A method, device and system for controlling power market clearing
By calculating the settlement price of hydropower in operation and adjusting the government benchmark price, the problem of market instability caused by the cost difference between hydropower and thermal power in the power market is solved, and the market stability and the rationality of user-side costs are improved.
Patent Information
- Application Number
- CN202111235672.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-10-22
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2041-10-22
AI Technical Summary
In the electricity market, the power generation cost composition of hydropower and thermal power is quite different, leading to market instability, and there may be problems with low-priced hydropower free-riding, raising the cost of electricity on the user side.
By obtaining the declared price data and hydropower clearing data, we use the preset hydropower market clearing model and price difference settlement formula to calculate the settlement price of hydropower in operation, and conduct power market clearing control according to market control methods, and adjust the government benchmark price to ensure The market is stable.
It improves the market stability of hydropower and thermal power bidding on the same stage in the electricity market, avoids hydropower free-riding, and ensures the rationality of user-side power purchase costs.
Smart Images

Figure CN113935778B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of power market clearing control, and in particular to a power market clearing control method, device and system. Background Art
[0002] At present, my country is in the early stages of power market reform. Most markets have only carried out market-based transactions for thermal power units, and have not yet opened up hydropower units to enter the power market. However, as the market-based reform of the power industry deepens, the power generation plans of various types of power sources will also be gradually liberalized, facing the problem of clearing and pricing mechanisms for hydropower and thermal power to compete in the same market.
[0003] In the existing technology, market transactions are usually regulated by adjusting the price of electricity to achieve market clearing.
[0004] However, the existing technology still has the following defects: the cost structures of hydropower and thermal power generation are quite different. The marginal cost of hydropower generation is lower and the fixed cost is higher, while the opposite is true for thermal power units. The fixed cost of thermal power units is relatively low, while the marginal cost of power generation is relatively high. If hydropower and thermal power compete in the same market, under the market model of unified market marginal clearing, it is easy to cause market instability. In addition, there may be a problem of low-priced hydropower free-riding, which will generally raise the electricity cost on the user side.
[0005] Therefore, there is a need for a method, device and system for controlling the market clearing of electricity, so as to solve the above-mentioned problems existing in the prior art. Summary of the invention
[0006] In view of the above-mentioned existing technical problems, the purpose of the present invention is to provide a method, device and system for controlling the market clearing of electricity, so as to improve the market stability under the premise of co-bidding of hydropower and thermal power in electricity.
[0007] The present invention provides a market clearing control method for electricity, the market clearing control method comprising: obtaining a declared price data group and a hydropower clearing data group; the declared price data group comprises a government benchmark price data group, a self-declared thermal power price data group and a self-declared hydropower price data group; calculating the in-operation hydropower settlement price according to a preset hydropower market clearing model group, a preset price difference settlement formula, the constraint condition group, the government benchmark price data group, the self-declared hydropower price data group, the self-declared thermal power price data group and the hydropower clearing data group; and performing clearing control on the electricity market according to the in-operation hydropower settlement price and a preset market control method.
[0008] In one embodiment, the in-operation hydropower settlement price is calculated based on a preset hydropower market clearing model group, a preset price difference settlement formula, the constraint condition group, the government benchmark price data group, the self-declared hydropower price data group, the self-declared thermal power price data group and the hydropower clearing data group. Specifically, a hydropower market clearing model group is constructed based on the government benchmark price data group, the self-declared hydropower price data group, the self-declared thermal power price data group and the hydropower clearing data group, and a first market clearing price of the hydropower market clearing model group is calculated based on a preset constraint condition group; the in-operation hydropower settlement price is calculated based on the government benchmark price data group, the self-declared hydropower price data group and the first market clearing price through a preset price difference settlement formula.
[0009] In one embodiment, the market clearing control method further includes: real-time monitoring of market transaction data for obtaining electricity, and adjusting the government benchmark price data group according to the market transaction data and a preset quotation adjustment method.
