User equipment reporting for maximum allowable exposure mitigation

By reporting power headroom and sustainable duty cycle information to the base station, the base station dynamically adjusts the UE scheduling, solving the problem of UE's uplink performance degradation under MPE limitations, improving the stability of link connections and the utilization of network resources efficiency.

CN114616876BActive Publication Date: 2024-11-05QUALCOMM INC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202080076235.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Priority Date
2020-11-04
Filing Date
2020-11-05
Publication Date
2024-11-05
Estimated Expiration
2040-11-05

AI Technical Summary

Technical Problem

In wireless communication systems, when the user equipment (UE) meets the maximum allowable exposure (MPE) limit, it may cause uplink performance degradation due to power backoff, and it is difficult for the base station to dynamically adjust the scheduling to help the UE maintain connection.

Method used

The UE reports the current power level and sustainable duty cycle information on the mobile integration window to the base station. The base station dynamically adjusts the UE's scheduling according to the report to ensure that the UE maintains uplink connection while meeting the MPE limit.

Benefits of technology

By dynamically adjusting the transmission frequency and bandwidth of the UE, the uplink performance is improved, connection discarded due to power backoff is avoided, and the use of network resources is optimized.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114616876B_ABST
    Figure CN114616876B_ABST
Patent Text Reader

Abstract

Various aspects of the present disclosure generally relate to wireless communications. In certain aspects, a user equipment (UE) may send and a base station may receive a report including information related to a power headroom available to the UE at a current power level and information related to a duty cycle that the UE can maintain within a mobile integration window based at least in part on a maximum allowed exposure limit. In certain aspects, a base station may send and a UE may receive scheduling information based at least in part on information related to a power headroom available to the UE at a current power level and information related to a duty cycle that the UE can maintain over a mobile integration window. Many other aspects are provided.
Need to check novelty before this filing date? Find Prior Art

Description

[0001] CROSS-REFERENCE TO RELATED APPLICATIONS

[0002] This patent application claims priority to U.S. Provisional Patent Application No. 62 / 933,089, filed on November 8, 2019, entitled “USER EQUIPMENT REPORTING FOR MAXIMUM PERMISSIBLE EXPOSURE MITIGATION,” and U.S. Non-Provisional Patent Application No. 16 / 949,574, filed on November 4, 2020, entitled “USER EQUIPMENT REPORTING FOR MAXIMUM PERMISSIBLE EXPOSURE MITIGATION,” which are hereby expressly incorporated herein by reference. Technical Field

[0003] Aspects of the present disclosure relate generally to wireless communications and techniques and apparatuses for user equipment reporting for maximum allowed exposure mitigation. Background Art

[0004] Wireless communication systems are widely deployed to provide a variety of telecommunication services, such as telephony, video, data, messaging, and broadcasting. Typical wireless communication systems may employ multiple access technologies that can support communication with multiple users by sharing available system resources (e.g., bandwidth, transmit power, etc.). Examples of such multiple access systems include code division multiple access (CDMA) systems, time division multiple access (TDMA) systems, frequency division multiple access (FDMA) systems, orthogonal frequency division multiple access (OFDMA) systems, single carrier frequency division multiple access (SC-FDMA) systems, and time division synchronous code division multiple access (TD-SCDMA) systems, as well as long term evolution (LTE). LTE / LTE-Advanced is a collection of enhancements to the Universal Mobile Telecommunications System (UMTS) mobile standard promulgated by the Third Generation Partnership Project (3GPP).

[0005] A wireless network may include multiple base stations (BSs) that can support communications for multiple user equipment (UEs). User equipment (UEs) may communicate with a base station (BS) via a downlink and an uplink. A downlink (or forward link) refers to a communication link from a BS to a UE, and an uplink (or reverse link) refers to a communication link from a UE to a BS. As will be described in more detail herein, a BS may be referred to as a Node B, gNB, access point (AP), radio head, transmit receive point (TRP), new radio (NR) BS, 5G Node B, and the like.

[0006] The above-mentioned multiple access technologies have been used in various telecommunication standards to provide a common protocol that enables different user devices to communicate at a city, country, region, or even global level. New Radio (NR) (also referred to as 5G) is a collection of enhancements to the LTE mobile standard promulgated by the Third Generation Partnership Project (3GPP). NR is designed to better support mobile broadband Internet access by improving spectrum efficiency, reducing costs, improving services, utilizing new spectrum, and using orthogonal frequency division multiplexing (OFDM) (CP-OFDM) with a cyclic prefix (CP) on the downlink (DL), using CP-OFDM and / or SC-FDM (e.g., also known as discrete Fourier transform spread OFDM (DFT-s-OFDM)) on the uplink (UL), and supporting beamforming, multiple input multiple output (MIMO) antenna technology, and carrier aggregation. Further improvements to LTE, NR, and other radio access technologies and telecommunication standards that employ these technologies are still useful as the demand for mobile broadband access continues to increase. Summary of the invention

[0007] In certain aspects, a method of wireless communication performed by a user equipment (UE) may include: sending a report to a base station including information related to a power headroom at a current power level and information related to a sustainable duty cycle over a moving integration window based at least in part on a maximum permitted exposure (MPE) limit; and receiving scheduling information from the base station based at least in part on the information related to the power headroom at the current power level and the information related to the sustainable duty cycle over the moving integration window.

[0008] In certain aspects, a method of wireless communication performed by a base station may include: receiving a report from a UE including information related to a power headroom at the UE and information related to a sustainable duty cycle for the UE over a mobile integration window based at least in part on an MPE limit; and sending scheduling information to the UE based at least in part on the information related to the power headroom at the UE and the information related to the sustainable duty cycle for the UE over the mobile integration window.

[0009] In certain aspects, a UE for wireless communication may include a memory and one or more processors operably coupled to the memory. The memory and the one or more processors may be configured to: send a report including information related to a power headroom at a current power level and information related to a sustainable duty cycle over a mobile integration window based at least in part on an MPE limit to a base station; and receive scheduling information from the base station based at least in part on the information related to the power headroom at the current power level and the information related to the sustainable duty cycle over the mobile integration window.

[0010] In certain aspects, a base station for wireless communication may include a memory and one or more processors operably coupled to the memory. The memory and the one or more processors may be configured to: receive from a UE a report including information related to a power headroom at the UE and information related to a sustainable duty cycle for the UE over a mobile integration window based at least in part on an MPE limit; and send to the UE scheduling information based at least in part on the information related to the power headroom at the UE and the information related to the sustainable duty cycle for the UE over the mobile integration window.

[0011] In certain aspects, a non-transitory computer-readable medium may store one or more instructions for wireless communication. When executed by one or more processors of a UE, the one or more instructions may cause the one or more processors to: send a report including information related to a power headroom at a current power level and information related to a sustainable duty cycle over a mobile integration window based at least in part on an MPE limit to a base station; and receive scheduling information from the base station based at least in part on the information related to the power headroom at the current power level and the information related to the sustainable duty cycle over the mobile integration window.

[0012] In certain aspects, a non-transitory computer-readable medium may store one or more instructions for wireless communication. The one or more instructions, when executed by one or more processors of a base station, may cause the one or more processors to: receive from a UE a report including information related to a power headroom at the UE and information related to a sustainable duty cycle for the UE over a mobile integration window based at least in part on an MPE limit; and send to the UE scheduling information based at least in part on the information related to the power headroom at the UE and information related to a sustainable duty cycle for the UE over the mobile integration window.

[0013] In certain aspects, an apparatus for wireless communication may include: a component for sending a report to a base station including information related to a power headroom at a current power level and information related to a sustainable duty cycle over a mobile integration window based at least in part on an MPE limit; and a component for receiving scheduling information from the base station based at least in part on the information related to the power headroom at the current power level and the information related to the sustainable duty cycle over the mobile integration window.

[0014] In certain aspects, an apparatus for wireless communication may include: a component for receiving a report from a UE including information related to a power headroom at the UE and information related to a sustainable duty cycle for the UE over a mobile integration window based at least in part on an MPE limit; and a component for sending scheduling information to the UE based at least in part on the information related to the power headroom at the UE and the information related to the sustainable duty cycle for the UE over the mobile integration window.

