A method and device for tracking creative implementation status
Through a system that connects ideas and needs, it automatically matches and updates the creative implementation status, solving the problem of low tracking efficiency of creative implementation status in the existing technology, and realizing rapid and timely updates and efficient management of creative implementation status.
Patent Information
- Application Number
- CN202111330345.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-11
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2041-11-11
AI Technical Summary
The tracking efficiency of the implementation status of ideas in the existing technology is low, requiring business personnel to manually identify and establish the correlation between ideas and requirements, which results in a long time consumption and the inability to determine the implementation status of ideas in a timely manner.
By connecting the system that stores ideas and the system that stores requirements, it automatically matches ideas and requirements, establishes relationships, and updates the implementation status of ideas based on the latest implementation status of requirements, reducing manual processing time and improving efficiency.
It realizes the automatic tracking of creative implementation status, improves efficiency, reduces manual errors, can update the implementation status of creative ideas in a timely manner, and supports the life cycle management of creative ideas from review to implementation.
Smart Images

Figure CN114004601B_ABST
Abstract
Description
Technical Field
[0001] The embodiments of the present invention relate to the technical field of creative management, and in particular to a method and device for tracking the implementation status of a creative idea. Background Art
[0002] At present, after the creative reviewers have completed the review of each creative idea, they can determine one or more creative ideas that need to be implemented, and give implementation opinions and suggestions for the one or more creative ideas that need to be implemented. Then, for the one or more creative ideas that need to be implemented, the business personnel can refer to the review results of the one or more creative ideas that need to be implemented, sort out the project requirements to be implemented, and initiate the signing, review and implementation process for the project requirements to be implemented. Among them, when determining the implementation status of each creative idea that needs to be implemented, the business personnel need to manually identify the implementation status of one or more project requirements corresponding to the creative idea that needs to be implemented, and then subjectively establish the association relationship between one or more project requirements and the creative idea that needs to be implemented in an artificial way, and then determine the implementation status of the creative idea that needs to be implemented in an artificial way according to the implementation status of one or more project requirements. However, this processing method requires business personnel to manually identify and track the implementation status of the creative idea, so it will take a long processing time, and it is also impossible to determine the implementation status of the creative idea in a timely manner, resulting in low tracking efficiency of the creative implementation status.
[0003] In summary, there is an urgent need for a method for tracking the implementation status of creativity to effectively improve the tracking efficiency of the implementation status of creativity. Summary of the invention
[0004] The embodiment of the present invention provides a method and device for tracking the implementation status of an idea, so as to effectively improve the tracking efficiency of the implementation status of an idea.
[0005] In a first aspect, an embodiment of the present invention provides a method for tracking the implementation status of a creative idea, comprising:
[0006] For any creative idea that has been reviewed, determine m requirements corresponding to the creative idea, and determine the requirement identification numbers of the m requirements;
[0007] Establishing an association relationship between the creative identification number of the creative idea and the m requirement identification numbers;
[0008] Obtaining the demand implementation states corresponding to the m demand identification numbers, and when determining that the demand implementation state corresponding to at least one demand identification number among the m demand identification numbers has changed, generating a target creative implementation state of the creative according to the business processing rule corresponding to the association relationship;
[0009] The target creative implementation state is adopted to update the creative implementation state of the creative.
[0010] In the above technical scheme, since the system for storing ideas and the system for storing requirements in the prior art scheme are independent of each other, that is, separated, when recording or updating the implementation status of an idea, business personnel are required to manually identify one or more requirements corresponding to the idea in the system for storing requirements and establish an association relationship, and at the same time query the implementation status of one or more requirements corresponding to the idea from the system for storing requirements and manually record them, and then judge the implementation status of the idea based on the implementation status of the one or more requirements manually recorded, resulting in low efficiency in tracking the implementation status of the idea. Based on this, the technical scheme in the present invention can automatically associate a certain idea with one or more corresponding requirements by connecting the system for storing ideas and the system for storing requirements, and can automatically obtain the latest implementation status of one or more requirements after establishing the association relationship, and update the implementation status of the idea based on the latest implementation status of the one or more requirements, without relying on business personnel to manually identify and track, thereby effectively improving the tracking efficiency of the implementation status of the idea. Specifically, for any creative idea that has been reviewed and completed, the m requirements corresponding to the creative idea can be automatically matched from the system storing the requirements, and the requirement identification numbers of the m requirements can be determined. At the same time, the association relationship between the creative identification number of the creative idea and the m requirement identification numbers can be automatically determined without the need for manual identification and matching by business personnel, which helps to improve the matching efficiency between the creative idea and the requirements, and can avoid errors caused by manual identification and matching. Then, the demand implementation status corresponding to the m requirement identification numbers is automatically obtained from the system storing the requirements, and when it is determined that the demand implementation status corresponding to at least one requirement identification number among the m requirement identification numbers has changed, the target creative implementation status of the creative idea can be accurately generated according to the business processing rules corresponding to the association relationship. Then, the target creative implementation status can be used to accurately update the creative implementation status of the creative idea. Among them, the target creative implementation status is newer than the creative implementation status, that is, the target creative implementation status is the latest creative implementation status of the creative idea, and the creative implementation status of the creative idea is historical data, that is, the old creative implementation status. In this way, since the solution automatically identifies one or more requirements corresponding to the creativity and establishes an association relationship based on the creativity, without the need for business personnel to subjectively judge the association between the creativity and the requirements, it can avoid errors caused by human subjective judgment, thereby reducing the time spent on manual processing, thereby effectively improving the efficiency of tracking the implementation status of the creativity, and realizing the life cycle management of the creativity from review to implementation.
[0011] Optionally, each creative idea that has been reviewed is stored in the first system; and each requirement corresponding to each creative idea that has been reviewed is stored in the second system.
[0012] Optionally, determining m requirements corresponding to the creativity includes:
[0013] Determine from the second system at least one demand-posing department corresponding to the creativity, and determine n demands corresponding to the at least one demand-posing department;
[0014] The m requirements corresponding to the creativity are determined from the n requirements by using a smooth inverse frequency algorithm.
[0015] In the above technical solution, after the first system and the second system are connected, at least one demand-raising department corresponding to any idea in the first system can be automatically matched from the second system, and multiple demands of the at least one demand-raising department within a certain time period can be automatically queried from the second system, or all historical demands of the at least one demand-raising department can be queried. Then, through the smooth inverse frequency algorithm, at least one demand corresponding to the idea can be accurately matched from multiple demands or all historical demands.
[0016] Optionally, determining from the second system at least one demand-posing department corresponding to the creativity includes:
[0017] Determine the implementation management department corresponding to the creativity in the first system, and match the implementation management department with each demand-posing department in the second system to determine each similarity value;
[0018] The demand proposing department whose similarity value is greater than or equal to the first similarity threshold is determined as the demand proposing department corresponding to the creativity.
[0019] In the above technical solution, after accurately determining the implementation management department corresponding to a certain idea from the first system, the implementation management department can be automatically matched with each demand-proposing department in the second system to determine each similarity value. That is, for example, keywords in the implementation management department can be extracted, and keywords of each demand-proposing department can be extracted respectively, and the keywords in the implementation management department can be matched with the keywords of each demand-proposing department respectively. Then, each similarity value can be directly compared with the first similarity threshold to determine at least one demand-proposing department that meets the first similarity threshold, and the at least one demand-proposing department can be determined as the demand-proposing department corresponding to the idea. In this way, the solution does not require manual identification and matching, thereby reducing the possibility of errors caused by subjective human identification and matching, thereby improving the matching efficiency between ideas and demand-proposing departments.
