A method for controlling the hoisting accuracy of the deck tank of a duplex stainless steel chemical tanker

By measuring and adjusting the bolt hole position of the deck tank with a total station, the problem of unstable fixation and bolt wear of the ship's deck tank is solved, achieving more efficient hoisting and longer service life.

CN114394209BActive Publication Date: 2024-10-18HUDONG ZHONGHUA SHIPBUILDINGGROUP
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202111385050.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-11-22
Publication Date
2024-10-18
Estimated Expiration
2041-11-22

AI Technical Summary

Technical Problem

In the existing technology, when the ship is sailing, due to the unstable segmental fixation of the deck tank, the bolts wear faster, the service life is shortened, and the hoisting efficiency is low.

Method used

Use a total station to measure the three-dimensional dimensions of the bolt holes on the deck tank connecting plate, adjust the installation position of the deck tank base so that the bolt hole positions coincide, and use circular patches to assist measurement and adjustment to ensure that the deck tank base connecting plate is in line with the deck. The bolt holes of the cabin connecting plate are in the same position to improve hoisting accuracy and stability.

Benefits of technology

It improves the hoisting accuracy and stability of deck cabin segments, extends the service life of bolts, shortens hoisting time, and improves work efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114394209B_ABST
    Figure CN114394209B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for controlling the hoisting accuracy of a deck cabin of a duplex stainless steel chemical tanker. The method uses a total station to measure the three-dimensional size of the bolt holes on the deck cabin segmented connecting plate, and adjusts the installation position of the deck cabin base according to the measured three-dimensional size of the bolt holes on the deck cabin segmented connecting plate, so that the position of the bolt hole on the deck cabin base connecting plate can coincide with the position of the bolt hole on the deck cabin segmented connecting plate during installation. After the deck cabin base position adjustment is completed and installed, the deck cabin is installed on the deck cabin base. The deck cabin hoisting control method of the present invention is simple to operate, and the deck cabin is accurately installed in place during the hoisting process, thereby improving the hoisting accuracy and work efficiency of the deck cabin and shortening the hoisting time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of shipbuilding, and in particular to a method for controlling the hoisting accuracy of a deck tank of a duplex stainless steel chemical ship. Background Art

[0002] In the design and construction process of cargo ships, in order to increase the product load and the flexibility of cargo transportation, 2 or 4 deck cabins are often set on the deck to increase the number of liquid cargo tanks. The appearance of the deck cabin segment is an octagonal prism, and a connecting plate with two bolt holes is set at the bow and stern ends of its two sides. On the deck surface, two deck cabin bases are set corresponding to each deck cabin segment, and a connecting plate with bolt holes is also set on the top of the base. After the deck cabin is hoisted, bolts are inserted into the bolt holes between the upper and lower connecting plates for fixing.

[0003] Patent No. CN111703553A discloses a method for controlling the construction accuracy of a deck tank of a chemical tanker, which improves the construction accuracy of the deck tank and shortens the construction period. However, the ship in the above-mentioned prior art will have various conditions such as heel, pitch, and roll when sailing. The deck tank sections on the deck surface are fixed in the front, back, left, and right directions only by 16 high-strength bolts in the middle of eight connecting plates. When the gap between the bolts and the connecting plates is too large, the deck tank sections will be unstable and shake greatly when the ship is sailing, and the bolts will be greatly worn and the service life of the bolts will be reduced. Summary of the invention

[0004] In order to overcome the above-mentioned shortcomings of the prior art, the present invention provides a special ship deck cabin hoisting accuracy control method. The present invention provides a special ship deck cabin hoisting accuracy control method that can meet the deck cabin hoisting accuracy requirements, so that the deck cabin can be installed in sections, improve work efficiency, and shorten hoisting time.

[0005] In order to achieve the above object, the technical solution adopted by the present invention is:

[0006] A method for controlling the hoisting accuracy of a deck cabin of a duplex stainless steel chemical tanker, the method uses a total station to measure the three-dimensional size of a bolt hole on a deck cabin connecting plate, and adjusts the installation position of a deck cabin base according to the measured three-dimensional size of the bolt hole on the deck cabin connecting plate, so that the position of the bolt hole on the deck cabin base connecting plate can coincide with the position of the bolt hole on the deck cabin connecting plate during installation. After the deck cabin base position adjustment is completed and installed, the deck cabin is installed on the deck cabin base. The method specifically comprises the following steps:

[0007] The first step is to remove all the scaffolding around the deck cabin sections so that all the bolt holes on the deck cabin connecting plates are not blocked, and at the same time, place the deck cabin sections horizontally on the construction platform;

