A method for predicting long-term settlement under the influence of creep during tunnel operation
By determining the dynamic load of the train and establishing a creep model, combined with three-dimensional finite element simulation, the problem of the inability to accurately predict the deformation and settlement of subway tunnels during operation in the existing technology has been solved, and efficient and accurate settlement prediction has been achieved, taking into account rock layer creep. Variation and load transfer effects.
Patent Information
- Application Number
- CN202111328339.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-10
- Publication Date
- 2024-10-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Existing technology cannot accurately predict the deformation and settlement of a subway tunnel during the operation period. In particular, it cannot consider the coupling effect of the creep mechanical properties of the rock layer and the vibration load of the train, resulting in complex calculations and low efficiency.
By determining the dynamic load of the train, a creep model is established, a three-dimensional finite element model is used to simulate the initial settlement value of the tunnel surrounding rock, and the rock layer creep parameters are added to predict the settlement amount under the influence of creep during tunnel operation.
The calculation speed and accuracy are improved, and the deformation and settlement during tunnel operation can be accurately and efficiently predicted. The influence of the lining, track bed, etc. on the load transfer is taken into account, and the accuracy of the prediction is enhanced.
Smart Images

Figure CN113901567B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of tunnel surrounding rock stability analysis, and in particular relates to a method for predicting long-term settlement under the influence of creep during tunnel operation. Background Art
[0002] With the rapid improvement of urbanization level, the requirements for urban traffic capacity are constantly increasing. The existing urban traffic capacity can no longer meet the requirements of urban traffic capacity for rapid development of urbanization. Subway technology is a measure that can effectively improve urban traffic capacity. However, subways are generally built in shallow strata 15m-50m below the surface, and the shallow strata are basically soil layers and soft rock layers. Soil layers and soft strata are prone to settlement and deformation, which pose a great threat to the safety of subway tunnels, especially for underground projects with a long service life such as subway tunnels. In addition, soft soil layers are widely distributed in coastal areas of my country. The abundant water source immersion and seawater erosion have caused the long-term settlement of subway tunnels to continue to grow during the operation period, accounting for a large proportion of the total settlement. The settlement and uneven settlement of subway tunnels in long-term operation are both large, and the settlement and uneven settlement of some sections of tunnels have been developing without convergence. Excessive settlement and uneven settlement of subway tunnels will have a great impact on the lateral and longitudinal forces of the tunnel structure, greatly reducing the safety, durability and waterproofness of the tunnel structure. Large longitudinal uneven settlement will also increase the unevenness of the track, thereby affecting the riding comfort and safe operation of the subway. If it is not effectively controlled, the tunnel will fall into a vicious cycle from uneven settlement to structural damage, and then uneven stress on the tunnel structure will lead to greater uneven settlement. At the same time, excessive settlement of subway tunnels will also cause disasters such as settlement, collapse and cracks on the ground along the line, seriously affecting the safety of ground traffic.
[0003] The long-term settlement of tunnels is studied. First, the factors affecting the long-term settlement of subway tunnels are analyzed. Existing studies have shown that the factors affecting the long-term settlement of subway tunnels in soft soil areas are mainly the following: the influence of subway traffic loads; the influence of geological conditions; the influence of shield construction process; the influence of local leakage of pipe segments; the influence of ground overload above the tunnel; the influence of construction in adjacent areas. After searching the existing technical literature, it was found that the research on the influence of train vibration loads mainly focused on the influence of train vibration loads on the safety of railways and high-speed rail tracks. A very small number of studies only focused on the influence of subway train loads on adjacent buildings. It is impossible to predict the influence of train vibration loads on the deformation of tunnel surrounding rocks, and the creep mechanical properties of the rock layer itself and the prediction of the long-term deformation and settlement of soft rock tunnel surrounding rocks under the coupling of train vibration loads are not considered. Directly using existing prediction methods has a complex calculation process and low calculation efficiency. Moreover, under actual working conditions, the existing train load calculation cannot take into account the impact of rails, fasteners, tunnel linings, etc. on load transfer, nor can it calculate the creep mechanical properties of the rock formation itself. The prediction of the deformation and settlement of subway tunnels during the operation period is inaccurate. Summary of the invention
[0004] The purpose of the present invention is to provide a method for predicting long-term settlement under the influence of creep during tunnel operation, which method can accurately and efficiently predict the deformation and settlement under the influence of creep during tunnel operation.
