Combined prediction method for service order size of power supply business hall considering regional mode
By dividing the types and urgency of work orders in the power supply business hall, building a neural network and support vector machine model, and calculating the weight using the CRITIC method, the problem of the number of work orders in the existing technology is solved, and the problem of failure to effectively count and analyze the number of work orders in the existing technology is realized. More refined service management and higher customer satisfaction.
Patent Information
- Application Number
- CN202111428605.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-29
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2041-11-29
AI Technical Summary
The existing technology has failed to effectively count and analyze the number of service tickets for power supply business halls, resulting in a lack of a refined management and customer experience-oriented service system, affecting service quality and customer satisfaction.
Using a combined prediction method for service work orders for power supply business halls that consider regional mode, a neural network and support vector machine model are constructed by dividing work order types and urgency, and a CRITIC method is used to calculate the model weight to achieve refined prediction of work orders. .
It has improved the accuracy of predicting the number of service work orders in the power supply business hall, improved service quality and customer satisfaction, and enhanced work order service efficiency and market development capabilities.
Smart Images

Figure CN114202112B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the fields of power supply business hall service work order scale prediction, and is mainly used for power supply business hall service work order scale prediction. Through accurate prediction, the service quality is improved, and the transformation to the "Internet + power marketing service" model is actively carried out. The business hall data reference is provided for the transformation of marketing services from customer demand orientation to customer experience orientation, and the transformation construction of the business hall is provided. Specifically, it relates to a power supply business hall service work order scale combination prediction method considering regional mode. Background Art
[0002] With the continuous emergence of new technologies such as "Internet +", people's growing needs for a better life, the shortcomings of the traditional customer service model of power supply business halls are constantly highlighted, and power customer needs and services are facing unprecedented new challenges, mainly manifested in the lack of a customer experience-oriented active service system, the lack of service operation-oriented operation capabilities, the lack of closed-loop and dynamic internal control means and mechanisms, and the lack of comprehensive business analysis service support capabilities. With the rise of new retail, the value of physical channels is gradually returning; young people are becoming more and more accustomed to mobile APP services, and the customer market segmentation and aggregation trends are obvious. In the future, power supply business halls need to give full play to their "peripheral nerves" role, position customers more accurately, and fully carry out various marketing activities such as new business promotion, new product sales, and online drainage while providing customers with more comprehensive, comprehensive, and professional services, so as to improve profitability and become a place for interactive value creation between the two parties. At present, there is no in-depth analysis and statistics on the number of service work orders in power supply business halls, and data expansion applications are lacking. The present invention combines the classification of different types of work orders and realizes the combined prediction of the number of work orders through different methods, which can provide a reference for subsequent improvement of service quality and good planning arrangements. Summary of the invention
[0003] The purpose of the present invention is to provide a combined prediction method for the scale of service work orders of power supply business halls considering regional modes, so as to solve the problem that there is no statistical analysis on the number of work orders. It can improve the refined management level of service work orders of power supply business halls, provide customers with more efficient, convenient and accurate high-quality services and a new experience of combining online and offline interactions, comprehensively improve customer satisfaction, increase stickiness with customers, and further serve market development.
[0004] To achieve the above object, the technical solution of the present invention is: a method for predicting the scale of service orders of power supply business halls considering regional modes, comprising the following steps:
[0005] Step S1: Based on the characteristics of the service work orders of the power supply business hall and considering the regional mode, the service work order types are divided from two dimensions, including the work order service object type and the work order urgency type;
[0006] Step S2, constructing the influencing factors of the number of service work orders of the power supply business hall, including population, regional area, GDP, tertiary industry structure, regional power grid power supply reliability, regional power grid voltage qualification rate, regional power grid asset scale and regional power grid asset average service age;
[0007] Step S3: collect historical data, adopt a neural network model to build a work order quantity prediction model for the work order service object type, adopt a support vector machine method to build a work order quantity prediction model for the work order urgency type, and use the actual work order data as input variables to simulate and train the model;
[0008] Step S4: Using the CRITIC method, based on the deviation of the prediction results of different prediction models, the weights of the two models are calculated, and finally the combined prediction model is constructed.
[0009] In one embodiment of the present invention, in step S1, the types of work order service objects are large industry, general industry and commerce, residents and agriculture; the types of work order urgency are extremely urgent, urgent and generally urgent.
[0010] In one embodiment of the present invention, in step S3, the neural network model is a BP neural network model.
[0011] In one embodiment of the present invention, in step S4, the CRITIC method is used to calculate the weights of the two models based on the deviation of the prediction results of different prediction models. The specific implementation method is as follows:
[0012] There are n samples to be evaluated and p evaluation indicators, forming the original indicator data matrix:
[0013]
[0014] In order to eliminate the influence of different dimensions on the evaluation results, it is necessary to make each indicator dimensionless.