[0008] The second step is to make a circular patch and stick the circular patch on the lower surface of the bolt hole on the deck cabin connecting plate. A circular patch is stuck on the lower surface of the bolt hole on each deck cabin connecting plate, and the cross center point of the circular patch coincides with the center point of the bolt hole;

[0009] The third step is to use a total station to measure the two end points of the centerline of the deck tank and the circular patches pre-attached on the lower surface of the bolt holes on each deck tank connection plate, and record the three-dimensional coordinates of the measurement points;

[0010] The fourth step is to import the three-dimensional coordinates of the recorded measurement points into the computer software for adjustment. The two end points of the center line of the deck cabin determine the X direction, and the circular patch measurement points pre-attached on the lower surface of the bolt holes on all deck cabin connecting plates determine the XY plane. After the adjustment is completed, the size data between the bolt holes on each deck cabin connecting plate is measured using the computer software, and the bolt hole size diagram on the deck cabin connecting plate is drawn;

[0011] Step 5: adjust the installation position of the deck cabin base on the ship reinforcement plate according to the bolt hole size drawing on the deck cabin connection plate. After the position adjustment of the deck cabin base is completed, weld the bottom of the deck cabin base to the ship reinforcement plate.

[0012] Step 6: Install the deck cabin base connecting plate on the deck cabin base, so that the positions of the bolt holes on the deck cabin base connecting plate coincide with the positions of the bolt holes on the deck cabin connecting plate when the deck cabin is installed in sections, and insert the bolts into each bolt hole and tighten the nuts;

[0013] Step 7. After all bolts are tightened, the deck cabin section installation is completed.

[0014] The deck cabin segment in the first step is in the shape of a regular octagonal prism, and two deck cabin connecting plates are installed on one side of the deck cabin segment, and two deck cabin connecting plates are installed at the same position on the opposite side.

[0015] The deck cabin connecting plate in the first step is trapezoidal in shape as a whole, and the four corners of the deck cabin connecting plate are arc corners. The long side of the deck cabin connecting plate is connected to the deck cabin in sections, and two identical bolt holes are opened in the middle of the end face close to the short side of the deck cabin connecting plate, and the diameter of the bolt holes is 48 mm.

[0016] The circular patch in the second step is an aluminum circular patch with a diameter of 48 mm and a cross mark at the center of the circular patch.

[0017] The center line of the deck tank in the third step is the straight line connecting the center points of the two regular octagonal end faces of the deck tank segment.

[0018] The two end points of the center line of the deck tank in the third step are two points on the straight line where the center line of the deck tank is located, and the two end points of the center line of the deck tank are outside the two end surfaces of the deck tank segment.

[0019] The dimensional data in the fourth step above are the relative length and width dimensions of a total of eight bolt holes on four deck cabin connecting plates measured using AUTOCAD software. The length and width dimensions include the length dimensions L1 and L2 of the bolt holes on the two deck cabin connecting plates on the same side, the width dimensions L3, L4, L5 and L6 of the bolt holes on the two deck cabin connecting plates on the opposite sides, and the oblique dimensions L7 and L8 of the bolt holes on the two deck cabin connecting plates on the opposite sides. The relative length and width dimensions of the eight bolt holes are the dimensions used in the modeling and design using the finite element software patran.

[0020] The deck cabin base in the fifth step is trapezoidal in shape as a whole, with a groove on the upper part of the deck cabin base, and deck cabin base connecting plates are connected to the two ends of the top of the deck cabin base, and the groove has the same shape as the end face of the deck cabin segment.

[0021] The shape of the deck cabin base connecting plate in the sixth step is the same as that of the deck cabin connecting plate. The two deck cabin base connecting plates are horizontally connected at both ends of the top of the deck cabin base with their long sides facing the groove. The diameter of the bolt holes on the deck cabin base connecting plates is 48 mm.

[0022] Based on the above scheme, the method of the present invention has achieved positive and beneficial effects through practice:

[0023] 1. The present invention measures the three-dimensional dimensions of the bolt holes of the four connecting plates of the deck cabin, so that the deck cabin sections can be accurately installed, thereby improving the hoisting accuracy of the deck cabin sections.

[0024] 2. The present invention controls the bolt hole deviation of the deck cabin connecting plate and the deck cabin base connecting plate to be within 2 mm, thereby improving the installation stability of the deck cabin, increasing the service life of the bolts, and extending the service life of the deck cabin.

[0025] 3. The present invention enables the deck cabin to be hoisted in sections by measuring the three-dimensional dimensions of the bolt holes of the four connecting plates of the deck cabin, thereby improving work efficiency and shortening hoisting time. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is a schematic diagram of deck tank sections in a method for controlling the hoisting accuracy of a deck tank of a duplex stainless steel chemical tanker according to the present invention.

