Power generation demand dispatching method, device and electronic equipment

The server automatically creates power generation demand work orders and screens target power generation vehicles, which solves the problem of low dispatch efficiency of existing power generation vehicles and enables faster and more accurate power generation service dispatch.

CN114037291BActive Publication Date: 2025-01-21HANGZHOU JINHUI TECH CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202111334467.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-11
Publication Date
2025-01-21
Estimated Expiration
2041-11-11

AI Technical Summary

Technical Problem

The current power generation vehicles have low efficiency in order delivery, mainly due to delays and inefficiencies caused by manual operations.

Method used

The server communicates with multiple base stations and power generation vehicles. After receiving the power outage alarm signal, it automatically creates a power generation demand work order, selects target power generation vehicles that meet the preset requirements based on the base station location information, and automatically dispatches the order.

Benefits of technology

It improves the efficiency of dispatching power generation vehicles, reduces manual intervention, and achieves faster and more accurate dispatch of power generation services.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114037291B_ABST
    Figure CN114037291B_ABST
Patent Text Reader

Abstract

The present invention provides a method, device and electronic device for dispatching power generation demand, which are applied to a server, and the server is connected to multiple base stations and multiple power generation vehicles in communication; the method includes: if a power outage alarm signal is received from any of the multiple base stations, a power generation demand work order of the base station is created; wherein the power outage alarm signal carries the location information of the base station; according to the location information of the base station, a target power generation vehicle that meets the preset requirements is screened out from the multiple power generation vehicles; the power generation demand work order of the base station is dispatched to the target power generation vehicle, so that the target power generation vehicle provides power generation services for the base station. The method automatically screens out the target power generation vehicle that meets the preset requirements from multiple power generation vehicles through preset requirements, thereby improving the dispatch efficiency of the power generation vehicles.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of vehicle dispatching, and in particular to a method, device and electronic equipment for dispatching power generation demand. Background Art

[0002] With the continuous development of the economy and the improvement of people's living standards, people's requirements for power supply reliability are also increasing. Whether it is a planned power outage or a power outage caused by a sudden failure, it will seriously affect people's daily life. As a commonly used backup power generation device, the emergency generator truck has the advantages of flexible mobility, fast access, stable power supply and long-lasting power supply. It can provide electricity to the power outage area in time and minimize the impact of power outages. It has become an important means for the power supply department to improve power supply reliability. For example, in the scenario where a communication base station is out of power and requires emergency power supply, the existing power generation truck dispatching method is mostly completed manually after the operator communicates with the base station operation and maintenance personnel, resulting in low efficiency in the dispatching of existing power generation trucks. Summary of the invention

[0003] The object of the present invention is to provide a method, device and electronic equipment for dispatching power generation demand, so as to improve the dispatching efficiency of power generation vehicles.

[0004] In a first aspect, an embodiment of the present invention provides a method for dispatching power generation demand orders, which is applied to a server, and the server is communicatively connected to multiple base stations and multiple power generation vehicles; the method includes: if a power outage alarm signal is received from any of the multiple base stations, creating a power generation demand work order for the base station; wherein the power outage alarm signal carries location information of the base station; based on the location information of the base station, selecting a target power generation vehicle that meets preset requirements from the multiple power generation vehicles; and dispatching the power generation demand work order of the base station to the target power generation vehicle, so as to provide power generation services for the base station through the target power generation vehicle.

[0005] In combination with the first aspect, an embodiment of the present invention provides a first possible implementation method of the first aspect, wherein, according to the location information of the base station, the step of screening out a target power generation vehicle that meets preset requirements from the multiple power generation vehicles includes: according to the location information of the base station, searching from the multiple power generation vehicles for a nearby power generation vehicle whose current distance from the base station is less than a preset distance threshold; if such a nearby power generation vehicle is found, calculating a comprehensive score for each of the nearby power generation vehicles according to a pre-designed scoring rule; and determining the vehicle among the nearby power generation vehicles whose comprehensive score exceeds the preset score as a target power generation vehicle.

[0006] In combination with the first possible implementation of the first aspect, an embodiment of the present invention provides a second possible implementation of the first aspect, wherein, after the step of searching, according to the location information of the base station, from the multiple power generation vehicles for a nearby power generation vehicle whose current distance from the base station is less than a preset distance threshold, the method further includes: if the nearby power generation vehicle is not found, delaying the processing of the power generation demand work order, and after waiting for a preset period of time, executing again the step of searching, according to the location information of the base station, from the multiple power generation vehicles for a nearby power generation vehicle whose current distance from the base station is less than a preset distance threshold, until the nearby power generation vehicle is found.

