Implementation method and system of a shared electrician

Through the shared electrician system, using mobile terminals and servers to match electrical resources, the problems of increased grid load and resource integration are solved, and the efficient allocation of electrical resources and rapid resolution of power consumption are achieved.

CN114254913BActive Publication Date: 2025-07-11SHENZHEN POWER SUPPLY BUREAU
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202111548330.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-17
Publication Date
2025-07-11
Estimated Expiration
2041-12-17

AI Technical Summary

Technical Problem

The increase in grid load and rising raw material prices have led to strong demand for electricians, and the lack of resource integration among different companies has led to complex electricity consumption problems and low resolution efficiency.

Method used

By establishing a shared electrician system, using mobile terminals and servers, generating demand work orders, matching internal electricians or shared electricians, achieving fast and efficient allocation of electrical resources.

Benefits of technology

It improves the efficiency of solving electricity problems, saves costs, ensures the system's data consistency and high availability among large-scale enterprises, and realizes the efficient allocation of electrical resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114254913B_ABST
    Figure CN114254913B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for implementing a shared electrician, which includes: responding to an electricity consumption problem application form filled out by an enterprise electricity user to generate a demand work order; analyzing the matching degree of internal electricians according to three dimensions of the operation ability range, qualification certificate information, and required processing time in the demand work order. If there are matching internal electricians, the demand work order is pushed to the mobile terminal corresponding to the internal electricians; otherwise, the demand work order is converted into a shared demand work order, the matching conditions therein are determined, and a job grabbing task is issued to the mobile terminals of the registered shared electricians; responding to the job grabbing operation of the shared electricians meeting the matching conditions to determine the final task recipient. The present invention also discloses a corresponding system. Implementing the present invention can quickly match suitable electricians to improve the efficiency of solving electricity consumption problems.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of daily operation and maintenance of power enterprises, and particularly relates to a method and system for realizing shared electricians. Background Art

[0002] With the continuous development of China's power industry, the overall load of the power grid is getting larger and larger. The prices of raw materials are rising continuously, electricity consumption is becoming increasingly tense, and more and more power consumption problems are encountered, which become more complex. The demand for electricians is increasing day by day. Electricians need certain qualifications to work, and the number of electricians in each enterprise is generally small, and the types of work are difficult to be complete. However, there is a lack of necessary communication and exchange between different enterprises. Therefore, there is an urgent need for a corresponding method to integrate the offline electrician resources to achieve the effective allocation of resources. Summary of the Invention

[0003] The technical problem to be solved by the present invention is to provide a method and system for realizing shared electricians, which can quickly match suitable electricians to improve the efficiency of solving power consumption problems.

[0004] To solve the above technical problem, as one aspect of the present invention, the present invention provides a method for realizing shared electricians, and the method includes:

[0005] Step S10, in response to an electricity consumption problem application form filled by an enterprise electricity user, generating a demand work order, where the electricity consumption problem application form at least includes the following contents: contact person, electricity consumption type, problem description, required processing time, specific remuneration, operation scope, qualification certificate requirements, and the address where the power supply and consumption problem occurs;

[0006] Step S11, according to the three dimensions of the operation ability scope, qualification certificate information, and required processing time in the demand work order, analyzing the matching degree of internal electricians. If there are matching internal electricians, pushing the demand work order to the mobile terminal corresponding to the internal electricians;

[0007] Step S12, if there are no matching internal electricians, converting the demand work order into a shared demand work order, determining the matching conditions therein, and publishing a task for grabbing the order to the mobile terminals of the registered shared electricians;

[0008] Step S13, in response to the order-grabbing operation of the shared electricians meeting the matching conditions, determining one of them as the final task acceptor, and pushing the detailed content of the demand work order to the mobile terminal of the shared electrician;

[0009] Step S14, after the task acceptor completes the task of the shared demand work order, responding to the operations of the enterprise electricity user and the task acceptor, and storing the corresponding record information.

[0010] Preferably, the method further includes: receiving a registration request and registration materials from an electrician user, and forming a shared electrician resource library, specifically including:

[0011] Receiving a login request from an electrician and performing identity verification using face recognition technology;

[0012] Receiving the ID card picture and qualification certificate picture uploaded by the electrician, as well as the filled operation ability range and the work unit;

[0013] Using picture recognition technology, judging whether it is consistent with the current logged-in person according to the filled information and the uploaded picture information. If the data is consistent, the registration is automatically successful; otherwise, accurately prompt the specific item information that does not meet the requirements for the electrician to fill in the registration again;

[0014] Receiving and storing the order-taking expectation information of the electrician, where the order-taking expectation information at least includes: willing working time, maximum distance of the work order, and minimum remuneration.

