secondary circuit is only 12%-18% of the feed flow to the primary mill circuit, thereby minimizing overall mill power consumption by grinding only the larger, lower flow, more difficult to grind materials.
[0035] Also disclosed is an apparatus for processing magnetite iron ore, the apparatus comprising a concentrate cyclone separator arranged to convey underflow material to a high frequency vibrating screen and to convey overflow material to a downstream CCD desliming concentrator.
[0036] Also disclosed is an apparatus for processing magnetite iron ore, the apparatus comprising a screen arranged to convey oversize material to a regrind mill and undersize material to a high grade concentrate thickener.
[0037] Preferably, the high grade concentrate thickener is arranged to divert overflow to a tailings storage facility and supply underflow to a filter feed tank. More preferably, all material from the regrind mill is supplied to a magnetic separator which diverts non-magnetic material to a tailings storage facility and supplies magnetic material to one or more desludging CCD thickeners.
[0038] In a preferred form, one or more desliming thickeners are arranged to divert overflow to a tailings storage facility and supply underflow to a filter feed tank. More preferably, the apparatus comprises a cyclone separator arranged to supply overflow to the one or more desliming thickeners and supply underflow to the screen for screening. Even more preferably, the apparatus provides a product upgrading circuit whereby the percentage content of iron by mass can be increased to ensure a specific grade.
[0039] Preferably, the plant provides a product upgrading circuit, whereby the mass percentage content of iron can be increased to ensure a grade of iron (Fe) content of at least 67% by weight.
[0040] In one form, the high grade concentrate concentrator is capable of providing a high grade magnetite product, for example 25% of the total product at a grade of at least 68% Fe.
[0041] Preferably, the product upgrading circuit minimizes additional grinding by processing only 15%-20% of the material supplied to the concentrate cyclone and ensures that the final concentrate product has a high P 98 45 μm (sieve) to achieve at least 67% Fe and less than 6% SiO 2 target grade.
[0042] Also disclosed is a method of dehydrating magnetite, comprising the step of extracting water from the magnetite by virtue of the magnetism of the magnetite, whereby the magnetite is pulled together under magnetic attraction, thereby squeezing the water outwardly and away from the magnetite.
[0043] Preferably, the method includes the step of using a magnetic drum to cause the magnetite to compress itself towards the drum, thereby draining water from the magnetite. More preferably, the drum is arranged so that the magnetite material falls off the drum under gravity after draining the water. Even more preferably, the magnetite is supplied along a belt filter which allows water to drip down from the magnetite and through the belt filter.
[0044] Also disclosed is an apparatus for dewatering magnetite, comprising a magnetic drum arranged to cause the magnetite to compress itself towards the drum, thereby expelling water from the magnetite.
[0045] Preferably, the apparatus comprises a conveyor belt filter arranged so that magnetite conveyed along the upper surface of the belt filter will compress itself downwardly under the magnetic attraction within the magnetite so that water is drained from the magnetite and through the conveyor belt filter.
[0046] More preferably, the apparatus is configured to achieve a target moisture content of less than or equal to 10% w / w.
[0047] According to another aspect of the present invention, there is provided an apparatus for processing magnetite iron ore, comprising a first high pressure grinding roller (HPGR) for crushing the magnetite iron ore into particles and a second high pressure grinding roller (HPGR) for grinding the particles.
[0048] Preferably, the first high pressure grinding roller grinds the magnetite iron ore from at least 80 mm, 100% through (F 100 80mm) feed particle size distribution is crushed to 8mm, 100% through (F 100 8mm) feed particle size distribution.
[0049] In a preferred form, the second high pressure grinding roller breaks the particles from a feed particle size distribution of 6-8 mm, 100% passing, to a feed particle size distribution of 60-100 μm, 80% passing.
[0050] According to another aspect of the present invention, there is provided a method of processing a low moisture magnetite ore body via a two stage HPGR circuit which allows optimization of the HPGR to operate from a top size of 80 mm to produce a P of 80 μm. 80 products to reduce power consumption.
[0051] Preferably, the first HPGR loop is in a closed loop with the screen and the second HPGR loop is closed with the air classifier / baghouse system.
[0052] More preferably, the two circuits are separated by dry magnetic separation to remove non-magnetic waste before the second circuit, thereby reducing the flux and additional grinding of the second HPGR circuit.
[0053] According to another aspect of the invention, there is provided an apparatus for processing magnetite iron ore, comprising an upstream cyclone and a mill for grinding particles, wherein the upstream cyclone is arranged to operate as a diverter by diverting material in the overflow of the upstream cyclone to bypass the mill and by supplying material in the underflow of the upstream cyclone to the mill, and wherein the apparatus comprises a magnetic separator arranged to convey magnetic material to said upstream cyclone and to divert non-magnetic material.
[0054] Preferably, the magnetic separator is arranged to divert non-magnetic material to a tailings storage facility.
[0055] According to another aspect of the present invention, there is provided an apparatus when used for processing magnetite iron ore, the apparatus comprising a screen arranged to convey oversize material to a regrinding mill and undersize material to a high-grade concentrate concentrator; and a Counter Current Decantation (CCD) concentrator type system for improving the grade of the product.
[0056] Preferably the plant provides a product upgrading loop whereby the mass content of iron can be increased from 64 wt% to 65 wt% total Fe in a magnetite feed stream to ensure a grade of at least 67% by weight of iron (Fe) with minimal losses by desliming (concentrate cyclone) prior to further hydraulic separation processing and by limiting the +45 micron material in the final product stream to <2 wt% via a derrick screen followed by a regrind mill and a magnetic separator to limit oversize mass losses.
[0057] According to another aspect of the present invention, there is provided a magnetite iron ore processing plant comprising a screen arranged to convey oversize material to a regrinding mill and undersize material to a high-grade concentrate concentrator; the plant comprises a countercurrent decantation (CCD) concentrator type system for improving product grade.
[0058] Preferably, the apparatus comprises a cyclone separator arranged to supply overflow to one or more CCD desludging thickeners and underflow to said screen for screening, and a product upgrading circuit which minimises additional grinding by processing only 15%-20% of the material supplied to the cyclone separator and ensures that the final concentrate product is at a P of 45 μm. 98 (sieve) to achieve at least 67% Fe and less than 6% SiO 2 target grade.
