A movable mechanized construction platform vehicle for steel bars in underground workshops

Through the designable construction platform vehicle of the mobile underground plant steel rod, the problem of complicated and long working period of the steel stick installation process during the mechanical excavation process of the underground plant was solved, and the simultaneous mechanization installation of the steel rod was realized, shortening the construction cycle and reducing it. Hidden safety hazards.

CN114229717BActive Publication Date: 2025-01-24SINOHYDRO BUREAU 5
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202111331240.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-11
Publication Date
2025-01-24
Estimated Expiration
2041-11-11

AI Technical Summary

Technical Problem

During the mechanical excavation of underground factory buildings, the existing technology cannot achieve synchronous mechanized installation of steel rods, resulting in a long construction period and safety hazards.

Method used

The mechanized construction platform vehicle of the steel rod of the mobile underground plant is designed, including mobile platform vehicles, angle adjustment devices, cranes and steel rod installation tracks to realize the mechanized carrying, on -site processing, lifting and angle positioning of steel rods.

Benefits of technology

Through the mechanized construction platform vehicle, the synchronous installation of steel rods is achieved, shortening the construction cycle, reducing construction costs and safety hazards, and improving construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114229717B_ABST
    Figure CN114229717B_ABST
Patent Text Reader

Abstract

The present invention discloses a movable mechanized construction platform vehicle for steel bars in an underground factory building, comprising a movable platform vehicle, wherein an angle adjustment device and a crane are arranged on the movable platform vehicle along the length direction of the movable platform vehicle, and a steel bar installation track is also arranged on the angle adjustment device; the present invention can realize the mechanized construction of the steel bar installation process, optimize the personnel configuration of the factory building space system, and an excavation machine, a drilling machine, and a steel bar installation machine form a set of mechanical construction production lines to ensure that block excavation and block support are carried out smoothly, and the construction of steel bars no longer occupies a linear construction period, thus saving construction time, optimizing the working space and construction process, reducing the potential safety hazards of personnel, providing workers with a convenient and labor-saving working environment, and being able to significantly control cost-effectiveness.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of water conservancy and hydropower engineering plant system construction, and in particular to a movable underground plant steel bar mechanized construction platform vehicle. Background Art

[0002] In the underground plant layout of a pumped storage power station project, since there are a few geological fault zones in the plant area that cannot be avoided, mechanical layered and block excavation is required, and a large number of steel bars, steel beams, and anchor cables are added for reinforced support. Therefore, mechanical block excavation is adopted to provide a working environment for the collaborative construction of various equipment. However, since all anchor cables and steel bars for reinforced support need to be installed simultaneously during layered excavation, relying on traditional manual installation, more than ten workers are required to work together, the construction cost is high and there are high safety hazards. At the same time, due to the complex process of steel bar construction, including drilling, installation, grouting, tensioning, and anchor head fixing, the overall construction period is long. If mechanized construction can be carried out from the installation process, the overall process time will be greatly shortened.

[0003] For the installation and construction of such steel bars at home and abroad, there are usually two methods:

[0004] 1. Pre-assembly: For relatively short steel bars, they can generally be pre-assembled in parts off-site. The general construction process is primary processing by the manufacturer, transportation to the site, secondary assembly and pre-tightening at the processing plant, secondary transportation, hoisting and installation. The steel bars are already finished products during hoisting, and the total length is generally within 25m. Generally, two cranes with a total of 4 lifting points are used for hoisting to ensure deflection, tilt and slowly lift, and manual fall chains and crowbars are used to assist in adjusting them into place for installation.

[0005] 2. Hoisting and assembly: For relatively long steel bars, they are generally pre-assembled in sections off-site and spliced ​​during hoisting. The general construction process is primary processing by the manufacturer, transportation to the site, secondary assembly and pre-tightening at the processing plant, secondary transportation, hoisting and installation, hoisting the next section of steel bars, and on-site splicing. The total length of the steel bars is expected to exceed 30m and cannot be hoisted at one time. During hoisting, a single steel bar is still a semi-finished product, and the total length is generally within 18m. Only one crane is used for lifting at two points. The hoisting process is the same as above, but a platform truck is required to splice the two steel bars at high altitude.

