A method for optimizing the operation of an integrated energy system considering comprehensive demand response

By establishing an energy coupling model for industrial users and integrating multi-energy flow optimization problems, the problem of growing energy demand and expanding capacity in the power grid is solved, and the operation cost saving of industrial users and the stability of energy network is improved, and comprehensive demand response optimization is used. The efficiency of energy resource utilization.

CN113869741BActive Publication Date: 2024-11-19STATE GRID SHANGHAI MUNICIPAL ELECTRIC POWER CO
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111150802.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-09-29
Publication Date
2024-11-19
Estimated Expiration
2041-09-29

AI Technical Summary

Technical Problem

The existing power grid is facing difficulties in energy consumption demand and capacity expansion, resulting in high engineering costs and low resource utilization. It is necessary to alleviate the contradiction between load growth and capacity expansion, especially at the industrial user level, the traditional demand response method has not been It can make full use of the multi-energy flow coupling characteristics, resulting in high pressure and poor stability during peak energy consumption.

Method used

A method for optimizing the operation of industrial integrated energy systems that consider comprehensive demand response is proposed. By obtaining the short-term diversified energy consumption needs of industrial users and the energy purchase situation of energy network, an energy coupling model is established, and cold, heat, electrical and gas energy conversion equipment is integrated. The mixed integer linear programming problem is adopted to optimize the operation of the industrial integrated energy system to achieve the optimal economic objective function and constraints, and solve it using MATLAB's yalmip platform and Cplex tool.

Benefits of technology

It realizes operating cost savings for industrial users, reduces the pressure of energy supply network during peak energy consumption, enhances the stability of the comprehensive energy network, and guides industrial users to participate in the city's comprehensive demand response, and optimizes the utilization efficiency of energy resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113869741B_ABST
    Figure CN113869741B_ABST
Patent Text Reader

Abstract

The present invention discloses an optimized operation method of an industrial integrated energy system considering comprehensive demand response. First, the forecast curve of the short-term multivariate energy demand and energy network energy purchase situation of the industrial user on the operation day is obtained; secondly, the cold, heat, electricity, and gas energy conversion equipment and energy flow coupling of the industrial integrated energy system are modeled and analyzed to establish an energy coupling model; thirdly, the cold, heat, and electricity energy demand characteristics of industrial users participating in the comprehensive demand response are studied, and a mathematical model of the response demand is established accordingly; then the optimization problem of the industrial integrated energy system is abstracted into a mixed integer linear programming problem, and the yalmip platform of MATLAB is used to call the Cplex solution tool for operation optimization and solution; finally, combined with the actual situation of the user, the economic optimal operation mode of the industrial integrated energy system is obtained, providing a basis for managers to formulate operation strategies. The present invention can save the operating costs of industrial users and guide them to participate in the comprehensive demand response of the city.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of operation optimization methods in the field of integrated energy, and specifically relates to an optimized operation method for an industrial integrated energy system taking integrated demand response into consideration. Background Art

[0002] As a strong support for the national economy, the power industry has undergone long-term construction and development. Today, the contradiction between the growth of energy demand and the difficulty of grid expansion will exist for a long time, and the contradiction becomes more acute when considering the seasonal and daily load characteristics. If a large-scale expansion is carried out on the basis of the existing power supply side and transmission and distribution network to ensure the stable operation of the power grid during the few days when the annual peak electricity consumption occurs, not only will the engineering cost be expensive, but also the resource utilization rate will be low from the perspective of the operation of the transmission and distribution network throughout the year. Therefore, a method is needed to alleviate the contradiction between load growth and expansion difficulties in the short term. Demand response provides a feasible solution to the above-mentioned grid development problems. Users can participate in demand response and interact with the grid in a two-way manner to alleviate the contradiction of tight power supply and reduce the peak-to-valley difference of the power system. As load situation awareness technology gradually matures, the demand side can participate in peak shaving, frequency regulation, ancillary services and new energy consumption, and the load side will change from a unilateral peak shaving and valley filling management mode to a two-way interaction with the demand side.