[0007] In combination with the first possible implementation of the first aspect, an embodiment of the present invention provides a third possible implementation of the first aspect, wherein the method further includes: if there is no vehicle with a comprehensive score exceeding a preset score among the nearby power generation vehicles, the target power generation vehicle is determined to be in a current order-receiving status of dispatching and having no assigned work order; if there is no vehicle with a current order-receiving status of dispatching and having no assigned work order among the nearby power generation vehicles, the target power generation vehicle is determined to be in a current order-receiving status of dispatching and having unreceived work orders; if there is no vehicle with a current order-receiving status of dispatching and having unreceived work orders among the nearby power generation vehicles, the target power generation vehicle is determined to be in a current order-receiving status of having received an order and generating electricity; if the nearby power generation vehicle If there is no vehicle whose current order-receiving status is that the order has been received and the vehicle is generating electricity among the nearby power generation vehicles, the vehicle whose current order-receiving status is that the order has been received but the vehicle is not generating electricity will be determined as the target power generation vehicle; if there is no vehicle whose current order-receiving status is that the order has been received but the vehicle is not generating electricity among the nearby power generation vehicles, the vehicle whose current order-receiving status is that the power generation has been completed but the work order has not been replied to will be determined as the target power generation vehicle; if there is no vehicle whose current order-receiving status is that the power generation has been completed but the work order has not been replied to among the nearby power generation vehicles, the vehicle whose current order-receiving status is that the power generation has been completed but the work order has not been reviewed will be determined as the target power generation vehicle; if there is no vehicle whose current order-receiving status is that the power generation has been completed but the work order has not been reviewed among the nearby power generation vehicles, the vehicle whose current order-receiving status is that the vehicle has not been dispatched will be determined as the target power generation vehicle.

[0008] In combination with the first possible implementation of the first aspect, an embodiment of the present invention provides a fourth possible implementation of the first aspect, wherein the step of determining a vehicle among the nearby power generation vehicles whose comprehensive score exceeds a preset score as a target power generation vehicle includes: if there are multiple nearby power generation vehicles whose comprehensive scores exceed the preset score, determining the vehicle with the shortest response time among the multiple nearby power generation vehicles as the target power generation vehicle.

[0009] In combination with the first possible implementation of the first aspect, the embodiment of the present invention provides a fifth possible implementation of the first aspect, wherein the step of calculating the comprehensive score of each of the nearby power generation vehicles according to the pre-designed scoring rule includes: calculating the comprehensive score of each of the nearby power generation vehicles according to the following relationship: VS=S+E, wherein VS represents the comprehensive score of the nearby power generation vehicle; S represents the possibility index of the nearby power generation vehicle accepting orders; Sn represents the current order acceptance status of the nearby power generation vehicle, which includes: the vehicle has been dispatched but no work order has been assigned, the vehicle has been dispatched but there is an unreceived work order, the order has been received and power is being generated, the order has been received but no power is being generated, the work order has not been replied to after power generation has been completed, the work order has been replied to after power generation but has not been reviewed, and the vehicle has not been dispatched; OA represents the number of work orders that have been reviewed and approved by the nearby power generation vehicle, OR represents the number of work orders rejected by the nearby power generation vehicle, and OSum represents the total number of work orders of the nearby power generation vehicle.

[0010] In combination with the first aspect, an embodiment of the present invention provides a sixth possible implementation method of the first aspect, wherein if a power outage alarm signal is received from any of the multiple base stations, the step of creating a power generation demand work order for the base station includes: if a power outage alarm signal is received from any of the multiple base stations, determining whether the base station exists in the base station library; if not, adding basic information of the base station to the base station library; determining whether the power outage alarm signal of the base station is successfully entered into the library; if yes, creating a power generation demand work order for the base station.

[0011] In combination with the first aspect, an embodiment of the present invention provides a seventh possible implementation method of the first aspect, wherein the method further includes: monitoring the processing progress of the power generation demand work order, and if it is monitored that the power generation demand work order has timed out and has not been processed, sending an alarm prompt message to a preset terminal; if the power generation demand work order is not processed within a preset time range, generating an alarm message and sending it to an operator.

[0012] In the second aspect, an embodiment of the present invention provides a power generation vehicle dispatching device, which is applied to a server, and the server is communicatively connected to multiple base stations and multiple power generation vehicles; the device includes: an alarm signal receiving module, which is used to create a power generation demand work order for any base station among the multiple base stations if a power outage alarm signal is received from the base station; wherein the power outage alarm signal carries the location information of the base station; a target power generation vehicle determination module, which is used to screen out a target power generation vehicle that meets preset requirements from the multiple power generation vehicles according to the location information of the base station; and a dispatching module, which is used to dispatch the power generation demand work order of the base station to the target power generation vehicle, so as to provide power generation services for the base station through the target power generation vehicle.