[0015] Preferably, the step S11 further includes:

[0016] If the judgment result is that there are two or more matching internal electricians, then according to the positioning information of the internal electricians, obtain the real-time positions of each successfully matched internal electrician;

[0017] Select the internal electrician whose real-time position is the closest to the address where the power supply and use problem occurs, and push the demand work order to the mobile terminal of the selected internal electrician.

[0018] Preferably, the step S13 further includes:

[0019] After the mobile terminals of each registered shared electrician receive the order-grabbing task, match it with their own order-taking expectation information to determine whether there is the right to grab the order for the order-grabbing task. If so, control the mobile terminal to display the order-grabbing operation interface for the shared electrician to perform the order-grabbing operation; otherwise, hide the order-grabbing task.

[0020] Preferably, the step of matching with its own order-taking expectation information to determine that it has the right to grab the order for the order-grabbing task specifically is:

[0021] Match the corresponding operation ability, qualification certificate, willing working time, and acceptable remuneration range of the shared electrician with the corresponding information in the current shared demand work order; and call the map interface in the mobile terminal to calculate the relative distance between its own current position and the address where the power supply and use problem occurs in the shared demand work order, and judge whether it is less than the maximum distance of the work order in its own order-taking expectation information. If all the above conditions are successfully matched, it is determined that it has the right to grab the order for the order-grabbing task.

[0022] Accordingly, on the other hand, the present invention also provides a system for implementing shared electricians, which is applied to an environment including multiple mobile terminals and a server. The system includes:

[0023] A demand work order generation unit, which is used to generate a demand work order in response to an enterprise electricity user filling out an electricity problem application form. The electricity problem application form at least includes the following content: contact person, electricity consumption type, problem description, required processing time, specific remuneration, operation scope, qualification certificate requirements, and the address where the power supply and consumption problem occurs;

[0024] An internal electrician matching unit, which is used to analyze the matching degree of internal electricians according to three dimensions of the operation ability scope, qualification certificate information, and required processing time in the demand work order. If there are matching internal electricians, the demand work order is pushed to the mobile terminal corresponding to the internal electricians;

[0025] A grab order task publishing unit, which is used to convert the demand work order into a shared demand work order when it is determined that there are no matching internal electricians, determine the matching conditions therein, and publish a grab order task to the mobile terminals of the registered shared electricians;

[0026] A task recipient determination unit, which is used to determine one of them as the final task recipient in response to the grab order operation of the shared electrician that meets the matching conditions, and push the detailed content of the demand work order to the mobile terminal of the shared electrician;

[0027] A record processing unit, which is used to respond to the operations of the enterprise electricity user and the task recipient after the task recipient completes the task of the shared demand work order, and store the corresponding record information.

[0028] Preferably, it further includes: a registration processing unit, which is used to receive the registration request and registration materials of electrician users, and form a shared electrician resource library. Specifically, the registration processing unit uses the following method to complete the registration process:

[0029] Receive the login request of the electrician and perform identity verification using face recognition technology;

[0030] Receive the ID card picture, qualification certificate picture uploaded by the electrician, as well as the filled operation ability scope and the work unit;

[0031] Use picture recognition technology to judge whether it is consistent with the current logged-in person according to the filled information and the uploaded picture information. If the data is consistent, the registration is automatically successful. Otherwise, accurately prompt the specific item information that does not meet the requirements so that the electrician can fill in the registration again;

[0032] Receive and store the order-taking expectation information of electricians, where the order-taking expectation information at least includes: willing working hours, maximum distance of work orders, and minimum remuneration.

[0033] Preferably, the internal electrician matching unit further includes:

[0034] A location acquisition unit, which is used when the judgment result is that there are more than two matching internal electricians; according to the positioning information of the internal electricians, obtain the real-time positions of each successfully matched internal electrician.

[0035] A selection unit, which is used to select the internal electrician with the real-time position closest to the address where the power supply and consumption problem occurs, and push the demand work order to the mobile terminal of the selected internal electrician.

