Analysis method of excavator motion coordination

Through the hierarchical analysis method and membership function method, the problems of low data utilization rate and insufficient analysis ability in the excavator movement coordination analysis are solved, and the analysis ability of the excavator movement coordination and operation efficiency are improved, and higher objectivity is achieved and reliability.

CN114611986BActive Publication Date: 2024-11-01YANSHAN UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210306012.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-03-25
Publication Date
2024-11-01
Estimated Expiration
2042-03-25

AI Technical Summary

Technical Problem

The prior art has low data utilization rate in excavator motion coordination analysis, relying on manual qualitative evaluation, single and fuzzy index dimensions, weak analysis ability, and lack objectivity and reliability.

Method used

The judgment matrix is ​​constructed using the hierarchical analysis method, the weights of each analysis sub-indicator are determined, and the influence of dimension units is eliminated through the membership function, thereby improving the error tolerance and result consistency of the analysis.

Benefits of technology

The excavator movement coordination, operating efficiency and safety are improved, quantitative definition and targeted adjustment measures are provided, and the objectivity and reliability of the analysis are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114611986B_ABST
    Figure CN114611986B_ABST
Patent Text Reader

Abstract

The present invention relates to an excavator motion coordination analysis method, which includes the following steps: step one: determining the excavator motion coordination analysis sub-indicators according to experimental data; step two: determining the weights of each analysis sub-indicator; step three: determining the membership function under the weights of each analysis sub-indicator; step four: determining the synthetic relationship of the overall evaluation index; step five: performing system analysis and decision-making according to the information obtained during the analysis process. The present invention provides an excavator motion coordination analysis method, which constructs a judgment matrix through a hierarchical analysis method to determine the weights of each analysis sub-indicator to avoid the influence of erroneous information on the calculation results; based on the membership functions of each analysis sub-indicator, the influence of the dimensional unit of the analysis sub-indicator is eliminated through function calculation; the present invention can qualitatively analyze the quality of the excavator motion coordination, improve the fault tolerance of the analysis and the consistency of the analysis results, and thus can improve the excavator motion coordination as well as the operating efficiency, comfort and safety.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of excavators, and in particular, relates to a method for analyzing the coordination of excavator movements. Background Art

[0002] Construction machinery plays an important role in the development of the national economy, among which excavators are called the king of construction machinery. The development trend of the excavator industry points out that my country has become the world's largest excavator market and the world's excavator industry manufacturing center, and is gradually being incorporated into the global excavator supply chain system. The performance of an excavator determines its market value and share. It is very important to evaluate the performance of an excavator, such as overall reliability, coordination, service life and other aspects.

[0003] At present, in the field of excavators, the research on the analysis of their motion coordination has problems such as low data utilization, no quantitative indicators and evaluation benchmarks based on manual qualitative evaluation, single and vague indicator dimensions, and weak analysis capabilities. Therefore, it is necessary to establish a new optimization method that uses data quantitative analysis methods for evaluation, has strong objectivity and reliability, and has targeted reasons. Its significance lies in the quantitative definition of the excavator's motion coordination, finding the current system deficiencies, and taking measures to adjust them, thereby improving the excavator's motion coordination as well as its operating efficiency, comfort, and safety. Summary of the invention

[0004] In order to overcome the shortcomings of the prior art, the present invention provides a method for analyzing the coordination of excavator movements. A judgment matrix is ​​constructed through a hierarchical analysis method to determine the weights of various analysis sub-indicators to avoid the influence of erroneous information on the calculation results. Based on the membership functions of various analysis sub-indicators, the influence of the dimensional units of the analysis sub-indicators is eliminated through function operations. The present invention can improve the fault tolerance of the analysis and the consistency of the analysis results, thereby improving the coordination of the excavator movements as well as the operating efficiency, comfort and safety.

[0005] To achieve the above purpose, the solution adopted by the present invention is:

[0006] A method for analyzing the coordination of excavator movements comprises the following steps:

[0007] Step 1: Determine the sub-indicators of excavator motion coordination analysis based on experimental data;

[0008] According to the experimental data of the excavator, the total analysis index Y of the excavator and the six excavator motion coordination analysis sub-indexes, namely, dynamic response time Y1, actuator speed Y2, actuator pressure impact Y3, precision control Y4, rotation drift Y5 and relative speed change Y6, are determined;

[0009] Step 2: Determine the weight of each analysis sub-indicator;

[0010] According to the six excavator motion coordination analysis sub-indicators determined in step 1, determine the weight of each sub-indicator. The specific steps are as follows:

[0011] Step 21: Assign weights to each analysis sub-indicator to ensure that the sum of the weights of all sub-indicators is 1;

[0012] Step 22: Determine the importance of all sub-indicators and construct a composite action condition judgment matrix A;

[0013] Step 23: Perform consistency check on the judgment matrix;

[0014] The consistency test needs to compare the importance of each pair of indicators by calculating the consistency ratio. If the consistency ratio CR is less than 0.1, the consistency of the judgment matrix is ​​considered acceptable. Otherwise, the judgment matrix needs to be modified. The method for obtaining it is as follows:

[0015]

[0016] Where: CI represents the consistency index; λ max represents the maximum characteristic root of the judgment matrix A; n represents the total number of analysis sub-indicators;

[0017]

[0018] In the formula: CR represents the consistency ratio; RI represents the average random consistency index;