[0013] In a third aspect, an embodiment of the present invention further provides an electronic device, wherein the electronic device includes a processor and a memory, the memory stores computer-executable instructions that can be executed by the processor, and the processor executes the computer-executable instructions to implement the power generation vehicle dispatching method described in any one of the seventh possible implementation methods of the first aspect to the first aspect.

[0014] The embodiments of the present invention bring the following beneficial effects:

[0015] The present invention provides a method, device and electronic device for dispatching power generation demand, which are applied to a server, and the server is connected to multiple base stations and multiple power generation vehicles in communication; the method includes: if a power outage alarm signal is received from any of the multiple base stations, a power generation demand work order of the base station is created; wherein the power outage alarm signal carries the location information of the base station; according to the location information of the base station, a target power generation vehicle that meets the preset requirements is screened out from the multiple power generation vehicles; the power generation demand work order of the base station is dispatched to the target power generation vehicle, so that the target power generation vehicle provides power generation services for the base station. The method automatically screens out the target power generation vehicle that meets the preset requirements from multiple power generation vehicles through preset requirements, thereby improving the dispatch efficiency of the power generation vehicles.

[0016] Other features and advantages disclosed in this embodiment will be described in the subsequent description, or some features and advantages can be inferred or determined without doubt from the description, or can be learned by implementing the above-mentioned technology of the present disclosure.

[0017] In order to make the above-mentioned objectives, features and advantages of the present disclosure more obvious and easy to understand, preferred embodiments are specifically cited below and described in detail with reference to the attached drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0019] Figure 1 A schematic diagram of a flow chart of a method for dispatching power generation demand provided by an embodiment of the present invention;

[0020] Figure 2 A schematic diagram of another method for dispatching power generation demand provided by an embodiment of the present invention;

[0021] Figure 3 A schematic diagram of the structure of a power generation demand dispatching device is provided for an embodiment of the present invention;

[0022] Figure 4 A schematic diagram of the structure of an electronic device is provided for an embodiment of the present invention.

[0023] Icons: 301 - warning signal receiving module; 302 - target power generation vehicle determination module; 303 - dispatching module; 41 - memory; 42 - processor; 43 - bus; 44 - communication interface. DETAILED DESCRIPTION

[0024] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0025] At present, when a communication base station is out of power and requires emergency power supply, the existing way of dispatching power trucks is mostly done manually after the operator communicates with the base station operation and maintenance personnel, resulting in low efficiency in the existing dispatching of power trucks.

[0026] Based on this, the embodiment of the present invention provides a method, device and electronic device for dispatching power generation demand, which can alleviate the above technical problems. The technology automatically selects target power generation vehicles that meet the preset requirements from multiple power generation vehicles by preset requirements, thereby improving the dispatch efficiency of power generation vehicles. To facilitate understanding of the embodiment of the present invention, a method for dispatching power generation demand disclosed in the embodiment of the present invention is first introduced in detail.

[0027] Example 1

[0028] like Figure 1 FIG. 1 is a flow chart of a method for dispatching power generation demand provided by an embodiment of the present invention. The method is applied to a server, which is communicatively connected with multiple base stations and multiple power generation vehicles.

[0029] Depend on Figure 1 As can be seen, the method comprises the following steps:

[0030] Step S101: if a power outage alarm signal of any base station among the multiple base stations is received, a power generation demand work order of the base station is created; wherein the power outage alarm signal carries the location information of the base station.

[0031] Step S102: According to the location information of the base station, a target power generation vehicle that meets preset requirements is selected from the multiple power generation vehicles.

[0032] In this embodiment, according to the location of the base station, a nearby power generation vehicle that is close to the power generation vehicle can be selected from multiple power generation vehicles by means of a preset range. Furthermore, the target power generation vehicle that meets the preset requirements can be selected by the operating status of the nearby power generation vehicle.

[0033] Step S103: dispatching the power generation demand work order of the base station to the target power generation vehicle, so that the target power generation vehicle provides power generation service for the base station.

[0034] In this embodiment, when multiple target power generation vehicles that meet the preset requirements are screened out, the power generation demand work order of the base station is dispatched to the target power generation vehicle closest to the base station, or the power generation demand work order of the base station is dispatched to the target power generation vehicle with the fastest response speed, so that the target power generation vehicle can provide power generation services for the base station.