[0003] Industrial user loads have great demand response potential due to their large energy demand. The energy flow in modern industrial parks is complex, and there are coupling relationships in various links such as energy production, conversion, storage, and utilization. Therefore, it is necessary to take the integrated energy system into consideration when studying the demand response of industrial users. At the same time, multi-energy flow coupling has also opened up a new response dimension for traditional power demand response. The integrated energy system integrates various energy supply networks and creates a new energy supply system. It is superior to a single energy system in terms of reliability, flexibility, and economy, and achieves comprehensive energy efficiency improvement. The peak and valley characteristics of different energy loads are often intertwined. The integrated demand response can reduce the pressure on the energy supply network during peak hours and enhance the stability of the integrated energy network through energy substitution. Summary of the invention

[0004] The purpose of the present invention is to overcome the shortcomings of the prior art and provide an industrial integrated energy system operation optimization method taking into account comprehensive demand response, which can save operating costs for industrial users and guide them to participate in urban comprehensive demand response.

[0005] A technical solution to achieve the above object is: a method for optimizing the operation of an industrial integrated energy system considering comprehensive demand response, the method comprising the following steps:

[0006] Step 1: Obtain the forecast curve of the short-term multi-energy demand and energy network purchasing situation of the industrial user on the operation day;

[0007] Step 2: Model and analyze the cold, heat, electricity, and gas energy conversion equipment and energy flow coupling of the industrial integrated energy system to establish an energy coupling model;

[0008] Step 3: According to the cooling, heating and electricity energy demand characteristics and comprehensive demand response of industrial users participating in comprehensive demand response, establish a specific compensation method for industrial users, and establish a mathematical model for response demand accordingly;

[0009] Step 4: Integrate the optimization problem of the industrial integrated energy system into a mixed integer linear programming problem, establish the optimization objective function with the best economic performance, establish the constraints of energy flow and equipment, use MATLAB's yalmip platform, and call the Cplex solver to run the optimization solution;

[0010] Step 5: Finally, based on the actual situation of the user, the economically optimal operation mode of the industrial integrated energy system is obtained, providing a basis for managers to formulate operation strategies.

[0011] Furthermore, in step 1, the short-term multiple energy demands of industrial users on the operating day include cooling demand, heating demand and electricity demand, and the energy network energy purchase situation is the power purchased from the power grid.

[0012] Further, in step 2, the cold, heat, electricity and gas energy conversion equipment of the industrial comprehensive energy system includes: a combined heat and power unit, a gas boiler, a heat storage tank and an electric refrigeration unit, wherein the combined heat and power unit includes: a gas turbine generator, a waste heat recovery boiler and an absorption chiller;

[0013] For each device, there are the following device models,

[0014] (1) CCHP unit:

[0015]

[0016]

[0017] P GT,h (t) = P WHB,h (t)+P LR,h (t)

[0018] P CCHP,c (t) = u CCHP (t)×P LR,h (t)×COP LR

[0019] P CCHP,h (t) = u CCHP (t)×P WHB,in,h (t)×η WHB

[0020] F CCHP,g (t) is the natural gas consumption rate of CCHP unit during period t, m 3 / h;u CCHP (t) is a 0-1 variable reflecting the start and stop status of the CCHP unit during period t, 1 indicates start and 0 indicates stop; P CCHP,e (t) is the output power of CCHP unit in period t, kW; P GT,h (t) is the thermal power generated by GT during period t, kW; LHV is the lower calorific value of natural gas, which is 9.7 kWh / Nm 3 ; η GT,e is the power generation efficiency of the gas turbine generator in the CCHP unit; η GT,loss P is the heat energy self-dissipation rate of the gas turbine generator; WHB,h (t) is the heat input power of the waste heat boiler in the CCHP unit during period t, kW; P CCHP,h (t) is the thermal power output of CCHP unit in period t, kW; P LR,h (t) is the thermal power absorbed by the lithium bromide refrigeration unit from the gas turbine, kW; COP LR is the heat-to-cool conversion efficiency of LR; P CCHP,c (t) is the cooling power output of CCHP unit, kW; η WHB is the thermal efficiency of WHB;

[0021] (2) Gas boiler:

[0022] P GB,h (t) = u GB (t)·F GB,g (t) LHV COP GB

[0023] Where P GB,h (t) is the heating power of the gas boiler during period t, kW; u GB (t) is a 0-1 variable reflecting the start and stop status of the gas boiler during period t, 1 means start, 0 means stop; F GB,g is the natural gas consumption rate of the gas boiler during period t, m 3 / h; COP GB is the heating coefficient of the gas boiler;