[0005] The method for predicting long-term settlement under the influence of creep during tunnel operation provided by the present invention comprises the following steps:
[0006] S1. Determine the dynamic load of the train;
[0007] S2. Establish a creep model through indoor uniaxial and triaxial creep tests to determine the creep parameters of the rock stratum where the tunnel is located;
[0008] S3. Establish a three-dimensional finite element model to obtain the initial settlement value of the tunnel surrounding rock;
[0009] S4. Apply train dynamic load to the tunnel ballast and add the creep parameters of the rock formation to obtain the creep strain and vertical settlement of the tunnel soil, and predict the creep effect during tunnel operation.
[0010] The step S1 includes using an exciting force function to simulate a train load, where the train load consists of a static load and a vibration load, specifically:
[0011] F(t)=k(p0+p i sin(ω i t))
[0012] Where F(t) represents the train load; k represents the dispersion coefficient of the influence of lining and ballast on load transfer; p0 represents the static load of the wheel; p i Indicates the typical values of the driving load under different conditions, i = 1, 2, 3, i = 1 is when the train is not smooth, i = 2 is when the dynamic additional load is applied; i = 3 is when the track surface waveform is lost, M represents the unsprung mass of the train; a i represents the typical vector height; ω i It represents the circular frequency of the wavelength of the unsmooth vibration corresponding to the vehicle speed under different factors i; ω i =2vπ / L i , v is the train speed; L i is the typical wavelength under different factors i.
[0013] The creep model is established in step S2, and the creep model includes elastic elements, viscous elements or plastic elements, and the elastic elements, viscous elements or plastic elements are connected in series or in parallel to form the creep model.
[0014] Determining the creep parameters of the rock layer where the tunnel is located in step S2 includes: A1. determining the elements that may be contained in the creep model through the experimental creep curve, establishing the creep model to obtain the creep equation; A2. obtaining the creep parameters through the experimental creep curve fitting.
[0015] The step A1 includes obtaining the creep equation of the creep model:
[0016]
[0017] Wherein, ε is the accumulated creep strain of the tunnel surrounding rock; A is the material-related coefficient in the creep deceleration stage; m0 is the time index; n0 is the stress index in the creep deceleration stage; k is the fitting linear coefficient between the stress and the stress index in the creep deceleration stage; σ is the loading stress; t is the creep time; B is the material-related coefficient in the creep stabilization stage; n1 is the stress index in the creep stabilization stage; C is the creep fitting parameter in the creep acceleration stage; d is the exponent of the creep fitting parameter in the creep acceleration stage; E is the creep fitting constant parameter in the creep acceleration stage; σ s Represents the stress threshold for nonlinear viscoplastic bodies.
[0018] The step A2 includes fitting several parameters of the creep equation of step A1:
[0019] B1. Fitting parameters of the stable creep stage; the strain rate in the stable creep stage is a constant, which is the creep equation when it is less than the stress threshold value; for σ<σ s The creep equation is derived to obtain σ<σ s The creep rate equation is converted to The creep rate and stress curves in logarithmic coordinates are plotted, and the material coefficient B in the creep stability stage and the stress index n1 in the creep stability stage are obtained by fitting;
[0020] B2. Fit the parameters of the deceleration creep stage; draw the time relationship diagram of reaching stable creep under different stress loading conditions; assume the strain rate of the stable creep stage is a constant, The creep rate equation is fitted, and the settlement m is set, m=m0+kσ, to obtain the settlement m values under different stresses; the fitting linear coefficient k between the time index m0 and the stress and stress index in the creep deceleration stage is solved by fitting the relationship between the settlement m and the loading stress σ; and the average value of the stress index n0 in the creep deceleration stage in the fitting formula under different stresses is taken;
[0021] B3. Fitting parameters of the accelerated creep stage; is greater than the stress threshold σ of the nonlinear viscoplastic body s The creep equation is Transformed into After derivation, the curve under logarithmic coordinates is drawn and fitted to obtain the exponent d of the creep fitting parameters in the creep acceleration stage and the creep fitting parameter C in the creep acceleration stage. The exponent d of the creep fitting parameters in the creep acceleration stage and the creep fitting parameter C in the creep acceleration stage are substituted into the value of a point in the acceleration stage to obtain the creep fitting constant parameter E in the creep acceleration stage.