[0035] The power generation demand dispatching method provided by the embodiment of the present invention is applied to a server, and the server is in communication connection with multiple base stations and multiple power generation vehicles; the method includes: if a power outage alarm signal is received from any of the multiple base stations, a power generation demand work order of the base station is created; wherein the power outage alarm signal carries the location information of the base station; according to the location information of the base station, a target power generation vehicle that meets the preset requirements is screened out from the multiple power generation vehicles; the power generation demand work order of the base station is dispatched to the target power generation vehicle, so as to provide power generation services for the base station through the target power generation vehicle. The method automatically screens out the target power generation vehicle that meets the preset requirements from multiple power generation vehicles through preset requirements, thereby improving the dispatching efficiency of the power generation vehicles.

[0036] Example 2

[0037] exist Figure 1 Based on the method shown, Figure 2 A schematic flow chart of another method for dispatching power generation demand provided by an embodiment of the present invention. The method is applied to a server, which is communicatively connected with multiple base stations and multiple power generation vehicles.

[0038] Depend on Figure 2 As can be seen, the method comprises the following steps:

[0039] Step S201: if a power outage alarm signal of any base station among the multiple base stations is received, a power generation demand work order of the base station is created; wherein the power outage alarm signal carries the location information of the base station.

[0040] In this embodiment, the above step S201 is implemented by the following steps A1-A4:

[0041] Step A1: If a power outage alarm signal of any base station among the multiple base stations is received, it is determined whether the base station exists in the base station database.

[0042] Step A2: If not, add the basic information of the base station to the base station database, wherein the basic information of the base station includes: the site code and longitude and latitude information of the base station.

[0043] Step A3: Determine whether the power outage alarm signal of the base station is successfully stored;

[0044] Step A4: If yes, create a power generation demand work order for the base station.

[0045] Step S202: According to the location information of the base station, a nearby power generation vehicle whose current distance to the base station is less than a preset distance threshold is searched from the multiple power generation vehicles.

[0046] In this embodiment, after step S202, the method further includes: if the nearby power generation vehicle is not found, delay processing the power generation demand work order, and after waiting for a preset time, perform again the step of searching for a nearby power generation vehicle whose current distance from the base station is less than a preset distance threshold from the multiple power generation vehicles according to the location information of the base station, until the nearby power generation vehicle is found. Further, if the nearby power generation vehicle has not been found within the preset time threshold, the search range of the power generation vehicle is expanded.

[0047] Step S203: If there is a nearby power generation vehicle, a comprehensive score of each nearby power generation vehicle is calculated according to a pre-designed scoring rule.

[0048] In one possible implementation, the comprehensive score of each nearby power generation vehicle is calculated using the following relationship:

[0049]

[0050]

[0051] VS=S+E

[0052] Among them, VS represents the comprehensive score of the nearby power generation vehicles; S represents the possibility index of the nearby power generation vehicles to accept orders; Sn represents the current order acceptance status of the nearby power generation vehicles, which includes: the vehicle has been dispatched but no work order has been assigned, the vehicle has been dispatched but there is an unreceived work order, the order has been received and power is being generated, the order has been received but no power is being generated, the work order has not been replied to after power generation is completed, the work order has been replied to after power generation but has not been reviewed, and the vehicle has not been dispatched; OA represents the number of work orders that have been reviewed and approved by the nearby power generation vehicles, OR represents the number of work orders rejected by the nearby power generation vehicles, and OSum represents the total number of work orders of the nearby power generation vehicles.

[0053] In this embodiment, Sn may be assigned a value according to actual conditions.

[0054] Step S204: Determine the nearby power generation vehicles whose comprehensive scores exceed a preset score as target power generation vehicles.

[0055] In this embodiment, if there is no vehicle with a comprehensive score exceeding the preset score among the nearby power generation vehicles, the target power generation vehicle is determined as the current order-receiving status of dispatching and without an assigned work order; if there is no vehicle with a current order-receiving status of dispatching and without an assigned work order among the nearby power generation vehicles, the target power generation vehicle is determined as the current order-receiving status of dispatching and with an unreceived work order; if there is no vehicle with a current order-receiving status of dispatching and with an unreceived work order among the nearby power generation vehicles, the target power generation vehicle is determined as the current order-receiving status of having received an order and generating electricity; if there is no vehicle with a current order-receiving status of having received an order and generating electricity among the nearby power generation vehicles, The vehicle whose current order-receiving status is "order received but not generating electricity" is determined as the target generating vehicle; if there is no vehicle whose current order-receiving status is "order received but not generating electricity" among the nearby generating vehicles, the vehicle whose current order-receiving status is "generating electricity completed but not responding to the work order" is determined as the target generating vehicle; if there is no vehicle whose current order-receiving status is "generating electricity completed but not responding to the work order" among the nearby generating vehicles, the vehicle whose current order-receiving status is "generating electricity completed but responding to the work order but not reviewed" is determined as the target generating vehicle; if there is no vehicle whose current order-receiving status is "generating electricity completed but responding to the work order but not reviewed" among the nearby generating vehicles, the vehicle whose current order-receiving status is "not dispatched" is determined as the target generating vehicle. Furthermore, if the comprehensive scores of multiple nearby generating vehicles exceed the preset score, the vehicle with the shortest response time among the multiple nearby generating vehicles is determined as the target generating vehicle.