[0059] According to another aspect of the present invention, there is provided a method for dehydrating fine magnetite concentrate (P80L≤45μm or more specifically P80L of 25μm-35μm) to a moisture content of ≤10% w / w, the method using an apparatus for dehydrating magnetite as described above, wherein the dehydrated magnetite is discharged from the drum and further dehydrated using a conveyor belt filter, the conveyor belt filter being arranged so that the magnetite conveyed along the upper surface of the belt filter will compress itself downwardly under the magnetic attraction within the magnetite, so that water is further discharged from the magnetite and drained through the conveyor belt filter. BRIEF DESCRIPTION OF THE DRAWINGS
[0061] Preferred embodiments of the present invention will now be described, by way of non-limiting example only, with reference to the accompanying drawings, in which:
[0062] Figure 1 It is the overall “Level 2” process flow chart, including modules 1 to 7;
[0063] Figure 2 Modules 1 and 2 are shown;
[0064] Figure 3 Module 3 is shown;
[0065] Figure 4 Module 4 is shown;
[0066] Figure 5 Module 5 is shown, including module 5A, module 5B and module 5C;
[0067] Figure 6 Module 6 is shown;
[0068] Figure 7 Module 7 is shown;
[0069] Figure 8 Shown are combined modules 3 and 4;
[0070] Fig. 9 Shown is a combined module 5A and module 5B;
[0071] Figure 9a An optional flowchart is shown, which Fig. 9 The above is further expanded to show a second circuit for grinding the harder to grind material that has passed through the first mill circuit;
[0072] Fig.10 Module 5C is shown; and
[0073] Figures 11 to 18 An alternative to high pressure filtration is shown, namely a dewatering drum followed by a belt filter.
[0074] Details
[0075] refer to Figures 1 to 18 , showing a method and apparatus for processing magnetite according to a preferred embodiment of the present invention.
[0076] Figure 1 The 2-stage processing is shown in its entirety, and Figure 2 Primary and secondary crushing in modules 1 and 2 are shown. Figure 3 , shows a method of processing magnetite iron ore, including the step of crushing the magnetite using a high pressure grinding roller (HPGR) 10. It should be noted that the high pressure grinding roller 10 is used in a tertiary crushing mode, rather than a grinding mode.
[0077] In the described embodiment, the step of using the high pressure grinding roller 10 causes the magnetite to be crushed from a feed particle size distribution of at least 80 mm to a feed particle size distribution of 8 mm. More preferably, the step of using the high pressure grinding roller 10 causes the magnetite to be crushed from a feed particle size distribution of at least 80 mm, 100% through (F 100 80mm) feed particle size distribution is crushed to 8mm, 100% through (F 100 8mm) feed particle size distribution.
[0078] In the case of a particular make / model of machine, the step of using a high pressure grinding roller 10 may include using a high pressure grinding roller having a pressure of 4 N / mm 2 The high pressure grinding roller 10 is a 2.4 m diameter x 2.2 m wide roller operated at a pressure of 1000 rpm and a roller speed of 2.7 m / s.
[0079] The method may also include the step of using dry screening 12 to produce a consistent product, and the step of discarding non-magnetic material using a dry magnetic separation (DMS) unit 14. The dry magnetic separation unit 14 may have a composite material manufacturing drum to avoid overheating caused by eddy current phenomena in steel drums.
[0080] Go to Figure 4 The method further comprises the step of passing the particles through an air classifier 16 which separates the fine particles supplied to the bag filter 18 from the coarse particles which are supplied back to the additional high pressure grinding rollers 20 for separating the particles from the bag filter 18. 100 6-8mm grinding to P 80 60-100μm.
[0081] In another aspect, there is provided an apparatus for processing magnetite iron ore comprising a dry magnetic separation (DMS) unit 14 having a composite material fabricated drum, the dry magnetic separation unit 14 being used to discard non-magnetic material.
[0082] exist Figure 3 In the invention, the apparatus for processing magnetite iron ore comprises a high pressure grinding roller (HPGR) 10 for crushing the magnetite. The apparatus for processing magnetite iron ore comprises a dry screen 12 for separating undersize particles from oversize particles, which are recycled back through the high pressure grinding roller 10.
[0083] exist Figure 4 The apparatus for processing magnetite iron ore comprises a device for separating particles from F 100 6-8mm grinding to P 80 60-100 μm further high pressure grinding roll (HPGR) 20; and an air classifier 16 for separating material to be extracted from material to be fed back to the further high pressure grinding roll 20 for further grinding.
[0084] Go to Figure 8 , Figure 8 A combined module 3 and module 4 are shown, and on the other hand, an apparatus for processing magnetite iron ore is provided, the apparatus comprising a first high-pressure grinding roller 10 for crushing the magnetite, a dry screen 12 for selectively feeding material back to the first high-pressure grinding roller 10, an air classifier 16 for selectively feeding coarse material back to a second high-pressure grinding roller 20, a second high-pressure grinding roller 20 for further grinding the magnetite material to return to the air classifier 16, and a dry magnetic separation (DMS) unit 14 for discarding non-magnetic material, wherein the dry magnetic separation unit 14 is outside the two feed and return loops associated with the first high-pressure grinding roller 10 and the second high-pressure grinding roller 20.
[0085] Reference Fig. 9 , also discloses an apparatus for processing magnetite iron ore in the form of modules 5A and 5B, the apparatus comprising an upstream cyclone separator 22 and a mill 24 for grinding particles, wherein the upstream cyclone separator 22 is arranged to operate as a diverter by diverting material in the overflow of the upstream cyclone separator 22 to bypass the mill 24 and by supplying material in the underflow of the upstream cyclone separator 22 to the mill 24.
[0086] The mill 24 may be in the form of a high intensity grinding mill (HIG mill). The mill 24 may be arranged in the apparatus without any return path to the mill 24 .
[0087] In one form, the cyclone 22 is arranged to divert about 25% of the material to bypass the mill 24. The cyclone 22 can be arranged to divert finely ground material around the mill to prevent over-grinding of feed material and thereby reduce overall mill power consumption. The mill can be configured to operate in a relatively low energy grinding mode in which difficult-to-grind particles are allowed to pass through an open circuit configuration above a target grind size to be processed and / or discarded by subsequent processing steps.