[0036] Preferably, it further includes a grab order task display and processing unit, which is used to match with its own order-taking expectation information after the mobile terminals of each registered shared electrician receive the grab order task, determine whether there is a grab order permission for the grab order task. If so, control the mobile terminal to display a grab order operation interface for the shared electrician to perform the grab order operation; otherwise, hide the grab order task.

[0037] Preferably, in the grab order task display and processing unit, the following method is used to implement the steps of matching with its own order-taking expectation information and determining that it has the grab order permission for the grab order task:

[0038] Match the corresponding operation ability, qualification certificate, willing working hours, and the range of remuneration that can receive orders of the shared electrician with the corresponding information in the current shared demand work order; and call the map interface in the mobile terminal to calculate the relative distance between its own current position and the address where the power supply and consumption problem occurs in the shared demand work order, and judge whether it is less than the maximum distance of the work order in its own order-taking expectation information; if all the above conditions are successfully matched, determine that it has the grab order permission for the grab order task.

[0039] Implementing the embodiments of the present invention has the following beneficial effects:

[0040] The present invention provides a method and system for realizing shared electricians. By adopting mainstream related Internet technologies such as microservices and distributed architectures, a shared electrician database is established. When an enterprise electricity user has an electricity problem, it can be reported through a mobile terminal to form a demand work order, and internal electricians are preferably selected for processing to save costs; when the internal electricians cannot meet the requirements of the work order, the work order will be sorted into external shared electricians to more quickly and accurately find highly matched electrician personnel. It can effectively ensure the normal operation of the grab order function and ensure the consistency and high availability of system data in the case of a large number of power supply and consumption problem work orders, electrician roles, and enterprises.

[0041] By using the intelligent order receiving system provided by the present invention, electricians can directly and intuitively view the basic information, order sending time, required completion time, and relative distance of problem work orders, making the implementation method of shared electricians more efficient and convenient, thereby improving the efficiency of solving power supply problems. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the drawings required for use in the description of the embodiments or the prior art. Obviously, the following drawings are only some embodiments of the present invention. For those of ordinary skill in the art, without creative efforts, obtaining other drawings based on these drawings still belongs to the scope of the present invention.

[0043] Figure 1 It is a schematic diagram of the main process of an embodiment of a method for implementing shared electricians provided by the present invention;

[0044] Figure 2 For Figure 1 it is a schematic diagram of the power consumption problem initiation interface involved in

[0045] Figure 3 For Figure 1 it is a schematic diagram of the contact address supplement interface involved in

[0046] Figure 4 For Figure 1 it is a schematic diagram of the order grabbing operation interface involved in

[0047] Figure 5 It is a schematic diagram of the structure of an embodiment of a system for implementing shared electricians provided by the present invention;

[0048] Figure 6 For Figure 5 it is a schematic diagram of the structure of the internal electrician matching unit in DETAILED DESCRIPTION OF THE EMBODIMENTS

[0049] To make the objectives, technical solutions, and advantages of the present invention clearer, the present invention will be further described in detail below with reference to the drawings.

[0050] As Figure 1 shown, it shows a schematic diagram of the main process of an embodiment of a method for implementing shared electricians provided by the present invention; in conjunction with Figures 2 to 5 shown, in this embodiment, the method for implementing shared electricians should be in an environment including multiple mobile terminals and a server, wherein the method includes:

[0051] Step S10: In response to an enterprise electricity user filling out an electricity problem application form, a demand work order is generated. The electricity problem application form includes at least the following information: contact person, electricity consumption type, problem description, required processing time, specific remuneration, operation scope, qualification certificate requirements, and the address where the power supply and consumption problem occurs.

[0052] It can be understood that the enterprise electricity user can fill out the electricity problem application form through the APP in the mobile terminal. As Figure 2 shown, it shows a schematic diagram of the interface for an enterprise electricity user to fill out the electricity problem. At the same time, the mobile terminal of the enterprise electricity user can also call the current map software to supplement the address. As Figure 3 shown, it can facilitate the upload of accurate address information.

[0053] Step S11: According to the three dimensions of the operation ability scope, qualification certificate information, and required processing time in the demand work order, analyze the matching degree of internal electricians. If there are matching internal electricians, push the demand work order to the mobile terminal corresponding to the internal electricians.