[0027] Figure 2 The present invention is a schematic diagram of a deck tank base in a method for controlling the hoisting accuracy of a deck tank of a duplex stainless steel chemical tanker.

[0028] Figure 3 It is a schematic diagram of a deck tank connection plate in a method for controlling the hoisting accuracy of a deck tank of a duplex stainless steel chemical tanker according to the present invention.

[0029] Figure 4 It is a schematic diagram of a circular patch in a method for controlling the hoisting accuracy of a deck tank of a duplex stainless steel chemical tanker according to the present invention.

[0030] Figure 5 The present invention is a schematic diagram of the bolt hole size of a deck tank connection plate in a method for controlling the hoisting accuracy of a duplex stainless steel chemical tanker deck tank.

[0031] Figure 6 The present invention is a schematic diagram of deck tank segmented lifting in a method for controlling lifting accuracy of a deck tank of a duplex stainless steel chemical tanker.

[0032] The meanings of the markings in the figure are:

[0033] 1. Deck compartment sections; 2. Deck compartment connecting plates; 3. Deck compartment base connecting plates; 4. Deck compartment base; 5. Bolt holes; 6. Round patches. DETAILED DESCRIPTION

[0034] In order to make the technical solutions, purposes and advantages of the present invention more clear, the present invention is described below by means of specific examples shown in the accompanying drawings. However, it should be understood that these descriptions are only exemplary and are not intended to limit the scope of the present invention. In addition, in the following description, the description of well-known structures and technologies is omitted to avoid unnecessary confusion of the concept of the present invention.

[0035] like Figure 5 As shown, the present invention provides a method for controlling the hoisting accuracy of a deck tank of a duplex stainless steel chemical tanker, and the specific implementation manner is as follows.

[0036] The present invention relates to a method for controlling the hoisting accuracy of a deck tank of a duplex stainless steel chemical ship. Figure 1 As shown, the deck tank section 1 of the duplex stainless steel chemical tanker is in the shape of a regular octagonal prism, two deck tank connecting plates 2 are installed on one side of the deck tank section 1, and two deck tank connecting plates 2 are installed at the same position on the opposite side. The deck tank of the duplex stainless steel chemical tanker is installed as a whole on the left and right sides of the superstructure at the rear of the ship.

[0037] The method of the present invention uses a total station to measure the three-dimensional dimensions of the bolt holes on the deck cabin connecting plate, and adjusts the installation position of the deck cabin base according to the measured three-dimensional dimensions of the bolt holes on the deck cabin connecting plate, so that the positions of the bolt holes on the deck cabin base connecting plate and the positions of the bolt holes on the deck cabin connecting plate can coincide with each other during installation. After the position adjustment of the deck cabin base is completed and the deck cabin is installed, the deck cabin is installed on the deck cabin base.

[0038] The above precision control method specifically includes the following implementation steps:

[0039] The first step is to remove all the scaffolding around the deck cabin section 1 so that all the bolt holes 5 on the deck cabin connecting plate 2 are not blocked. At the same time, the deck cabin section 1 is placed horizontally on the construction platform. Figure 1 As shown, the deck cabin segment 1 is placed on the construction platform for subsequent measurement and operation. The deck cabin segment 1 is in the shape of a regular octagonal prism. Two deck cabin connecting plates 2 are installed on one side of the deck cabin segment 1, and two deck cabin connecting plates 2 are installed at the same position on the opposite side. The deck cabin connecting plate 2 is trapezoidal in shape as a whole. The four corners of the deck cabin connecting plate 2 are arc angles. The long side of the deck cabin connecting plate 2 is connected to the deck cabin segment 1. Two identical bolt holes 5 are opened in the middle of the end face close to the short side of the deck cabin connecting plate 2. The diameter of the bolt hole 5 is 48 mm.

[0040] The second step is to make a circular patch 6 and stick the circular patch 6 on the lower surface of the bolt hole 5 on the deck cabin connecting plate 2. A circular patch 6 is stuck on the lower surface of the bolt hole 5 on each deck cabin connecting plate 2, and the cross center point of the circular patch 6 coincides with the center point of the bolt hole 5. Figure 4 As shown, it is convenient to use a total station to measure the size data of all bolt holes on the deck cabin connecting plate 2. Here, the circular patch 6 is an aluminum circular patch with a diameter of 48 mm and a cross mark at the center of the circular patch 6.