[0015] As fully described herein with reference to and as illustrated in the accompanying drawings and description, aspects generally include methods, apparatus, systems, computer program products, non-transitory computer-readable media, user equipment, base stations, wireless communication devices, and / or processing systems.

[0016] The foregoing has been fairly extensively summarized according to the features and technical advantages of the examples of the present disclosure so that the following detailed description can be better understood. Additional features and advantages will be described below. The disclosed concepts and specific examples can be easily used as the basis for modifying or designing other structures for achieving the same purpose of the present disclosure. Such equivalent constructions do not depart from the scope of the appended claims. When the following description is considered in conjunction with the attached drawings, the characteristics of the concepts disclosed herein, their organization and methods of operation, and the associated advantages will be better understood. Each of the accompanying drawings is provided for the purpose of illustration and description, rather than as a definition of the limitations of the claims. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order that the above-mentioned features of the present disclosure may be understood in detail, a more specific description briefly summarized above may be made with reference to various aspects, some of which are shown in the attached drawings. However, it should be noted that the attached drawings only show certain typical aspects of the present disclosure and therefore should not be considered to limit the scope of the present disclosure, as the specification may allow other equivalent aspects. The same reference numerals in different drawings may identify the same or similar elements.

[0018] Figure 1 is a diagram illustrating an example of a wireless network in accordance with various aspects of the present disclosure.

[0019] Figure 2 is a diagram illustrating an example of a base station communicating with a UE in a wireless network according to various aspects of the present disclosure.

[0020] Figure 3 is a diagram illustrating an example of a UE adjusting transmit power over a mobile integration window to meet a maximum permitted exposure (MPE) limit in accordance with various aspects of the present disclosure.

[0021] Figure 4is a diagram illustrating an example of UE reporting for MPE mitigation in accordance with various aspects of the present disclosure.

[0022] Figure 5 is a diagram illustrating example processes performed, for example, by a UE according to various aspects of the present disclosure.

[0023] Figure 6 is a diagram illustrating example processes performed, for example, by a base station according to various aspects of the present disclosure. DETAILED DESCRIPTION

[0024] The various aspects of the present disclosure will be described more fully below with reference to the accompanying drawings. However, the present disclosure can be embodied in many different forms and should not be interpreted as being limited to any specific structure or function presented throughout the present disclosure. Specifically, these aspects are provided so that the present disclosure will be detailed and complete, and the scope of the present disclosure will be fully conveyed to those skilled in the art. Based on the teachings of this article, it should be understood by those skilled in the art that the scope of the present disclosure is intended to cover any aspect of the disclosure disclosed herein, regardless of whether these aspects are implemented independently of any other aspect of the present disclosure or in combination with any other aspect of the present disclosure. For example, any number of aspects set forth herein may be used to implement a device or practice method. In addition, the scope of the disclosure is intended to cover devices or methods practiced using other structures, functionality, or structures and functionality as an addition to the various aspects of the disclosure set forth herein or in addition to the various aspects of the disclosure set forth herein. It should be understood that any aspect of the present disclosure may be embodied by one or more elements in the claims.

[0025] Several aspects of telecommunication systems will now be presented with reference to various devices and techniques. These devices and techniques will be described in the following detailed description and illustrated in the accompanying drawings by various blocks, modules, components, circuits, steps, processes, algorithms, etc. (collectively referred to as "elements"). These elements may be implemented using hardware, software, or a combination thereof. Whether such elements are implemented as hardware or software depends on the specific application and the design constraints imposed on the overall system.

[0026] It should be noted that while various aspects may be described using terminology typically associated with 5G or NR radio access technologies (RATs), aspects of the present disclosure may be applied to other RATs, such as 3G RATs, 4G RATs, and / or RATs beyond 5G (e.g., 6G).

[0027] Figure 11 is a diagram illustrating an example of a wireless network 100 according to various aspects of the present disclosure. The wireless network 100 may be or may include elements of a 5G (NR) network, an LTE network, etc. The wireless network 100 may include a plurality of base stations 110 (shown as BS110a, BS110b, BS110c, and BS110d) and other network entities. A base station (BS) is an entity that communicates with a user equipment (UE) and may also be referred to as an NR BS, a Node B, a gNB, a 5G Node B (NB), an access point, a transmit receive point (TRP), etc. Each BS may provide communication coverage for a specific geographic area. In 3GPP, the term "cell" may refer to a coverage area of ​​a BS and / or a BS subsystem serving this coverage area, depending on the context in which the term "cell" is used.

[0028] A BS may provide communication coverage for a macro cell, a pico cell, a femto cell, and / or another type of cell. A macro cell may cover a relatively large geographic area (e.g., a radius of several kilometers) and may allow unrestricted access to UEs with service subscriptions. A pico cell may cover a relatively small geographic area and may allow unrestricted access to UEs with service subscriptions. A femto cell may cover a relatively small geographic area (e.g., a home) and may allow limited access to UEs associated with the femto cell (e.g., UEs in a closed subscriber group (CSG)). A BS for a macro cell may be referred to as a macro BS. A BS for a pico cell may be referred to as a pico BS. A BS for a femto cell may be referred to as a femto BS or a home BS. In Figure 1 In the example shown, BS 110a may be a macro BS for macro cell 102a, BS 110b may be a pico BS for pico cell 102b, and BS 110c may be a femto BS for femto cell 102c. A BS may support one or more (e.g., three) cells. The terms "eNB", "base station", "NR BS", "gNB", "TRP", "AP", "Node B", "5G NB", and "cell" may be used interchangeably herein.

[0029] In some aspects, the cell may not necessarily be fixed, and the geographical area of ​​the cell may move according to the location of the mobile BS. In some aspects, the BSs may be interconnected with each other and / or with one or more other BSs or network nodes (not shown) in the wireless network 100 through various types of backhaul interfaces such as direct physical connections, virtual networks, etc. using any suitable transport network.

[0030] The wireless network 100 may also include a relay station. A relay station is an entity that can receive transmissions of data from an upstream station (e.g., a BS or a UE) and send transmissions of data to a downstream station (e.g., a UE or a BS). A relay station may also be a UE that can relay transmissions for other UEs. Figure 1 In the example shown, a relay BS 110d may communicate with a macro BS 110a and a UE 120d to facilitate communication between the BS 110a and the UE 120d. A relay BS may also be referred to as a relay station, a relay base station, a relay, or the like.

[0031] The wireless network 100 may be a heterogeneous network including different types of BSs (e.g., macro BSs, pico BSs, femto BSs, relay BSs, etc.). These different types of BSs may have different transmit power levels, different coverage areas, and different effects on interference in the wireless network 100. For example, a macro BS may have a high transmit power level (e.g., 5 to 40 watts), while a pico BS, a femto BS, and a relay BS may have a lower transmit power level (e.g., 0.1 to 2 watts).

[0032] The network controller 130 may be coupled to a set of BSs and may provide coordination and control for these BSs. The network controller 130 may communicate with the BSs via a backhaul. The BSs may also communicate with each other (eg, directly or indirectly) via a wireless or wired backhaul.

[0033] UEs 120 (e.g., 120a, 120b, 120c) may be dispersed throughout the wireless network 100, and each UE may be fixed or mobile. UEs may also be referred to as access terminals, terminals, mobile stations, subscriber units, stations, etc. UEs may be cellular phones (e.g., smart phones), personal digital assistants (PDAs), wireless modems, wireless communication devices, handheld devices, laptop computers, cordless phones, wireless local loop (WLL) stations, tablet computers, cameras, gaming devices, netbooks, smartbooks, ultrabooks, medical devices or equipment, biometric sensors / devices, wearable devices (smart watches, smart clothing, smart glasses, smart wristbands, smart jewelry (e.g., smart rings, smart bracelets)), entertainment devices (e.g., music or video devices, or satellite radios), vehicle-mounted components or sensors, smart meters / sensors, industrial manufacturing equipment, global positioning system devices, or any other suitable device configured to communicate via wireless or wired media.