[0019] Step 24: Use the geometric mean method to obtain the eigenvector corresponding to the maximum eigenvalue of the judgment matrix;

[0020] The method for obtaining the eigenvector corresponding to the maximum eigenvalue of the judgment matrix is ​​as follows:

[0021]

[0022] Where: V Yi A represents the eigenvector of the maximum eigenvalue obtained by the geometric mean algorithm of the i-th sub-index; ij It represents the element of the judgment matrix of the i-th row sub-indicator and the j-th column sub-indicator; i and j represent the horizontal and vertical sub-indicator numbers in the judgment matrix respectively;

[0023] Step 25: Normalize the feature vector to obtain the weight of each sub-indicator;

[0024] The characteristic vector is normalized to obtain the weight of each sub-indicator, and the method for obtaining it is shown in the following formula:

[0025]

[0026] Where: W Yi represents the weight of the i-th analysis sub-indicator; V Yi The eigenvector representing the maximum eigenvalue obtained by the geometric mean algorithm of the i-th sub-indicator;

[0027] Step 3: Determine the membership function under the weight of each analysis sub-indicator;

[0028] The membership function is the weight W of a certain sub-indicator. Yi Under, the percentage of each sub-index is as follows: the membership function under the weight of each sub-index is dynamic response membership function Y1', steady-state speed membership function Y2', impact membership function Y3', precise controllability membership function Y4', rotation drift membership function Y5' and relative speed membership function Y6';

[0029] Step 4: Determine the synthetic relationship of the overall evaluation indicators;

[0030] The synthetic relationship of the total analysis index is determined based on the results of step 2 and step 3. The corresponding mathematical expression is as follows:

[0031]

[0032] Where: Y represents the total analysis index of the excavator; Y1', Y2'...Y6' represent the membership functions of the 1st, 2nd...6th analysis sub-indexes respectively; K1, K2...K6 represent the logical values ​​of the minimum requirements of the 1st, 2nd...6th sub-indexes respectively;

[0033] When the analysis sub-index reaches the lower limit of the set index, the logic value K1, K2…K6 of the judgment sub-index takes the value of 0, otherwise it takes the value of 1;

[0034] Step 5: Conduct system analysis and decision making based on the information obtained during the analysis process;

[0035] According to the total analysis index Y obtained in step 4, the intervals are divided to find the current system deficiencies, conduct excavator motion coordination analysis and decision-making, and take measures to adjust them, thereby improving the excavator motion coordination and operating efficiency.

[0036] Preferably, the experimental data in step 1 include input signal data, hydraulic cylinder displacement data, hydraulic cylinder movement speed data and hydraulic cylinder pressure data of the boom actuator, dipper arm actuator, bucket actuator and slewing actuator during movement, wherein the experimental data of the slewing actuator also includes slewing angle data, slewing angular velocity data and actuator pressure data.

[0037] Preferably, the specific implementation of the 6 sub-indicators in step 1 is as follows:

[0038] The sub-indicator dynamic response time Y1 is the response characteristic between the input signal and the displacement / angle output of the actuator. The dynamic response time is shown in the following formula:

[0039] Y1=t1-t2

[0040] Where: Y1 represents the dynamic response time; t1 represents the actuator displacement / angle start time; t2 represents the input signal start time;

[0041] The sub-index actuator speed Y2 is the ratio of the specified stroke of each action to the specified motion time defined by the machine at the factory. The actuator speed sub-index is as follows:

[0042]

[0043] Where: Y2 represents the actuator speed; d represents the actuator specified stroke; t3 represents the specified movement time;

[0044] The sub-indicator actuator pressure shock amount Y3 is the pressure shock at the actuator startup stage, and the pressure shock amount is as follows:

[0045]

[0046] Where: Y3 represents the pressure impact of the actuator; p max It indicates the pressure under the maximum overshoot in the startup phase of the actuator; p indicates the pressure in the steady state after the startup phase;

[0047] The sub-index precision controllability Y4 is the linear relationship between the speed / angular velocity of the actuator and the handle input signal. It is mainly the quantitative linear relationship between the speed change and the handle signal change when the actuator speed needs to be finely adjusted in a small range during handle micro-operation. The precision controllability is shown in the following formula:

[0048]

[0049] Where: Y4 represents precision control; ΔV max It indicates the maximum difference between the theoretical curve and the actual curve under the same input signal; V0 indicates the speed between the theoretical curve and the actual curve under the minimum input signal; V n Indicates the speed of the theoretical curve and the actual curve under the maximum input signal;

[0050] The sub-index rotation drift amount Y5 is the slip angle of the excavator's rotary platform due to inertia when the rotation pilot handle signal stops;

[0051] The sub-index relative speed change Y6 is the speed change of other actions when joining or exiting the action in the compound motion, that is, the ratio of the speed change Δv of other actions at this stage to the speed v of other actions before joining or exiting. The speed change is shown in the following formula:

[0052]

[0053] Where: Y6 represents the relative speed change; Δv represents the speed change of other actions at this stage when a certain actuator action is added or exited; v represents the speed of other actions before addition or exit.

[0054] Preferably, in step 21, the weights of the various analysis sub-indicators are allocated to ensure that the sum of the indicators is 1; the specific process is as follows:

[0055] Let the weight of dynamic responsiveness index be W Y1 , the weight of the actuator speed index is W Y2 , the weight of the pressure shock index is W Y3 , the weight of the precision control index is W Y4 , the weight of the rotation drift index is W Y5 , the weight of the relative speed change index is W Y6 ;

[0056]

[0057] Where: W Y Represents the sum of sub-indicators, set to 1; W Yi Indicates the weight of the i-th sub-indicator.