[0041] In the third step, the total station is used to measure the two end points of the deck cabin centerline 7 and the circular patch 6 pre-attached on the lower surface of the bolt hole 5 on each deck cabin connecting plate 2, and the three-dimensional coordinates of the measuring points are recorded. Figure 3 As shown, the three-dimensional coordinates of the measurement points are recorded to facilitate subsequent import into AUTOCAD software for subsequent measurement. The center line 7 of the deck tank is the straight line where the center points of the two regular octagonal end faces of the deck tank segment 1 are connected. The two end points of the center line 7 of the deck tank are two points on the straight line where the center line 7 of the deck tank is located, and the two end points of the center line 7 of the deck tank are outside the two end faces of the deck tank segment 1.

[0042] The fourth step is to import the three-dimensional coordinates of the recorded measurement points into the computer software for adjustment. The computer software is a conventional CAD software, and the AUTOCAD 2014 version can be selected. The manufacturer is Autodesk. The two end points of the center line 7 of the deck cabin determine the X direction, and the measurement points of the circular patch 6 pre-attached on the lower surface of the bolt holes 5 on all the deck cabin connecting plates 2 determine the XY plane. After the adjustment is completed, the computer software is used to measure the size data between the bolt holes 5 on each deck cabin connecting plate 2, and the size diagram of the bolt holes 5 on the deck cabin connecting plate 2 is drawn. The size diagram of the bolt holes of the deck cabin connecting plate is as shown in the attached figure. Figure 5 As shown, the installation position of the deck cabin base 4 on the ship reinforcement plate can be adjusted according to the deck cabin connection plate bolt hole size diagram, which facilitates the accurate installation of the deck cabin base.

[0043] Step 5: Adjust the installation position of the deck cabin base 4 on the ship reinforcement plate according to the bolt hole 5 dimension drawing drawn on the deck cabin connection plate 2. After the position adjustment of the deck cabin base 4 is completed, weld the bottom of the deck cabin base 4 to the ship reinforcement plate. The deck cabin base 4 is trapezoidal in shape as a whole, and there is a groove on the upper part of the deck cabin base 4. The two ends of the top of the deck cabin base 4 are connected to the deck cabin base connection plate 3, and the groove has the same shape as the end face of the deck cabin segment 1.

[0044] Step 6: Install the deck cabin base connecting plate 3 on the deck cabin base 4, so that the positions of the bolt holes on the deck cabin base connecting plate 3 coincide with the positions of the bolt holes 5 on the deck cabin connecting plate 2 when the deck cabin segment 1 is installed, and insert the bolts into each bolt hole and tighten the nuts. The shape of the deck cabin base connecting plate 3 is the same as that of the deck cabin connecting plate 2, and the two deck cabin base connecting plates 3 are horizontally connected at the two ends of the top of the deck cabin base 4 with their long sides facing the groove, and the diameter of the bolt holes on the deck cabin base connecting plate 3 is 48 mm.

[0045] Step 7. After all bolts are tightened, the installation of deck compartment section 1 is completed.

[0046] The dimensional data in the fourth step are the relative length and width dimensions of the eight bolt holes 5 on the four deck cabin connecting plates 2 measured by AUTOCAD software. The length and width dimensions include the length dimensions L1 and L2 of the bolt holes 5 on the two deck cabin connecting plates 2 on the same side, the width dimensions L3, L4, L5 and L6 of the bolt holes 5 on the two deck cabin connecting plates 2 on the opposite sides, and the oblique dimensions L7 and L8 of the bolt holes 5 on the two deck cabin connecting plates 2 on the opposite sides. The relative length and width dimensions of the eight bolt holes 5 are the dimensions during modeling and design using the finite element software patran, which is the 2012 version and manufactured by MSC.

[0047] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the specific implementation methods of the present invention can still be modified or some technical features can be replaced by equivalents without departing from the spirit of the technical solution of the present invention, which should be included in the scope of the technical solution for protection of the present invention.