[0006] Based on the above reasons, a steel rod construction platform vehicle is needed, which can carry out mechanized installation of steel rods simultaneously during the layered mechanical excavation of the factory building. After the excavation and preliminary support of each layer are completed, mechanical drilling is carried out according to the angle classification, and the angle of the steel rod installation track is adjusted synchronously to carry out the steel rod installation work without affecting the continued excavation work of the machinery in other areas, so as to achieve the construction appearance of layered excavation and process-based assembly lines, and achieve the purpose of shortening the linear construction period. Summary of the invention

[0007] The technical problem solved by the present invention is to provide a movable mechanized construction platform vehicle for steel bars in underground factories. The prior art cannot complete the integrated operations of steel bar transportation, on-site processing and assembly, steel bar lifting, and angled positioning installation during the mechanical excavation of factories, and cannot ensure that the conditions for simultaneous mechanical construction of steel bars are available during the mechanical excavation, resulting in a long construction period.

[0008] In order to solve the above technical problems, the technical solution adopted by the present invention is: a movable underground workshop steel bar mechanized construction platform vehicle, comprising a mobile platform vehicle, an angle adjustment device and a crane are provided on the mobile platform vehicle along the length direction of the mobile platform vehicle, and a steel bar installation track is also provided on the angle adjustment device;

[0009] The angle adjustment device comprises a first supporting steel tube, a second supporting steel tube and a third supporting steel tube arranged along the length direction of the mobile platform vehicle, and the bottom ends of the first supporting steel tube, the second supporting steel tube and the third supporting steel tube are fixed to the mobile platform vehicle through a connecting bottom plate; the top ends of the first supporting steel tube and the second supporting steel tube are provided with bearing connecting plates, and track connecting plates are fixed to the bearing connecting plates, and the two track connecting plates are located on the same side of the wheel axle, and the track connecting plates are fixedly connected to the steel rod mounting track through a track connecting base; two vertical threaded rods are also provided on the bearing connecting plate at the top of the first supporting steel tube, and the threaded rods are respectively located on the left and right sides of the rotating shaft of the wheel axle after passing through the base plate of the wheel axle, and an adjusting nut that is tight against the base plate is sleeved on the threaded rod under the base plate of the wheel axle; a crane connecting plate is provided on the top of the third supporting steel tube, and the crane wheel axle and the crane are connected in sequence above the crane connecting plate;

[0010] The steel rod installation track includes a U-shaped bottom groove arranged on the track connection base, a plurality of rolling shafts are arranged in the U-shaped bottom groove along the length direction, and also includes a pull rope wound around the outside of the rolling shaft, and a steel rod bearing sleeve is fixedly installed on the pull rope; a motor mounting seat is also provided on the outer wall of one end of the U-shaped bottom groove, and a rotating motor is provided on the motor mounting seat, and the rotating motor drives the pull rope and the steel rod bearing sleeve to rotate around the rolling shaft.

[0011] In particular, a cushion layer is also provided on the bearing connecting plate at the top of the second supporting steel pipe.

[0012] Particularly, a plurality of limiting clips are provided at the top opening of the U-shaped bottom groove along the length direction.

[0013] Particularly, an aiming and placing rod for aligning the steel rod installation position is provided at one end of the U-shaped bottom groove away from the motor mounting seat.

[0014] Furthermore, the aiming and releasing rod includes an L-shaped aiming rod respectively arranged on the left and right side walls of the U-shaped bottom groove, the L-shaped aiming rod is arranged back to back, and a downwardly inclined guide plate is provided at the end of the U-shaped bottom groove.

[0015] Particularly, a steel bar storage platform is also provided on the mobile platform vehicle.

[0016] In particular, the mobile platform vehicle is also provided with anti-collision guardrails and handrails on the outside.

