A disaster risk dynamic analysis method and system based on ground monitoring
Through the combination of remote sensing technology and geology and crop information, the drought distribution map is refined and corrected, which solves the problem that accurate drought distribution map cannot be obtained in the existing technology, and accurately assesses and early warnings of drought levels, and improves farmers' response capabilities.
Patent Information
- Application Number
- CN202111540684.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-16
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2041-12-16
AI Technical Summary
The existing technology cannot obtain accurate drought distribution maps in disaster areas, resulting in the inability to accurately predict drought conditions based on real-time data, and thus missed early warning and prevention.
Through remote sensing technology, the overall disaster situation in the target area is collected, combined with geological crack information and crop growth trends, the drought distribution map is refined and corrected, the actual drought distribution map is generated, and dynamic monitoring is carried out to timely release drought level and early warning information.
Accurate assessment and timely warning of drought levels have been achieved, and the impact of drought on farmers and crops has been avoided to the greatest extent, and farmers can respond to droughts.
Smart Images

Figure CN114202218B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of agricultural disasters, and in particular to a method and system for dynamic analysis of disaster risks based on ground monitoring. Background Art
[0002] Agricultural drought is the most common and most influential climate disaster in my country. Every year, the reduction in grain production and economic losses caused by drought account for about 50% of the total economic losses caused by meteorological disasters. Severe agricultural disasters have caused a significant reduction in crop production in my country, causing chaos in the operation of the agricultural economy and seriously threatening people's production, quality of life, and the safety of life and property.
[0003] However, the inventors of this application found that the above technology has at least the following technical problems in the process of implementing the technical solution of the invention in the embodiment of this application:
[0004] There is a technical problem in the existing technology that it is impossible to obtain an accurate distribution map of drought conditions in the disaster area, making it impossible to accurately predict the drought conditions based on real-time data, and thus missing out on early warning and prevention and control. Summary of the invention
[0005] In view of the defects in the prior art, the purpose of the embodiments of the present application is to provide a method and system for dynamic analysis of disaster risks based on ground monitoring, which solves the technical problem that it is impossible to obtain an accurate drought distribution map of the disaster area in the prior art, making it impossible to accurately predict the drought based on real-time data, and thus miss the early warning and prevention and control. Through remote sensing technology, the disaster situation in the target area is generally collected to obtain a drought distribution map. At the same time, the drought distribution map is further refined and corrected based on the actual collected near-ground drought characteristics to ensure that the drought distribution map conforms to the actual situation of the target area, achieving the technical effect of dynamic monitoring based on an accurate drought distribution map of the disaster area, timely publishing drought data, issuing drought levels and drought warning information, minimizing the impact of drought on farmers and crops, and improving farmers' ability to respond to natural disasters such as droughts.
[0006] On the one hand, an embodiment of the present application provides a method for dynamic analysis of disaster risks based on ground monitoring, wherein the method includes: obtaining first ground information to be monitored, wherein the first ground information to be monitored includes first geological information, first ground boundary information and first planted crop information; based on remote sensing technology, traversing and detecting the drought within the first ground boundary information to obtain a drought distribution map of the first ground information to be monitored; based on an image acquisition device, traversing and collecting the ground of the first geological information to obtain geological crack information, and at the same time, traversing and collecting the growth trend of the first planted crop information to obtain pathological growth information; using the geological crack information as a first correction parameter and the pathological growth information as a second correction parameter; based on the first correction parameter and the second correction parameter, refining and correcting the drought distribution map to generate an actual drought distribution map of the first ground information to be monitored; continuously and dynamically monitoring the actual drought distribution map to determine the drought level of the first ground information to be monitored, and timely issuing drought warning information.
[0007] On the other hand, the present application also provides a disaster risk dynamic analysis system based on ground monitoring, wherein the system includes: a first acquisition unit: the first acquisition unit is used to obtain first ground information to be monitored, wherein the first ground information to be monitored includes first geological information, first ground boundary information and first planted crop information; a first detection unit: the first detection unit is used to traverse and detect the drought within the first ground boundary information based on remote sensing technology to obtain a drought distribution map of the first ground information to be monitored; a first acquisition unit: the first acquisition unit is used to traverse and collect the ground of the first geological information based on an image acquisition device to obtain geological crack information. information, and at the same time, traverse and collect the growth situation of the first planted crop information to obtain pathological growth information; a second obtaining unit: the second obtaining unit is used to use the geological fracture information as the first correction parameter and the pathological growth information as the second correction parameter; a first correction unit: the first correction unit is used to refine and correct the drought distribution map according to the first correction parameter and the second correction parameter, and generate an actual drought distribution map of the first ground information to be monitored; a first monitoring unit: the first monitoring unit is used to continuously and dynamically monitor the actual drought distribution map, determine the drought level of the first ground information to be monitored, and promptly issue drought warning information.
[0008] One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:
[0009] Based on remote sensing technology, the disaster situation in the target area is generally collected to obtain a drought distribution map. At the same time, the drought distribution map is further refined and corrected based on the actual near-ground drought characteristics collected to ensure that the drought distribution map conforms to the actual situation in the target area. The actual drought distribution map is then dynamically monitored to grasp the fluctuation of drought data in real time, and then the distribution, duration and other information of the drought are preset to determine the drought level in the target area. At the same time, drought data, drought levels and drought warning information are published in a timely manner to facilitate farmers to make timely response measures, thereby achieving the technical effect of avoiding the impact of agricultural drought on farmers and crops to the greatest extent and improving farmers' resilience to natural disasters such as drought.