[0034] Some UEs may be considered as machine type communication (MTC) UEs, or evolved or enhanced machine type communication (eMTC) UEs. MTC UEs and eMTC UEs include, for example, robots, drones, remote devices, sensors, meters, monitors, location tags, etc. that can communicate with a base station, another device (e.g., a remote device), or some other entity. A wireless node may provide connectivity, for example, for or to a network (e.g., a wide area network such as the Internet or a cellular network) via a wired or wireless communication link. Some UEs may be considered as Internet of Things (IoT) devices, and / or may be implemented as NB-IoT (narrowband Internet of Things) devices. Some UEs may be considered as customer premises equipment (Customer Premises Equipment, CPE). UE120 may be included in a housing that houses components of UE 120 (such as a processor component, a memory component, etc.). In some aspects, a processor component and a memory component may be coupled together. For example, a processor component (e.g., one or more processors) and a memory component (e.g., a memory) may be operably coupled, communicatively coupled, electronically coupled, electrically coupled, etc.

[0035] Generally speaking, any number of wireless networks can be deployed in a given geographic area. Each wireless network can support a specific radio access technology (RAT) and can operate on one or more frequencies. RAT can also be referred to as radio technology, air interface, etc. Frequency can also be referred to as carrier, frequency channel, etc. Each frequency can support a single RAT in a given geographic area to avoid interference between wireless networks of different RATs. In some cases, NR or 5G RAT networks can be deployed.

[0036] In certain aspects, two or more UEs 120 (e.g., shown as UE 120a and UE 120e) may communicate directly (e.g., without using base station 110 as an intermediary for communicating with each other) using one or more sidelink channels. For example, UE 120 may communicate using peer-to-peer (P2P) communication, device-to-device (D2D) communication, vehicle-to-everything (V2X) protocol (e.g., which may include vehicle-to-vehicle (V2V) protocol, vehicle-to-infrastructure (V2I) protocol, etc.), mesh network, etc. In this case, UE 120 may perform scheduling operations, resource selection operations, and / or other operations described elsewhere herein as being performed by base station 110.

[0037] The devices of the wireless network 100 can communicate using an electromagnetic spectrum, which can be subdivided into various categories, bands, channels, etc. based on frequency or wavelength. For example, the devices of the wireless network 100 can communicate using an operating band having a first frequency range (FR1) that can span from 410 MHz to 7.125 GHz, and / or can communicate using an operating band having a second frequency range (FR2) that can span from 24.25 GHz to 52.6 GHz. The frequencies between FR1 and FR2 are sometimes referred to as mid-band frequencies. Although portions of FR1 are greater than 6 GHz, FR1 is often referred to as a "below 6 GHz" band. Similarly, FR2 is often referred to as a "millimeter wave" band, although it is different from an extremely high frequency (EHF) band (30 GHz–300 GHz) identified as a "millimeter wave" band by the International Telecommunication Union (ITU). Therefore, unless otherwise specifically stated, it should be understood that, if used herein, the term "below 6 GHz" or the like can broadly represent frequencies less than 6 GHz, frequencies within FR1, and / or mid-band frequencies (e.g., greater than 7.125 GHz). Similarly, unless otherwise specifically stated, it should be understood that if used herein, the term "millimeter wave" or the like can broadly refer to frequencies within the EHF band, frequencies within FR2, and / or mid-band frequencies (e.g., less than 24.25 GHz). It is contemplated that the frequencies included in FR1 and FR2 may be modified, and the techniques described herein are applicable to those modified frequency ranges.

[0038] As mentioned above, Figure 1 is provided as an example. Other examples may differ from Figure 1 Examples described.

[0039] Figure 2 is a diagram illustrating an example 200 of a base station 110 and a UE 120 communicating in a wireless network in accordance with various aspects of the present disclosure. The base station 110 may be equipped with T antennas 234a through 234t, and the UE 120 may be equipped with R antennas 254a through 254r, where in general T≥1 and R≥1.

[0040] At the base station 110, the transmit processor 220 may receive data for one or more UEs from the data source 212, select one or more modulation and coding schemes (MCS) for each UE based at least in part on a channel quality indicator (CQI) received from the UE, process (e.g., encode and modulate) the data for each UE based at least in part on the (one or more) MCS selected for each UE, and provide data symbols for all UEs. The transmit processor 220 may also process system information (e.g., for semi-static resource partitioning information (SRPI) and the like) and control information (e.g., CQI requests, grants, upper layer signaling, etc.) and provide overhead symbols and control symbols. The transmit processor 220 may also generate reference symbols for reference signals (e.g., cell-specific reference signals (CRS), demodulation reference signals (DMRS), etc.) and synchronization signals (e.g., primary synchronization signals (PSS) and secondary synchronization signals (SSS)). A transmit (TX) multiple-input multiple-output (MIMO) processor 230 may perform spatial processing (e.g., precoding) on ​​data symbols, control symbols, overhead symbols, and / or reference symbols, where applicable, and may provide T output symbol streams to T modulators (MOD) 232a to 232t. Each modulator 232 may process a corresponding output symbol stream (e.g., for OFDM, etc.) to obtain an output sample stream. Each modulator 232 may further process the output sample stream (e.g., convert to analog, amplify, filter, and upconvert) to obtain a downlink signal. T downlink signals from modulators 232a to 232t may be transmitted via T antennas 234a to 234t, respectively.

[0041] At UE 120, antennas 252a to 252r may receive downlink signals from base station 110 and / or other base stations, and may provide received signals to demodulators (DEMOD) 254a to 254r, respectively. Each demodulator 254 may condition (e.g., filter, amplify, downconvert, and digitize) the received signal to obtain input samples. Each demodulator 254 may further process the input samples (e.g., for OFDM, etc.) to obtain received symbols. A MIMO detector 256 may obtain received symbols from all R demodulators 254a to 254r, perform MIMO detection on the received symbols where applicable, and provide detected symbols. A receive processor 258 may process (e.g., demodulate and decode) the detected symbols, provide decoded data for UE 120 to a data sink 260, and provide decoded control information and system information to a controller / processor 280. The term "controller / processor" may refer to one or more controllers, one or more processors, or a combination thereof. The channel processor may determine reference signal received power (RSRP), received signal strength indicator (RSSI), reference signal received quality (RSRQ), channel quality indicator (CQI), etc. In some aspects, one or more components of the UE 120 may be included in the housing 284.

[0042] The network controller 130 may include a communication unit 294, a controller / processor 290, and a memory 292. The network controller 130 may include, for example, one or more devices in a core network. The network controller 130 may communicate with the base station 110 via the communication unit 294.

[0043] On the uplink, at the UE 120, a transmit processor 264 may receive and process data from a data source 262 and control information from a controller / processor 280 (e.g., for reports including RSRP, RSSI, RSRQ, CQI, etc.). The transmit processor 264 may also generate reference symbols for one or more reference signals. The symbols from the transmit processor 264 may be precoded by a TX MIMO processor 266, where applicable, further processed by demodulators 254a through 254r (e.g., for DFT-s-OFDM, CP-OFDM, etc.), and transmitted to the base station 110. In certain aspects, the UE 120 includes a transceiver. The transceiver may include any combination of antenna(s) 252, modulators and / or demodulators 254, a MIMO detector 256, a receive processor 258, a transmit processor 264, and / or a TX MIMO processor 266. The transceiver may be used by a processor (eg, controller / processor 280) and memory 282 to perform aspects of any of the methods described herein.

[0044] At the base station 110, uplink signals from the UE 120 and other UEs may be received by the antenna 234, processed by the demodulator 232, detected by the MIMO detector 236 where applicable, and further processed by the receive processor 238 to obtain decoded data and control information sent by the UE 120. The receive processor 238 may provide the decoded data to the data sink 239 and provide the decoded control information to the controller / processor 240. The base station 110 may include a communication unit 244 and communicate with the network controller 130 via the communication unit 244. The base station 110 may include a scheduler 246 to schedule the UE 120 for downlink and / or uplink communication. In certain aspects, the base station 110 includes a transceiver. The transceiver may include any combination of (one or more) antennas 234, modulators and / or demodulators 232, MIMO detectors 236, receive processors 238, transmit processors 220, and / or TX MIMO processors 230. The transceiver may be used by a processor (eg, controller / processor 240) and memory 242 to perform aspects of any of the methods described herein.