Claims

1. A method for controlling the hoisting accuracy of a deck tank of a duplex stainless steel chemical tanker, wherein the deck tank of the duplex stainless steel chemical tanker is divided into regular octagonal prisms, two deck tank connecting plates are installed on one side of the deck tank segment, and two deck tank connecting plates are installed at the same position on the opposite side, characterized in that: The method uses a total station to measure the three-dimensional size of the bolt hole on the deck cabin connecting plate, and adjusts the installation position of the deck cabin base according to the measured three-dimensional size of the bolt hole on the deck cabin connecting plate, so that the position of the bolt hole on the deck cabin base connecting plate can coincide with the position of the bolt hole on the deck cabin connecting plate during installation. After the deck cabin base position adjustment is completed and installed, the deck cabin is installed on the deck cabin base. The method specifically includes the following steps: The first step is to remove all the scaffolding around the deck cabin section (1) so that all the bolt holes (5) on the deck cabin connecting plate (2) are not blocked, and at the same time, the deck cabin section (1) is placed horizontally on the construction platform; The second step is to make a circular patch (6) and stick the circular patch (6) on the lower surface of the bolt hole (5) on the deck cabin connection plate (2). The circular patch (6) is stuck on the lower surface of each bolt hole (5) on the deck cabin connection plate (2), and the cross center point of the circular patch (6) coincides with the center point of the bolt hole (5); The third step is to use a total station to measure the two end points of the deck tank center line (7) and the circular patch (6) pre-attached on the lower surface of the bolt hole (5) on each deck tank connecting plate (2), and record the three-dimensional coordinates of the measurement points; the deck tank center line (7) is the straight line where the center points of the two regular octagonal end faces of the deck tank segment (1) are connected; the two end points of the deck tank center line (7) are two points on the straight line where the deck tank center line (7) is located, and the two end points of the deck tank center line (7) are outside the two end faces of the deck tank segment (1); The fourth step is to import the three-dimensional coordinates of the recorded measurement points into the computer software for adjustment. The two end points of the deck cabin centerline (7) determine the X direction. The measurement points of the circular patches (6) pre-attached on the lower surface of the bolt holes (5) on all the deck cabin connecting plates (2) determine the XY plane. After the adjustment is completed, the size data between the bolt holes (5) on each deck cabin connecting plate (2) is measured by computer software, and the size drawing of the bolt holes (5) on the deck cabin connecting plate (2) is drawn; the size data is the relative length and width dimensions of a total of eight bolt holes (5) on four deck cabin connecting plates (2) measured by CAD software. The length and width dimensions include the length dimension of the bolt holes (5) on the two deck cabin connecting plates (2) on the same side, the width dimension of the bolt holes (5) on the two deck cabin connecting plates (2) on the opposite side, and the oblique dimension of the bolt holes (5) on the two deck cabin connecting plates (2) on the opposite side. The relative length and width dimensions of the eight bolt holes (5) are the dimensions when the finite element software is used for modeling and design; Step 5: Adjust the installation position of the deck tank base (4) on the ship reinforcement plate according to the dimension drawing of the bolt hole (5) on the deck tank connection plate (2). After the position adjustment of the deck tank base (4) is completed, weld the bottom of the deck tank base (4) to the ship reinforcement plate; Step 6: Install the deck tank base connecting plate (3) on the deck tank base (4) so ​​that the positions of the bolt holes on the deck tank base connecting plate (3) coincide with the positions of the bolt holes (5) on the deck tank connecting plate (2) when the deck tank segments (1) are installed, and insert bolts into each bolt hole and tighten the nuts; Step 7. After all bolts are tightened, the installation of the deck tank section (1) is completed.

2. The method for controlling the hoisting accuracy of a duplex stainless steel chemical tanker deck tank according to claim 1 is characterized in that: The deck cabin connecting plate (2) in the first step is in a trapezoidal shape as a whole, and the four corners of the deck cabin connecting plate (2) are arc corners. The long side of the deck cabin connecting plate (2) is connected to the deck cabin segment (1), and two identical bolt holes (5) are opened in the middle of the end face close to the short side of the deck cabin connecting plate (2), and the diameter of the bolt hole (5) is 48 mm.

3. The method for controlling the hoisting accuracy of a duplex stainless steel chemical tanker deck tank according to claim 1 is characterized in that: The circular patch (6) in the second step is an aluminum circular patch, the diameter of the circular patch is 48 mm, and the center of the circular patch (6) is a cross mark.

4. The method for controlling the hoisting accuracy of a duplex stainless steel chemical tanker deck tank according to claim 1, characterized in that: The deck cabin base (4) in the fifth step is in a trapezoidal shape as a whole, and a groove is provided on the upper part of the deck cabin base (4). The two ends of the top of the deck cabin base (4) are connected to a deck cabin base connecting plate (3), and the groove has the same shape as the end face of the deck cabin segment (1).

5. The method for controlling the hoisting accuracy of a duplex stainless steel chemical tanker deck tank according to claim 1, characterized in that: The shape of the deck cabin base connecting plate (3) in the sixth step is the same as that of the deck cabin connecting plate (2). The two deck cabin base connecting plates (3) are horizontally connected to the two ends of the top of the deck cabin base (4) with their long sides facing the groove. The diameter of the bolt holes on the deck cabin base connecting plates (3) is 48 mm.