[0015] The CRITIC weight method uses forward or reverse processing;
[0016] Forward or reverse processing:
[0017] If the value of the indicator used is larger, the better, the positive indicator:
[0018]
[0019] If the value of the indicator used is as small as possible, the reverse indicator:
[0020]
[0021] Expressed in the form of standard deviation:
[0022]
[0023] Sj represents the standard deviation of the jth indicator;
[0024] In the CRITIC method, standard deviation is used to indicate the fluctuation of the internal values of each indicator. The larger the standard deviation, the greater the difference in the value of the indicator, the more information can be displayed, the stronger the evaluation strength of the indicator itself, and the more weight should be assigned to the indicator.
[0025] Expressed as a correlation coefficient:
[0026]
[0027] r ij Represents the correlation coefficient between evaluation indicators i and j;
[0028] The correlation coefficient is used to express the correlation between indicators. The stronger the correlation with other indicators, the less conflict the indicator has with other indicators. The more the same information is reflected, the more repetitive the evaluation content can be, which weakens the evaluation strength of the indicator. The weight assigned to the indicator should be reduced.
[0029]
[0030] C j The larger it is, the greater the role of the jth evaluation index in the entire evaluation index system, and more weight should be assigned to it;
[0031] So the objective weight W of the jth indicator j for:
[0032]
[0033] Compared with the prior art, the present invention has the following beneficial effects: based on a systematic and comprehensive investigation of the current status of service work orders in power supply business halls, the method of the present invention scientifically and reasonably divides the work order types, and constructs intelligent prediction methods in combination with the division dimensions to respectively realize scientific prediction of the work order scale, and uses a scientific and objective weighting method, combined with the prediction accuracy of different prediction models, to realize the weight determination of the prediction model. The technical solution disclosed by this method can improve the accuracy of the prediction of the number of service work orders in power supply business halls, further improve the quality of work order services, and effectively improve the efficiency of work order services. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 This is a flow chart of the combined prediction method for the scale of service work orders in power supply business halls taking into account regional modes according to the present invention.
[0035] Figure 2 It is the topological diagram of the BP neural network of the present invention.
[0036] Figure 3 It is the optimal hyperplane graph of SVM of the present invention.
[0037] Figure 4 A schematic diagram of the intermediate nodes output by the SVM classification function of the present invention. DETAILED DESCRIPTION
[0038] The technical solution of the present invention is described in detail below in conjunction with the accompanying drawings.
[0039] The present invention provides a combined prediction method for the scale of service work orders of power supply business halls considering regional modes, comprising the following steps:
[0040] Step S1: Based on the characteristics of the service work orders of the power supply business hall and considering the regional mode, the service work order types are divided from two dimensions, including the work order service object type and the work order urgency type;
[0041] Step S2, constructing the influencing factors of the number of work orders of the power supply service business hall, including population, regional area, GDP, tertiary industry structure, regional power grid power supply reliability, regional power grid voltage qualification rate, regional power grid asset scale and regional power grid asset average service life;
[0042] Step S3: collect historical data, adopt a neural network model to build a work order quantity prediction model for the work order service object type, adopt a support vector machine method to build a work order quantity prediction model for the work order urgency type, and use the actual work order data as input variables to simulate and train the model;
[0043] Step S4: Using the CRITIC method, based on the deviation of the prediction results of different prediction models, the weights of the two models are calculated, and finally the combined prediction model is constructed.
[0044] The following is the specific implementation process of the present invention.
[0045] Step S1. Combined with the characteristics of the service work orders of the power supply business hall and considering the regional mode, the service work order types are divided from two dimensions. The types of service objects of the work orders are large industry, general industry and commerce, residents and agriculture, etc. The types of urgency of the work orders are very urgent, urgent and general urgent.
[0046] Step S2. Construct a combination of factors influencing the number of work orders in the power supply service business hall, including population size, regional area, GDP, tertiary industry structure, regional power grid power supply reliability, regional power grid voltage qualification rate, regional power grid asset scale, and average service life of regional power grid assets.
[0047] Step S3. Collect historical data, adopt a neural network model to build a work order quantity prediction model for the work order service object classification, adopt a support vector machine method to build a work order quantity prediction model for the work order urgency type, combine the actual work order data as input variables, and perform simulation training on the model;
[0048] In step S3, the topology of the constructed BP neural network is as follows: Figure 2 shown.