[0024] (3) Electric refrigeration:

[0025] P ER,c (t) = P ER,e (t)×COP ER

[0026] Where P ER,e (t) is the power consumption of the electric refrigeration unit during period t, kW; P ER,c(t) is the cooling power produced in period t, kW; COP ER is the refrigeration coefficient;

[0027] (4) Heat storage tank:

[0028]

[0029] In the formula, S TST,h (t) is the heat storage capacity of the heat storage tank during period t, kWh; k TST,loss is the heat loss coefficient of the heat storage tank; P TST,h,ch (t) and P TST,h,disc (t) are the charging and discharging power of the heat storage tank in period t, kW; η TST,ch and η TST,disc are the charging and discharging efficiencies of the heat storage tank respectively.

[0030] Further, as described in step 3, the energy demand that industrial users can participate in responding is divided into energy demand that can be reduced and energy demand that can be transferred. Industrial users participate in the incentive-based comprehensive response and respond to the peak-shaving instructions of the power grid during the period specified in the agreement. The power of successful response is the difference between the user's predicted online purchase power and the user's actual online purchase power when not participating in the response;

[0031] The model that can reduce energy demand is:

[0032] 0≤P cut (t)≤u cut (t)·k cut,max ·P cut,max (t)

[0033] Where P cut (t) is the power reduction demanded at time t, kW; u cut (t) is a 0-1 variable that indicates whether the reducible demand at time t participates in the response. cut (t) = 1 when participating in the response, when u cut (t) = 0 when no participation; k cut,max The maximum reduction factor allowed for industrial users; P cut,max (t) is the total power that can be reduced at time t, kW;

[0034] The model for shiftable energy demand is:

[0035] P trans (t) = P trans,out (t)-P trans,in (t)

[0036] P trans,min (t)≤P trans,0 (t)-P trans (t)≤P trans,max(t)

[0037]

[0038]

[0039] Where P trans,out (t) and P trans,in (t) are the energy demand power transferred out and in during period t, kW; P trans,min (t) and P trans,max (t) is the minimum and maximum power values ​​of the transferable energy demand in period t, kW; P trans,0 (t) is the transferable energy demand power when no response is involved in period t, kW; P trans (t) is the energy demand power value participating in the dispatch during period t, kW; t trans,floor and t trans,ceiling Indicates the start and end time periods when the transferable energy demand participates in the response; transferring energy demand only adjusts energy consumption in time and does not change the total energy consumption.

[0040] Furthermore, in step 4, the objective function of the optimal operation of the industrial integrated energy system is to minimize the operating cost. The operating cost includes: the cost of purchasing gas from the natural gas network, the cost of purchasing electricity from the power grid, the start-up and shutdown costs of CCHP units and gas boilers, the maintenance costs of all equipment, and the compensation for participating in the comprehensive demand response. Its expression is: min(C F +C E +C S +C M -C IDR ), where C F is the gas purchase cost for users, C E The cost of electricity purchased by users, C S is the equipment start-up and shutdown cost, C M is the equipment maintenance cost, C IDR compensation for participation in comprehensive demand response;

[0041] in,

[0042]

[0043]

[0044]

[0045]

[0046]

[0047] c f is the unit price of natural gas, in yuan / m3, Fgrid,g (t) is the gas purchase rate of the user from the natural gas grid during period t, in m 3 / h, Δt is the unit time interval, the unit is h;

[0048] c buy,e (t) is the electricity price per kilowatt-hour purchased by the user during period t, in yuan / kWh, P grid,e (t) is the average power purchased by users from the power grid during period t, in kW; C on is the startup cost of CCHP unit, C off is the shutdown cost, in yuan; u CCHP,on (t),u CCHP,off (t) is a 0-1 variable reflecting the change in the state of the CCHP unit during the t period. When the CCHP unit is started at time t, u CCHP,on (t) is 1, otherwise it is 0. When the CCHP unit is shut down at time t, u CCHP,off (t) is 1, otherwise it is 0;