[0022] The step S3 sets the horizontal length of the three-dimensional finite element model, the numerical length of the three-dimensional finite element model and the horizontal length of the tunnel model according to preset values; and simulates the soil in the tunnel model; the horizontal length of the three-dimensional finite element model is selected as ten times the tunnel diameter, and the vertical length of the model is selected as eight times the tunnel diameter, and the horizontal length of the tunnel model ranges from 120m to 180m; the soil in the tunnel model is simulated using the Mohr-Coulomb model; and tunnel excavation is performed to obtain the initial settlement value of the tunnel surrounding rock.
[0023] The step S4 includes applying a train dynamic load to the tunnel ballast, adding the creep parameters of the rock formation, obtaining the creep strain of the tunnel soil and the vertical settlement of the surrounding rock, and predicting the long-term settlement under the influence of creep during tunnel operation.
[0024] In step S4, the vertical settlement amount s of the surrounding rock includes:
[0025]
[0026] Where h is the tunnel burial depth; ε is the accumulated creep strain of the tunnel surrounding rock.
[0027] The method for predicting long-term settlement under the influence of creep during tunnel operation provided by the present invention incorporates the influence of lining, roadbed, etc. on load transfer, and can simulate the influence of creep parameters on settlement under long-term stress conditions, thereby improving the calculation speed and accuracy. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a schematic diagram of the process of the present invention.
[0029] Figure 2 Schematic diagram of a train load time history curve according to an embodiment of the present invention.
[0030] Figure 3 Schematic diagram of strain-time curves of uniaxial creep under different loads according to an embodiment of the present invention.
[0031] Figure 4 It is a schematic diagram of the time required to reach stable creep under different stress loading conditions in an embodiment of the present invention.
[0032] Figure 5 Schematic diagram of a finite element calculation model according to an embodiment of the present invention.
[0033] Figure 6 Schematic diagram of mesh division of the finite element calculation model according to an embodiment of the present invention.
[0034] Figure 7 Schematic diagram of displacement after tunnel excavation according to an embodiment of the present invention.
[0035] Figure 8 Schematic diagram of loading dynamic load of a train according to an embodiment of the present invention.
[0036] Fig. 9 It is a schematic diagram of a predicted tunnel surrounding rock time-settlement curve under a long-term train dynamic load according to an embodiment of the present invention. DETAILED DESCRIPTION
[0037] like Figure 1 The structural diagram of the system of the present invention is as follows: The method for predicting long-term settlement under the influence of creep during tunnel operation provided by the present invention comprises the following steps:
[0038] S1. Determine the dynamic load of the train;
[0039] S2. Establish a creep model through indoor uniaxial and triaxial creep tests to determine the creep parameters of the rock stratum where the tunnel is located;
[0040] S3. Establish a three-dimensional finite element model to obtain the initial settlement value of the tunnel surrounding rock;
[0041] S4. Apply train dynamic load to the tunnel ballast and add the creep parameters of the rock formation to obtain the creep strain and vertical settlement of the tunnel soil, and predict the creep effect during tunnel operation.
