A method for integral hoisting construction of a steel structure truss bridge across an existing line
Through the overall hoisting method and the use of large-tonnage crawler cranes, combined with the protection measures of nylon ropes and steel plates, the difficulties in equipment entry and tight construction schedule during the construction of steel structure truss overpasses across existing lines were solved, and efficient and safe hoisting and assembly were achieved. , reducing interference to existing lines.
Patent Information
- Application Number
- CN202111416107.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-25
- Publication Date
- 2024-10-18
- Estimated Expiration
- 2041-11-25
Smart Images

Figure CN114134816B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of integral hoisting construction of a steel structure truss overpass across an existing line, and in particular to an integral hoisting construction method of a steel structure truss overpass across an existing line. Background Art
[0002] The steel overpass across the existing platform of the new high-speed railway station is a passenger passage. It is close to the existing line. It is difficult for large hoisting equipment to enter the construction site, and the construction is difficult. It is generally a space truss corridor structure with a large construction scope and many types of components. All kinds of steel components need to be processed and manufactured in the factory, and then transported to the construction site. Various components must be organized and planned according to the requirements of the drawings. Classification and numbering, small components must be classified and packaged in an orderly manner. In view of the tight construction period, the construction site is close to the operating line, and the steel truss is large in size and heavy under unfavorable conditions. It was decided to adopt the overall hoisting method. After strict calculation, the location of the crane and the on-site assembly site were determined to ensure the installation progress and complete the hoisting and installation construction safely and efficiently. Summary of the invention
[0003] The object of the present invention is to provide a method for integrally hoisting a steel structure truss overpass across an existing line to solve the problems raised in the above-mentioned background technology.
[0004] To achieve the above object, the present invention provides the following technical solution: a method for integrally hoisting a steel structure truss bridge across an existing line, comprising the following steps:
[0005] Step 1: Place the crane station and DK507+324.2 5.95 meters away from the platform, hang a 240t super-lift counterweight, the distance behind the vehicle meets the 15m radius requirement, rotate the boom 36° counterclockwise, and drop the beam on the 5 and VII roadbeds, 1.5 meters away from the platform, with a working radius of 34 meters, a boom of 60 meters, a rated lifting capacity of 141t, and a safety factor of 1.2 to meet the regulatory requirements;
[0006] Step 2: The crane travels 12 meters without load, moves forward to DK507+314 (the crane crawler is 0.96 meters away from the platform edge), hangs a 240t overload counterweight, the distance behind the vehicle meets the 15m radius requirement, rotates the boom 113° counterclockwise, drops the beam, the crawler is 0.96m away from the platform, the maximum working radius is 31m, the boom is 60m, the rated lifting capacity is 157t, and the safety factor of 1.34 meets the regulatory requirements;
[0007] Step 3: The crane travels 42 meters without load, moves forward to DK507+272.62 (the crane crawler is 2.75 meters away from the platform edge), lifts the 60t segment, rotates the boom 49° clockwise, and moves the edge of the large mileage side to DK507+292.2. The crawler is 2.75 meters away from the platform, the maximum working radius is 22 meters, the boom is 60 meters, the rated lifting capacity is 76.9t, and the safety factor is 1.28, which meets the regulatory requirements;
[0008] Step 4: The crane travels 5.5 meters without load, moves forward to DK507+267 (the crane crawler is 2.65 meters away from the platform edge), lifts the 45t segment, rotates the boom 41° clockwise, and docks with the 60t segment. The crawler is 2.65 meters away from the platform, the maximum working radius is 26 meters, the boom is 60 meters, the rated lifting capacity is 60.2t, and the safety factor of 1.33 meets the regulatory requirements;
[0009] Step 5: Weld the remaining beam sections with small mileage. The crane travels 208 meters without load, retreats to DK507+475.2 (the crane crawler is 5.73 meters away from the platform edge), lifts the 117t segment, rotates the boom 13° clockwise, the crawler is 5.73 meters away from the platform, the maximum working radius is 34 meters, the boom is 60 meters, the rated lifting capacity is 141t, and the safety factor of 1.2 meets the specification requirements;