[0049] and are the maintenance costs of gas turbine generator, lithium bromide absorption chiller, heat pump and electric refrigeration supply unit energy, in RMB / kWh, P GT,e (t), P LR,c (t), P HP,e (t) and P ER,e (t) are the power generation power of the gas turbine generator, the cooling power of the lithium bromide absorption refrigerator, the heating power of the heat pump and the cooling power of the electric refrigeration in the period t, in kW;

[0050] C IDR The compensation fee for users to participate in comprehensive demand response, in yuan; c IDR is the unit electricity compensation price for comprehensive demand response, in yuan / kWh; t IDR,floor and t IDR,ceiling They are the start and end time of the park's participation in comprehensive demand response, and P grid (t) are the predicted purchased power when not participating in comprehensive demand response and the actual purchased power after participating in demand response, in kW.

[0051] Furthermore, in step 5, combined with the actual situation of the user, it is concluded that the economically optimal operation mode of the industrial integrated energy system is subject to the constraints of the operation optimization. The constraints of the operation optimization include the energy balance constraints of the integrated energy system, the output constraints of the equipment, the climbing constraints, and the upper and lower energy limits of the energy storage.

[0052] The present invention provides an integrated energy system optimization operation method considering comprehensive demand response, abstracting the operation optimization problem of the industrial integrated energy system into a mixed integer linear programming problem, determining the objective function and constraint conditions of the operation optimization, and solving the optimal operation plan of the integrated energy system. First, the forecast curve of the short-term multivariate energy demand of the industrial user and the energy purchase situation of the energy network is obtained; secondly, a mathematical model of the energy conversion equipment of the industrial integrated energy system is established; thirdly, a comprehensive demand response model is established, including an energy demand model and a response compensation model involved in the response; then, the operation optimization problem of the integrated energy system is abstracted into a mixed integer linear programming problem, with the optimal economic efficiency of the operation of the integrated energy system as the objective function, and the constraint conditions are the energy balance equation of the integrated energy system, the output constraint of the equipment, the climbing constraint, etc.; finally, the mixed integer linear programming problem is solved to obtain the optimal economic operation mode of the industrial integrated energy system, and provide operation guidance for the industrial integrated energy system. BRIEF DESCRIPTION OF THE DRAWINGS

[0053] Figure 1 A flow chart of an industrial integrated energy system operation optimization method considering integrated demand response according to the present invention;

[0054] Figure 2 This is the energy flow diagram of the comprehensive energy system. DETAILED DESCRIPTION

[0055] In order to better understand the technical solution of the present invention, the following is a detailed description through specific embodiments:

[0056] See also Figure 1 and Figure 2 , an industrial integrated energy system optimization operation method considering comprehensive demand response of the present invention comprises the following steps:

[0057] Step 1: Obtain the forecast curve of the short-term multi-energy demand and energy network purchasing situation of the industrial user on the operating day.

[0058] Step 2: Model and analyze the cold, heat, electricity, and gas energy conversion equipment and energy flow coupling of the industrial integrated energy system to establish an energy coupling model.

[0059] Step 3: According to the cooling, heating and electricity energy demand characteristics and comprehensive demand response of industrial users participating in comprehensive demand response, establish a specific compensation method for industrial users, and establish a mathematical model of response demand based on this.

[0060] Step 4: Integrate the optimization problem of the industrial integrated energy system into a mixed integer linear programming problem, establish the optimization objective function with the best economic performance, establish the constraints of energy flow and equipment, use MATLAB's yalmip platform, and call the Cplex solving tool to run the optimization solution.

[0061] Step 5: Finally, based on the actual situation of the user, the economically optimal operation mode of the industrial integrated energy system is obtained, providing a basis for managers to formulate operation strategies.

[0062] In step 1, the short-term multiple energy demand of industrial users on the operating day includes cooling demand, heating demand and electricity demand, and the energy network purchase situation is the power purchased from the power grid. Industrial users purchase electricity and gas from the power grid and natural gas network respectively, and consume natural gas to produce cooling, heating and electricity through the integrated energy system to meet their multiple energy needs. The prediction time interval is 15 minutes, and there are 96 prediction points in one operating day.