[0045] As described in greater detail elsewhere herein, the controller / processor 240 of the base station 110, the controller / processor 280 of the UE 120, and / or Figure 2 Any other component(s) of the base station 110 may perform one or more techniques associated with maximum permissible exposure (MPE) mitigation. For example, the controller / processor 240 of the base station 110, the controller / processor 280 of the UE 120, and / or Figure 2 Any other component(s) may perform or direct e.g. Figure 5 The process of 500 Figure 6 600 and / or other processes described herein. Memories 242 and 282 may store data and program codes for base station 110 and UE 120, respectively. In some aspects, memory 242 and / or memory 282 may include a non-transitory computer-readable medium storing one or more instructions for wireless communication. For example, one or more instructions, when executed by one or more processors of base station 110 and / or UE 120 (e.g., directly, or after compilation, conversion, interpretation, etc.), may cause one or more processors, UE 120, and / or base station 110 to perform or direct, for example, Figure 5 The process of 500 Figure 6 The process 600 of , and / or the operations of other processes described herein. In some aspects, executing instructions may include running instructions, converting instructions, compiling instructions, interpreting instructions, etc.

[0046] In certain aspects, UE 120 may include: means for sending a report based at least in part on the maximum allowed exposure limit to base station 110, including information related to the power headroom at the current power level and information related to the sustainable duty cycle over the mobile integration window; and means for receiving scheduling information based at least in part on the information related to the power headroom at the current power level and information related to the sustainable duty cycle over the mobile integration window from base station 110, etc. In certain aspects, such means may include combining Figure 2 One or more components of UE 120 are depicted, such as controller / processor 280, transmit processor 264, TX MIMO processor 266, MOD 254, antenna 252, DEMOD 254, MIMO detector 256, receive processor 258, etc.

[0047] In certain aspects, base station 110 may include: means for receiving a report from UE 120 that includes information related to a power headroom at UE 120 and information related to a sustainable duty cycle for UE 120 over a mobile integration window based at least in part on a maximum allowed exposure limit; and means for sending scheduling information to UE 120 that is based at least in part on the information related to the power headroom at UE 120 and information related to a sustainable duty cycle for UE 120 over a mobile integration window, etc. In certain aspects, such means may include combining Figure 2 One or more components of base station 110 are depicted, such as antenna 234, DEMOD 232, MIMO detector 236, receive processor 238, controller / processor 240, transmit processor 220, TX MIMO processor 230, MOD 232, antenna 234, and the like.

[0048] As mentioned above, Figure 2 is provided as an example. Other examples may differ from Figure 2 Examples described.

[0049] Figure 3 is a diagram illustrating an example 300 of a UE adjusting transmit power over a mobile integration window to meet a maximum permitted exposure (MPE) limit in accordance with various aspects of the present disclosure.

[0050] Because the UE may emit radio frequency (RF) waves, microwaves, and / or other radiation, the UE is typically subject to regulatory RF safety requirements that set forth specific guidelines or MPE limits that constrain various operations that the UE may perform. For example, RF emissions typically increase when the UE is transmitting, and may further increase if the UE is performing frequent transmissions, high-power transmissions, etc. Accordingly, since frequent and / or high-power transmissions may result in significant RF emissions, regulatory agencies (e.g., the U.S. Federal Communications Commission (FCC)) may provide information related to acceptable RF radiation exposure when the UE communicates using different radio access technologies.

[0051] For example, when a UE communicates using a radio access technology operating in a frequency range below 6 GHz, the applicable RF exposure parameter is the specific absorption rate (SAR), which refers to the rate at which energy is absorbed by a human body when exposed to RF energy (e.g., power absorbed per unit mass, which may be expressed in terms of watts per kilogram (W / kg)). In particular, SAR requirements typically specify that the overall radiated power of the UE be kept below a certain level to limit the heating that may occur when RF energy is absorbed. In another example, when a UE communicates using a radio access technology operating in a high frequency range, such as a millimeter wave (mmW) frequency range, the applicable RF exposure parameter is power density, which may be regulated to limit heating of the UE and / or nearby surfaces.

[0052] Accordingly, the UE must generally meet an MPE limit, which is typically a regulatory requirement defined in terms of total exposure over a certain amount of time, and the total exposure may be averaged over a moving integration window (or moving time window). Figure 3 In the example and as indicated by reference numeral 310, if the UE transmits substantially continuously over a mobile integration window of N seconds (e.g., 100 seconds), the UE may be subject to an average power limit (P ) corresponding to an average power that satisfies the MPE limit. 限制 ). Accordingly, as shown in reference numeral 320, if the average power over the mobile integration window is lower than the average power limit that satisfies the MPE limit, the UE may use an instantaneous transmit power that exceeds the average power limit for a period of time. For example, the UE may transmit at the maximum transmit power at the beginning of the mobile integration window and then reduce the instantaneous transmit power until the end of the mobile integration window to ensure that the MPE limit for the total exposure is met over the entire mobile integration window. In general, as shown in reference numeral 330, the UE may reduce the instantaneous transmit power to the reserved power level (P 保留 ), which is the minimum transmit power level to maintain a link with the base station.

[0053] However, in some cases, the UE may operate in a wireless network using time division duplex (TDD), which is often centered around the downlink. Accordingly, because the UE is unlikely to be scheduled to perform continuous transmission, reducing the instantaneous transmit power based on a worst-case scenario may potentially result in uplink performance degradation. For example, if the UE must take a larger-than-necessary power backoff based on the (possibly incorrect) assumption that the UE will continuously transmit over a mobile integration window, then a large amount of power backoff may degrade the performance for uplink transmissions and cause the uplink connection to be dropped. In addition, since the base station communicating with the UE may not know how much remaining energy budget is available to the UE within the mobile integration window, the base station cannot take appropriate actions to adjust the scheduling to help the UE maintain the uplink connection.

[0054] Certain aspects described herein relate to techniques and apparatus for providing a report to a base station that includes information about the power headroom available to a UE at a current power level and information about a duty cycle that the UE can maintain over a mobile integration window and / or a remaining energy budget that the UE has over a mobile integration window. Accordingly, the base station can use the information contained in the report to dynamically adjust scheduling of the UE to help the UE maintain an uplink connection, meet MPE constraints, and the like. For example, in certain aspects, if the report indicates that the UE has a low energy budget, the base station can schedule the UE to reduce the transmission frequency, modify the uplink grant to reduce the uplink transmission power (e.g., by scheduling a narrower uplink bandwidth or a lower modulation order), and the like. In another example, if the report indicates that the UE has a low energy budget, the base station can schedule the UE to increase the transmission frequency, modify the uplink grant to increase the uplink transmission power (e.g., by scheduling a wider uplink bandwidth or a higher modulation order), and the like to improve performance. In this way, by providing the base station with UE reports indicating the uplink energy budget available to the UE, the base station can schedule the UE more efficiently, which improves performance, saves network resources that might otherwise be wasted on reestablishing connections that were dropped due to the UE reducing uplink transmit power more than necessary, etc.

[0055] Figure 4 4 is a diagram illustrating an example 400 of UE reporting for MPE mitigation according to various aspects of the present disclosure. Figure 4 As shown, example 400 includes a UE communicating with a base station. As described herein, in some cases, the UE may be a "simple" UE with a preconfigured maximum transmit power and duty cycle to always meet the MPE limit. For example, the preconfigured maximum transmit power of a simple UE may be set to P 限制, which is the average power that satisfies the MPE limit, and a simple UE may be configured with an assumption about how often transmissions occur (e.g., a 25% duty cycle). Alternatively, in some cases, the UE may be a "smart" UE that may dynamically adjust transmit power and / or duty cycle to satisfy the MPE limit within the mobile integration window. For example, as described in further detail above, a smart UE may transmit at a power exceeding P within a portion of the mobile integration window. 限制 The high power is transmitted, and then the transmission power, duty cycle, etc. are reduced to ensure that the average power over the entire integration window is lower than P 限制 .