[0020] Optionally, the determining m requirements corresponding to the creativity from the n requirements by using a smooth inverse frequency algorithm includes:
[0021] Determining, by means of the smoothed inverse frequency algorithm, at least one first keyword in the name of the idea and the implementation advice of the idea;
[0022] For each of the n requirements, determine the name of the requirement and at least one second keyword in the requirement content of the requirement by using the smoothed inverse frequency algorithm;
[0023] Matching the at least one first keyword with the at least one second keyword to determine a similarity value between the creativity and the requirement;
[0024] If it is determined that the similarity value is greater than or equal to a second similarity threshold, the demand is determined as the demand corresponding to the creativity.
[0025] In the above technical scheme, by using a smooth inverse frequency algorithm to perform keyword extraction on the name and implementation opinions of a certain idea in the first system, at least one first keyword in the name and implementation opinions of the idea can be accurately extracted. At the same time, for each demand corresponding to the idea, by using a smooth inverse frequency algorithm to perform keyword extraction on the name and demand content of the demand, at least one second keyword in the name and demand content of the demand can be accurately extracted. By matching the at least one first keyword with the at least one second keyword, the similarity value between the idea and the demand can be automatically determined. When it is determined that the similarity value meets the second similarity threshold, the demand can be determined to be the demand corresponding to the idea without the need for human subjective identification and matching, thereby reducing the possibility of errors caused by human subjective identification and matching, thereby improving the matching efficiency between the idea and the corresponding one or more demands.
[0026] Optionally, the establishing of an association relationship between the creative identification number of the creative idea and the m requirement identification numbers includes:
[0027] If m is a first number that is less than or equal to the number threshold, then when it is determined that the first number of requirement identification numbers has passed the verification, a one-to-one association relationship is established between the idea identification number of the idea and the first number of requirement identification numbers;
[0028] If m is a second number greater than the number threshold, then when it is determined that the second number of requirement identification numbers has passed verification, a one-to-many association relationship is established between the idea identification number of the idea and the second number of requirement identification numbers.
[0029] In the above technical solution, if it is determined that the value of m is a first number that is less than or equal to a quantity threshold, then when the first number of requirement identification numbers is verified, a one-to-one association relationship can be automatically and accurately established between the creative identification number of the idea and the first number of requirement identification numbers. If m is a second number greater than the quantity threshold, then when the second number of requirement identification numbers is verified, a one-to-many association relationship can be automatically and accurately established between the creative identification number of the idea and the second number of requirement identification numbers. In this way, the scheme can automatically establish an association relationship between an idea and one or more requirements without relying on business personnel to manually determine the association relationship between an idea and one or more requirements, and without relying on business personnel to manually and subjectively establish an association between the implementation status of an idea and the implementation status of one or more requirements, thereby realizing automatic association between an idea and the corresponding one or more requirements.
[0030] Optionally, generating a target creative implementation state of the creative according to a business processing rule corresponding to the association relationship includes:
[0031] If the association relationship is a one-to-one association relationship, the target creative implementation status of the creativity is generated according to the business processing rules corresponding to the one-to-one association relationship and based on the demand implementation status corresponding to the first number of demand identification numbers.
[0032] In the above technical solution, since one idea can correspond to one or more requirements, there is a one-to-one or one-to-many relationship between the idea identification number and the requirement identification number. Based on this, the technical solution in the present invention can simultaneously meet the business rule requirements when one idea corresponds to one requirement or one idea corresponds to multiple requirements by providing a set of mapping rules between the requirement implementation status and the idea implementation status, so as to avoid the situation where the business judgment standards are inconsistent. Specifically, when it is determined that the idea identification number of the idea corresponds to a requirement identification number, it can be determined that the association between the idea identification number and the corresponding requirement identification number is a one-to-one association relationship, so that according to the business processing rules corresponding to the one-to-one association relationship and according to the requirement implementation status corresponding to the one requirement identification number, the target idea implementation status of the idea can be accurately generated, that is, the latest idea implementation status of the idea. Then, the historical idea implementation status of the idea in the first system can be updated in a timely manner according to the latest idea implementation status of the idea.
[0033] Optionally, generating a target creative implementation state of the creative according to a business processing rule corresponding to the association relationship includes:
[0034] If the association relationship is a one-to-many association relationship, the target creative implementation status of the creativity is generated according to the business processing rules corresponding to the one-to-many association relationship and based on the demand implementation status corresponding to the second number of demand identification numbers.
[0035] In the above technical solution, when it is determined that the idea identification number of an idea corresponds to multiple demand identification numbers, it can be determined that the association relationship between the idea identification number and the corresponding multiple demand identification numbers is a one-to-many association relationship, so that according to the business processing rules corresponding to the one-to-many association relationship and according to the demand implementation status corresponding to the multiple demand identification numbers, the target idea implementation status of the idea can be accurately generated, that is, the latest idea implementation status of the idea. Then, the historical idea implementation status of the idea in the first system can be updated in a timely manner according to the latest idea implementation status of the idea.
[0036] Optionally, the business processing rules corresponding to the one-to-many association relationship include a first sub-business processing rule and a second sub-business processing rule;
[0037] The generating of the target creative implementation state of the creative according to the business processing rule corresponding to the one-to-many association relationship and based on the demand implementation state corresponding to the demand identification number of the second number includes:
[0038] If the requirement implementation state corresponding to at least one requirement identification number among the second number of requirement identification numbers exists in the first requirement implementation state record corresponding to the first sub-business processing rule, then generating the first target creative implementation state of the creative according to the first sub-business processing rule;
[0039] If all the requirement implementation states corresponding to the second number of requirement identification numbers exist in the second requirement implementation state record corresponding to the second sub-business processing rule, then the second target creative implementation state of the creativity is generated according to the second sub-business processing rule.
[0040] In the above technical solution, for the one-to-many association between the creative identification number and the requirement identification number, there are two situations when generating the creative implementation status of the creative. One situation is: if the requirement implementation status corresponding to at least one requirement identification number in the second number of requirement identification numbers exists in the first requirement implementation status record, then it is necessary to generate the first target creative implementation status of the creative according to the first sub-business processing rule; the other situation is: if the requirement implementation status corresponding to the second number of requirement identification numbers all exist in the second requirement implementation status record, then it is necessary to generate the second target creative implementation status of the creative according to the second sub-business processing rule. Among them, the first target creative implementation status is different from the second target creative implementation status. In this way, the scheme can generate different creative implementation states of the creative according to different sub-business processing rules in a more fine-grained manner, so that it can better meet the actual needs of different situations arising in actual application scenarios, and it is also more flexible.
[0041] In a second aspect, an embodiment of the present invention further provides a device for tracking the implementation status of a creative idea, including:
[0042] A determination unit, configured to determine, for any creative idea that has been reviewed, m requirements corresponding to the creative idea, and determine requirement identification numbers of the m requirements;
[0043] A processing unit is used to establish an association relationship between the creative identification number of the creative and m requirement identification numbers; obtain the requirement implementation status corresponding to the m requirement identification numbers, and when it is determined that the requirement implementation status corresponding to at least one of the m requirement identification numbers has changed, generate a target creative implementation status of the creative according to the business processing rules corresponding to the association relationship; and use the target creative implementation status to update the creative implementation status of the creative.
[0044] Optionally, each creative idea that has been reviewed is stored in the first system; and each requirement corresponding to each creative idea that has been reviewed is stored in the second system.
[0045] Optionally, the determining unit is specifically configured to:
[0046] Determine from the second system at least one demand-posing department corresponding to the creativity, and determine n demands corresponding to the at least one demand-posing department;
[0047] The m requirements corresponding to the creativity are determined from the n requirements by using a smooth inverse frequency algorithm.
[0048] Optionally, the determining unit is specifically configured to:
[0049] Determine the implementation management department corresponding to the creativity in the first system, and match the implementation management department with each demand-posing department in the second system to determine each similarity value;
[0050] The demand proposing department whose similarity value is greater than or equal to the first similarity threshold is determined as the demand proposing department corresponding to the creativity.