[0017] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0018] 1. Multiple processes on the plane and mechanized coordination. The finished steel bars are transported by mobile platform vehicles, and the finished product protection, pre-installation processing, and on-site steel bar rectification and repair work are conveniently carried out on the operating table. On the mechanized excavation workshop working surface, the uncivilized stacking of materials is reduced, the interference with other operating machinery is reduced, and the limited construction space is fully planned and utilized to the greatest extent.

[0019] 2. Save installation time. The one-time carrying capacity meets the construction volume, saving the time of multiple transportations; the convenient steel bar track installation saves manual adjustment time; most of the processes can be completed on the platform car, saving the time of process connection; the deflection deformation caused by hoisting is not included, the installation angle is more accurate, saving the time of defect rectification.

[0020] 3. It is conducive to safe and civilized construction. The steel bar platform car can carry and install the steel bar in the hole, and there is no uncivilized stacking of materials; mechanization replaces part of the manual operation, reduces the work of on-site personnel, and is conducive to reducing safety hazards.

[0021] 4. The cost-effectiveness of the investment and benefit output is high. Calculated based on the number of more than 300 steel bars, the investment cost is about 1 / 6 of the cost saved by shortening the construction period, which has a high economic benefit. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a structural schematic diagram of the present invention.

[0023] Figure 2 It is a schematic diagram of the rear explosion structure of the present invention.

[0024] Figure 3 This is a schematic diagram of the main structure of the steel rod installation track.

[0025] Figure 4 Schematic diagram of the structure of the steel rod installation track from top view.

[0026] Figure 5 It is a structural schematic diagram of the connection relationship between the axle and the threaded rod.

[0027] Figure 6 This is a schematic diagram of the aiming and releasing rod structure.

[0028] The meanings of the numbers in the figure are as follows: mobile platform vehicle—1; steel bar storage platform—11; anti-collision guardrail—12; handrail—13; angle adjustment device—2; first supporting steel pipe—21; second supporting steel pipe—22; third supporting steel pipe—23; crane connecting plate—231; crane wheel axle—232; connecting base plate—24; bearing connecting plate—25; threaded rod—251; adjusting nut—252; axle—26; base plate—261; track connecting plate—27; track connecting base—28; cushion layer—29; crane—3; steel bar mounting track—4; U-shaped bottom groove—41; rolling shaft—42; pull rope—43; steel bar bearing sleeve—44; motor mounting seat—45; rotating motor—46; limit clip—47; aiming and releasing rod—48; L-shaped aiming rod—481; guide plate—482. DETAILED DESCRIPTION

[0029] The technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention, so as to have a further understanding of the concept of the present invention, the technical problems solved, the technical features constituting the technical scheme and the technical effects brought about.

[0030] like Figure 1 As shown, the movable mechanized construction platform vehicle for steel bars in underground workshops of the present invention comprises a mobile platform vehicle 1, on which an angle adjustment device 2 and a crane 3 are provided along the length direction of the mobile platform vehicle 1, and a steel bar installation rail 4 is also provided on the angle adjustment device 2.

[0031] like Figure 2 As shown, the angle adjustment device 2 includes a first support steel tube 21, a second support steel tube 22 and a third support steel tube 23 arranged along the length direction of the mobile platform vehicle 1, and the bottom ends of the first support steel tube 21, the second support steel tube 22 and the third support steel tube 23 are fixed to the mobile platform vehicle 1 through a connecting bottom plate 24; the top ends of the first support steel tube 21 and the second support steel tube 22 are provided with a bearing connecting plate 25, and the bearing connecting plate 25 is fixed with a track connecting plate 27, and the two track connecting plates 27 are located on the same side of the wheel axle 26, and the track connecting plates 27 It is fixedly connected to the steel rod mounting rail 4 through the rail connecting base 28; two vertical threaded rods 251 are also provided on the bearing connecting plate 25 at the top of the first supporting steel pipe 21, and the threaded rods 251 pass through the base plate 261 of the wheel axle 26 and are respectively located on the left and right sides of the rotating shaft of the wheel axle 26, and an adjusting nut that is tight against the base plate 261 is sleeved on the threaded rod 251 below the base plate 261 of the wheel axle 26; a crane connecting plate 231 is provided on the top of the third supporting steel pipe 23, and the crane wheel axle 232 and the crane 3 are connected in sequence above the crane connecting plate 231.