[0056] like Figure 4 In and as shown by reference numeral 410, the UE may send and the base station may receive a power headroom report indicating a duty cycle that the UE may maintain over a mobile integration window and / or a remaining energy budget available to the UE over the mobile integration window. In certain aspects, the UE may periodically send a power headroom report to the base station, or the UE may send a power headroom report to the base station based at least in part on a determination that one or more conditions are satisfied. For example, in certain aspects, the power headroom report may be sent when a value and / or change in the power headroom available at the UE satisfies a threshold, when a value and / or change in one or more power reductions effective at the UE satisfies a threshold, when a value and / or change in the sustainable duty cycle satisfies a threshold, when a value and / or change in the remaining energy budget satisfies a threshold, based on a request from the base station, and the like.

[0057] In certain aspects, the UE may track how much energy has been radiated during the mobile integration window and dynamically adjust transmit power (e.g., by using a lower transmit power for each transmission), transmit duty cycle (e.g., by reducing transmit frequency), etc. to ensure that the transmission limits are met based on the remaining energy budget until the end of the integration window. For example, the UE may be configured to reduce transmit power to meet regulatory requirements by applying a power management maximum power reduction (P-MPR), and the P-MPR may have any suitable value to allow the UE to back off transmit power to a level that can ensure compliance with applicable regulatory requirements. Accordingly, the UE may generally have the ability to determine: a power headroom at a current power level based at least in part on a currently available power budget, a P-MPR currently in effect at the UE to meet the MPE limits, a duty cycle that the UE can maintain over the remainder of the mobile integration window while meeting the MPE limits, an energy budget available for the remainder of the mobile integration window, and the like.

[0058] Accordingly, in certain aspects, a power headroom report sent to a base station may generally indicate how much additional power the UE has available for allocation to future transmissions. For example, if the maximum transmit power for a UE is 23 dBm and the UE transmits at 10 dBm, the report may indicate that the UE has a power headroom of 13 dB. In this way, the base station may determine whether the scheduling can be changed to increase the transmit power at the UE. In addition, in certain aspects, the report may indicate one or more power reductions in effect at the UE. For example, the power reduction may include a maximum power reduction (MPR), an additional MPR (A-MPR) added to the MPR to provide additional spectrum emission control due to regulatory, deployment or other constraints, a P-MPR in effect to meet the MPE limit, and the like. In this way, if the report indicates that the P-MPR in effect at the UE is greater than zero, the base station may know that the UE is applying power backoff for the purpose of meeting the MPE limit. In such cases, the power headroom indicated in the report may be zero, because if the UE is already applying power reduction to meet the MPE limit, the UE will have no additional power available for allocation to future transmissions. In addition, in certain aspects, the power headroom report may also include information related to: the duty cycle that the UE can maintain at the current transmit power level over the remainder of the mobile integration window and still meet the MPE limits, the amount of energy budget the UE has available for the remainder of the mobile integration window, and the like.

[0059] In certain aspects, where the power headroom report includes information related to the duty cycle that the UE can maintain over the remainder of the mobile integration window, the power headroom can be relative to the maximum configured power (P cmax ) and the P-MPR that the UE will apply for the reported duty cycle. For example, the maximum configured power may generally be defined as the maximum output power (P 功率等级 ) (e.g., +23 dBm for tier 3 devices) and the sum of all power reductions in effect at the UE (e.g., the sum of MPR, A-MPR, and / or P-MPR). In certain aspects, the UE may calculate the maximum configured power as if the P-MPR value configured for the UE had been applied even in the absence of an applied P-MPR value (e.g., when the power headroom is greater than zero).

[0060] Accordingly, in the power headroom report sent to the base station, the reported power headroom may correspond to the difference between the actual transmit power of the UE operating and the maximum configured power P cmaxFurthermore, the sustainable duty cycle indicated by the UE in the report may be determined based on the current transmit power level associated with the reported power headroom, or the sustainable duty cycle indicated in the report may be based on the assumption that the current transmit power is increased to a level that exhausts the power headroom (e.g., a power level at which the power headroom is reduced to zero, which may be the maximum power that the UE can use to transmit for a given beam).

[0061] In certain aspects, when the UE is a smart UE that can dynamically adjust the transmit power and / or duty cycle to meet the MPE limit within the mobile integration window, the smart UE can report a power headroom value, a sustainable duty cycle value, a remaining energy budget, etc. according to the current status in the mobile integration window. In addition, when the current transmit power level at the smart UE is reduced to P 保留 (which is the minimum transmit power level to maintain a link with the base station), the UE may be applying the maximum P-MPR available to the UE (e.g., because the transmit power level has been reduced to the minimum transmit power level required to maintain a link with the base station). In such cases, the UE may report the maximum P-MPR value applied at the UE and further report updated information related to the duty cycle that the UE may maintain over the remainder of the mobile integration window, the energy budget available to the UE over the remainder of the mobile integration window, etc. In certain aspects, the P-MPR 保留 The value of P may be a static parameter with a fixed value, which may be specific to the UE (e.g., based on the antenna configuration and / or other design parameters associated with the UE). Additionally or alternatively, the UE may dynamically modify P based on an internal algorithm. 保留 The value and P 保留 Alternatively, when the UE is a simple UE with a preconfigured maximum transmit power and duty cycle to always meet the MPE limit, the simple UE may report the P-MPR (if any) in effect at the simple UE and the duty cycle that the simple UE is capable of maintaining, although the simple UE may have a fixed duty cycle that does not change adaptively.

[0062] In certain aspects, when reporting a sustainable duty cycle, the duty cycle may be quantized as a bit sequence including multiple bits indicating one of a plurality of duty cycle values ​​in a range with greater granularity at the lower end of the range. For example, in certain aspects, a three-bit field may be used to indicate one of eight possible duty cycle values, which may include 100%, 50%, 30%, 25%, 20%, 15% and 10%, as well as additional values ​​reserved for future expansion. For example, a 100% duty cycle may generally mean that the UE has no problem meeting the MPE limit at the current transmit power level (e.g., the UE may maintain substantially continuous transmission at the current transmit power level over the remainder of the mobile integration window without exceeding the MPE limit). In contrast, a low duty cycle (e.g., 10%) may mean that the UE is at risk of exceeding the MPE limit unless the scheduling frequency of transmission is reduced. In other examples, a four-bit field may be used to indicate one of sixteen possible duty cycles to provide more granularity, etc., in the sustainable duty cycle indicated in the report. Typically, greater granularity may be provided at the lower end of the range because the UE is more likely to operate at a duty cycle at the lower end of the range (e.g., in a downlink-centric wireless network). Additionally, greater granularity may be provided at the lower end of the range because the UE is more likely to encounter problems maintaining a link with the base station at a lower duty cycle.

[0063] Similarly, when reporting the remaining energy budget, the remaining energy budget may be quantized as a bit sequence including a plurality of bits indicating one of a plurality of energy budget values ​​in a range with greater granularity at the lower end of the range, (e.g., from 0 to 1, where 0 indicates that the UE has no remaining energy budget and can only transmit with full P-MPR in effect, and where 1 indicates that the UE has a larger energy budget and has no problem meeting the MPE constraints). In certain aspects, the bit sequence may include a three-bit field to indicate one of eight possible energy budget values, which may include energy budgets of 1, 0.50, 0.30, 0.25, 0.20, 0.15, and 0.10, as well as additional values ​​reserved for future expansion. In other examples, additional bits may be used to provide more granularity in the range. Typically, as with the sustainable duty cycle, greater granularity may be provided at the lower end of the range because the UE is more likely to encounter problems maintaining a link with the base station when a large portion of the energy budget has been consumed.

[0064] In certain aspects, when reporting a sustainable duty cycle, the UE may report values ​​of the P-MPR and / or the sustainable duty cycle that depend on each other. For example, when the power headroom available at the UE is greater than zero, the value of the P-MPR may be zero, and the UE may have a sustainable duty cycle of 100%. Additionally or alternatively, when the power headroom available at the UE reaches zero, meaning that the UE cannot increase the uplink transmit power, the UE may have to apply a non-zero P-MPR to meet the MPE limit and reduce the duty cycle accordingly. For example, the MPE limit typically corresponds to a fixed energy budget, which is based on the average transmit power over time. Accordingly, if the UE increases the transmit power within a given time period, the UE may reduce the transmit duty cycle to meet the fixed energy budget limit over the given time period. Similarly, if the UE reduces the transmit power within a given time period, the UE may increase the transmit duty cycle without exceeding the fixed energy budget.