[0010] In one embodiment, after the electricity market is cleared according to the settlement price of the hydropower in operation and a preset market control method, the market clearing control method further includes: outputting a control result and sending the control result to the user.
[0011] The present invention also provides a market-clearing control device for electricity, comprising a data acquisition unit, a price calculation unit and a clearing control unit, wherein the data acquisition unit is used to acquire a declared price data group and a hydropower clearing data group; the declared price data group comprises a government benchmark price data group, a self-declared thermal power price data group and a self-declared hydropower price data group; the price calculation unit is used to calculate the in-operation hydropower settlement price based on a preset hydropower market-clearing model group, a preset in-operation hydropower price difference calculation formula, the constraint condition group, the government benchmark price data group, the self-declared hydropower price data group, the self-declared thermal power price data group and the hydropower clearing data group; the clearing control unit is used to perform market-clearing control of electricity based on the in-operation hydropower settlement price.
[0012] In one embodiment, the price calculation unit is also used to: construct a hydropower market clearing model group based on the government benchmark price data group, the self-declared hydropower price data group, the self-declared thermal power price data group and the hydropower clearing data group, and calculate the first market clearing price of the hydropower market clearing model group based on a preset constraint condition group; calculate the settlement price of in-operation hydropower through a preset price difference settlement formula based on the government benchmark price data group, the self-declared hydropower price data group and the first market clearing price.
[0013] In one embodiment, the market clearing control device also includes a monitoring and adjustment unit, which is used to: monitor and obtain market transaction data of electricity in real time, and adjust the government benchmark price data group according to the market transaction data and a preset quotation adjustment method.
[0014] In one embodiment, the market-clearing control device further includes a result feedback unit, and the result feedback unit is used to output the control result and send the control result to the user.
[0015] The present invention also provides a market-clearing control system for electricity, which includes a clearing control module, a data management module and a user interaction module, and the clearing control module, the data management module and the user interaction module are communicatively connected with each other. The clearing control module is used to execute the market-clearing control method for electricity as described above, and the data management module is used to store a declared price data group, a hydropower clearing data group and data generated during the execution of the market-clearing control method; the user interaction module is used to obtain the user's operation instructions and send the operation instructions to the clearing control module.
[0016] In one embodiment, the user interaction module is further used to send a control result to the user.
[0017] Compared with the prior art, the embodiments of the present invention have the following beneficial effects:
[0018] The present invention provides a method, device and system for controlling the market clearing of electricity. The method, device and system are used to build a model based on a preset hydropower market clearing model group, the government benchmark price data group, the self-declared hydropower price data group, the self-declared thermal power price data group and the hydropower clearing data group. The economic optimal solution of the model is obtained through a preset constraint condition group. Subsequently, the settlement price of in-service hydropower is calculated through a preset price difference settlement formula. The electricity market is cleared based on the in-service hydropower settlement price and a preset market control method. The method, device and system for controlling the market clearing improve the market stability under the premise of co-bidding of hydropower and thermal power in electricity. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The present invention will be further described below in conjunction with the accompanying drawings, wherein:
[0020] Figure 1 A flow chart showing an embodiment of a method for controlling electricity market clearing according to the present invention;
[0021] Figure 2 A structural diagram showing an embodiment of a power market clearing control device according to the present invention;
[0022] Figure 3A structural diagram of an embodiment of an electricity market clearing control system according to the present invention is shown. DETAILED DESCRIPTION
[0023] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention. Specific embodiment 1
[0025] The embodiment of the present invention first describes a method for controlling market clearing of electricity. Figure 1 FIG. 1 is a flow chart showing an embodiment of a method for controlling the market clearing of electricity according to the present invention. Figure 1 As shown, the method comprises the following steps:
[0026] S1: Obtain the declared price data group and the water and electricity clearing data group.