[0058] Preferably, in step 22, the importance of all sub-indicators is determined to construct a composite action condition judgment matrix, and the specific process is as follows:

[0059] All sub-indicators are compared in terms of importance. The scales for comparison of importance are: 1 for equal importance; 3 for slightly important; 5 for obviously important; 7 for extremely important. In the following judgment matrix A, A ij It is expressed as the importance of index i relative to index j; both i and j are integers between ∈1 and 6; that is, A 1j , A 2j , A 3j , A 4j , A 5j , A 6jThey are the importance of dynamic response index relative to other indexes, the importance of actuator speed index relative to other indexes, the importance of pressure shock index relative to other indexes, the importance of precision control index relative to other indexes, the importance of rotation drift index relative to other indexes, and the importance of relative speed change index relative to other indexes; A i1 , A i2 , A i3 , A i4 , A i5 , A i6 They are the importance of other indicators relative to dynamic response indicators, the importance of other indicators relative to actuator speed indicators, the importance of other indicators relative to pressure shock indicators, the importance of other indicators relative to precision control indicators, the importance of other indicators relative to rotation drift indicators, and the importance of other indicators relative to relative speed change indicators; the judgment matrix A is completed according to the scale division of the comparison of the importance of each pair, and the judgment matrix A is a positive reciprocal matrix, satisfying A ij ×A ji =1, the judgment matrix A is as follows:

[0060]

[0061] Where: A represents the judgment matrix; A 12 , A 13 …A 65 Respectively represent the 30 elements of the judgment matrix;

[0062] When i=j, the two identical sub-indicators in the corresponding judgment matrix are equally important and are recorded as 1. Taking the above matrix as an example, assuming A 13 =5, it means that the dynamic response index is obviously more important than the pressure shock index. ij ×A ji =1, A 31 =1 / 5.

[0063] Preferably, the specific selection rule of the average random consistency index RI in step 23 is as follows:

[0064]

[0065] Where: n represents the number of analysis sub-indicators.

[0066] Preferably, the membership function values ​​in step 3 are all between 0 and 1, and the specific implementation method is as follows:

[0067] The dynamic response membership function means that the dynamic responsiveness is the difference between the start time of the actuator movement and the start time of the pilot handle input signal. This difference is represented by x. The minimum boundary value of the membership function is defined as the operator reaction time plus the dead zone travel time. Its critical value is a1, and the unit is milliseconds. The maximum boundary value of the membership function is the maximum response time between the handle input and the actuator output set by the excavator factory. Its critical value is b1, and the unit is milliseconds. The dynamic response membership function is shown as follows:

[0068]

[0069] In the formula: Y1' represents the membership function of dynamic response; K1 represents the logical value for judging whether the index reaches the minimum requirement; a1 represents the maximum response time critical value; b1 represents the minimum response time critical value; x1 represents the response time;

[0070] The steady-state speed membership function refers to the calculation of the steady-state speed, which is the stable speed of the actuator during the process of moving from the initial position to the terminal position. Its value is x2, and its critical a2 and b2 values ​​depend on the factory requirements; the steady-state speed membership function is shown in the following formula:

[0071]

[0072] Where: Y2' represents the steady-state speed membership function; a2 represents the upper limit of the speed in the acceptance interval; b2 represents the lower limit of the speed in the acceptance interval; x2 represents the steady-state speed;

[0073] The calculation formula Y3' of the impact membership function is consistent with the expression Y3 of the impact sub-index in claim 3, as shown in the following formula:

[0074] Y3′=Y3

[0075] Where: Y3' represents the shock membership function;

[0076] The calculation formula Y4' of the precision controllability membership function is consistent with the precision controllability sub-index expression Y4 in claim 3, as shown in the following formula:

[0077] Y4′=Y4

[0078] Where: Y4' represents the precise controllable membership function;

[0079] The swing drift membership function refers to the swing drift, that is, the sliding angle of the excavator swing platform due to inertia when the swing pilot handle signal stops. The swing drift membership function is shown in the following formula:

[0080]

[0081] Where: Y5' represents the rotation drift membership function; x5 represents the rotation drift in actual operation; a5 represents the rotation drift allowed in actual operation;

[0082] The calculation formula Y6' of the relative speed membership function is consistent with the relative speed expression Y6 in claim 3, as shown below:

[0083] Y6′=Y6

[0084] Where: Y6' represents the relative speed membership function.

[0085] Compared with the prior art, the present invention has the following beneficial effects:

[0086] (1) The present invention provides an excavator motion coordination analysis method, which constructs a judgment matrix through a hierarchical analysis method to determine the weights of various analysis sub-indicators to avoid the influence of erroneous information on the calculation results; based on the membership functions of various analysis sub-indicators, the influence of the dimensional units of the analysis sub-indicators on the final results is eliminated through function operations;

[0087] (2) The present invention can qualitatively analyze the coordination of the excavator's movements, improve the fault tolerance of the analysis and the consistency of the analysis results, and thus improve the coordination of the excavator's movements as well as its operating efficiency, comfort and safety. BRIEF DESCRIPTION OF THE DRAWINGS

[0088] Figure 1 A control block diagram of a method for analyzing the coordination of excavator motion according to an embodiment of the present invention;