[0088] As in Fig. 9 As shown in , the apparatus comprises a downstream desliming thickener 26 (and possibly more than one), wherein the downstream desliming thickener 26 is supplied with material from the mill 24 and the overflow from the upstream cyclone separator. More preferably, the downstream desliming thickener 26 is arranged to deslim material from the mill 24 and the overflow from the upstream cyclone separator 22 at an ascending rate to discard silica and non-magnetic material.
[0089] In one particular form, the downstream desliming concentrator is arranged to deslim material from the mill 24 and the overflow from the upstream cyclone 22 at an ascending rate, discarding silica and non-magnetic material with a relatively low loss of magnetic material compared to the mass loss. Specifically, the downstream desliming concentrator 26 can be arranged to deslim material from the mill 24 and the overflow from the upstream cyclone 22 at a high ascending rate of 8-10 m / h, discarding silica and non-magnetic material with a relatively low loss of magnetic material compared to the mass loss.
[0090] The downstream desliming thickener may be arranged such that overflow from the downstream desliming thickener 26 is diverted to the tailings storage facility 28, while underflow from the downstream desliming thickener 26 is supplied onward for further processing.
[0091] Also like Fig. 9 As shown in , the apparatus comprises a magnetic separator 30 arranged to convey magnetic material to said upstream cyclone separator 22 and to divert non-magnetic material to a tailings storage facility 28. More preferably, said magnetic separator 30 provides wet magnetic separation.
[0092] In another aspect, there is an apparatus for processing magnetite iron ore, the apparatus comprising a mill 24 for grinding ore particles, wherein the mill 24 is in the form of a high intensity grinding mill (HIG mill).
[0093] Reference Fig.10 Module 5C shown in the figure also discloses an apparatus for processing magnetite iron ore, the apparatus comprising a screen 32 (which may be in the form of a high frequency vibrating screen) arranged to convey the oversize material to a regrinding mill 34 and the undersize material to a high grade concentrate concentrator 36.
[0094] The high grade concentrate thickener 36 is arranged to divert overflow to the tailings storage facility 28 and supply underflow to a filter feed tank 38. All material from the regrind mill 34 is supplied to a magnetic separator 40 which diverts non-magnetic material to the tailings storage facility 28 and supplies magnetic material to one or more desludging thickeners 42.
[0095] One or more CCD desliming thickeners 42 are arranged to divert overflow to the tailings storage facility 28 and supply underflow to the filter feed tank 38. The apparatus includes a cyclone separator 44, which is arranged to supply overflow to the one or more desliming thickeners 42 and supply underflow to the screen 32 for screening. The apparatus thus provides a product upgrading loop, whereby the percentage content of iron by mass can be increased to ensure a specific grade.
[0096] In one form, the plant may provide a product upgrading circuit, whereby the percentage content of iron by mass can be increased to ensure a grade of at least 67% iron (Fe) by weight.
[0097] The high grade concentrate concentrator 36 is capable of providing a high grade magnetite product, for example 25% of the total product at a Fe grade of at least 68%.
[0098] The product upgrading circuit can minimise additional grinding by processing only 15%-20% of the material fed to the cyclone 44 and ensure that the final concentrate product is at a P of 45 μm. 98 (sieve) to achieve at least 67% Fe and less than 6% SiO 2 target grade.
[0099] Reference Figures 11 to 18 , also discloses a method for dehydrating magnetite 46, the method comprising the step of extracting water from magnetite 46 through the magnetic properties of magnetite 46, whereby magnetite 46 gathers together under magnetic attraction, thereby squeezing water outward and away from magnetite 46. Fig.11 A container 47 is shown in which the method can be implemented, and Figures 12 to 18 More details of the dewatering equipment are shown.
[0100] The method may include using a magnetic drum (see Fig.13 and Fig.15 ) a step of causing the magnetite 46 to compress itself toward the drum, thereby draining water from the magnetite 46. The drum may be arranged so that the magnetite 46 material falls off the drum under gravity after draining the water. In one form, the magnetite 46 may be supplied along a belt filter 50 that allows water to drip down from the magnetite 46 and through the belt filter 50. The belt filter 50 may be in the form of a vibrating belt filter.
[0101] Also disclosed is an apparatus for dewatering magnetite, the apparatus comprising a magnetic drum arranged to cause the magnetite to compress itself towards the drum, thereby expelling water from the magnetite. The apparatus may include a vibrator for vibrating the belt filter.
[0102] The apparatus may include a conveyor belt filter 50 arranged so that magnetite conveyed along the upper surface of the belt filter 50 will compress itself downwardly under the magnetic attraction within the magnetite, causing water to drain from the magnetite and through the conveyor belt filter 50.
[0103] More preferably, the apparatus is configured to achieve a target moisture content of less than or equal to 10% w / w. Example
[0104] 1. Glossary
[0105] Table 1: Glossary
[0106] Abbreviation Definition
[0107] BBWi Bond Ball Work Index
[0108] CCD Countercurrent Decantation
[0109] CHF Concentrate Processing Facility
[0110] COS Coarse Ore Stockpile
[0111] CWi Crushing work index
[0112] DMS Dry Magnetic Separation
[0113] dt / h dry metric tons per hour
[0114] DTR Davis Tube Recovery
[0115] F 80 Feed particle size distribution - 80% pass
[0116] Fe Iron
[0117] FORTESCUE / FMG Fortescue Metals Group Ltd
[0118] G Gauss
[0119] g / t grams per metric ton
[0120] HPGR High Pressure Grinding Roller
[0121] kg kilogram
[0122] km Kilometer
[0123] kW Kilowatt
[0124] kWh / t kilowatt-hour per metric ton
[0125] μm micrometer
[0126] m Meters
[0127] m 3 / h cubic meters per hour
[0128] mFe Magnets
[0129] mm Millimeters
[0130] Pa Pascal
[0131] Mtpa million metric tons per year
[0132] dMtpa dry million metric tons per year
[0133] O / F Overflow
[0134] O / S Oversize
[0135] P 80 Product particle size distribution - 80% pass
[0136] P 98 Product particle size distribution - 98% passed
[0137] ROM Run of Mine
[0138] rpm revolutions per minute
[0139] SiO 2 Silicon dioxide
[0140] t / h metric tons per hour t / m 2 h metric tons per square meter per hour, refers to the specific sedimentation rate TSF Tailings Storage Facility
[0141] U / F bottom flow
[0142] U / S undersize
[0143] VS variable speed
[0144] VSD Variable Speed Drive
[0145] w / w weight / weight
[0146] WMS Wet Magnetic Separation
[0147] 2. NORTH STAR 2-level device
[0148] The Level 2 unit is designed to process 62.5Mtpa of ROM feed at 32% DTR MR, resulting in a nominal P of 30μm. 80 Produces 20 dMtpa of magnetite concentrate containing 67.1% Fe and 5.6% SiO 2 , where the magnetic Fe recovery was 100% (compared to laboratory DTR test work results for ROM feed).