[0010] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS
[0011] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments made with reference to the following drawings:
[0012] Figure 1 A schematic diagram of a flow chart of a method for dynamic analysis of disaster risk based on ground monitoring according to an embodiment of the present application;
[0013] Figure 2 A schematic diagram of a process for early warning of drought data and early warning prevention and control based on a method for dynamic analysis of disaster risks based on ground monitoring according to an embodiment of the present application;
[0014] Figure 3 A schematic diagram of a process of refining and correcting the drought distribution map in a method for dynamic analysis of disaster risks based on ground monitoring according to an embodiment of the present application;
[0015] Figure 4 A schematic diagram of a process of performing data reorganization and generating the actual drought distribution map in a method for dynamic analysis of disaster risk based on ground monitoring according to an embodiment of the present application;
[0016] Figure 5 A schematic flow chart of a preset classification logic of a method for dynamic analysis of disaster risks based on ground monitoring according to an embodiment of the present application;
[0017] Figure 6 A schematic diagram of a flow chart of decentralized processing of the historical drought data set in a method for dynamic analysis of disaster risks based on ground monitoring according to an embodiment of the present application;
[0018] Figure 7A schematic diagram of a process for obtaining pathological growth information of a method for dynamic analysis of disaster risk based on ground monitoring according to an embodiment of the present application;
[0019] Figure 8 This is a schematic diagram of the structure of a disaster risk dynamic analysis system based on ground monitoring according to an embodiment of the present application;
[0020] Fig. 9 It is a schematic diagram of the structure of an exemplary electronic device according to an embodiment of the present application. DETAILED DESCRIPTION
[0021] The embodiment of the present application solves the technical problem that it is impossible to obtain an accurate drought distribution map of the disaster area in the prior art, which makes it impossible to accurately predict the drought based on real-time data, and thus miss the early warning and prevention and control. Through remote sensing technology, the disaster situation in the target area is generally collected to obtain a drought distribution map. At the same time, the drought distribution map is further refined and corrected based on the actual collected near-ground drought characteristics to ensure that the drought distribution map conforms to the actual situation of the target area, and achieves the technical effect of dynamic monitoring based on an accurate drought distribution map of the disaster area, timely publishing drought data, issuing drought levels and drought warning information, minimizing the impact of drought on farmers and crops, and improving farmers' responsiveness to natural disasters such as drought.
[0022] Below, the exemplary embodiments according to the present application will be described in detail with reference to the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments of the present application, and it should be understood that the present application is not limited to the exemplary embodiments described here.
[0023] Application Overview
[0024] Agricultural drought is the most common and most influential climate disaster in my country. Every year, the reduction in grain production and economic losses caused by drought account for about 50% of the total economic losses caused by meteorological disasters. Severe agricultural disasters have caused a significant reduction in crop production in my country, resulting in chaos in the operation of the agricultural economy, and seriously threatening people's production, quality of life, and the safety of life and property. In the existing technology, there is a technical problem that it is impossible to obtain an accurate distribution map of drought conditions in the disaster area, making it impossible to accurately predict the drought conditions based on real-time data, and thus missing the early warning and prevention and control.
[0025] In response to the above technical problems, the overall idea of the technical solution provided by this application is as follows:
[0026] The embodiment of the present application provides a method for dynamic analysis of disaster risks based on ground monitoring, wherein the method includes: obtaining first ground information to be monitored, wherein the first ground information to be monitored includes first geological information, first ground boundary information and first planted crop information; based on remote sensing technology, traversing and detecting the drought within the first ground boundary information to obtain a drought distribution map of the first ground information to be monitored; based on an image acquisition device, traversing and acquiring the ground of the first geological information to obtain geological crack information, and at the same time, traversing and acquiring the growth trend of the first planted crop information to obtain pathological growth information; using the geological crack information as a first correction parameter and the pathological growth information as a second correction parameter; refining and correcting the drought distribution map according to the first correction parameter and the second correction parameter to generate an actual drought distribution map of the first ground information to be monitored; continuously and dynamically monitoring the actual drought distribution map to determine the drought level of the first ground information to be monitored, and timely issuing drought warning information.
[0027] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0028] Embodiment 1
[0029] like Figure 1 As shown, an embodiment of the present application provides a method for dynamic analysis of disaster risks based on ground monitoring, wherein the method includes:
[0030] Step S100: obtaining first ground information to be monitored, wherein the first ground information to be monitored includes first geological information, first ground boundary information and first planted crop information;
[0031] Specifically, agricultural drought is the most common and most influential climate disaster in my country. Every year, the reduction in grain production and economic losses caused by drought account for about 50% of the total economic losses caused by meteorological disasters. Severe agricultural disasters have caused a significant reduction in crop production in my country, resulting in chaos in the operation of the agricultural economy, and seriously threatening people's production, quality of life, and the safety of life and property. In an embodiment of the present application, in order to minimize the impact of agricultural drought on farmers and crops, the target area can be dynamically monitored based on a ground monitoring system, and the monitoring data can be comprehensively analyzed, so as to avoid the impact of drought as much as possible and minimize the loss. Among them, the first ground information to be monitored is the target area in this application, that is, the target area is monitored on the ground, and further, it includes the first geological information, the first ground boundary information and the first planted crop information, the first geological information includes the land quality of the target area, soil moisture, etc., the first ground boundary information includes the boundary information of the target area, and the first planted crop information includes the information of the crops planted in the target area.