[0065] like Figure 4 In and as further shown by reference numeral 420, the base station may send, and the UE may receive, scheduling information that adjusts scheduled transmissions for the UE, adjusts uplink transmit power for the UE, etc., based at least in part on the power headroom report. For example, in some aspects, when the power headroom report indicates that the UE can only maintain a low duty cycle, the UE is running out of energy budget, etc., the base station may reduce the frequency of scheduling uplink transmissions for the UE, modify the uplink grant to reduce the uplink transmit power for the UE (e.g., by scheduling a narrower uplink bandwidth and / or a lower modulation order), etc. In other cases, when the power headroom report indicates that the UE can maintain a high duty cycle and / or has a large energy budget available for the remainder of the mobile integration window, the base station may increase the frequency of scheduling uplink transmissions for the UE, modify the uplink grant to increase the uplink transmit power for the UE (e.g., by scheduling a wider uplink bandwidth and / or a higher modulation order), etc. In some aspects, the base station may generally gradually adjust scheduling information for the UE to avoid causing problems that may result in non-compliance with MPE limits. For example, a sudden increase in transmit power and / or duty cycle for a UE may result in a sudden decrease in the remaining energy budget available to the UE. Accordingly, the scheduling information may be gradually adjusted to ensure that if the adjusted scheduling information causes the UE to exhaust the energy budget or be at risk of exceeding the MPE limit, further power headroom reports are triggered. In this way, if the adjusted scheduling information triggers another power headroom report where the UE is reporting a lower power headroom, a higher P-MPR value, a reduction in the duty cycle that the UE can sustain over the mobile integration window, a reduction in the energy budget available to the UE, etc., the base station may take action to mitigate the risk of the UE exceeding the MPE limit.

[0066] In certain aspects, to determine scheduling information based on the power headroom report, the base station may monitor the power headroom report from the UE over time to observe how the power headroom, P-MPR value, sustainable duty cycle value, energy budget value, etc. change over time. For example, when the power headroom report indicates that the sustainable duty cycle decreases, the base station may adjust the scheduling for the UE, which reduces the duty cycle for the UE to the sustainable duty cycle (or less). For example, the base station may schedule fewer uplink transmissions for the UE to reduce the duty cycle for the UE.

[0067] Additionally or alternatively, in certain aspects, the base station may determine scheduling information for a UE based on whether the UE is a simple UE with a fixed maximum transmit power and a fixed duty cycle or a smart UE with the ability to adjust transmit power and / or duty cycle. For example, in the case where the UE is a smart UE, the base station may increase or decrease the duty cycle for the UE to improve uplink performance for the UE. Conversely, in the case where the UE is a simple UE with a hard power limit, the base station may reduce the frequency of scheduling the simple UE, but even in such cases, the simple UE will not be able to increase the transmit power for each transmission above the hard power limit. Accordingly, if the base station can determine that the UE is a smart UE, the base station may reduce the duty cycle to a level where the smart UE still has sufficient power to maintain a link with the base station at each transmission.

[0068] In certain aspects, the base station may therefore determine whether the UE providing the power headroom report is a simple UE or a smart UE, and determine scheduling information for the UE accordingly. For example, the base station may implicitly distinguish between a simple UE and a smart UE because a simple UE may always report a duty cycle below 100% even if the UE has a power headroom greater than zero, while a smart UE may report a duty cycle of 100% when the UE has a power headroom greater than zero. Accordingly, in one technique, the base station may implicitly determine that the UE is a simple UE if the report indicates that the power headroom is greater than zero and the duty cycle is less than 100%, the power headroom is greater than zero and the energy budget is zero, etc. In another technique, the power headroom report may include an explicit indicator as to whether the UE is a simple UE with a fixed maximum transmit power and duty cycle or a smart UE with an adjustable transmit power and / or duty cycle, and the base station may make scheduling decisions for the UE based on the explicit indicator.

[0069] As mentioned above, Figure 4 is provided as an example. Other examples may differ from Figure 4 Examples described.

[0070] Figure 55 is a diagram illustrating an example process 500, performed, for example, by a UE, in accordance with various aspects of the present disclosure. Example process 500 is an example in which a UE (eg, UE 120, etc.) performs operations associated with MPE mitigation.

[0071] like Figure 5 As shown, in certain aspects, process 500 may include sending a report to a base station including information related to a power headroom at a current power level and information related to a sustainable duty cycle over a mobile integration window based at least in part on an MPE limit (block 510). For example, as described above, a UE may send to a base station (e.g., using controller / processor 280, transmit processor 264, TX MIMO processor 266, MOD 254, antenna 252, etc.) a report to a base station including information related to a power headroom at a current power level and information related to a sustainable duty cycle over a mobile integration window based at least in part on an MPE limit.

[0072] like Figure 5 As further shown, in certain aspects, process 500 may include receiving, from a base station, scheduling information based at least in part on information related to a power headroom at a current power level and information related to a sustainable duty cycle over a mobile integration window (block 520). For example, as described above, a UE may receive (e.g., using antenna 252, DEMOD 254, MIMO detector 256, receive processor 258, controller / processor 280, etc.) scheduling information based at least in part on information related to a power headroom at a current power level and information related to a sustainable duty cycle over a mobile integration window from a base station.

[0073] Process 500 may include additional aspects, such as any single aspect or any combination of aspects described below and / or described in conjunction with one or more other processes described elsewhere herein.

[0074] In a first aspect, the report further comprises information related to one or more power reductions in effect at the UE.

[0075] In a second aspect, either alone or in combination with the first aspect, process 500 further comprises determining a maximum configured power based at least in part on a maximum output power associated with the UE and one or more power reductions effective at the UE, and the power headroom at a current power level is based at least in part on a difference between the current power level and the maximum configured power.

[0076] In a third aspect, alone or in combination with one or more of the first and second aspects, the sustainable duty cycle may be based at least in part on one or more of a current power level or a maximum power level that the UE can transmit that exhausts a power headroom at the current power level.

[0077] In a fourth aspect, alone or in combination with one or more of the first to third aspects, the power headroom at the current power level and the sustainable duty cycle over the mobile integration window are at least partially based on one or more of the maximum power limit or the maximum transmit duty cycle adjusted to meet the MPE limit within the mobile integration window.

[0078] In a fifth aspect, alone or in combination with one or more of the first to fourth aspects, one or more of a maximum power limit or a maximum transmit duty cycle is adjusted based at least in part on a reserved power level defining a minimum power level to maintain a link with a base station.

[0079] In a sixth aspect, either alone or in combination with one or more of the first to fifth aspects, the power headroom at the current power level and the sustainable duty cycle over the mobile integration window are at least partially based on a fixed maximum power limit and a fixed maximum transmit duty cycle configured for the UE to meet MPE limitations.

[0080] In a seventh aspect, either alone or in combination with one or more of the first to sixth aspects, information related to a sustainable duty cycle comprises a bit sequence comprising a plurality of bits indicating one of a plurality of duty cycle values ​​in a range having greater granularity at a lower end of the range.

[0081] In an eighth aspect, alone or in combination with one or more of the first to seventh aspects, the report further comprises information related to a remaining energy budget within a mobile integration window based at least in part on the MPE limit.

[0082] In a ninth aspect, alone or in combination with one or more of the first to eighth aspects, a report is sent based at least in part on a change in one or more of a power headroom, a sustainable duty cycle, or a remaining energy budget satisfying a threshold.

[0083] In a tenth aspect, either alone or in combination with one or more of the first to ninth aspects, the information related to the remaining energy budget comprises a bit sequence comprising a plurality of bits indicating one of a plurality of energy budget values ​​in a range having greater granularity at a lower end of the range.

[0084] In an eleventh aspect, alone or in combination with one or more of the first to tenth aspects, the scheduling information includes one or more of an adjusted number of scheduled transmissions or an adjusted transmit power for the UE in a mobile integration window.