[0049] (1) Forward propagation process
[0050] The input layer has n neurons x∈Rn, x=(x1,x2,…,x n ); the hidden layer has d neurons h∈Rd, h=(h1,h2,…,h d ); the output layer has m neurons y∈Rm, F=(F1,F2,…,F m ), the weights and thresholds between the input layer and the hidden layer are W ij and b j , the weights and thresholds between the hidden layer and the output layer are W jk and b k ;
[0051] Hidden layer nodes:
[0052] Output layer nodes:
[0053] In the formula, the transfer function
[0054] The error of the output node of a sample is:
[0055]
[0056] In the formula, t k 、F k are the expected output and the calculated output of the network respectively; the error of all samples Where p is the number of samples;
[0057] (2) Back propagation process
[0058] The error calculation formula between the output layer nodes and the hidden layer nodes is:
[0059] δ k =(t k -F k )F k (1-F k )
[0060] Weight correction:
[0061] Threshold correction:
[0062] In the above formula, n0 is the number of iterations; between the input layer nodes and the hidden layer nodes, the error calculation formula is:
[0063]
[0064] Weight correction:
[0065] Threshold correction:
[0066] Build a support vector machine prediction model,
[0067] Support vector machines were originally used to solve classification problems. Prediction technology was developed on their basis. The following mainly introduces their classification theory and their application in prediction technology. Suppose the training sample set is {(x i ,y i ),i=1,2,···,l}, where x i ∈R n is the i-th example of the input pattern, y i ∈{+1,-1} is the target output corresponding to the two-class classification problem; the goal of the support vector classifier is to construct a decision function, i.e., a classification hyperplane, to classify the test data as correctly as possible;
[0068] If there is a classification hyperplane:
[0069] <ω,x>+b=0
[0070] Satisfy the constraints:
[0071] y i (<ω,x>+b)-1≥0,i=1,2,···,l
[0072] The training set is said to be linearly separable, where <·,·> represents the inner product of the vectors, ω∈R n is an adjustable weight vector, b∈R is a bias;
[0073] According to statistical learning theory, if the training sample set is not separated by the hyperplane error, and the distance between the sample data closest to the hyperplane and the classification hyperplane is the largest, then the hyperplane is the optimal hyperplane (OptimalHyperplane), such as Figure 3 As shown, the resulting decision function is:
[0074] f(x)=sgn(<ω,x>+b)
[0075] where sgn(·) is the sign function;
[0076] Using the Lagrange optimization method and Wofle duality theory, the two types of classification problems can be transformed into their dual problems, namely maximizing the functional:
[0077]
[0078] Among them, α i is the Lagrange multiplier corresponding to sample i;
[0079] The above formula is a quadratic programming problem with inequality constraints. There is a unique solution, and only a small part of the solution is α i is not zero, and its corresponding sample is the support vector. Solving the above problem to obtain the optimal classification function is:
[0080]
[0081] Among them, nsv is the number of support vectors, b is the classification threshold, which can be obtained by taking the median of any pair of support vectors in two categories;
[0082] In 1995, Cortes and Vapnild introduced the relaxation term ξ i A generalized classification surface is realized to solve the problem that the training samples are linearly inseparable, that is, a compromise is made between the minimum misclassified samples and the maximum classification interval. For nonlinear problems, they can be transformed into linear problems in a high-dimensional space through nonlinear transformation, and then the optimal classification surface is sought in this high-dimensional space. Only the inner product operation between samples (x i ·x j ) is involved, so only the inner product operation needs to be performed in the high-dimensional space, and the inner product operation can be realized by the function in the original space. According to the Hilbert-Schmidt principle, as long as the kernel function K(x i ·x j ) satisfies Mercer's condition, which corresponds to the inner product in a certain exchange space.
[0083] Therefore, the kernel function K(x i ·x j ) instead of the inner product in the formula, we can realize linear classification after some nonlinear transformation, and the optimal classification function becomes:
[0084]
[0085] In short, SVM maps the input vector to a high-dimensional feature space through some pre-selected nonlinear mapping, and constructs the optimal classification hyperplane in this feature space. In form, the SVM classification function is similar to a neural network, and the output is a linear combination of intermediate nodes, and each intermediate node corresponds to a support vector, such as Figure 4The number of intermediate nodes of a neural network must be selected based on experience or comparative experiments, and different logics will have a great impact on network performance; while the number of intermediate nodes of an SVM is automatically determined by calculation.
[0086] Vapnik generalized the results obtained in SVM classification theory by introducing the ε-insensitive loss function, making it applicable to function fitting. With this generalization, the SVM method becomes a general method for expressing functions in high-dimensional space. It can be used for various function estimation problems, including density estimation problems and solving linear operator equations. Introducing the slack variable ξ i and The following optimization problem is constructed:
[0087]
[0088] Among them, the constant C is the penalty coefficient;
[0089] The optimization problem in the dual space is:
[0090]
[0091] Among them, α i , is the Lagrange multiplier;
[0092] Solve this problem and get the optimal Lagrange multiplier α i , So we get the fitting function:
[0093]
[0094] Step S4: Using the CRITIC method, based on the deviation of the prediction results of different prediction models, the weights of the two models are calculated, and finally the combined prediction model is constructed.