[0032] Step S200: Based on remote sensing technology, traverse detection is performed on the drought conditions within the first ground boundary information to obtain a drought distribution map of the first ground information to be monitored;
[0033] Step S300: Based on the image acquisition device, the ground of the first geological information is traversed and collected to obtain geological fracture information, and at the same time, the growth trend of the first planted crop information is traversed and collected to obtain pathological growth information;
[0034] Specifically, due to the vast terrain of the target area, the drought conditions in the target area can be traversed and detected based on remote sensing technology. Remote sensing is the use of instruments such as remote sensors that are sensitive to electromagnetic waves to detect target objects at a distance from the target and without contact with the target object. In agriculture, remote sensing technology is used to monitor crop planting areas and crop growth information, quickly monitor and evaluate agricultural drought and pests and diseases and other disaster information, estimate global, national and regional crop yields, and provide information for food supply quantity analysis and forecasting and early warning. Furthermore, the drought distribution map is the drought distribution of the target area obtained based on remote sensing technology.
[0035] At the same time, based on the image acquisition device, the ground image of the target area can be collected near the ground. The geological crack information reflects the severity of the drought to a certain extent. For example, the larger the crack, the more severe the drought. The growth status of the crops can also be imaged, which also reflects the severity of the drought. For example, if the appearance of the crops is yellow and wilted, it means that the drought is also relatively serious.
[0036] Step S400: using the geological fracture information as a first correction parameter and the pathological growth information as a second correction parameter;
[0037] Step S500: refining and correcting the drought distribution map according to the first correction parameter and the second correction parameter to generate an actual drought distribution map of the first ground information to be monitored;
[0038] Specifically, although remote sensing technology is already quite mature, in order to conduct a comprehensive monitoring and analysis of the drought in the target area, the drought distribution map can be further refined and corrected based on the actual near-ground drought characteristics collected to ensure that the drought distribution map conforms to the actual situation in the target area, that is, the drought distribution map is refined and corrected according to the first correction parameter and the second correction parameter to generate an actual drought distribution map of the first ground information to be monitored, wherein the actual drought distribution map completely and truly reflects the drought information in the target area, making it convenient for professionals to make accurate analysis of the development of the drought.
[0039] Step S600: Continuously and dynamically monitor the actual drought distribution map, determine the drought level of the first monitored ground information, and issue drought warning information in a timely manner.
[0040] Specifically, after the drought distribution map is refined and revised, it is necessary to conduct uninterrupted dynamic monitoring on it to grasp the data fluctuations in real time, and then preset the distribution of drought, duration and other information, determine the drought level in the target area, and publish drought data, drought levels and drought warning information in a timely manner to facilitate farmers to make timely response measures and reduce losses.
[0041] Further, such as Figure 2 As shown, the embodiment of the present application also includes:
[0042] Step S710: obtaining drought resistance characteristics of the first crop and water requirement information of the first crop according to the first planted crop information;
[0043] Step S720: based on the drought level, presetting the drought duration of the first ground information to be monitored;
[0044] Step S730: obtaining a drought tolerance duration threshold of the first crop according to the drought tolerance characteristics of the first crop and the water required by the first crop;
[0045] Step S740: determining whether the drought tolerance duration threshold exceeds the drought duration;
[0046] Step S750: if the drought tolerance time threshold does not exceed the drought duration, generating a first drought warning instruction;
[0047] Step S760: According to the first drought warning instruction, the drought data is warned and early warning prevention and control measures are carried out.
[0048] Specifically, in order to carry out early warning and control of drought based on the growth conditions of crops themselves, further, the drought resistance characteristics of the first crop reflect whether the planted crops are drought-resistant, and the water required information of the first crop reflects the water information required for the normal growth of the planted crops. At the same time, the duration of the drought reflects the information that the drought that has occurred may be aggravated or even prolonged, depending on the drought level. If the drought level is high, the corresponding duration may be longer. Then, according to the drought resistance characteristics of the first crop and the water required information of the first crop, the drought resistance duration threshold of the first crop is obtained. The drought resistance duration threshold indicates the longest drought resistance time limit acceptable to the planted crops, and then it is determined whether the drought resistance duration threshold exceeds the drought duration. If it does not exceed, it means that the drought that is about to be extended may affect the growth of crops next. Therefore, according to the first drought warning instruction, the drought data can be warned, and early warning and control can be carried out at the same time to ensure that the drought is warned and controlled based on the growth conditions of the crops themselves, and the damage to the crops is minimized.