[0032] like Figure 3 and Figure 4 As shown, the steel rod installation track 4 includes a U-shaped bottom groove 41 arranged on the track connection base 28, and a plurality of rolling shafts 42 are arranged in the length direction of the U-shaped bottom groove 41, and also includes a pull rope 43 wound around the outside of the rolling shaft 42, and a steel rod bearing sleeve 44 is also fixedly installed on the pull rope 43; a motor mounting seat 45 is also provided on the outer wall of one end of the U-shaped bottom groove 41, and a rotating motor 46 is provided on the motor mounting seat 45, and the rotating motor 46 drives the pull rope 43 and the steel rod bearing sleeve 44 to rotate around the rolling shaft 42.

[0033] In the present invention, first, each accessory is cut off-site according to the processing size. The accessories are selected to assemble the steel rod installation track 4, and the rolling shaft 42 is welded between the left and right side walls of the U-shaped bottom groove 41 at a spacing of 30 cm. The pulley group of the pull rope 43 is fixedly installed at the front and rear ends of the U-shaped bottom groove 41, and a motor mounting seat 45 is set at one end of the U-shaped bottom groove 41. A rotating motor 46 is fixed on the motor mounting seat 45, and the pull rope 43 is driven to move around the outside of the rolling shaft 42 by the rotating motor 46. At the same time, a steel rod bearing sleeve 44 is fixedly installed on the pull rope 43. In the process of the rotating motor 46 driving the pull rope to rotate, the steel rod bearing sleeve 44 drives the steel rod to move on the rolling shaft 42, thereby realizing the transportation and movement of the steel rod. During the transportation and movement of the steel bar, since the installation of the steel bar usually has an inclination angle, the angle range is usually -5°~30°. When the front end of the steel bar installation track 4 sinks, a plurality of steel bar bearing sleeves 44 are usually set on the pull rope 43 according to the length of the steel bar, and the steel bar is placed between two steel bar bearing sleeves 44, so that the steel bar is pushed forward by the steel bar bearing sleeve 44 at the rear end, and the steel bar bearing sleeve 44 at the front end provides a supporting force to prevent the steel bar from sliding. When the front end of the steel bar installation track 4 rises, the steel bar can be driven and supported only by the steel bar bearing sleeve 44 at the rear end of the steel bar.

[0034] like Figure 5 As shown, continue to assemble the angle adjustment device 2 off-site, weld the bearing connecting plate 25 and the connecting bottom plate 24 to the two ends of the supporting steel pipe, dig a through hole on the base plate 261 of the wheel axle 26, insert the threaded rod 251, rotate the adjusting nut 252 to adjust the wheel axle 26 to a normal height, and then set the track connecting plate 27 on the end of the rotating shaft of the wheel axle 26, and weld the track connecting base 28 on the outer wall of the track connecting plate 27. The track connecting base 28 is U-shaped and opens upward. The U-shaped bottom groove 41 of the steel rod mounting rail 4 is fixed in the track connecting base 28. The height of the wheel axle 26 on the first supporting steel pipe 21 is raised or lowered by adjusting the height of the adjusting nut 252, thereby realizing the angle adjustment of the steel rod mounting rail 4.

[0035] Continue to process the steel rod hoisting system, fix the crane axle 232 on the crane connecting plate 231 at the top of the third supporting steel pipe 23, and connect the crane 3 after the crane axle 232 is debugged; realize the left and right rotation of the crane 3 through the crane axle 232, so as to hoist the steel rod from the ground to the steel rod installation rail 4.