[0095] The CRITIC weighting method is an objective weighting method. The idea is to use two indicators, namely contrast intensity and conflict index. The contrast intensity is represented by the standard deviation. If the data standard deviation is larger, the fluctuation is larger, and the weight will be higher; the conflict is represented by the correlation coefficient. If the correlation coefficient value between the indicators is larger, the conflict is smaller, and the weight will be lower. When calculating the weight, the contrast intensity is multiplied by the conflict index and normalized to obtain the final weight. When using SPSSAU, the contrast intensity and conflict index will be automatically established, and the weight value will be calculated.
[0096] The CRITIC weighting method is applicable to a type of data where data stability can be regarded as a kind of information and there is a certain correlation between the indicators or factors analyzed. Therefore, the CRITIC weighting method just uses the volatility (comparison intensity) and correlation (conflict) of the data to calculate the weights.
[0097] Assuming there are n samples to be evaluated and p evaluation indicators, the original indicator data matrix is formed:
[0098]
[0099] In order to eliminate the influence of different dimensions on the evaluation results, it is necessary to make each indicator dimensionless.
[0100] The CRITIC weighting method generally uses forward or reverse processing; standardization is not recommended because if standardization is used, all standard deviations become the number 1, that is, the standard deviations of all indicators are exactly the same, which makes the volatility indicator meaningless.
[0101] Forward or reverse processing:
[0102] If the value of the indicator used is larger, the better, the positive indicator:
[0103]
[0104] If the value of the indicator used is as small as possible, the reverse indicator:
[0105]
[0106] Expressed in the form of standard deviation:
[0107]
[0108] Sj represents the standard deviation of the jth indicator;
[0109] In the CRITIC method, standard deviation is used to indicate the fluctuation of the internal values of each indicator. The larger the standard deviation, the greater the difference in the value of the indicator, the more information can be displayed, the stronger the evaluation strength of the indicator itself, and the more weight should be assigned to the indicator.
[0110] Expressed as a correlation coefficient:
[0111]
[0112] r ij Represents the correlation coefficient between evaluation indicators i and j;
[0113] The correlation coefficient is used to express the correlation between indicators. The stronger the correlation with other indicators, the less conflict the indicator has with other indicators. The more the same information is reflected, the more repetitive the evaluation content can be, which weakens the evaluation strength of the indicator to a certain extent. The weight assigned to the indicator should be reduced.
[0114]
[0115] C j The larger it is, the greater the role of the jth evaluation index in the entire evaluation index system, and more weight should be assigned to it;
[0116] So the objective weight W of the jth indicator j for:
[0117]
[0118] Those skilled in the art will appreciate that all or part of the processes of the above-mentioned embodiments can be implemented by instructing related hardware through a computer program, and the program can be stored in a computer-readable storage medium, wherein the computer-readable storage medium is a disk, an optical disk, a read-only storage memory, or a random access memory, etc.
[0119] It should be noted that relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprises" or any other variants thereof are intended to cover non-exclusive inclusion, so that an article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprises a..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0120] The above description is only a specific implementation of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest range consistent with the principles and novel features disclosed herein.
[0121] It should be understood that the present application is not limited to what has been described above and shown in the drawings, and various modifications and changes may be made without departing from the scope thereof. The scope of the present application is limited only by the appended claims.
[0122] The above are preferred embodiments of the present invention. Any changes made according to the technical solution of the present invention, as long as the resulting functions do not exceed the scope of the technical solution of the present invention, belong to the protection scope of the present invention.
Claims
1. A combined prediction method for the service order scale of power supply business hall considering regional mode, It is characterized in that The steps include: Step S1: Based on the characteristics of the service work orders of the power supply business hall and considering the regional mode, the service work order types are divided from two dimensions, including the work order service object type and the work order urgency type; Step S2, constructing the influencing factors of the number of service work orders of the power supply business hall, including population, regional area, GDP, tertiary industry structure, regional power grid power supply reliability, regional power grid voltage qualification rate, regional power grid asset scale and regional power grid asset average service age; The types of work order service objects are large industry, general industry and commerce, residents, and agriculture; The urgency level of the work order is very urgent, urgent, and general urgent. Step S3: collect historical data, adopt a neural network model to build a work order quantity prediction model for the work order service object type, adopt a support vector machine method to build a work order quantity prediction model for the work order urgency type, and use the actual work order data as input variables to simulate and train the model; Step S4: Using the CRITIC method, based on the deviation of the prediction results of different prediction models, the weights of the two models are calculated, and finally the combined prediction model is constructed.
2. According to the method for combined prediction of service work order scale of power supply business hall considering regional mode in claim 1, It is characterized in that In step S3, the neural network model is a BP neural network model.