[0049] Further, such as Figure 3 As shown, the drought distribution map is refined and corrected according to the first correction parameter and the second correction parameter, and step S500 further includes:
[0050] Step S510: classifying and feature-marking the drought distribution map to obtain first-level drought features, second-level drought features, and third-level drought features, wherein the first-level drought features correspond to the first distribution area, the second-level drought features correspond to the second distribution area, and the third-level drought features correspond to the third distribution area;
[0051] Step S520: obtaining first geological fracture information and first pathological growth information of the first distribution area, second geological fracture information and second pathological growth information of the second distribution area, and third geological fracture information and third pathological growth information of the third distribution area;
[0052] Step S530: Based on the first geological fracture information and the first pathological growth information, the first level drought characteristics are corrected to generate a first level corrected drought characteristics;
[0053] Step S540: Based on the second geological fracture information and the second pathological growth information, the second level drought characteristics are corrected to generate a second level corrected drought characteristics;
[0054] Step S550: Based on the third geological fracture information and the third pathological growth information, the third level drought characteristics are corrected to generate a third level corrected drought characteristics;
[0055] Step S560: reorganizing and optimizing the first-level corrected drought characteristics, the second-level corrected drought characteristics, and the third-level corrected drought characteristics to generate the actual drought distribution map.
[0056] Specifically, in order to refine and correct the drought distribution map, further, the drought distribution map obtained by remote sensing technology is subjected to data feature analysis, classification, and feature marking, that is, data with similar data features and higher than the predetermined drought data features are divided into the first-level drought features, data with similar data features and close to the predetermined drought data features are divided into the second-level drought features, and data with similar data features and lower than the predetermined drought data features are divided into the third-level drought features. At the same time, based on the GPS positioning technology of remote sensing technology, the first distribution area marks the area covered by the first-level drought features, the second distribution area marks the area covered by the second-level drought features, and the third distribution area marks the area covered by the third-level drought features.
[0057] Furthermore, based on the image acquisition device, the first geological fracture information and the first pathological growth information of the first distribution area near the ground can be obtained. Similarly, the second geological fracture information and the second pathological growth information of the second distribution area, and the third geological fracture information and the third pathological growth information of the third distribution area can be obtained. Then, based on the geological fracture information and the pathological growth information of crops in each area, the initial drought characteristics of each area (i.e., the first-level drought characteristics, the second-level drought characteristics, and the third-level drought characteristics) are corrected, and then the data of the corrected drought characteristics of each level are reorganized and optimized to generate the actual drought distribution map, thereby realizing the refined correction of the drought distribution map.
[0058] Further, such as Figure 4 As shown, the embodiment of the present application also includes:
[0059] Step S561: obtaining first drought characteristic data corresponding to the first-level corrected drought characteristic, second drought characteristic data corresponding to the second-level corrected drought characteristic, and third drought characteristic data corresponding to the third-level corrected drought characteristic;
[0060] Step S562: constructing a drought characteristic data set based on the first drought characteristic data, the second drought characteristic data and the third drought characteristic data;
[0061] Step S563: splitting the data in the drought characteristic data set to generate a first classification set and a second classification set, wherein the first classification set includes temperature distribution information, and the second classification set includes precipitation distribution information;
[0062] Step S564: deeply traverse and analyze the data in the first classification set and the second classification set, and reorganize the data according to a preset classification logic to generate the actual drought distribution map.
[0063] Specifically, in order to reorganize and optimize the data of the revised drought characteristics at each level, further, the drought characteristic data contained in the revised drought characteristics at each level can be specifically obtained, including terrain, landform, altitude, annual precipitation, temperature and humidity and other characteristic data, and then based on the drought characteristic data, the drought characteristic data set is constructed. By splitting the data in the data set, it can be generally divided into two categories, namely the first classification set and the second classification set, wherein the first classification set contains temperature distribution characteristics and the second classification set contains precipitation distribution characteristics. It should be noted that because temperature and precipitation are the main manifestations of drought development, they are divided into two categories, but are not limited to these two categories. In this application, these two categories are used as examples for explanation, and the data in the first classification set and the second classification set are deeply traversed and analyzed, and the data is reorganized according to the preset hierarchical logic to generate the actual drought distribution map. Further data reorganization and optimization of the revised drought characteristics at each level are achieved.
[0064] Further, such as Figure 5 As shown, the data is reorganized according to the preset classification logic, and step S564 also includes:
[0065] Step S5641: Based on the big data, a historical drought data set of the first ground information to be monitored is collected;
[0066] Step S5642: Obtaining population distribution information and water resource utilization rate information of the first ground information to be monitored;
[0067] Step S5643: inputting the historical drought data set, the population distribution information and the water resource utilization rate information into a drought assessment model, and training the drought assessment model with the identified drought assessment classification features until convergence;
[0068] Step S5644: obtaining the training result of the drought assessment model, wherein the training result includes drought assessment classification features;
[0069] Step S5645: Generate the preset grading logic according to the drought assessment grading characteristics.
[0070] Specifically, in order to reorganize data according to a preset grading logic, further, the historical drought data set is a collection of historical disaster conditions in the target area. At the same time, the population distribution information is the population distribution status of the target area, and the water resource utilization information reflects the water use status of the target area. Since drought will affect population distribution and water use status, the historical drought data set, the population distribution information and the water resource utilization information can be input into a drought assessment model to ensure accurate assessment of the drought in the target area. Based on the drought assessment grading feature, the drought assessment model can continuously train the input data until the training reaches a convergence state, wherein the drought assessment grading feature is a preset drought development to a certain predetermined feature, which can be compared based on the upper threshold, the same level threshold and the lower threshold of the predetermined feature, so that a more accurate training result is trained, which includes the drought assessment grading feature, and then based on the drought assessment grading feature, the preset grading logic is generated.