[0054] It can be understood that since it is processed by electricians within the same enterprise, there is no need to compare the remuneration, and generally the remuneration is set to free. This operation can improve the utilization rate of internal electricians and save costs.

[0055] Specifically, in an actual example, step S11 further includes:

[0056] If the judgment result is that there are matching internal electricians and there are more than two; then according to the positioning information of the internal electricians, obtain the real-time positions of each successfully matched internal electrician.

[0057] Select the internal electrician whose real-time position is the closest to the address where the power supply and consumption problem occurs, and push the demand work order to the mobile terminal of the selected internal electrician.

[0058] Step S12: If there are no matching internal electricians, convert the demand work order into a shared demand work order, determine the matching conditions therein, and issue a job grabbing task to the mobile terminals of the registered shared electricians.

[0059] It can be understood that in this job grabbing task, some information can be hidden, such as hiding the contact person's name and phone number in the demand work order.

[0060] It can be understood that when the internal electricians cannot meet the requirements of the work order, the work order will be sorted into external shared electricians to more quickly and accurately find highly matched electrician personnel.

[0061] Step S13: In response to the order grabbing operation of the shared electricians that meet the matching conditions, determine one of them as the final task recipient, and push the detailed content of the demand work order to the mobile terminal of the shared electrician;

[0062] In a specific example, step S13 further includes:

[0063] After the mobile terminals of each registered shared electrician receive the order grabbing task, match it with their own order receiving expectation information to determine whether there is the right to grab the order for the order grabbing task. If so, control the mobile terminal to display the order grabbing operation interface for the shared electrician to perform the order grabbing operation; otherwise, hide the order grabbing task.

[0064] Preferably, the step of matching with its own order receiving expectation information to determine that it has the right to grab the order for the order grabbing task is specifically as follows:

[0065] Match the corresponding operation ability, qualification certificate, willing working hours, and acceptable remuneration range of the shared electrician with the corresponding information in the current shared demand work order; and call the map interface in the mobile terminal to calculate the relative distance between its own current position and the address where the power supply and use problem occurs in the shared demand work order, and determine whether it is less than the maximum work order distance in its own order receiving expectation information; if all the above conditions are successfully matched, it is determined that it has the right to grab the order for the order grabbing task.

[0066] As Figure 3 shown, a schematic diagram of an order grabbing operation interface is shown.

[0067] Specifically, in an actual example, when the shared electrician logs in to the APP of his mobile terminal, the APP will match the current shared demand work order with his own conditions. If the match is successful, the order grabbing operation interface will be displayed. If the shared electrician wants to grab the work order, he only needs to click the "Confirm Receiving Order" button in the interface to perform the order grabbing operation. Generally, the shared electrician who performs the order grabbing operation first will be the final task recipient. After receiving the order, the system will push the detailed content of the demand work order to the mobile terminal of the shared electrician, and the detailed content will include the contact name and phone information in the demand work order for easy contact.

[0068] Step S14: After the task recipient completes the task of the shared demand work order, respond to the operations of the enterprise electricity user and the task recipient, and store the corresponding record information.

[0069] After the task is completed, both the enterprise user and the task recipient can operate on the shared demand work order through the mobile terminal, fill in the corresponding completion information, and finally successfully process the work order. Further, they can also upload pictures of the on-site completion. The server will record information such as the completion time of this work order.

[0070] It is understandable that if the shared electrician cancels the work order after selecting to grab the order, the work order will be put back into the order-grabbing list again.

[0071] It is understandable that the method further includes the step of receiving the registration request and registration materials of the electrician user to form a shared electrician resource library, specifically including:

[0072] Receiving the login request of the electrician and performing identity verification using face recognition technology;

[0073] Receiving the ID card picture, qualification certificate picture uploaded by the electrician, as well as the filled operation ability range and the work unit;

[0074] Using picture recognition technology, judging whether it is consistent with the current login person according to the filled information and the uploaded picture information. If the data is consistent, the registration is automatically successful. Otherwise, accurately prompt the specific item information that does not meet the requirements so that the electrician can fill in the registration again;

[0075] Receiving and storing the order-taking expectation information of the electrician, where the order-taking expectation information at least includes: willing working time, maximum distance of the work order, and minimum remuneration.