[0042] The step S1 includes using an exciting force function to simulate a train load, where the train load consists of a static load and a vibration load, specifically:
[0043] F(t)=k(p0+p i sin(ω i t))
[0044] Where F(t) represents the train load; k represents the dispersion coefficient of the influence of lining and roadbed on load transfer; p0 represents the static load of the wheel; p i Indicates the typical values of the driving load under different conditions, i = 1, 2, 3, i = 1 is when the train is not smooth, i = 2 is when the dynamic additional load is applied; i = 3 is when the track surface waveform is lost, M represents the unsprung mass of the train; a i represents the typical vector height; ω i It represents the circular frequency of the wavelength of the unsmooth vibration corresponding to the vehicle speed under different factors i; ω i =2vπ / L i , v is the train speed; L i is the typical wavelength under different factors i.
[0045] The step S2 of establishing a creep model includes elastic elements, viscous elements or plastic elements, and the elastic elements, viscous elements or plastic elements are connected in series or in parallel to form a creep model. The step S2 of determining the creep parameters of the rock formation where the tunnel is located includes: A1. determining the elements that may be contained in the creep model through the experimental creep curve, establishing the creep model to obtain the creep equation; A2. obtaining the creep parameters through the experimental creep curve fitting.
[0046] The step A1 includes obtaining the creep equation of the creep model:
[0047]
[0048] Wherein, ε is the accumulated creep strain of the tunnel surrounding rock; A is the material-related coefficient in the creep deceleration stage; m0 is the time index; n0 is the stress index in the creep deceleration stage; k is the fitting linear coefficient between the stress and the stress index in the creep deceleration stage; σ is the loading stress; t is the creep time; B is the material-related coefficient in the creep stabilization stage; n1 is the stress index in the creep stabilization stage; C is the creep fitting parameter in the creep acceleration stage; d is the exponent of the creep fitting parameter in the creep acceleration stage; E is the creep fitting constant parameter in the creep acceleration stage; σ sRepresents the stress threshold for nonlinear viscoplastic bodies.
[0049] The step A2 includes fitting several parameters of the creep equation of step A1:
[0050] B1. Fitting parameters of the stable creep stage; the strain rate in the stable creep stage is a constant, which is applicable to the creep equation when the stress is less than the threshold value; for σ<σ s The creep equation is derived to obtain σ<σ s The creep rate equation at this time is: At this time, the first term of the creep rate equation decays to zero, and the creep rate is equal to the second term, that is, σ<σ s The creep rate equation is converted to The creep rate and stress curves in logarithmic coordinates are plotted, and the material coefficient B in the creep stability stage and the stress index n1 in the creep stability stage are obtained by fitting;
[0051] B2. Fit the parameters of the deceleration creep stage; draw the time relationship diagram of reaching stable creep under different stress loading conditions; assume the strain rate of the stable creep stage is a constant, The creep rate equation is fitted, and the settlement m is set, m=m0+kσ, to obtain the settlement m values under different stresses; the fitting linear coefficient k between the time index m0 and the stress and stress index in the creep deceleration stage is solved by fitting the relationship between the settlement m and the loading stress σ; and the average value of the stress index n0 in the creep deceleration stage in the fitting formula under different stresses is taken;
[0052] B3. Fitting parameters of the accelerated creep stage; is the stress threshold σ applicable to nonlinear viscoplastic bodies s The creep equation is Transformed into After derivation, the curve under logarithmic coordinates is drawn and fitted to obtain the exponent d of the creep fitting parameters in the creep acceleration stage and the creep fitting parameter C in the creep acceleration stage. The exponent d of the creep fitting parameters in the creep acceleration stage and the creep fitting parameter C in the creep acceleration stage are substituted into the value of a point in the acceleration stage to obtain the creep fitting constant parameter E in the creep acceleration stage.
[0053] In the step S3, since the three-dimensional tunnel can be simplified into an axisymmetric three-dimensional model, according to experience, the horizontal length of the three-dimensional finite element model is selected as ten times the tunnel diameter, and the vertical length of the model is selected as eight times the tunnel diameter. The horizontal length of the tunnel model ranges from 120m to 180m; the soil in the tunnel model is simulated using the Mohr-Coulomb model, and the floating weight is taken during the calculation process; and the tunnel is excavated to obtain the initial settlement value of the tunnel surrounding rock.