[0063] In step 2, the cold, heat, electricity and gas energy conversion equipment of the industrial comprehensive energy system includes: a combined heat and power unit, a gas boiler, a heat storage tank and an electric refrigeration unit, wherein the combined heat and power unit includes: a gas turbine generator, a waste heat recovery boiler and an absorption chiller. Among them, the combined heat and power unit includes a gas turbine, a waste heat recovery boiler and a lithium bromide absorption chiller. The unit uses natural gas as fuel. The electricity generated by the combustion of natural gas in the gas turbine supplies the electricity demand of users. The flue gas generated is partly generated by the waste heat boiler to produce medium-grade (170℃-550℃) hot steam, which is the main heat source for industrial production. The other part of the flue gas is passed through the absorption chiller to produce cold water, and the remaining unusable flue gas is discharged into the air as residual smoke. When establishing the combined heat and power unit and gas boiler model, its start-stop state and climbing power need to be considered. When establishing the heat storage tank model, it is necessary to establish the relationship between its heat storage size and the charging and discharging heat power.

[0064] For each device, there are the following device models,

[0065] (1) CCHP unit:

[0066]

[0067]

[0068] P GT,h (t) = P WHB,h (t)+P LR,h (t)

[0069] P CCHP,c (t) = u CCHP (t)×P LR,h (t)×COP LR

[0070] P CCHP,h (t) = u CCHP (t)×P WHB,in,h (t)×η WHB

[0071] F CCHP,g (t) is the natural gas consumption rate of CCHP unit during period t, m 3 / h;u CCHP (t) is a 0-1 variable reflecting the start and stop status of the CCHP unit during period t, 1 indicates start and 0 indicates stop; P CCHP,e (t) is the output power of CCHP unit in period t, kW; P GT,h (t) is the thermal power generated by GT during period t, kW; LHV is the lower calorific value of natural gas, which is 9.7 kWh / Nm 3 ; η GT,e is the power generation efficiency of the gas turbine generator in the CCHP unit; η GT,loss P is the heat energy self-dissipation rate of the gas turbine generator; WHB,h (t) is the heat input power of the waste heat boiler in the CCHP unit during period t, kW; P CCHP,h (t) is the thermal power output of CCHP unit in period t, kW; P LR,h (t) is the thermal power absorbed by the lithium bromide refrigeration unit from the gas turbine, kW; COP LR is the heat-to-cool conversion efficiency of LR; P CCHP,c (t) is the cooling power output of CCHP unit, kW; η WHB is the thermal efficiency of WHB;

[0072] (2) Gas boiler:

[0073] P GB,h (t) = u GB (t)·F GB,g (t) LHV COP GB

[0074] Where P GB,h (t) is the heating power of the gas boiler during period t, kW; u GB (t) is a 0-1 variable reflecting the start and stop status of the gas boiler during period t, 1 means start, 0 means stop; F GB,g is the natural gas consumption rate of the gas boiler during period t, m 3 / h; COP GB is the heating coefficient of the gas boiler;

[0075] (3) Electric refrigeration:

[0076] P ER,c (t) = P ER,e (t)×COP ER

[0077] Where P ER,e (t) is the power consumption of the electric refrigeration unit during period t, kW; PER,c (t) is the cooling power produced in period t, kW; COP ER is the refrigeration coefficient;

[0078] (4) Heat storage tank:

[0079]

[0080] In the formula, S TST,h (t) is the heat storage capacity of the heat storage tank during period t, kWh; k TST,loss is the heat loss coefficient of the heat storage tank; P TST,h,ch (t) and P TST,h,disc (t) are the charging and discharging power of the heat storage tank in period t, kW; η TST,ch and η TST ,di sc are the charging and discharging efficiencies of the heat storage tank respectively.

[0081] In step 3, the energy demand that industrial users can participate in responding is divided into energy demand that can be reduced and energy demand that can be transferred. Industrial users participate in the incentive-based comprehensive response and respond to the peak-shaving instructions of the power grid during the period specified in the agreement. The power of successful response is the difference between the user's predicted online purchase power and the user's actual online purchase power when not participating in the response;

[0082] The model that can reduce energy demand is:

[0083] 0≤P cut (t)≤u cut (t)·k cut,max ·P cut,max (t)

[0084] Where P cut (t) is the power reduction demanded at time t, kW; u cut (t) is a 0-1 variable that indicates whether the reducible demand at time t participates in the response. cut (t) = 1 when participating in the response, when u cut (t) = 0 when no participation; k cut,max The maximum reduction factor allowed for industrial users; P cut,max (t) is the total power that can be reduced at time t, kW;