[0051] Optionally, the determining unit is specifically configured to:
[0052] Determining, by means of the smoothed inverse frequency algorithm, at least one first keyword in the name of the idea and the implementation advice of the idea;
[0053] For each of the n requirements, determine the name of the requirement and at least one second keyword in the requirement content of the requirement by using the smoothed inverse frequency algorithm;
[0054] Matching the at least one first keyword with the at least one second keyword to determine a similarity value between the creativity and the requirement;
[0055] If it is determined that the similarity value is greater than or equal to a second similarity threshold, the demand is determined as the demand corresponding to the creativity.
[0056] Optionally, the processing unit is specifically configured to:
[0057] If m is a first number that is less than or equal to the number threshold, then when it is determined that the first number of requirement identification numbers has passed the verification, a one-to-one association relationship is established between the idea identification number of the idea and the first number of requirement identification numbers;
[0058] If m is a second number greater than the number threshold, then when it is determined that the second number of requirement identification numbers has passed verification, a one-to-many association relationship is established between the idea identification number of the idea and the second number of requirement identification numbers.
[0059] Optionally, the processing unit is specifically configured to:
[0060] If the association relationship is a one-to-one association relationship, the target creative implementation status of the creativity is generated according to the business processing rules corresponding to the one-to-one association relationship and based on the demand implementation status corresponding to the first number of demand identification numbers.
[0061] Optionally, the processing unit is specifically configured to:
[0062] If the association relationship is a one-to-many association relationship, the target creative implementation status of the creativity is generated according to the business processing rules corresponding to the one-to-many association relationship and based on the demand implementation status corresponding to the second number of demand identification numbers.
[0063] Optionally, the business processing rules corresponding to the one-to-many association relationship include a first sub-business processing rule and a second sub-business processing rule;
[0064] The processing unit is specifically used for:
[0065] If the requirement implementation state corresponding to at least one requirement identification number among the second number of requirement identification numbers exists in the first requirement implementation state record corresponding to the first sub-business processing rule, then generating the first target creative implementation state of the creative according to the first sub-business processing rule;
[0066] If all the requirement implementation states corresponding to the second number of requirement identification numbers exist in the second requirement implementation state record corresponding to the second sub-business processing rule, then the second target creative implementation state of the creativity is generated according to the second sub-business processing rule.
[0067] In a third aspect, an embodiment of the present invention provides a computing device, comprising at least one processor and at least one memory, wherein the memory stores a computer program, and when the program is executed by the processor, the processor executes any method for tracking the creative implementation status described in the first aspect above.
[0068] In a fourth aspect, an embodiment of the present invention provides a computer-readable storage medium storing a computer program executable by a computing device, wherein when the program is run on the computing device, the computing device executes any method for tracking the creative implementation status described in the first aspect above. BRIEF DESCRIPTION OF THE DRAWINGS
[0069] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0070] Figure 1 A possible system architecture diagram provided for an embodiment of the present invention;
[0071] Figure 2 A flowchart of a method for tracking the implementation status of a creative idea provided by an embodiment of the present invention;
[0072] Figure 3A schematic diagram of a structure for tracking the implementation status of a creative idea provided by an embodiment of the present invention;
[0073] Figure 4 A schematic diagram of the structure of a device for tracking the implementation status of a creative idea provided by an embodiment of the present invention;
[0074] Figure 5 A schematic diagram of the structure of a computing device provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0075] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0076] In order to facilitate understanding of the embodiments of the present invention, first Figure 1 A possible system architecture shown in FIG. 1 is used as an example to illustrate a tracking system architecture applicable to the creative implementation status of an embodiment of the present invention. Figure 1 As shown, the system architecture may include a creative management system 100 (i.e., the first system) and an IT management system 200 (i.e., the second system). The creative management system 100 and the IT management system 200 are connected, for example, by wired communication or wireless communication, which is not limited in the embodiment of the present invention. The creative management system 100 manages creativity, and the IT management system 200 manages requirements or implementation projects.
[0077] For example, one or more users (such as employees of a certain enterprise or an institution, etc.) can submit their ideas, suggestions and other creative ideas for a certain project, enterprise or institution, etc., a web page layout, a certain business process, a certain financial product, a newly developed application or a newly released rules and regulations, etc., through the creative management system 100, and the reviewers will review the ideas, suggestions and other creative ideas submitted by the one or more users. Alternatively, a certain enterprise, an institution or a department carries out a certain creative activity (such as a creative activity for the promotion of financial products or related creative activities for financial projects, etc.), and one or more employees submit their own ideas for the creative activity through the creative management system 100, and the reviewers will review the ideas submitted by the one or more employees. Then, after all the creative reviews are completed, some good ideas can be selected for project implementation, and the reviewers will give suggestions and opinions on the implementation of these good ideas. In addition, the business personnel will refer to the review results of the ideas that need to be established for implementation, sort out the project requirements to be implemented, and initiate the implementation process of the project requirements to be implemented in the IT management system 200. The IT management system 200 will record the implementation status of each project requirement. When it is necessary to track the implementation status of each idea in the creative management system 100, the creative management system 100 can be connected with the IT management system 200. Based on the information such as the name, implementation opinions, and implementation management department of each idea in the creative management system 100, at least one requirement corresponding to the idea can be automatically identified from the IT management system 200, and an association relationship between the idea and the at least one requirement can be established. Then, according to the business processing rules corresponding to the association relationship and based on the requirement implementation status of the at least one requirement, a new idea implementation status of the idea can be generated, and the idea implementation status of the idea in the creative management system 100 can be updated using the new idea implementation status of the idea.
[0078] It should be noted that the above Figure 1 The system architecture shown is only an example and is not limited to this embodiment of the present invention.
[0079] Based on the above description, Figure 2 The flow of a method for tracking the implementation status of an idea provided by an embodiment of the present invention is exemplarily shown, and the flow can be executed by a device for tracking the implementation status of an idea.
[0080] like Figure 2 As shown in the figure, the process specifically includes:
[0081] Step 201: for any creative idea that has been reviewed, m requirements corresponding to the creative idea are determined, and requirement identification numbers of the m requirements are determined.
[0082] In the embodiment of the present invention, for any idea that has been reviewed, it is first necessary to establish an association relationship between the idea and the corresponding one or more requirements, and after the association relationship is established, the latest implementation status of each requirement corresponding to each idea with the established association relationship is obtained in batches, and based on the latest implementation status of one or more requirements corresponding to each idea, it is determined whether to update the idea implementation status of the idea. Among them, each idea that has been reviewed is stored in the first system; each requirement corresponding to each idea that has been reviewed is stored in the second system. Moreover, the first system can be used to assist the idea proposer to submit the idea, and record the implementation opinions and suggestions given by the idea reviewer to the adopted idea and record the idea implementation status of each idea; the second system is used to assist the requirement proposer to propose the requirement and record the requirement implementation status of each requirement. In this way, when establishing the association relationship between the idea and the corresponding one or more requirements, after the first system and the second system are connected, at least one requirement proposal department corresponding to any idea in the first system can be automatically matched from the second system, and n requirements of the at least one requirement proposal department in a certain time period can be automatically queried from the second system, or n requirements of the at least one requirement proposal department in a historical period can be queried. Then, through the smooth inverse frequency algorithm, the m requirements corresponding to the creativity can be accurately determined from the n requirements. Among them, when determining at least one requirement-proposing department corresponding to the creativity from the second system, firstly, the implementation management department corresponding to any creativity is accurately determined from the first system, and the implementation management department is matched with each requirement-proposing department in the second system respectively, so that multiple similarity values can be determined, and then the multiple similarity values are respectively compared with the first similarity threshold, so that at least one requirement-proposing department that meets the first similarity threshold can be determined, and the at least one requirement-proposing department is determined as the requirement-proposing department corresponding to the creativity, and n requirements in the at least one requirement-proposing department can be determined. For example, when matching the implementation management department with each demand-proposing department in the second system (such as an IT management system) respectively, keywords of the implementation management department can be extracted through keyword extraction algorithms, such as TF-IDF (Term Frequency-Inverse Document Frequency) keyword algorithm, TextRank keyword algorithm, SIF (smooth inverse frequency) algorithm, etc., and at least one keyword in the implementation management department is extracted. Then, keyword extraction processing is performed on each demand-proposing department in the second system through the keyword extraction algorithm to extract at least one keyword of each demand-proposing department, and at least one keyword in the implementation management department is matched with at least one keyword of each demand-proposing department to determine the similarity value between the implementation management department and the demand-proposing department.The first similarity threshold may be set according to actual application scenarios or the experience of those skilled in the art, and the embodiment of the present invention does not limit this.