[0054] The step S4 includes applying a train dynamic load to the tunnel ballast, adding the creep parameters of the rock formation, obtaining the creep strain of the tunnel soil and the vertical settlement of the surrounding rock, and predicting the long-term settlement under the influence of creep during tunnel operation.
[0055] In step S4, the vertical settlement amount s of the surrounding rock includes:
[0056]
[0057] Where h is the tunnel burial depth; ε is the accumulated creep strain of the tunnel surrounding rock.
[0058] In the embodiment, a subway tunnel is used as the background. The tunnel is buried at a depth of 25 meters. The rock layer is medium-weathered muddy siltstone. The specific parameters are: bulk modulus is 393.8075MPa, shear modulus is 415MPa, and density is 2.45g / cm 3 , porosity is 0.225, permeability is 1.77e -13 , the uniaxial compressive strength is 21.92MPa.
[0059] like Figure 2 It is a schematic diagram of the train load time-history curve of an embodiment of the present invention. Step 1, determine the dynamic load of the subway train. The subway train adopts 6-car A-type car, 3 meters wide, about 22 meters long, 3.8m high, 143mm track gauge, maximum transport speed of 80km / h, and maximum passenger capacity of 2592 people / train. According to the subway train operation standard, the dispersion coefficient k of the influence of lining and roadbed on load transfer is 0.9, the static load of the wheel is 80kN, the unsprung mass of the train is 750kg, and the typical uneven vibration wavelength and corresponding arrow height are: L1=10m, a1=3.5mm, L2=2m, a2=0.4mm, L3=0.5m, a3=0.08mm, and the train speed is the average value of the entire line operation, v=55km / h. Substitute the above data into the exciting force function F(t)=k(p0+p i sin(ω i t)), draw the train load time history curve as shown in Figure 2 shown.
[0060] like Figure 3 Schematic diagram of the strain-time curve of uniaxial creep under different loads of an embodiment of the present invention. Figure 4 It is a schematic diagram of the time to reach stable creep under different stress loading conditions of the embodiment of the present invention. In the second step, the Norton-Bailey equation of this embodiment is expressed as:
[0061]
[0062] Wherein, ε is the accumulated creep strain of the tunnel surrounding rock; A is the material-related coefficient in the creep deceleration stage; m0 is the time index; n0 is the stress index in the creep deceleration stage; k is the fitting linear coefficient between the stress and the stress index in the creep deceleration stage; σ is the loading stress; t is the creep time; B is the material-related coefficient in the creep stabilization stage; n1 is the stress index in the creep stabilization stage; C is the creep fitting parameter in the creep acceleration stage; d is the exponent of the creep fitting parameter in the creep acceleration stage; E is the creep fitting constant parameter in the creep acceleration stage; σ s Represents the stress threshold for nonlinear viscoplastic bodies.
[0063] Fitting several parameters of the creep equation:
[0064] Fitting parameters of the stable creep stage; the strain rate in the stable creep stage is a constant, which is applicable to the creep equation when the stress is less than the threshold value; for σ<σ s The creep equation is derived to obtain σ<σ s The creep rate equation at this time is: At this time, the first term of the creep rate equation decays to zero, and the creep rate is equal to the second term, that is, σ<σ s The creep rate equation is converted to The creep rate and stress curves in logarithmic coordinates are plotted, and the material coefficient B in the creep stability stage and the stress index n1 in the creep stability stage are obtained by fitting;
[0065] Fit the parameters of the deceleration creep stage; draw the time relationship diagram of reaching stable creep under different stress loading conditions; assume the strain rate of the stable creep stage is a constant, The creep rate equation is fitted, and the settlement m is set, m=m0+kσ, to obtain the settlement m values under different stresses; the fitting linear coefficient k between the time index m0 and the stress and stress index in the creep deceleration stage is solved by fitting the relationship between the settlement m and the loading stress σ; and the average value of the stress index n0 in the creep deceleration stage in the fitting formula under different stresses is taken;
[0066] Fitting parameters of the accelerated creep stage; is the stress threshold σ applicable to nonlinear viscoplastic bodies s The creep equation is Transformed into After derivation, the curve under logarithmic coordinates is drawn and fitted to obtain the exponent d of the creep fitting parameter in the creep acceleration stage and the creep fitting parameter C in the creep acceleration stage. The exponent d of the creep fitting parameter in the creep acceleration stage and the creep fitting parameter C in the creep acceleration stage are substituted into the value of the acceleration stage to obtain the creep fitting constant parameter E in the creep acceleration stage. By taking the average value of the variables in the fitting formula, it can be obtained that m0=0.011, n0=0.194, and the value range of A is 1.627e -8 ~3.136e -8 / h, in Figure 4 It can be seen that the fitting curve is in good agreement with the experimental curve, and the parameters of the final creep equation are obtained.