[0149] The main process equipment consists of the following dry equipment facilities and wet equipment facilities:
[0150] Primary crushing
[0151] Secondary crushing
[0152] ·Three-stage HPGR crushing / screening
[0153] HPGR grinding / air classification
[0154] Fine grinding through magnetic separation and desliming
[0155] CMS Concentrate Upgrading Circuit
[0156] Concentrate and tailings thickening
[0157] · Overland pipeline to port
[0158] · Concentrate filtration and storage facilities at the port.
[0159] 2.1 Overall process flow chart
[0160] Extensive test work programs and process modeling have been conducted over 5 years to establish and validate the basis for the design of the process flowsheet. This testing has utilized material from diamond core drilling and initial mining operations. Extensive laboratory and supplier testing has been verified and validated through the operation of a Level 1 Demonstration Plant and a pilot plant at a location configured in accordance with the Level 2 flowsheet.
[0161] The North Star, Eastern Limb and Glacier Valley low moisture ore bodies enable dry processing using two-stage crushing, HPGR, screening and air classifiers, replacing the more conventional (and higher energy) wet processing of ball milling and cyclones. The use of more efficient agitated regrind mills for subsequent wet processing further reduces energy consumption.
[0162] Based on operating data from the Level 1 Demonstration Plant and extensive test work in the vendor laboratory and at the North Star pilot plant, a Level 2 flowsheet was developed that divides the plant into the following seven modular areas:
[0163] Module 1 - primary crushing
[0164] Module 2 - Secondary crushing
[0165] Module 3-Three-stage crushing
[0166] Module 4 - Grinding
[0167] Module 5 - Fine Grinding
[0168] Module 6 - Tailings
[0169] Module 7 - Dehydration (Port)
[0170] exist Figure 1 The overall 2-level processing flow chart is shown in FIG.
[0171] 2.2 Process equipment
[0172] The Level 2 process unit is designed to process 62.5Mtpa of ROM feed from the 32% ROM feed DTR MR to produce 20Mtpa of magnetite concentrate product containing 67.1% Fe and 5.6% SiO 2 .
[0173] Table 3 shows an overview of the main equipment for a Level 2 installation.
[0174] Table 3: Overview of Level 2 Main Equipment
[0175]
[0176]
[0177] 3. Process description
[0178] 3.1 Module 1 - Primary Crushing (F 100 1.2m to P 100 400mm)
[0179] From the prepared ROM finger of the mining operation, the ROM ore is loaded into a Caterpillar 793F or equivalent rear dump truck and hauled to two gyratory primary crushers. The primary crushers receive 310mm average F 80 size (based on heavy ANFO explosion model) and at an average moisture content of 0.6%. Based on a design CWi of 21 kWh / t, the two primary crushers are each capable of providing ore with a P of 140-160 mm 80 The crushed product is conveyed to the downstream secondary crushing in module 2.
[0180] At an on-stream utilisation of approximately 76.5% (6700h / a), each primary crusher will nominally process 4630t / h of material and has a design capacity of 6,600t / h. This additional capacity allows mining to feed each primary crusher (and subsequent downstream secondary crushers) with a split ratio of 50 / 50 up to a maximum of 60 / 40.
[0181] See also Figure 2 .
[0182] 3.2 Module 2 - Secondary Crushing (F 100 400mm to P100 80mm)
[0183] The purpose of secondary crushing is to reduce the size of the primary crusher product before delivering the material to the coarse ore stockpile (COS). The six cone-type secondary crushers each operate at a nominal capacity of 1,540 t / h, with an operating utilization of 76.5%. The ore is sized at 40 mm to 45 mm. 80 Discharged from the crusher and transported to the COS. The COS consists of four stockpiles that allow the material to be stacked according to the target quality recovery range (low, medium and high). The moving average time delay of the data from the online magnetic analysis will help the radial stacker to direct the crushed material to the corresponding pile.
[0184] The COS acts as a breakpoint between upstream modules 1 and 2, which operate at 76.5% utilization, and the rest of the plant, which operates at 84.5% utilization, by providing effective storage for up to 12 hours before bulldozers are needed to push material forward for downstream processing. Four skirt feeders below the COS fine-tune the blend to ensure uniform bulk recycle feed to downstream module 3.
[0185] See also Figure 2 : Module 1 and Module 2.
[0186] 3.3 Module 3-Three-stage crushing (F 100 80mm to P 100 8mm)
[0187] A tertiary crushing process via a HPGR was introduced into the North Star 2 flowsheet to allow a consistent fine feed to the primary grind. Secondary crushed ore (F 100 80mm) is fed into the HPGR crushing circuit to produce a product of less than 6 to 8mm. The four crushing HPGRs are closed by ten dry double-deck banana screens to produce a consistent product. For the 20Mtpa concentrate production flowsheet, 8,340t / h of ore passes through the HPGR 2.25 times in module 3 and is crushed from the 43mm F 80 After the feed is crushed, the P 80 Discard the undersize.
[0188] The undersize is then fed to twenty dry magnetic separation (DMS) units to efficiently reject silica and non-magnetic material before being conveyed to primary grinding further downstream. An upper size flowsheet of 8mm has been selected based on IBO unit data and test work. The DMS operation will therefore process 32% of the MR feed on 3000G rare earth type dry drums and reject 17% of the total mass (primarily silica and other non-magnetic material) with a low magnetic material loss of 1.5%. See Figure 3 .
[0189] For the 20 dMtpa concentrate production flowsheet, DMS reject is equivalent to a nominal composition of 16.3% Fe and 51.8% SiO 2 10.5dMtpa of material, which is sent to dry tailings dumps. Figure 3 :Module 3.
[0190] 3.4 Module 4 - Primary Grinding (F 100 6-8mm to P 80 60-100μm)
[0191] 8 HPGRs in grinding service operated in closed circuit with air staging to produce 80 μm P 80 When receiving a feed with a BBWi of ≤ 20.8 kWh / t and operating at 490% cycle duty, the HPGR product emissions target is for 20% of the emission products by mass to be ≤ 80 μm.