[0083] For example, assume that the implementation management department of a certain idea (such as idea A) in the first system (such as the idea management system) is implementation management department A, and assume that there are five demand-raising departments in the second system (such as the IT management system), namely, demand-raising department a, demand-raising department b, demand-raising department c, demand-raising department d and demand-raising department e. By performing keyword extraction processing on the implementation management department A to obtain at least one keyword, and performing keyword extraction processing on the demand proposing department a, demand proposing department b, demand proposing department c, demand proposing department d and demand proposing department e respectively to obtain at least one keyword, in this way, at least one keyword of the implementation management department A is matched with at least one keyword of the five demand proposing departments respectively, and five similarity values can be determined. Suppose that the similarity value between the implementation management department A and the demand proposing department a is 0.8, the similarity value between the implementation management department A and the demand proposing department b is 0.85, the similarity value between the implementation management department A and the demand proposing department c is 0.65, the similarity value between the implementation management department A and the demand proposing department d is 0.55, and the similarity value between the implementation management department A and the demand proposing department e is 0.35. Among them, assuming that the first similarity value is 0.75, it can be determined that the similarity value 0.8 between the implementation management department A and the demand proposing department a is greater than 0.75, and the similarity value 0.85 between the implementation management department A and the demand proposing department b is greater than 0.75, then the demand proposing department a and the demand proposing department b can be determined as the two demand proposing departments corresponding to the idea A.
[0084] After determining at least one demand-proposing department corresponding to a certain idea, one or more demands corresponding to the idea can be matched from the demands of the at least one demand-proposing department. Specifically, the name and implementation opinions of the idea are extracted by a smooth inverse frequency algorithm to extract at least one first keyword, and at the same time, for each demand corresponding to the idea, the name and demand content of the demand are extracted by a smooth inverse frequency algorithm to extract at least one second keyword. Then, the at least one first keyword is matched with the at least one second keyword to automatically determine the similarity value between the idea and the demand, and when it is determined that the similarity value meets the second similarity threshold, that is, when the similarity value is greater than or equal to the second similarity threshold, it can be determined that the demand is the demand corresponding to the idea, so that the m demands corresponding to the idea can be determined without human subjective identification and matching, thereby reducing the possibility of errors caused by human subjective identification and matching, thereby improving the matching efficiency of the idea and the corresponding one or more demands. Among them, the second similarity threshold can be set according to the actual application scenario or the experience of those skilled in the art, and the embodiment of the present invention does not limit this.
[0085] Exemplarily, the two demand-proposing departments corresponding to the above-determined creative A are continued to be described as an example, assuming that there are three demands in demand-proposing department a and demand-proposing department b, that is, the three demands in demand-proposing department a are demand a1, demand a2, and demand a3, and the three demands in demand-proposing department b are demand b1, demand b2, and demand b3. By performing keyword extraction processing on the name and implementation opinions of creative A, at least one first keyword is extracted, and keyword extraction processing is performed on demands a1, demand a2, demand a3, demand b1, demand b2, and demand b3, respectively, and at least one second keyword is extracted. In this way, by matching at least one first keyword of creative A with at least one second keyword of requirements a1, a2, a3, b1, b2, and b3, six similarity values can be determined. Assume that the similarity values between creative A and requirement a1 are 0.85, the similarity values between creative A and requirement a2 are 0.65, the similarity values between creative A and requirement a3 are 0.81, the similarity values between creative A and requirement b1 are 0.55, the similarity values between creative A and requirement b2 are 0.82, and the similarity values between creative A and requirement b3 are 0.4. Assuming that the second similarity value is 0.78, it can be determined that the similarity value 0.85 between creative A and requirement a1 is greater than 0.78, the similarity value 0.81 between creative A and requirement a3 is greater than 0.78, and the similarity value 0.82 between creative A and requirement b2 is greater than 0.78, then requirements a1, a3, and b2 can be determined as the three requirements corresponding to creative A. Alternatively, it is assumed that the similarity between idea A and demand a1 is 0.82, the similarity between idea A and demand a2 is 0.62, the similarity between idea A and demand a3 is 0.7, the similarity between idea A and demand b1 is 0.5, the similarity between idea A and demand b2 is 0.6, and the similarity between idea A and demand b3 is 0.35. Among them, assuming that the second similarity value is 0.78, it can be determined that the similarity between idea A and demand a1, 0.82, is greater than 0.78, and demand a1 can be determined as a demand corresponding to idea A.
[0086] Step 202: Establish an association relationship between the creative identification number of the creative and m requirement identification numbers.
[0087] In the embodiment of the present invention, after determining the m requirements corresponding to a certain idea and determining the requirement identification numbers of the m requirements, the association relationship between the idea identification number of the idea and the requirement identification numbers of the m requirements can be automatically established. Specifically, if it is determined that the value of m is a first number less than or equal to the quantity threshold, when the first number of requirement identification numbers is verified, a one-to-one association relationship can be automatically established for the idea identification number of the idea and the first number of requirement identification numbers. If m is a second number greater than the quantity threshold, when the second number of requirement identification numbers is verified, a one-to-many association relationship can be automatically established for the idea identification number of the idea and the second number of requirement identification numbers. In this way, the scheme can automatically establish an association relationship between the idea and one or more requirements without relying on business personnel to manually determine the association relationship between the idea and one or more requirements, and without relying on business personnel to manually subjectively establish the association between the implementation status of the idea and the implementation status of one or more requirements, so that the idea can be automatically associated with the corresponding one or more requirements. Among them, the quantity threshold can be set according to the actual application scenario or the experience of those skilled in the art, and the embodiment of the present invention does not limit this.
[0088] For example, assuming that it is determined that a certain idea (such as idea A) corresponds to a demand, such as demand a1, then the value of m can be determined to be 1, and assuming that the quantity threshold is 1, then the value of m can be determined to be equal to the quantity threshold 1, that is, when the demand identification number of demand a1 is verified (that is, when the demand identification number of demand a1 is verified to be correct), a one-to-one association relationship can be automatically established between the idea identification number of idea A and the demand identification number of demand a1. Alternatively, assuming that it is determined that a certain idea (such as idea A) corresponds to three demands, such as demand a1, demand a3, and demand b2, then the value of m can be determined to be 3, and assuming that the quantity threshold is 1, then the value of m can be determined to be greater than the quantity threshold 1, that is, when the demand identification numbers of demand a1, demand a3, and demand b2 are verified (that is, when the demand identification number of demand a1, demand a3, and demand b2 are verified to be correct), a one-to-many association relationship can be automatically established between the idea identification number of idea A and the demand identification number of demand a1, demand a3, and demand b2.