[0067] like Figure 5 FIG. 1 is a schematic diagram of a finite element calculation model of an embodiment of the present invention. Figure 6 FIG. 1 is a schematic diagram of mesh division of a finite element calculation model according to an embodiment of the present invention. Figure 7 FIG. 1 is a schematic diagram of displacement after tunnel excavation in an embodiment of the present invention. The third step is to establish a three-dimensional finite element model. The schematic diagram of the model is shown in FIG. Figure 5 As shown in the figure, the enlarged part is the lining and ballast structure. The bottom of the model is a fixed constraint, the surrounding is set as roller support, the top is a free boundary, and the whole is set as a gravity field. The mesh division diagram of the geometric model is shown in the figure Figure 6 As shown in Figure 1, the number of grid points is 30529, the number of cells is 162212, the number of edge cells is 4879, and the number of vertex cells is 546. The tunnel is excavated and the following is obtained: Figure 7 Shown is the displacement and plastic strain distribution diagram of the west embankment section.
[0068] The fourth step is to add the train dynamic load and the creep parameters of the rock formation. The train dynamic load loading diagram is as follows: Figure 8 , and obtain the comparison between the predicted value and the actual value of tunnel settlement, such as Fig. 9 The figure is a schematic diagram of the predicted tunnel surrounding rock time-settlement curve under the long-term dynamic load of the train according to the embodiment of the present invention. The results show that the growth rate of the settlement first increases and then decreases with time. Compared with the actual value, the predicted value is greater than the actual value at the initial stage of loading, and the predicted value is less than the actual value after a certain period of time, but the difference is small, and finally tends to be consistent. Therefore, this embodiment can accurately predict the long-term settlement of the tunnel roof considering the creep characteristics of the rock mass, and has certain application value and reference significance. Compared with previous methods, the present invention is simpler, more efficient, and more accurate in predicting the long-term settlement of the tunnel roof, and the predicted settlement amount can be obtained faster.
Claims
1. A method for predicting long-term settlement under the influence of creep during tunnel operation, characterized in that The steps include: S1. Determine the dynamic load of the train; S2. Establish a creep model through indoor uniaxial and triaxial creep tests to determine the creep parameters of the rock stratum where the tunnel is located; Determine the creep parameters of the rock formation where the tunnel is located, including: A1. Determine the elements that may be contained in the creep model through the experimental creep curve, establish the creep model to obtain the creep equation; A2. Obtain the creep parameters through the experimental creep curve fitting; Step A1 includes obtaining the creep equation of the creep model: Wherein, ε is the accumulated creep strain of the tunnel surrounding rock; A is the material-related coefficient in the creep deceleration stage; m0 is the time index; n0 is the stress index in the creep deceleration stage; k is the fitting linear coefficient between the stress and the stress index in the creep deceleration stage; σ is the loading stress; t is the creep time; B is the material-related coefficient in the creep stabilization stage; n1 is the stress index in the creep stabilization stage; C is the creep fitting parameter in the creep acceleration stage; d is the exponent of the creep fitting parameter in the creep acceleration stage; E is the creep fitting constant parameter in the creep acceleration stage; σ s represents the stress threshold of nonlinear viscoplastic body; Step A2 includes fitting several parameters of the creep equation of step A1: B1. Fitting parameters of the stable creep stage; the strain rate in the stable creep stage is a constant, which is the creep equation when it is less than the stress threshold value; for σ<σ s The creep equation is derived to obtain σ<σ s The creep rate equation is converted to The creep rate and stress curves in logarithmic coordinates are plotted, and the material coefficient B in the creep stability stage and the stress index n1 in the creep stability stage are obtained by fitting; B2. Fit the parameters of the deceleration creep stage; draw the time