[0027] Since the marginal cost of hydropower generation is relatively low, if hydropower is put on the same stage to compete with thermal power (or other types of power generation), there is a high probability that the market will be unbalanced and the cost on the user side will be raised. In this regard, it is necessary to appropriately adjust the hydropower settlement price through a series of calculations based on the government-set benchmark price for hydropower in the spot market bidding and the self-declared price of hydropower suppliers, so as to avoid the imbalance of hydropower and thermal power in the same stage competition and achieve the smooth development of the power market.
[0028] Specifically, the declared price data group includes the government benchmark price data group, the self-declared thermal power price data group and the self-declared hydropower price data group. Among them, the government benchmark price data in the government benchmark price data group is the benchmark price set by the government agency for the hydropower units in operation to compete in the spot market with reference to the benchmark thermal power grid-connected electricity price; the self-declared thermal power price data group is the normally declared monotonically non-decreasing electricity price for each capacity segment; the self-declared hydropower price data group is the monotonically non-increasing segmented capacity electricity price that is willing to decrease compared to the grid-connected benchmark electricity price.
[0029] Since the benchmark price of hydropower set by the government needs to take into account the actual situation of market consumption, after setting the initial benchmark price, the transaction data of the hydropower market is collected in real time to monitor the market consumption of hydropower, and the government benchmark price is adjusted according to the consumption situation. In one embodiment, the market clearing control method further includes: real-time monitoring of the market transaction data of electricity, and adjusting the government benchmark price data group according to the market transaction data and the preset quotation adjustment method.
[0030] In one embodiment, the hydropower clearing data group includes multiple data groups required for subsequent modeling operations, including: system data group, unit data group, tie line data group, load data group and sensitivity data group. Among them, the system data group includes time period information, system load, and system backup requirements; the unit data group includes basic unit information, unit calculation parameters, unit startup quotation, unit energy quotation, unit initial state, unit power constraint and unit ramp rate; the tie line planning data group includes basic tie line information and tie line planned power; the load data group includes bus load forecast results; the sensitivity data group includes the power generation transfer distribution factors of the unit and load injection power for the line and section flow respectively. Among them, the unit ramp rate includes the maximum up ramp rate and the maximum down ramp rate.
[0031] S2: Calculate the settlement price of operating hydropower based on the preset hydropower market clearing model group, the preset price difference settlement formula, the preset constraint condition group, the government benchmark price data group, the self-declared hydropower price data group, the self-declared thermal power price data group and the hydropower clearing data group.
[0032] In order to minimize the increase in electricity purchase costs on the user side, it is necessary to calculate the minimum electricity purchase cost under various constraints.
[0033] In this regard, the embodiment of the present invention establishes a preset hydropower market clearing model group, constrains it with multiple constraints on the basis of the model, and brings various data into the model to obtain the first market clearing price (i.e., the minimum electricity purchase cost) and the unit output plan. Subsequently, through the preset price difference settlement formula, the difference between the government benchmark price and the first market clearing price is deducted from the self-declared hydropower price, thereby realizing the hydropower price difference settlement, so as to avoid the problem of hydropower taking a market free ride when competing with thermal power, thereby achieving control of the power market clearing by regulating the hydropower settlement price in the power market.
[0034] In one embodiment, the in-operation hydropower settlement price is calculated based on a preset hydropower market clearing model group, a preset price difference settlement formula, the constraint condition group, the government benchmark price data group, the self-declared hydropower price data group, the self-declared thermal power price data group and the hydropower clearing data group. Specifically, a hydropower market clearing model group is constructed based on the government benchmark price data group, the self-declared hydropower price data group, the self-declared thermal power price data group and the hydropower clearing data group, and a first market clearing price of the hydropower market clearing model group is calculated based on a preset constraint condition group; the in-operation hydropower settlement price is calculated based on the government benchmark price data group, the self-declared hydropower price data group and the first market clearing price through a preset price difference settlement formula.