[0089] For example, Figure 3 FIG. 1 is a schematic diagram of a structure for tracking the implementation status of a creative idea provided by an embodiment of the present invention. Figure 3It can be seen that the technical solution in the embodiment of the present invention can be implemented by two modules. One module is the idea-demand relationship association module, which is mainly used to identify one or more requirements corresponding to a certain idea and establish an association relationship between the idea and the one or more requirements. The other module is the idea implementation status analysis module, which is mainly used to automatically and synchronously update the idea implementation status of the idea according to the requirement implementation status of one or more requirements corresponding to a certain idea.
[0090] For the creative-demand relationship association module:
[0091] Step a: Identify one or more requirements corresponding to any creativity in the first system, and determine the requirement identification numbers of the one or more requirements corresponding to the creativity.
[0092] For each idea that has passed the review, the idea implementation unit of the idea in the first system (such as the idea management system) is used as a benchmark to perform fuzzy matching on the demand-proposing departments of each demand in the second system (such as the IT management system), so as to determine at least one demand-proposing department corresponding to the idea. For example, taking a bank as an example, for ideas that are planned to be implemented / being implemented / completed at the head office level, the idea implementation unit is the corresponding head office idea implementation management department; for ideas that are planned to be implemented / being implemented / completed at the branch level, the idea implementation unit is the corresponding branch idea implementation management department. By using the smooth inverse frequency algorithm to perform keyword extraction processing on the name and implementation opinions of the idea, at least one keyword is obtained, and by using the smooth inverse frequency algorithm to perform keyword extraction processing on the name and demand content of each demand in at least one demand-proposing department, at least one keyword is obtained respectively, and at least one keyword corresponding to the idea is fuzzily matched again with at least one keyword corresponding to each demand, so as to obtain multiple similarity values. Then, the multiple similarity values are sorted in order from high to low. If a similarity value is higher than the second similarity threshold, it can be considered that the demand corresponding to the similarity value belongs to the relevant demand of the idea, and the demand identification number of the demand can be obtained from the second system. In this way, it can be determined that one or more requirements are related requirements of the creativity, and the requirement identification numbers of the one or more requirements can be obtained from the second system.
[0093] Step b: Verify whether the requirement identification number of one or more requirements is correct.
[0094] Among them, verify whether the requirement identification number of one or more requirements is correct, that is, for each requirement identification number, determine whether the requirement identification number of the requirement exists or is missing, whether the implementation status corresponding to the requirement identification number of the requirement is normal, etc. If the requirement identification number of one or more requirements is determined to be correct, then the association relationship between the creative identification number of the idea and the requirement identification number of one or more requirements can be established. If it is determined that the requirement identification number of one or more requirements is incorrect, that is, it is determined that there is an abnormality in the requirement identification number of one or more requirements (such as the missing implementation status of the requirement, etc.), then the association failure information will be returned, and it is necessary to try again, such as re-obtaining the identification number of one or more requirements corresponding to the idea, re-verifying and re-establishing the association relationship.
[0095] Step c: Business personnel can check the demand identification number associated with a certain idea in the first system. If it is found that the demand identification number corresponding to the idea is incorrectly identified, manual processing and adjustment can be carried out. After re-entering the new demand identification number and submitting it, the system will re-check the correctness of the demand identification number and re-associate it with the idea identification number of the idea.
[0096] Step 203, obtaining the demand implementation status corresponding to the m demand identification numbers, and when it is determined that the demand implementation status corresponding to at least one of the m demand identification numbers has changed, generating the target creative implementation status of the creativity according to the business processing rules corresponding to the association relationship.
[0097] Step 204: using the target creative implementation status, update the creative implementation status of the creative.
[0098] Among them, the demand implementation status corresponding to each demand identification number corresponding to each creative idea with established association relationship can be automatically obtained from the second system (such as IT management system) at a set time interval (such as every 5 hours, 10 hours, every day or every two days, etc.). Then, the demand implementation status corresponding to m demand identification numbers corresponding to a certain creative idea is selected from the demand implementation status corresponding to each demand identification number corresponding to each creative idea. Alternatively, the demand implementation status corresponding to m demand identification numbers corresponding to a certain creative idea can be automatically directly obtained from the second system at a set time interval (such as every 5 hours, 10 hours, every day or every two days, etc.). For the demand implementation status corresponding to each demand identification number among the m demand identification numbers, it is determined whether the demand implementation status corresponding to the demand identification number has changed, that is, it is determined whether the demand implementation status corresponding to the demand identification number is the same as the demand implementation status corresponding to the demand identification number obtained at the previous time interval. If they are not the same, it means that the implementation status corresponding to the demand identification number has changed, and then it is necessary to update the creative implementation status of a certain creative idea corresponding to the demand identification number, that is, automatically and synchronously update the creative implementation status of the creative idea. If the demand implementation states corresponding to the m demand identification numbers corresponding to a certain idea have not changed, there is no need to update the idea implementation state of the idea. Specifically, if it is determined that the demand implementation state corresponding to at least one of the m demand identification numbers has changed, then when it is determined that the association between the idea identification number of the idea and the m demand identification numbers is a one-to-one association, the target idea implementation state of the idea can be accurately generated according to the business processing rules corresponding to the one-to-one association, and based on the demand implementation states corresponding to the first number of demand identification numbers, that is, the latest idea implementation state of the idea. Alternatively, if it is determined that the demand implementation state corresponding to at least one of the m demand identification numbers has changed, then when it is determined that the association between the idea identification number of the idea and the m demand identification numbers is a one-to-many association, the target idea implementation state of the idea can be accurately generated according to the business processing rules corresponding to the one-to-many association, and based on the demand implementation states corresponding to the second number of demand identification numbers, that is, the latest idea implementation state of the idea. Then, the target creative implementation status of the creative can be used in a timely manner to update the creative implementation status of the creative in the first system (such as a creative management system), that is, to update the historical creative implementation status of the creative in the first system according to the latest creative implementation status of the creative. If it is determined that the demand implementation status corresponding to the m demand identification numbers has not changed, there is no need to update the creative implementation status of the creative in the first system.
[0099] Among them, if it is determined that the association relationship between the creative identification number of the creative and the m requirement identification numbers is a one-to-many association relationship, there may be two situations when generating the creative implementation status of the creative. One situation is: if the requirement implementation status corresponding to at least one requirement identification number in the second number of requirement identification numbers exists in the first requirement implementation status record, then it is necessary to generate the first target creative implementation status of the creative according to the first sub-business processing rule; the other situation is: if the requirement implementation status corresponding to the second number of requirement identification numbers all exist in the second requirement implementation status record, then it is necessary to generate the second target creative implementation status of the creative according to the second sub-business processing rule. Among them, the first target creative implementation status is different from the second target creative implementation status. In this way, the scheme has a complete mapping rule between the creative implementation status and the requirement implementation status, and can generate a new creative implementation status of the creative according to the specific requirement implementation status of one or more requirements corresponding to a certain creative, so as to avoid the matching errors caused by manual judgment, thereby improving the standardization and comparability of the creative implementation status.