[0192] Module 3 product material less than 6 mm is conveyed to the air classifier feed bin along with the recycled HPGR grind product. Ten air classifier systems operate in parallel to remove P with a target of approximately 80 μm. 80 The HPGR product produces fine particles. For each AC system, the ore is withdrawn from the bottom of the AC feed bin through a variable speed air classifier vibratory feeder to provide a constant feed rate to the static separator.
[0193] The air classifier system is a three-product separator consisting of a static separator and a dynamic separator. The static section separates the "coarser fines" cut from the air classifier, which is then air conveyed to the dynamic separator. In the dynamic separator, the fines are further refined, with the goal of 80 μm P 80 and upper size of <2mm. The outlet product is conveyed to the bag house. The coarse material discharged from the static section and dynamic section of the air classifier is combined and conveyed to the HPGR grinding feed bin.
[0194] Dynamic Classifier Products(P 80 The 80μm) fraction is recovered via a baghouse system and transported via a covered conveyor to six stirred coarse slurry tanks where process water is added to slurry the fine particles to 50% w / w solids density. The slurry is then pumped to two stirred RMS feed tanks where it is further diluted to 30% w / w solids density before being supplied to the rougher wet magnetic separation circuit. Figure 4 .
[0195] 3.5 Module 5 - Fine Grinding (F 80 80μm to P 80 35μm)
[0196] Module 5 consists of Figure 5 The wet concentrating device depicted in FIG.
[0197] This module is further broken down as follows:
[0198] Module 5A - consists of a rougher wet magnetic separation (WMS) and a cyclone classifier
[0199] Module 5B - consists of fine grinding and desludging
[0200] Module 5C - consists of the cleaner wet magnetic separation (WMS) and concentrate product upgrading circuit.
[0201] In module 5A, the air classifier fines from module 4 are pumped to a rougher WMS (RMS) unit at a solids density of 30% w / w. The RMS unit is a single drum with ceramic ferrite magnets operating at a magnetic field strength of 1150G. For a 20dMtpa concentrate production flowsheet, the RMS unit rejects 38% of the total mass to tailings while limiting magnetic Fe (mFe) losses to 1.8%. The RMS concentrate is conveyed to a hydrocyclone to remove 35μm <P 80 The fine particle material (laser) is then transported to a stirred mill, which is designed to grind to 35 μm P 80 (Laser) product size. Therefore, 25% of the material sent to the hydrocyclone is sent to the overflow and bypasses the stirred mill to reduce power consumption due to over-grinding.
[0202] In module 5B, an open circuit stirred mill was used to grind the particles at a F of 105 μm. 80 (Sieve) Grind the hydrocyclone underflow to produce 35 μm P 80 The finely ground product is then combined with the hydrocyclone overflow and conveyed to the desludging circuit.
[0203] The 2nd stage desludging circuit operates at a high rise rate (8-10 m / h based on O / F) to allow low density, high silica content solids (between 59% and 63% SiO 2 The 20 dMtpa concentrate production flowsheet is based on the 5 CCDs (4 in parallel and then 1 in series) that are used for the desludging circuit due to their smaller diameter and subsequent lower water consumption.
[0204] In module 5C, the desludging product from module 5B is pumped to a cleaner WMS (CMS) unit at a solids density of 20% w / w. The CMS unit is a tripledrum Stephenson type with ceramic ferrite magnets, operating at a magnetic field strength of 1000 G. For a 20 Mtpa concentrate production flowsheet, the CMS unit rejects 13% of the total mass to tailings while limiting magnetic Fe (mFe) losses to 0.6%.
[0205] Depending on the ore body being processed, the cleaner concentrate will be in the 64-67% Fe range. Test work has shown a significant reduction in Fe grade in the >45 μm size fraction for the North Star and Eastern Limb deposits. Therefore, the remainder of module 5C is collectively referred to as the concentrate product upgrading circuit in which processing steps are employed to ensure that the final concentrate product is P > 45 μm. 98 (sieve) to achieve 67.1% Fe and 5.6% SiO 2 The equipment in the upgrading loop includes:
[0206] Concentrate cyclone separator - overflow contains about 60% 24μm P 80 (Laser) input (inlet) cleaner concentrate quality, and is transported to the CCD cleaner;
[0207] High frequency vibrating screen - underflow contains about 60% of the input concentrate, cyclone separator U / F is sent to the high grade concentrate thickener;
[0208] High-grade (HG) concentrate concentrator - further upgrading the high-frequency vibrating screen U / S grade in the high-rate concentrator to a product grade of 68%-69% Fe;
[0209] Regrinding mill - with 69μm F 80 (Sieve) Grind high frequency vibrating screen O / S to produce 26-30μm P 80 (Laser) products, and consume 12.2kWh / t of power;
[0210] Re-Cleaner Wet Magnetic Separator - The regrind mill product is processed at a solids density of 20% w / w through a RCMS (Re-Cleaner Wet Magnetic Separation) unit consisting of a tripledrum Stephenson type with ceramic ferrite magnets operating at a magnetic field strength of 1000 G. The RCMS unit rejects 16% of the total mass to tailings while limiting magnetic Fe (mFe) losses to 1.5%.
[0211] CCD Cleaner - Processes concentrate cyclone O / F and RCMS concentrate in a 2-stage desludging circuit operating at a high rise rate (8-10 m / h based on O / F) to allow additional removal of low density, high silica content solids (at 45% SiO 2 concentration up to 8% by mass), while limiting mFe losses to 1.1%.
[0212] The upgrading circuit removes approximately 7% of the input cleaner concentrate mass to achieve a 67.2% Fe grade with an estimated 1% magnetic loss. The HG and CCD concentrator products are combined in concentrate storage tanks and subsequently pumped to the Module 7 port via an overland pipeline.
[0213] 3.6 Module 6 - Tailings
[0214] Wet tailings from the RMS, CMS and RCMS are combined with overflow from the RMS desludging and CCD cleaner O / F streams and conveyed to three tailings high rate thickeners before being pumped to the tailings storage facility (TSF). The tailings thickeners are designed to achieve an underflow density of 62% w / w solids while pumping 0.3 t / m 2 h specific settling rate and 5 m / h rise rate. Based on test work, flocculant addition has been designed to be 40 g / t and coagulant addition is considered as a mitigation strategy to reduce the amount of residual flocculant in the process water that provides make-up water to the desludging circuit. Figure 6 .