[0035] In one embodiment, the preset hydropower market clearing model group includes a hydropower unit combination model and a hydropower unit dispatching model. The hydropower unit combination model can be used to solve the unit startup combination when the power purchase cost is minimized; the hydropower unit dispatching model can be used to solve the unit output plan when the power purchase cost is minimized. On this basis, in one embodiment, the hydropower unit combination model is a mixed integer linear programming model, and the hydropower unit dispatching model is a linear programming model; both can call mature optimization algorithm software packages (such as CPLEX) for optimization calculations.
[0036] Among them, the formula of the hydropower unit combination model is:
[0037]
[0038] On the other hand, the formula of the hydropower unit dispatching model is:
[0039]
[0040] Wherein, N represents the total number of units; T represents the total number of time periods considered, and here 96 time periods of the operating day are considered, that is, in the embodiment of the present invention, T is 96; P i,t represents the output of unit i in period t; C i,t (P i,t ), are the operating cost, startup cost and downtime cost of unit i in period t (optional). i,t (P i,t ) is a multi-segment linear function of the government benchmark price data set and the self-declared hydropower price data set.
[0041] For the preset hydropower unit combination model, a preset constraint condition group including several constraint conditions is also required to constrain. In one embodiment, the constraint condition group includes a first constraint condition group for constraining the hydropower unit combination model and a second constraint condition group for constraining the hydropower unit scheduling model; wherein the first constraint condition group includes a system constraint group, a unit constraint group and a network security constraint group; the second constraint condition group includes a second system constraint group, a second unit constraint group and a second network security constraint group.
[0042] In one embodiment, the system constraint group includes load balance constraint, system positive reserve constraint, system negative reserve constraint, system spinning reserve constraint, and AGC reserve constraint; the unit constraint group includes unit output limit constraint, unit ramp constraint, and unit minimum start-stop time constraint; the network security constraint group includes line flow constraint and section flow constraint. Among them, the system positive reserve constraint and the system negative reserve constraint are the reserve capacity constraints reserved to prevent the fluctuation of system supply and demand imbalance caused by the forecast deviation of system load and various accidents.
[0043] Specifically, the load balancing constraints are:
[0044]
[0045] Among them, P i,t represents the output of unit i in period t, D t is the system load during period t, which has deducted the net power supplied by the interconnection line.
[0046] Specifically, the system positive and standby constraints are as follows:
[0047]
[0048] Among them, α i,t represents the start and stop status of unit i in period t, α i,t =0 means the unit is shut down, α i,t =1 means the unit is on; is the maximum output of unit i in period t; is the system positive spare capacity requirement for period t.
[0049] Specifically, the system negative reserve constraints are:
[0050]
[0051] in, is the minimum output of unit i in period t; is the system negative reserve capacity requirement for period t.
[0052] Specifically, the system spinning reserve constraints are:
[0053]
[0054]
[0055] in, is the maximum ramp rate of unit i, is the maximum down-slope rate of unit i; are the maximum and minimum outputs of unit i in period t respectively; They are respectively used to increase and decrease the spinning reserve requirement for period t.
[0056] Specifically, the AGC standby constraints are:
[0057]
[0058]
[0059] in, They are the AGC up-regulation and down-regulation reserves that unit i can provide during period t; They are the AGC upward and downward reserve requirements for period t respectively.
[0060] Specifically, the unit output limit constraints are:
[0061]
[0062] If the unit is shut down, α i,t =0, then the unit output can be limited to 0 through this constraint; when the unit is turned on, α i,t =1, this constraint is the conventional upper and lower output limit constraint.
[0063] Specifically, the unit climbing constraints are as follows:
[0064]
[0065]
[0066] Among them, ΔP i U is the maximum ramp rate of unit i, ΔP i D is the maximum ramp down rate of unit i.