[0089] Figure 2 Structural diagram of an excavator according to an embodiment of the present invention;

[0090] Figure 3 is a detailed flow chart of the method for analyzing the coordination of excavator movements according to an embodiment of the present invention;

[0091] Figure 4 The dynamic response curve diagram of the bucket arm and bucket of the embodiment of the present invention;

[0092] Figure 5 This is a graph showing pressure impact of the bucket arm and bucket according to an embodiment of the present invention;

[0093] Figure 6 This is a curve diagram of the precision controllability of the dipper arm and the bucket according to an embodiment of the present invention;

[0094] Figure 7 This is a graph of the relative speed between the dipper arm and the bucket according to an embodiment of the present invention;

[0095] Figure 8 The following is a Simulink block diagram of an application program according to an embodiment of the present invention. DETAILED DESCRIPTION

[0096] Hereinafter, embodiments of the present invention will be described with reference to the drawings.

[0097] The embodiment of the present invention provides a method for analyzing the coordination of excavator movements. Figure 1 The control block diagram of the excavator motion coordination analysis method is shown. The judgment matrix is ​​constructed by the hierarchical analysis method to determine the weights of each analysis sub-index to avoid the influence of erroneous information on the calculation results. Based on the membership function of each analysis sub-index, the influence of the dimensional unit of the analysis sub-index is eliminated by function operation. In order to prove the applicability of the present invention, it is applied to examples, such as Figure 3 The figure is a detailed flow chart of the method for analyzing the coordination of excavator movements according to the embodiment, which specifically includes the following steps:

[0098] S1: Determine the excavator motion coordination analysis index based on experimental data;

[0099] The experimental data are shown in Table 1, including the excavator-related experimental data such as the boom actuator 1, the dipper arm actuator 2, the bucket actuator 3, and the swing actuator 4. Figure 2 As shown; specifically, the input signal data of the boom, dipper arm and bucket actuators during movement, the hydraulic cylinder displacement data, the hydraulic cylinder movement speed data, and the hydraulic cylinder pressure data, among which the experimental data of the rotary actuator include the rotary angle data, the rotary angular velocity data, and the actuator pressure data; according to the experimental data of the excavator, the total analysis index Y of the excavator and six sub-indicators including dynamic response Y1, actuator speed Y2, pressure shock Y3, precise controllability Y4, rotary drift Y5 and relative speed change Y6 are determined.

[0100] Table 1 Experimental data table of embodiment

[0101]

[0102]

[0103] Sub-indicator dynamic response time Y1 is as follows Figure 4 The following is the response characteristic curve between the input signal and the displacement / angle output of the actuator. The dynamic response time is as follows:

[0104] Y1=t1-t2

[0105] Where: Y1 represents the dynamic response time; t1 represents the actuator displacement / angle start time; t2 represents the input signal start time;

[0106] The sub-index actuator speed Y2 is the ratio of the specified stroke of each action to the specified motion time defined by the machine at the factory. The actuator speed is as follows:

[0107]

[0108] Where: Y2 represents the actuator speed; d represents the actuator specified stroke; t3 represents the specified movement time;

[0109] Sub-index actuator pressure shock Y3 Figure 5 The figure shows the pressure shock characteristic curve of the actuator during the startup phase. The pressure shock amount of the actuator is as follows:

[0110]

[0111] Where: Y3 represents the pressure impact of the actuator; p max It indicates the pressure under the maximum overshoot in the startup phase of the actuator; p indicates the pressure in the steady state after the startup phase;

[0112] Sub-indicator precision control Y4 Figure 6 The linear relationship between the speed / angular velocity of the actuator and the handle input signal is shown in FIG. Figure 6 The figure shows the followability of the speed change and the handle signal change when the actuator speed needs to be finely adjusted in a small range during the handle micro-operation. The quantitative linear relationship between the two is shown in the following formula:

[0113]

[0114] Where: Y4 represents precision control; ΔV max It indicates the maximum difference between the theoretical curve and the actual curve under the same input signal; V0 indicates the speed between the theoretical curve and the actual curve under the minimum input signal; V n Indicates the speed of the theoretical curve and the actual curve under the maximum input signal;

[0115] Sub-index slewing drift Y5 is the slip angle of the excavator slewing platform due to inertia and other reasons when the slewing pilot handle signal stops;

[0116] Sub-index relative speed change Y6 Figure 7 The figure shows the speed change characteristic curve of other actions when adding or exiting an action in a compound motion, that is, the ratio of the speed change Δv of other actions at this stage to the speed v of other actions before adding or exiting. Specifically, the relative speed change is shown in the following formula:

[0117]

[0118] Where: Y6 represents the relative speed change; Δv represents the speed change of other actions at this stage when a certain actuator action is added or exited; v represents the speed of other actions before addition or exit.

[0119] S2: Determine the weight of each analysis indicator;

[0120] According to the six excavator motion coordination analysis sub-indicators determined by S1, the weight of each sub-indicator is determined. The specific steps are as follows:

[0121] S21: Allocate the weights of each analysis sub-indicator to ensure that the sum of the weights of all sub-indicators is 1;

[0122] Let the weight of dynamic responsiveness index be W Y1 , the weight of the actuator speed index is W Y2 , the weight of the pressure shock index is W Y3 , the weight of the precision control index is W Y4 , the weight of the rotation drift index is W Y5 , the weight of the relative speed change index is W Y6 ;

[0123]

[0124] Where: W Y Represents the sum of sub-indicators, set to 1; W Yi Indicates the weight of the i-th sub-indicator.