[0215] For the 20 dMtpa concentrate production flowsheet, 32 Mtpa of solids with 18% Fe and 52% SiO containing 19.4 Gl / a of water are delivered to the TSF via a 7 km slurry pipeline. 2 estimated composition.
[0216] See also Figure 6 :Module 6.
[0217] 3.7 Module 7-Dehydration (Port)
[0218] 2,700 dt / h slurry at a density of 62% w / w solids was pumped approximately 135 km to the port. Based on test work (Paterson & Cooke), a yield stress of 1.8 Pa and a plastic viscosity of 40 mPa.s were used for pumping calculations. The slurry was pumped at a solid density in the range of 55% to 68% w / w at a speed of 1.7 to 1.8 m / s.
[0219] Port filtration facilities are based on drum and belt filters and include thickeners, filter feed tanks, filters and auxiliary equipment, e.g. Figure 7 16 drum and 8 belt filters were operated at a filtration rate to achieve a target moisture content of ≤ 10% w / w.
[0220] See also Figure 7 :Module 7.
[0221] Note: Process flow
[0222] Clearly new and inventive areas to be considered are combined modules 3 / 4, combined modules 5A / 5B and module 5C.
[0223] Module 3 tertiary crushing and module 4 grinding: The new flow chart allows:
[0224] Optimization to promote better working of HPGR to maximize HPGR, promote micro-cracking of materials with lower power consumption, where:
[0225] • The input feed size to module 3 may preferably be run at an upper size of 80mm (and possibly up to 100mm) to reduce the load on the upstream secondary crushing.
[0226] The feed size from module 4 is 80 μm P 80 (and potentially down to 60 μm) to improve magnetic release and power reduction in downstream magnetic separators and tower mills respectively.
[0227] Dry magnetic separation occurring outside the two circuits allows for an optimized size to be sent to the DMS (upper size is 6-8 mm) to effectively discard silica and non-magnetic materials at low magnetic losses (17% mass loss at 1.5% magnetic loss). Also, with the DMS outside the circuits, this mitigates the impact of input feed ROM mass recovery fluctuations on the two independent circuits.
[0228] See also Figure 8 .
[0229] Modules 5a & 5b Fine Grinding: New flow chart allows:
[0230] • Optimize mill power by using the upstream cyclone as a "power" separator by diverting approximately 25% of the material in the cyclone overflow to a downstream desliming thickener.
[0231] Desludging of mill and cyclone overflow magnetite products at high rise rates (10 m / h) to effectively discard silica and non-magnetic materials at low magnetic losses (22% mass loss at 1.5% magnetic loss (MFe)) to ensure better operating performance leaving the downstream CMS unit.
[0232] See also Fig. 9 .
[0233] Reference Figure 9a , showing that Fig. 9 An alternative flow chart further extends claims 1-14 as depicted in to show a second circuit (item 24) for grinding harder-to-grind material that has passed through the first mill circuit. The mill product from item 24 is further processed to remove non-magnetic material (via a deslimer thickener and cleaner magnetic separator), where the magnetic concentrate stream is further classified via a cyclone separator (to remove fine particles) and a high frequency low amplitude vibrating screen, where the high frequency low amplitude vibrating screen oversize stream is used as feed to a second stage open circuit mill system. Although this second stage open circuit mill system operates in a higher energy grinding mode than the first stage circuit, the feed to the second stage circuit is only 12%-18% of the feed flow to the first stage mill circuit, thereby minimizing overall mill power consumption by grinding only the larger, lower flow, harder-to-grind material.
[0234] Module 5c Product Upgrade Loop: New flow chart allows:
[0235] - Guaranteed 67+% Fe grade for all ore bodies considered for the project. Typically 64+% Fe grade is upgraded to 67+% Fe with <10% mass loss of feed to module 5c (or 2-3% of original ROM feed).
[0236] The upgrading circuit minimizes additional grinding by processing only 15%-20% of the CMS concentrate material and ensures that the final concentrate product is at 45μm P 98 (sieve) to achieve 67+% Fe and <6% SiO 2 target grade.
[0237] The potential to provide a high grade magnetite product, i.e. 25% of the total product at a grade > 68% Fe.
[0238] See also Fig.10 .
[0239] As will be appreciated from the foregoing, embodiments of the present invention provide an apparatus for processing magnetite iron ore, comprising a first high pressure grinding roller (HPGR) for crushing the magnetite iron ore into particles and a second high pressure grinding roller (HPGR) for grinding the particles. Advantageously, the applicant has determined that energy savings are achieved by having a first HPGR that performs the crushing operation and a second HPGR that performs the grinding operation. Due to vibration, product being too fine, lack of clearance and vibration of the machine, it was never previously expected that an HPGR could be used to reduce 8 mm, 100% through (F 100 8mm) feed particle size distribution to produce 80μm P 80 The applicant has identified the viscosity in the material, the ability of the HPGR to shear the iron ore material from the silica, and has applied inventiveness to achieve an arrangement that enables significant energy and cost savings to be achieved. The present invention relates to unexpected results that have been achieved by virtue of the knowledge, expertise, ingenuity and investment of time of the inventors.
[0240] In one form, the first high pressure grinding roller can be used to grind magnetite iron ore from at least 80 mm, 100% through (F 100 80mm) feed particle size distribution is crushed to 8mm, 100% through (F 100 The second high pressure grinding roller crushes the particles from the feed particle size distribution of 6-8 mm, 100% passing, to the feed particle size distribution of 60-100 μm, 80% passing.
[0241] Advantageously, a method of processing a low moisture magnetite ore body via a two stage HPGR circuit is provided which allows optimization of the HPGR to operate from a top size of 80 mm to produce a P of 80 μm. 80 products to reduce power consumption. The first HPGR loop can be in closed loop with the screen and the second HPGR loop can be closed with the air classifier / bag house system. The two loops can be separated by dry magnetic separation to remove non-magnetic waste before the second loop, reducing the flux and additional grinding of the second HPGR loop.
[0242] Advantageously, embodiments of the invention ensure that a 67% Fe grade is achieved from a total Fe of 64-65wt% of a magnetite feed stream with minimal mass loss by (a) desliming (concentrate cyclone) prior to further hydraulic separation processing; and (b) limiting the oversize mass loss by limiting the +45 micron material in the final product stream to <2wt% via a headframe screen followed by a regrind mill and magnetic separator.