[0076] As Figure 5 shown, a structural schematic diagram of an embodiment of a system for implementing a shared electrician provided by the present invention is shown. In combination with Figure 6 shown, in this embodiment, the system 1 is applied to an environment including multiple mobile terminals and a server. More specifically, the system 1 includes:

[0077] A demand work order generation unit 10, configured to generate a demand work order in response to an enterprise electricity user filling out an electricity problem application form. The electricity problem application form at least includes the following contents: contact person, electricity consumption type, problem description, required processing time, specific remuneration, operation scope, qualification certificate requirements, and the address where the power supply and consumption problem occurs;

[0078] An internal electrician matching unit 11, configured to analyze the matching degree of internal electricians according to three dimensions of the operation ability range, qualification certificate information, and required processing time in the demand work order. If there are matching internal electricians, push the demand work order to the mobile terminal corresponding to the internal electrician;

[0079] A order-grabbing task publishing unit 12, configured to convert the demand work order into a shared demand work order when it is determined that there are no matching internal electricians, determine the matching conditions therein, and publish an order-grabbing task to the mobile terminals of the registered shared electricians;

[0080] The task acceptor determination unit 13 is used to respond to the order grabbing operation of the shared electricians who meet the matching conditions, determine one of them as the final task acceptor, and push the detailed content of the required work order to the mobile terminal of the shared electrician;

[0081] The record processing unit 14 is used to respond to the operations of the enterprise electricity user and the task acceptor after the task acceptor completes the task of the shared demand work order, and store corresponding record information.

[0082] The system further includes a registration processing unit 15, which is used to receive the registration request and registration information of the electrician user to form a shared electrician resource library. Specifically, the registration processing unit uses the following method to complete the registration process:

[0083] Receive the electrician's login request and use facial recognition technology to verify his identity;

[0084] Receive the ID card and qualification certificate photos uploaded by the electrician, as well as the filled-in scope of work ability and the work unit mentioned;

[0085] Image recognition technology is used to determine whether the filled-in information and uploaded image information are consistent with the current login person. If the data is consistent, the registration is automatically successful. Otherwise, the specific information that does not meet the requirements is accurately prompted so that the electrician can re-fill the registration;

[0086] The order acceptance expectation information of the electrician is received and stored, wherein the order acceptance expectation information at least includes: the desired working time, the maximum distance of the work order and the minimum remuneration.

[0087] More specifically, the internal electrical matching unit 11 further includes:

[0088] The position acquisition unit 110 is used to acquire the real-time position of each successfully matched internal electrician according to the positioning information of the internal electrician when the judgment result shows that there are two or more matching internal electricians;

[0089] The selection unit 111 is used to select an internal electrician whose real-time location is closest to the address where the power supply problem occurs, and push the required work order to the mobile terminal of the selected internal electrician.

[0090] More specifically, the system of the present invention further includes an order grabbing task display processing unit 16, which is used to match the order grabbing task with the mobile terminal of each registered shared electrician after the mobile terminal receives the order grabbing task, and determine whether there is order grabbing authority for the order grabbing task. If so, the mobile terminal is controlled to display an order grabbing operation interface for the shared electrician to perform the order grabbing operation; otherwise, the order grabbing task is hidden.

[0091] In a specific example, in the order snatching task display processing unit 16, the following method is adopted to match with its own order snatching expected information and determine the step of having the order snatching permission for the order snatching task:

[0092] Match the corresponding operation ability, qualification certificate, willing working hours, and acceptable remuneration range of the shared electrician with the corresponding information in the current shared demand work order; and call the map interface in the mobile terminal to calculate the relative distance between its own current position and the address where the power supply and use problem occurs in the shared demand work order, and determine whether it is less than the maximum distance of the work order in its own order snatching expected information; if the above conditions are all successfully matched, it is determined that it has the order snatching permission for the order snatching task.

[0093] In the present invention, the platform code architectures on the server and mobile terminal sides involved use a distributed development architecture and technologies such as Spring Boot microservices. In the case of a relatively large number of power supply and use problem work orders, electrician roles, and enterprises, it can effectively ensure the normal operation of the order snatching function and ensure the consistency and high availability of system data.

[0094] For more details, reference can be made to and combined with the foregoing description of Figures 1 to 4 and details will not be elaborated here.