[0010] Step 6: The crane travels 7.6 meters without load, retreats to DK507+467.6 (the crane crawler is 0.95 meters away from the platform), lifts the 117t segment, rotates the boom 120° clockwise, the crawler is 0.95 meters away from the platform, the maximum working radius is 34 meters, the boom is 60 meters, the rated lifting capacity is 141t, and the safety factor of 1.2 meets the requirements of the specification, and the beam is dropped;
[0011] Step 7: After the welding of the remaining sections on the short-distance side is completed, the crane travels 160 meters without load, retreats to DK507+307.6 (the crane crawler is 5.81 meters away from the platform edge), lifts the 110t segment, rotates the boom 37° counterclockwise, and moves the beam to the 5 and VII roadbeds. The long-distance edge mileage is DK507+301, the crawler is 5.81 meters away from the platform, the maximum working radius is 36 meters, the boom is 60 meters, the rated lifting capacity is 132t, and the safety factor of 1.2 meets the specification requirements;
[0012] Step 8: The crane travels 13 meters without load, retreats to DK507+320.4 (the crane crawler is 1.84 meters away from the platform edge), lifts the 110t segment, raises the boom, and moves the beam to the DK507+312.8 roadbed of tracks 5 and VII. The edge mileage of the large mileage is DK507+312.8, the crawler is 1.84 meters away from the platform, the maximum working radius is 36 meters, the boom is 60 meters, the rated lifting capacity is 132t, and the safety factor of 1.2 meets the specification requirements;
[0013] Step 9: The crane travels 11.3 meters without load, retreats to DK507+331.7 (the crane crawler is 1.84 meters away from the platform edge), lifts the 110t segment, raises the boom, and moves the beam to the DK507+323.2 roadbed of track 5 and VII. The edge mileage of the large mileage is DK507+323.2, the crawler is 1.84 meters away from the platform, the maximum working radius is 36 meters, the boom is 60 meters, the rated lifting capacity is 132t, and the safety factor of 1.2 meets the specification requirements;
[0014] Step 10: The crane travels 16.3 meters without load, retreats to DK507+336.7 (the crane crawler is 1.84 meters away from the platform edge), lifts the 110t segment, raises the boom, stops lifting when the beam is 0.5 meters higher than the support, rotates 28° clockwise, drops the beam, the crawler is 1.84 meters away from the platform, the maximum working radius is 30 meters, the boom is 60 meters, the rated lifting capacity is 163t, and the safety factor is 1.48, which meets the requirements of the specification;
[0015] Step 11: The crane travels 172 meters without load, retreats to DK507+508 (the crane crawler is 8.17 meters away from the platform edge), lifts the 110t segment, raises the boom, rotates 4° counterclockwise, and moves the small mileage edge of the beam to DK507+515. The crawler is 8.17 meters away from the platform, the maximum working radius is 36 meters, the boom is 60 meters, the rated lifting capacity is 132t, and the safety factor of 1.2 meets the specification requirements;
[0016] Step 12: The crane travels 12 meters without load, retreats to DK507+496 (the crane crawler is 7.35 meters away from the platform edge), lifts the 110t segment, raises the boom, rotates 4° counterclockwise, and moves the small mileage edge of the beam to DK507+503.9. The crawler is 7.35 meters away from the platform, the maximum working radius is 36 meters, the boom is 60 meters, the rated lifting capacity is 132t, and the safety factor of 1.2 meets the specification requirements;
[0017] Step 13: The crane travels 11 meters without load, retreats to DK507+485 (the crane crawler is 5.27 meters away from the platform edge), lifts the 110t section, raises the boom, rotates 197° clockwise, drops the beam, and the crawler is 5.27 meters away from the platform. The maximum working radius is 36 meters, the boom is 60 meters, the rated lifting capacity is 132t, and the safety factor is 1.2, which meets the regulatory requirements.
[0018] Preferably, the maximum hoisting weight of the crane overpass steel truss is 117t, the steel truss structure characteristics and on-site construction conditions, the crane station is located on the 5 and VII roadbeds, the crane turning radius is 31 meters, and the crane arm length is selected to be 60 meters.
[0019] Preferably, the cable ropes are 4 25 m long. Nylon rope, pre-tie the guy rope to the overpass, set it at both ends of the hoisting section according to the hoisting section, and tie it to the four corners of the end of the lower chord.