[0056] Step S205: dispatching the power generation demand work order of the base station to the target power generation vehicle, so as to provide power generation service for the base station through the target power generation vehicle.

[0057] In another embodiment, the method further comprises the following steps B1-B2:

[0058] Step B1: monitor the processing progress of the power generation demand work order, and if it is detected that the power generation demand work order has timed out and has not been processed, send an alarm prompt message to a preset terminal.

[0059] Step B2: If the power generation demand work order is not processed within a preset time range, an alarm message is generated and sent to the operator.

[0060] The power generation demand dispatching method provided by the embodiment of the present invention is applied to a server, and the server is connected to multiple base stations and multiple power generation vehicles in communication; the method includes: if a power outage alarm signal of any base station among the multiple base stations is received, a power generation demand work order of the base station is created; wherein the power outage alarm signal carries the location information of the base station; according to the location information of the base station, a nearby power generation vehicle whose current distance from the base station is less than a preset distance threshold is searched from the multiple power generation vehicles; if the nearby power generation vehicle is found, the comprehensive score of each nearby power generation vehicle is calculated according to the pre-designed scoring rules; the vehicle with a comprehensive score exceeding the preset score in the nearby power generation vehicles is determined as a target power generation vehicle; the power generation demand work order of the base station is dispatched to the target power generation vehicle, so as to provide power generation services for the base station through the target power generation vehicle. The method calculates the comprehensive score of each nearby power generation vehicle through the pre-designed scoring rules, automatically selects the target power generation vehicle that meets the preset requirements from multiple power generation vehicles, and further improves the dispatching efficiency of the power generation vehicle.

[0061] Example 3

[0062] The embodiment of the present invention also provides a power generation demand dispatching device, which is applied to a server, and the server is communicatively connected with multiple base stations and multiple power generation vehicles. Figure 3 As shown, a schematic diagram of the structure of a power generation demand dispatching device is provided in an embodiment of the invention, and the device includes:

[0063] The alarm signal receiving module 301 is used to create a power generation demand work order for any base station among the multiple base stations if a power outage alarm signal is received from the base station; wherein the power outage alarm signal carries the location information of the base station.

[0064] The target power generation vehicle determination module 302 is used to select a target power generation vehicle that meets preset requirements from the multiple power generation vehicles according to the location information of the base station;

[0065] The dispatching module 303 is used to dispatch the power generation demand work order of the base station to the target power generation vehicle, so that the target power generation vehicle provides power generation service for the base station.

[0066] The alarm signal receiving module 301, the target power generation vehicle determining module 302 and the dispatching module 303 are connected in sequence.

[0067] In one embodiment, the target power generation vehicle determination module 302 is also used to select target power generation vehicles that meet preset requirements from the multiple power generation vehicles according to the location information of the base station, including: according to the location information of the base station, searching from the multiple power generation vehicles for nearby power generation vehicles whose current distance from the base station is less than a preset distance threshold; if such nearby power generation vehicles are found, calculating the comprehensive score of each of the nearby power generation vehicles according to a pre-designed scoring rule; and determining the vehicle among the nearby power generation vehicles whose comprehensive score exceeds the preset score as the target power generation vehicle.

[0068] In one of the embodiments, the dispatching module 303 is also used for searching, according to the location information of the base station, a nearby power generation vehicle whose current distance from the base station is less than a preset distance threshold from the multiple power generation vehicles. The method further includes: if the nearby power generation vehicle is not found, delaying the processing of the power generation demand work order, and after waiting for a preset period of time, executing again the step of searching, according to the location information of the base station, a nearby power generation vehicle whose current distance from the base station is less than a preset distance threshold from the multiple power generation vehicles until the nearby power generation vehicle is found.