[0067] Specifically, the minimum start and stop time constraints of the unit are as follows:
[0068]
[0069]
[0070] Among them, α i,t is the start and stop status of unit i in period t; T U 、T D The minimum continuous start time and minimum continuous shutdown time of the unit; is the continuous startup time and continuous shutdown time of unit i in period t, which can be expressed by the state variable α i,t (i=1~N, t=1~T) to express:
[0071]
[0072]
[0073] Specifically, the line power flow constraints are:
[0074]
[0075] in, is the power transmission limit of line l; G l-i is the generator output power transfer distribution factor of the node where unit i is located to line l; K is the number of nodes in the system; G l-k is the generator output power transfer distribution factor of node k to line l; D k,t is the bus load prediction result of node k in period t.
[0076] Specifically, the cross-section flow constraints are:
[0077]
[0078] Among them, are the power flow transmission limits of section s; G s-i G is the generator output power transfer distribution factor of the node where unit i is located to section s; s-k is the generator output power transfer distribution factor for node k to section s.
[0079] In one embodiment, the second system constraint includes a second load balance constraint; the second unit constraint group includes a second unit output limit constraint and a second unit ramp constraint; the second network security constraint group includes a second line flow constraint and a second section flow constraint.
[0080] Among them, the second load balancing constraint is the same as the load balancing constraint, the second unit output limitation constraint is the same as the unit output limitation constraint; and the second network security constraint group is the same as the network security constraint group.
[0081] On the other hand, the formula for the ramp constraint of the second unit is:
[0082]
[0083] In the formula, is the maximum ramp rate of unit i, ΔP i D is the maximum ramp down rate of unit i.
[0084] Through the above modeling and solving process, the first market clearing price (i.e., the minimum power purchase cost) after minimizing the power purchase cost can be obtained. On this basis, unlike the prior art method of directly using the optimal solution of the model (the first market clearing price) for settlement, in order to enable the power market to develop smoothly under the premise of hydropower and thermal power bidding on the same platform, the embodiment of the present invention calculates the settlement price of hydropower in operation through a preset price difference settlement formula. Among them, the preset price difference settlement formula is:
[0085] P i,settle =P i,Gid -(P ref -P i );
[0086] Where P i,settle is the settlement price of hydropower in operation of hydropower unit i, P i,Gid is the self-declared hydropower price data of hydropower unit i, P ref is the government benchmark price data; P i is the node electricity price of hydropower unit i that clears the spot market (obtained based on the first market clearing price and the unit output plan when the electricity purchase cost is minimized).
[0087] S3: Based on the settlement price of the hydropower in operation and the preset market control method, the electricity market is cleared and controlled.
[0088] After calculating and obtaining the settlement price of hydropower in operation, the hydropower market transaction should be settled according to the settlement price of hydropower in operation at the node to be settled. At the same time, the thermal power market transaction should be settled according to the self-declared thermal power price of the corresponding node, so as to complete the power market clearing control. By pricing and settling the hydropower to be settled based on the hydropower price in operation obtained from the price difference settlement, the embodiment of the present invention avoids the problem of unstable market development caused by different cost pricing when hydropower and thermal power compete on the same platform.
[0089] In order to enable users to more intuitively understand the market clearing control of electricity, it is necessary to send the market clearing control results to users. Therefore, in one embodiment, after the electricity market is cleared according to the settlement price of the hydropower in operation and the preset market control method, the market clearing control method further includes: outputting the control results and sending the control results to the user. In one embodiment, the control results include the node electricity prices of various units, the unit output plans and the market settlement fees.
[0090] The present invention provides a market clearing control method for electricity. Modeling is performed according to a preset hydropower market clearing model group, the government benchmark price data group, the self-declared hydropower price data group, the self-declared thermal power price data group and the hydropower clearing data group. The economic optimal solution of the model group is obtained through a preset constraint condition group. Subsequently, the settlement price of in-operation hydropower is calculated through a preset price difference settlement formula. The electricity market is cleared according to the settlement price of in-operation hydropower and a preset market control method. The market clearing control method improves the market stability under the premise of co-bidding of hydropower and thermal power in electricity. Specific embodiment 2
[0092] In addition to the above method, the embodiment of the present invention also describes a market clearing control device for electricity. Figure 2 A structural diagram of an embodiment of a power market clearing control device according to the present invention is shown.