[0085] The model for shiftable energy demand is:

[0086] P trans (t) = P trans,out (t)-P trans,in (t)

[0087] P trans,min (t)≤P trans,0 (t)-Ptrans (t)≤P trans,max (t)

[0088]

[0089]

[0090] Where P trans,out (t) and P trans,in (t) are the energy demand power transferred out and in during period t, kW; P trans,min (t) and P trans,max (t) is the minimum and maximum power values ​​of the transferable energy demand in period t, kW; P trans,0 (t) is the transferable energy demand power when no response is involved in period t, kW; P trans (t) is the energy demand power value participating in the dispatch during period t, kW; t trans,floor and t trans,ceiling Indicates the start and end time periods when the transferable energy demand participates in the response; transferring energy demand only adjusts energy consumption in time and does not change the total energy consumption.

[0091] In step 4, the objective function of the optimal operation of the industrial integrated energy system is to minimize the operating cost. The operating cost includes: the cost of purchasing gas from the natural gas network, the cost of purchasing electricity from the power grid, the start-up and shutdown costs of CCHP units and gas boilers, the maintenance costs of all equipment, and the compensation for participating in the comprehensive demand response. Its expression is: min(C F +C E +C S +C M -C IDR ), where C F is the gas purchase cost for users, C E The cost of electricity purchased by users, C S is the equipment start-up and shutdown cost, C M is the equipment maintenance cost, C IDR compensation for participation in comprehensive demand response;

[0092] in,

[0093]

[0094]

[0095]

[0096]

[0097]

[0098] c fis the unit price of natural gas, in yuan / m3, F grid,g (t) is the gas purchase rate of the user from the natural gas grid during period t, in m 3 / h, Δt is the unit time interval, the unit is h;

[0099] c buy,e (t) is the electricity price per kilowatt-hour purchased by the user during period t, in yuan / kWh, P grid,e (t) is the average power purchased by users from the power grid during period t, in kW; C on is the startup cost of CCHP unit, C off is the shutdown cost, in yuan; u CCHP,on (t),u CCHP,off (t) is a 0-1 variable reflecting the change in the state of the CCHP unit during the t period. When the CCHP unit is started at time t, u CCHP,on (t) is 1, otherwise it is 0. When the CCHP unit is shut down at time t, u CCHP,off (t) is 1, otherwise it is 0;

[0100] and are the maintenance costs of gas turbine generator, lithium bromide absorption chiller, heat pump and electric refrigeration supply unit energy, in RMB / kWh, P GT,e (t), P LR,c (t), P HP,e (t) and P ER,e (t) are the power generation power of the gas turbine generator, the cooling power of the lithium bromide absorption refrigerator, the heating power of the heat pump and the cooling power of the electric refrigeration in the period t, in kW;

[0101] C IDR The compensation fee for users to participate in comprehensive demand response, in yuan; c IDR is the unit electricity compensation price for comprehensive demand response, in yuan / kWh; t IDR,floor and t IDR,ceiling They are the start and end time of the park's participation in comprehensive demand response, and P grid (t) are the predicted purchased power when not participating in comprehensive demand response and the actual purchased power after participating in demand response, in kW.

[0102] In step 5, combined with the actual situation of the user, it is concluded that the economically optimal operation mode of the industrial integrated energy system is subject to the constraints of the operation optimization. The constraints of the operation optimization include the energy balance constraints of the integrated energy system, the output constraints of the equipment, the climbing constraints, and the upper and lower energy limits of the energy storage.

[0103] This method is applied to the target industrial users for actual calculation. If the original cooling demand of the industrial users is all realized by electric refrigeration, the electricity demand and heat demand are purchased through the energy supply network, and they do not participate in the comprehensive demand response, their operating cost is 144,000 yuan. After optimization, the cost of the comprehensive energy system will be reduced to 109,000 yuan, saving 24%.

[0104] Those skilled in the art should recognize that the above embodiments are only used to illustrate the present invention, and are not intended to limit the present invention. As long as they are within the spirit of the present invention, any changes or modifications to the above embodiments will fall within the scope of the claims of the present invention.