[0100] For example. Continue with Figure 3 Take the creative implementation status analysis module as an example:
[0101] According to the set time interval, the demand implementation status corresponding to each requirement identification number corresponding to each creative idea with established association relationship is periodically obtained from the second system (such as IT management system). If the demand implementation status corresponding to at least one requirement identification number corresponding to a creative idea has changed, the creative implementation status of the creative idea needs to be automatically and synchronously updated. If the demand implementation status corresponding to each requirement identification number corresponding to a creative idea has not changed, there is no need to update the creative implementation status of the creative idea in the first system (such as creative management system). For example, continuing with the above-mentioned creative A as an example, assuming that the creative A corresponds to a requirement a1, a one-to-one association relationship is established between the creative A and the requirement a1. If the demand implementation status of the requirement a1 has changed, the creative implementation status of the creative A needs to be automatically and synchronously updated; if the demand implementation status of the requirement a1 has not changed, there is no need to update the creative implementation status of the creative A. Alternatively, assuming that the idea A corresponds to three requirements, namely, requirements a1, a3 and b2, then a one-to-many association relationship is established between the idea A and requirements a1, a3 and b2. If the implementation status of at least one of the three requirements (such as any one or any combination of requirements a1, a3 or b2) changes, the idea implementation status of the idea A needs to be automatically updated synchronously; if the implementation status of the three requirements (requirements a1, a3 and b2) does not change, the idea implementation status of the idea A needs to be automatically updated synchronously. If it is determined that a certain idea has a one-to-one association relationship with the corresponding requirement, such as a one-to-one association relationship between the idea A and the requirement a1, when it is determined that the implementation status of the requirement a1 changes, the new idea implementation status of the idea A is generated according to the business processing rules corresponding to the one-to-one association relationship and based on the current implementation status of the requirement a1. The form of the business processing rules corresponding to the one-to-one association relationship can be shown in Table 1.
[0102] Table 1
[0103] Requirement implementation status corresponding to the requirement identification number The creative implementation status corresponding to the creative identification number In definition Implementing Awaiting approval Implementing Under review Implementing Normal in implementation Implementing Changes in progress Implementing Termination during implementation Implementation completed Acceptance during implementation Implementing Accepted Implementation completed Terminated Implementation completed Cancelled Implementation completed
[0104] Based on Table 1, for example, assuming that the demand implementation status of the demand a1 obtained in the previous time interval is pending approval, and the demand implementation status of the demand a1 obtained this time is normal in implementation, it can be determined that the demand implementation status of the demand a1 has changed, and then according to the business processing rules shown in Table 1, based on the current demand implementation status of the demand a1 being normal in implementation, in Table 1, the creative implementation status of the idea A corresponding to the current demand implementation status of the demand a1 (i.e., normal in implementation) is being implemented, then the new creative implementation status of the idea A generated is being implemented. Alternatively, assuming that the demand implementation status of the demand a1 obtained in the previous time interval is normal in implementation, and the demand implementation status of the demand a1 obtained this time is accepted, it can be determined that the demand implementation status of the demand a1 has changed, and then according to the business processing rules shown in Table 1, based on the current demand implementation status of the demand a1 being accepted, in Table 1, the creative implementation status of the idea A corresponding to the current demand implementation status of the demand a1 (i.e., accepted) is completed, then the new creative implementation status of the idea A generated is completed. Then, after generating a new creative implementation status of creative A, the new creative implementation status can be used to update the creative implementation status of creative A in the first system (such as a creative management system). After updating the creative implementation status of one or more creatives in the first system, business personnel can simultaneously view the latest creative implementation status of one or more creatives through the first system, and can view the current demand implementation status of one or more demands associated with one or more creatives.
[0105] Alternatively, if it is determined that a certain idea has a one-to-many association relationship with the corresponding demand, such as a one-to-many association relationship between idea A and demand a1, demand a3, and demand b2, then when it is determined that the demand implementation status of at least one demand among the three demands (such as any one or any combination of demand a1, demand a3, or demand b2) has changed, a new idea implementation status of idea A is generated according to the business processing rules corresponding to the one-to-many association relationship and based on the current demand implementation status of demand a1, the current demand implementation status of demand a3, and the current demand implementation status of demand b2. The form of the business processing rules corresponding to the one-to-many association relationship can be shown in Table 2.
[0106] Table 2
[0107]
[0108]
[0109] Based on Table 2, it is assumed that among the three requirements corresponding to Creative A, only one requirement has its demand implementation status changed, for example, the demand implementation status of requirement a1 has changed, while the demand implementation status of requirement a3 and the demand implementation status of requirement b2 have not changed, that is, it is assumed that the demand implementation status of requirement a3 is under review or terminated, and the demand implementation status of requirement b2 is changed in implementation or cancelled, for example, the demand implementation status of requirement a1 obtained in the previous time interval is pending approval, and the demand implementation status of requirement a1 obtained this time is normal in implementation, then it can be determined that the demand implementation status of requirement a1 (that is, normal in implementation) meets the first requirement of the mapping rule in Table 2, then it can be based on the first requirement of the mapping rule shown in Table 2 (that is, the first sub-business processing rule), and based on the current demand implementation status of requirement a1, the current demand implementation status of requirement a3 and the current demand implementation status of requirement b2, in Table 2, the current demand implementation status of requirement a1 (that is, normal in implementation) corresponds to the creative implementation status of Creative A according to the first requirement of the mapping rule as being implemented, then the new creative implementation status of Creative A generated is being implemented. Alternatively, it is assumed that among the three requirements corresponding to the creative A, the demand implementation status of at least two requirements has changed, and it is assumed that the demand implementation status of requirements a1 and a3 has changed, for example, the demand implementation status of the previous time interval of the demand a1 is pending approval, and the demand implementation status of the demand a1 obtained this time is normal in implementation, the demand implementation status of the previous time interval of the demand a3 is under approval, and the demand implementation status of the demand a3 obtained this time is terminated, and the demand implementation status of the demand b2 has not changed, that is, it is assumed that the demand implementation status of the demand b2 is changed in implementation. Although the demand implementation status of the demand a3 belongs to one of the left demand implementation statuses corresponding to the second requirement in the mapping rule shown in Table 2, the demand implementation status of the demand a1 and the demand b2 both exist in one of the left demand implementation statuses corresponding to the first requirement in the mapping rule shown in Table 2. Therefore, according to the mapping rule requirements shown in Table 2, the creative implementation status of the creative A is generated according to the first requirement of the mapping rule shown in Table 2, and the new creative implementation status of the creative A is generated as being implemented. Then, the new creative implementation status of the creative A can be used to update the creative implementation status of the creative A in the creative management system.
[0110] Alternatively, suppose that among the three requirements corresponding to creative A, only one requirement has its implementation status changed, for example, the implementation status of requirement a1 has changed, while the implementation status of requirements a3 and b2 has not changed, that is, suppose that the implementation status of requirement a3 is terminated, and the implementation status of requirement b2 is canceled, for example, the implementation status of requirement a1 obtained in the previous time interval is pending approval, and the implementation status of requirement a1 obtained this time is accepted. In this way, it can be determined that the current implementation status of requirement a1 (that is, accepted), the current implementation status of requirement a3 (that is, terminated), and the current implementation status of requirement b2 (that is, canceled) all exist in one of the left-side implementation statuses corresponding to the second requirement in the mapping rule shown in Table 2, and meet the second requirement of the mapping rule in Table 2 (that is, the second sub-business processing rule). Then, the creative implementation status generation for creative A is in accordance with the second requirement of the mapping rule shown in Table 2, and the new creative implementation status of creative A is generated as implementation completed. Alternatively, it is assumed that among the three requirements corresponding to the creative A, the implementation status of at least two requirements has changed, and it is assumed that the implementation status of requirements a1 and a3 has changed, for example, the implementation status of requirement a1 obtained in the previous time interval is pending approval, and the implementation status of requirement a1 obtained this time is canceled, the implementation status of requirement a3 obtained in the previous time interval is under approval, and the implementation status of requirement a3 obtained this time is terminated, and the implementation status of requirement b2 has not changed, that is, it is assumed that the implementation status of requirement b2 is terminated during implementation. In this way, it can be determined that the current implementation status of requirement a1 (i.e., canceled), the current implementation status of requirement a3 (i.e., terminated), and the current implementation status of requirement b2 (i.e., terminated during implementation) all exist in one of the left-side implementation statuses corresponding to the second requirement in the mapping rules shown in Table 2, and meet the second requirement of the mapping rules in Table 2. Then, the creative implementation status generation for creative A is in accordance with the second requirement of the mapping rules shown in Table 2, and the new creative implementation status of creative A is generated as implementation completed. Then, the new idea implementation status of idea A can be used to update the idea implementation status of idea A in the first system (such as an idea management system).