[0093] like Figure 2As shown, the market clearing control device includes a data acquisition unit 11, a price calculation unit 12 and a clearing control unit 13.
[0094] The data acquisition unit 11 is used to acquire a declared price data group and a hydropower clearing data group. The declared price data group includes a government benchmark price data group, a self-declared thermal power price data group, and a self-declared hydropower price data group.
[0095] The price calculation unit 12 is used to calculate the settlement price of hydropower in operation according to the preset hydropower market clearing model, the preset formula for calculating the price difference of hydropower in operation, the constraint condition group, the government benchmark price data group, the self-declared hydropower price data group, the self-declared thermal power price data group and the hydropower clearing data group. In one embodiment, specifically, the price calculation unit 12 is also used to construct a hydropower market clearing model according to the government benchmark price data group, the self-declared hydropower price data group, the self-declared thermal power price data group and the hydropower clearing data group, and calculate the first market clearing price of the hydropower market clearing model according to the preset constraint condition group; calculate the settlement price of hydropower in operation according to the government benchmark price data group, the self-declared hydropower price data group and the first market clearing price through the preset price difference settlement formula.
[0096] The clearing control unit 13 is used to control the market clearing of electricity according to the settlement price of the hydropower in operation.
[0097] When it is necessary to perform market clearing control on the electricity market, the market clearing control device realizes the market clearing control of electricity through the method as described above. Specifically, firstly, the declared price data group and the hydropower clearing data group are acquired through the data acquisition unit 11; then, the settlement price of the hydropower in operation is calculated through the price calculation unit 12 according to the preset hydropower market clearing model, the preset hydropower price difference calculation formula in operation, the constraint condition group, the government benchmark price data group, the self-declared hydropower price data group, the self-declared thermal power price data group and the hydropower clearing data group; finally, the market clearing control of electricity is performed according to the settlement price of the hydropower in operation through the clearing control unit 13.
[0098] Since the benchmark price of hydropower set by the government needs to take into account the actual situation of market consumption, after setting the initial benchmark price, the transaction data of the hydropower market is collected in real time to monitor the market consumption of hydropower, and the government benchmark price is adjusted according to the consumption situation. In one embodiment, the market clearing control device also includes a monitoring and adjustment unit, which is used to monitor the market transaction data of electricity in real time, and adjust the government benchmark price data group according to the market transaction data and a preset quotation adjustment method.
[0099] In one embodiment, the market-clearing control device further includes a result feedback unit, and the result feedback unit is used to output the control result and send the control result to the user.
[0100] The present invention provides a market clearing control device for electric power, which models a preset hydropower market clearing model group, the government benchmark price data group, the self-declared hydropower price data group, the self-declared thermal power price data group and the hydropower clearing data group, obtains the economic optimal solution of the model group through a preset constraint condition group, then calculates the settlement price of in-service hydropower through a preset price difference settlement formula, and performs clearing control on the electric power market based on the settlement price of in-service hydropower and a preset market control method. The market clearing control device improves the market stability under the premise of co-bidding of hydropower and thermal power in the electric power. Specific embodiment three
[0102] In addition to the above method and apparatus, the present invention also describes a market clearing control system for electricity. Figure 3 A structural diagram of an embodiment of an electricity market clearing control system according to the present invention is shown.
[0103] like Figure 3 As shown, the market clearing control system includes a clearing control module 1, a data management module 2 and a user interaction module 3, and the clearing control module 1, the data management module 2 and the user interaction module 3 are communicatively connected with each other.
[0104] Among them, the clearing control module 1 is used to execute the market clearing control method for electricity as described above, the data management module 2 is used to store the declared price data group, the hydropower clearing data group and the data generated during the execution of the market clearing control method; the user interaction module 3 is used to obtain the user's operation instructions and send the operation instructions to the clearing control module.