[0085] In a twelfth aspect, alone or in combination with one or more of the first to eleventh aspects, the MPE limit is based at least in part on one or more of a SAR for transmissions via the first radio access technology or a power density for transmissions via the second radio access technology.

[0086] Although Figure 5 Example blocks of process 500 are shown, but in some aspects, Figure 5 Process 500 may include additional blocks, fewer blocks, different blocks, or differently arranged blocks than those depicted in . Additionally or alternatively, two or more of the blocks of process 500 may be performed in parallel.

[0087] Figure 6 is a diagram illustrating an example process 600, performed, for example, by a base station, in accordance with various aspects of the present disclosure. Example process 600 is an example in which a base station (eg, base station 110, etc.) performs operations associated with MPE mitigation based on UE reports.

[0088] like Figure 6 As shown, in certain aspects, process 600 may include receiving from a UE a report including information related to a power headroom at the UE and information related to a sustainable duty cycle for the UE over a mobile integration window based at least in part on an MPE limit (block 610). For example, as described above, a base station may receive from a UE (e.g., using antenna 234, DEMOD 232, MIMO detector 236, receive processor 238, controller / processor 240, etc.) a report including information related to a power headroom at the UE and information related to a sustainable duty cycle for the UE over a mobile integration window based at least in part on an MPE limit.

[0089] like Figure 6 As further shown in FIG. 6 , in certain aspects, process 600 may include sending scheduling information to the UE based at least in part on information related to a power headroom at the UE and information related to a sustainable duty cycle for the UE over a mobile integration window (block 620). For example, as described above, the base station may send (e.g., using controller / processor 240, transmit processor 220, TX MIMO processor 230, MOD 232, antenna 234, etc.) scheduling information to the UE based at least in part on information related to a power headroom at the UE and information related to a sustainable duty cycle for the UE over a mobile integration window.

[0090] Process 600 may include additional aspects, such as any single aspect or any combination of aspects described below and / or in conjunction with one or more other processes described elsewhere herein.

[0091] In a first aspect, the report further comprises information related to one or more power reductions in effect at the UE.

[0092] In a second aspect, alone or in combination with the first aspect, the power headroom at the UE is based at least in part on a difference between a current power level in effect at the UE and a maximum configured power for the UE, the maximum configured power being based at least in part on a maximum output power associated with the UE and one or more power reductions in effect at the UE.

[0093] In a third aspect, alone or in combination with one or more of the first and second aspects, the sustainable duty cycle may be based at least in part on one or more of a current power level in effect at the UE or a maximum power level the UE is capable of transmitting that depletes power headroom at the UE.

[0094] In a fourth aspect, alone or in combination with one or more of the first to third aspects, a power headroom at the UE and a sustainable duty cycle over a mobile integration window are at least partially based on one or more of a maximum power limit or a maximum transmit duty cycle adjusted by the UE to satisfy an MPE limit within the mobile integration window.

[0095] In a fifth aspect, either alone or in combination with one or more of the first to fourth aspects, one or more of the maximum power limit or the maximum transmit duty cycle is adjusted by the UE at least in part based on a reserved power level defining a minimum power level for maintaining a link between the UE and a base station.

[0096] In a sixth aspect, alone or in combination with one or more of the first to fifth aspects, a power headroom at the UE and a sustainable duty cycle over a mobile integration window are at least partially based on a fixed maximum power limit and a fixed maximum transmit duty cycle configured for the UE to satisfy an MPE limit.

[0097] In a seventh aspect, either alone or in combination with one or more of the first to sixth aspects, information related to a sustainable duty cycle comprises a bit sequence comprising a plurality of bits indicating one of a plurality of duty cycle values ​​in a range having greater granularity at a lower end of the range.

[0098] In an eighth aspect, alone or in combination with one or more of the first to seventh aspects, the report further comprises information related to a remaining energy budget available at the UE within a mobile integration window based at least in part on the MPE limit.

[0099] In a ninth aspect, alone or in combination with one or more of the first to eighth aspects, a report is received based at least in part on a change in one or more of a power headroom, a sustainable duty cycle, or a remaining energy budget satisfying a threshold.

[0100] In a tenth aspect, either alone or in combination with one or more of the first to ninth aspects, the information related to the remaining energy budget comprises a bit sequence comprising a plurality of bits indicating one of a plurality of energy budget values ​​in a range having greater granularity at a lower end of the range.

[0101] In an eleventh aspect, alone or in combination with one or more of the first to tenth aspects, the scheduling information includes one or more of an adjusted number of scheduled transmissions or an adjusted transmit power for the UE in a mobile integration window.

[0102] In a twelfth aspect, alone or in combination with one or more of the first to eleventh aspects, the MPE limit is based at least in part on one or more of a SAR for transmissions via the first radio access technology or a power density for transmissions via the second radio access technology.

[0103] Although Figure 6 Example blocks of process 600 are shown, but in some aspects, Figure 6 Process 600 may include additional blocks, fewer blocks, different blocks, or differently arranged blocks than those depicted in . Additionally or alternatively, two or more of the blocks of process 600 may be performed in parallel.

[0104] The foregoing disclosure provides illustration and description, but is not intended to be exhaustive or to limit the aspects to the precise forms disclosed. Modifications and variations may be made in light of the above disclosure or may be acquired from practice of the aspects.

[0105] As used herein, the term "component" is intended to be broadly interpreted as hardware, firmware, and / or a combination of hardware and software. As used herein, a processor is implemented in hardware, firmware, and / or a combination of hardware and software.

[0106] As used herein, satisfying a threshold may refer to a value being greater than a threshold, greater than or equal to a threshold, less than a threshold, less than or equal to a threshold, equal to a threshold, not equal to a threshold, etc., depending on the context.

[0107] It will be apparent that the systems and / or methods described herein may be implemented in various forms of hardware, firmware, and / or combinations of hardware and software. The actual dedicated control hardware or software code used to implement these systems and / or methods is not a limitation of the aspects. Thus, the operation and behavior of the systems and / or methods are described herein without reference to specific software code—it should be understood that software and hardware may be designed to implement the systems and / or methods based, at least in part, on the description herein.

[0108] Even if a specific combination of features is stated in the claims and / or disclosed in the specification, these combinations are not intended to limit the disclosure of various aspects. In fact, many of these features can be combined in a manner that is not specifically stated in the claims and / or disclosed in the specification. Although each dependent claim listed below can directly rely on only one claim, the disclosure of various aspects includes that each dependent claim is combined with each other claim in the claim set. The phrase "at least one" referring to the list of items refers to any combination of those items, including a single member. As an example, "at least one of a, b or c" is intended to cover a, b, c, ab, ac, bc and abc, and any combination with multiple identical elements (e.g., aa, aaa, aab, aac, abb, acc, bb, bbb, bbc, cc and ccc or any other order of a, b and c).

[0109] The elements, actions or instructions used herein should not be interpreted as critical or necessary unless explicitly described as such. Likewise, as used herein, the articles "one" and "an" are intended to include one or more items, and can be used interchangeably with "one or more". In addition, as used herein, the article "the" is intended to include one or more items quoted in conjunction with the article "the", and can be used interchangeably with "one or more". In addition, as used herein, the terms "set" and "group" are intended to include one or more items (e.g., related items, unrelated items, combinations of related and unrelated items, etc.), and can be used interchangeably with "one or more". In the case of only one item being meant, the phrase "only one" or similar language is used. Likewise, as used herein, the terms "have", "have", "have" etc. are intended to be open terms. In addition, the phrase "based on" is intended to mean "based at least in part on", unless otherwise explicitly stated. Likewise, as used herein, the term "or" when used in a series is intended to be inclusive and may be used interchangeably with "and / or" unless expressly stated otherwise (e.g., if used in conjunction with "either" or "only one of...").

Claims

1. A method of wireless communication performed by a user equipment UE, comprising: sending a report based at least in part on a maximum allowed exposed MPE limit to a base station and including information related to a power headroom at a current power level and information related to a duty cycle sustainable for the UE over a mobility integration window and a remaining energy budget the UE has over the mobility integration window; as well as Scheduling information based at least in part on the information related to the power headroom at the current power level and the information related to a sustainable duty cycle and the remaining energy budget over the mobile integration window is received from the base station.