Claims

1. A method for optimizing the operation of an industrial integrated energy system considering comprehensive demand response, characterized in that: The method comprises the following steps: Step 1: Obtain the forecast curve of the short-term multi-energy demand and energy network purchasing situation of the industrial user on the operation day; Step 2: Model and analyze the cold, heat, electricity, and gas energy conversion equipment and energy flow coupling of the industrial integrated energy system to establish an energy coupling model; Step 3: According to the cooling, heating and electricity energy demand characteristics and comprehensive demand response of industrial users participating in comprehensive demand response, establish a specific compensation method for industrial users, and establish a mathematical model for response demand accordingly; Step 4: Integrate the optimization problem of the industrial integrated energy system into a mixed integer linear programming problem, establish the optimization objective function with the best economic performance, establish the constraints of energy flow and equipment, use MATLAB's yalmip platform, and call the Cplex solver to run the optimization solution; Step 5: Finally, based on the actual situation of the user, the optimal economic operation mode of the industrial integrated energy system is obtained to provide a basis for managers to formulate operation strategies. In step 3, the energy demand that industrial users can participate in responding is divided into energy demand that can be reduced and energy demand that can be transferred. Industrial users participate in the incentive-based comprehensive response and respond to the peak-shaving instructions of the power grid during the period specified in the agreement. The power of successful response is the difference between the user's predicted online purchase power and the user's actual online purchase power when not participating in the response; The model that can reduce energy demand is: 0≤P cut (t)≤u cut (t)·k cut,max ·P cut,max (t) Where P cut (t) is the power reduction demanded at time t, kW; u cut (t) is a 0-1 variable that indicates whether the reducible demand at time t participates in the response. cut (t) = 1 when participating in the response, when u cut (t) = 0 when no participation; k cut,max The maximum reduction factor allowed for industrial users; P cut,max (t) is the total power that can be reduced at time t, kW; The model for shiftable energy demand is: P trans (t)=P trans,out (t)-P trans,in (t) P trans,min (t)≤P trans,0 (t)-P trans (t)≤P trans,max (t) Where P trans,out (t) and P trans,in (t) are the energy demand power transferred out and in during period t, kW; P trans,min (t) and P trans,max (t) is the minimum and maximum power values ​​of the transferable energy demand in period t, kW; P trans,0 (t) is the transferable energy demand power when no response is involved in period t, kW; P trans (t) is the energy demand power value participating in the dispatch during period t, kW; t trans,f l oor and t trans,ceiling Indicates the start and end time periods when the transferable energy demand participates in the response; transferring energy demand only adjusts energy consumption in time and does not change the total energy consumption.

2. The method for optimizing the operation of an industrial integrated energy system considering comprehensive demand response according to claim 1, characterized in that: In step 1, the short-term multi-energy demand of industrial users on the operating day includes cooling demand, heating demand and electricity demand, and the energy network energy purchase situation is the power purchased from the power grid.