[0125] S22: Determine the importance of all sub-indicators and construct a composite action condition judgment matrix A;

[0126] The importance of all sub-indicators is compared pairwise, as shown in Table 2, which is a table of importance divided by the hierarchical analysis method.

[0127] Table 2 Example Analytical Hierarchy Process - Importance Table

[0128] Scale meaning 1 Equally important 3 Slightly important 5 Obviously important 7 Strongly important reciprocal A / B=3 or B / A=1 / 3

[0129] In the following judgment matrix A, A ij It is expressed as the importance of index i relative to index j; both i and j are integers between ∈1 and 6; that is, A 1j , A 2j , A 3j , A 4j , A 5j , A 6j They are the importance of dynamic response index relative to other indexes, the importance of actuator speed index relative to other indexes, the importance of pressure shock index relative to other indexes, the importance of precision control index relative to other indexes, the importance of rotation drift index relative to other indexes, and the importance of relative speed change index relative to other indexes; A i1 , A i2, A i3 , A i4 , A i5 , A i6 They are the importance of other indicators relative to dynamic response indicators, the importance of other indicators relative to actuator speed indicators, the importance of other indicators relative to pressure shock indicators, the importance of other indicators relative to precision control indicators, the importance of other indicators relative to rotation drift indicators, and the importance of other indicators relative to relative speed change indicators; the judgment matrix A is completed according to the scale division of the comparison of the importance of each pair, and the judgment matrix A is a positive reciprocal matrix, satisfying A ij ×A ji =1, the judgment matrix A is as follows:

[0130]

[0131] Where: A represents the judgment matrix; A 12 , A 13 …A 65 Respectively represent the 30 elements of the judgment matrix;

[0132] When i=j, the two identical sub-indicators in the corresponding judgment matrix are equally important and are recorded as 1. Taking the above matrix as an example, assuming A 13 =5, it means that the dynamic response index is obviously more important than the pressure shock index. ij ×A ji =1, A 31 =1 / 5.

[0133] S23: Perform consistency check on the judgment matrix;

[0134] The consistency test needs to compare the importance of each pair of indicators by calculating the consistency ratio. If the consistency ratio CR is less than 0.1, the consistency of the judgment matrix is ​​considered acceptable. Otherwise, the judgment matrix needs to be modified. The method for obtaining it is as follows:

[0135]

[0136] Where: CI represents the consistency index; λ max represents the maximum characteristic root of the judgment matrix A; n represents the total number of analysis sub-indicators;

[0137]

[0138] In the formula: CR represents the consistency ratio; RI represents the average random consistency index;

[0139] The specific selection rules of the average random consistency index RI are as follows:

[0140]

[0141] Where: n represents the number of analysis sub-indicators;

[0142] S24: using the geometric mean method to obtain the eigenvector corresponding to the maximum eigenvalue of the judgment matrix;

[0143] The method for obtaining the eigenvector corresponding to the maximum eigenvalue of the judgment matrix is ​​as follows:

[0144]

[0145] Where: V Yi A represents the eigenvector of the maximum eigenvalue obtained by the geometric mean algorithm of the i-th sub-index; ij It represents the element of the judgment matrix of the i-th row sub-indicator and the j-th column sub-indicator; i and j represent the horizontal and vertical sub-indicator numbers in the judgment matrix respectively;

[0146] S25: normalize the feature vector to obtain the weight of each sub-indicator;

[0147] The characteristic vector is normalized to obtain the weight of each sub-indicator, and the method for obtaining it is shown in the following formula:

[0148]

[0149] Where: W Yi represents the weight of the ith sub-analysis indicator; V Yi The eigenvector representing the maximum eigenvalue obtained by the geometric mean algorithm of the i-th sub-indicator;

[0150] S3: Determine the membership function under the weight of each analysis sub-indicator;

[0151] The membership function is the weight W of a certain sub-indicator. Yi Under the percentage, the membership functions under the weight of each sub-indicator are determined as dynamic response membership function Y1', steady-state speed membership function Y2', impact membership function Y3', precise controllability membership function Y4', rotation drift membership function Y5' and relative speed membership function Y6';

[0152] The dynamic response membership function refers to the dynamic responsiveness, which is the difference between the start time of the actuator movement and the start time of the pilot handle input signal. This difference is represented by x. The minimum boundary value of the membership function is defined as the operator reaction time plus the dead zone travel time. Its critical value is a1, which is in milliseconds. The maximum boundary value of the membership function is the maximum response time between the excavator factory set handle input and the actuator output. Its critical value is b1, which is in milliseconds. The dynamic response membership function is shown as follows:

[0153]

[0154] In the formula: Y1' represents the membership function of dynamic response; K1 represents the logical value for judging whether the index reaches the minimum requirement; a1 represents the maximum response time critical value; b1 represents the minimum response time critical value; x1 represents the response time;

[0155] The steady-state speed membership function refers to the calculation of the steady-state speed, which is the stable speed of the actuator during the process of moving from the initial position to the terminal position. Its value is x2, and its critical a2 and b2 values ​​depend on the factory requirements; the steady-state speed membership function is shown as follows:

[0156]

[0157] Where: Y2' represents the steady-state speed membership function; a2 represents the upper limit of the speed in the acceptance interval; b2 represents the lower limit of the speed in the acceptance interval; x2 represents the steady-state speed;