[0095] Implementing the embodiments of the present invention has the following beneficial effects:

[0096] The present invention provides a method and system for implementing a shared electrician. By adopting mainstream Internet technologies such as microservices and distributed architectures, a shared electrician database is established. When an enterprise electricity user has an electricity problem, it can be reported through a mobile terminal to form a demand work order, and internal electricians are preferentially selected for processing to save costs; when the internal electricians cannot meet the requirements of the work order, the work order will be sorted to external shared electricians to more quickly and accurately find highly matching electrician personnel. In the case of a relatively large number of power supply and use problem work orders, electrician roles, and enterprises, it can effectively ensure the normal operation of the order snatching function and ensure the consistency and high availability of system data.

[0097] By using the intelligent order receiving system provided by the present invention, electricians can directly and intuitively see the basic information, order sending time, required completion time, and relative distance of the problem work order, making the implementation method of the shared electrician more efficient and convenient, thereby improving the efficiency of solving power supply problems.

[0098] Those skilled in the art should understand that the embodiments of the present invention can be provided as a method, apparatus, or computer program product. Therefore, the present invention can take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware aspects. Moreover, the present invention can take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk memory, CD-ROM, optical memory, etc.) containing computer-usable program code.

[0099] The present invention is described with reference to the flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each flow and / or block in the flowchart and / or block diagram, and the combination of flows and / or blocks in the flowchart and / or block diagram, can be realized by computer program instructions. These computer program instructions can be provided to the processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing devices to generate a machine, such that the instructions executed by the processor of the computer or other programmable data processing devices generate means for realizing the specified functions in Figure 1 one flow or multiple flows and / or blocks Figure 1 one block or multiple blocks.

[0100] The above-disclosed is only a preferred embodiment of the present invention, and of course, it cannot be used to limit the scope of the rights of the present invention. Therefore, equivalent changes made according to the claims of the present invention still fall within the scope covered by the present invention.

Claims

1. A method for implementing a shared electrician, characterized in that, The method includes: Step S10: Respond to the electricity consumption problem application form filled in by the enterprise electricity user to generate a demand work order. The electricity consumption problem application form includes at least the following content: contact person, electricity consumption type, problem description, required processing time, specific remuneration, operation scope, qualification certificate requirements, and the address where the power supply and consumption problem occurs; Step S11: Analyze the matching degree of internal electricians according to the three dimensions of the operation ability scope, qualification certificate information, and required processing time in the demand work order. If there are matching internal electricians, push the demand work order to the mobile terminal corresponding to the internal electrician; Step S12: If there are no matching internal electricians, convert the demand work order into a shared demand work order, determine the matching conditions therein, and release a task of grabbing the order to the mobile terminals of the registered shared electricians; Step S13: Respond to the order-grabbing operation of the shared electrician who meets the matching conditions, determine one of them as the final task acceptor, and push the detailed content of the demand work order to the mobile terminal of the shared electrician; Step S14: After the task acceptor completes the task of the shared demand work order, respond to the operations of the enterprise electricity user and the task acceptor, and store the corresponding record information; Among them, it further includes: receiving the registration request and registration materials of the electrician user to form a shared electrician resource library, specifically including: Receiving the login request of the electrician and performing identity verification using face recognition technology; Receiving the ID card picture, qualification certificate picture uploaded by the electrician, as well as the filled operation ability scope and work unit; Using picture recognition technology, judge whether it is consistent with the current logged-in person according to the filled information and the uploaded picture information. If the data is consistent, the automatic registration is successful; otherwise, accurately prompt the specific item information that does not meet the requirements for the electrician to fill in the registration again; Receiving and storing the order-grabbing expectation information of the electrician, and the order-grabbing expectation information includes at least: willing working time, maximum distance of the work order, and minimum remuneration; Among them, the step S11 further includes: If the judgment result is that there are matching internal electricians and there are more than two; then according to the positioning information of the internal electricians, obtain the real-time positions of each successfully matched internal electrician; Select the internal electrician whose real-time position is the closest to the address where the power supply and consumption problem occurs, and push the demand work order to the mobile terminal of the selected internal electrician.

2. The method according to claim 1, characterized in that, The step S13 further includes: After the mobile terminals of each registered shared electrician receive the order-grabbing task, match it with their own order-grabbing expectation information to determine whether there is an order-grabbing permission for the order-grabbing task. If so, control the mobile terminal to display an order-grabbing operation interface for the shared electrician to perform the order-grabbing operation; otherwise, hide the order-grabbing task.