[0111] The above embodiments show that, since the system for storing ideas and the system for storing requirements in the prior art solutions are independent of each other, that is, separated, when recording or updating the implementation status of an idea, business personnel are required to manually identify one or more requirements corresponding to the idea in the system for storing requirements and establish an association relationship, and at the same time query the implementation status of one or more requirements corresponding to the idea from the system for storing requirements and manually record them, and then judge the implementation status of the idea based on the implementation status of the manually recorded one or more requirements, which results in low efficiency in tracking the implementation status of the idea. Based on this, the technical solution in the present invention can automatically associate a certain idea with one or more corresponding requirements by connecting the system for storing ideas and the system for storing requirements, and can automatically obtain the latest implementation status of one or more requirements after establishing the association relationship, and update the implementation status of the idea based on the latest implementation status of the one or more requirements, without relying on business personnel to manually identify and track, thereby effectively improving the tracking efficiency of the implementation status of the idea. Specifically, for any creative idea that has been reviewed and completed, the m requirements corresponding to the creative idea can be automatically matched from the system storing the requirements, and the requirement identification numbers of the m requirements can be determined. At the same time, the association relationship between the creative identification number of the creative idea and the m requirement identification numbers can be automatically determined without the need for manual identification and matching by business personnel, which helps to improve the matching efficiency between the creative idea and the requirements, and can avoid errors caused by manual identification and matching. Then, the demand implementation status corresponding to the m requirement identification numbers is automatically obtained from the system storing the requirements, and when it is determined that the demand implementation status corresponding to at least one requirement identification number among the m requirement identification numbers has changed, the target creative implementation status of the creative idea can be accurately generated according to the business processing rules corresponding to the association relationship. Then, the target creative implementation status can be used to accurately update the creative implementation status of the creative idea. Among them, the target creative implementation status is newer than the creative implementation status, that is, the target creative implementation status is the latest creative implementation status of the creative idea, and the creative implementation status of the creative idea is historical data, that is, the old creative implementation status. In this way, since the solution automatically identifies one or more requirements corresponding to the creativity and establishes an association relationship based on the creativity, without the need for business personnel to subjectively judge the association between the creativity and the requirements, it can avoid errors caused by human subjective judgment, thereby reducing the time spent on manual processing, thereby effectively improving the efficiency of tracking the implementation status of the creativity, and realizing the life cycle management of the creativity from review to implementation.
[0112] Based on the same technical concept, Figure 4 An apparatus for tracking the implementation status of an idea provided by an embodiment of the present invention is exemplarily shown, and the apparatus can execute the process of the method for tracking the implementation status of an idea.
[0113] like Figure 4 As shown, the device comprises:
[0114] The determination unit 401 is used to determine, for any creative idea that has been reviewed, m requirements corresponding to the creative idea, and determine the requirement identification numbers of the m requirements;
[0115] Processing unit 402 is used to establish an association relationship between the creative identification number of the creative and m requirement identification numbers; obtain the requirement implementation status corresponding to the m requirement identification numbers, and when it is determined that the requirement implementation status corresponding to at least one of the m requirement identification numbers has changed, generate a target creative implementation status of the creative according to the business processing rules corresponding to the association relationship; and use the target creative implementation status to update the creative implementation status of the creative.
[0116] Optionally, each creative idea that has been reviewed is stored in the first system; and each requirement corresponding to each creative idea that has been reviewed is stored in the second system.
[0117] Optionally, the determining unit 401 is specifically configured to:
[0118] Determine from the second system at least one demand-posing department corresponding to the creativity, and determine n demands corresponding to the at least one demand-posing department;
[0119] The m requirements corresponding to the creativity are determined from the n requirements by using a smooth inverse frequency algorithm.
[0120] Optionally, the determining unit 401 is specifically configured to:
[0121] Determine the implementation management department corresponding to the creativity in the first system, and match the implementation management department with each demand-posing department in the second system to determine each similarity value;
[0122] The demand proposing department whose similarity value is greater than or equal to the first similarity threshold is determined as the demand proposing department corresponding to the creativity.
[0123] Optionally, the determining unit 401 is specifically configured to:
[0124] Determining, by means of the smoothed inverse frequency algorithm, at least one first keyword in the name of the idea and the implementation advice of the idea;
[0125] For each of the n requirements, determine the name of the requirement and at least one second keyword in the requirement content of the requirement by using the smoothed inverse frequency algorithm;
[0126] Matching the at least one first keyword with the at least one second keyword to determine a similarity value between the creativity and the requirement;
[0127] If it is determined that the similarity value is greater than or equal to a second similarity threshold, the demand is determined as the demand corresponding to the creativity.
[0128] Optionally, the processing unit 402 is specifically configured to:
[0129] If m is a first number that is less than or equal to the number threshold, then when it is determined that the first number of requirement identification numbers has passed the verification, a one-to-one association relationship is established between the idea identification number of the idea and the first number of requirement identification numbers;
[0130] If m is a second number greater than the number threshold, then when it is determined that the second number of requirement identification numbers has passed verification, a one-to-many association relationship is established between the idea identification number of the idea and the second number of requirement identification numbers.
[0131] Optionally, the processing unit 402 is specifically configured to:
[0132] If the association relationship is a one-to-one association relationship, the target creative implementation status of the creativity is generated according to the business processing rules corresponding to the one-to-one association relationship and based on the demand implementation status corresponding to the first number of demand identification numbers.
[0133] Optionally, the processing unit 402 is specifically configured to:
[0134] If the association relationship is a one-to-many association relationship, the target creative implementation status of the creativity is generated according to the business processing rules corresponding to the one-to-many association relationship and based on the demand implementation status corresponding to the second number of demand identification numbers.
[0135] Optionally, the business processing rules corresponding to the one-to-many association relationship include a first sub-business processing rule and a second sub-business processing rule;
[0136] The processing unit 402 is specifically used for:
[0137] If the requirement implementation state corresponding to at least one requirement identification number among the second number of requirement identification numbers exists in the first requirement implementation state record corresponding to the first sub-business processing rule, then generating the first target creative implementation state of the creative according to the first sub-business processing rule;
[0138] If all the requirement implementation states corresponding to the second number of requirement identification numbers exist in the second requirement implementation state record corresponding to the second sub-business processing rule, then the second target creative implementation state of the creativity is generated according to the second sub-business processing rule.
[0139] Based on the same technical concept, the embodiment of the present invention also provides a computing device, such as Figure 5 As shown, it includes at least one processor 501 and a memory 502 connected to the at least one processor. The specific connection medium between the processor 501 and the memory 502 is not limited in the embodiment of the present invention. Figure 5 For example, the processor 501 and the memory 502 are connected via a bus. The bus can be divided into an address bus, a data bus, a control bus, etc.
[0140] In the embodiment of the present invention, the memory 502 stores instructions that can be executed by at least one processor 501. The at least one processor 501 can execute the steps included in the aforementioned method for tracking the creative implementation status by executing the instructions stored in the memory 502.
[0141] Among them, the processor 501 is the control center of the computing device, and can use various interfaces and lines to connect various parts of the computing device, and realize data processing by running or executing instructions stored in the memory 502 and calling data stored in the memory 502. Optionally, the processor 501 may include one or more processing units, and the processor 501 may integrate an application processor and a modem processor, wherein the application processor mainly processes the operating system, user interface, and application programs, and the modem processor mainly processes the issuance of instructions. It is understandable that the above-mentioned modem processor may not be integrated into the processor 501. In some embodiments, the processor 501 and the memory 502 may be implemented on the same chip, and in some embodiments, they may also be implemented separately on independent chips.