[0158] The expression of the shock membership function Y3' is consistent with the expression of the shock sub-indicator Y3;

[0159] Y3'=Y3

[0160] Where: Y3' represents the shock membership function;

[0161] The precise controllability membership function expression Y4' is consistent with the precise controllability sub-index expression Y4;

[0162] Y4'=Y4

[0163] Where: Y4' represents the precise controllable membership function;

[0164] The slewing drift membership function refers to the slewing drift, which is the slip angle of the excavator slewing platform due to inertia and other reasons when the slewing pilot handle signal stops. The slewing drift membership function is shown in the following formula:

[0165]

[0166] Where: Y5' represents the rotation drift membership function; x5 represents the rotation drift in actual operation; a5 represents the rotation drift allowed in actual operation;

[0167] The relative speed membership function expression Y6' is consistent with the relative speed expression Y6.

[0168] Y6'=Y6

[0169] Where: Y6' represents the relative speed membership function;

[0170] S4: Determine the synthetic relationship of the overall evaluation indicators;

[0171] The synthetic relationship of the total analysis index is determined based on the results of S2 and S3. The corresponding mathematical expression is as follows:

[0172]

[0173] Where: Y represents the total analysis index of the excavator; Y1', Y2'...Y6' represent the membership functions of the 1st, 2nd...6th analysis sub-indexes respectively; K1, K2...K6 represent the logical values ​​of the minimum requirements of the 1st, 2nd...6th sub-indexes respectively;

[0174] When the evaluation index reaches the lower limit of the set index, the logical value K1, K2...K6 of the discrimination sub-index takes the value of 0, otherwise it takes the value of 1.

[0175] S5: Conduct system analysis and decision making based on the information obtained during the analysis process;

[0176] According to the total analysis index Y obtained by S4, the total analysis score Y is set to 1 point. The specific score distribution is as follows: 0.8-1 points means that the excavator's motion coordination has reached the optimal state, which can greatly improve the excavator's maneuverability; 0.6-0.8 points means that the excavator has good motion coordination and is convenient and quick to use; 0.4-0.6 points means that the excavator's motion coordination is qualified and can meet the normal operation of the excavator; 0.2-0.4 points means that some indicators of the excavator's motion coordination are unqualified, and the motion coordination cannot meet the normal operation; 0-0.2 points means that the excavator's motion is completely uncoordinated, and there are serious defects in the sub-items of the coordination performance, and it is impossible to operate;

[0177] The coordination of excavator motion is analyzed by converting the test data into analysis scores of each indicator through a single indicator membership function, and the weight of each indicator is obtained by using the hierarchical analysis method. The calculated analysis indicator score and the weight are added to get the total score of the excavator motion coordination analysis. According to the obtained excavator motion coordination analysis score, the current system deficiencies are found, and according to its specific actual working conditions and test curves, the problems are theoretically analyzed, and measures are taken to adjust them, thereby improving the coordination of the excavator motion and the working efficiency.

[0178] The excavator motion coordination analysis method proposed in this invention is combined with MATLab / Simulink to calculate the coordination of the combined action of digging arm and digging bucket. Figure 8 The current motion score of the excavator is 0.5978, which means that the motion coordination performance of the excavator is qualified and can operate normally, but its motion coordination needs to be improved. Figure 4 The dynamic response curve of the boom and bucket is shown; Figure 5 The arm and bucket pressure impact curves shown; Figure 6 The precision control curve of the arm and bucket is shown. Figure 7 The relative speed curve of the boom and bucket shows that in the combined action of boom excavation and bucket excavation, the pressure shock and relative speed change greatly, and the precision control is poor. The phenomenon represented by the curve is consistent with the scores of many professional operators, and is basically consistent with the sub-indicator scores of Simulink shown in Table 3, which proves the feasibility of the excavator action coordination method provided by the present invention.

[0179] Table 3 Example Matlab / Simulink sub-index analysis values ​​and total analysis values

[0180]

[0181]

[0182] In summary, the prediction results of this case prove that the excavator motion coordination analysis method of the present invention has a good effect.

[0183] (1) The embodiment of the present invention uses the hierarchical analysis method to analyze and calculate the analysis indicators, construct a judgment matrix, and mathematically convert the experience of experts or operators into the thinking process of weight coefficients, thereby avoiding the introduction of fuzzy information too early, making the calculation result of the weight coefficient more objective and accurate;

[0184] (2) The present invention constructs a membership function of the analysis index, eliminates the influence of the dimensional unit of the analysis index, obtains a more specific value under a certain index, and performs analysis, so that the obtained analysis result is more accurate and scientific;

[0185] (3) The calculation and analysis results given by Simulink simulation in the embodiment of the present invention prove that the method can qualitatively analyze the coordination of the excavator's movements, improve the fault tolerance of the analysis and the consistency of the analysis results, and thus improve the coordination of the excavator's movements as well as its operating efficiency, comfort and safety.

[0186] The embodiments described above are only descriptions of the preferred implementation modes of the present invention, and are not intended to limit the scope of the present invention. Without departing from the design spirit of the present invention, various modifications and improvements made to the technical solutions of the present invention by ordinary technicians in this field should all fall within the protection scope determined by the claims of the present invention.