[0020] Preferably, each section of the truss hoisting has a total of 8 hoisting points, which are connected and fixed by surrounding the upper chord.
[0021] Preferably, in order to ensure the safety of lifting, a 10cm*10cm steel plate with a wall thickness of 14mm is added at the lifting point, and corner guards are added to prevent damage to the steel beam.
[0022] Preferably, in order to ensure the progress of the lifting construction, the 400t crawler crane enters the site in advance to take position, assemble, and stabilize the vehicle, and the 80t crane cooperates with the lifting and weighting.
[0023] Compared with the prior art, the present invention has the following beneficial effects:
[0024] 1. The overall hoisting method is used to solve the problem of small construction area and short construction time of the existing line, so that the construction time is less affected by the existing line;
[0025] 2. The assembly and hoisting of steel trusses are divided into different areas, which avoids interference with existing lines to the greatest extent and facilitates precise assembly;
[0026] 3. The overall lifting adopts a large-tonnage crawler crane, which avoids the coordination problems caused by too many lifting equipment, ensures a single command chain during the lifting process, and facilitates safety control;
[0027] 4. It is convenient to arrange the crane travel route reasonably and improve the efficiency of steel truss bridge assembly and hoisting;
[0028] 5. It is convenient to reasonably arrange the daily workload and accurately schedule construction tasks within the daily window of the existing line, thus minimizing interference with the normal operation of the existing line. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is an elevation view of the steel truss overpass of the present invention;
[0030] Figure 2 The main arm working condition of the crane of the present invention;
[0031] Figure 3 The hanging point arrangement diagram of the present invention is DETAILED DESCRIPTION
[0032] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0033] See also Figure 1-3 The present invention provides a method for integrally hoisting a steel structure truss bridge across an existing line, comprising the following steps:
[0034] Step 1: Place the crane station and DK507+324.2 5.95 meters away from the platform, hang a 240t super-lift counterweight, the distance behind the vehicle meets the 15m radius requirement, rotate the boom 36° counterclockwise, and drop the beam on the 5 and VII roadbeds, 1.5 meters away from the platform, with a working radius of 34 meters, a boom of 60 meters, a rated lifting capacity of 141t, and a safety factor of 1.2 to meet the regulatory requirements;
[0035] Step 2: The crane travels 12 meters without load, moves forward to DK507+314 (the crane crawler is 0.96 meters away from the platform edge), hangs a 240t overload counterweight, the distance behind the vehicle meets the 15m radius requirement, rotates the boom 113° counterclockwise, drops the beam, the crawler is 0.96m away from the platform, the maximum working radius is 31m, the boom is 60m, the rated lifting capacity is 157t, and the safety factor of 1.34 meets the regulatory requirements;
[0036] Step 3: The crane travels 42 meters without load, moves forward to DK507+272.62 (the crane crawler is 2.75 meters away from the platform edge), lifts the 60t segment, rotates the boom 49° clockwise, and moves the edge of the large mileage side to DK507+292.2. The crawler is 2.75 meters away from the platform, the maximum working radius is 22 meters, the boom is 60 meters, the rated lifting capacity is 76.9t, and the safety factor is 1.28, which meets the regulatory requirements;
[0037] Step 4: The crane travels 5.5 meters without load, moves forward to DK507+267 (the crane crawler is 2.65 meters away from the platform edge), lifts the 45t segment, rotates the boom 41° clockwise, and docks with the 60t segment. The crawler is 2.65 meters away from the platform, the maximum working radius is 26 meters, the boom is 60 meters, the rated lifting capacity is 60.2t, and the safety factor of 1.33 meets the regulatory requirements;
[0038] Step 5: Weld the remaining beam sections with small mileage. The crane travels 208 meters without load, retreats to DK507+475.2 (the crane crawler is 5.73 meters away from the platform edge), lifts the 117t segment, rotates the boom 13° clockwise, the crawler is 5.73 meters away from the platform, the maximum working radius is 34 meters, the boom is 60 meters, the rated lifting capacity is 141t, and the safety factor of 1.2 meets the specification requirements;