3. The method according to claim 2, wherein The step of matching with its own order-grabbing expectation information to determine that there is an order-grabbing permission for the order-grabbing task specifically is: Match the corresponding operation capabilities, qualification certificates, willing working hours, and acceptable remuneration ranges of shared electricians with the corresponding information in the current shared demand work order; and call the map interface in the mobile terminal to calculate the relative distance between the current location of itself and the address where the power supply and consumption problem occurs in the shared demand work order, and determine whether it is less than the maximum distance of the work order in its own order-taking expectation information; if all the above conditions are successfully matched, it is determined that it has the right to grab the order for the said order-grabbing task.

4. A system for implementing a shared electrician, which is applied to an environment including multiple mobile terminals and a server, is characterized in that, The system includes: A demand work order generation unit, which is used to respond to the electricity consumption problem application form filled in by an enterprise electricity user and generate a demand work order. The electricity consumption problem application form at least includes the following contents: contact person, electricity consumption type, problem description, required processing time, specific remuneration, operation scope, qualification certificate requirements, and the address where the power supply and consumption problem occurs; An internal electrician matching unit, which is used to analyze the matching degree of internal electricians according to the three dimensions of the operation ability range, qualification certificate information, and required processing time in the demand work order. If there are matching internal electricians, push the demand work order to the mobile terminal corresponding to the internal electricians; An order-grabbing task publishing unit, which is used to convert the demand work order into a shared demand work order when it is judged that there are no matching internal electricians, determine the matching conditions therein, and publish the order-grabbing task to the mobile terminals of the registered shared electricians; A task recipient determination unit, which is used to respond to the order-grabbing operation of the shared electrician that meets the matching conditions, determine one of them as the final task recipient, and push the detailed content of the demand work order to the mobile terminal of the shared electrician; A record processing unit, which is used to respond to the operations of the enterprise electricity user and the task recipient after the task recipient completes the task of the shared demand work order, and store the corresponding record information; Among them, it further includes: a registration processing unit, which is used to receive the registration request and registration materials of electrician users and form a shared electrician resource library. Specifically, the registration processing unit uses the following method to complete the registration process: Receive the login request of the electrician and perform identity verification using face recognition technology; Receive the ID card picture, qualification certificate picture uploaded by the electrician, as well as the filled operation ability range and work unit; Use picture recognition technology to judge whether it is consistent with the current logged-in person according to the filled information and the uploaded picture information. If the data meets the consistency, the registration is automatically successful, otherwise, accurately prompt the specific item information that does not meet the requirements for the electrician to fill in the registration again; Receive and store the order-taking expectation information of the electrician. The order-taking expectation information at least includes: willing working hours, maximum distance of the work order, and minimum remuneration; Among them, the internal electrician matching unit further includes: A location acquisition unit, which is used when the judgment result is that there are matching internal electricians and there are more than two; according to the positioning information of the internal electricians, acquire the real-time location of each successfully matched internal electrician; A selection unit, which is used to select the internal electrician with the real-time location closest to the address where the power supply and consumption problem occurs, and push the demand work order to the mobile terminal of the selected internal electrician.

5. The system according to claim 4, wherein Further includes a task snatching display processing unit, which is used to match with its own order receiving expectation information after the mobile terminals of each registered shared electrician receive a task snatching task, determine whether there is a task snatching permission for the task snatching task, and if so, control the mobile terminal to display a task snatching operation interface for the shared electrician to perform a task snatching operation; otherwise, hide the task snatching task.

6. The system according to claim 5, wherein In the task snatching display processing unit, the following method is adopted to implement the step of matching with its own order receiving expectation information and determining that it has the task snatching permission for the task snatching task: Match the corresponding operation ability, qualification certificate, willing working time, and acceptable remuneration range of the shared electrician with the corresponding information in the current shared demand work order; and call the map interface in the mobile terminal to calculate the relative distance between its own current position and the address where the power supply and consumption problem occurs in the shared demand work order, and determine whether it is less than the maximum distance of the work order in its own order receiving expectation information; if all the above conditions are successfully matched, it is determined that it has the task snatching permission for the task snatching task.

Citation Information

Patent Citations

  • Fast-power-on type ammeter after-service one-stop platform and application method for repairing ecosystem

    CN106067097A