[0105] In one embodiment, the user interaction module 3 is also used to send the control result to the user. On this basis, the user interaction module 3 also includes a touchable / non-touchable display screen, an input keyboard, a virtual keyboard, an indicator light, and a combination of one or more of the above.
[0106] The present invention provides a market clearing control system for electricity. Modeling is performed based on a preset hydropower market clearing model group, the government benchmark price data group, the self-declared hydropower price data group, the self-declared thermal power price data group and the hydropower clearing data group. The economic optimal solution of the model group is obtained through a preset constraint condition group. Subsequently, the settlement price of in-service hydropower is calculated through a preset price difference settlement formula. The electricity market is cleared based on the in-service hydropower settlement price and a preset market control method. The market clearing control system improves the market stability under the premise of co-bidding of hydropower and thermal power in electricity.
[0107] The specific embodiments described above further illustrate the purpose, technical solutions and beneficial effects of the present invention. It should be understood that the above description is only a specific embodiment of the present invention and is not intended to limit the scope of protection of the present invention. It is particularly pointed out that for those skilled in the art, any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the scope of protection of the present invention.
Claims
1. A method for controlling the market clearing of electricity, characterized in that: The market clearing control method includes: Obtaining a declared price data group and a hydropower clearing data group; the declared price data group includes a government benchmark price data group, a self-declared thermal power price data group, and a self-declared hydropower price data group; Calculate the settlement price of hydropower in operation according to the preset hydropower market clearing model group, the preset price difference settlement formula, the preset constraint condition group, the government benchmark price data group, the self-declared hydropower price data group, the self-declared thermal power price data group and the hydropower clearing data group; Carry out clearing control of the electricity market according to the settlement price of the hydropower in operation and the preset market control method; The calculation of the settlement price of hydropower in operation according to the preset hydropower market clearing model group, the preset price difference settlement formula, the preset constraint condition group, the government benchmark price data group, the self-declared hydropower price data group, the self-declared thermal power price data group and the hydropower clearing data group is specifically as follows: Constructing a hydropower market clearing model group based on the government benchmark price data group, the self-declared hydropower price data group, the self-declared thermal power price data group and the hydropower clearing data group, and calculating a first market clearing price of the hydropower market clearing model group based on a preset constraint condition group; Calculate the settlement price of the hydropower in operation by using a preset price difference settlement formula based on the government benchmark price data group, the self-declared hydropower price data group and the first market clearing price; The preset hydropower market clearing model group includes a hydropower unit combination model and a hydropower unit scheduling model. The hydropower unit combination model is used to solve the unit startup combination when the power purchase cost is minimized; the hydropower unit scheduling model is used to solve the unit output plan when the power purchase cost is minimized; The combined model of the hydropower unit is: ; The hydropower unit dispatching model is: ; In the formula, N Indicates the total number of units; T represents the total time period considered; Indicates the unit i exist t Output during the time period; 、 、 For each unit i In the period t operating costs, start-up costs and downtime costs; The preset constraint condition group includes a first constraint condition group for constraining the combination model of the hydropower unit and a second constraint condition group for constraining the dispatch model of the hydropower unit; wherein the first constraint condition group includes a system constraint group, a unit constraint group and a network security constraint group; the second constraint condition group includes a second system constraint group, a second unit constraint group and a second network security constraint group; the system constraint group includes load balance constraints, system positive standby constraints, system negative standby constraints, system rotating standby constraints and AGC standby constraints; the unit constraint group includes unit output limit constraints, unit climbing constraints and unit minimum start and stop time constraints; the network security constraint group includes line flow constraints and section flow constraints; The preset price difference settlement formula includes: ; In the formula, is the settlement price of hydropower in operation of hydropower unit i, is the self-declared hydropower price data of hydropower unit i, It is the government benchmark price data; is the node electricity price of hydropower unit i that clears the spot market.
2. The method for controlling the market clearing of electricity according to claim 1, characterized in that: The market clearing control method further comprises: Real-time monitoring is performed to obtain market transaction data of electricity, and the government benchmark price data group is adjusted according to the market transaction data and a preset quotation adjustment method.