[0039] Step 6: The crane travels 7.6 meters without load, retreats to DK507+467.6 (the crane crawler is 0.95 meters away from the platform), lifts the 117t segment, rotates the boom 120° clockwise, the crawler is 0.95 meters away from the platform, the maximum working radius is 34 meters, the boom is 60 meters, the rated lifting capacity is 141t, and the safety factor of 1.2 meets the requirements of the specification, and the beam is dropped;
[0040] Step 7: After the welding of the remaining sections on the short-distance side is completed, the crane travels 160 meters without load, retreats to DK507+307.6 (the crane crawler is 5.81 meters away from the platform edge), lifts the 110t segment, rotates the boom 37° counterclockwise, and moves the beam to the 5 and VII roadbeds. The long-distance edge mileage is DK507+301, the crawler is 5.81 meters away from the platform, the maximum working radius is 36 meters, the boom is 60 meters, the rated lifting capacity is 132t, and the safety factor of 1.2 meets the specification requirements;
[0041] Step 8: The crane travels 13 meters without load, retreats to DK507+320.4 (the crane crawler is 1.84 meters away from the platform edge), lifts the 110t segment, raises the boom, and moves the beam to the DK507+312.8 roadbed of tracks 5 and VII. The edge mileage of the large mileage is DK507+312.8, the crawler is 1.84 meters away from the platform, the maximum working radius is 36 meters, the boom is 60 meters, the rated lifting capacity is 132t, and the safety factor of 1.2 meets the specification requirements;
[0042] Step 9: The crane travels 11.3 meters without load, retreats to DK507+331.7 (the crane crawler is 1.84 meters away from the platform edge), lifts the 110t segment, raises the boom, and moves the beam to the DK507+323.2 roadbed of track 5 and VII. The edge mileage of the large mileage is DK507+323.2, the crawler is 1.84 meters away from the platform, the maximum working radius is 36 meters, the boom is 60 meters, the rated lifting capacity is 132t, and the safety factor of 1.2 meets the specification requirements;
[0043] Step 10: The crane travels 16.3 meters without load, retreats to DK507+336.7 (the crane crawler is 1.84 meters away from the platform edge), lifts the 110t segment, raises the boom, stops lifting when the beam is 0.5 meters higher than the support, rotates 28° clockwise, drops the beam, the crawler is 1.84 meters away from the platform, the maximum working radius is 30 meters, the boom is 60 meters, the rated lifting capacity is 163t, and the safety factor is 1.48, which meets the requirements of the specification;
[0044] Step 11: The crane travels 172 meters without load, retreats to DK507+508 (the crane crawler is 8.17 meters away from the platform edge), lifts the 110t segment, raises the boom, rotates 4° counterclockwise, and moves the small mileage edge of the beam to DK507+515. The crawler is 8.17 meters away from the platform, the maximum working radius is 36 meters, the boom is 60 meters, the rated lifting capacity is 132t, and the safety factor of 1.2 meets the specification requirements;
[0045] Step 12: The crane travels 12 meters without load, retreats to DK507+496 (the crane crawler is 7.35 meters away from the platform edge), lifts the 110t segment, raises the boom, rotates 4° counterclockwise, and moves the small mileage edge of the beam to DK507+503.9. The crawler is 7.35 meters away from the platform, the maximum working radius is 36 meters, the boom is 60 meters, the rated lifting capacity is 132t, and the safety factor of 1.2 meets the specification requirements;
[0046] Step 13: The crane travels 11 meters without load, retreats to DK507+485 (the crane crawler is 5.27 meters away from the platform edge), lifts the 110t section, raises the boom, rotates 197° clockwise, drops the beam, and the crawler is 5.27 meters away from the platform. The maximum working radius is 36 meters, the boom is 60 meters, the rated lifting capacity is 132t, and the safety factor is 1.2, which meets the regulatory requirements.
[0047] The maximum hoisting weight of the steel truss of the crane overpass is 117t. Considering the structural characteristics of the steel truss and the on-site construction conditions, the crane station is located on the 5 and VII roadbeds, the crane turning radius is 31 meters, and the crane arm length is selected to be 60 meters.
[0048] Use 4 25m guy ropes Nylon rope, pre-tie the guy rope to the overpass, set it at both ends of the hoisting section according to the hoisting section, and tie it to the four corners of the end of the lower chord.