3. The method for optimizing the operation of an industrial integrated energy system considering comprehensive demand response according to claim 1, characterized in that: In step 2, the cold, heat, electricity and gas energy conversion equipment of the industrial comprehensive energy system includes: a combined heat and power unit, a gas boiler, a heat storage tank and an electric refrigeration unit, wherein the combined heat and power unit includes: a gas turbine generator, a waste heat recovery boiler and an absorption chiller; For each device, there are the following device models, (1) CCHP unit: P GT,h (t)=P WHB,h (t)+P LR,h (t) P CCHP,c (t)=u CCHP (t)×P LR,h (t)×COP LR P CCHP,h (t)=u CCHP (t)×P WHB,in,h (t)×η WHB F CCHP,g (t) is the natural gas consumption rate of CCHP unit during period t, m 3 / h;u CCHP (t) is a 0-1 variable reflecting the start and stop status of the CCHP unit during period t, 1 indicates start and 0 indicates stop; P CCHP,e (t) is the output power of CCHP unit in period t, kW; P GT,h (t) is the thermal power generated by GT during period t, kW; LHV is the lower calorific value of natural gas, which is 9.7 kWh / Nm 3 ; η GT,e is the power generation efficiency of the gas turbine generator in the CCHP unit; η GT,loss P is the heat energy self-dissipation rate of the gas turbine generator; WHB,h (t) is the heat input power of the waste heat boiler in the CCHP unit during period t, kW; P CCHP,h (t) is the thermal power output of CCHP unit in period t, kW; P LR,h (t) is the thermal power absorbed by the lithium bromide refrigeration unit from the gas turbine, kW; COP LR is the heat-to-cool conversion efficiency of LR; P CCHP,c (t) is the cooling power output of CCHP unit, kW; η WHB is the thermal efficiency of WHB; (2) Gas boiler: P GB,h (t)=u GB (t)·F GB,g (t)·LHV·COP GB Where P GB,h (t) is the heating power of the gas boiler during period t, kW; u GB (t) is a 0-1 variable reflecting the start and stop status of the gas boiler during period t, 1 means start, 0 means stop; F GB,g is the natural gas consumption rate of the gas boiler during period t, m 3 / h; COP GB is the heating coefficient of the gas boiler; (3) Electric refrigeration: P ER,c (t)=P ER,e (t)×COP ER Where P ER,e (t) is the power consumption of the electric refrigeration unit during period t, kW; P ER,c (t) is the cooling power produced in period t, kW; COP ER is the refrigeration coefficient; (4) Heat storage tank: In the formula, S TST,h (t) is the heat storage capacity of the heat storage tank during period t, kWh; k TST,loss is the heat loss coefficient of the heat storage tank; P TST,h,ch (t) and P TST,h,disc (t) are the charging and discharging power of the heat storage tank in period t, kW; η TST,ch and η TST,disc are the charging and discharging efficiencies of the heat storage tank respectively.

4. The method for optimizing the operation of an industrial integrated energy system considering comprehensive demand response according to claim 1, characterized in that: In step 4, the objective function of the optimal operation of the industrial integrated energy system is to minimize the operating cost. The operating cost includes: the cost of purchasing gas from the natural gas network, the cost of purchasing electricity from the power grid, the start-up and shutdown costs of CCHP units and gas boilers, the maintenance costs of all equipment, and the compensation for participating in the comprehensive demand response. Its expression is: min(C F +C E +C S +C M -C IDR ), where C F is the gas purchase cost for users, C E The cost of electricity purchased by users, C S is the equipment start-up and shutdown cost, C M is the equipment maintenance cost, C IDR compensation for participation in comprehensive demand response; in, c f is the unit price of natural gas, in yuan / m 3 , F grid,g (t) is the gas purchase rate of the user from the natural gas grid during period t, in m 3 / h, Δt is the unit time interval, the unit is h; c buy,e (t) is the electricity price per kilowatt-hour purchased by the user during period t, in yuan / kWh, P grid,e (t) is the average power purchased by the user from the power grid during period t, in kW; C on is the startup cost of CCHP unit, C off is the shutdown cost, in yuan; u CCHP,on (t),u CCHP,off (t) is a 0-1 variable reflecting the change in the state of the CCHP unit during the t period. When the CCHP unit is started at time t, u CCHP,on (t) is 1, otherwise it is 0. When the CCHP unit is shut down at time t, u CCHP,off (t) is 1, otherwise it is 0; and are the maintenance costs of gas turbine generator, lithium bromide absorption chiller, heat pump and electric refrigeration supply unit energy, in RMB / kWh, P GT,e (t), P LR,c (t), P HP,e (t) and P ER,e (t) are the power generation power of the gas turbine generator, the cooling power of the lithium bromide absorption refrigerator, the heating power of the heat pump and the cooling power of the electric refrigeration in the period t, in kW; C IDR The compensation fee for users to participate in comprehensive demand response, in yuan; c IDR is the unit electricity compensation price for comprehensive demand response, in yuan / kWh; t IDR,floor and t IDR,ceiling They are the start and end time of the park's participation in comprehensive demand response, and P grid (t) are the predicted purchased power when not participating in comprehensive demand response and the actual purchased power after participating in demand response, in kW.

5. The method for optimizing the operation of an industrial integrated energy system considering comprehensive demand response according to claim 1, characterized in that: In step 5, combined with the actual situation of the user, it is concluded that the economically optimal operation mode of the industrial integrated energy system is subject to the constraints of the operation optimization. The constraints of the operation optimization include the energy balance constraints of the integrated energy system, the output constraints of the equipment, the climbing constraints, and the upper and lower energy limits of the energy storage.