[0142] Processor 501 may be a general-purpose processor, such as a central processing unit (CPU), a digital signal processor, an application-specific integrated circuit (ASIC), a field programmable gate array or other programmable logic device, a discrete gate or transistor logic device, or a discrete hardware component, and may implement or execute the methods, steps, and logic block diagrams disclosed in the embodiments of the present invention. A general-purpose processor may be a microprocessor or any conventional processor, etc. The steps of the method disclosed in the embodiment of the tracking method for combining the creative implementation status may be directly embodied as being executed by a hardware processor, or may be executed by a combination of hardware and software modules in the processor.
[0143] The memory 502 is a non-volatile computer-readable storage medium that can be used to store non-volatile software programs, non-volatile computer executable programs and modules. The memory 502 may include at least one type of storage medium, such as a flash memory, a hard disk, a multimedia card, a card-type memory, a random access memory (Random Access Memory, RAM), a static random access memory (Static Random Access Memory, SRAM), a programmable read-only memory (Programmable Read Only Memory, PROM), a read-only memory (Read Only Memory, ROM), an electrically erasable programmable read-only memory (Electrically Erasable Programmable Read-Only Memory, EEPROM), a magnetic memory, a disk, an optical disk, etc. The memory 502 is any other medium that can be used to carry or store the desired program code in the form of an instruction or data structure and can be accessed by a computer, but is not limited thereto. The memory 502 in the embodiment of the present invention can also be a circuit or any other device that can realize a storage function, for storing program instructions and / or data.
[0144] Based on the same technical concept, an embodiment of the present invention also provides a computer-readable storage medium, which stores a computer program that can be executed by a computing device. When the program runs on the computing device, the computing device executes the steps of the above-mentioned creative implementation status tracking method.
[0145] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0146] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0147] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0148] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0149] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.
[0150] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of this application and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A method for tracking the status of creative implementation, It is characterized in that include: For any idea that has been reviewed in the first system, m requirements corresponding to the idea are determined from the second system, and requirement identification numbers of the m requirements are determined, the first system is used to store each idea that has been reviewed, and the second system is used to store each requirement corresponding to each idea that has been reviewed, and the first system and the second system are independent of each other; Establishing an association relationship between the creative identification number of the creative idea and the m requirement identification numbers, wherein the association relationship is a one-to-one association relationship or a one-to-many association relationship; Obtaining the demand implementation states corresponding to the m demand identification numbers, and when it is determined that the demand implementation state corresponding to at least one demand identification number among the m demand identification numbers has changed, generating the target creative implementation state of the creativity according to the business processing rule corresponding to the association relationship, if the association relationship is the one-to-one association relationship, generating the target creative implementation state of the creativity according to the business processing rule corresponding to the one-to-one association relationship, or if the association relationship is the one-to-many association relationship, generating the target creative implementation state of the creativity according to the business processing rule corresponding to the one-to-many association relationship; The target creative implementation state is adopted to update the creative implementation state of the creative.
2. The method according to claim 1, It is characterized in that Determine m requirements corresponding to the creativity, including: Determine from the second system at least one demand-posing department corresponding to the creativity, and determine n demands corresponding to the at least one demand-posing department; The m requirements corresponding to the creativity are determined from the n requirements by using a smooth inverse frequency algorithm.
3. The method according to claim 2, It is characterized in that The step of determining at least one demand-posing department corresponding to the creativity from the second system includes: Determine the implementation management department corresponding to the creativity in the first system, and match the implementation management department with each demand-posing department in the second system to determine each similarity value; The demand proposing department whose similarity value is greater than or equal to the first similarity threshold is determined as the demand proposing department corresponding to the creativity.
4. The method according to claim 2, It is characterized in that The step of determining m requirements corresponding to the creativity from the n requirements by using a smooth inverse frequency algorithm includes: Determining, by means of the smoothed inverse frequency algorithm, at least one first keyword in the name of the idea and the implementation advice of the idea; For each of the n requirements, determine the name of the requirement and at least one second keyword in the requirement content of the requirement by using the smoothed inverse frequency algorithm; Matching the at least one first keyword with the at least one second keyword to determine a similarity value between the creativity and the requirement; If it is determined that the similarity value is greater than or equal to a second similarity threshold, the demand is determined as the demand corresponding to the creativity.
5. The method according to claim 1, It is characterized in that The step of establishing an association relationship between the creative identification number of the creative idea and the m requirement identification numbers includes: If m is a first number that is less than or equal to the number threshold, then when it is determined that the first number of requirement identification numbers has passed the verification, a one-to-one association relationship is established between the idea identification number of the idea and the first number of requirement identification numbers; If m is a second number greater than the number threshold, then when it is determined that the second number of requirement identification numbers has passed verification, a one-to-many association relationship is established between the idea identification number of the idea and the second number of requirement identification numbers.
6. The method according to claim 5, It is characterized in that According to the business processing rules corresponding to the association relationship, the target creative implementation status of the creative is generated, including: If the association relationship is a one-to-one association relationship, the target creative implementation status of the creativity is generated according to the business processing rules corresponding to the one-to-one association relationship and based on the demand implementation status corresponding to the first number of demand identification numbers.
7. The method according to claim 5, It is characterized in that According to the business processing rules corresponding to the association relationship, the target creative implementation status of the creative is generated, including: If the association relationship is a one-to-many association relationship, the target creative implementation status of the creativity is generated according to the business processing rules corresponding to the one-to-many association relationship and based on the demand implementation status corresponding to the second number of demand identification numbers.
8. The method according to claim 7, It is characterized in that The business processing rules corresponding to the one-to-many association relationship include a first sub-business processing rule and a second sub-business processing rule; The generating of the target creative implementation state of the creative according to the business processing rule corresponding to the one-to-many association relationship and based on the demand implementation state corresponding to the demand identification number of the second number includes: If the requirement implementation state corresponding to at least one requirement identification number among the second number of requirement identification numbers exists in the first requirement implementation state record corresponding to the first sub-business processing rule, then generating the first target creative implementation state of the creative according to the first sub-business processing rule; If all the requirement implementation states corresponding to the second number of requirement identification numbers exist in the second requirement implementation state record corresponding to the second sub-business processing rule, then the second target creative implementation state of the creativity is generated according to the second sub-business processing rule.
9. A device for tracking the implementation status of a creative idea, It is characterized in that include: a determination unit, configured to determine, for any creative idea that has been reviewed in the first system, m requirements corresponding to the creative idea from the second system, and determine requirement identification numbers of the m requirements, wherein the first system is configured to store each creative idea that has been reviewed, and the second system is configured to store each requirement corresponding to each creative idea that has been reviewed, and the first system and the second system are independent of each other; A processing unit is used to establish an association relationship between the creative identification number of the creative and m requirement identification numbers, wherein the association relationship is a one-to-one association relationship or a one-to-many association relationship; obtain the requirement implementation status corresponding to the m requirement identification numbers, and when it is determined that the requirement implementation status corresponding to at least one requirement identification number among the m requirement identification numbers has changed, generate the target creative implementation status of the creative according to the business processing rules corresponding to the association relationship; if the association relationship is the one-to-one association relationship, generate the target creative implementation status of the creative according to the business processing rules corresponding to the one-to-one association relationship, or if the association relationship is the one-to-many association relationship, generate the target creative implementation status of the creative according to the business processing rules corresponding to the one-to-many association relationship; and use the target creative implementation status to update the creative implementation status of the creative.
10. A computing device, It is characterized in that The method comprises at least one processor and at least one memory, wherein the memory stores a computer program, and when the program is executed by the processor, the processor executes the method according to any one of claims 1 to 8.
11. A computer-readable storage medium, It is characterized in that It stores a computer program executable by a computing device, and when the program is run on the computing device, the computing device executes the method according to any one of claims 1 to 8.