Claims

1. A method for analyzing the coordination of excavator movements, characterized in that: It includes the following steps: Step 1: Determine the sub-indicators of excavator motion coordination analysis based on experimental data; According to the experimental data of the excavator, the total analysis index Y of the excavator and the six excavator motion coordination analysis sub-indexes, namely, dynamic response time Y1, actuator speed Y2, actuator pressure impact Y3, precision control Y4, rotation drift Y5 and relative speed change Y6, are determined; Step 2: Determine the weight of each analysis sub-indicator; According to the six excavator motion coordination analysis sub-indicators determined in step 1, determine the weight of each sub-indicator. The specific steps are as follows: Step 21: Assign weights to each analysis sub-indicator to ensure that the sum of the weights of all sub-indicators is 1; Step 22: Determine the importance of all sub-indicators and construct a composite action condition judgment matrix A; Step 23: Perform consistency check on the judgment matrix; The consistency test needs to compare the importance of each pair of indicators by calculating the consistency ratio. If the consistency ratio CR is less than 0.1, the consistency of the judgment matrix is ​​considered acceptable. Otherwise, the judgment matrix needs to be modified. The method for obtaining it is as follows: Where: CI represents the consistency index; λ max Represents the maximum eigenvalue of the judgment matrix A; n represents the total number of analyzed sub-indicators; In the formula: CR represents the consistency ratio; RI represents the average random consistency index; Step 24: Use the geometric mean method to obtain the eigenvector corresponding to the maximum eigenvalue of the judgment matrix; The method for obtaining the eigenvector corresponding to the maximum eigenvalue of the judgment matrix is ​​as follows: Where: V Yi A represents the eigenvector of the maximum eigenvalue obtained by the geometric mean algorithm of the i-th sub-index; ij It represents the element of the judgment matrix of the i-th row sub-indicator and the j-th column sub-indicator; i and j represent the horizontal and vertical sub-indicator numbers in the judgment matrix respectively; Step 25: Normalize the feature vector to obtain the weight of each sub-indicator; The characteristic vector is normalized to obtain the weight of each sub-indicator, and the method for obtaining it is shown in the following formula: Where: W Yi represents the weight of the i-th analysis sub-indicator; V Yi The eigenvector representing the maximum eigenvalue obtained by the geometric mean algorithm of the i-th sub-indicator; Step 3: Determine the membership function under the weight of each analysis sub-indicator; The membership function is the weight W of a certain sub-indicator. Yi Under, the percentage of each sub-index is as follows: the membership function under the weight of each sub-index is dynamic response membership function Y1', steady-state speed membership function Y2', impact membership function Y3', precise controllability membership function Y4', rotation drift membership function Y5' and relative speed membership function Y6'; Step 4: Determine the synthetic relationship of the overall evaluation indicators; According to the results of step 2 and step 3, the synthetic relationship of the total analysis index is determined, and the corresponding mathematical expression is as follows: Where: Y represents the total analysis index of the excavator; Y1', Y2'...Y6' represent the membership functions of the 1st, 2nd...6th analysis sub-indexes respectively; K1, K2...K6 represent the logical values ​​of the minimum requirements of the 1st, 2nd...6th sub-indexes respectively; When the analysis sub-index reaches the lower limit of the set index, the logic value K1, K2…K6 of the judgment sub-index takes the value of 0, otherwise it takes the value of 1; Step 5: Conduct system analysis and decision making based on the information obtained during the analysis process; According to the total analysis index Y obtained in step 4, the intervals are divided to find the current system deficiencies, conduct excavator motion coordination analysis and decision-making, and take measures to adjust them, thereby improving the excavator motion coordination and operating efficiency.

2. The method for analyzing the coordination of excavator movements according to claim 1, characterized in that: The experimental data in step 1 include input signal data, hydraulic cylinder displacement data, hydraulic cylinder movement speed data and hydraulic cylinder pressure data of the boom actuator, dipper arm actuator, bucket actuator and rotary actuator during movement, wherein the experimental data of the rotary actuator also includes rotation angle data, rotation angular velocity data and actuator pressure data.

3. The method for analyzing the coordination of excavator movements according to claim 1, characterized in that: The specific implementation of the 6 sub-indicators in step 1 is as follows: The sub-indicator dynamic response time Y1 is the response characteristic between the input signal and the displacement / angle output of the actuator. The dynamic response time is shown in the following formula: Y1=t1-t2 Where: Y1 represents the dynamic response time; t1 represents the actuator displacement / angle start time; t2 represents the input signal start time; The sub-index actuator speed Y2 is the ratio of the specified stroke of each action to the specified motion time defined by the machine at the factory. The actuator speed sub-index is as follows: Where: Y2 represents the actuator speed; d represents the actuator specified stroke; t3 represents the specified movement time; The sub-indicator actuator pressure shock amount Y3 is the pressure shock at the actuator startup stage, and the pressure shock amount is as follows: Where: Y3 represents the pressure impact of the actuator; p max It indicates the pressure under the maximum overshoot in the startup phase of the actuator; p indicates the pressure in the steady state after the startup phase; The sub-index precision controllability Y4 is the linear relationship between the speed / angular velocity of the actuator and the handle input signal. It is mainly the quantitative linear relationship between the speed change and the handle signal change when the actuator speed needs to be finely adjusted in a small range during handle micro-operation. The precision controllability is shown in the following formula: Where: Y4 represents precision control; ΔV max It indicates the maximum difference between the theoretical curve and the actual curve under the same input signal; V0 indicates the speed between the theoretical curve and the actual curve under the minimum input signal; V n Indicates the speed of the theoretical curve and the actual curve under the maximum input signal; The sub-index rotation drift amount Y5 is the slip angle of the excavator's rotary platform due to inertia when the rotation pilot handle signal stops; The sub-index relative speed change Y6 is the speed change of other actions when joining or exiting the action in the compound motion, that is, the ratio of the speed change Δv of other actions at this stage to the speed v of other actions before joining or exiting. The speed change is shown in the following formula: Where: Y6 represents the relative speed change; Δv represents the speed change of other actions at this stage when a certain actuator action is added or exited; v represents the speed of other actions before addition or exit.