[0069] In one of the embodiments, the target power generation vehicle determination module 302 is also used to, if there is no vehicle with a comprehensive score exceeding a preset score among the nearby power generation vehicles, determine the target power generation vehicle as a vehicle with a current order acceptance status of being dispatched and without an assigned work order; if there is no vehicle with a current order acceptance status of being dispatched and without an assigned work order among the nearby power generation vehicles, determine the target power generation vehicle as a vehicle with a current order acceptance status of being dispatched and with an unreceived work order; if there is no vehicle with a current order acceptance status of being dispatched and with an unreceived work order among the nearby power generation vehicles, determine the target power generation vehicle as a vehicle with a current order acceptance status of having received an order and generating electricity; if there is no vehicle with a current order acceptance status of being dispatched and with an unreceived work order among the nearby power generation vehicles For vehicles that have received orders and are generating electricity, the vehicle whose current order-receiving status is that the order has been received but not generating electricity is determined as the target power-generating vehicle; if there is no vehicle whose current order-receiving status is that the order has been received but not generating electricity among the nearby power-generating vehicles, the vehicle whose current order-receiving status is that the power generation has been completed but the work order has not been replied to is determined as the target power-generating vehicle; if there is no vehicle whose current order-receiving status is that the power generation has been completed but the work order has not been replied to among the nearby power-generating vehicles, the vehicle whose current order-receiving status is that the power generation has been completed and the work order has not been reviewed is determined as the target power-generating vehicle; if there is no vehicle whose current order-receiving status is that the power generation has been completed and the work order has been replied but not reviewed among the nearby power-generating vehicles, the vehicle whose current order-receiving status is that the vehicle has not departed is determined as the target power-generating vehicle.

[0070] In one embodiment, the target power generation vehicle determination module 302 is also used to determine a vehicle among the nearby power generation vehicles whose comprehensive score exceeds a preset score as a target power generation vehicle, including: if there are multiple nearby power generation vehicles whose comprehensive scores exceed the preset score, the vehicle with the shortest response time among the multiple nearby power generation vehicles is determined as the target power generation vehicle.

[0071] In one embodiment, the target power generation vehicle determination module 302 is further configured to calculate the comprehensive score of each of the nearby power generation vehicles according to a pre-designed scoring rule, including: calculating the comprehensive score of each of the nearby power generation vehicles according to the following relationship: VS=S+E, wherein VS represents the comprehensive score of the nearby power generation vehicle; S represents the possibility index of the nearby power generation vehicle accepting orders; Sn represents the current order acceptance status of the nearby power generation vehicle, which includes: the vehicle has been dispatched but no work order has been assigned, the vehicle has been dispatched but there is an unreceived work order, the order has been received and power is being generated, the order has been received but no power is being generated, the work order has not been replied to after power generation has been completed, the work order has been replied to after power generation but has not been reviewed, and the vehicle has not been dispatched; OA represents the number of work orders that have been reviewed and approved by the nearby power generation vehicle, OR represents the number of work orders rejected by the nearby power generation vehicle, and OSum represents the total number of work orders of the nearby power generation vehicle.

[0072] In one of the embodiments, the above-mentioned alarm signal receiving module 301 is also used to create a power generation demand work order for any base station among the multiple base stations if a power outage alarm signal is received from the multiple base stations, including: if a power outage alarm signal is received from any base station among the multiple base stations, determine whether the base station exists in the base station library; if not, add the basic information of the base station to the base station library; determine whether the power outage alarm signal of the base station is successfully entered into the library; if yes, create a power generation demand work order for the base station.

[0073] In one of the embodiments, the dispatching module 303 is also used to monitor the processing progress of the power generation demand work order. If it is detected that the power generation demand work order has timed out and has not been processed, an alarm prompt message is sent to a preset terminal; if the power generation demand work order is not processed within a preset time range, an alarm message is generated and sent to the operator.

[0074] The power generation demand dispatching device provided in the embodiment of the present invention has the same technical features as the power generation demand dispatching method provided in the above embodiment, so it can also solve the same technical problems and achieve the same technical effects. Those skilled in the art can clearly understand that for the convenience and simplicity of description, the specific working process of the device described above can refer to the corresponding process in the above method embodiment, and will not be repeated here.

[0075] Example 4

[0076] This embodiment provides an electronic device, including a processor and a memory, wherein the memory stores computer executable instructions that can be executed by the processor, and the processor executes the computer executable instructions to implement the steps of the power generation demand dispatching method.

[0077] This embodiment provides a computer-readable storage medium, in which a computer program is stored. When the computer program is executed by a processor, the steps of the power generation demand dispatching method are implemented.

[0078] See also Figure 4 A structural schematic diagram of an electronic device is shown, which includes: a memory 41 and a processor 42. The memory 41 stores a computer program that can be run on the processor 42. When the processor executes the computer program, the steps provided by the above-mentioned power generation demand dispatching method are implemented.

[0079] like Figure 4 As shown, the device further includes: a bus 43 and a communication interface 44, a processor 42, a communication interface 44 and a memory 41 are connected via the bus 43; the processor 42 is used to execute executable modules stored in the memory 41, such as computer programs.