[0243] Advantageously, the present invention provides a method for dewatering fine magnetite concentrate (P80L≤45μm or more specifically P80L of 25μm-35μm) to a moisture content of ≤10% w / w, the method using an apparatus for dewatering magnetite, wherein the dewatered magnetite is discharged from a drum and further dewatered using a conveyor belt filter, the conveyor belt filter being arranged so that the magnetite conveyed along the upper surface of the belt filter will compress itself downwardly under the magnetic attraction within the magnetite, so that water is further drained from the magnetite and drained through the conveyor belt filter.
[0244] Although various embodiments of the present invention have been described above, it should be understood that they are presented by way of example only rather than by way of limitation. It will be apparent to those skilled in the relevant art that various changes in form and detail may be made in the present invention without departing from the spirit and scope of the present invention. Therefore, the present invention should not be limited by any of the exemplary embodiments described above.
[0245] Reference in this specification to any previous publication (or information derived therefrom) or to any known matter is not and should not be taken as an acknowledgment or confirmation or in any form of suggestion that the previous publication (or information derived therefrom) or known matter forms part of the common general knowledge in the field to which this specification relates.
[0246] Throughout this specification and the appended claims, unless the context requires otherwise, the word "comprise" and variations such as "comprises" and "comprising", will be understood to mean the inclusion of stated integers or steps or groups of integers or steps but not the exclusion of any other integers or steps or groups of integers or steps.
[0247] The present invention also relates to the following items:
[0248] 1. A method of dehydrating magnetite to a moisture content of <10% w / w, comprising the step of extracting water from the magnetite by virtue of the magnetism of the magnetite, whereby the magnetite clumps together under magnetic attraction, thereby squeezing water outwards and away from the magnetite.
[0249] 2. The method for dehydrating magnetite according to item 1, comprising the step of using a magnetic drum to compress the magnetite toward the magnetic drum, thereby expelling water from the magnetite.
[0250] 3. A method of dewatering magnetite according to item 2, wherein the drum is arranged so that the magnetite material falls off the drum under gravity after draining the water.
[0251] 4. A method of dewatering magnetite according to item 3, wherein the magnetite is supplied along a belt filter which allows water to drip down from the magnetite and pass through the belt filter.
[0252] 5. The method for dehydrating magnetite according to item 3, wherein the belt filter is a vibrating belt filter.
[0253] 6. Apparatus for dewatering magnetite comprising a magnetic drum arranged to cause said magnetite to compress itself towards said drum, thereby expelling water from said magnetite.
[0254] 7. The apparatus for dehydrating magnetite according to item 6, comprising a conveyor belt filter, wherein the conveyor belt filter is arranged so that the magnetite conveyed along the upper surface of the belt filter will compress itself downward under the magnetic attraction within the magnetite, so that water is discharged from the magnetite and drained through the conveyor belt filter.
[0255] 8. The apparatus for dehydrating magnetite according to item 7, comprising a vibrator for vibrating the conveyor filter.
[0256] 9. Apparatus for dehydrating magnetite according to any one of items 5 to 7, wherein the apparatus is configured to achieve a target moisture content of less than or equal to 10% w / w.
[0257] 10. A method of dehydrating magnetite to a moisture content of <10% w / w comprising the step of extracting water from said magnetite by virtue of the magnetic properties of said magnetite whereby said magnetite clumps together under magnetic attraction thereby squeezing water outwards and away from said magnetite.
[0258] 11. A method for dehydrating fine magnetite concentrate (P80L≤45μm or more specifically P80L of 25μm-35μm) to a moisture content of ≤10% w / w, using the apparatus for dehydrating magnetite according to item 5, wherein the dehydrated magnetite is discharged from the drum and further dehydrated using a conveyor belt filter, the conveyor belt filter being arranged so that the magnetite conveyed along the upper surface of the belt filter compresses itself downwardly under the magnetic attraction within the magnetite, so that water is further discharged from the magnetite and drained through the conveyor belt filter.
[0259] Explanation of Reference Letters in the Drawings
[0260] Figure 1
[0261] A primary crushing (×2)
[0262] B Secondary crushing (×6)
[0263] C Coarse Ore Stock
[0264] D High Pressure Grinding Roller (4)
[0265] E Fine particles
[0266] F air classifier (×10)
[0267] G Bag Filter Chambers (×6) - 4 full size / 2 half size
[0268] H Magnetic Materials
[0269] I Screen material
[0270] J Screen material
[0271] K dry sieve (×10)
[0272] L Coarse material
[0273] M high pressure grinding roller (×8)
[0274] N dry magnetic separation (×20)
[0275] O Rough waste stock
[0276] P water addition
[0277] Q Coarse material transfer tank (×2)
[0278] R Cyclone overflow
[0279] S RMS magnetic materials
[0280] T rougher wet magnetic separation (×58)
[0281] U RMS non-magnetic materials (non-mags)
[0282] V RMS desludging thickener overflow
[0283] W Cyclone Underflow
[0284] X Fine Grinding Mill (×7)
[0285] Y tailings thickener (×3)
[0286] Z to tailings storage facility
[0287] Aa overflow
[0288] Ba RMS Desludging LFCU (4×1)
[0289] CARMS desludge underflow
[0290] Da Cleaner Wet Magnetic Separation (×44)
[0291] Ea CMS Magnetic Materials
[0292] Fa cyclone overflow
[0293] Ga cyclone underflow
[0294] Ha derrick screen (×80)
[0295] Ia sieve feed
[0296] Ja Screening Material
[0297] Ka regrinding mill (×2)
[0298] La re-cleaner wet magnetic separation (×6)
[0299] Ma CMS non-magnetic materials
[0300] Na RCMS non-magnetic materials
[0301] Oa high grade concentrate concentrator
[0302] Pa RCMS magnetic materials
[0303] Qa overflow
[0304] Ra CCD Cleaner LFCU (2×1)
[0305] Sa water addition