2. The method of claim 1, wherein the report further comprises information related to one or more power reductions in effect at the UE.

3. The method of claim 2, further comprising: A maximum configured power is determined based at least in part on a maximum output power associated with the UE and the one or more power reductions in effect at the UE, wherein the power headroom at the current power level is based at least in part on a difference between the current power level and the maximum configured power.

4. The method of claim 1, wherein the sustainable duty cycle is based at least in part on one or more of the current power level or a maximum power level that the UE can transmit that exhausts the power headroom at the current power level.

5. The method of claim 1 , wherein the power headroom at the current power level and the sustainable duty cycle over the mobile integration window are based at least in part on one or more of a maximum power limit or a maximum transmit duty cycle adjusted to meet the MPE limit within the mobile integration window.

6. The method of claim 5, wherein one or more of the maximum power limit or the maximum transmit duty cycle is adjusted based at least in part on a reserved power level defining a minimum power level to maintain a link with the base station.

7. The method of claim 1 , wherein the power headroom at the current power level and the sustainable duty cycle over the mobile integration window are based at least in part on a fixed maximum power limit and a fixed maximum transmit duty cycle configured for the UE to meet the MPE limit.

8. The method of claim 1, wherein the information related to the sustainable duty cycle comprises a bit sequence including a plurality of bits indicating one of a plurality of duty cycle values ​​in a range having greater granularity at a lower end of the range.

9. The method of claim 1, wherein the report is sent based at least in part on a change in one or more of the power headroom, the sustainable duty cycle, or the remaining energy budget satisfying a threshold.

10. The method of claim 1, wherein the information related to the remaining energy budget comprises a bit sequence including a plurality of bits indicating one of a plurality of energy budget values ​​in a range having greater granularity at a lower end of the range.

11. The method of claim 1, wherein the scheduling information comprises one or more of an adjusted number of scheduled transmissions or an adjusted transmit power for the UE in the mobile integration window.

12. The method of claim 1, wherein the MPE limit is based at least in part on one or more of a specific absorption rate for transmissions via a first radio access technology or a power density for transmissions via a second radio access technology.

13. A method of wireless communication performed by a base station, comprising: receiving, from a user equipment (UE), a report based at least in part on a maximum allowed exposed MPE limit, comprising information related to a power headroom at the UE and information related to a duty cycle sustainable for the UE over a mobility integration window and a remaining energy budget the UE has over the mobility integration window; as well as Scheduling information based at least in part on the information related to the power headroom at the UE and the information related to a sustainable duty cycle and the remaining energy budget for the UE over the mobile integration window is sent to the UE.

14. The method of claim 13, wherein the report further comprises information related to one or more power reductions in effect at the UE.

15. The method of claim 14, wherein the power headroom at the UE is based at least in part on a difference between a current power level in effect at the UE and a maximum configured power for the UE, the maximum configured power being based at least in part on a maximum output power associated with the UE and the one or more power reductions in effect at the UE.

16. The method of claim 13, wherein the sustainable duty cycle is based at least in part on one or more of a current power level in effect at the UE or a maximum power level that the UE is capable of transmitting that depletes the power headroom at the UE.

17. The method of claim 13, wherein the power headroom at the UE and the sustainable duty cycle over the mobile integration window are based at least in part on one or more of a maximum power limit or a maximum transmit duty cycle adjusted by the UE to meet the MPE limit within the mobile integration window.

18. The method of claim 17, wherein one or more of the maximum power limit or the maximum transmit duty cycle is adjusted by the UE based at least in part on a reserved power level defining a minimum power level to maintain a link between the UE and the base station.

19. The method of claim 13, wherein the power headroom at the UE and the sustainable duty cycle over the mobile integration window are based at least in part on a fixed maximum power limit and a fixed maximum transmit duty cycle configured for the UE to meet the MPE limit.

20. The method of claim 13, wherein the information related to the sustainable duty cycle comprises a bit sequence including a plurality of bits indicating one of a plurality of duty cycle values ​​in a range having greater granularity at a lower end of the range.

21. The method of claim 13, wherein the report is received based at least in part on a change in one or more of the power headroom, the sustainable duty cycle, or the remaining energy budget satisfying a threshold.

22. The method of claim 13, wherein the information related to the remaining energy budget comprises a bit sequence including a plurality of bits indicating one of a plurality of energy budget values ​​in a range having greater granularity at a lower end of the range.

23. The method of claim 13, wherein the scheduling information comprises one or more of an adjusted number of scheduled transmissions or an adjusted transmit power for UEs in the mobile integration window.

24. The method of claim 13, wherein the MPE limit is based at least in part on one or more of a specific absorption rate for transmissions via a first radio access technology or a power density for transmissions via a second radio access technology.

25. A user equipment UE for wireless communication, comprising: Memory; as well as one or more processors operably coupled to the memory, the memory and the one or more processors being configured to: sending a report based at least in part on a maximum allowed exposed MPE limit to a base station and including information related to a power headroom at a current power level and information related to a duty cycle sustainable for the UE over a mobility integration window and a remaining energy budget the UE has over the mobility integration window; as well as Scheduling information based at least in part on the information related to the power headroom at the current power level and the information related to a sustainable duty cycle and the remaining energy budget over the mobile integration window is received from the base station.

26. The UE of claim 25, wherein the MPE limit is based at least in part on one or more of a specific absorption rate for transmissions via a first radio access technology or a power density for transmissions via a second radio access technology.

27. A base station for wireless communication, comprising: Memory; as well as one or more processors operably coupled to the memory, the memory and the one or more processors being configured to: receiving, from a user equipment (UE), a report based at least in part on a maximum allowed exposed MPE limit, comprising information related to a power headroom at the UE and information related to a duty cycle sustainable for the UE over a mobility integration window and a remaining energy budget the UE has over the mobility integration window; as well as Scheduling information based at least in part on the information related to the power headroom at the UE and the information related to a sustainable duty cycle and the remaining energy budget for the UE over the mobile integration window is sent to the UE.

28. The base station of claim 27, wherein the MPE limit is based at least in part on one or more of a specific absorption rate for transmissions via a first radio access technology or a power density for transmissions via a second radio access technology.

29. A user equipment UE for wireless communication, comprising: means for sending to a base station a report based at least in part on a maximum allowed exposed MPE limit and including information related to a power headroom at a current power level and information related to a duty cycle sustainable for the UE over a mobility integration window and a remaining energy budget the UE has over the mobility integration window; as well as Means for receiving, from the base station, scheduling information based at least in part on the information related to the power headroom at the current power level and the information related to a sustainable duty cycle over the mobile integration window and the remaining energy budget.

30. A base station for wireless communication, comprising: means for receiving, from a user equipment (UE), a report based at least in part on a maximum allowed exposed (MPE) limit, comprising information related to a power headroom at the UE and information related to a duty cycle sustainable for the UE over a mobility integration window and a remaining energy budget the UE has over the mobility integration window; as well as Means for sending scheduling information to the UE based at least in part on the information related to the power headroom at the UE and the information related to a sustainable duty cycle and the remaining energy budget for the UE over the mobile integration window.

31. A non-transitory computer-readable storage medium having stored thereon instructions for wireless communication at a user equipment (UE), the instructions being executed by a processor to: sending a report based at least in part on the maximum allowed exposed MPE limit to a base station, including information related to a power headroom at a current power level and information related to a duty cycle sustainable for the UE over a mobility integration window and a remaining energy budget that the UE has over the mobility integration window; and Scheduling information based at least in part on the information related to the power headroom at the current power level and the information related to a sustainable duty cycle and the remaining energy budget over the mobile integration window is received from the base station.

32. A non-transitory computer-readable storage medium having stored thereon instructions for wireless communication at a base station, the instructions being executable by a processor to: receiving from a user equipment (UE) a report based at least in part on a maximum allowed exposed (MPE) limit, comprising information related to a power headroom at the UE and information related to a duty cycle sustainable for the UE over a mobility integration window and a remaining energy budget the UE has over the mobility integration window; and Scheduling information based at least in part on the information related to the power headroom at the UE and the information related to a sustainable duty cycle and the remaining energy budget for the UE over the mobile integration window is sent to the UE.