[0080] The memory 41 may include a high-speed random access memory (RAM), and may also include a non-volatile memory, such as at least one disk memory. The communication connection between the system network element and at least one other network element is realized through at least one communication interface 44 (which may be wired or wireless), and the Internet, wide area network, local area network, metropolitan area network, etc. may be used.

[0081] The bus 43 may be an ISA bus, a PCI bus, or an EISA bus. The bus may be divided into an address bus, a data bus, a control bus, etc. For ease of representation, Figure 4 Only one bidirectional arrow is used in the diagram, but this does not mean that there is only one bus or only one type of bus.

[0082] Among them, the memory 41 is used to store the program, and the processor 42 executes the program after receiving the execution instruction. The method performed by the power generation demand dispatching device disclosed in any embodiment of the present invention can be applied to the processor 42, or implemented by the processor 42. The processor 42 may be an integrated circuit chip with signal processing capabilities. In the implementation process, each step of the above method can be completed by the hardware integrated logic circuit or software instructions in the processor 42. The above processor 42 can be a general-purpose processor, including a central processing unit (CPU), a network processor (NP), etc.; it can also be a digital signal processor (DSP), an application specific integrated circuit (ASIC), a field-programmable gate array (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components. The disclosed methods, steps and logic block diagrams in the embodiments of the present invention can be implemented or executed. The general-purpose processor can be a microprocessor or the processor can also be any conventional processor, etc. The steps of the method disclosed in the embodiment of the present invention can be directly embodied as being executed by a hardware decoding processor, or can be executed by a combination of hardware and software modules in the decoding processor. The software module can be located in a storage medium mature in the art such as a random access memory, a flash memory, a read-only memory, a programmable read-only memory, or an electrically erasable programmable memory, a register, etc. The storage medium is located in the memory 41, and the processor 42 reads the information in the memory 41 and completes the steps of the above method in combination with its hardware.

[0083] Furthermore, an embodiment of the present invention also provides a machine-readable storage medium, which stores machine-executable instructions. When the machine-executable instructions are called and executed by the processor 42, the machine-executable instructions prompt the processor 42 to implement the above-mentioned power generation demand dispatching method.

[0084] The electronic device and computer-readable storage medium provided by the embodiments of the present invention have the same technical features, and therefore can solve the same technical problems and achieve the same technical effects.

[0085] In addition, in the description of the embodiments of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0086] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

Claims

1. A method for dispatching power generation demand, characterized in that: Applied to a server, the server is communicatively connected with a plurality of base stations and a plurality of power generation vehicles; the method comprises: If a power outage alarm signal of any base station among the multiple base stations is received, a power generation demand work order of the base station is created; wherein the power outage alarm signal carries the location information of the base station; According to the location information of the base station, searching from the plurality of power generation vehicles for a nearby power generation vehicle whose current distance to the base station is less than a preset distance threshold; If the nearby power generation vehicle is found, the comprehensive score of each of the nearby power generation vehicles is calculated according to the pre-designed sub-rules; wherein the step of calculating the comprehensive score of each of the nearby power generation vehicles according to the pre-designed sub-rules includes: The comprehensive score of each nearby power generation vehicle is calculated by the following relationship: Wherein, VS represents the comprehensive score of the nearby power generation vehicles; Indicates the possibility index of the nearby power generation vehicle accepting the order; Indicates the current order acceptance status of the nearby power generation vehicle, and the current order acceptance status includes: dispatching without assigned work orders, dispatching with unreceived work orders, receiving orders and generating electricity, receiving orders but not generating electricity, power generation is completed but no work orders are replied, power generation is completed but work orders are replied but not reviewed, and the vehicle has not dispatched; OA indicates the number of work orders of the nearby power generation vehicle that have been reviewed and approved, and OR indicates the number of work orders rejected by the nearby power generation vehicle. The total number of work orders for the nearby power generation vehicles; Determine a vehicle among the nearby power generation vehicles whose comprehensive score exceeds a preset score as a target power generation vehicle; The power generation demand work order of the base station is dispatched to the target power generation vehicle, so that the target power generation vehicle provides power generation service for the base station.

2. The method for dispatching power generation demand according to claim 1, characterized in that: After the step of searching, from the plurality of power generation vehicles, for a nearby power generation vehicle whose current distance from the base station is less than a preset distance threshold according to the location information of the base station, the method further comprises: If the nearby power generation vehicle is not found, the power generation demand work order is processed with a delay. After waiting for a preset period of time, the step of searching for a nearby power generation vehicle whose current distance to the base station is less than a preset distance threshold from the multiple power generation vehicles based on the location information of the base station is executed again until the nearby power generation vehicle is found.