[0071] Further, such as Figure 6 As shown, the embodiment of the present application also includes:
[0072] Step S56411: obtaining a first feature data set according to the historical drought data set;
[0073] Step S56412: performing centralization processing on the first feature data set to obtain a second feature data set;
[0074] Step S56413: Obtain a first covariance matrix of the second feature data set;
[0075] Step S56414: operating the first covariance matrix to obtain a first eigenvalue and a first eigenvector of the first covariance matrix;
[0076] Step S56415: Project the first feature data set to the first feature vector to obtain a first reduced-dimensionality data set, wherein the first reduced-dimensionality data set is a feature data set obtained after the first feature data set is reduced in dimensionality.
[0077] Specifically, in order to ensure that the training data set samples are comprehensive and non-repetitive, the extracted feature data can be numerically processed according to the historical drought data set, and a feature data set matrix can be constructed to obtain the first feature data set. Then, each feature data in the first feature data set is centralized. First, the average value of each feature in the first feature data set is solved, and then for all samples, each feature is subtracted from its own mean value to obtain a new feature value. The new feature value constitutes the second feature data set, and the second feature data set is a data matrix. Through the covariance formula:
[0078]
[0079] The second feature data set is operated to obtain a first covariance matrix of the second feature data set. is the feature data in the second feature data set; is the average value of the feature data; M is the total amount of sample data in the second feature data set. Then, through matrix operations, the eigenvalues and eigenvectors of the first covariance matrix are obtained, and each eigenvalue corresponds to an eigenvector. Among the first eigenvectors obtained, the largest first K eigenvalues and their corresponding eigenvectors are selected, and the original features in the first feature data set are projected onto the selected eigenvectors to obtain the feature data set after dimensionality reduction. The feature data in the database are reduced in dimensionality by principal component analysis. Under the premise of ensuring the amount of information, redundant data is eliminated, so that the sample size of the feature data in the database is reduced, and the information loss after dimensionality reduction is minimized, thereby speeding up the training model's operation speed on the data.
[0080] Further, such as Figure 7 As shown, the step S300 of obtaining the pathological growth information further includes:
[0081] Step S310: Based on the image acquisition device, the growth status of the first planted crop information is traversed and collected to obtain crop appearance characteristics and crop soil color characteristics;
[0082] Step S320: judging whether the first planted crop information has pathological growth according to the crop appearance characteristics and the crop soil color characteristics;
[0083] Step S330: If the first planted crop information contains pathological growth, the pathological growth information is obtained.
[0084] Specifically, in order to reasonably monitor the pathological growth of crops, further analysis can be performed based on the collected crop appearance characteristics and crop soil color characteristics, wherein the crop appearance characteristics include yellowing and wilting of leaves, or leaf shedding, etc., and the crop soil color characteristics include lightening of soil color, the beginning of drought, etc., and then based on the crop appearance characteristics and crop soil color characteristics, it is determined whether the first planted crop information has pathological growth. If so, specific pathological growth information is obtained, and the drought distribution map is filled and refined, thereby achieving reasonable monitoring of the pathological growth of crops.
[0085] Compared with the prior art, the present invention has the following beneficial effects:
[0086] 1. Based on remote sensing technology, the disaster situation in the target area is generally collected to obtain a drought distribution map. At the same time, the drought distribution map is further refined and corrected based on the actual near-ground drought characteristics collected to ensure that the drought distribution map conforms to the actual situation in the target area. Then, the actual drought distribution map is dynamically monitored to grasp the fluctuation of drought data in real time, and then the distribution and duration of drought are preset to determine the drought level in the target area. At the same time, drought data, drought level and drought warning information are published in a timely manner to facilitate farmers to take timely response measures, thereby achieving the technical effect of avoiding the impact of agricultural drought on farmers and crops to the greatest extent and improving farmers' resilience to natural disasters such as drought.
[0087] Embodiment 2
[0088] Based on the same inventive concept as the method for dynamic analysis of disaster risk based on ground monitoring in the aforementioned embodiment, the present invention also provides a dynamic analysis system for disaster risk based on ground monitoring, such as Figure 8 As shown, the system comprises:
[0089] First obtaining unit 11: The first obtaining unit 11 is used to obtain first ground information to be monitored, wherein the first ground information to be monitored includes first geological information, first ground boundary information and first planted crop information;
[0090] The first detection unit 12: The first detection unit 12 is used to perform traversal detection on the drought condition within the first ground boundary information based on remote sensing technology to obtain a drought condition distribution map of the first ground information to be monitored;
[0091] The first acquisition unit 13: The first acquisition unit 13 is used to traverse and acquire the ground of the first geological information based on an image acquisition device to obtain geological fracture information, and at the same time, traverse and acquire the growth trend of the first planted crop information to obtain pathological growth information;
[0092] The second obtaining unit 14: The second obtaining unit 14 is used to use the geological fracture information as the first correction parameter and the pathological growth information as the second correction parameter;
[0093] The first correction unit 15: The first correction unit 15 is used to refine and correct the drought distribution map according to the first correction parameter and the second correction parameter to generate an actual drought distribution map of the first ground information to be monitored;
[0094] The first monitoring unit 16: The first monitoring unit 16 is used to continuously and dynamically monitor the actual drought distribution map, determine the drought level of the first monitored ground information, and issue drought warning information in a timely manner.