[0036] Finally, the mobile platform vehicle 1 is processed and connected to the above three systems. First, holes are drilled in the bottom steel plate and then the mobile wheels are welded. Then, the angle adjustment device 2, the hoisting system and the steel bar installation track 4 are connected in sequence with nuts. The short side wall of the welded track connection base 28 is used to limit the movement of the track. The connecting plate of the track on the other side does not need to be welded, which is used to provide the displacement after adjusting the angle. Then, an I-beam support is welded on one side of the mobile platform vehicle 1, and a steel bar storage platform 11 and a storage platform guardrail are set on the I-beam support. Finally, the anti-collision fence and handrail of the platform vehicle are welded. At this point, the steel bar installation platform has the installation capabilities of carrying, moving and adjusting the angle, meeting the construction requirements.

[0037] As a preferred embodiment, a cushion layer 29 is further provided on the bearing connection plate 25 at the top of the second support steel pipe 22. Usually, the installation angle of the steel rod is -5° to 30°. The cushion layer 29 is added below the bearing connection plate 25 at the top of the second support steel pipe 22 to raise the height of the bearing connection plate 25 at the top of the second support steel pipe 22, so as to facilitate the installation of the steel rod at a negative angle.

[0038] As a preferred embodiment, a plurality of limit clips 47 are further provided at the top opening of the U-shaped bottom groove 41 along the length direction; since the steel rod may bounce and jump during the transportation and movement on the steel rod mounting track 4, a plurality of limit clips 47 are provided at the top opening of the U-shaped bottom groove 41 of the steel rod mounting track 4 along the length direction of the track to confine the steel rod inside the U-shaped bottom groove, thereby preventing the steel rod from bouncing and falling during movement and transportation, thereby avoiding safety hazards.

[0039] As a preferred embodiment, an aiming rod 48 for aligning the steel rod installation position is provided at one end of the U-shaped bottom groove 41 away from the motor mounting seat 45 .

[0040] like Figure 6 As shown, as a further embodiment, the aiming and releasing rod 48 includes L-shaped aiming rods 481 respectively arranged on the left and right side walls of the U-shaped bottom groove 41, and the L-shaped aiming rods 481 are arranged back to back, and a downward inclined guide plate 482 is provided at the end of the U-shaped bottom groove 41; a structure similar to a crosshair is formed by the two L-shaped aiming rods 481 being arranged back to back, through which the steel rod can be accurately guided to the steel rod installation position, thereby realizing precise positioning of the steel rod transportation and guiding.

[0041] As a preferred embodiment, a steel bar storage platform 11 is also provided on the mobile platform vehicle 1; in the prior art, steel bars are usually stored on the ground, which requires a large amount of space and easily causes excessive stacking of steel bars, which not only poses a safety hazard but also affects other construction projects. By arranging a steel bar storage platform 11 on the mobile platform vehicle 1, it is possible to achieve temporary storage of steel bars and other commonly used tools, thereby avoiding occupying other construction sites.

[0042] As a preferred embodiment, the mobile platform vehicle 1 is further provided with an anti-collision guardrail 12 and a handrail 13 on the outside.

[0043] The patent of the present invention realizes the mechanized construction of the steel bar installation process by independently processing a set of steel bar installation platform vehicles during the mechanical excavation of the factory building when the geological conditions are poor and steel bars need to be reinforced for support. The personnel allocation of the factory building space system is optimized. The excavation machinery, drilling machinery, and steel bar installation machinery form a set of mechanical construction production lines to ensure the smooth progress of block excavation and block support. The construction of steel bars no longer occupies the linear construction period, which saves construction time, optimizes the working space and construction process, reduces the safety hazards of personnel, provides workers with a convenient and labor-saving working environment, and can significantly control cost-effectiveness.

[0044] The terms “connection” and “fixation” mentioned in the description of the present invention may refer to fixed connection, processing and forming, welding or mechanical connection. The specific meanings of the above terms in the present invention shall be understood according to the specific circumstances.

[0045] In the description of the present invention, the terms "center", "upper", "lower", "horizontal", "inside", "outside", etc., which indicate the orientation or position relationship, are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying a specific orientation that the device or element referred to must have, and therefore cannot be understood as a limitation on the present invention.