3. The method for dispatching power generation demand according to claim 1, characterized in that: The method further comprises: If there is no vehicle with a comprehensive score exceeding a preset score among the nearby power generation vehicles, a vehicle with a current order acceptance status of being dispatched and having no assigned work order is determined as the target power generation vehicle; If there is no vehicle in the nearby power generation vehicles whose current order acceptance status is dispatched and has no assigned work order, a vehicle whose current order acceptance status is dispatched and has no work order is determined as the target power generation vehicle; If there is no vehicle in the nearby power generation vehicles whose current order acceptance status is dispatched and has not received a work order, a vehicle whose current order acceptance status is received and generating electricity is determined as the target power generation vehicle; If there is no vehicle in the nearby power generation vehicles whose current order receiving status is that the order has been received and the power generation is in progress, a vehicle whose current order receiving status is that the order has been received and the power generation is not in progress is determined as the target power generation vehicle; If there is no vehicle whose current order-receiving status is "order received but not generating electricity" among the nearby power generation vehicles, a vehicle whose current order-receiving status is "generating electricity completed but not responding to the work order" is determined as the target power generation vehicle; If there is no vehicle whose current order acceptance status is "power generation completed but work order not responded" among the nearby power generation vehicles, a vehicle whose current order acceptance status is "power generation completed but work order responded but not reviewed" is determined as the target power generation vehicle; If there is no vehicle in the nearby power generation vehicles whose current order receiving status is power generation completed and work order replied but not reviewed, a vehicle whose current order receiving status is not dispatched is determined as the target power generation vehicle.

4. The method for dispatching power generation demand according to claim 1, characterized in that: The step of determining a vehicle among the nearby power generation vehicles whose comprehensive score exceeds a preset score as a target power generation vehicle comprises: If the comprehensive scores of multiple nearby power generation vehicles exceed a preset score, the vehicle with the shortest response time among the multiple nearby power generation vehicles is determined as the target power generation vehicle.

5. The method for dispatching power generation demand according to claim 1, characterized in that: If a power outage alarm signal of any base station among the multiple base stations is received, the step of creating a power generation demand work order for the base station includes: If a power outage alarm signal of any base station among the multiple base stations is received, determining whether the base station exists in the base station database; If not, adding basic information of the base station to the base station database; Determine whether the power outage alarm signal of the base station is successfully stored; If yes, create a power generation demand work order for the base station.

6. The method for dispatching power generation demand according to claim 1, characterized in that: The method further comprises: Monitoring the processing progress of the power generation demand work order, and if it is monitored that the power generation demand work order has timed out and has not been processed, sending an alarm prompt message to a preset terminal; If the power generation demand work order is not processed within a preset time range, an alarm message is generated and sent to the operator.

7. A power generation demand dispatching device, characterized in that: Applied to a server, the server is communicatively connected with a plurality of base stations and a plurality of power generation vehicles; the device comprises: An alarm signal receiving module, configured to create a power generation demand work order for any base station among the multiple base stations if a power outage alarm signal is received from the base station; wherein the power outage alarm signal carries the location information of the base station; The target power generation vehicle determination module is used to search, from the plurality of power generation vehicles, for a nearby power generation vehicle whose current distance from the base station is less than a preset distance threshold according to the location information of the base station; if the nearby power generation vehicle is found, the comprehensive score of each of the nearby power generation vehicles is calculated according to the pre-designed sub-rules; wherein the step of calculating the comprehensive score of each of the nearby power generation vehicles according to the pre-designed sub-rules includes: The comprehensive score of each nearby power generation vehicle is calculated by the following relationship: , , , where VS represents the comprehensive score of the nearby power generation vehicles; Indicates the possibility index of the nearby power generation vehicle accepting the order; Indicates the current order acceptance status of the nearby power generation vehicle, and the current order acceptance status includes: dispatching without assigned work orders, dispatching with unreceived work orders, receiving orders and generating electricity, receiving orders but not generating electricity, power generation is completed but no work orders are replied, power generation is completed but work orders are replied but not reviewed, and the vehicle has not dispatched; OA indicates the number of work orders of the nearby power generation vehicle that have been reviewed and approved, and OR indicates the number of work orders rejected by the nearby power generation vehicle. The total number of work orders for the nearby power generation vehicles; and determining the vehicles among the nearby power generation vehicles whose comprehensive scores exceed a preset score as target power generation vehicles; The dispatching module is used to dispatch the power generation demand work order of the base station to the target power generation vehicle, so that the target power generation vehicle provides power generation services for the base station.

8. An electronic device, characterized in that: The electronic device includes a processor and a memory, the memory stores computer-executable instructions that can be executed by the processor, and the processor executes the computer-executable instructions to implement the power generation demand dispatching method described in any one of claims 1 to 6.

Citation Information

Patent Citations

  • Communication base station backup energy system and management method thereof

    CN107742905A