[0095] Furthermore, the system also includes:
[0096] A third obtaining unit: the third obtaining unit is used to obtain the drought resistance characteristics of the first crop and the water required by the first crop according to the first planted crop information;
[0097] First preset unit: The first preset unit is used to preset the drought duration of the first to-be-monitored ground information based on the drought disaster level;
[0098] Fourth obtaining unit: the fourth obtaining unit is used to obtain a drought tolerance time threshold of the first crop according to the drought tolerance characteristic of the first crop and the water required by the first crop;
[0099] The first judgment unit is used to judge whether the drought tolerance time threshold exceeds the drought duration;
[0100] The first generating unit: the first generating unit is used to generate a first drought warning instruction if the drought tolerance time threshold does not exceed the drought duration;
[0101] The first early warning unit: The first early warning unit is used to warn of drought data according to the first drought early warning instruction and to carry out early warning prevention and control.
[0102] Furthermore, the system also includes:
[0103] First marking unit: The first marking unit is used to classify and feature mark the drought distribution map to obtain first-level drought characteristics, second-level drought characteristics and third-level drought characteristics, wherein the first-level drought characteristics correspond to the first distribution area, the second-level drought characteristics correspond to the second distribution area, and the third-level drought characteristics correspond to the third distribution area;
[0104] Fifth obtaining unit: the fifth obtaining unit is used to obtain first geological fracture information and first pathological growth information of the first distribution area, second geological fracture information and second pathological growth information of the second distribution area, and third geological fracture information and third pathological growth information of the third distribution area;
[0105] The second correction unit is used to correct the first level drought characteristics based on the first geological fracture information and the first pathological growth information to generate a first level corrected drought characteristics;
[0106] The third correction unit is used to correct the second-level drought characteristics based on the second geological fracture information and the second pathological growth information to generate a second-level corrected drought characteristics;
[0107] Fourth correction unit: the fourth correction unit is used to correct the third level drought characteristics based on the third geological fracture information and the third pathological growth information to generate a third level corrected drought characteristics;
[0108] The first optimization unit: The first optimization unit is used to reorganize and optimize the first-level corrected drought characteristics, the second-level corrected drought characteristics and the third-level corrected drought characteristics to generate the actual drought distribution map.
[0109] Furthermore, the system also includes:
[0110] Sixth obtaining unit: the sixth obtaining unit is used to obtain the first drought characteristic data corresponding to the first-level revised drought characteristic, the second drought characteristic data corresponding to the second-level revised drought characteristic, and the third drought characteristic data corresponding to the third-level revised drought characteristic;
[0111] A first construction unit: the first construction unit is used to construct a drought characteristic data set based on the first drought characteristic data, the second drought characteristic data and the third drought characteristic data;
[0112] First splitting unit: The first splitting unit is used to split the data in the drought characteristic data set to generate a first classification set and a second classification set, wherein the first classification set contains temperature distribution information, and the second classification set contains precipitation distribution information;
[0113] The first parsing unit: The first parsing unit is used to perform in-depth traversal and analysis on the data in the first classification set and the second classification set, and to reorganize the data according to a preset classification logic to generate the actual drought distribution map.
[0114] Furthermore, the system also includes:
[0115] The first acquisition unit: the first acquisition unit is used to acquire a historical drought data set of the first ground information to be monitored based on big data;
[0116] Seventh obtaining unit: the seventh obtaining unit is used to obtain population distribution information and water resource utilization rate information of the first ground information to be monitored;
[0117] First input unit: The first input unit is used to input the historical drought data set, the population distribution information and the water resource utilization rate information into the drought assessment model, and train the drought assessment model with the identified drought assessment classification features until convergence;
[0118] An eighth obtaining unit: the eighth obtaining unit is used to obtain the training result of the drought assessment model, wherein the training result includes drought assessment classification features;
[0119] Second generating unit: The second generating unit is used to generate the preset grading logic according to the drought assessment grading characteristics.
[0120] Furthermore, the system also includes:
[0121] Ninth obtaining unit: the ninth obtaining unit is used to obtain a first feature data set according to the historical drought data set;
[0122] The tenth obtaining unit is used to perform centralization processing on the first feature data set to obtain a second feature data set;
[0123] An eleventh obtaining unit: the eleventh obtaining unit is used to obtain a first covariance matrix of the second feature data set;
[0124] First operation unit: The first operation unit is used to operate the first covariance matrix to obtain the first eigenvalue and the first eigenvector of the first covariance matrix;
[0125] The twelfth obtaining unit: the twelfth obtaining unit is used to project the first feature data set to the first feature vector to obtain a first reduced dimension data set, wherein the first reduced dimension data set is a feature data set obtained after the first feature data set is reduced in dimension.
[0126] Furthermore, the system also includes:
[0127] The second acquisition unit: the second acquisition unit is used to traverse and acquire the growth status of the first planted crop information based on the image acquisition device, and obtain crop appearance characteristics and crop soil color characteristics;
[0128] The second judging unit is used to judge whether the first planted crop information has pathological growth according to the crop appearance characteristics and crop soil color characteristics;
[0129] Thirteenth obtaining unit: the thirteenth obtaining unit is used to obtain the pathological growth information if the first planted crop information contains pathological growth.
[0130] The foregoing Figure 1The various variations and specific examples of a dynamic analysis method of disaster risk based on ground monitoring in Example 1 are also applicable to a dynamic analysis system of disaster risk based on ground monitoring in this embodiment. Through the above detailed description of a dynamic analysis method of disaster risk based on ground monitoring, those skilled in the art can clearly know the implementation method of a dynamic analysis system of disaster risk based on ground monitoring in this embodiment, so for the sake of brevity of the specification, it will not be described in detail again.