[0049] There are 8 lifting points in each section of the truss lifting, which are connected and fixed by wrapping around the upper chord.
[0050] To ensure the safety of lifting, a 10cm*10cm steel plate with a wall thickness of 14mm is added at the lifting point, and corner guards are added to prevent damage to the steel beam.
[0051] In order to ensure the progress of the lifting construction, the 400t crawler crane entered the site in advance to take position, assemble and stabilize the vehicle, and the 80t crane cooperated with the lifting and weighting.
[0052] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A method for the overall hoisting construction of a steel structure truss bridge across an existing line. Features: The following steps are involved: Step 1: Place the crane station and DK507+324.2 5.95 meters away from the platform, hang a 240t super-lift counterweight, the distance behind the vehicle meets the 15m radius requirement, rotate the boom 36° counterclockwise, and drop the beam on the 5 and VII roadbeds, 1.5 meters away from the platform, with a working radius of 34 meters, a boom of 60 meters, a rated lifting capacity of 141t, and a safety factor of 1.2 to meet the regulatory requirements; Step 2: The crane travels 12 meters without load, and moves forward to DK507+314, that is, the crane crawler is 0.96 meters away from the platform edge, and a 240t overload counterweight is hung. The distance behind the crane meets the 15-meter radius requirement, and the boom is rotated 113° counterclockwise, and the beam is dropped. The crawler is 0.96 meters away from the platform, the maximum working radius is 31 meters, the boom is 60 meters, the rated lifting capacity is 157t, and the safety factor of 1.34 meets the specification requirements; Step 3: The crane travels 42 meters without load, moves forward to DK507+272.62, that is, the crane crawler is 2.75 meters away from the platform edge, lifts the 60t segment, rotates the boom 49° clockwise, and moves the large mileage side edge to DK507+292.
2. The crawler is 2.75 meters away from the platform, the maximum working radius is 22 meters, the boom is 60 meters, the rated lifting capacity is 76.9t, and the safety factor is 1.28, which meets the regulatory requirements; Step 4: The crane travels 5.5 meters without load, and moves forward to DK507+267, that is, the crane crawler is 2.65 meters away from the platform edge, lifts the 45t segment, rotates the boom 41° clockwise, and docks with the 60t segment. The crawler is 2.65 meters away from the platform, the maximum working radius is 26 meters, the boom is 60 meters, the rated lifting capacity is 60.2t, and the safety factor is 1.33, which meets the regulatory requirements; Step 5: Weld the remaining beam sections with small mileage. The crane travels 208 meters without load and retreats to DK507+475.2, i.e. the crane crawler is 5.73 meters away from the platform edge. Lift the 117t segment, rotate the boom 13° clockwise, the crawler is 5.73 meters away from the platform, the maximum working radius is 34 meters, the boom is 60 meters, the rated lifting capacity is 141t, and the safety factor of 1.2 meets the specification requirements; Step 6: The crane travels 7.6 meters without load, retreats to DK507+467.6, that is, the crane crawler is 0.95 meters away from the platform edge, lifts the 117t segment, rotates the boom 120° clockwise, the crawler is 0.95 meters away from the platform, the maximum working radius is 34 meters, the boom is 60 meters, the rated lifting capacity is 141t, and the safety factor of 1.2 meets the requirements of the specification, and the beam is dropped; Step 7: After the welding of the remaining sections on the short-distance side is completed, the crane travels 160 meters without load, retreats to DK507+307.6, that is, the crane crawler is 5.81 meters away from the platform edge, lifts the 110t segment, rotates the boom 37° counterclockwise, and moves the beam to the 5 and VII roadbeds. The long-distance edge mileage is DK507+301, the crawler is 5.81 meters away from the platform, the maximum working radius is 36 meters, the boom is 60 meters, the rated lifting capacity is 132t, and the safety factor is 1.2, which meets the specification requirements; Step 8: The crane travels 13 meters without load, retreats to DK507+320.4, that is, the crane crawler is 1.84 meters away from the platform edge, lifts the 110t segment, lifts the boom, and moves the beam to the DK507+312.8 roadbed of tracks 5 and VII. The edge mileage of the large mileage is DK507+312.8, the crawler is 1.84 meters away from the platform, the maximum working radius is 36 meters, the