4. The method for analyzing the coordination of excavator movements according to claim 1, characterized in that: In step 21, the weights of the various analysis sub-indicators are allocated to ensure that the sum of the indicators is 1; the specific process is as follows: Let the weight of dynamic responsiveness index be W Y1 , the weight of the actuator speed index is W Y2 , the weight of the pressure shock index is W Y3 , the weight of the precision control index is W Y4 , the weight of the rotation drift index is W Y5 , the weight of the relative speed change index is W Y6 ; Where: W Y Represents the sum of sub-indicators, set to 1; W Yi Indicates the weight of the i-th sub-indicator.

5. The method for analyzing the coordination of excavator movements according to claim 1, characterized in that: In step 22, the importance of all sub-indicators is determined to construct a composite action condition judgment matrix. The specific process is as follows: All sub-indicators are compared in terms of importance. The scales for comparison of importance are: 1 for equal importance; 3 for slightly important; 5 for obviously important; 7 for extremely important. In the following judgment matrix A, A ij It is expressed as the importance of index i relative to index j; both i and j are integers between ∈1 and 6; that is, A 1j , A 2j , A 3j , A 4j , A 5j , A 6j They are the importance of dynamic response index relative to other indexes, the importance of actuator speed index relative to other indexes, the importance of pressure shock index relative to other indexes, the importance of precision control index relative to other indexes, the importance of rotation drift index relative to other indexes, and the importance of relative speed change index relative to other indexes; A i1 , A i2 , A i3 , A i4 , A i5 , A i6 They are the importance of other indicators relative to dynamic response indicators, the importance of other indicators relative to actuator speed indicators, the importance of other indicators relative to pressure shock indicators, the importance of other indicators relative to precision control indicators, the importance of other indicators relative to rotation drift indicators, and the importance of other indicators relative to relative speed change indicators; The judgment matrix A is completed according to the scale division of the comparison of the importance of each pair. The judgment matrix A is a positive reciprocal matrix that satisfies A. ij ×A ji =1, the judgment matrix A is as follows: Where: A represents the judgment matrix; A 12 , A 13 …A 65 They represent the 30 elements of the judgment matrix respectively; When i=j, the two identical sub-indicators in the corresponding judgment matrix are equally important and are recorded as 1. Taking the above matrix as an example, assuming A 13 =5, it means that the dynamic response index is more important than the pressure shock index. ij ×A ji =1, A 31 =1 / 5.

6. The method for analyzing the coordination of excavator movements according to claim 1, characterized in that: The specific selection rule of the average random consistency index RI in step 23 is as follows: Where: n represents the number of analysis sub-indicators.

7. The method for analyzing the coordination of excavator movements according to claim 1, characterized in that: The membership function values ​​in step 3 are all between 0 and 1, and the specific implementation method is as follows: The dynamic response membership function means that the dynamic responsiveness is the difference between the start time of the actuator movement and the start time of the pilot handle input signal. This difference is represented by x. The minimum boundary value of the membership function is defined as the operator reaction time plus the dead zone travel time. Its critical value is a1, and the unit is milliseconds. The maximum boundary value of the membership function is the maximum response time between the handle input and the actuator output set by the excavator factory. Its critical value is b1, and the unit is milliseconds. The dynamic response membership function is shown as follows: In the formula: Y1' represents the membership function of dynamic response; K1 represents the logical value for judging whether the index reaches the minimum requirement; a1 represents the maximum response time critical value; b1 represents the minimum response time critical value; x1 represents the response time; The steady-state speed membership function refers to the calculation of the steady-state speed, which is the stable speed of the actuator during the process of moving from the initial position to the terminal position. Its value is x2, and its critical a2 and b2 values ​​depend on the factory requirements; the steady-state speed membership function is shown in the following formula: Where: Y2' represents the steady-state speed membership function; a2 represents the upper limit of the speed in the acceptance interval; b2 represents the lower limit of the speed in the acceptance interval; x2 represents the steady-state speed; The calculation formula Y3' of the impact membership function is consistent with the expression Y3 of the impact sub-index in claim 3, as shown in the following formula: Y′3=Y3 Where: Y3' represents the shock membership function; The calculation formula Y4' of the precision controllability membership function is consistent with the precision controllability sub-index expression Y4 in claim 3, as shown in the following formula: Y′4=Y4 Where: Y4' represents the precise controllable membership function; The swing drift membership function refers to the swing drift, that is, the sliding angle of the excavator swing platform due to inertia when the swing pilot handle signal stops. The swing drift membership function is shown in the following formula: Where: Y5' represents the rotation drift membership function; x5 represents the rotation drift in actual operation; a5 represents the rotation drift allowed in actual operation; The calculation formula Y6' of the relative speed membership function is consistent with the relative speed expression Y6 in claim 3, as shown below: Y′6=Y6 Where: Y6' represents the relative speed membership function.