[0046] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments can still be modified, or some or all of the technical features therein can be replaced by equivalents. However, these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A movable underground workshop steel bar mechanized construction platform vehicle, characterized in that: It comprises a mobile platform vehicle (1), wherein an angle adjustment device (2) and a crane (3) are provided on the mobile platform vehicle (1) along the length direction of the mobile platform vehicle (1), and a steel rod installation track (4) is also provided on the angle adjustment device (2); The angle adjustment device (2) comprises a first support steel pipe (21), a second support steel pipe (22) and a third support steel pipe (23) arranged along the length direction of the mobile platform vehicle (1); the bottom ends of the first support steel pipe (21), the second support steel pipe (22) and the third support steel pipe (23) are fixed to the mobile platform vehicle (1) via a connecting bottom plate (24); the top ends of the first support steel pipe (21) and the second support steel pipe (22) are provided with a bearing connecting plate (25); the bearing connecting plates (25) are fixed with a track connecting plate (27); the two track connecting plates (27) are located on the same side of the wheel axle (26); the track connecting plates (27) are connected to the wheel axle (26); The track connection base (28) is fixedly connected to the steel rod mounting track (4); two vertical threaded rods (251) are also provided on the bearing connection plate (25) at the top of the first supporting steel pipe (21); the threaded rods (251) pass through the base plate (261) of the wheel axle (26) and are respectively located on the left and right sides of the rotating shaft of the wheel axle (26); and an adjusting nut that is pressed against the base plate (261) is sleeved on the threaded rod (251) below the base plate (261) of the wheel axle (26); a crane connection plate (231) is provided on the top of the third supporting steel pipe (23); the crane wheel axle (232) and the crane (3) are connected in sequence above the crane connection plate (231); The steel rod installation track (4) comprises a U-shaped bottom groove (41) arranged on the track connection base (28), a plurality of rolling shafts (42) are arranged in the U-shaped bottom groove (41) along the length direction, and also comprises a pull rope (43) wound around the outside of the rolling shaft (42), and a steel rod bearing sleeve (44) is fixedly mounted on the pull rope (43); a motor mounting seat (45) is also arranged on the outer wall of one end of the U-shaped bottom groove (41), and a rotating motor (46) is arranged on the motor mounting seat (45), and the rotating motor (46) drives the pull rope (43) and the steel rod bearing sleeve (44) to rotate around the rolling shaft (42).

2. A movable underground workshop steel bar mechanized construction platform vehicle as claimed in claim 1, characterized in that: A cushion layer (29) is also provided on the bearing connection plate (25) at the top of the second supporting steel pipe (22).

3. A movable underground workshop steel bar mechanized construction platform vehicle as claimed in claim 1, characterized in that: A plurality of limit clips (47) are also provided at the top opening of the U-shaped bottom groove (41) along the length direction.

4. A movable underground workshop steel bar mechanized construction platform vehicle as claimed in claim 1, characterized in that: An aiming rod (48) for aligning the steel rod installation position is provided at one end of the U-shaped bottom groove (41) away from the motor installation seat (45).

5. A movable underground workshop steel bar mechanized construction platform vehicle as claimed in claim 4, characterized in that: The aiming and releasing rod (48) comprises an L-shaped aiming rod (481) respectively arranged on the left and right side walls of the U-shaped bottom groove (41); the L-shaped aiming rod (481) is arranged in a back-to-back manner, and a downwardly inclined guide plate (482) is provided at the end of the U-shaped bottom groove (41).

6. A movable underground workshop steel bar mechanized construction platform vehicle as claimed in claim 1, characterized in that: A steel bar storage platform (11) is also provided on the mobile platform vehicle (1).

7. The movable underground workshop steel bar mechanized construction platform vehicle as claimed in claim 1, characterized in that: The mobile platform vehicle (1) is also provided with an anti-collision guardrail (12) and a handrail (13) on the outside.

Citation Information

Patent Citations

  • Hanger rail type electric hanging boat and high-rise long span house, bridge building construction method and use thereof

    CN101514586A

  • Be used for restricted space hoist device