boom is 60 meters, the rated lifting capacity is 132t, and the safety factor of 1.2 meets the specification requirements; Step 9: The crane travels 11.3 meters without load, retreats to DK507+331.7, that is, the crane crawler is 1.84 meters away from the platform edge, lifts the 110t segment, lifts the boom, and moves the beam to the DK507+323.2 roadbed of 5 and VII tracks. The mileage of the large mileage edge is DK507+323.2, the crawler is 1.84 meters away from the platform, the maximum working radius is 36 meters, the boom is 60 meters, the rated lifting capacity is 132t, and the safety factor of 1.2 meets the specification requirements; Step 10: The crane travels 16.3 meters without load, retreats to DK507+336.7, that is, the crane crawler is 1.84 meters away from the platform edge, lifts the 110t segment, raises the boom, stops lifting when the beam is 0.5 meters higher than the support, rotates 28° clockwise, drops the beam, the crawler is 1.84 meters away from the platform, the maximum working radius is 30 meters, the boom is 60 meters, the rated lifting capacity is 163t, and the safety factor is 1.48, which meets the requirements of the specification; Step 11: The crane travels 172 meters without load, retreats to DK507+508, that is, the crane crawler is 8.17 meters away from the platform edge, lifts the 110t segment, raises the boom, rotates 4° counterclockwise, and moves the small mileage edge of the beam to DK507+515. The crawler is 8.17 meters away from the platform, the maximum working radius is 36 meters, the boom is 60 meters, the rated lifting capacity is 132t, and the safety factor is 1.2, which meets the requirements of the specification; Step 12: The crane travels 12 meters without load, retreats to DK507+496, that is, the crane crawler is 7.35 meters away from the platform edge, lifts the 110t segment, raises the boom, rotates 4° counterclockwise, and moves the small mileage edge of the beam to DK507+503.
9. The crawler is 7.35 meters away from the platform, the maximum working radius is 36 meters, the boom is 60 meters, the rated lifting capacity is 132t, and the safety factor is 1.2, which meets the specification requirements; Step 13: The crane travels 11 meters without load, retreats to DK507+485, that is, the crane track is 5.27 meters away from the platform edge, lifts the 110t section, raises the boom, rotates 197° clockwise, drops the beam, and the crawler track is 5.27 meters away from the platform. The maximum working radius is 36 meters, the boom is 60 meters, the rated lifting capacity is 132t, and the safety factor is 1.2, which meets the regulatory requirements.
2. The overall hoisting construction method of a steel structure truss bridge across an existing line according to claim 1, Features: The maximum hoisting weight of the steel truss of the crane overpass is 117t. Considering the structural characteristics of the steel truss and the on-site construction conditions, the crane station is located on the 5 and VII roadbeds, the crane turning radius is 31 meters, and the crane arm length is selected to be 60 meters.
3. The overall hoisting construction method of a steel structure truss bridge across an existing line according to claim 1, Features: Four 25-meter-long φ10 nylon ropes are used as the guy ropes. The guy ropes are pre-tied to the overpass. According to the lifting section, they are set at both ends of the lifting section and tied to the four corners of the end of the lower chord.
4. The method for integrally hoisting a steel structure truss bridge across an existing line according to claim 1, Features: The truss hoisting has a total of 8 lifting points for each section, which are connected and fixed by surrounding the upper chord.
5. The overall hoisting construction method of a steel structure truss bridge across an existing line according to claim 4, Features: In order to ensure the safety of lifting, a 10cm*10cm steel plate with a wall thickness of 14mm is added at the lifting point, and corner guards are added to prevent damage to the steel beam.
6. The method for integrally hoisting a steel structure truss bridge across an existing line according to claim 1, Features: In order to ensure the progress of the lifting construction, the 400t crawler crane entered the site in advance to take position, assemble and stabilize the vehicle, and the 80t crane cooperated with the lifting and weighting.
Citation Information
Patent Citations
Construction method for hoisting railway overpass box girder by using large-sized crawler crane
CN107858936A
Construction method for erecting T-beam in narrow space close to existing railway line
CN110528390A