[0131] Embodiment 3
[0132] Reference below Fig. 9 To describe the electronic device of the embodiment of the present application.
[0133] Fig. 9 The figure shows a schematic structural diagram of an electronic device according to an embodiment of the present application.
[0134] Based on the inventive concept of a method for dynamic analysis of disaster risks based on ground monitoring in the aforementioned example, the present invention also provides a dynamic analysis system for disaster risks based on ground monitoring, on which a computer program is stored, and when the program is executed by a processor, the steps of any method of a dynamic analysis system for disaster risks based on ground monitoring described above are implemented.
[0135] Among them, Fig. 9 In the embodiment of the present invention, a bus architecture (represented by bus 300) is shown, which may include any number of interconnected buses and bridges, and bus 300 links various circuits including one or more processors represented by processor 302 and memory represented by memory 304. Bus 300 may also link various other circuits such as peripherals, voltage regulators, and power management circuits, which are well known in the art and are not further described herein. Bus interface 305 provides an interface between bus 300 and receiver 301 and transmitter 303. Receiver 301 and transmitter 303 may be the same element, namely a transceiver, providing a unit for communicating with various other systems over a transmission medium. Processor 302 is responsible for managing bus 300 and general processing, while memory 304 may be used to store data used by processor 302 when performing operations.
[0136] The embodiment of the present application provides a method for dynamic analysis of disaster risks based on ground monitoring, wherein the method includes: obtaining first ground information to be monitored, wherein the first ground information to be monitored includes first geological information, first ground boundary information and first planted crop information; based on remote sensing technology, traversing and detecting the drought within the first ground boundary information to obtain a drought distribution map of the first ground information to be monitored; based on an image acquisition device, traversing and acquiring the ground of the first geological information to obtain geological crack information, and at the same time, traversing and acquiring the growth trend of the first planted crop information to obtain pathological growth information; using the geological crack information as a first correction parameter and the pathological growth information as a second correction parameter; refining and correcting the drought distribution map according to the first correction parameter and the second correction parameter to generate an actual drought distribution map of the first ground information to be monitored; continuously and dynamically monitoring the actual drought distribution map to determine the drought level of the first ground information to be monitored, and timely issuing drought warning information.
[0137] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, systems or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0138] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A system that specifies the functions of a box or multiple boxes.
[0139] These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing device to work in a specific manner, so that the instructions stored in the computer-readable memory produce a product including an instruction system, which is implemented in the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0140] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0141] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.
[0142] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A method for dynamic analysis of disaster risk based on ground monitoring, wherein: The method comprises: Obtaining first ground information to be monitored, wherein the first ground information to be monitored includes first geological information, first ground boundary information, and first planted crop information; Based on remote sensing technology, performing traversal detection on the drought conditions within the first ground boundary information to obtain a drought distribution map of the first ground information to be monitored; Based on the image acquisition device, the ground of the first geological information is traversed and collected to obtain geological fracture information, and at the same time, the growth trend of the first planted crop information is traversed and collected to obtain pathological growth information; Using the geological fracture information as a first correction parameter and the pathological growth information as a second correction parameter; According to the first correction parameter and the second correction parameter, the drought distribution map is refined and corrected to generate an actual drought distribution map of the first ground information to be monitored; Continuously and dynamically monitoring the actual drought distribution map, determining the drought level of the first ground information to be monitored, and timely issuing drought warning information; The method further comprises: According to the first planted crop information, obtaining drought resistance characteristics of the first crop and water requirement information of the first crop; Based on the drought level, presetting the duration of the drought in the first ground information to be monitored; Obtaining a drought tolerance duration threshold of the first crop according to the drought tolerance characteristics of the first crop and the water required by the first crop; Determine whether the drought tolerance duration threshold exceeds the drought duration; If the drought tolerance time threshold does not exceed the drought duration, generating a first drought warning instruction; According to the first drought warning instruction, early warning of drought data is carried out, and early warning prevention and control are carried out; The refining and correcting the drought distribution map according to the first correction parameter and the second correction parameter further includes: Classifying and feature-marking the drought distribution map to obtain first-level drought characteristics, second-level drought characteristics, and third-level drought characteristics, wherein the first-level drought characteristics correspond to the first distribution area, the second-level drought characteristics correspond to the second distribution area, and the third-level drought characteristics correspond to the third distribution area; Obtaining first geological fracture information and first pathological growth information of the first distribution area, second geological fracture information and second pathological growth information of the second distribution area, and third geological fracture information and third pathological growth information of the third distribution area; Based on the first geological fracture information and the first pathological growth information, the first level drought characteristics are corrected to generate a first level corrected drought characteristics; Based on the second geological fracture information and the second pathological growth information, the second level drought characteristics are corrected to generate a second level corrected drought characteristics; Based on the third geological fracture information and the third pathological growth information, the third level drought characteristics are corrected to generate a third level corrected drought characteristics; The first-level corrected drought characteristics, the second-level corrected drought characteristics and the third-level corrected drought characteristics are reorganized and optimized to generate the actual drought distribution map.