relationship diagram of reaching stable creep under different stress loading conditions; assume the strain rate of the stable creep stage is a constant, The creep rate equation is fitted, and the settlement m is set, m=m0+kσ, to obtain the settlement m values under different stresses; the fitting linear coefficient k between the time index m0 and the stress and stress index in the creep deceleration stage is solved by fitting the relationship between the settlement m and the loading stress σ; and the average value of the stress index n0 in the creep deceleration stage in the fitting formula under different stresses is taken; B3. Fitting parameters of the accelerated creep stage; is greater than the stress threshold σ of the nonlinear viscoplastic body s The creep equation is Transformed into After derivation, a curve under logarithmic coordinates is drawn and fitted to obtain the exponent d of the creep fitting parameter in the creep acceleration stage and the creep fitting parameter C in the creep acceleration stage. The exponent d of the creep fitting parameter in the creep acceleration stage and the creep fitting parameter C in the creep acceleration stage are substituted into the value of a point in the acceleration stage to obtain the creep fitting constant parameter E in the creep acceleration stage. S3. Establish a three-dimensional finite element model to obtain the initial settlement value of the tunnel surrounding rock; S4. Apply train dynamic load to the tunnel ballast and add the creep parameters of the rock formation to obtain the creep strain and vertical settlement of the tunnel soil, and predict the creep effect during tunnel operation.
2. The method for predicting long-term settlement under the influence of creep during tunnel operation according to claim 1, characterized in that The step S1 includes using an exciting force function to simulate a train load, where the train load consists of a static load and a vibration load, specifically: F(t)=k'(p0+p i sin(ω i t)) Where F(t) represents the train load; k' represents the dispersion coefficient of the influence of lining and ballast on load transfer; p0 represents the static load of the wheel; p i Indicates the typical values of the driving load under different conditions, i = 1, 2, 3, i = 1 is when the train is not smooth, i = 2 is when the dynamic additional load is applied; i = 3 is when the track surface waveform is lost, M represents the unsprung mass of the train; a i represents the typical vector height; ω i It represents the circular frequency of the wavelength of the unsmooth vibration corresponding to the vehicle speed under different factors i; ω i =2vπ / L i , v is the train speed; L i is the typical wavelength under different factors i.
3. The method for predicting long-term settlement under the influence of creep during tunnel operation according to claim 1, characterized in that The creep model is established in step S2, and the creep model includes elastic elements, viscous elements or plastic elements, and the elastic elements, viscous elements or plastic elements are connected in series or in parallel to form the creep model.
4. The method for predicting long-term settlement under the influence of creep during tunnel operation according to claim 1, characterized in that The step S3 is to set the horizontal length of the three-dimensional finite element model, the numerical length of the three-dimensional finite element model and the horizontal length of the tunnel model according to preset values; and simulate the soil in the tunnel model; The horizontal length of the three-dimensional finite element model is selected as ten times the tunnel diameter, and the vertical length of the model is selected as eight times the tunnel diameter. The horizontal length of the tunnel model ranges from 120m to 180m. The soil in the tunnel model is simulated using the Mohr-Coulomb model. Tunnel excavation is carried out to obtain the initial settlement value of the tunnel surrounding rock.
5. The method for predicting long-term settlement under the influence of creep during tunnel operation according to claim 1, characterized in that In step S4, the vertical settlement amount s of the surrounding rock includes: Where h is the tunnel burial depth; ε is the accumulated creep strain of the tunnel surrounding rock.
Citation Information
Patent Citations
Method for determining dynamic load of subway operating train and long-term settlement of tunnel
CN104390629A
Method for evaluating long-term power stability of railway roadbed
CN105931143A
Abaqus-based multiaxial creep fatigue prediction method
WO2020143284A1