[0306] Ta concentrate storage tank (×4)
[0307] Ua to port concentrate pipeline
[0308] Va concentrate filter feed tank (×4) Wa concentrate thickener Xa port concentrate processing facility Ya dewatering drum (×16)
[0309] Za concentrate filter (×8) Ab PW returns to OPF Bb concentrate product to be stored Figure 2
[0310] Cb module 1
[0311] Db primary crushing Eb module 2
[0312] Fb secondary crushing (×3)
[0313] Gb coarse ore stock
[0314] Figure 3 Hb Fresh feed from COS Ib High pressure grinding roller Jb Dry screen Kb Oversize Lb Undersize Mb Magnetic material Nb To module 4
[0315] Ob dry magnetic separation Pb non-magnetic materials Qb DMS waste residue
[0316] Figure 4 Rb comes from module 3
[0317] Sb Air classifier (static / dynamic) Tb Fine particles Ub Magnetic material Vb Coarse material Wb Bag filter Xb Transfer hopper Yb High pressure grinding roller Zb Water addition Ac RMS Feed tank Bc To module 5A
[0318] Figure 5
[0319] Cc is from module 4
[0320] Dc module 5AEc cyclone overflow Fc RMS magnetic material Gc rougher wet magnetic separation (×58) Hc water addition Ic RMS feed tank Jc RMS desludging thickener overflow Kc cyclone underflow Lc RMS non-magnetic material Mc fine grinding mill (×7) Nc RMS desludging LFCU (4×1) Oc to module 6 Pc CMS magnetic material Qc cleaner wet magnetic separation (×44) Rc RMS desludging underflow Sc CMS non-magnetic material Tc module 5BUc regrinding mill Vc CCD cleaner LFCU (2×1) Figure 6
[0321] Wc module 5A-RMS non-magnetic material Xc module 5B-RMS desludging O / FYc module 5C-CMS non-magnetic material Zc module 5C-RCMS non-magnetic material Ad module 5C-CCD cleaner O / FBd tailings thickener (×3)
[0322] Cd to tailings storage facility
[0323] Figure 7
[0324] Dd Concentrate pipeline to port Ed Concentrate thickener Fd Concentrate filter Feed tank (×4) Gd Dewatering drum (×16)
[0325] Hd concentrate processing facilities Id concentrate filter (×8)
[0326] Jd Concentrate products to be stored
[0327] Figure 8 Kd Fresh Feed Ld Module 3
[0328] Md High Pressure Grinding Roller Nd Module 4
[0329] Od Screen material Pd Screen material Qd Dry screen Rd Magnetic material Sd Air classifier (static / dynamic) Td Fine particles Ud Coarse material Vd Dry magnetic separation Wd Non-magnetic material Xd DMS waste residue Yd High pressure grinding roller Zd Bag filter chamber Ae Transfer hopper Be Water addition Ce RMS Feed tank De To module 5A
[0330] Fig. 9 Ee Air classifier Fine particles Fe module 5aGe Cyclone separator Overflow He module 5bIe RMS concentrate Je RMS tailings Ke Magnetic separator
[0331] Le Upstream cyclone Me To module 6 Ne Cyclone underflow Oe To mill feed tank Pe HIG mill Qe Mill product tank Re Overflow
[0332] Se to tailings
[0333] Te water addition
[0334] Ue bottom flow
[0335] Ve CCD1We CCD2Xe Desliming Thickener Ye to CMS
[0336] Figure 9a Ze Fig. 9 Af Cleaner Magnetic Separator Bf CMS Tailings Cf Concentrate Cyclone Overflow Fines Df Concentrate Cyclone Ef Concentrate Cyclone Underflow Ff High Frequency Low Amplitude Vibrating Screen Gf Undersize Hf Oversize If 2nd Mill Circuit Jf Mill Products
[0337] Fig.10 Kf from module 5C section ALf CMS concentrate Mf cyclone overflow Nf cyclone underflow Of screen overfill Pf derrick screen Qf screen underfill Rf HG TH overflow Sf high grade concentrate thickener Tf regrinding mill Uf recleaner wet magnetic separation Vf RCMS tailings Wf RCMS concentrate Xf to tailings module 6 Yf overflow Zf underfill Ag CCD1Bg CCD2Cg CCD3Dg water addition Eg CCD desludging thickener Fg filter Gg feed tank Hg to filter module 7.
Claims
1. An apparatus for dewatering magnetite, comprising a magnetic drum arranged so that the magnetite compresses itself towards the magnetic drum, thereby draining water from the magnetite, wherein the apparatus comprises a conveyor filter arranged so that the dewatered magnetite is drained from the magnetic drum and further dewatered using the conveyor filter, the magnetite being conveyed along an upper surface of the conveyor filter whereby the magnetite compresses itself downwardly under the magnetic attraction within the magnetite, causing water to drain from the magnetite and through the conveyor filter, and wherein the conveyor filter is in the form of a vibrating conveyor filter.
2. An apparatus for dehydrating magnetite according to claim 1, wherein the apparatus comprises a vibrator for vibrating the conveyor filter.
3. Apparatus for dehydrating magnetite according to claim 1 or claim 2, wherein the apparatus is configured to achieve a target moisture content of less than or equal to 10% w / w.
4. A method of dehydrating magnetite to a moisture content of <10% w / w, comprising the step of extracting water from said magnetite by virtue of the magnetic properties of said magnetite, whereby said magnetite clumps together under magnetic attraction, thereby squeezing water outwardly and away from said magnetite, wherein said method comprises the following steps: using a magnetic drum to cause said magnetite to compress itself toward said magnetic drum, thereby expelling water from said magnetite; discharging the dewatered magnetite from the drum to a conveyor filter in the form of a vibrating conveyor filter; and The magnetite is supplied along the conveyor filter which allows water to drip down from the magnetite and through the conveyor filter.
5. A method of dehydrating magnetite to a moisture content of <10% w / w according to claim 4, wherein the magnetic drum is arranged so that the magnetite material falls off the magnetic drum under gravity after drainage of water.
6. A method for dehydrating fine magnetite concentrate to a moisture content of ≤10% w / w, wherein the P80L of the fine magnetite concentrate is ≤45 μm, the method using the apparatus for dehydrating magnetite according to any one of claims 1 to 3, wherein the dehydrated magnetite is discharged from the magnetic drum and further dehydrated using the conveyor filter, the conveyor filter being arranged so that the magnetite conveyed along the upper surface of the conveyor filter will compress itself downwardly under the magnetic attraction within the magnetite, so that water is further discharged from the magnetite and drained through the conveyor filter.
7. A method for dehydrating fine magnetite concentrate to a moisture content of ≤ 10% w / w according to claim 6, wherein the fine magnetite concentrate has a P80L of 25 μm-35 μm.