2. The method of claim 1, wherein: The method further comprises: Obtaining first drought characteristic data corresponding to the first-level corrected drought characteristic, second drought characteristic data corresponding to the second-level corrected drought characteristic, and third drought characteristic data corresponding to the third-level corrected drought characteristic; constructing a drought characteristic data set based on the first drought characteristic data, the second drought characteristic data and the third drought characteristic data; Splitting the data in the drought characteristic data set to generate a first classification set and a second classification set, wherein the first classification set includes temperature distribution information, and the second classification set includes precipitation distribution information; The data in the first classification set and the second classification set are deeply traversed and analyzed, and the data are reorganized according to a preset classification logic to generate the actual drought distribution map.
3. The method of claim 2, wherein: The data reorganization according to the preset classification logic also includes: Based on big data, collecting a historical drought data set of the first ground information to be monitored; Obtaining population distribution information and water resource utilization rate information of the first ground information to be monitored; Inputting the historical drought data set, the population distribution information and the water resource utilization rate information into a drought assessment model, and training the drought assessment model with the identified drought assessment classification features until convergence; Obtaining a training result of the drought assessment model, wherein the training result includes drought assessment classification features; The preset grading logic is generated according to the drought assessment grading characteristics.
4. The method of claim 3, wherein: The method further comprises: According to the historical drought data set, a first feature data set is obtained; Centralizing the first feature data set to obtain a second feature data set; Obtaining a first covariance matrix of the second feature data set; Performing operations on the first covariance matrix to obtain a first eigenvalue and a first eigenvector of the first covariance matrix; The first feature data set is projected onto the first feature vector to obtain a first reduced-dimensionality data set, wherein the first reduced-dimensionality data set is a feature data set obtained after the first feature data set is reduced in dimensionality.
5. The method of claim 1, wherein: The obtaining of pathological growth information further includes: Based on the image acquisition device, the growth status of the first planted crop information is traversed and collected to obtain crop appearance characteristics and crop soil color characteristics; Judging whether the first planted crop information has pathological growth according to the crop appearance characteristics and crop soil color characteristics; If the first planted crop information contains pathological growth, the pathological growth information is obtained.
6. A disaster risk dynamic analysis system based on ground monitoring, wherein: The system comprises: First obtaining unit: The first obtaining unit is used to obtain first ground information to be monitored, wherein the first ground information to be monitored includes first geological information, first ground boundary information and first planted crop information; The first detection unit is used to perform traversal detection on the drought condition within the first ground boundary information based on remote sensing technology to obtain a drought condition distribution map of the first ground information to be monitored; The first acquisition unit is used to traverse and acquire the ground of the first geological information based on an image acquisition device to obtain geological fracture information, and at the same time, traverse and acquire the growth trend of the first planted crop information to obtain pathological growth information; Second obtaining unit: The second obtaining unit is used to use the geological fracture information as the first correction parameter and the pathological growth information as the second correction parameter; The first correction unit is used to refine and correct the drought distribution map according to the first correction parameter and the second correction parameter to generate an actual drought distribution map of the first ground information to be monitored; The first monitoring unit: the first monitoring unit is used to continuously and dynamically monitor the actual drought distribution map, determine the drought level of the first monitored ground information, and issue drought warning information in a timely manner; Furthermore, the system also includes: A third obtaining unit: the third obtaining unit is used to obtain the drought resistance characteristics of the first crop and the water required by the first crop according to the first planted crop information; First preset unit: The first preset unit is used to preset the drought duration of the first to-be-monitored ground information based on the drought disaster level; Fourth obtaining unit: the fourth obtaining unit is used to obtain a drought tolerance time threshold of the first crop according to the drought tolerance characteristic of the first crop and the water required by the first crop; The first judgment unit is used to judge whether the drought tolerance time threshold exceeds the drought duration; The first generating unit: the first generating unit is used to generate a first drought warning instruction if the drought tolerance time threshold does not exceed the drought duration; First early warning unit: The first early warning unit is used to warn drought data according to the first drought early warning instruction and to carry out early warning prevention and control; Furthermore, the system also includes: First marking unit: The first marking unit is used to classify and feature mark the drought distribution map to obtain first-level drought characteristics, second-level drought characteristics and third-level drought characteristics, wherein the first-level drought characteristics correspond to the first distribution area, the second-level drought characteristics correspond to the second distribution area, and the third-level drought characteristics correspond to the third distribution area; Fifth obtaining unit: the fifth obtaining unit is used to obtain first geological fracture information and first pathological growth information of the first distribution area, second geological fracture information and second pathological growth information of the second distribution area, and third geological fracture information and third pathological growth information of the third distribution area; The second correction unit is used to correct the first level drought characteristics based on the first geological fracture information and the first pathological growth information to generate a first level corrected drought characteristics; The third correction unit is used to correct the second-level drought characteristics based on the second geological fracture information and the second pathological growth information to generate a second-level corrected drought characteristics; Fourth correction unit: the fourth correction unit is used to correct the third level drought characteristics based on the third geological fracture information and the third pathological growth information to generate a third level corrected drought characteristics; The first optimization unit: The first optimization unit is used to reorganize and optimize the first-level corrected drought characteristics, the second-level corrected drought characteristics and the third-level corrected drought characteristics to generate the actual drought distribution map.
7. A disaster risk dynamic analysis system based on ground monitoring, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein: When the processor executes the program, the steps of the method according to any one of claims 1 to 5 are implemented.