3. The method for controlling the market clearing of electricity according to claim 2, characterized in that: After the electricity market is cleared according to the settlement price of the hydropower in operation and the preset market control method, the market clearing control method further includes: Output the control result and send it to the user.
4. A power market clearing control device, characterized in that: The market clearing control device comprises a data acquisition unit, a price calculation unit and a clearing control unit, wherein: The data acquisition unit is used to acquire a declared price data group and a hydropower clearing data group; the declared price data group includes a government benchmark price data group, a self-declared thermal power price data group and a self-declared hydropower price data group; The price calculation unit is used to calculate the settlement price of in-operation hydropower according to the preset hydropower market clearing model group, the preset in-operation hydropower price difference calculation formula, the preset constraint condition group, the government benchmark price data group, the self-declared hydropower price data group, the self-declared thermal power price data group and the hydropower clearing data group; The clearing control unit is used to control the market clearing of electricity according to the settlement price of the hydropower in operation; The price calculation unit is also used for: Constructing a hydropower market clearing model group based on the government benchmark price data group, the self-declared hydropower price data group, the self-declared thermal power price data group and the hydropower clearing data group, and calculating a first market clearing price of the hydropower market clearing model group based on a preset constraint condition group; Calculate the settlement price of the hydropower in operation by using a preset price difference settlement formula based on the government benchmark price data group, the self-declared hydropower price data group and the first market clearing price; The preset hydropower market clearing model group includes a hydropower unit combination model and a hydropower unit scheduling model. The hydropower unit combination model is used to solve the unit startup combination when the power purchase cost is minimized; the hydropower unit scheduling model is used to solve the unit output plan when the power purchase cost is minimized; The combined model of the hydropower unit is: ; The hydropower unit dispatching model is: ; In the formula, N Indicates the total number of units; T represents the total time period considered; Indicates the unit i exist t Output during the time period; 、 、 For each unit i In the period t operating costs, start-up costs and downtime costs; The preset constraint condition group includes a first constraint condition group for constraining the combination model of the hydropower unit and a second constraint condition group for constraining the dispatch model of the hydropower unit; wherein the first constraint condition group includes a system constraint group, a unit constraint group and a network security constraint group; the second constraint condition group includes a second system constraint group, a second unit constraint group and a second network security constraint group; the system constraint group includes load balance constraints, system positive standby constraints, system negative standby constraints, system rotating standby constraints and AGC standby constraints; the unit constraint group includes unit output limit constraints, unit climbing constraints and unit minimum start and stop time constraints; the network security constraint group includes line flow constraints and section flow constraints; The preset price difference settlement formula includes: ; In the formula, is the settlement price of hydropower in operation of hydropower unit i, is the self-declared hydropower price data of hydropower unit i, It is the government benchmark price data; is the node electricity price of hydropower unit i that clears the spot market.
5. The power market clearing control device according to claim 4, characterized in that: The market clearing control device further comprises a monitoring and adjusting unit, which is used to: Real-time monitoring is performed to obtain market transaction data of electricity, and the government benchmark price data group is adjusted according to the market transaction data and a preset quotation adjustment method.
6. The power market clearing control device according to any one of claims 4-5, characterized in that: The market clearing control device further comprises a result feedback unit, which is used to output the control result and send the control result to the user.
7. A power market clearing control system, characterized in that: The market clearing control system includes a clearing control module, a data management module and a user interaction module, and the clearing control module, the data management module and the user interaction module are communicatively connected with each other. The clearing control module is used to execute the market clearing control method for electricity as described in any one of claims 1 to 3, and the data management module is used to store the declared price data group, the hydropower clearing data group and the data generated during the execution of the market clearing control method; the user interaction module is used to obtain the user's operation instructions and send the operation instructions to the clearing control module.
8. The power market clearing control system according to claim 7, characterized in that: The user interaction module is also used to send a control result to the user.
